KR101070338B1 KR1020110032294A KR20110032294A KR101070338B1 KR 101070338 B1 KR101070338 B1 KR 101070338B1 KR 1020110032294 A KR1020110032294 A KR 1020110032294A KR 20110032294 A KR20110032294 A KR 20110032294A KR 101070338 B1 KR101070338 B1 KR 101070338B1
Authority
KR
South Korea
Prior art keywords
formwork
concrete
boundary stone
fixed shaft
landscaping
Prior art date
Application number
KR1020110032294A
Other languages
Korean (ko)
Inventor
유재홍
이준복
김석기
노찬기
박재교
임중열
이경환
김종실
Original Assignee
주식회사 건화
주식회사 유신
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 건화, 주식회사 유신 filed Critical 주식회사 건화
Priority to KR1020110032294A priority Critical patent/KR101070338B1/en
Application granted granted Critical
Publication of KR101070338B1 publication Critical patent/KR101070338B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
    • E01C19/526Apparatus for laying individual preformed surfacing elements, e.g. kerbstones hand operated
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/223Kerb-and-gutter structures; Kerbs with drainage openings channel or conduits, e.g. with out- or inlets, with integral gutter or with channel formed into the kerb ; Kerbs adapted to house cables or pipes, or to form conduits
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E01C19/506Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes for kerbs, gutters or similar structures, e.g. raised portions, median barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)
  • Revetment (AREA)

Abstract

본 발명은 단지, 조경, 공원, 하천, 도로에 형성되는 경계석에 관한 것으로, 더 상세하게는 경계석을 시공시 밀착 고정되는 거푸집에 의해 콘크리트 주입에 따른 거푸집이 벌어지는 현상을 방지함과 아울러 표면이 각 시설물의 주변환경 조건과 유사한 환경으로 시공이 이루어질 수 있도록 하기 위하여,
거푸집을 이용하여 단지, 조경, 공원, 하천, 도로 등과 같은 각 시설물에 형성되는 경계석을 시공하는 방법에 있어서, 상기 각 시설물의 경계지 지면의 양측에 거푸집을 밀착 고정하기 위하여 일정 간격으로 다수 개의 고정축을 박아 고정하는 고정축 고정단계와; 상기 고정축의 내측으로 내측면에 석재 질감을 가질 수 있도록 음각과 양각 형태의 무늬/모양부가 형성된 거푸집의 각 끝단 면의 서로 대응되는 위치에 적어도 하나 이상 형성되는 각각의 삽입돌기와 삽입홈을 서로 삽입하여 연결하는 거푸집 연결단계와; 상기 거푸집을 연결하는 과정에서 거푸집의 외측면에 형성된 결합홈으로 일단이 슬라이딩 삽입 지지되고, 타단이 상기 고정축에 걸어짐과 동시에 그 고정축과 접촉되게 회전되는 편심캠으로 구성되는 밀착수단에 의해 거푸집을 고정축 측으로 밀착 고정하는 밀착 고정단계와; 상기 밀착 고정된 양 거푸집 사이로 타설된 콘크리트를 충진하는 콘크리트 충진단계와; 상기 충진된 콘크리트의 상부로 밑면에 석재 질감을 가질 수 있도록 음각과 양각 형태의 무늬/모양부가 형성되며 상부에 중량체가 구비된 상 거푸집을 올려놓는 상 거푸집 설치단계와; 상기 상 거푸집을 설치 후 콘크리트의 양생 기간을 거쳐 상 거푸집과 양 거푸집을 해체하는 거푸집 해체단계와; 상기 거푸집 해체 후 시공된 경계석의 표면으로 형성된 무늬/모양이 천연 질감을 가질 수 있게 천연 질감재 도포단계를; 포함하는 것을 특징으로 하는 자연친화적인 자연 질감을 갖는 단지, 조경, 공원, 하천, 도로에 형성되는 경계석의 시공방법에 관한 것이다.
The present invention relates to a boundary stone formed only in landscaping, parks, rivers, and roads, and more particularly, to prevent the phenomenon of forming due to the concrete injection by the formwork that is tightly fixed during construction of the boundary stone. In order to allow construction to occur in an environment similar to the surrounding conditions of the facility,
In the method of constructing the boundary stone formed in each facility, such as landscaping, parks, rivers, roads, etc. by using the formwork, a plurality of fixed at regular intervals to closely adhere the formwork on both sides of the boundary surface of each facility A fixed shaft fixing step of driving and fixing the shaft; Inserting each of the insertion protrusions and the insertion groove is formed at least one corresponding position of each end surface of the formwork formed in the intaglio and embossed form to have a stone texture on the inner side of the fixed shaft to each other A die connecting step of connecting; In the process of connecting the formwork by means of a close contact with the coupling groove formed on the outer side of the formwork is formed by the eccentric cam is rotated in contact with the fixed shaft and the other end is supported by the sliding shaft and the other end is engaged with the fixed shaft A close fixing step of tightly fixing the formwork to the fixed shaft side; A concrete filling step of filling concrete poured between the two fixed molds; An image formwork installation step of forming an intaglio and an embossed pattern / shape portion so as to have a stone texture on the bottom of the filled concrete, and placing an image formwork having a weight on the top; A formwork dismantling step of dismantling the formwork and both formwork after the curing phase of the concrete after installing the formwork; Applying a natural texture material so that the pattern / shape formed by the surface of the boundary stone constructed after disassembly of the form can have a natural texture; It relates to a construction method of the boundary stone formed in the landscaping, parks, rivers, roads having a nature-friendly natural texture, including.

Description

자연친화적인 자연 질감을 갖는 단지, 조경, 공원, 하천, 도로에 형성되는 경계석의 시공방법{Eco-friendly with natural textures, complex, landscaping, parks, rivers, road construction method of boundary stone formation}Eco-friendly with natural textures, complex, landscaping, parks, rivers, road construction method of boundary stone formation}

본 발명은 단지, 조경, 공원, 하천, 도로에 시공되는 경계석에 관한 것으로, 더 상세하게는 경계석을 시공시 밀착 고정되는 거푸집에 의해 콘크리트 주입에 따른 거푸집이 벌어지는 현상을 방지함과 아울러 경계석의 표면이 각 시설물의 주변환경 조건과 유사한 환경으로 시공이 이루어질 수 있도록 한 자연친화적인 자연 질감을 갖는 단지, 조경, 공원, 하천, 도로에 형성되는 경계석의 시공방법에 관한 것이다.
The present invention relates to a boundary stone that is constructed only in landscaping, parks, rivers, and roads, and more particularly, prevents formwork from being poured due to concrete injection by the formwork that is tightly fixed during construction of the boundary stone. The present invention relates to a method of constructing boundary stones formed in landscaping, parks, rivers, and roads, which has a natural-friendly natural texture that allows construction to be performed in an environment similar to the surrounding environmental conditions of each facility.

일반적으로 각 시설물, 즉 아파트나 주택 또는 산업시설물 단지, 조경 시설물, 공원, 하천, 도로 등의 경계에는 각 시설물과 구분하기 위한 경계석이 시공되어 지는 데, 본원에서는 상기한 여러 시설물 중에서도 조경과 관련하여 일 예로 설명한다. In general, boundary stones are installed at the boundaries of each facility, that is, apartments, houses, or industrial complexes, landscaping facilities, parks, rivers, and roads. An example will be described.

조경(造景)은 주변 환경을 아름답게 꾸미는 작업으로서, 특히 공원 등에 많은 시설물이 구비되며, 근래에 들어서는 윤택한 생활환경을 개선하고자 하는 취지로 아파트나 주택단지 내에도 다양한 형태의 조경 시설물이 시공되고 있는 실정이다. Landscaping is a work to beautify the surrounding environment, especially a lot of facilities such as parks, etc. Recently, various types of landscaping facilities are constructed in apartments and housing complexes in order to improve the favorable living environment. There is a situation.

이러한, 조경 시설물은 식물재료·토목재료·물 또는 여러 형태로 제작된 조형물 등과 같이 다양한 종류의 재료를 이용하여 주변환경과 가장 유사한 조건은 물론 쾌적한 생활공간으로 꾸밈으로써, 조경 시설물을 이용하는 사람이나 보는 사람들로 하여금 안락감을 느끼면서 자연 속에서 생활하는 느낌을 줄 수 있는 유용한 시설물 중의 하나인 것이다. Such landscaping facilities are made of various materials such as plant materials, civil engineering materials, water, or sculptures made in various forms. It is one of the useful facilities that can make people feel comfortable living in nature.

아울러, 조경 시설물과 도로 또는 다른 시설물과 구획하기 위하여 경계석이 시공되는 데, 이러한 일반적인 종래의 경계석은 주지된 방식에 의해 시공되는 것으로, 즉 도 4a 및 도 4b에 도시된 바와 같이 조경 시설물과 접한 경계지의 지면(1) 양측에 거푸집(100)을 세울 위치에 일정한 길이로 절단된 철근(110)을 박아 고정한 후 상기 철근(110)의 내측으로 각각의 거푸집(100)을 기대어 놓은 다음 상기 양 거푸집(100)의 사이로 타설된 콘크리트를 일정 높이 만큼 주입하여 양생 기간을 거처 주입된 콘크리트가 경화되어 조경 시설물과 구획하기 위한 경계석(200)이 성형되면 철근과 거푸집을 해체함으로써, 경계석을 시공하기 위한 일련의 시공작업이 완료된다. In addition, boundary stones are constructed to partition landscaping facilities and roads or other facilities, and these general conventional boundary stones are constructed in a known manner, i.e., borders in contact with landscaping facilities as shown in FIGS. 4A and 4B. After fixing the reinforcing bar 110 cut to a certain length in a position to set up the formwork 100 on both sides of the ground (1) of the ground and leaning each formwork 100 to the inside of the reinforcing bar 110 and then the both formwork ( When the concrete poured through a certain height is injected through a curing period by curing the injected concrete through 100), and the boundary stone 200 for partitioning with the landscaping facility is formed, by dismantling the reinforcing bars and formwork, a series of structures for constructing the boundary stone Construction work is completed.

그러나, 상기와 같이 종래 조경 시설물과 구획하기 위한 경계석을 시공하기 위하여 거푸집(100) 사이로 콘크리트를 주입하는 과정에서 주입되는 콘크리트의 압력에 의해 거푸집(100)과 거푸집(100)이 서로 맞닿아 있는 부분이 벌어짐으로 인해 그 벌어진 틈으로 주입되는 콘크리트가 누설되는 문제점이 발생하였다. However, the formwork 100 and the formwork 100 are in contact with each other by the pressure of the concrete injected in the process of injecting concrete between the formwork 100 in order to construct a boundary stone for partitioning with the conventional landscaping facilities as described above. This opening caused a problem of leakage of concrete injected into the opening.

즉, 상기 거푸집은 철근이 고정되지 있을 않을 뿐만 아니라 서로 맞닿아 연결되는 부분 또한 서로 고정되지 않고 단순히 서로 맞닿아 있는 상태이므로 주입되는 콘크리트의 압력에 의해 서로 연결되는 부분이 쉽게 벌어졌던 것이다. That is, the formwork is not only fixed to the reinforcing bar, but also the parts that are in contact with each other is also fixed to each other by simply being in contact with each other without being fixed to each other, so that the parts connected to each other by the pressure of the concrete is easily opened.

또한, 상기 거푸집은 전술한 바와 같이 고정되지 않고 철근으로 단순하게 기댄 상태이므로, 콘크리트가 주입되거나 주입되는 과정에서 발생하는 압력에 의하여 지면으로 박여진 철근의 지지력이 약할 경우 거푸집이 외부 측으로 기울어지거나, 또는 주입되어 콘크리트가 점점 쌓이는 과정에서 콘크리트의 상부 측에서 발생하는 압력에 의하여 거푸집의 상부가 벌어지는 현상이 발생하였고, 그로 인해 거푸집을 수직으로 세우기 위한 후처리작업에 더욱더 많은 시간과 번거로운 작업을 행해야 하는 문제점도 초래되었다. In addition, since the formwork is not fixed as described above and simply leans with rebar, the formwork is inclined to the outside when the supporting force of the steel embedded in the ground is weak due to the pressure generated in the process of injecting or injecting concrete, or In the process of gradually accumulating concrete, the upper part of the formwork is formed by the pressure generated at the upper side of the concrete, which causes more and more time and troublesome work in the post-treatment work to vertically form the formwork. Also brought about.

그리고, 무엇보다도 시공되는 종래의 경계석은 콘크리트로만 시공되어 표면이 밋밋하게 성형됨으로써, 조경 시설물이나 각 시설물과는 상당히 대조적인 문제점, 즉 자연친화적인 형태로 조성되는 조경 시설물과 각 시설물과의 주변 환경과는 어울리지 않는 문제점을 가지고 있었다. And, above all, the conventional boundary stone that is constructed is constructed only with concrete, and the surface is smoothly formed, so that it is a problem that contrasts significantly with the landscaping facility or each facility, that is, the landscaping facility formed in a nature-friendly form and the surrounding environment of each facility. Had a problem that did not fit.

이러한 문제점을 해소하고자 종래에도 경계석을 시공하고난 후에 그 경계석의 표면으로 석재의 질감 등을 가질 수 있도록 모르타르를 이용하여 덧칠하는 추가적인 작업을 별도로 행해야 함으로써, 상당히 번거로운 작업과 비용 또한 상승되는 문제점이 있었다.
In order to solve such a problem, conventionally, after constructing the boundary stone, an additional work of applying mortar to the surface of the boundary stone must be performed separately so that the surface of the boundary stone can have a texture, etc., which leads to a considerable cumbersome work and cost. .

본 발명은 상기와 같은 종래의 제반 문제점을 해소하고자 창안한 것으로, 그 주된 목적은 경계석을 시공시 밀착 고정되는 거푸집에 의해 콘크리트 주입에 따른 거푸집이 벌어지는 현상을 방지함과 아울러 표면이 각 시설물의 주변환경 조건과 유사한 환경으로 시공이 이루어질 수 있도록 한 자연친화적인 자연 질감을 갖는 단지, 조경, 공원, 하천, 도로에 형성되는 경계석의 시공방법을 제공하는 데 있다. The present invention has been made to solve the above-mentioned conventional problems, its main purpose is to prevent the phenomena caused by the concrete injection by the formwork is tightly fixed during construction of the boundary stone and the surface of the surroundings of each facility The purpose of the present invention is to provide a method of constructing boundary stones formed in landscaping, parks, rivers, and roads, which has a natural-friendly natural texture that allows construction to be performed in an environment similar to environmental conditions.

본 발명의 다른 목적은, 시공되는 경계석의 표면으로 더욱더 다양한 형태의 무늬/모양이 형성되어 질 수 있도록 하는 데 있다. Another object of the present invention is to allow a wide variety of patterns / shapes to be formed on the surface of the boundary stone to be constructed.

본 발명의 또 다른 목적은, 시공된 경계석의 표면 보호 또한 용이하게 이루어질 수 있도록 하는 데 있다.
Still another object of the present invention is to make it easy to protect the surface of the constructed boundary stone.

상기와 같은 기술적 과제를 해결하기 위한 본 발명은, 거푸집을 이용하여 단지, 조경, 공원, 하천, 도로 등과 같은 각 시설물에 형성되는 경계석을 시공하는 방법에 있어서, 상기 각 시설물의 경계지 지면의 양측에 거푸집을 밀착 고정하기 위하여 일정 간격으로 다수 개의 고정축을 박아 고정하는 고정축 고정단계와; 상기 고정축의 내측으로 내측면에 석재 질감을 가질 수 있도록 음각과 양각 형태의 무늬/모양부가 형성된 거푸집의 각 끝단 면의 서로 대응되는 위치에 적어도 하나 이상 형성되는 각각의 삽입돌기와 삽입홈을 서로 삽입하여 연결하는 거푸집 연결단계와; 상기 거푸집을 연결하는 과정에서 거푸집의 외측면에 형성된 결합홈으로 일단이 슬라이딩 삽입 지지되고, 타단이 상기 고정축에 걸어짐과 동시에 그 고정축과 접촉되게 회전되는 편심캠으로 구성되는 밀착수단에 의해 거푸집을 고정축 측으로 밀착 고정하는 밀착 고정단계와; 상기 밀착 고정된 양 거푸집 사이로 타설된 콘크리트를 충진하는 콘크리트 충진단계와; 상기 충진된 콘크리트의 상부로 밑면에 석재 질감을 가질 수 있도록 음각과 양각 형태의 무늬/모양부가 형성되며 상부에 중량체가 구비된 상 거푸집을 올려놓는 상 거푸집 설치단계와; 상기 상 거푸집을 설치 후 콘크리트의 양생 기간을 거쳐 상 거푸집과 양 거푸집을 해체하는 거푸집 해체단계와; 상기 거푸집 해체 후 시공된 경계석의 표면으로 형성된 무늬/모양이 천연 질감을 가질 수 있게 천연 질감재 도포단계와; 상기 천연 질감재가 도포된 표면으로 그 표면을 보호하기 위해 침투식 강화 실러, 우레탄 계열의 코팅제, 아크릴 계열의 코팅제, 엑포시 계열의 코팅제 중 어느 하나가 코팅되는 코팅단계를 더 포함하는 것을 특징으로 한다. The present invention for solving the above technical problem, in the method of constructing a boundary stone formed in each facility, such as landscaping, parks, rivers, roads, etc. using formwork, both sides of the boundary ground of each facility A fixed shaft fixing step of fixing a plurality of fixed shafts at regular intervals to fix the formwork in close contact; Inserting each of the insertion protrusions and the insertion groove is formed at least one corresponding position of each end surface of the formwork formed in the intaglio and embossed form to have a stone texture on the inner side of the fixed shaft to each other A die connecting step of connecting; In the process of connecting the formwork by means of a close contact with the coupling groove formed on the outer side of the formwork is formed by the eccentric cam is rotated in contact with the fixed shaft and the other end is supported by the sliding shaft and the other end is engaged with the fixed shaft A close fixing step of tightly fixing the formwork to the fixed shaft side; A concrete filling step of filling concrete poured between the two fixed molds; An image formwork installation step of forming an intaglio and an embossed pattern / shape portion so as to have a stone texture on the bottom of the filled concrete, and placing an image formwork having a weight on the top; A formwork disassembling step of dismantling the formwork and the both formwork after the curing phase of the concrete after installing the phase formwork; Applying a natural texture material so that the pattern / shape formed by the surface of the boundary stone constructed after disassembly of the form can have a natural texture; In order to protect the surface with the surface of the natural texture material is applied to the penetration-type reinforcement sealer, urethane-based coating agent, acrylic-based coating agent, a coating step of coating any one of the epoxy-based coating agent further comprises .

삭제delete

상기 각 거푸집에 형성되는 무늬/모양부는 그 거푸집의 표면으로부터 분리되어 거푸집의 내측면으로 탈착되는 형태로 형성되는 것을 특징으로 한다.
The pattern / shape formed in each formwork is formed in a form that is separated from the surface of the formwork and detached to the inner side of the formwork.

본 발명은 각 시설물에 형성되는 경계석을 시공시 밀착 고정되는 거푸집에 의해 콘크리트 주입에 따른 거푸집이 벌어지는 현상을 방지함과 아울러 표면이 조경 시설물의 주변환경 조건과 유사한 환경과 천연 질감을 갖도록 시공이 이루어질 수 있도록 함으로써, 시공시 콘크리트의 누설을 방지함은 물론 거푸집 보정을 위한 추가적인 작업 또한 생략할 수 있어, 공사기간을 단축할 수 있을 뿐만 아니라 한 번의 시공작업을 통하여 조경 시설물과의 주변환경과 최대한의 호환성을 가져, 자연친화적인 느낌을 그대로 가질 수 있는 효과를 가지는 것이다.The present invention prevents the phenomenon of formwork due to concrete injection by the formwork tightly fixed when constructing the boundary stone formed in each facility, and the construction is made so that the surface has an environment and natural texture similar to the surrounding environment conditions of the landscaping facility. By not only preventing the leakage of concrete during construction, but also eliminating the additional work to correct the formwork, the construction period can be shortened, as well as the surrounding environment and the maximum environment with the landscaping facility through one construction work. It has the effect of being compatible and having a natural feeling.

또한, 시공되는 경계석의 표면으로 다양한 무늬/모양부를 가지는 패널을 구비하여 더욱더 다양한 형태의 무늬/모양이 형성되어 질 수 있도록 함으로써, 각 시설물에 따라 경계석을 시공하기 위한 선택 폭이 넓은 효과도 갖는다. In addition, by having a panel having a variety of patterns / shapes to the surface of the boundary stone to be constructed so that a wider variety of patterns / shapes can be formed, there is also a wide range of options for constructing the boundary stone according to each facility.

또한, 시공된 경계석의 표면 보호 또한 코팅제에 의해 용이하게 이루어질 수 있도록 함으로서, 경계석이 손상되는 것을 최대한 방지함과 아울러 더욱더 오랜 사용기간을 확보할 수 있는 효과도 갖는다.
In addition, the surface of the constructed boundary stone can also be easily made by the coating agent, thereby preventing the boundary stone from being damaged as much as possible, and also having an effect of securing a longer service life.

도 1은 본 발명의 제조단계를 개략적으로 나타낸 요부 블록도.
도 2a 내지 도 2g는 본 발명의 제조과정을 나타낸 것으로,
도 2a는 고정축 고정단계를 나타낸 요부도.
도 2b는 거푸집 연결단계를 나타낸 요부도.
도 2c는 밀착 고정단계를 나타낸 요부도.
도 2d는 콘크리트 충진단계를 나타낸 요부도.
도 2e는 상 거푸집 설치단계를 나타낸 요부도.
도 2f는 거푸집 해체단계를 나타낸 요부도.
도 3은 본 발명의 다른 실시 예를 개략적으로 나타낸 요부도.
도 4a 및 도 4a는 일반적인 경계석이 시공되는 상태의 요부도.
1 is a main block diagram schematically showing a manufacturing step of the present invention.
Figure 2a to 2g shows the manufacturing process of the present invention,
Figure 2a is a main part showing a fixed shaft fixing step.
Figure 2b is a main view showing the formwork connecting step.
Figure 2c is a principal part showing a close fixing step.
Figure 2d is a main view showing the concrete filling step.
Figure 2e is a main view showing the phase formwork installation step.
Figure 2f is a main view showing the form disassembly step.
3 is a main view schematically showing another embodiment of the present invention.
4A and 4A are main parts of a state in which a general boundary stone is constructed.

이하, 본 발명의 바람직한 실시 예를 첨부된 도면을 참고하여 좀더 상세하게 설명하면 다음과 같다. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 제조단계를 개략적으로 나타낸 요부 블록도이다. 1 is a main block diagram schematically showing a manufacturing step of the present invention.

도시된 바와 같이 거푸집을 이용하여 단지, 조경, 공원, 하천, 도로 등과 각 시설물에 형성되는 경계석을 시공하는 방법에 있어서,
In the method of constructing the boundary stone formed in the complex, landscaping, parks, rivers, roads, etc. by using the formwork, each facility,

본 발명은, 경계석을 시공시 밀착 고정되는 거푸집에 의해 콘크리트 주입에 따른 거푸집이 벌어지는 현상을 방지함과 아울러 표면이 조경 시설물의 주변환경 조건과 유사한 환경으로 시공이 이루어질 수 있도록 하기 위하여, The present invention, in order to prevent the phenomena due to the concrete injection by the formwork is tightly fixed during construction of the boundary stone, and to allow the surface to be constructed in an environment similar to the surrounding conditions of the landscaping facility,

먼저, 상기 각 시설물의 경계지 지면(1)의 양측에 거푸집(100)을 밀착 고정하기 위하여 도 2a에서와 같이 일정 간격으로 다수 개의 고정축(10)을 작업자가 직접 해머 등에 의한 수작업이나 건설장비인 파일 해머(pile hammer) 등으로 박아 고정하는 고정축 고정단계(S1)를 행한다. 이때, 상기 고정축은 후술하는 거푸집 사이로 주입되는 콘크리트의 압력에 의해서도 최대한 유동성이 없도록 지면으로 비교적 깊이 박는 것이 바람직하다. First, in order to closely fix the formwork 100 on both sides of the boundary ground ground 1 of the respective facilities, as shown in FIG. A fixed shaft fixing step (S1) for driving with a pile hammer or the like is performed. At this time, it is preferable that the fixed shaft is relatively deeply driven into the ground so as to have maximum fluidity even by the pressure of concrete injected between the molds to be described later.

그런 다음 상기 고정축의 내측으로 도 2b에서와 같이 내측면에 각 시설물의 주변환경과 같이 성형된 후에는 석재 질감을 가질 수 있도록 음각 및 양각 형태의 무늬/모양부(20)가 형성된 거푸집(100)의 각 끝단 면의 서로 대응되는 위치에 적어도 하나 이상 형성되는 각각의 삽입돌기(22)와 삽입홈(24)을 서로 삽입하여 거푸집을 설치하고자 하는 길이만큼 연결하는 거푸집 연결단계(S2)를 행한다. Then, the mold 100 is formed with the intaglio and embossed patterns / shapes 20 so as to have a stone texture after being molded into the inner surface of the fixed shaft as shown in FIG. 2B. Forming step (S2) of connecting each of the insertion projections 22 and the insertion grooves 24 formed at least one corresponding position of each end surface of each end to each other by the length to be installed to form the formwork.

즉, 거푸집이 서로 맞닿는 위치에 삽입돌기와 그와 대응되는 삽입홈을 형성하여 서로 삽입하면서 연결 지지 되도록 함으로써, 후술하는 거푸집과 거푸집 사이로 주입되는 콘크리트의 압력에 대해서도 서로 맞닿아 연결된 부분의 높은 대응력으로 인해 벌어지는 것을 방지할 수 있는 것이다. That is, by forming the insertion protrusion and the corresponding insertion groove at the position where the formwork is in contact with each other to be connected and supported while inserting each other, due to the high response force of the parts connected in contact with each other also to the pressure of the concrete injected between the formwork and the form to be described later You can prevent it from happening.

그리고, 상기 거푸집을 연결하는 과정에서 도 2c에서와 같이 거푸집(100)의 외측면에 형성된 결합홈(30)으로 일단에 상기 결합홈과 대응되게 형성되는 슬라이드부(42)가 슬라이딩 삽입 지지되고, 타단이 상기 고정축(10)에 걸어지도록 걸고리부(44)가 형성되어 걸어짐과 동시에 그 걸고리부에 회전 자유롭게 핀결합되어 상기 고정축과 접촉되게 회전되는 편심캠(45)으로 구성되는 밀착수단(40)에 의해 거푸집(100)을 고정축(10) 측으로 밀착 고정하는 밀착 고정단계(S3)를 행한다. Then, in the process of connecting the die as shown in Figure 2c as the coupling groove 30 formed on the outer surface of the die 100, the slide portion 42 formed to correspond to the coupling groove at one end is supported by sliding insertion, The contact means 44 is formed so that the other end is hooked to the fixed shaft 10, the contact means composed of an eccentric cam 45 is rotated in contact with the fixed shaft while being pinned freely rotatable to the hook portion A close fixing step S3 for tightly fixing the formwork 100 to the fixed shaft 10 side by 40 is performed.

즉, 상기 편심캠을 회전시킴에 따라 고정축과 접촉된 부분을 기점으로 편심캠의 편심된 부분만큼 고정축 측으로 거푸집을 당겨 밀착시켜 고정하게 되는 것이다. That is, as the eccentric cam is rotated, the dies are pulled to the fixed shaft side by the eccentric portion of the eccentric cam and fixed to the fixed shaft.

상기에서, 편심캠의 일측에는 작업자가 쉽게 잡아서 회전시킬 수 있도록 손잡이(45a)가 형성되는 것이 바람직하다. In the above, it is preferable that the handle 45a is formed at one side of the eccentric cam so that the worker can easily grasp and rotate it.

상기 밀착 고정된 양 거푸집(100) 사이로 도 2d에서와 같이 타설된 콘크리트를 충진하는 콘크리트 충진단계(S4)를 행한다. 이때, 상기 거푸집은 서로 맞닿아 연결되는 부분이 삽입돌기와 삽입홈에 의해 주입되어 충진되는 콘크리트의 압력에 대하여 충분한 대응력을 가질 뿐만 아니라 거푸집이 전체적으로 고정축 측으로 밀착 고정되어 지지됨에 따라 콘크리트 압력에 대하여 더욱더 높은 대응력을 가져 벌어지는 현상을 원천적으로 차단할 수 있는 것이다. A concrete filling step (S4) is performed to fill the poured concrete as shown in FIG. 2D between the closely fixed both formwork 100. At this time, the formwork is not only has a sufficient response to the pressure of the concrete is injected by the insertion protrusion and the insertion groove is connected to each other, as well as the formwork is tightly fixed to the fixed shaft side as a whole support the concrete pressure It is possible to fundamentally block the phenomenon that occurs with a high response.

그리고 나서 상기 충진된 콘크리트의 상부로 도 2e에서와 같이 양 측면에 설치된 거푸집의 내측면에 형성된 무늬/모양부와 같이 밑면에 석재 질감을 가질 수 있도록 음각 및 양각 형태의 무늬/모양부(20)가 형성되며 상부에 하중에 의해 상기 무늬/모양부가 콘크리트의 상면으로 새겨질 수 있도록 가압하는 무게 추 등과 같은 중량체(25)가 구비된 상 거푸집(100A)을 올려놓는 상 거푸집 설치단계(S5)를 행한다. 이때, 상기 상 거푸집은 상기한 바와 같이 올려놓는 것이 아니라 통상적인 방식인 가압방식으로 가압하여 콘크리트의 상부로 상 거푸집에 형성된 무늬/모양부에 의해 무늬/모양이 형성되도록 하여도 무방하다. Then, the intaglio and embossed patterns / shapes 20 to have a stone texture on the bottom, such as a pattern / shape formed on the inner side of the formwork installed on both sides, as shown in Figure 2e to the top of the filled concrete (20) Is formed and the formwork installation step (S5) to put the upper formwork (100A) is provided with a weight body 25, such as a weight to press the pattern / shape portion to be carved into the upper surface of the concrete by the load on the top (S5) Do it. At this time, the image formwork may not be placed as described above, but by pressing in a conventional manner, the pattern form may be formed by a pattern / shape formed on the image formwork to the upper portion of the concrete.

또한, 상기 상 거푸집을 올려놓기 전에 콘크리트의 표면으로 통상적인 이형제를 뿌림으로써, 무늬/모양이 더욱더 선명하게 하도록 하는 것이 바람직하다.It is also desirable to spray the usual release agent onto the surface of the concrete prior to placing the formwork so that the pattern / shape becomes more clear.

그에 따라 시공되는 경계석의 양 측면 뿐만 아니라 상면 또한 조경 시설물의 주변환경과 최대한 호환성을 가질 수 있게 되는 것이다. Accordingly, both sides of the boundary stone to be constructed as well as the top surface will be able to be as compatible as possible with the surrounding environment of the landscape facility.

아울러, 상기 상 거푸집을 설치 후 콘크리트의 양생 기간을 거쳐 도 2f에서와 같이 상 거푸집과 양 거푸집(100)을 해체하는 거푸집 해체단계(S6)를 행함으로써, 일련의 자연친화적인 자연 질감을 갖는 경계석(200)의 시공이 완료되는 것이다.
In addition, after the phase formwork is installed through the curing period of the concrete, as shown in Figure 2f by performing the form dismantling step (S6) of disassembling the formwork and both formwork 100, a boundary stone having a series of natural friendly natural texture Construction of the 200 is completed.

따라서, 본 발명은 종래와 같이 경계석을 시공 후 별도의 추가적인 작업 없이도 한 번의 경계석을 시공시 그 표면이 각 시설물의 주변환경 조건과 최대한 근접한 호환성을 가질 수 있도록 시공됨은 물론 주입되는 콘크리트에 의해 거푸집의 벌어지는 현상 또한 발생하지 않게 됨으로써, 시공이 단시간 내에 신속하고 간편하게 이루어질 수 있는 조건과 함께 추가적인 후처리작업 없이도 각 시설물과의 호환성을 가짐에 따라 자연친화적인 자연 질감을 그대로 살릴 수 있는 뛰어난 조건을 가지는 것이다.
Therefore, the present invention is constructed so that the surface is as close as possible to the compatibility with the environmental conditions of each facility when constructing a single boundary stone without any additional work after the construction of the boundary stone as conventional, as well as the form of the formwork by the injected concrete Also, the phenomenon does not occur, so that construction can be done quickly and easily in a short time, and it has excellent conditions to preserve natural-friendly natural texture as it is compatible with each facility without additional post-treatment work. .

그리고, 상기 거푸집 해체 후 시공된 경계석의 표면으로 형성된 무늬/모양이 보다 선명하면서 천연 질감을 가질 수 있도록 도시하지 않았지만 통상적인 천연 색상을 가지는 스테인(stain)이나 분말형태의 엔티크 등과 같은 천연 질감재를 공지의 방식인 칠하거나 스프레이 방식 등을 도포하는 천연 질감재 도포단계(S7)를 행함으로써, 경계석의 표면으로 형성되는 무늬/모양이 더욱더 선명하면서 천연 그대로의 질감을 느낄 수 있어, 각 시설물과의 뛰어나 조화는 물론 심미감도 뛰어난 조건을 가진다. Further, although the pattern / shape formed by the surface of the boundary stone constructed after dismantling the form is not shown to have a clearer and more natural texture, natural texture materials such as stain or powder type antiques having normal natural colors By applying a natural texture material coating step (S7) of painting or spraying a known method, the pattern / shape formed on the surface of the boundary stone is more vivid and feel the natural texture, and each facility and Excellent condition of harmony and of course aesthetics.

끝으로, 상기 천연 질감재의 표면으로 도시하지 않았지만 그 표면을 보호하기 위해 침투식 강화 실러, 우레탄 계열의 코팅제, 아크릴 계열의 코팅제, 엑포시 계열의 코팅제 중 어느 하나를 통상적인 스프레이 방식이나 도포 방식 등으로 코팅되는 코팅단계(S8)를 더 포함하는 것이 바람직하다. Lastly, although not shown as the surface of the natural texture material, in order to protect the surface of the penetration type reinforcement sealer, urethane-based coating, acrylic-based coating, any one of the coating agent of the epoxy-based spray or coating method It is preferable to further include a coating step (S8) to be coated with.

이로써, 시공된 경계석의 표면에 코팅제를 코팅함으로써, 경계석이 손상됨을 최소화하고 그로 인해 보다 오랜 사용기간을 확보할 수 있는 조건 또한 가지는 것이다.
In this way, by coating the coating on the surface of the construction of the boundary stone, there is also a condition that can minimize the damage of the boundary stone, thereby ensuring a longer service life.

그리고, 상기 각 거푸집(100)(100A)에 형성되는 무늬/모양부(20)는 도 3에서와 같이 그 거푸집의 표면으로부터 분리되어 거푸집의 내측면으로 탈착되는 형태로 형성되는 것이 바람직하다. In addition, the pattern / shape portion 20 formed in each of the molds 100 and 100A is preferably formed to be separated from the surface of the formwork and detached to the inner side of the formwork as shown in FIG. 3.

다시 말해서, 무늬/모양부(20)를 별도의 패널(20A)에 형성하고, 그 패널(20A)은 거푸집의 내측면에 형성된 결합홈이나 돌기 또는 브래킷 등에 의해 탈착되도록 구비함으로써, 각 시설물 따라 상기 무늬/모양부가 형성되는 다양 형태의 패널을 구비하여 필요로 하는 조건에 따라 선택적으로 사용할 수 있도록 것이 바람직하다.
In other words, the pattern / shape portion 20 is formed in a separate panel 20A, and the panel 20A is provided to be detached by a coupling groove, a protrusion or a bracket formed on the inner side of the formwork, and according to each facility, It is desirable to have various types of panels in which a pattern / shape is formed so that they can be selectively used according to the required conditions.

1 : 지면
10 : 고정축 20A : 패널
22 : 삽입돌기 24 : 삽입홈
25 : 중량체 30 : 결합홈
40 : 밀착수단 42 : 슬라이드부
44 : 걸고리 45 : 편심캠
45a : 손잡이 100 : 거푸집
100A : 상 거푸집 200 : 경계석
1: ground
10: fixed shaft 20A: panel
22: insertion protrusion 24: insertion groove
25: weight 30: coupling groove
40: contact means 42: the slide portion
44: hook 45: eccentric cam
45a: Handle 100: Formwork
100A: Formwork 200: Boundary Stone

Claims (3)

거푸집(100)을 이용하여 단지, 조경, 공원, 하천, 도로 등과 같은 각 시설물에 형성되는 경계석(200)을 시공하는 방법에 있어서,
상기 각 시설물의 경계지 지면(1)의 양측에 거푸집(100)을 밀착 고정하기 위하여 일정 간격으로 다수 개의 고정축(10)을 박아 고정하는 고정축 고정단계(S1)와;
상기 고정축의 내측으로 내측면에 석재 질감을 가질 수 있도록 음각과 양각 형태의 무늬/모양부(20)가 형성된 거푸집(100)의 각 끝단 면의 서로 대응되는 위치에 적어도 하나 이상 형성되는 각각의 삽입돌기(22)와 삽입홈(24)을 서로 삽입하여 연결하는 거푸집 연결단계(S2)와;
상기 거푸집을 연결하는 과정에서 거푸집의 외측면에 형성된 결합홈(30)으로 일단이 슬라이딩 삽입 지지되고, 타단이 상기 고정축에 걸어짐과 동시에 그 고정축과 접촉되게 회전되는 편심캠(45)으로 구성되는 밀착수단(40)에 의해 거푸집을 고정축 측으로 밀착 고정하는 밀착 고정단계(S3)와;
상기 밀착 고정된 양 거푸집 사이로 타설된 콘크리트를 충진하는 콘크리트 충진단계(S4)와;
상기 충진된 콘크리트의 상부로 밑면에 석재 질감을 가질 수 있도록 음각과 양각 형태의 무늬/모양부(20)가 형성되며 상부에 중량체(25)가 구비된 상 거푸집을 올려놓는 상 거푸집 설치단계(S5)와;
상기 상 거푸집을 설치 후 콘크리트의 양생 기간을 거쳐 상 거푸집과 양 거푸집을 해체하는 거푸집 해체단계(S6)와;
상기 거푸집 해체 후 시공된 경계석의 표면으로 형성된 무늬/모양이 천연 질감을 가질 수 있게 천연 질감재 도포단계(S7)와;
상기 천연 질감재가 도포된 표면으로 그 표면을 보호하기 위해 침투식 강화 실러, 우레탄 계열의 코팅제, 아크릴 계열의 코팅제, 엑포시 계열의 코팅제 중 어느 하나를 코팅하는 코팅단계(S8)를 더 포함하는 것을 특징으로 하는 자연친화적인 자연 질감을 갖는 단지, 조경, 공원, 하천, 도로에 형성되는 경계석의 시공방법.
In the method for constructing the boundary stone 200 formed in each facility, such as landscaping, parks, rivers, roads, etc. using the formwork 100,
A fixed shaft fixing step (S1) for driving and fixing a plurality of fixed shafts 10 at regular intervals in order to closely fix the formwork 100 on both sides of the boundary ground surface 1 of each facility;
Each insert is formed at least one at a position corresponding to each end surface of the formwork 100 in which the intaglio and embossed patterns / shapes 20 are formed so as to have a stone texture on the inner surface of the fixed shaft. Formwork connecting step (S2) for inserting and connecting the projection 22 and the insertion groove 24 to each other;
In the process of connecting the formwork, one end is supported by sliding insertion into the coupling groove 30 formed on the outer surface of the formwork, the other end is hung on the fixed shaft and at the same time rotated to contact with the fixed shaft to the eccentric cam (45) A close fixing step (S3) for tightly fixing the formwork to the fixed shaft side by the close means 40 configured;
A concrete filling step (S4) of filling concrete poured between the two fixed molds;
The step form installation step of placing the upper formwork with the weight body 25 is formed on the top of the filled concrete so that the intaglio and embossed pattern / shape portion 20 to have a stone texture on the bottom ( S5);
Formwork dismantling step (S6) of dismantling the formwork and both formwork through the curing period of concrete after installing the formwork;
A step of applying a natural texture material (S7) so that the pattern / shape formed by the surface of the boundary stone constructed after disassembly of the form can have a natural texture;
Further comprising a coating step (S8) for coating any one of the penetration-type reinforcement sealer, a urethane-based coating agent, an acrylic-based coating agent, an epoxy-based coating agent to protect the surface with the surface of the natural texture material is applied. A method of constructing boundary stones formed in landscaping, parks, rivers, and roads, which has a natural friendly natural texture.
삭제delete 제1항에 있어서,
상기 각 거푸집(100)(100A)에 형성되는 무늬/모양부(20)는 그 거푸집의 표면으로부터 분리되어 거푸집의 내측면으로 탈착되는 형태로 형성되는 것을 특징으로 하는 자연친화적인 자연 질감을 갖는 단지, 조경, 공원, 하천, 도로에 형성되는 경계석의 시공방법.
The method of claim 1,
The pattern / shape portion 20 formed in each of the molds 100 and 100A is separated from the surface of the formwork and is formed in a form that is detached to the inner side of the formwork. Construction method of boundary stone formed in park, landscape, park, river, road.
KR1020110032294A 2011-04-07 2011-04-07 Eco-friendly with natural textures, complex, landscaping, parks, rivers, road construction method of boundary stone formation KR101070338B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110032294A KR101070338B1 (en) 2011-04-07 2011-04-07 Eco-friendly with natural textures, complex, landscaping, parks, rivers, road construction method of boundary stone formation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110032294A KR101070338B1 (en) 2011-04-07 2011-04-07 Eco-friendly with natural textures, complex, landscaping, parks, rivers, road construction method of boundary stone formation

Publications (1)

Publication Number Publication Date
KR101070338B1 true KR101070338B1 (en) 2011-10-06

Family

ID=45032334

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110032294A KR101070338B1 (en) 2011-04-07 2011-04-07 Eco-friendly with natural textures, complex, landscaping, parks, rivers, road construction method of boundary stone formation

Country Status (1)

Country Link
KR (1) KR101070338B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102049804B1 (en) * 2019-04-01 2019-11-28 (주)옥련건설 Steam curing device for manhole maintenance and steam curing method using the same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200406040Y1 (en) * 2005-09-14 2006-01-20 이경환 Stone decorative formwork and stone pattern formwork.

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200406040Y1 (en) * 2005-09-14 2006-01-20 이경환 Stone decorative formwork and stone pattern formwork.

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102049804B1 (en) * 2019-04-01 2019-11-28 (주)옥련건설 Steam curing device for manhole maintenance and steam curing method using the same

Similar Documents

Publication Publication Date Title
KR101616308B1 (en) Concrete structure and method for manufacturing the same using 3d printing
US10267011B2 (en) Pre-cast decorative retaining wall system
US10053833B2 (en) Pre-cast decorative retaining wall system
JP4157120B2 (en) Method for producing artificial stone
CN104328790B (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
KR101070338B1 (en) Eco-friendly with natural textures, complex, landscaping, parks, rivers, road construction method of boundary stone formation
US20070234664A1 (en) Method of forming a decorative concrete wall
CN105672249A (en) Concrete channel plate pile and manufacturing method thereof
KR100900155B1 (en) Manufacturing method of double-sided natural stone block
KR20090083661A (en) A block for constructing breast wall
JP3883830B2 (en) Construction materials for civil engineering structures
KR102341776B1 (en) the improved form structure to manufacturing block unit for breast wall
KR101468465B1 (en) Retaining wall construction method for retaining wall construction in soft ground using a pile that concerns the cut area and carved the mountain ground subsidence and piles that
JP2008291543A (en) Method of constructing concrete structure by using soil concrete inside
JPH0932014A (en) Method of execution for retaining wall
JP4170955B2 (en) Construction method of concrete structure using residual formwork and soil concrete
KR101071692B1 (en) Eco-friendly engineering, landscaping, parks, construction of boundary stone to hacheonyong press
KR100943672B1 (en) Manufacturing method of the artificial rock where the crack is formed
KR200348495Y1 (en) Artificial fall imitation stone structure
GB2443806A (en) Method of forming a prefabricated block
CN211523255U (en) Manufacturing tool for foundation bearing platform template
CN208183809U (en) Poured band of outer wall of basement backfills water sealing structure in advance
CN209958816U (en) Parcel formula reinforcing apparatus
KR200428841Y1 (en) a mold of building outer wall
CN205766738U (en) A kind of municipal administration precast pier mould

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee