KR20040017514A - apparatus for easy examining waterproof of wall and grouting method for preventing leakage using the same - Google Patents

apparatus for easy examining waterproof of wall and grouting method for preventing leakage using the same Download PDF

Info

Publication number
KR20040017514A
KR20040017514A KR1020020049608A KR20020049608A KR20040017514A KR 20040017514 A KR20040017514 A KR 20040017514A KR 1020020049608 A KR1020020049608 A KR 1020020049608A KR 20020049608 A KR20020049608 A KR 20020049608A KR 20040017514 A KR20040017514 A KR 20040017514A
Authority
KR
South Korea
Prior art keywords
wall
underground structure
groove
waterproof
grouting
Prior art date
Application number
KR1020020049608A
Other languages
Korean (ko)
Other versions
KR100476840B1 (en
Inventor
최춘식
Original Assignee
최춘식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최춘식 filed Critical 최춘식
Priority to KR10-2002-0049608A priority Critical patent/KR100476840B1/en
Publication of KR20040017514A publication Critical patent/KR20040017514A/en
Application granted granted Critical
Publication of KR100476840B1 publication Critical patent/KR100476840B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0283Retaining or protecting walls characterised by constructional features of mixed type
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/08Investigation of foundation soil in situ after finishing the foundation structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Examining Or Testing Airtightness (AREA)
  • Building Environments (AREA)

Abstract

PURPOSE: A device for inspecting the simple waterproof of a wall and a method for grouting an index of water leakage are provided to inspect the completion of a waterproof work by inspecting the water leakage for walls of the underground structures and to prevent the leakage of water by press-injecting and filling waterproof grouting liquid through a perforated pipe mounted to inspect waterproof to a correspondent spot. CONSTITUTION: A device for inspecting the simple waterproof of a wall is composed of a groove(13) formed at a construction joint part or a mold joint part(12) of the wall of a underground structure(10) in a constant size to a underground structure wall connecting surface for grouting; a perforated pipe inserted into the groove; a fixing tool for fixing the perforated pipe; and a plug inserted into the perforated pipe.

Description

벽체 간이방수 검사장치 및 그를 이용한 누수지수 그라우팅 방법 {apparatus for easy examining waterproof of wall and grouting method for preventing leakage using the same}Simple waterproof inspection device for wall and leak index grouting method using same {apparatus for easy examining waterproof of wall and grouting method for preventing leakage using the same}

본 발명은 지하철등과 같은 지하 구조물의 지하 구조물 벽체에 시공이음부 또는 거푸집 이음부등과 같은 취약부에 시공되는 방수 공사시 방수 시트를 벽면에 부착하기 전에 지하 구조물의 지하 구조물 벽면에 형성된 시공 이음부 또는 거푸집 이음부에 지하 구조물의 길이 방향으로 일정한 크기의 기성제품으로 만든 소구경의 유공관을 삽입 또는 부착 설치한 후에 그 위에 방수 시트를 부착하고 보호몰탈을 바르고 양생과정을 거쳐 지하 구조물의 구축을 완료하고 난 후에 지하 구조물의 지하 구조물 벽체에 기히 매설된 유공관을 통하여 누수가 발생하거나 벽체에 누수가 발생하였을 경우에 방수검사용으로 기히 매설된 유공관을 통하여 그라우팅액을 압력 주입하여 해당 부위에 방수를 실시하는 벽체 간이방수검사 장치 및 그를 이용한 누수지수 그라우팅방법에 관한 것이다.The present invention is a construction joint formed on the wall of the underground structure of the underground structure before attaching the waterproof sheet to the wall during the waterproof construction to be constructed in weak parts such as construction joints or formwork joints in the underground structure walls of underground structures such as subway or After inserting or attaching small-diameter perforated tubes made of ready-made products of a certain size in the longitudinal direction of the underground structure in the formwork joints, attach the waterproof sheet on them, apply protective mortar, and finish the construction of the underground structure through curing process. After leaking through the perforated pipes which are buried in the wall of the underground structure of the underground structure or when the leaks occur in the wall, the grouting solution is pressure-injected through the perforated pipes for waterproof inspection. Wall simple waterproof test device and leak index using it It relates to a routing method.

이러한 방법은 지하 구조물이 완성된 후에는 지중에 지하 구조물이 매립되어 지하 구조물에서 취약부인 시공이음부 또는 거푸집이음부등에 완벽한 방수가 시공되지 않아 누수가 발생되었을 때 방수검사용으로 기히 매설한 유공관을 통하여 그라우팅을 실시하여 누수의 원인이된 부위를 방수그라우팅을 하여 충전시켜 누수를 차단하는 완벽한 방수를 하는데 그 목적이 있다. 이것은 지하 구조물의 취약부에대한 누수검사를 병행하면서 유공관을 통하여 누수여부를 확인한 후에 방수가 안된 부분에는 유공관을 통하여 재차 방수를 시공하는 것이다.In this method, after the underground structure is completed, the underground structure is buried in the ground, so the waterproof pipes are completely buried for waterproof inspection when leaks occur because perfect waterproofing is not applied to the construction joints or formwork joints which are weak parts of the underground structures. Through the grouting through the waterproof grouting of the area causing the leak is filled with the purpose of perfect waterproof to block the leak. This is to check the leakage through the perforated pipe while conducting the leak test on the weak part of the underground structure, and then waterproof again through the perforated pipe at the part that is not waterproof.

종래에는 지하 구조물을 시공하면서 벽체등에 면정리를 한 후에 프라이머를 도포하고 그 위에 방수시트를 부착한 후에 보호몰탈로 방수시트를 보호하는 방수공사를 실시하여 왔다. 그러나 이러한 방수방법에는 방수시트가 균일하게 벽체와 접착이 완벽하게 되지 않고 중간중간에 들뜨게 되는 점과 또한 지하 구조물의 시공이음부 또는 거푸집이음부등과 같은 시공상 반드시 설치되어야 하는 부분이 콘크리트의 재료분리 또는 거푸집에 의해 충분한 밀실 다짐이 이행되지 않아 벽체에 무수한 공극이 발생된 채로 시공되어 방수가 이뤄지게되면 추후에 이러한 시공상의 취약부분이 누수의 원인이되는 취약부로 발전이되는데 지중에 설치된 지하구조물인 관계로 이러한 누수부위를 용이하게 발견하기가 대단히 어려우며,설령 발견을 하더라도 누수부위에 재차 방수작업을 하기 위하여 주위의 모든 토사를 제거하여야하고 누수부위를 일정부분 제거한 다음에 그라우팅 또는 방수시트를 이용하여 재공사를 시행하여야 하는 번거로움과 재시공에 따른 제경비와 누수의 재발이 되는지를 끊임없이 관리를 하여야 하는 문제점이 있었다.Conventionally, after constructing the surface of the basement while cleaning the surface and the like after applying a primer and attaching the waterproof sheet on it has been carried out waterproof construction to protect the waterproof sheet with a protective mortar. However, in this waterproofing method, the waterproof sheet is not uniformly adhered to the wall, but is lifted in the middle, and also the parts that must be installed in construction such as construction joints or form joints of underground structures are materials of concrete. If sufficient compaction is not fulfilled due to separation or formwork, and the construction is made with numerous voids on the wall, and waterproof is achieved, these weak parts in the construction are developed into weak parts causing leakage. As a result, it is very difficult to find such leaks easily, and even if it is found, all soils around it should be removed to waterproof the leaks again. The hassle of having to reconstruct There was a problem of constantly managing whether recurring expenses and leaks caused by reconstruction.

본 발명은 이상과 같은 사항을 감안하여 창출된 것으로서, 지하 구조물의 지하 구조물 벽체에 누수의 여부를 점검하여 방수공사의 완벽여부를 점검하면서 누수가 발생되면 해당 부위에 방수검사용으로 기히 매설되어 있는 유공관을 통하여 방수 그라우팅액을 압입 주입하여 해당부위에 그라우팅액이 충전되어 누수를 방지할 수 있도록하는 벽체 간이방수검사장치 및 그를 이용한 누수지수 그라우팅 방법에 관한 것이다.The present invention was created in view of the above matters, and if the leak occurs while checking the completeness of the waterproofing work by checking the leakage of the underground structure wall of the underground structure, which is already buried for waterproof inspection in the corresponding area. The present invention relates to a simple wall waterproofing inspection device and a leak index grouting method using the same, by injecting a waterproof grouting solution through a pore tube and filling the grouting solution to prevent leakage.

도 1은 본 발명에 있어서 지하구조물의 지하 구조물 벽체에 벽체 간이방수 검사장치를 설치한 것을 보여주는 단면도.1 is a cross-sectional view showing the installation of a simple wall waterproofing inspection apparatus on the wall of the underground structure of the underground structure in the present invention.

도 2a는 도 1의 벽체 간이방수 검사장치의 유공관을 지하 구조물 벽체 및 지하 구조물 벽체 연결면에 설치한 것을 보여주는 단면도.Figure 2a is a cross-sectional view showing the installation of the perforated pipe of the wall simple waterproof inspection apparatus of Figure 1 on the underground structure wall and the underground structure wall connection surface.

도 2b는 도 1의 벽체 간이방수 검사장치의 유공관을 지하 구조물 벽체 및 지하 구조물 벽체 연결면에 설치한 다른 실시예를 보여주는 단면도Figure 2b is a cross-sectional view showing another embodiment in which the perforated pipe of the wall simple waterproof inspection apparatus of Figure 1 installed on the underground structure wall and the underground structure wall connection surface

도 3은 본 발명의 유공관을 보여주는 도면.3 is a view showing a hole pipe of the present invention.

도 4는 본 발명의 유공관을 고정시키는 유공관 고정구 단면도.Figure 4 is a cross-sectional view of the hole tube fixture for fixing the hole tube of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10...지하 구조물 11...지하 구조물 벽체10 ... underground structure 11 ... underground structure wall

12...시공 이음부 또는 거푸집 이음부12. Construction joints or formwork joints

13...홈 14...방수시트13 ... Home 14 ... Waterproof Sheet

15...기초콘크리트 16...유공관15 ... Foundation Concrete 16 ... Merit Hall

17...마개 18...유공관 고정구17.Spigot 18.Method

19...구멍 20...지하 구조물 벽체연결면19 ... hole 20 ... underground structure wall connection surface

21...관 22...주입관21 ... Building 22 ... Injection Building

본 발명은 지하철등과 같은 지하 구조물의 지하 구조물 벽체의 시공이음부 또는 거푸집 이음부(12)등에 지하 구조물(10)의 길이 방향으로 일정한 크기로 형성된 거푸집에 의하여 형성된 V자형태 또는 사다리꼴형태의 면목 홈(13)이 형성된 홈내에 유공관(16)을 삽입하거나 또는 이러한 이음부의 면에 유공관을 부착한 후에 방수 시트(14)를 부착하고 보호몰탈을 바르고 양생과정을 거쳐 지하 구조물의 구축을 완료한 후에 지하 구조물 벽체에 기히 매설된 유공관을 통하여 또는 벽체에 누수가 발생하였을 경우 기히 지하 구조물 벽체에 매설된 유공관(16)을 통하여 그라우팅액을 압력 주입하여 누수부위를 그라우팅액으로 충전하여 누수를 차단하여 방수를 실시하는 것을 특징으로 한다.The present invention is a V-shaped or trapezoidal face formed by formwork formed in a predetermined size in the longitudinal direction of the underground structure 10 in the construction joints or formwork joints 12 of the underground structure walls of underground structures such as subways, etc. After inserting the perforated tube 16 into the groove in which the groove 13 is formed or attaching the perforated tube to the surface of the joint part, after attaching the waterproof sheet 14, applying a protective mortar, and completing the construction of the underground structure after curing When leakage occurs through the perforated pipes that are buried in the wall of the underground structure or through the perforated pipes 16 that are buried in the wall of the underground structure, the grouting fluid is injected into the grouting solution by filling the leaked area with the grouting solution to prevent water leakage. It characterized in that to perform.

이하 첨부된 도면에 의하여 본 발명을 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 있어서 지하 구조물의 지하 구조물 벽체에 벽체 간이방수검사장치를 설치한 것을 보여주는 단면도로서 지하 구조물(10)의 설치를 위하여 지하 지반에 기초콘크리트(15)를 타설양생하고 그 위에 지하 구조물(10)을 구축하게되는데 이때 지하 구조물의 설치크기등을 감안하여 시공이음부(12)를 설치하거나 거푸집의 크기에 의하여 거푸집 이음부(12)를 두게 된다. 이러한 시공이음부 또는 거푸집이음부(12)와 같은 이음부가 타설된 콘크리트의 재료분리 현상으로 인하여 벽체가 수많은 공극으로 형성되거나 또는 거푸집에 의하여 밀실하게 콘크리트의 다짐이 시행되지 못하여 역시 공극이 형성되게 된다. 이러한 취약부에 누수가 발생되게 되는데 이와같은 취약부에 거푸집을 설치할 때 두게되는 면목에 의하여 형성되는 V자 형태 또는 사다리꼴 형태의 홈(13)을 이용하여 지하 구조물(10)의 길이 방향으로 유공관을 삽입설치하거나 또는 시공이음부의 면에 유공관을 부착설치하고 "ㄷ"자 형태의 유공관 고정구(18)로 지하 구조물 벽체에 유공관을 고정시킨다. 이때미리 매설하거나 부착된 유공관을 통하여 누수가 발생되면 유공관(16)을 통하여 그라우팅을 실시하기 위하여 지하 구조물 벽체 연결면(20)의 중간부분 까지 유공관(16)을 홈에 삽입한 후에 유공관을 마개(17)로 막아 놓거나 이음부에 유공관을 부착시키고 벽체의 표면에 프라이머를 도포한 후에 방수시트(14)를 접착시공하고 보호물탈을 타설양생하여 방수시트를 보호하면서 벽에 밀착되게 한다. 이렇게 지하 구조물(10)의 구축 공사가 완료된 후에 누수가 발생될 경우에는 유공관(16)을 통하여 일정한 압력으로 그라우팅액을 압력 주입하여 누수가 발생되는 부분을 그라우팅액으로 충전시켜 누수를 방지하는 것이다. 주로 지하 구조물의 벽체의 기초 콘크리트 위에 설치된 1단 벽체 또는 2단 벽체에 설치하거나 하단부의 벽체와 기초 콘크리트 위에 설치되는 헌치와의 경계부에 설치하게 되는데 이러한 부위에 누수가 많이 발생하게 되며 이러한 부위에 발생된 물이 모여서 누수가 진행되는 경우가 자주발생되기 때문이다. 유공관의 직경은 1 ~ 1.5㎝이며 바람직한 것은 1㎝이다. 또한, 면목에 의하여 형성된 V자형태 또는 사다리꼴형태의 홈의 깊이는 2㎝이며 그라우팅액을 유공관내에 주입할 때에 압력의 크기는 2 ~3 ㎏/㎠이다.1 is a cross-sectional view showing the installation of a simple wall waterproofing inspection device on the wall of the underground structure of the underground structure in the present invention for the installation of the underground structure 10 to pour the foundation concrete 15 in the underground ground and basement thereon The structure 10 is to be constructed in which the installation joint 12 is installed in consideration of the installation size of the underground structure or the formwork joint 12 is placed by the size of the formwork. Due to the material separation phenomenon of the concrete in which the joints, such as the construction joints or the mold joints 12, are poured, the walls are formed with numerous voids or the compacts are not firmly carried out by the molds, thereby forming voids. . Leakage is generated in such a weak part, by using a V-shaped or trapezoidal groove 13 formed by a face placed when installing the formwork in such a weak part to insert the perforated tube in the longitudinal direction of the underground structure (10). Or install a hole on the surface of the construction joints, and the hole in the "c" shaped hole tube 18 to fix the hole in the wall of the underground structure. At this time, when the leak occurs through the buried pipes or buried in advance, the hole pipes 16 are inserted into the grooves to the middle of the underground structure wall connection surface 20 to grout through the hole pipes 16 and then stop the hole pipes ( 17) After sealing or attaching the perforated pipe to the joint and applying the primer on the surface of the wall, the waterproof sheet 14 is adhered and the protective material is removed by curing curing the waterproof sheet to be in close contact with the wall. When leakage occurs after the construction work of the underground structure 10 is completed, the grouting solution is injected into the grouting liquid at a constant pressure through the perforated pipe 16 to fill the portion where the leakage occurs with the grouting solution to prevent leakage. It is mainly installed on the first or second wall installed on the foundation concrete of the wall of the underground structure or at the boundary between the wall of the lower part and the haunches installed on the foundation concrete. This is because water leaks often occur due to the gathered water. The diameter of the perforated tube is 1 to 1.5 cm, preferably 1 cm. In addition, the depth of the V-shaped or trapezoidal groove formed by the face wood is 2 cm, and the pressure is 2 to 3 kg / cm 2 when the grouting liquid is injected into the perforated tube.

도 2a는 도 1의 벽체 간이방수검사장치의 유공관을 지하 구조물 벽체(11) 및 지하 구조물 벽체 연결면(20)에 설치한 것을 보여주는 단면도로서 시공이음부 또는 거푸집이음부(12)에 거푸집에 설치된 면목에 의하여 형성된 홈(13)내에 유공관(16)을 삽입하고 시공이음부 또는 거푸집이음부(12)의 지하 구조물 벽체 연결면(20)에는 향후에 발생될 수 있는 누수에 대비하여 유공관(16)을 통한 그라우팅을 시공하기 위하여 지하 구조물 벽체 연결면(20)의 중간부분까지만 홈(13)을 형성하고 홈에 유공관(16)을 매설하고 유공관(16)의 끝단에 마개(17)로 막아 놓아 이물질등이 유공관(16)내로 들어가는 것을 방지한다. 지하 구조물(10)의 구축이 완료된 후에 유공관(16) 또는 지하 구조물 벽체(11)에 누수가 발생될 경우에 해당부위의 유공관(16)의 마개(17)를 제거하고 유공관의 주입구에 일정한 압력의 그라우팅액을 주입하고난 후에 유공관의 주입구를 마개로 밀봉하면누수 방지 그라우팅이 완료된 것이다. 도 2b는 도 1의 벽체간이 방수검사장치의 유공관(16)을 벽체 및 지하 구조물 벽체 연결면(20)에 설치한 다른예를 보여주는 단면도로서 시공이음부 또는 거푸집이음부의 면에 유공관을 부착설치하고 지하구조물 벽체 연결면(20)에는 일정한 크기의 홈(13)을 설치하고 홈에 관(21)을 매설하고 지하에 매설되는 부분이 아닌 쪽에는 주입관(22)을 관(21)에 삽입하고 유공관(16)이 부착설치된 쪽의 관(21)에는 유공관(16)을 연장하여 관(21)에 삽입하고 그 위에 방수시트를 부착하고 보호몰탈을 바르고 양생과정을 거쳐 구조물의 구축을 완료한다. 주입관을 설치한 것은 향후에 유공관을 통하여 누수되는 경우에 주입관을 통하여 그라우팅을 실시하기 위하여 설치한 것이다. 도 3은 본 발명의 유공관을 보여주는 도면이고 도 4는 본 발명의 유공관을 고정시키는 고정구 단면도이다.Figure 2a is a cross-sectional view showing the installation of the perforated pipe of the simple wall waterproofing inspection device of Figure 1 on the underground structure wall 11 and the underground structure wall connection surface 20 installed in the formwork on the construction joint or formwork part 12 Inserting the perforated tube 16 into the groove 13 formed by the face wood and the underground structure wall connection surface 20 of the construction joint or the form joint 12 in preparation for leaks that may occur in the future In order to construct the grouting through the grooves 13 to form only the middle portion of the wall connection surface 20 of the underground structure, embeds the perforated tube 16 in the groove and plugs the end of the perforated tube 16 with a stopper 17 to prevent foreign substances. The back is prevented from entering the perforated pipe 16. After the construction of the underground structure 10 is completed, when the leak occurs in the perforated pipe 16 or the wall 11 of the underground structure, the stopper 17 of the perforated pipe 16 at the corresponding portion is removed and a constant pressure is applied to the inlet of the perforated pipe. After injecting the grouting solution, if the inlet of the perforated tube is sealed with a stopper, leakage preventing grouting is completed. Figure 2b is a cross-sectional view showing another example of installing the perforated pipe 16 of the wall between the waterproof test apparatus of Figure 1 on the wall and the underground structure wall connecting surface 20, the installation of the perforated pipe on the surface of the construction joints or formwork joints And install a groove 13 having a predetermined size in the underground structure wall connection surface 20 and embed the tube 21 in the groove, and insert the injection tube 22 into the tube 21 on the side which is not buried underground. To the tube 21 on the side of the installation of the perforated tube 16 is extended to insert the perforated tube 16 into the tube 21, attach a waterproof sheet thereon, apply a protective mortar and complete the construction of the structure through the curing process . The injection pipe is installed to grout through the injection pipe in the case of leaking through the perforated pipe in the future. 3 is a view showing a hole tube of the present invention and Figure 4 is a cross-sectional view of the fixture for fixing the hole tube of the present invention.

이상의 설명에서와 같은 본 발명에 따른 간이방수검사장치를 이용한 누수지수 그라우팅 방법은 지하 구조물에서 취약부로 인식되어 온 시공이음부 또는 거푸집이음부의 누수문제를 상기 점검장치를 통하여 방수여부를 점검하고 유공관을 통하여 누수가 발생되면 유공관을 통하여 일정한 압력으로 방수 그라우팅을 실시하여 누수부위를 그라우팅액으로 충전하는 것으로서 종전의 방법과는 달리 누수가 진전되는 부위의 유공관을 통하여 그라우팅액을 충전하면 간단히 누수를 방지할 수 있는 유용한 방법인 것이다.Leakage index grouting method using a simple waterproof test device according to the present invention as described above in the construction joints or form joints that have been recognized as a weak part in the underground structure to check whether or not waterproofing through the inspection device and the hole pipe When leakage occurs through the hole hole, waterproof grouting is carried out at a constant pressure to fill the leaking part with grouting liquid. Unlike the conventional method, when the grouting liquid is filled through the hole hole in the leaking area, it is simply prevented from leaking. It's a useful way to do it.

Claims (8)

지하 구조물의 벽체의 시공이음부 또는 거푸집이음부에 일정한 크기로 형성된 홈과 홈내에 삽입된 유공관과 유공관을 고정시키기 위한 유공관 고정구와 향후 그라우팅을 위하여 시공이음부 또는 거푸집이음부의 지하 구조물 벽체 연결면까지 형성한 홈과 홈내에 삽입된 유공관과 유공관에 삽입된 마개로 이루어진 것을 특징으로 하는 벽체 간이방수검사장치.Wall joint surface of underground joints or form joints for the future grouting and fixtures for fixing holes and pipes inserted into the grooves of a certain size in the construction joints or form joints of underground structures Simple waterproof inspection apparatus for the wall, characterized in that consisting of the groove formed in the groove and the hole inserted into the groove and the plug inserted into the hole. 제 1항에 있어서The method of claim 1 상기 홈은 지하 구조물의 길이방향으로 설치된 거푸집에 의하여 형성된 면목에 의하여 V자 또는 사다리꼴 형태로 된 홈으로서 깊이가 2㎝인 것을 특징으로 하는 벽체 간이방수검사장치.The groove is a simple waterproof wall inspection apparatus, characterized in that the groove is formed in the V-shaped or trapezoidal shape by the face formed by the formwork installed in the longitudinal direction of the underground structure 2cm in depth. 제 1항에 있어서The method of claim 1 상기 유공관의 규격은 직경 1 ~ 1.5㎝인 것을 특징으로 하는 벽체 간이방수검사장치.The hole is a standard of the wall simple waterproof inspection apparatus, characterized in that the diameter of 1 ~ 1.5㎝. 제 1항에 있어서The method of claim 1 상기 유공관을 지하 구조물의 벽체의 시공이음부 또는 거푸집이음부에 설치하는 것은 벽체의 시공이음부 또는 거푸집이음부에 부착설치하고 지하 구조물 벽체 연결면에는 일정한 크기의 홈을 형성하고 홈내에 관을 매설하며 지하에 매설되지 않는 쪽에는 주입관을 관에 삽입하며 일측에는 유공관을 일정길이 연장하여 관에 삽입한 것을 특징으로 하는 벽체 간이방수검사장치.Installing the perforated pipes in the construction joints or form joints of the wall of the underground structure is attached to the construction joints or form joints of the wall and form a groove of a certain size on the wall connection surface of the underground structure and embed the pipes in the grooves It is inserted into the tube on the side that is not buried underground, and on one side of the wall simple waterproof inspection device characterized in that inserted into the tube extending a certain length of the perforated tube. 지하 구조물의 벽체에 발생되는 누수부위에 시행하는 그라우팅방법에 있어서In the grouting method to be applied to the leaks generated in the wall of the underground structure (a) 지하 구조물의 벽체를 면정리하는 단계;(a) clearing the walls of the underground structure; (b) 지하 구조물의 벽체의 시공이음부 또는 거푸집이음부에 거푸집에 의하여 길이방향으로 형성된 면목에 의하여 V자 또는 사다리꼴 형태로 된 홈을 설치하는 단계;(b) installing a V-shaped or trapezoidal groove by a face formed in the longitudinal direction by the formwork in the construction joint or the form joint of the wall of the underground structure; (c) 지하 구조물의 벽체의 시공이음부 또는 거푸집이음부의 지하 구조물 벽체 연결면의 중간부분 까지 일정한 크기의 홈을 형성하는 단계;(c) forming a groove having a predetermined size up to a middle portion of the construction joint part of the wall of the underground structure or the connection surface of the underground structure wall of the formwork part; (d) 형성된 홈내에 유공관을 삽입하고 유공관 고정구로 유공관을 고정하는 단계;(d) inserting the hole tube into the formed groove and fixing the hole tube with the hole tube fixture; (e) 지하 구조물 벽체 연결면에 삽입된 유공관의 끝단에 마개로 막는 단계;(e) plugging the end of the perforated tube inserted into the underground structure wall connection surface; (f) 지하 구조물의 벽체에 프라이머를 바르고 방수시트를 부착하며 그 위에 보호몰탈을 타설양생하여 방수를 마감하는 단계;(f) applying a primer to the walls of the underground structure, attaching the waterproof sheet, and curing the protective mortar thereon to finish the waterproofing; (g) 방수시공이 완료된 후에 유공관 또는 지하 구조물 벽체에 누수가 진행되어 해당 부위에 설치된 유공관의 마개를 제거하고 일정한 압력으로 그라우팅액을 주입하고 주입구를 마개로 밀봉하는 단계로 이루어지는 것을 특징으로 하는 벽체 간이방수검사장치 및 그를 이용한 누수지수 그라우팅 방법.(g) After the waterproof construction is completed, the water leak proceeds to the wall of the perforated pipe or the underground structure to remove the stopper of the perforated pipe installed in the site, injecting grouting liquid at a constant pressure and sealing the inlet with a stopper. Simple waterproof inspection device and leak index grouting method using the same. 제 5항에 있어서The method of claim 5 상기 홈은 지하 구조물의 길이방향으로 설치하되 홈의 깊이는 2㎝인 것을 특징으로 하는 벽체 간이방수검사장치 및 그를 이용한 누수지수 그라우팅 방법.The groove is installed in the longitudinal direction of the underground structure, the depth of the groove is characterized in that the simple waterproof wall inspection apparatus and leak index grouting method using the same. 제 5항에 있어서The method of claim 5 상기 유공관의 규격은 직경 1 ~ 1.5㎝이며 그라우팅 압력은 2 ~ 3 ㎏/㎠인 것을 특징으로 하는 벽체 간이방수검사장치 및 그를 이용한 누수지수 그라우팅 방법.The diameter of the hole tube is 1 ~ 1.5cm in diameter and grouting pressure is a wall simple waterproof inspection apparatus, characterized in that it is 2 ~ 3 kg / ㎠ and leak index grouting method using the same. 제 5항에 있어서The method of claim 5 상기 (C)단계가 지하 구조물의 벽체의 시공이음부 또는 거푸집 이음부에 유공관을 부착설치하고 지하 구조물 벽체 연결면에는 일정한 크기의 홈을 형성하고 홈내에 관을 매설하고 지중에 매설되지 않는 쪽에는 주입관을 관에 삽입하며 일측에는 유공관을 일정길이 연장하여 관에 삽입한 것을 특징으로 하는 벽체 간이방수검사장치 및 그를 이용한 누수지수 그라우팅 방법.In the step (C), the perforated pipe is attached to the construction joint or the form joint of the wall of the underground structure, and the grooves of the underground structure wall are formed with a certain size groove, and the pipe is embedded in the groove and is not buried in the ground. Injecting pipe is inserted into the tube, and on one side of the wall simple waterproof inspection apparatus and leak index index grouting method using the same, characterized in that inserted into the tube extending a certain length.
KR10-2002-0049608A 2002-08-22 2002-08-22 apparatus for easy examining waterproof of wall and grouting method for preventing leakage using the same KR100476840B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0049608A KR100476840B1 (en) 2002-08-22 2002-08-22 apparatus for easy examining waterproof of wall and grouting method for preventing leakage using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0049608A KR100476840B1 (en) 2002-08-22 2002-08-22 apparatus for easy examining waterproof of wall and grouting method for preventing leakage using the same

Publications (2)

Publication Number Publication Date
KR20040017514A true KR20040017514A (en) 2004-02-27
KR100476840B1 KR100476840B1 (en) 2005-03-18

Family

ID=37323049

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0049608A KR100476840B1 (en) 2002-08-22 2002-08-22 apparatus for easy examining waterproof of wall and grouting method for preventing leakage using the same

Country Status (1)

Country Link
KR (1) KR100476840B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102002950A (en) * 2010-11-11 2011-04-06 东南大学 Liquid division slip casting reinforcing method for subsurface structure construction joints
CN104878741A (en) * 2015-05-12 2015-09-02 安徽省建筑科学研究设计院 Post-grouting waterproof structure for wall joint of underground diaphragm wall and waterproof method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110299058A (en) * 2019-06-06 2019-10-01 甘肃工业职业技术学院 Pipe gallery system under a kind of land for teaching

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60192020A (en) * 1984-03-12 1985-09-30 Fujita Corp Water stopping method for construction joint of underground continuous wall
JPS60199123A (en) * 1984-03-23 1985-10-08 Ise Bosui Kogyo:Kk Water-proofing work for concrete wall
JP3360387B2 (en) * 1993-11-15 2002-12-24 株式会社ニコン Projection optical system and projection exposure apparatus
JPH08135032A (en) * 1994-11-02 1996-05-28 Takenaka Komuten Co Ltd Construction method of concrete joint water stop hose
JPH09184206A (en) * 1995-12-28 1997-07-15 Ohbayashi Corp Joint inducing crack
JPH09228403A (en) * 1996-02-28 1997-09-02 Aichi Toso:Kk Retaining method of waterproofness in underground building
JP3892952B2 (en) * 1997-09-02 2007-03-14 早川ゴム株式会社 Joint structure and repair method for joint structure
KR100310201B1 (en) * 1998-10-07 2001-12-17 최춘식 Water-proof grout applying process of rear side of water leakage portion in concrete structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102002950A (en) * 2010-11-11 2011-04-06 东南大学 Liquid division slip casting reinforcing method for subsurface structure construction joints
CN104878741A (en) * 2015-05-12 2015-09-02 安徽省建筑科学研究设计院 Post-grouting waterproof structure for wall joint of underground diaphragm wall and waterproof method thereof

Also Published As

Publication number Publication date
KR100476840B1 (en) 2005-03-18

Similar Documents

Publication Publication Date Title
US8683773B2 (en) System and method for leaking crack repair
KR20180034725A (en) Medium and large diameter pipeline inner diameter around the president and grout repair and reinforcement
US5328647A (en) Process to seal structural joints
KR100476840B1 (en) apparatus for easy examining waterproof of wall and grouting method for preventing leakage using the same
JPH09189133A (en) Repairing method of concrete wall
KR102083378B1 (en) Reinforcement member and construction method to reinforce concrete box
JP2002294727A (en) Manhole structure, manhole structure cut-off flexible joint and construction method of manhole structure
KR100617507B1 (en) A Concrete Manhole
KR100512074B1 (en) Method of construction for waterproof for connection part of construction structure
KR100310457B1 (en) Waterproofing method of concrete structure
KR102037163B1 (en) Water Leakage Repair Method and Construction Equipment of Concrete Structures
US5189861A (en) Sewer chimney coupling and method of building a sewer chimney
KR0180959B1 (en) Waterproofing construction
KR100617522B1 (en) Connecting Structure and Method between Manhole and Pipe
KR200255534Y1 (en) Device for Stagnant Water Interception in Wall
JP6901814B1 (en) Pipe mouth water stop method, water stop ring and pipe mouth water stop tool set
JP2905176B2 (en) Buried pipe repair method
JP7459351B1 (en) Watertightness Test Method
KR100316850B1 (en) Waterproofing structure at joints between precast concrete segment block
KR100610698B1 (en) Device for mending crevice of concrete structure and mending method thereof
KR200265427Y1 (en) A Pipe Connecting Structure using a Fiber Mold
KR20010025497A (en) Repair Stuff for Water Leakage Prevention and Repair Method of Tunnel
JPH041366A (en) Composite type back-filling impregnation cut-off method
KR200366435Y1 (en) Connecting Structure between Manhole and Pipe
KR200312008Y1 (en) Asinking preventin equipment of a ladder type for a drainpipe use of recycling plastic

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130307

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20140307

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20150302

Year of fee payment: 11

LAPS Lapse due to unpaid annual fee