KR200371165Y1 - Reinforcement structure of h beam for landslide prevention measure - Google Patents

Reinforcement structure of h beam for landslide prevention measure Download PDF

Info

Publication number
KR200371165Y1
KR200371165Y1 KR20-2004-0028205U KR20040028205U KR200371165Y1 KR 200371165 Y1 KR200371165 Y1 KR 200371165Y1 KR 20040028205 U KR20040028205 U KR 20040028205U KR 200371165 Y1 KR200371165 Y1 KR 200371165Y1
Authority
KR
South Korea
Prior art keywords
reinforcement
bending
reinforce
longitudinal direction
present
Prior art date
Application number
KR20-2004-0028205U
Other languages
Korean (ko)
Inventor
김충열
Original Assignee
김충열
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김충열 filed Critical 김충열
Priority to KR20-2004-0028205U priority Critical patent/KR200371165Y1/en
Application granted granted Critical
Publication of KR200371165Y1 publication Critical patent/KR200371165Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/04Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
    • E01F7/045Devices specially adapted for protecting against falling rocks, e.g. galleries, nets, rock traps
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S256/00Fences
    • Y10S256/01Compensator, spring

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

본 고안에 의한 사태방지책용 에이치빔의 보강구는 에이치빔의 굽힘력과 뒤틀림력을 보강하는 사태방지책용 에이치빔의 보강구에 있어서, 에이치빔의 측면에 형성된 홈에 다수개를 길이 방향으로 이격 고정하되, 에이치빔의 길이 방향으로 나란하게 형성되어 굽힘력을 보강하는 굽힘보강부, 에이치빔의 길이 방향과 연직하게 형성되어 뒤틀림을 보강하는 뒤틀림보강부를 일체로 절곡 형성하는 것으로 이루어진다.The reinforcement tool of the ah beam for landslide prevention measures according to the present invention is a reinforcement tool for the ah beam for avalanche prevention measures to reinforce the bending and twisting forces of the H beam, and a plurality of grooves formed on the side of the H beam are spaced apart in the longitudinal direction. However, the bending reinforcement portion formed side by side in the longitudinal direction of the H-beam reinforces the bending force, is formed to be perpendicular to the longitudinal direction of the H-beam is formed by integrally bending the twist reinforcement portion to reinforce the distortion.

따라서 본 고안은 H빔의 홈에 고정 설치되기 때문에 보다 큰 H빔을 사용하지 않고도 작은 크기의 H빔의 굽힘 응력과 뒤틀림 응력을 용이하게 보강할 수 있으며, 별도로 구성된 보강구를 H빔에 설치할 수 있어 이미 시공된 상태의 H빔을 용이하게 보강하여 작업자를 편리하게 하고 자원의 낭비를 용이하게 줄일 수 있는 것이다.Therefore, the present invention is fixedly installed in the groove of the H-beam, so it is possible to easily reinforce the bending stress and the torsional stress of the small-size H-beam without using the larger H-beam, and separately configured reinforcement can be installed in the H-beam. It is easy to reinforce the H-beam already in the construction state to facilitate the operator and reduce the waste of resources easily.

Description

사태방지책용 에이치빔의 보강구{REINFORCEMENT STRUCTURE OF H BEAM FOR LANDSLIDE PREVENTION MEASURE}H-beam reinforcement for landslide prevention {REINFORCEMENT STRUCTURE OF H BEAM FOR LANDSLIDE PREVENTION MEASURE}

본 고안은 사태방지책용 에이치빔을 보강하는 보강구에 관한 것으로서, 더욱상세하게는 H빔의 크기를 크게 하지 않고도 H빔의 굽힘과 뒤틀림을 용이하게 보강할 수 있도록 하는 사태방지책용 에이치빔의 보강구에 관한 것이다.The present invention relates to a reinforcement for reinforcing the H-beam for preventing avalanche, more specifically, the reinforcing of the H-beam for preventing avalanche to easily reinforce the bending and twisting of the H-beam without increasing the size of the H-beam. It's about a phrase.

도로는 도시를 통과하거나 산 옆을 통과할 수 있으므로, 도시를 통과할 때에는 도로에서 발생되는 소음을 줄이기 위해 도로의 측면에 방음벽을 설치하게 되고, 산 옆을 통과할 때에는 산에서 떨어지는 낙석을 차단하기 위해서 사태방지책을 설치하게 된다.Roads can pass through the city or by the side of the mountain, so when you pass through the city, sound barriers are installed on the sides of the road to reduce noise generated by the road. In order to prevent this, a situation prevention plan is installed.

사태방지책에 사용되는 H빔은 산에서 떨어지는 낙석의 힘에 의해 절곡되거나 뒤틀릴 수 있으며, 방음벽에 사용되는 H빔도 바람에 의한 압력에 의해 절곡되거나 뒤틀릴 수 있어, H빔을 보강하게 된다.The H beam used for the landslide prevention can be bent or distorted by the force of falling rocks from the mountain, and the H beam used for the soundproof wall can be bent or distorted by the wind pressure, thereby reinforcing the H beam.

그리고 종래에는 상기와 같은 경우에 H빔을 특별히 보강하지 않고 시방서에 기재된 H빔을 설치한 뒤, 외력에 의해 H빔이 휘거나 굽었을 때에 보다 큰 치수의 H빔으로 재시공하였다,In the conventional case, the H beam described in the specification is installed without special reinforcement of the H beam, and then reconstructed into an H beam having a larger dimension when the H beam is bent or bent by an external force.

따라서 종래에는 보다 큰 치수의 H빔을 재시공시에 사용하기 때문에, 재료비의 상승으로 시공 단가를 상승하게 된다.Therefore, since the H beam of larger dimension is conventionally used at the time of reconstruction, the construction cost increases with the increase of material cost.

특히 시공된 상태의 H빔을 보강하기 위해서는 설치된 H빔을 철거한 뒤에 다시 보다 치수가 큰 H빔으로 시공하기 때문에, 불필요한 낭비를 유발하게 된다는 단점이 있다.In particular, in order to reinforce the H-beams in the constructed state, since the installed H-beams are removed and then installed again with a larger H-beam, there is a disadvantage in that unnecessary waste is caused.

본 고안은 상기와 같은 종래 기술의 문제점을 해결하기 위하여 안출된 것으로서, 본 고안의 목적은 H빔의 크기를 크게 하지 않고도 H빔의 굽힘과 뒤틀림을 용이하게 보강할 수 있음과 더불어 이미 시공된 상태의 H빔을 용이하게 보강할 수 있는 사태방지책용 에이치빔의 보강구를 제공하는 데 있다.The present invention is devised to solve the problems of the prior art as described above, the object of the present invention is to be able to easily reinforce the bending and twisting of the H-beam without increasing the size of the H-beam and already constructed state It is to provide a reinforcement tool of the H-beam for preventing a situation that can easily reinforce the H beam of the.

따라서 본 고안은 상기와 같은 목적을 달성하기 위하여, 에이치빔의 굽힘력과 뒤틀림력을 보강하는 사태방지책용 에이치빔의 보강구에 있어서, 에이치빔의 측면에 형성된 홈에 다수개를 길이 방향으로 이격 고정하되, 에이치빔의 길이 방향으로 나란하게 형성되어 굽힘력을 보강하는 굽힘보강부, 에이치빔의 길이 방향과 연직하게 형성되어 뒤틀림을 보강하는 뒤틀림보강부를 일체로 절곡 형성하는 것으로 이루어지는 사태방지책용 에이치빔의 보강구를 제공한다.Therefore, the present invention, in order to achieve the above object, in the reinforcing hole of the H-beam for preventing the situation to reinforce the bending and twisting force of the H-beam, a plurality of grooves formed in the side of the H-beam spaced apart in the longitudinal direction H, which is fixed, but is formed side by side in the longitudinal direction of the H-beams bending reinforcement portion, and the vertically formed and the longitudinal reinforcement of the H-beam beam to form a twist reinforcement portion to reinforce the warp to prevent the situation Provide the reinforcement of the beam.

도 1은 본 고안에 의한 보강구가 적용되는 사태방지책의 일 예를 나타내는 정면도,1 is a front view showing an example of a situation prevention measures to which the reinforcement according to the present invention is applied,

도 2는 본 고안에 의한 사태방지책용 에이치빔의 보강구의 일 예를 나타내는 발췌 사시도,Figure 2 is an excerpt perspective view showing an example of the reinforcement of the H-beam for landslide prevention measures according to the present invention

도 3은 본 고안에 의한 사태방지책용 에이치빔의 보강구의 다른 예를 나타내는 발췌 사시도이다.Figure 3 is an excerpt perspective view showing another example of the reinforcing tool of the H-beam for a landslide prevention measures according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

2 : 에이치빔 2a : 홈2: H Beam 2a: Home

10 : 보강구 10a : 굽힘보강부10: reinforcement 10a: bending reinforcement

10b : 뒤틀림보강부 10c : 볼트삽입부10b: twisting reinforcement 10c: bolt insertion

10d : 볼트10d: bolt

이하 본 고안의 바람직한 실시예를 첨부한 도면에 의거하여 더욱 상세하게 설명한다.Hereinafter, preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings.

도 1은 본 고안의 보강구가 적용되는 사태방지책의 일 예를 나타내는 도면으로서, 상기 사태방지책은 상하로 이격된 케이블(1)이 다수의 에이치빔(2)(이하 H빔으로 기재함)에 상하로 이격되어 설치되어 도로측으로 쏟아지는 사태의 진입을 차단하게 된다.1 is a view showing an example of a landslide prevention measures to which the reinforcing tool of the present invention is applied, wherein the landslide prevention measures are provided in a number of H beams 2 (hereinafter referred to as H beams) spaced vertically spaced cable (1) It is installed spaced apart up and down to block the entry of the situation that spills on the road side.

그리고 본 고안의 보강구(10)는 간단한 구조로서 상기 H빔(2)의 굽힘력과 뒤틀림력을 보강하게 되는 바, 다수의 보강구(10)가 상기 H빔(2)의 측면에 형성된 홈(2a)에 길이 방향으로 이격되어 상기 케이블(1)에 간섭되지 않도록 고정된다.And the reinforcement 10 of the present invention is a simple structure to reinforce the bending force and the bending force of the H beam (2), a plurality of reinforcement (10) grooves formed on the side of the H beam (2) It is spaced apart in the longitudinal direction at 2a so as not to interfere with the cable 1.

특히 상기 보강부(10)는 상기 H빔(2)의 길이 방향으로 나란하게 형성되어 굽힘력을 보강하는 굽힘보강부(10a), 상기 H빔(2)의 길이 방향과 연직하게 형성되어뒤틀림을 보강하는 뒤틀림보강부(10b)로 이루어져서 측면이 ㄱ자 형상으로 일체로 절곡 형성되는 구조이다.In particular, the reinforcing portion 10 is formed side by side in the longitudinal direction of the H beam (2) is bent reinforcing portion (10a) for reinforcing the bending force, perpendicular to the longitudinal direction of the H beam (2) to warp Consisting of the reinforcing torsion reinforcing portion (10b) is a structure in which the side is formed integrally bent in the L-shape.

그래서 본 고안은 상기 굽힘보강부(10a)와 뒤틀림보강부(10b)가 용접 처리되어 상기 H빔(2)과 접촉된 부분이 용접 고정된다.Thus, in the present invention, the bending reinforcement portion 10a and the distortion reinforcement portion 10b are welded to fix the welded portion to the H beam 2.

더우기 상기 H빔(2)과 보강구(10)를 보다 견고하게 고정하기 위하여, 본 고안에서는 상기 굽힘보강부(10a)와 뒤틀림보강부(10b)의 양측면에 볼트삽입부(10c)를 형성함과 더불어 상기 H빔(2)에 관통구멍을 형성하여 볼트(10d)와 너트(미도시)로 체결 고정되는 구조를 포함한다.Furthermore, in order to fix the H beam 2 and the reinforcement 10 more firmly, in the present invention, bolt inserting portions 10c are formed on both sides of the bending reinforcement portion 10a and the distortion reinforcement portion 10b. In addition, a through hole is formed in the H beam 2 and includes a structure that is fastened and fixed with a bolt 10d and a nut (not shown).

이와 같이 이루어지는 본 고안에 의한 사태방지책용 에이치빔의 보강구는 H빔(2)의 측면에 형성된 홈(2a)에 고정하게 된다.The reinforcing tool of the H-beams for preventing a landslide according to the present invention is fixed to the grooves 2a formed on the side surfaces of the H-beams 2.

즉 도 2의 쇄선의 보강구(10)를 실선과 같이 H빔(2)의 홈(2a)에 삽입한 뒤, 용접 작업으로 보강구(10)를 고정하게 되며, 상기 보강구(10)는 H빔(2)의 홈(2a)에 상하로 이격되어 다수개 설치되는 것이다.That is, after inserting the reinforcement 10 of the chain line of FIG. 2 into the groove 2a of the H beam 2 like a solid line, the reinforcement 10 is fixed by welding, and the reinforcement 10 is A plurality of spaced apart vertically in the groove (2a) of the H beam (2).

또한 도 3의 쇄선의 보강구(10)를 실선과 같이 H빔(2)의 홈(2a)에 삽입한 뒤, 볼트(10e)와 너트를 이용하여 보강구(10)를 고정할 수 있으며, 더욱 견고하게 고정하기 위해 볼트(10e)로 고정한 뒤에 다시 용접 작업으로 용접 고정할 수도 있다.In addition, after inserting the reinforcement 10 of the chain line of Figure 3 into the groove (2a) of the H beam (2) like a solid line, the reinforcement (10) can be fixed using a bolt (10e) and a nut, In order to fix more firmly, it may be fixed by bolt 10e and welded again by a welding operation.

그러면 굽힘보강부(10a)가 H빔(2)의 길이 방향과 동일한 방향으로 고정되기 때문에 H빔(2)의 굽힘력을 증대하게 되며, 뒤틀림보강부(10b)가 H빔(2)의 단면 방향으로 고정되기 때문에 H빔(2)의 뒤틀림력을 증대하게 된다.Then, since the bending reinforcement portion 10a is fixed in the same direction as the length direction of the H beam 2, the bending force of the H beam 2 is increased, and the distortion reinforcement portion 10b is a cross section of the H beam 2. Since it is fixed in the direction, the twisting force of the H beam 2 is increased.

물론 본 고안의 보강구(10)는 H빔(2)이 동시에 굽히거나 뒤틀려지더라도 이를 충분히 보강할 수 있는 것이다.Of course, the reinforcement 10 of the present invention can sufficiently reinforce the H beam 2 even if bent or twisted at the same time.

본 고안에서는 사태방지책에 사용되는 H빔에 사용되나, 토목, 건축 공사의 구조물에 사용되는 H빔에 모두 사용할 수 있음은 자명한 사실이다.In the present invention, it is used for the H beam used for the prevention of the situation, but it is obvious that it can be used for both the H beam used in the structure of civil engineering and building construction.

이상 설명한 바와 같이, 본 고안에 의한 사태방지책용 에이치빔의 보강구는 H빔의 홈에 고정 설치되기 때문에 보다 큰 H빔을 사용하지 않고도 작은 크기의 H빔의 굽힘 응력과 뒤틀림 응력을 용이하게 보강할 수 있으며, 별도로 구성된 보강구를 H빔에 설치할 수 있어 이미 시공된 상태의 H빔을 용이하게 보강하여 작업자를 편리하게 하고 자원의 낭비를 용이하게 줄일 수 있다는 이점이 있다.As described above, the reinforcing tool of the H-beam for preventing a landslide according to the present invention is fixedly installed in the groove of the H-beam, thereby easily reinforcing the bending stress and the torsional stress of the small-size H-beam without using a larger H-beam. It is possible to install a separately configured reinforcement in the H beam has the advantage that it is easy to reinforce the H beam of the already constructed state to facilitate the operator and reduce the waste of resources easily.

Claims (3)

에이치빔의 굽힘력과 뒤틀림력을 보강하는 사태방지책용 에이치빔의 보강구에 있어서,In the reinforcement tool of the H-beams for preventing landslides that reinforce the bending and twisting forces of H-beams, 에이치빔(2)의 측면에 형성된 홈(2a)에 다수개를 길이 방향으로 이격 고정하되,While a plurality of grooves (2a) formed on the side of the H-beam (2) is fixed in the longitudinal direction spaced apart, 에이치빔(2)의 길이 방향으로 나란하게 형성되어 굽힘력을 보강하는 굽힘보강부(10a), 에이치빔(2)의 길이 방향과 연직하게 형성되어 뒤틀림을 보강하는 뒤틀림보강부(10b)를 일체로 절곡 형성하는 것으로 이루어지는 사태방지책용 에이치빔의 보강구.The bending reinforcement part 10a formed side by side in the longitudinal direction of the H beam 2 to reinforce the bending force and the distortion reinforcement part 10b which are formed perpendicular to the longitudinal direction of the H beam 2 to reinforce the distortion The reinforcement tool of the H-beam for preventing a landslide, which is formed by bending. 제1항에 있어서,The method of claim 1, 상기 굽힘보강부(10a)와 뒤틀림보강부(10b)는 용접 처리되어 에이치빔(2)과 접촉된 부분과 고정되는 것으로 이루어지는 사태방지책용 에이치빔의 보강구.The bending reinforcing portion (10a) and the torsion reinforcing portion (10b) is welded reinforcement of the situation prevention measures made of a H-beam consisting of being fixed to the part in contact with the H-beam (2). 제1항과 제2항 중의 어느 한 항에 있어서,The method according to any one of claims 1 and 2, 상기 굽힘보강부(10a)와 뒤틀림보강부(10b)의 양측면에 볼트삽입부(10c)를 형성함과 더불어 에이치빔(2)에 관통구멍을 형성하여 볼트(10d)와 너트로 체결 고정되는 것을 포함하여 이루어지는 사태방지책용 에이치빔의 보강구.The bolt inserting portion 10c is formed on both sides of the bending reinforcing portion 10a and the twisting reinforcing portion 10b, and a through hole is formed in the H beam 2 to be fastened and fixed by the bolt 10d and the nut. A reinforcement tool of the H-beam for preventing a landslide.
KR20-2004-0028205U 2004-10-05 2004-10-05 Reinforcement structure of h beam for landslide prevention measure KR200371165Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0028205U KR200371165Y1 (en) 2004-10-05 2004-10-05 Reinforcement structure of h beam for landslide prevention measure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0028205U KR200371165Y1 (en) 2004-10-05 2004-10-05 Reinforcement structure of h beam for landslide prevention measure

Publications (1)

Publication Number Publication Date
KR200371165Y1 true KR200371165Y1 (en) 2004-12-24

Family

ID=49443291

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0028205U KR200371165Y1 (en) 2004-10-05 2004-10-05 Reinforcement structure of h beam for landslide prevention measure

Country Status (1)

Country Link
KR (1) KR200371165Y1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100693007B1 (en) * 2005-04-21 2007-03-12 현대제철 주식회사 Horizontal resisting power increasing structure of web direction of H pile
KR101256435B1 (en) 2011-06-29 2013-05-10 (주)아루미존 Wire net anchor for wire net fence establishment
KR101534216B1 (en) * 2013-11-18 2015-07-09 동부제철 주식회사 Column for supporting panel
KR101840979B1 (en) * 2017-09-26 2018-05-04 박성원 Stiffener

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100693007B1 (en) * 2005-04-21 2007-03-12 현대제철 주식회사 Horizontal resisting power increasing structure of web direction of H pile
KR101256435B1 (en) 2011-06-29 2013-05-10 (주)아루미존 Wire net anchor for wire net fence establishment
KR101534216B1 (en) * 2013-11-18 2015-07-09 동부제철 주식회사 Column for supporting panel
KR101840979B1 (en) * 2017-09-26 2018-05-04 박성원 Stiffener

Similar Documents

Publication Publication Date Title
KR101210721B1 (en) Retaining Wall Using PHC Pile
KR200409324Y1 (en) Deck plate
KR101043239B1 (en) Prestressed segment concrete girder for bridge and manufacturing method thereof
KR200371165Y1 (en) Reinforcement structure of h beam for landslide prevention measure
JP5267278B2 (en) Steel sheet pile wall and construction method thereof, synthetic floor board structure using steel sheet pile wall and construction method thereof
JP2004324265A (en) Bridge fall preventing device, movement limiting device and bridge fall preventing method
KR102074193B1 (en) Structure of bamboo soil nailing
US11739491B2 (en) Hybrid permanent anchor
KR102186408B1 (en) Non-open cut type tunnel construction structure using steel pipe with tensile force
KR101861684B1 (en) Reinforced earth-anchor structure for weakground
KR20090019969A (en) Construction formation of corrugated steel pipe using wire rope
KR100779991B1 (en) Independent temporary method H-pile wall prestressed
KR200225554Y1 (en) Concrete PC beam reinforcement device for bridge
KR200277686Y1 (en) removable tie cable
KR19990085243A (en) Rock bolt linkage reinforcement device and linkage fixing method to prevent rock collapse
KR101984470B1 (en) Reinforcement method using steel wire of h-beam
KR200308413Y1 (en) End Tip Apparatus for Reducing Opening Cross Section of Steel Pipe Pile
JP5747516B2 (en) Shield tunnel
JP2009215789A (en) Reinforcement structure
KR102585929B1 (en) Method and Apparatus for Reinforcing the Parent Moment of the Bridge Structure
KR100661123B1 (en) Concrete Pile with an Extended Head Using Reinforcing Plate
JP5135689B2 (en) Shear reinforcement method
KR200286397Y1 (en) Structure of reinforcement soil retaining wall with triangle-shaped anchor bar reinforcement
CN211340846U (en) Arched waist rail
KR102074573B1 (en) Bracket for ground reinforcement

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20100303

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee