KR200348495Y1 - Artificial fall imitation stone structure - Google Patents
Artificial fall imitation stone structure Download PDFInfo
- Publication number
- KR200348495Y1 KR200348495Y1 KR20-2004-0001130U KR20040001130U KR200348495Y1 KR 200348495 Y1 KR200348495 Y1 KR 200348495Y1 KR 20040001130 U KR20040001130 U KR 20040001130U KR 200348495 Y1 KR200348495 Y1 KR 200348495Y1
- Authority
- KR
- South Korea
- Prior art keywords
- artificial
- cgrc
- concrete
- waterfall
- arm
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B44—DECORATIVE ARTS
- B44C—PRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
- B44C5/00—Processes for producing special ornamental bodies
- B44C5/06—Natural ornaments; Imitations thereof
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B44—DECORATIVE ARTS
- B44F—SPECIAL DESIGNS OR PICTURES
- B44F9/00—Designs imitating natural patterns
- B44F9/04—Designs imitating natural patterns of stone surfaces, e.g. marble
Landscapes
- Revetment (AREA)
Abstract
본 고안은 인공폭포의 인공암 구조물에 관한 것으로, 더 상세히는 블록화된 인공암을 별도 제작하여 현장에서 조립 및 설치하므로서 작업공정 및 코스트를 절감하기 위한 인공폭포의 인공암 구조물에 관한 것이다.The present invention relates to a man-made waterfall of artificial waterfalls, and more particularly to a man-made waterfall of artificial waterfalls to reduce the work process and cost by assembling and installing in the field by separately manufacturing a blocked artificial cancer.
본 고안은 옹벽(10)과, 이 옹벽(10)에 고정되는 철구조물(20)과, 이 철구조물(20)에 복수의 인공암(40)이 설치된 인공폭포에 있어서, 전면에 CGRC부(41)가 형성되고 이 CGRC부(41) 내측에 일정한 간격을 두고 보강재(42)가 구비되고 이 보강재(42)를 감싸며 콘크리트(43)가 형성되며, 상기 콘크리트(43)에 매립되어 돌출된 복수의 결합부재(44)를 갖는 CGRC 인공암(40)과. 상기 인공암(40)의 결합부재(44)가 철구조물(20)에 결합된 것 특징으로 한다.The present invention is an artificial waterfall in which the retaining wall 10, the steel structure 20 fixed to the retaining wall 10, and a plurality of artificial arms 40 are installed on the steel structure 20, the CGRC portion ( 41 is formed and the reinforcement 42 is provided at regular intervals inside the CGRC portion 41, the reinforcement 42 is wrapped around the concrete 43 is formed, a plurality of protrusions embedded in the concrete 43 CGRC artificial arm (40) having a coupling member (44). Coupling member 44 of the artificial arm 40 is characterized in that coupled to the steel structure (20).
Description
본 고안은 인공폭포의 인공암 구조물에 관한 것으로, 더 상세히는 블록화된 인공암을 별도 제작하여 현장에서 조립 및 설치하므로서 작업공정 및 코스트를 절감하기 위한 인공폭포의 인공암 구조물에 관한 것이다.The present invention relates to a man-made waterfall of artificial waterfalls, and more particularly to a man-made waterfall of artificial waterfalls to reduce the work process and cost by assembling and installing in the field by separately manufacturing a blocked artificial cancer.
일반적으로 공원이나 절개사면 및 보강옹벽 등에 조경을 목적으로 인공벽체나 인공폭포 등을 제작하기 위해서는 현장 제작되는 인공암이 사용된다. 인공암은 열에 강하고 장시간 자외선에 노출되어도 변색되지 않는 제품으로 하되, 주 원료로는 시멘트와 보강철물 및 콘크리트 등으로 이루어진다.In general, in order to produce artificial walls and waterfalls for the purpose of landscaping, such as parks, inclined slopes and reinforcement retaining walls, on-site artificial rocks are used. Artificial rock is a product that is resistant to heat and does not discolor even when exposed to ultraviolet rays for a long time. The main raw materials are cement, reinforcing steel, and concrete.
도 9는 종래의 인공폭포를 도시한 것으로, 인공폭포를 설치하기 위해서는 먼저 옹벽(1)을 형성하고, 이 옹벽(1)의 일측에 결합되는 철구조물(2)과, 상기 철구조물(2)에 따라 콘크리트를 타설된 인공암(4)이 형성되고 이 인공암의 표면에 도료를 도포하는 것이다.FIG. 9 illustrates a conventional artificial waterfall, in order to install the artificial waterfall, the retaining wall 1 is first formed, and the iron structure 2 coupled to one side of the retaining wall 1 and the iron structure 2. According to this, the artificial rock 4 in which concrete is poured is formed and paint is applied to the surface of the artificial rock.
이와 같이 인공암을 제작하기 위해서, 상기 철구조물에 거푸집 및 이 메쉬망등을 설치하고 콘크리트를 타설함에 있어 많은 인력과 자재 등 소요되며 안전사고가 발생되는 등의 제반 문제점이 야기되었고, 그 뿐만아니라 설치된 인공암에 수작업으로 도료를 도포해야 하므로 작업공정이 복잡하고, 이로 인해 제작비용이 고가인 문제점이 있었다.Thus, in order to manufacture the artificial cancer, in order to install the formwork and this mesh network in the steel structure and concrete, a lot of manpower and materials are required, such as safety accidents occur, and not only Since the paint must be applied manually to the installed artificial cancer, the work process is complicated, and thus there is a problem in that the manufacturing cost is high.
또한 인공암(1)에 도포된 도료는 햇빛에 노출이 되어 쉽게 색상이 탈색되고변형되는 문제점도 있었다.In addition, the paint applied to the artificial cancer (1) was exposed to sunlight, there was also a problem that the color is easily discolored and deformed.
상기의 문제점을 해결하기 위한 본 고안은 콘크리트에 CGRC부를 첨가하고 다양한 형상과 모양으로블럭화된 인공암을 제작함과 아울러 현장에서는 조립 및 설치만 하므로서 작업공정 및 코스트를 절감시키기 위한 목적이 있다.The present invention for solving the above problems is to add a CGRC part to the concrete and to produce a man-made block blocked in various shapes and shapes, as well as to assemble and install in the field, there is a purpose for reducing the work process and cost.
도 1은 본 고안에 따른 인공폭포의 인공암 제조방법을 보인 간략도1 is a simplified view showing an artificial cancer manufacturing method of artificial waterfall according to the present invention
도 2는 본 고안에 따른 인공폭포의 인공암 제조방법을 보인 단면도2 is a cross-sectional view showing a method for manufacturing artificial cancer of the artificial waterfall according to the present invention
도 3은 본 고안에 따른 인공폭포 인공암이 설치상태 측단면도Figure 3 is a side cross-sectional view of the artificial waterfall artificial cancer installation state according to the present invention
도 4,5,6는 도 3에 도시된 인공폭포의 인공암을 보인 일부 단면도4, 5, and 6 are partial cross-sectional views showing the artificial cancer of the artificial waterfall shown in FIG.
도 7는 본 고안에 따른 인공폭포 인공암 보인 다른실시예 측단면도Figure 7 is a side cross-sectional view showing another embodiment of artificial waterfall artificial cancer according to the present invention
도 8은 도 7에 도시된 인공폭포의 인공암을 보인 일부확대도8 is a partially enlarged view showing the artificial cancer of the artificial waterfall shown in FIG.
도 9는 종래의 인공폭포를 보인 단면도9 is a cross-sectional view showing a conventional artificial waterfall
* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
10: 옹벽 20: 철구조물10: retaining wall 20: steel structure
21: 지지브라켓 30: 뼈대21: support bracket 30: skeleton
31: 고정바 32: 지지바31: fixed bar 32: support bar
40: 인공암 41: CGRC부40: artificial cancer 41: CGRC unit
42: 보강재 43: 콘크리트42: reinforcement 43: concrete
44: 결합부재 46: 경사면44: coupling member 46: inclined surface
상기 목적을 달성하기 위한 옹벽과, 이 옹벽에 고정되는 철구조물과, 이 철구조물에 복수의 인공암이 설치된 인공폭포에 있어서, 전면에 CGRC부가 형성되고 이 CGRC부의 내측에 일정한 간격을 두고 보강재가 구비되고 이 보강재를 감싸며 콘크리트가 형성되며, 상기 콘크리트에 매립되어 돌출된 복수의 결합부재를 갖는 CGRC 인공암블럭과, 상기 인공암블럭의 결합부재가 철구조물에 결합된 것을 특징으로 한다.In a retaining wall for achieving the above object, an iron structure fixed to the retaining wall, and an artificial waterfall provided with a plurality of artificial arms on the iron structure, a CGRC portion is formed on the front surface and a reinforcement material is formed at regular intervals inside the CGRC portion. It is provided and wraps the reinforcing material, the concrete is formed, characterized in that the CGRC artificial arm block having a plurality of coupling members embedded in the concrete projecting, and the coupling member of the artificial arm block is coupled to the steel structure.
이하, 본 고안의 바람직한 실시예를 첨부도면에 따라 더욱 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings.
도 1은 본 고안에 따른 인공폭포의 인공암 제조방법을 보인 간략도이고, 도 2는 본 고안에 따른 인공폭포의 인공암이 제조방법을 보인 단면도이며, 도 3은 본 고안에 따른 인공폭포 인공암이 설치상태 측단면도이고, 도 4,5,6는 도 3에 도시된 인공폭포의 인공암을 보인 일부 단면도이며, 도 7는 본 고안에 따른 인공폭포 인공암 보인 다른실시예 측단면도이고, 도 8은 도 7에 도시된 인공폭포의 인공암을 보인 일부확대도이다.1 is a simplified view showing a method of manufacturing artificial cancer of the artificial waterfall according to the present invention, Figure 2 is a cross-sectional view showing a method of manufacturing an artificial waterfall of the artificial waterfall according to the present invention, Figure 3 is an artificial waterfall artificial according to the present invention 4 is a side cross-sectional view of the installation state, and FIGS. 4, 5, and 6 are partial cross-sectional views showing the artificial cancer of the artificial waterfall shown in FIG. 3, and FIG. FIG. 8 is a partially enlarged view showing the artificial cancer of the artificial waterfall shown in FIG. 7.
도 1 및 도 2에 도시된 바와 같이 본 고안은 인공암 금형(48) 제작하는 제1단계(100)와, 상기 금형(48)의 내부에 CGRC부(41)를 주입하는 제2단계(200)와, 상기 CGRC부(41)에서 일정한 간격을 두고 보강재(42) 및 결합부재(44)를 설치하는 제3단계(300)와, 상기 CGRC부(41)의 상부에 콘크리트를 주입하여 인공암을 양생하는 제4단계로 이루어진다.As shown in FIG. 1 and FIG. 2, the present invention provides a first step 100 of manufacturing an artificial cancer mold 48 and a second step 200 of injecting a CGRC part 41 into the mold 48. ) And the third step 300 of installing the reinforcing material 42 and the coupling member 44 at regular intervals from the CGRC part 41, and injecting concrete into the upper part of the CGRC part 41 to artificial cancer. The fourth step is to cure.
상기 제1단계(100)는 소정 형상과 모양을 갖도록 복수의 금형(48)을 제작한다.In the first step 100, a plurality of molds 48 are manufactured to have a predetermined shape and shape.
상기 제2단계(200)는 시멘트, 모래, BOTTOM-ASH, 감소제, 색소, 기포제거제가 혼합된 액상의 CGRC부(41)를 금형(48)의 내부에 골고루 주입하는 것이다.The second step 200 is to uniformly inject the CGRC portion 41 of the liquid phase mixed with cement, sand, BOTTOM-ASH, reducing agent, pigment, defoamer evenly inside the mold 48.
상기 제3단계(300)는 상기 CGRC부(41)에서 일정한 간격을 두고 설치되는 보강재(42)와 결합부재(44)를 갖는다.The third step 300 has a reinforcing member 42 and a coupling member 44 which are installed at regular intervals in the CGRC portion 41.
상기 결합부재(44)는 인공암(40)의 조립 및 설치 구조에 따라 변경될 수 있는 것이다.The coupling member 44 may be changed according to the assembly and installation structure of the artificial arm 40.
상기 제4단계(400)는 상기 CGRC부(41)에 적층됨과 동시에 보강재(42)와 결합부재(44)를 감싸며 콘크리트(43)를 주입하고,금형을 제거한 후 일정시간 동안 자연 건조시켜 인공암을 양생한다.The fourth step 400 is laminated to the CGRC part 41 and at the same time to wrap the reinforcing material 42 and the coupling member 44, injecting the concrete 43, remove the mold and dried naturally for a predetermined time after artificial cancer To cure.
상기 콘크리트(43)에는 몰탈방수액과 물을 1:3 비율로 희석하여 상기 콘크리트(43)에 주입하면 누수가 방지되는 것이다.In the concrete 43, when the mortar waterproofing liquid and water are diluted in a ratio of 1: 3 and injected into the concrete 43, leakage of water is prevented.
상기 CGRC부(41)는 시멘트 29㎏/%와, BOTTOM-ASH 15㎏/%와, 모래 37㎏/%와, 색소 18㎏/%와, 감수제 0.7㎏/%와, 기포제거제 0.3㎏/%가 혼합된 것을 특징으로 한다.The CGRC portion 41 is 29 kg /% cement, 15 kg /% BOTTOM-ASH, 37 kg /% sand, 18 kg /% pigment, 0.7 kg /% water reducing agent, 0.3 kg /% defoamer It is characterized in that the mixed.
상기 BOTTOM-ASH는 친환경적인 재료로서 가볍고 자외선에 적응력이 뛰어나며 그리고 연성이 첨가되어 콘크리트(43) 양생 중에 발생되는 수축작용에 의한 균열을 방지한다.The BOTTOM-ASH is an environmentally friendly material, light and excellent in adaptability to ultraviolet rays, and ductility is added to prevent cracking due to shrinkage action generated during curing of concrete 43.
상기 색소는 천연색소로서 자연스러운 색상와 모양을 표현하여 사용자의 욕구를 충족시킬 수 있는 것이다.The pigment is a natural pigment that can satisfy the user's desire by expressing the natural color and shape.
상기 감수제와 기포제거제는 콘크리트(43) 양생 중에 수분 및 기포가 제거되는 것이다.The water reducing agent and the bubble remover is to remove moisture and bubbles during the curing of the concrete (43).
상기 인공암(40)의 CGRC부(41)는 2∼5㎝ 정도의 두께가 적당하며, 상기 CGRC부(41)를 포함한 인공암(40)의 전체두께는 5∼20㎝가 바람직하다. 그리고 낙석 등의 위험지역에는 20cm 이상이 될 수 있는 것이다.The CGRC portion 41 of the artificial arm 40 has a suitable thickness of about 2 to 5 cm, and the total thickness of the artificial arm 40 including the CGRC portion 41 is preferably 5 to 20 cm. And in dangerous areas such as rockfall, it can be more than 20cm.
도 3 내지 도 6에 도시된 바와 같이 본 고안은 바닥의 기초공사를 하여 옹벽(10)을 세우고, 이 옹벽(10)의 일측에 소정의 형상으로 갖는 철구조물(20)이 설치하며, 이 철구조물(20)에 따라 설치되는 복수의 뼈대(30)와, 상기 뼈대(30)에 결합되는 인공암(40)으로 이루어진다.As shown in Figures 3 to 6 the present invention is to build the retaining wall 10 by the foundation of the floor, the iron structure 20 having a predetermined shape on one side of the retaining wall 10 is installed, this iron It consists of a plurality of skeletons (30) installed along the structure (20), and an artificial arm (40) coupled to the skeleton (30).
상기 철구조물(20)에는 30∼60㎝ 간격을 두고 복수의 지지브라켓(21)이 고정되며 이 지지브라켓(21)에 뼈대(30)가 결합된다.A plurality of support brackets 21 are fixed to the steel structure 20 at intervals of 30 to 60 cm, and the armature 30 is coupled to the support brackets 21.
상기 뼈대(30)에는 인공암(40)에 결합되는 다수의 고정바(22)와, 상기 고정바(22)와 고정바(22) 사이에 지지바(23)가 대각선 및 크로스 등으로 결합된다.The armature 30 has a plurality of fixed bars 22 coupled to the artificial arm 40, and the support bar 23 is diagonally and cross-coupled between the fixed bar 22 and the fixed bar 22. .
상기 고정바(22)의 일측단은 " ┗ " 형상으로 절곡되며 이 절곡된 일면에 관통구멍(24)이 형성된다.One end of the fixing bar 22 is bent in a "┗" shape and a through hole 24 is formed in the bent surface.
상기 인공암(40)은 자연석의 느낌을 주는 CGRC부(41)가 형성되고 이 CGRC부(41)의 내측에는 일정한 간격을 두고 보강재(42)가 구비되고 이 보강재(42)를 감싸며 콘크리트(43)가 형성되며 상기 콘크리트(43)의 내측에서 연장된 복수의 결합부재(44)가 돌출된다.The artificial arm 40 has a CGRC portion 41 is formed to give a feeling of natural stone and the reinforcement 42 is provided at regular intervals inside the CGRC portion 41 and surrounds the reinforcement 42 and concrete 43 ) Is formed and a plurality of coupling members 44 extending from the inside of the concrete 43 protrude.
상기 결합부재(44)는 콘크리트(43)에 매립되어 외부로 돌출되며 일측단에 " ㄴ " 형상으로 절곡되며 이 절곡된 측면에 관통구멍(45)이 형성된다.The coupling member 44 is embedded in the concrete 43 and protrudes to the outside and is bent in a "b" shape at one end thereof, and a through hole 45 is formed at the bent side.
도 4에 도시된 바와 같이 상기 철구조물(20)에 고정된 뼈대(30)의 고정바(22)와 인공암(40)의 결합부재(44)는 서로 맞대어져 상기 관통구멍(24,45)에 볼트와 너트가 끼워져 고정되는 것이다.As shown in FIG. 4, the fixing bar 22 of the armature 30 fixed to the steel structure 20 and the coupling member 44 of the artificial arm 40 are opposed to each other to form the through holes 24 and 45. Bolts and nuts are fitted in place.
도 5에 도시된 바와 같이 상기 철구조물(20)에 고정된 지지브라켓(21)에 상기 인공암(40)의 결합부재(44)가 볼트와 너트에 의해 고정되는 것이다.As shown in FIG. 5, the coupling member 44 of the artificial arm 40 is fixed to the support bracket 21 fixed to the steel structure 20 by bolts and nuts.
이렇게 상기 인공암(40)을 반복적으로 설치하여 인공폭포, 가정용 수조,잔디블록,호안블럭 등 조경용으로 사용가능한 것이다.Thus, the artificial cancer 40 is repeatedly installed and can be used for landscaping such as artificial waterfalls, home water tanks, grass blocks, and lake blocks.
한편, 각각의 인공암(40)을 분리 및 조립이 가능하여 다양한 형태로 구비될 수 있으며, 하자 발생시 수리가 간편한 장점이 있으며, 그리고 해체작업이 원활하게 이루어진다.On the other hand, it is possible to separate and assemble each artificial arm 40 can be provided in a variety of forms, there is an advantage of easy repair in the event of a fault, and the dismantling operation is made smoothly.
도 7에 도시된 바와 같이 본 고안은 바닥의 기초공사를 하여 옹벽(10)을 세우고, 이 옹벽(10)의 일측에 결합되는 철구조물(20)과, 상기 철구조물(20)을 따라 복수의 인공암(40)이 결합되는 구조로 이루어진다.As shown in FIG. 7, the present invention establishes the retaining wall 10 by laying the foundation of the floor, and the steel structure 20 coupled to one side of the retaining wall 10 and a plurality of the steel structures 20 along the iron structure 20. It is made of a structure that the artificial cancer 40 is coupled.
상기 인공암(40)은 자연석의 느낌을 주는 CGRC부(41)가 형성되고 이CGRC부(41)의 내측에 일정한 간격을 두고 보강재(42)가 구비되고 이 보강재(42)를 감싸며 콘크리트(43)가 타설되며 상기 콘크리트(43)에 매립되어 외부로 돌출된 복수의 결합부재(44)가 형성된다.The artificial arm 40 has a CGRC portion 41 is formed to give a feeling of natural stone and is provided with a reinforcement 42 at regular intervals inside the CGRC portion 41 and surrounds the reinforcement 42 and concrete 43 ) Is poured and embedded in the concrete 43, a plurality of coupling members 44 protruding to the outside is formed.
이와 같이 상기 인공암(40)의 결합부재(44)가 철구조물(20)에 직접 용접 등에 의해 고정된다.In this way, the coupling member 44 of the artificial arm 40 is fixed to the steel structure 20 by direct welding or the like.
그리고 상기 인공암(40)이 수직 또는 수평으로 설치되는 경우, 상기 인공암(40)에 구비된 보강재(42)가 철구조물(20)에 직접 결합된다.When the artificial arm 40 is installed vertically or horizontally, the reinforcing material 42 provided in the artificial arm 40 is directly coupled to the steel structure 20.
도 8에 도시된 바와 같이 상기 인공암(40)은 일부가 겹쳐지게 결합되는데, 상기 인공암(40)과 인공암(40)의 겹쳐지는 부분은 동일한 경사면(46)을 갖는 것이다.As shown in FIG. 8, a part of the artificial arm 40 is combined to overlap each other, and the overlapping portions of the artificial arm 40 and the artificial arm 40 have the same inclined surface 46.
이와 같이 상기 인공암(40) 구조물을 설치한 후 인공암(40)과 임공암(40) 사이에 기밀부재를 도포 또는 부착하여 누수를 방지하는 것이다.As described above, after installing the artificial arm 40 structure, the airtight member is applied or attached between the artificial arm 40 and the hollow arm 40 to prevent leakage.
상기와 같이블록화된 인공암(40)을 별도 제작하여 현장에서는 조립 및 설치만 하므로서 작업공정 및 코스트가 절감됨과 아울러 인공암(40)을 제작 금형(48)을 여러 종류 구비하여 규격화에의한 대량생산이 가능하며, 이로 인해 사용자의 욕구를 충족시킬 수 있는 것이다.By separately manufacturing the blocked artificial arm 40 as described above, the work process and cost are reduced by only assembling and installing in the field, and the artificial arm 40 is equipped with various kinds of molds 48 to manufacture a large amount by standardization. Production is possible, which can meet the needs of users.
따라서, 본 고안은 블럭화된 인공암을 별도 제작하여 현장에서 조립 및 설치만 하므로서 작업공정 및 코스트가 절감되는 효과가 있다.Therefore, the present invention has the effect of reducing the work process and cost by only assembling and installing in the field by separately manufacturing the blocked artificial cancer.
또한, 상기 블럭화된 인공암은 규격화에 의한 대량생산이 가능하여 소비자로 하여금 비용의 부담을 줄일 수 있는 효과가 있다.In addition, the blocked artificial cancer can be mass-produced by the standardization has the effect of reducing the burden on the consumer.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0001130U KR200348495Y1 (en) | 2004-01-15 | 2004-01-15 | Artificial fall imitation stone structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0001130U KR200348495Y1 (en) | 2004-01-15 | 2004-01-15 | Artificial fall imitation stone structure |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040002939A Division KR100607856B1 (en) | 2004-01-15 | 2004-01-15 | Imitation stone of Artificial fall manufacture method and imitation stone structure |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200348495Y1 true KR200348495Y1 (en) | 2004-04-29 |
Family
ID=49345537
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0001130U KR200348495Y1 (en) | 2004-01-15 | 2004-01-15 | Artificial fall imitation stone structure |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200348495Y1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101007051B1 (en) | 2010-09-10 | 2011-01-12 | 김우진 | Apparatus for variously direct artificial rock and an artificial waterfall structure having the same |
KR101018566B1 (en) | 2010-11-10 | 2011-03-03 | 김득일 | A construction method of artificial stone with durability |
KR101042532B1 (en) * | 2008-06-05 | 2011-06-17 | 레인보우스케이프주식회사 | Strengthen Artificial Rock Improved Whitening and Structure And Artificial Waterfall using the same |
KR101767491B1 (en) | 2017-04-20 | 2017-08-11 | 이우연 | Concrete artificial sculpture and constructiom method thereof |
-
2004
- 2004-01-15 KR KR20-2004-0001130U patent/KR200348495Y1/en not_active IP Right Cessation
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101042532B1 (en) * | 2008-06-05 | 2011-06-17 | 레인보우스케이프주식회사 | Strengthen Artificial Rock Improved Whitening and Structure And Artificial Waterfall using the same |
KR101007051B1 (en) | 2010-09-10 | 2011-01-12 | 김우진 | Apparatus for variously direct artificial rock and an artificial waterfall structure having the same |
KR101018566B1 (en) | 2010-11-10 | 2011-03-03 | 김득일 | A construction method of artificial stone with durability |
KR101767491B1 (en) | 2017-04-20 | 2017-08-11 | 이우연 | Concrete artificial sculpture and constructiom method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100771248B1 (en) | Micro panel | |
KR200348495Y1 (en) | Artificial fall imitation stone structure | |
KR100607856B1 (en) | Imitation stone of Artificial fall manufacture method and imitation stone structure | |
KR100304861B1 (en) | Insulation Precast Concrete Panel | |
US20070234664A1 (en) | Method of forming a decorative concrete wall | |
KR102094230B1 (en) | Manufacturing of Panel with Color on the Front of Concrete Panel | |
KR20030018019A (en) | Structures of artificial falls and method for constructing the same | |
KR100995815B1 (en) | Shortcrete retaining wall construction method | |
KR20090083661A (en) | A block for constructing breast wall | |
KR100419302B1 (en) | Coupling structure of manhole for power lines manufactured by using precast concrete | |
KR100671959B1 (en) | Construction method of retaining wall | |
KR101038148B1 (en) | Construction Method of Artificial Rock and Artificial Rock manufactured by the same method | |
KR101293407B1 (en) | A large size artificial rock manufacturing method | |
KR100674080B1 (en) | A pillar constructing method for a bridge | |
KR20030020818A (en) | Constructing member for constructing embankment, method of making same and embankment constructed with same | |
KR100796241B1 (en) | A method for an artificial rock | |
KR100451429B1 (en) | Combination system of block type reinforced retaining wall used waste concrete and waste limestone and constructing method thereof | |
CN1325745C (en) | Concrete material reinforced stainless steel anti-theft net and its producing method | |
KR101134389B1 (en) | Method for manufacturing artificial rock | |
KR100663867B1 (en) | Strenght reinforcement method of gabion brease wall construction | |
KR101070338B1 (en) | Eco-friendly with natural textures, complex, landscaping, parks, rivers, road construction method of boundary stone formation | |
KR200334489Y1 (en) | Decoration Panel of Concrete Structure | |
KR101071692B1 (en) | Eco-friendly engineering, landscaping, parks, construction of boundary stone to hacheonyong press | |
KR102388496B1 (en) | Extension panel of cut retaining wall and its construction method | |
JP4082624B1 (en) | Precast members for masonry simulated structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
U107 | Dual application of utility model | ||
REGI | Registration of establishment | ||
T201 | Request for technology evaluation of utility model | ||
T701 | Written decision to grant on technology evaluation | ||
G701 | Publication of correction | ||
EXTG | Extinguishment |