KR200381573Y1 - A pile for cofferdam - Google Patents

A pile for cofferdam Download PDF

Info

Publication number
KR200381573Y1
KR200381573Y1 KR20-2005-0001185U KR20050001185U KR200381573Y1 KR 200381573 Y1 KR200381573 Y1 KR 200381573Y1 KR 20050001185 U KR20050001185 U KR 20050001185U KR 200381573 Y1 KR200381573 Y1 KR 200381573Y1
Authority
KR
South Korea
Prior art keywords
pile
main body
injection pipe
injection
file
Prior art date
Application number
KR20-2005-0001185U
Other languages
Korean (ko)
Inventor
허영숙
Original Assignee
주식회사 덕왕건설
허영숙
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 덕왕건설, 허영숙 filed Critical 주식회사 덕왕건설
Priority to KR20-2005-0001185U priority Critical patent/KR200381573Y1/en
Application granted granted Critical
Publication of KR200381573Y1 publication Critical patent/KR200381573Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/14Sealing joints between adjacent sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

본 고안은 지중 물막이 또는 흙막이용 파일에 관한 것으로, 상세하게는 물막이용 또는 흙막이용 파일에 분사공이 다수개 형성된 분사관이 설치되어, 다수개의 파일을 연접시공 후 분사관을 통해 고결재를 분사함으로써 파일간의 간극을 메워 차수 및 토사의 붕괴를 완벽하게 할 수 있도록 구성된 지중 물막이 또는 흙막이용 파일에 관한 것이다.The present invention relates to a pile for underground water or mud, and more specifically, the injection pipe formed with a plurality of injection holes are installed in the pile for the water or mud, by injecting a high-density material through the injection pipe after connecting a plurality of piles The present invention relates to an underground clam or soil pile file that is configured to fill gaps between piles and to complete the collapse of orders and soils.

본 고안에 따르면, 가운데에 로드삽입공이 뚫린 본체로 구성된 물막이 또는 흙막이용 파일에 있어서, 상기 본체에 다수개의 분사공이 형성된 분사관이 길이방향으로 고정되게 설치된 지중 물막이 또는 흙막이용 파일이 제공된다.According to the present invention, in the pile or mud file pile consisting of a main body with a rod insertion hole in the middle, there is provided an underground mud or mud file pile installed so that the injection pipe formed with a plurality of injection holes in the body is fixed in the longitudinal direction.

Description

지중 물막이 또는 흙막이용 파일{A pile for cofferdam} Pile for ground or mudguard {A pile for cofferdam}

본 고안은 지중 물막이 또는 흙막이용 파일에 관한 것으로, 상세하게는 물막이용 또는 흙막이용 파일에 분사공이 다수개 형성된 분사관이 설치되어, 다수개의 파일을 연접시공 후 분사관을 통해 고결재를 분사함으로써 파일간의 간극을 메워 차수 및 토사의 붕괴를 완벽하게 할 수 있도록 구성된 지중 물막이 또는 흙막이용 파일에 관한 것이다.The present invention relates to a pile for underground water or mud, and more specifically, the injection pipe formed with a plurality of injection holes are installed in the pile for the water or mud, by injecting a high-density material through the injection pipe after connecting a plurality of piles The present invention relates to an underground clam or soil pile file that is configured to fill gaps between piles and to complete the collapse of orders and soils.

각종 구조물을 축조하기 위하여 터파기를 할 경우 토사나 지하수에 의해 지반이 붕괴되는 것을 방지하기 위하여 물막이 또는 흙막이용 파일을 연접되게 다수개 설치하게 된다. 이와 같이 연속 설치된 물박이 또는 흙막이용 파일이 지중에 벽을 형성하게 되어 시공중에는 물막이 또는 흙막이 역할을 하고 시공후에는 벽체를 형성시키는 거푸집을 고정하거나 벽체의 일부를 구성하기도 한다.When digging in order to build various structures, a plurality of piles or piles for piles are connected in order to prevent the ground from being collapsed by soil or groundwater. In this way, a continuous pile of water-based or earthquake piles form a wall in the ground, so that during construction, a water-block or earth-block may be used, and after construction, formwork may be fixed or form part of a wall.

이와 같은 물막이 또는 흙막이용 파일의 구조는 가운데에 굴착로드가 삽입되는 로드삽입공이 형성된 다각형 또는 원형의 본체의 내부에 강성을 증대시키기 위한 철골조가 매설된 관체의 구조를 가지고, 이를 하나하나씩 지중에 매설하여 물막이 또는 흙막이 벽을 형성하게 된다.The structure of the pile or soil pile file has a structure of a tube with steel frame embedded to increase rigidity inside a polygonal or circular body in which a rod insertion hole is formed in which a drilling rod is inserted in the center thereof, and each of them is embedded in the ground one by one. As a result, a water barrier or an earthen wall is formed.

이를 이용한 시공방법은 로드삽입공에 굴착로드를 삽입한 상태로, 굴착하면서 파일을 지중에 매설하고, 로드를 인출하여 다른 파일을 끼운 후 미리 삽입한 파일의 인접된 위치에 다시 삽입하는 반복작업을 향하여, 다수개의 파일이 연접된 지중 물막이 또는 흙막이 벽체가 형성된다.The construction method using this method is a repetitive operation in which a drilling rod is inserted into a rod inserting hole, and a file is buried in the ground while excavating, withdrawing a rod, inserting another file, and reinserting it into an adjacent position of a pre-inserted file. Towards the surface, the underground water barrier or the soil wall, in which a plurality of piles are connected, is formed.

그러나 상기의 파일을 이용한 물막이 또는 흙막이 벽체는 파일과 파일의 사이에 아무리 인접되게 시공을 한다고 하더라도 간격이 형성될 수 밖에 없고, 그 틈 사이로 물이나 토사가 흘러 지반이 붕괴되는 문제점이 있다.However, no matter how close the construction between the pile and the pile wall using the pile, the gap between the pile is bound to be formed, there is a problem that water or soil flows through the gap, the ground collapses.

특히 원형의 파일을 원형굴착관의 내부에 삽입하여 지중에 매설하는 경우는, 원형굴착관과 굴착로드가 함께 지중으로 삽입되면서 굴착한 후, 굴착로드를 인출하고 이어서 원형의 파일을 삽입한 후 원형굴착관을 인출하게 되는데, 이 때 원형굴착관의 두께만큼의 공간이 형성되어, 지하수가 있는 지중에서의 물막이 또는 흙막이 공사는 그 효율성이 없고 구조물의 축조 후에는 전체 구조물이 붕괴되는 위험성이 있다.In particular, in the case of embedding a circular pile inside the circular drilling pipe and embedding it in the ground, the excavation is carried out while the circular drilling pipe and the drilling rod are inserted into the ground, and then the drilling rod is withdrawn, and then the circular pile is inserted, When the excavation pipe is drawn out, at this time, a space equal to the thickness of the circular excavation pipe is formed, and there is a risk that the water or earthquake work in the ground where the groundwater is inefficient is ineffective and the entire structure collapses after the construction of the structure.

본 고안의 목적은 상기와 같은 종래의 문제점을 해소하고자 하는 것으로, 물막이 또는 흙막이용 파일에 다수개의 분사공이 형성된 분사관을 설치하여, 하나의 파일을 지중에 매설한 후 또는 다수개의 파일로 물막이 또는 흙막이 벽체를 형성시킨 후 고결재를 분사관으로 고압분사하여, 파일 사이의 틈을 메워 토사나 지하수의 흐름을 방지하여 지반의 붕괴를 효과적으로 방지하는 지중 물막이 또는 흙막이용 파일을 제공함에 있다. An object of the present invention is to solve the conventional problems as described above, by installing a spray pipe formed with a plurality of injection holes in the pile for the water film or soil film, after embedding one pile in the ground or with a plurality of piles After forming the earth wall, high-density material is sprayed by the injection pipe to fill the gap between the pile to prevent the flow of earth and sand or groundwater to provide an underground water barrier or pile file for effectively preventing the collapse of the ground.

이하 본 고안을 첨부도면에 의거 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

우선 본 고안의 파일(100)은 가운데에 로드삽입공(1)이 뚫린 본체(2)와 본체(2)의 내부에 강성을 위해 매설된 철골조로 구성되고, 상기 본체(2)에는 다수개의 분사공(3)이 형성된 분사관(4)이 길이방향으로 고정되게 설치된다.First, the pile 100 of the present invention is composed of a main body 2 having a rod inserting hole 1 in the center and a steel frame embedded for rigidity inside the main body 2, and the main body 2 has a plurality of minutes. The injection pipe 4 in which the slot 3 was formed is installed to be fixed in the longitudinal direction.

그리고, 본체(2)의 외주면에는 길이방향으로 설치홈(5)이 요설되고, 상기 설치홈(5)에 분사공(3)이 외부를 향하게 분사관(4)이 삽입설치되어, 본체(2)의 외면으로 분사관(4)이 돌출되지 않게 설치된 구조를 가지도록 실시될 수도 있다.In addition, an installation groove 5 is provided on the outer circumferential surface of the main body 2 in the longitudinal direction, and an injection pipe 4 is inserted into the installation groove 5 so that the injection hole 3 faces outward, and the main body 2 is installed. It may be implemented to have a structure installed so that the injection pipe (4) does not protrude to the outer surface of the).

또한, 상기의 분사관(4)은 본체(2)에 매설되되 분사공(3)은 본체(2)의 외부로 노출되게 실시될 수도 있고, 분사공(3)에는 분사관(4)의 내부에서 외부로 향하는 압력에만 개구되는 마개(6)가 설치된 개폐구(7)가 설치될 수도 있으며, 본체(2)에는 다수개의 거푸집 또는 브라켓 장착용 너트(8)가 삽입설치되어 각종 거푸집(9)을 용이하게 고정설치할 수 있도록 실시될 수도 있다.In addition, the injection pipe 4 is embedded in the main body 2, the injection hole 3 may be implemented to be exposed to the outside of the main body 2, the injection hole 3 in the interior of the injection pipe (4) Opening or closing hole 7 is provided with a stopper (6) which is open only to the pressure to the outside in the installation, a plurality of formwork or bracket mounting nuts (8) are inserted into the body (2) to form a variety of formwork (9) It may be implemented to be easily fixed installation.

이와 같은 구조를 가진 본 고안의 파일(100)의 작용 및 이를 이용한 시공방법을 상술하면 다음과 같다.The operation of the pile 100 of the present invention having such a structure and a construction method using the same will be described below.

도 3의 (a), (b), (c)에 도시된 바와 같이 굴착로드(10)에 파일(100)을 삽입설치하기 위하여, 지중에 파일삽입공(11)을 천공하고, 이에 파일(100)을 삽입한 후 굴착로드(10)를 끼워 설치한다.As shown in (a), (b) and (c) of FIG. 3, in order to insert and install the pile 100 in the excavation rod 10, the pile insertion hole 11 is drilled in the ground, and thus Insert 100) and install the excavation rod 10.

굴착로드(10)에 파일(100)을 끼운 상태에서 도 3의 (d)에서와 같이 굴착로드(10)로 천공을 하면서 파일(100)을 지중에 삽입하고, 굴착로드(10)만을 뽑아 내면 도 3의 (e)와 같이 된다.When the pile 100 is inserted into the excavation rod 10, the pile 100 is inserted into the ground while drilling with the excavation rod 10 as shown in FIG. 3D, and only the excavation rod 10 is pulled out. It is as shown in Fig. 3E.

이와 같은 방법으로 다수개의 연접된 파일(100)을 지중에 삽입하게 되면, 도 3의 (f)와 같이 물막이 또는 흙막이용 연속벽체가 형성된다.When a plurality of connected piles 100 are inserted in the ground in this manner, a continuous wall for water barrier or soil barrier is formed as shown in FIG.

다수개의 파일(100)을 시공할 때는 분사관(4)이 인접된 파일(100)의 일측면을 향하도록 하여 파일(100)간의 사이 틈을 시멘트 등의 고결재(12)로 메울 수 있도록 한다.When constructing a plurality of piles (100) so that the injection pipe 4 is directed to one side of the adjacent pile (100) to fill the gap between the piles (100), such as cement 12 and the high settlement material 12. .

상기와 같이 연속 물막이 또는 흙막이 벽체가 형성되면, 파일(100)에 설치된 분사관(4)의 상단 개구부로 시멘트 등의 틈 충진재인 고결재(12)를 압입분사하여 도 4에 도시된 바와 같이 파일(100)의 사이 틈을 메우게 된다. 또는 하나의 파일(100)을 삽입한 후 바로 고결재(12)를 분사할 수도 있으나 이는 지반의 여건이나 작업의 상황 등에 따라 선택된다.When the continuous water barrier or soil wall is formed as described above, the injection of the solidified material 12, which is a gap filler such as cement, into the upper opening of the injection pipe 4 installed in the pile 100, the pile as shown in FIG. The gap between the 100 is filled. Alternatively, after the one file 100 is inserted, the fastening material 12 may be sprayed immediately, but this is selected according to the condition of the ground or the work situation.

상기의 분사관(4)에는 다수개의 분사공(3)이 인접된 파일(100)의 일측면을 향하고 있고, 분사공(3)을 통해 고압으로 분사된 고결재(12)는 사이 틈과 일정부분의 파일(100)과 토양의 사이를 충진하게 된다. 따라서 파일(100)과 파일(100)은 고결재(12)에 의해 사이 공간이 충진될 뿐만 아니라, 파일(100)과 파일(100)이 견고히 일체로 결합되어 지하수의 차단 및 토사의 붕괴를 효과적으로 막을 수가 있게 된다. 이와 같은 상태는 도 4에 도시되어 있다.In the injection pipe 4, a plurality of injection holes 3 are directed toward one side of the adjacent pile 100, and the solidified material 12 injected at high pressure through the injection hole 3 has a gap therebetween. Filling between the pile of the portion 100 and the soil. Therefore, not only the space between the pile 100 and the pile 100 is filled by the solidified material 12, but the pile 100 and the pile 100 are firmly combined to effectively block the groundwater and collapse of the soil. You can stop it. This state is illustrated in FIG. 4.

그리고 본 고안의 분사관(4)은 파일(100)의 본체(2)에 돌출되게 설치되지 않고, 본체(2)에 형성된 설치홈(5)에 삽입고정함으로써, 파일(100)을 지중에 삽입할 때 용이하게 삽입될 수 있도록 하고 분사관(4)의 손상을 최소화할 수가 있게 된다.In addition, the injection pipe 4 of the present invention is not installed to protrude into the main body 2 of the pile 100, and is inserted into the mounting groove 5 formed in the main body 2, thereby inserting the pile 100 into the ground. When it is possible to be easily inserted and to minimize the damage to the injection pipe (4).

물론 분사관(4)은 본체(2)에 매설할 수도 있으나 어느 경우든지 분사공(3)은 본체(2)의 외측으로 노출되게 하여야 함은 당연하다.Of course, the injection pipe 4 may be embedded in the main body 2, but in any case, the injection hole 3 should be exposed to the outside of the main body (2).

또한 분사관(4)에 형성된 분사공(3)에는 개폐구(7)가 설치되어 있어, 파일(100)을 지중에 매설할 때에 토사 등이 유입되지 않도록 하고, 고결재(12)를 분사할 때는 용이하게 외부로 분출되도록 일측방향으로만 개구되는 구조를 가진다. 즉 개폐구(7)는 도 2의 부분 상세도와 같이 외측으로만 개구되는 마개(6)가 설치되어 있다.In addition, the opening and closing hole 7 is provided in the injection hole 3 formed in the injection pipe 4, and when the pile 100 is buried in the ground, the soil and the like do not flow, and when the solidified material 12 is injected, It has a structure that is opened only in one direction so as to easily eject to the outside. That is, the opening and closing port 7 is provided with the stopper 6 which opens only to the outer side like the partial detail of FIG.

특히 본 고안은 도 5에 도시된 바와 같이 원형굴착관(13)의 내부로 굴착로드(10)를 삽입하여 지반을 굴착하고, 원형굴착관(13)의 내부로 파일(100)을 삽입한 후, 원형굴착관(13)을 제거하여 연속 물막이 또는 흙막이 벽체를 형성시키는 공법에서는 더욱 더 유용한데, 이는 원형굴착관(13)이 제거 된 후의 공간이 필연적으로 형성되기 때문이다. 그러나 본 고안의 파일(100)에 의하여 상기와 같은 공간이 형성되더라도, 도 5 내지 도 7에서와 같이 원형굴착관(13)의 사이 공간으로 고결재(12)를 분사하여 파일(100)과 파일(100)을 견고히 결합시키게 된다.In particular, the present invention is to excavate the ground by inserting the excavating rod 10 into the inside of the circular excavation tube 13, as shown in Figure 5, after inserting the pile 100 into the inside of the circular excavation tube 13 Further, in the method of removing the circular excavation tube 13 to form a continuous water or earth wall, it is even more useful because the space after the circular excavation tube 13 is inevitably formed. However, even if the above space is formed by the pile 100 of the present invention, as shown in Figs. 5 to 7 by spraying the solidified material 12 into the space between the circular drilling pipe 13, pile 100 and pile It will be firmly coupled to (100).

상기와 같이 건축물을 축조하기 위하여 사방으로 물막이 또는 흙막이 벽체가 형성되면, 물막이 또는 흙막이 벽체로 둘러싸인 내측 부분을 굴착하고, 건축물을 구성하는 벽체를 형성시키게 되는데, 이 때 벽체를 형성시키기 위하여 설치되는 거푸집(9)은 본 고안에 의하여 용이하게 설치고정된다.When water or earth walls are formed in all directions to construct the building as described above, the inner part surrounded by the water walls or earth walls is excavated, and a wall constituting the building is formed. (9) is easily installed and fixed by the present invention.

즉, 본 고안의 파일(100)에는 거푸집 또는 브라켓 장착용 너트(8)가 매설되어 있기 때문에, 도 8과 같이 파일(100)에 매설된 거푸집 또는 브라켓 장착용 너트(8)에 거푸집(9)을 고정하는 체결볼트(14)를 체결하여 고정하고, 파일(100)과 거푸집(9)의 사이에 콘크리트 등을 충진하여 벽체를 양성하게 된다.That is, since the die 100 or the bracket mounting nut 8 is embedded in the pile 100 of the present invention, the die 9 embedded in the die or bracket mounting nut 8 embedded in the pile 100 as shown in FIG. 8. Fastening by fastening the fastening bolts 14 for fixing the, and filling the concrete between the pile 100 and the formwork (9) to nurture the wall.

이와 같이 본 고안의 분사관(4)과 거푸집 또는 브라켓 장착용 너트(8)가 설치된 파일(100)을 이용함으로써, 파일(100)간의 틈이 없고, 건축물의 벽체를 형성시키기 위한 거푸집(9)의 체결이 용이한 장점을 가지게 된다.Thus, by using the pile 100 provided with the injection pipe 4 and the die or bracket mounting nut 8 of the present invention, there is no gap between the pile 100, the formwork for forming the wall of the building (9) The fastening of has the advantage.

이와 같이 본 고안은 물막이 또는 흙막이용 파일(100)에 다수개의 분사공(3)이 형성된 분사관(4)이 설치되어, 이를 통해 고결재(12)를 분사함으로써 파일(100) 사이의 틈을 메워 토사나 지하수의 흐름을 완벽하게 차단하여 지반의 붕괴와 같은 사고를 방지하는 효과가 있고, 삽입설치된 거푸집 또는 브라켓 장착용 너트(8)에 의해 건축물의 벽체를 형성시키는 거푸집(9)을 용이하게 고정설치할 수 있는 효과가 있다.As such, the present invention is provided with a spray pipe 4 having a plurality of spray holes 3 formed in the pile 100 for the water barrier or the soil barrier, thereby injecting the solidified material 12 through the gap 100 between the piles 100. It is effective to prevent accidents such as the collapse of the ground by completely blocking the flow of infill soil or groundwater, and to easily form the formwork (9) to form the wall of the building by the inserted formwork or bracket mounting nut (8). It can be fixed and installed.

도 1은 본 고안인 파일의 다양한 실시예의 사시도1 is a perspective view of various embodiments of the present inventors file

도 2는 본 고안인 파일의 부분 단면 상세도Figure 2 is a partial cross-sectional detail of the present inventors pile

도 3은 본 고안인 파일을 이용한 물막이 또는 흙막이 시공방법의 단계별 상태도Figure 3 is a step-by-step state diagram of the construction of the water barrier or soil using the present inventors pile

도 4는 도 4(f)의 "A-A"부 단면도4 is a cross-sectional view taken along the line “A-A” of FIG. 4 (f).

도 5는 다른 실시예의 파일을 이용한 물막이 또는 흙막이 시공방법의 단계별 상태도5 is a step-by-step state diagram of the construction of the water barrier or soil using a pile of another embodiment

도 6은 도 5(c)의 "B-B"부 단면도FIG. 6 is a sectional view taken along the line “B-B” of FIG.

도 7은 도 5(d)의 "C-C"부 단면도FIG. 7 is a sectional view taken along the line "C-C" in FIG.

도 8은 본 고안을 이용하여 거푸집을 설치한 상태도8 is a state in which the formwork is installed using the present invention

※ 도면의 주요 부분에 대한 부호의 설명※ Explanation of codes for main parts of drawing

1 : 로드삽입공 2 : 본체1 rod insertion hole 2 body

3 : 분사공 4 : 분사관3: injection hole 4: injection pipe

5 : 설치홈 6 : 마개5: mounting groove 6: stopper

7 : 개폐구 8 : 거푸집 또는 브라켓 장착용 너트7 opening and closing port 8: formwork or bracket mounting nut

9 : 거푸집 10 : 굴착로드9: formwork 10: excavation rod

11 : 파일삽입공 12 : 고결재11: File insertion hole 12: Freezing

13 : 원형굴착관 14 : 체결볼트13: round drilling pipe 14: fastening bolt

100 : 파일100: file

Claims (5)

가운데에 로드삽입공(1)이 뚫린 본체(2)로 구성된 물막이 또는 흙막이용 파일(100)에 있어서, 상기 본체(2)에 다수개의 분사공(3)이 형성된 분사관(4)이 길이방향으로 고정되게 설치됨을 특징으로 하는 지중 물막이 또는 흙막이용 파일.In the pile or soil pile file (100) consisting of a main body (2) having a rod insertion hole (1) in the middle, the injection pipe (4) having a plurality of injection holes (3) formed in the main body (2) is longitudinal Underground clapper or earthen file, characterized in that is installed to be fixed. 제 1항에 있어서, 본체(2)의 외주면에 길이방향으로 설치홈(5)이 요설되고, 상기 설치홈(5)에 분사공(3)이 외부를 향하게 분사관(4)이 삽입설치되어, 본체(2)의 외면으로 분사관(4)이 돌출되지 않게 설치된 지중 물막이 또는 흙막이용 파일.According to claim 1, wherein the installation groove (5) is provided in the longitudinal direction on the outer peripheral surface of the main body 2, the injection pipe 4 is inserted into the installation groove 5 so that the injection hole (3) facing outward , Pile for underground water barriers or mudles installed so that the injection pipe (4) does not protrude to the outer surface of the main body (2). 제 1항에 있어서, 분사관(4)은 본체(2)에 매설되되 분사공(3)은 본체(2)의 외부로 노출된 지중 물막이 또는 흙막이용 파일.The pile for earthquake clam or mud clod according to claim 1, wherein the injection pipe (4) is embedded in the main body (2) while the injection hole (3) is exposed to the outside of the main body (2). 제 1항에 있어서, 분사공(3)에는 분사관(4)의 내부에서 외부로 향하는 압력에만 개구되는 마개(6)가 설치된 개폐구(7)가 설치된 지중 물막이 또는 흙막이용 파일.2. The pile for underground water gutters or mudstones according to claim 1, wherein the injection hole (3) is provided with an opening and closing hole (7) provided with a stopper (6) opened only in the pressure from the inside of the injection pipe (4) to the outside. 제 1항에 있어서, 본체(2)에는 다수개의 거푸집 또는 브라켓 장착용 너트(8)가 삽입설치된 지중 물막이 또는 흙막이용 파일.The underground water clam or mud file according to claim 1, wherein a plurality of formwork or bracket mounting nuts (8) are inserted into the main body (2).
KR20-2005-0001185U 2005-01-14 2005-01-14 A pile for cofferdam KR200381573Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2005-0001185U KR200381573Y1 (en) 2005-01-14 2005-01-14 A pile for cofferdam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2005-0001185U KR200381573Y1 (en) 2005-01-14 2005-01-14 A pile for cofferdam

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020050002833A Division KR100559978B1 (en) 2005-01-12 2005-01-12 A pile for cofferdam and cofferdam method using it

Publications (1)

Publication Number Publication Date
KR200381573Y1 true KR200381573Y1 (en) 2005-04-14

Family

ID=43683155

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0001185U KR200381573Y1 (en) 2005-01-14 2005-01-14 A pile for cofferdam

Country Status (1)

Country Link
KR (1) KR200381573Y1 (en)

Similar Documents

Publication Publication Date Title
KR100559978B1 (en) A pile for cofferdam and cofferdam method using it
KR102153902B1 (en) Slurry wall, construction method for the same and wire mesh assembly
KR101925597B1 (en) Underground continuous wall grouting waterproofing method
KR100927186B1 (en) Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
KR101925598B1 (en) Underground continuous wall grouting waterproofing method
KR100415809B1 (en) precast pile for braced wall and the method using the same
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR101078080B1 (en) Earth retaining wall and it's construction method using the precast pile and ground reinforcement
JP4727718B2 (en) Retaining method for retaining wall
KR101005193B1 (en) Pile for cofferdam
KR200381573Y1 (en) A pile for cofferdam
KR20170059150A (en) A Foundation Method Of Continuous and Cut Off wall By Overlap Casing
KR100682335B1 (en) Land-side protection wall method using sheet pile
KR100477357B1 (en) Construction method for retaining of earth
KR100697001B1 (en) Multi-Protector System
KR200296444Y1 (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method
WO2009139510A1 (en) Construction method for continuous cut-off wall using overlap casing
KR20070059766A (en) A soil nailing reinforcement member using wood
JP4905296B2 (en) Method for constructing retaining wall and retaining wall
JP2005256571A (en) Continuous wall body and its construction method
KR100327547B1 (en) Composite retaining wall construction method
KR20210002947A (en) Two-side semicircle arch type leading pipe and structure of non-excavation type tunnel using thereof and method of constructing thereof
KR102610909B1 (en) Method and structure of steel pipe propulsion using anchor installation inside steel pipe to prevent sinking
KR100704643B1 (en) Land-side protection wall method
KR102371284B1 (en) Slurry wall, construction method for the same and wire mesh assembly

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
EXTG Extinguishment