KR200277686Y1 - removable tie cable - Google Patents

removable tie cable Download PDF

Info

Publication number
KR200277686Y1
KR200277686Y1 KR2020020006705U KR20020006705U KR200277686Y1 KR 200277686 Y1 KR200277686 Y1 KR 200277686Y1 KR 2020020006705 U KR2020020006705 U KR 2020020006705U KR 20020006705 U KR20020006705 U KR 20020006705U KR 200277686 Y1 KR200277686 Y1 KR 200277686Y1
Authority
KR
South Korea
Prior art keywords
fixing
strand
spring
head
wedge
Prior art date
Application number
KR2020020006705U
Other languages
Korean (ko)
Inventor
박태영
Original Assignee
한성씨앤시스(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한성씨앤시스(주) filed Critical 한성씨앤시스(주)
Priority to KR2020020006705U priority Critical patent/KR200277686Y1/en
Application granted granted Critical
Publication of KR200277686Y1 publication Critical patent/KR200277686Y1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

본 고안은 토목 공사 등에 사용되는 제거형의 타이케이블에 관한 것으로, 그 주요 구성은 다음과 같다. 슬라이드파이프(1)와 강연선(2) 등을 포함하여 구성된 타이케이블로서, 상기 강연선(2)의 일단은, 보호캡(8)으로 둘러싸인 고정정착헤드(20) 와 앵커플레이트(4)로 구성된 고정정착구(9)가 형성되고, 상기 강연선(2)의 타단에는, 강연선(2)을 잡아 주는 웨지(5), 이 웨지(5)의 외주를 고정시키는 앵커헤드(6), 앵커헤드(6)에 수직으로 설치되는 앵커플레이트(4)의 조합으로 구성하는 것을 특징으로 한다. 상기한 강연선(2)의 일단을 고정하는 고정정착헤드(20)는 그 내경 중심에 스프링(11)이 설치되며, 그 스프링(11)의 외주로는 인너블럭(12)이 설치되고, 그리고 상기한 강연선(2)을 고정하기 위하여 인너블럭(12)의 후부로는 고정재(21)가 수직으로 설치되며, 이 고정재(21)의 통공(22)을 관통하여 강연선(2)이 고정설치된다. 상기한 스프링(11)의 타단은 인출선(3)과 일체로 이루어져, 이 인출선의 당김에 의하여 스프링(11)의 제거가 가능하도록 구성한 것을 특징으로 한다.The present invention relates to a removal type tie cable used in civil engineering, etc. The main configuration is as follows. A tie cable comprising a slide pipe (1) and a stranded wire (2), etc., wherein one end of the stranded wire (2) is fixed by a fixed fixing head (20) and an anchor plate (4) surrounded by a protective cap (8). A fixing unit 9 is formed, and at the other end of the strand 2, a wedge 5 holding the strand 2, an anchor head 6 fixing the outer circumference of the wedge 5, and an anchor head 6 Characterized in that it consists of a combination of anchor plates (4) installed perpendicular to the. The fixed anchoring head 20 fixing one end of the strand 2 is provided with a spring 11 at the center of its inner diameter, and an inner block 12 is installed at the outer circumference of the spring 11. In order to fix one of the strands 2, the fixing member 21 is vertically installed at the rear of the inner block 12, and the strand 2 is fixed through the through-hole 22 of the fixing member 21. The other end of the spring 11 is formed integrally with the leader line 3, characterized in that configured to be able to remove the spring 11 by pulling the leader line.

Description

제거형 타이케이블{removable tie cable}Removable tie cable

본 고안은 토목, 건축 등에 사용되는 타이케이블에 관한 것으로, 특히 설치된 앵커 내에의 강연선 및 에이치빔을 공사 후에 제거가 가능한 제거형의 타이케이블에 관한 것이다.The present invention relates to a tie cable used in civil engineering, construction, etc., and more particularly relates to a tie-type cable of the removable type that can remove the strands and H-beams in the installed anchor after construction.

토목 등의 공사에서 예를 들어, 흙막이 벽체만으로 토압에 저항할 수 없을 때 흙막이벽 보강용으로 타이케이블, 또는 와이어 로우프, 철근 등을 사용하고 있다In civil engineering, for example, when the soil wall cannot resist soil pressure, tie cables, wire ropes, and reinforcing bars are used to reinforce the wall.

그러나 앵커링 파일, 즉 단면이 예를 들어, 에이치형상인 에이치빔파일을 사용하여 1차 공사완료 후 이어서 측면 공사가 진행될 경우 에이치빔 파일을 묻어둔 상태에서 성토공사를 하고 나면, 파일과 타이케이블이 연결 고정된 관계로 중간에 있는 파일을 제거할 수 없게된다. 공사 완료 후, 앵커링 파일을 뽑아 낼 수 없어 자원 낭비일 뿐만 아니라 고가의 에이치빔을 그대로 두어야 하기 때문에 경제적 측면에서도 바람직하지 못하다However, when the construction of the anchoring pile, ie, the H-beam beam having a cross-section, for example, H-beam beam, is carried out after the completion of the first construction and the construction of the beam is buried, the pile and the tie cable Due to the fixed connection, you will not be able to remove files in the middle. After completion of the construction, the anchoring file cannot be pulled out, which is not only a waste of resources but also an expensive H-beam, which is not preferable in terms of economy.

또한 이 위치에서 다른 필요한 공사 등을 행할 경우, 이 지중에 매설되어 있는 에이치빔과 타이케이블이 공사에 있어 많은 지장을 초래함으로써, 공사 지연의 근본적인 원인의 하나로 지적될 만큼 처리에 있어 문제가 되어왔다.In addition, when other necessary construction is performed at this location, H-beams and tie-cables buried in this area cause a lot of problems in construction, which has been a problem in processing so that it can be pointed out as one of the root causes of construction delay. .

본 고안은 상기한 문제점을 감안하여 고안한 것으로, 본 고안의 목적은, 성토공사로 일차 공사가 완료되고 연속해서 이차 공사가 진행되는 경우, 예를 들어 도로를 건설할 때 양쪽에 파일을 세우고 중간에 성토하면서 토압에 대응하기 위해 타이케이블을 설치하고 성토가 끝나고 바로 측면에 확장 공사할 경우, 에이치빔 파일과 함께 설치되는 타이케이블을 모두 제거 가능한 형식의 타이케이블을 구성하여, 에이치빔 파일의 재활용이 가능하고 공사 시간을 줄이고, 공사비 증가의 원인을 제거토록 한 것에 그 목적이 있다.The present invention has been devised in view of the above problems, and the object of the present invention is to construct a pile on both sides when constructing a road, for example, when the secondary work is completed after the primary work is completed by the landfill work. In order to cope with earth pressure while laying on the ground, if a tie cable is installed and extended to the side immediately after the end of the laying, the tie cable of a type that can remove all tie cables installed together with the H-beam pile will be recycled. The aim is to make this possible, reduce construction time, and eliminate the cause of the increase in construction costs.

도 1 은 본 고안에 따른 제거형 타이케이블의 구성을 설명하기 위한 도면1 is a view for explaining the configuration of the removable tie cable according to the present invention

도 2 는 도 1 의 고정정착헤드(20) 부위만을 도 1 의 길이 방향에서 수직으로 잘라 본 단면상의 구성도FIG. 2 is a cross-sectional configuration view of the fixed fixing head 20 of FIG.

도 3 은 도 1 의 고정정착구(9) 부위에 대한 상세 단면 구성도3 is a detailed cross-sectional view of the fixing fixture 9 of FIG.

도 4 는 앵커헤드(6)에 대한 구성을 도 1 의 길이 방향에 수직으로 잘라 본 단면 구성도.4 is a cross-sectional configuration of the anchor head 6 cut perpendicularly to the longitudinal direction of FIG. 1.

도 5 는 본 고안에 따른 한 실시예5 is an embodiment according to the present invention

상기한 목적을 달성하기 위한 본 고안의 주요 구성은, 주요 구성은 그 주요 구성은 다음과 같다. 슬라이드파이프(1)와 강연선(2) 등을 포함하여 구성된 타이케이블로서, 상기 강연선(2)의 일단은, 보호캡(8)으로 둘러싸인 고정정착헤드(20) 와 앵커플레이트(4)로 구성된 고정정착구(9)가 형성되고, 상기 강연선(2)의 타단에는, 강연선(2)을 잡아 주는 웨지(5), 이 웨지(5)의 외주를 고정시키는 앵커헤드(6), 앵커헤드(6)에 수직으로 설치되는 앵커플레이트(4)의 조합으로 구성하는 것을 특징으로 한다. 상기한 강연선(2)의 일단을 고정하는 고정정착헤드(20)는 그 내경 중심에 스프링(11)이 설치되며, 그 스프링(11)의 외주로는 인너블럭(12)이 설치되고, 그리고 상기한 강연선(2)을 고정하기 위하여 인너블럭(12)의 후부로는 고정재(21)가 수직으로 설치되며, 이 고정재(21)의 통공(22)을 관통하여 강연선(2)이 고정설치되며, 상기한 스프링(11)의 타단은 인출선(3)과 일체로 이루어져, 이 인출선의 당김에 의하여 스프링(11)의 제거가 가능하도록 구성한 것을 특징으로 한다.The main configuration of the present invention for achieving the above object, the main configuration is as follows. A tie cable comprising a slide pipe (1) and a stranded wire (2), etc., wherein one end of the stranded wire (2) is fixed by a fixed fixing head (20) and an anchor plate (4) surrounded by a protective cap (8). A fixing unit 9 is formed, and at the other end of the strand 2, a wedge 5 holding the strand 2, an anchor head 6 fixing the outer circumference of the wedge 5, and an anchor head 6 Characterized in that it consists of a combination of anchor plates (4) installed perpendicular to the. The fixed anchoring head 20 fixing one end of the strand 2 is provided with a spring 11 at the center of its inner diameter, and an inner block 12 is installed at the outer circumference of the spring 11. In order to fix the strand 2, the fixing member 21 is vertically installed at the rear of the inner block 12, and the strand 2 is fixed through the through hole 22 of the fixing member 21. The other end of the spring 11 is formed integrally with the leader line 3, characterized in that configured to be able to remove the spring 11 by pulling the leader line.

상기한 특징 외의 다른 특징 및 구조에 대하여 이하, 첨부도면과 함께 상술한다.Other features and structures than those described above will be described in detail below with the accompanying drawings.

도 1 은 본 고안에 따른 제거형 타이케이블의 구성을 설명하기 위한 도면이다.1 is a view for explaining the configuration of the removable tie cable according to the present invention.

도시한 바와 같이, 슬라이드파이프(1), 예를 들어, PE(폴리에틸렌) 재질의 슬라이드파이프(1)의 내에는 강연선(2) 및 인출선(3)이 내장되고, 여기서 강연선(2)의 일단은 웨지(5), 앵커헤드(6) 및 앵커플레이트(4)의 조립체로 구성된다. 그리고 그 반대쪽은 보호캡(8)으로 둘러싸인 고정정착헤드(20) 와 앵커플레이트(4)로 구성된 고정정착구(9)가 형성된다.As shown in the drawing, a stranded wire 2 and a lead wire 3 are embedded in the slide pipe 1, for example, a slide pipe 1 made of PE (polyethylene). Is composed of an assembly of wedges 5, anchor heads 6 and anchor plates 4. And the opposite side is formed with a fixing fixture (9) consisting of a fixed fixing head 20 and the anchor plate (4) surrounded by a protective cap (8).

고정정착구(9)는 도 2 에 도시한 개략 종단면의 구성에서 보시는 바와 같이, 고정정착헤드(20)와, 그 중앙에 설치되는 스프링(11)과 그 주위의 인너블럭(12)과 강연선(2)의 조립체를 포함한다.As shown in the configuration of the schematic longitudinal section shown in Fig. 2, the fixing fixture 9 has a fixing fixing head 20, a spring 11 provided at the center thereof, an inner block 12 and a stranded wire 2 around the fixing fixing head 20. ) Assembly.

도 3 은 도 1 에서의 고정정착구(9) 부위에 대한 상세 단면 구성도이다.3 is a detailed cross-sectional configuration diagram of the fixing fixture 9 in FIG.

도시한 바와 같이, 판상의 고정재(21)의 좌측으로 즉, 후방으로 고정정착헤드(20)가 설치되고, 고정정착헤드(20)는 그 내경으로 인너블럭(12)과 스프링(11)을 포함한다. 인너블럭(12)이 외주로는 웨지(25)가 설치되는데 이 웨지(25)는 강연선(2)을 쐐기식으로 고정하고 있다. 따라서, 웨지(25)는 스프링(11)을 제거할 경우 강연선(2)의 조임이 느슨하게 된다.As shown, the fixing fixing head 20 is installed to the left of the plate-shaped fixing member 21, that is, the fixing fixing head 20 includes the inner block 12 and the spring 11 in its inner diameter. do. The inner block 12 is provided with a wedge 25 on its outer circumference, and the wedge 25 fixes the strand 2 in a wedge fashion. Therefore, when the wedge 25 is removed from the spring 11, the tightness of the strand 2 is loosened.

고정재(21)는 원형상으로 이루어 지며 강연선(2)의 설치 개수에 따라 통공이 형성된다. 예를 들어, 강연선이 4 개일 경우엔 4 개의 통공(22)이 형성된다.Fixing material 21 is made of a circular shape is formed through the hole according to the number of installation of the strand (2). For example, if there are four strands, four through holes 22 are formed.

앵커플레이트(4)는 본 고안에 따른 타이케이블의 좌우 대칭으로 설치되며 그 중앙엔 강연선(2)들이 충분히 수용될 수 있을 정도로 충분히 큰 통공이 형성되며 개략 4 각형상으로 이루어진다. 그러나 그 4 각 형상뿐만 아니라 어떠한 다른 판상 형태로도 만들 수 있다.The anchor plate (4) is installed in the symmetrical ties of the tie cable according to the present invention is formed in the center is large enough to form a through hole large enough to accommodate the strands (2) in the shape of a rough quadrilateral. However, it can be made into any other plate shape as well as the quadrilateral shape.

케이블을 당기는 인장 부위, 즉 앵커헤드(6)는 인장 정착헤드로써, 그 단면 구성이 도 4 와 같이, 강연선(2)을 수용하는 홈이 형성된 원판형이며 그 홈의 외주엔 웨지(5)가 설치되어 강연선(2)을 잡아 줄 수 있게 구성된다. 웨지(5)는 공지된 바와 같이 그 외주 일부가 절개되어 있는 형상이다. 이 웨지의 형상은 공지의 형상이므로, 이에 대한 상세한 구조적인 설명이 불필요하다.The tensioning section for pulling the cable, that is, the anchor head 6, is a tension fixing head, and its cross-sectional configuration is a disk with a groove for accommodating the strand 2 as shown in FIG. 4, and the wedge 5 is formed at the outer circumference of the groove. Installed is configured to hold the strand (2). The wedge 5 is a shape in which a part of its outer periphery is cut | disconnected as known. Since the shape of this wedge is a known shape, detailed structural description thereof is unnecessary.

다음은 상기한 본 고안의 구성에 의한 실시 예를 설명한다.The following describes an embodiment by the configuration of the present invention described above.

도 5의 예에 나타나있듯이, 에이치빔(30)(여기서 에이치(H)빔은 그 단면의 형상이 H 형상인 철구조물 빔을 말한다.)을 좌우 양쪽으로 설치한 후, 벽체를 대고 그 두 에이치빔(30) 사이를 본 고안에 따른 제거형의 타이 케이블을 상호 연결하되 그 구조물을 유지하는데 필요한 수만큼 설치한다.As shown in the example of Fig. 5, the H beam 30 (here, the H beam refers to a steel structure beam whose shape is H-shaped in cross section) is installed on the left and right sides, and then the two h Interconnect the removable tie cables according to the present invention between the beams 30, but install as many as necessary to maintain the structure.

이 상태에서, 공사 완료 후 강연선(2)을 뽑아내고자 할 경우, 소정의 예비 준비 작업을 한 후, 먼저 인출선(3)을 잡아 당겨내면 도 3 에 도시한 바와 같이 인출선의 다른 끝 단부가 스프링(11)으로 형성되어 있어, 이 스프링이 당겨지면서 설치된 스프링의 직경이 줄어든다. 그러면 그 주위의 인너블럭(12), 웨지(25) 등이 안으로 밀려들어오면서, 조임이 느슨해지고, 어느 정도 유격이 생기므로 강연선(2)을 잡아당기면 쉽게 제거가 가능하다.In this state, when the stranded wire 2 is to be pulled out after completion of the construction, after the preliminary preliminary preparation work, the lead wire 3 is pulled out first, and as shown in FIG. 3, the other end of the lead wire is springed. It is formed of (11), and the diameter of the installed spring is reduced as this spring is pulled. Then, the inner block 12, the wedge 25, and the like are pushed in, and the tightening becomes loose, and a certain amount of play occurs, so that the strand 2 can be easily removed by pulling the strand 2.

이와 같은 실시로 인하여 강연선(2)이 모두 제거되면 원하는 한쪽 부위의 에이치빔(30)을 제거하고 다른 확장 공사 후 필요에 따라 다른 부위도 제거 할 수 있다. 즉 본 고안에 의하면 에이치빔(30) 양측단 모두를 상방으로 뽑아내어 제거할 수 있게 된다.Due to such implementation, when the strands 2 are all removed, the H beam 30 of one desired portion may be removed and other portions may be removed as necessary after other expansion work. In other words, according to the present invention, both ends of the H-beam 30 can be pulled out and removed.

이상과 같은 본 고안에 의하면 고가의 에이치빔을 뽑아 내어 재사용할 수 있는 잇점이 있다According to the present invention as described above there is an advantage that can be extracted and reused expensive H-beam

또한 본 고안에 의하면 차후, 이 위치에서 또 다른 천공 등의 공사를 할 경우, 이 불필요하게 박혀 있는 에이치 빔으로 인하여 발생되는 공사상의 어려움이나별도의 어려운 제거 작업을 할 필요가 없는 장점이 있다.In addition, according to the present invention, in the future, when another construction, such as drilling in the position, there is an advantage that does not need to remove the difficulty or construction difficulties caused by this unnecessary embedded H-beam.

Claims (2)

슬라이드파이프(1)와 강연선(2) 등을 포함하여 이루어지는 타이케이블에 있어서,In a tie cable comprising a slide pipe (1), a stranded wire (2), etc., 상기 강연선(2)의 일단은, 보호캡(8)으로 둘러싸인 고정정착헤드(20) 와 앵커플레이트(4)로 구성된 고정정착구(9)가 형성되고,One end of the strand 2, a fixing fixture 9 consisting of a fixing fixing head 20 and an anchor plate 4 surrounded by a protective cap 8 is formed, 상기 강연선(2)의 타단에는, 강연선(2)을 잡아 주는 웨지(5), 이 웨지(5)의 외주를 고정시키는 앵커헤드(6), 앵커헤드(6)에 수직으로 설치되는 앵커플레이트(4)의 조합으로 구성하는 것을 특징으로 제거형 타이케이블At the other end of the strand 2, a wedge 5 holding the strand 2, an anchor head 6 fixing the outer periphery of the wedge 5, an anchor plate perpendicular to the anchor head 6 ( 4) Removable tie cable, characterized by consisting of a combination 제 1 항에 있어서,The method of claim 1, 상기한 강연선(2)의 일단을 고정하는 고정정착헤드(20)는 그 내경 중심에 스프링(11)이 설치되며, 그 스프링(11)의 외주로는 인너블럭(12) 및 강연선(2)이 설치되고, 그리고 상기한 강연선(2)을 고정하기 위하여 웨지(25)의 후부로는 고정재(21)가 수직으로 설치되며, 이 고정재(21)의 통공(22)을 관통하여 강연선(2)이 고정설치되며, 상기한 스프링(11)의 타단은 인출선(3)과 일체로 이루어져, 이 인출선의 당김에 의하여 스프링(11)의 제거가 가능하도록 구성한 것을 특징으로 제거형 타이케이블The fixed fixing head 20 for fixing one end of the strand 2 is provided with a spring 11 at the center of the inner diameter, the outer block of the spring 11 is the inner block 12 and the strand 2 The fixing member 21 is vertically installed at the rear of the wedge 25 so as to fix the strand 2, and the strand 2 passes through the through hole 22 of the fixing member 21. It is fixedly installed, the other end of the spring 11 is formed integrally with the lead wire (3), characterized in that the removal of the spring 11 by the pull-out of this lead wire is configured to remove the tie cable
KR2020020006705U 2002-03-07 2002-03-07 removable tie cable KR200277686Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020006705U KR200277686Y1 (en) 2002-03-07 2002-03-07 removable tie cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020006705U KR200277686Y1 (en) 2002-03-07 2002-03-07 removable tie cable

Publications (1)

Publication Number Publication Date
KR200277686Y1 true KR200277686Y1 (en) 2002-06-07

Family

ID=73073916

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020006705U KR200277686Y1 (en) 2002-03-07 2002-03-07 removable tie cable

Country Status (1)

Country Link
KR (1) KR200277686Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100741405B1 (en) * 2006-03-09 2007-07-20 심석래 A tie cable
KR101146764B1 (en) * 2010-04-12 2012-05-17 김희봉 structure of remavable anchor
CN109555546A (en) * 2019-01-21 2019-04-02 中国水利水电第十工程局有限公司 It faces upward the lower rope device of anchor cable for deep hole wide-angle

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100741405B1 (en) * 2006-03-09 2007-07-20 심석래 A tie cable
KR101146764B1 (en) * 2010-04-12 2012-05-17 김희봉 structure of remavable anchor
CN109555546A (en) * 2019-01-21 2019-04-02 中国水利水电第十工程局有限公司 It faces upward the lower rope device of anchor cable for deep hole wide-angle
CN109555546B (en) * 2019-01-21 2024-04-09 中国水利水电第十工程局有限公司 Cable unloading device for deep hole large-angle upward-leaning anchor cable

Similar Documents

Publication Publication Date Title
JP4522941B2 (en) How to dismantle and remove the arch bridge
KR102082333B1 (en) Prestressed pile and Self reliance retaining wall construction method using the same
US3650112A (en) Method of shoring and apparatus therefor
JP6375195B2 (en) Widened PC slab structure and widening method of existing PC slab
JP4823937B2 (en) Fall bridge prevention structure
KR102197103B1 (en) One-sided Camber-type Composite File for Retaining Wall and Method for manufacturing this same and Method for constructing Retaining Wall using this same
KR200277686Y1 (en) removable tie cable
KR100903751B1 (en) Combination device for cables
KR102184900B1 (en) Temporary retaining wall structure using circular steel pipe and construction method thereof
JP2004324265A (en) Bridge fall preventing device, movement limiting device and bridge fall preventing method
KR102074193B1 (en) Structure of bamboo soil nailing
JP2006016893A (en) Shearing reinforcing method of existing structure
JP7031970B2 (en) How to repair PC structures
KR100906161B1 (en) Construction of corrugated steel pipe using wire rope
KR101241403B1 (en) Removal anchor
JP2019218726A (en) Reinforcement anchor
KR20150050012A (en) Retaining Wall and Construction Method thereof
KR102130519B1 (en) Waling member for earth anchor
KR200241299Y1 (en) External steel wire reinforcement anchoring apparatus for concrete structure
JP5101050B2 (en) Segment unit
JPS584094A (en) Method of constructing low road cross
KR102255360B1 (en) Prestressed steel pipe structure and non-crackable construction method using the same
KR102421097B1 (en) Precast concrete culvet structure
KR200277684Y1 (en) anchor for removable anchor
KR20190108963A (en) Apparatus for fixing reinforced retainaing wall block

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20080527

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee