KR20030091836A - A Continuous and Cut Off wall And Foundation Method By Overlap Casing - Google Patents

A Continuous and Cut Off wall And Foundation Method By Overlap Casing Download PDF

Info

Publication number
KR20030091836A
KR20030091836A KR1020030051460A KR20030051460A KR20030091836A KR 20030091836 A KR20030091836 A KR 20030091836A KR 1020030051460 A KR1020030051460 A KR 1020030051460A KR 20030051460 A KR20030051460 A KR 20030051460A KR 20030091836 A KR20030091836 A KR 20030091836A
Authority
KR
South Korea
Prior art keywords
inscribed
wall
order
order wall
cylinder
Prior art date
Application number
KR1020030051460A
Other languages
Korean (ko)
Inventor
김광민
Original Assignee
케이엠토건 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 케이엠토건 주식회사 filed Critical 케이엠토건 주식회사
Priority to KR1020030051460A priority Critical patent/KR20030091836A/en
Publication of KR20030091836A publication Critical patent/KR20030091836A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

PURPOSE: A column-type waterproof wall using a casing and an installation method thereof are provided to increase a waterproof effect, enable proper adjustment of the rigidity of the waterproof wall according to the installation conditions, and reinforce the ground. CONSTITUTION: In a waterproof wall installed under the ground, a circular hole is bored in the ground by a boring machine for excavation(5) and overlap casings(10) with an overlap arc surface formed to the outer periphery of the casing are formed to the inside of the hole. The overlap arc surface and the outer periphery of the overlap casings are consecutively connected. The inside of each overlap casing is filled with a waterproof wall-forming material(15). Reinforcing bars and H-beams are inserted in the overlap casing filled with the waterproof wall-forming material. The waterproof wall-forming material forms a column-type waterproof wall by drawing the overlap casing after the filling of the waterproof wall-forming material.

Description

원통기둥을 이용한 주열식 차수벽 및 그 설치공법 {A Continuous and Cut Off wall And Foundation Method By Overlap Casing}A row and cut off wall and foundation method by overlap casing}

본 발명은 지하터파기, 물막이, 도로확장 등의 토목공사를 실시할 때에 지반(지중)에서 발생되는 지하수에 의해 토사가 흘러내리거나 지반이 무너지는 것을 방지하기 위한 원통기둥을 이용한 주열식 차수벽 및 그 설치공법에 관한 것이다.In the present invention, when performing civil works such as underground burrow, water barrier, road expansion, etc., the main order water barrier wall using a cylindrical column to prevent the soil from flowing down or the ground collapse by groundwater generated in the ground (ground); It is about the installation method.

이를 좀더 상세히 설명하면, 통상의 굴삭용 천공기를 이용하여 원형의 구멍을 소정의 깊이만큼 수직으로 뚫어주면서 외주에 내접호면이 직선상으로 형성된 내접원통기둥(OVERLAP CASING)을 설치하되, 인접하는 내접원통기둥은 내접호면과 외주를 밀접하게 당접되어 겹쳐지도록 하면서 연속적으로 설치하고, 연속적으로 설치되는 각 내접원통기둥의 내부에 콘크리트와 같은 차수벽형성물질을 충진시키되 소정의 간격에 위치하는 내접원통기둥의 내부에 철근과 H빔을 각각 삽입시켜 주며, 소정의 시간이 경과한 후에 내접원통기둥을 인발하여 줌으로서 주열식차수벽 또는 지중벽체(이하 "주열식차수벽"으로 통칭함)가 형성되어지도록 하는 원통기둥을 이용한 주열식 차수벽 및 그 설치공법을 제공하려는 것이다.To explain this in more detail, while using a conventional drilling machine to drill a circular hole vertically by a predetermined depth to install an inscribed cylindrical cylinder (OVERLAP CASING) formed in a straight line on the outer periphery, the adjacent inscribed cylindrical cylinder Continuously install the inner circumferential surface and the outer periphery so as to overlap and overlap each other, and fill the inner wall cylinders of the inner cylinders with a predetermined interval while filling the inner wall of the inner cylindrical cylinders located at predetermined intervals. Inserted beams respectively, and after a predetermined time elapses, the inlined cylindrical column is drawn and zoomed to form a columnar ordered wall or underground wall (hereinafter referred to as the "lined ordered wall"). And its installation method.

건축물은 건설하거나 구축물을 설치하기 위한 지하터파기공사와 강이나 바다에서 실시하는 가물막이 공사와, 도로를 확장하는 공사 등과 같은 각종 토목공사를 실시할 때에는 토사가 흘러내리거나 지반이 무너지는 것을 방지하기 위하여 방호벽을 설치하게 되고, 지반에서 용출되는 지하수가 공사구역으로 유입되지 못하도록 하는 차수기능도 부여하여야한다.To prevent earth and sand from collapsing during the construction of various civil works, such as underground excavation works for construction or installation of structures, temporary screening works on rivers or seas, and road extensions. For this purpose, a barrier is to be installed, and the order function to prevent the groundwater from the ground flowing into the construction area is to be provided.

이와 같이 차수공법과 함께 방호벽을 설치하는 흙막이 공법은 종래에도 많은 흙막이 공법들이 제안되어 활용되고 있다.As described above, many earthquake shielding methods have been proposed and utilized in the conventional earthquake shielding method for installing a barrier along with the water-staining method.

종래의 흙막이 공법 중에서 시트파일공법은, 크레인을 이용한 바이블로 해머에 의해 시트파일을 직타하여 지반에 강제 삽입시키도록 하는 항타(직타)공법과 압입인발장치에 의해 시트파일은 억지 삽입시키도록 하는 유압식(NPS)공법으로서, 강널말뚝을 설치하여 차수벽과 토류벽의 역할을 동시에 하도록 하는 것으로서, 재질적인 강도와 내구성이 우월한 시트파일을 사용하게 되면 연속 벽형 강성체로서의 토류벽 역할을 충분히 할 수 있게 되고 강널말뚝의 재질이 수밀성을 갖도록 함으로서 접촉부의 수밀성이 우월해서 뛰어난 차수효과를 얻을 수 있으나, 항타(직타)식 공법은 시트파일을 설치할 때마다 직타 시켜야 하므로 소음공해가 극심하고 진동이 심하게 발생되는 문제가 있고, 유압식(NPS)공법은 무진동 무소음으로서 설치를 실행할 수 있으나 시공을 위해서는 반력받침대와 파워 유닛(POWER UNIT)및 압입항타기를 별도로 설치하여야 하고 시공이 완료되면 반력받침대를 철거하여야 하는 등, 작업준비와 공장이 복잡하여 작업 공정히 더디게 진행되어 작업성 능률이 떨어지며 경비가 너무 많이 소요되는 문제가 있었다.The sheet pile method of the conventional soil barrier method is a hydraulic type to force the sheet pile to be inserted by a rudder (direct stroke) method and a press-pull apparatus to force the sheet pile directly into the ground by a blow blower using a crane. (NPS) is a method that installs steel sheet piles to act as a water barrier wall and a soil wall at the same time. When a sheet pile with superior material strength and durability is used, it is possible to fully serve as a soil wall as a continuous wall rigid body. It is excellent in watertightness of the contact part by the watertightness of the material, so the superior ordering effect can be obtained, but the rudder type method has to be hit directly every time the seat pile is installed, which causes severe noise pollution and severe vibration. , NPS method can be installed without vibration as noiseless For the ball, the reaction force support, power unit and pressurized ride must be installed separately, and when the construction is completed, the reaction force support must be removed. There was a problem that took too much.

종래의 워터제트병용시트파일공법은 전술한 시트파일공법과 동일하게 실시되지만 시트파일의 모서리부분에 워터제트파이프를 설치하여 바이블로 해머에 의해 항타(직타)하여 설치하되 항타 시에는 제트펌프를 가동시키면서 설치하게 되며, 대체로 일반항타로서 항타가 곤란한 점성도, 모래자갈층, 풍화암층에 시트파일을 설치할 때 유용하게 채택된다. 그러나 워터제트파이프를 별도로 제작하여 모든 시트파일의 모서리에 장착시켜야하는 번거로움이 있고, 제트펌프와 보조크레인 및 발전기들을 추가적으로 구비하여 설치하여야하므로 많은 시간과 비용이 소요되는 문제가 있었다.The conventional water jet combined seat pile method is performed in the same manner as the sheet pile method described above, but the water jet pipe is installed at the corner of the seat pile and driven by a blow hammer to install the jet pump. In general, it is useful to install a sheet pile in the viscosity, sand gravel layer, and weathered rock layer, which are difficult to drive as general driving. However, there is a problem in that the water jet pipe has to be manufactured separately and installed at the corners of all sheet piles, and additionally equipped with a jet pump, an auxiliary crane, and a generator, so that a lot of time and cost are required.

종래의 H파일 토류벽공법은 일반적인 개착식공법으로서, H파일을 항타(직타)하여 설치하거나 굴삭용 천공기에 의해 수직공을 뚫어 주고 그 수직공에 H파일을 삽입하여 설치한 후 터파기를 실시하는 공법이다. 그러나 이와 같은 공법은 토류판을 강성체로 하여 토류벽으로서의 역할은 기대할 수 있으나 토질조건으로 볼 때에는 차수효과를 기대할 수 없고 상부와 두부의 변위가 상대적으로 커서 배면부지반의 이완현상이 크게 발생하게 되는 문제가 있으며, 토질조건에 부합되는 차수그라우트(GROUT)공법을 선택하여 부가적으로 실시하기가 어렵고 연결부에서 누수현상이 발생할 우려가 높아 차수효과를 기대할 수 없는 문제가 있었다.Conventional H-pile earth wall method is a general open-type method, the H-pile is installed by hitting (direct hitting) or by drilling a vertical hole by an excavation drilling machine and inserting the H-file into the vertical hole, and then carrying out the trench to be. However, this method can be expected to play a role as a earth wall using the earth plate as a rigid body. However, in terms of soil conditions, the order effect cannot be expected and the displacement of the upper and head parts is relatively large. In addition, it is difficult to select additional GROUT method that meets the soil conditions, and it is difficult to carry out additional effects.

종래의 LW병용 H파일 토류공법은 H파일 토류벽에 차수효과를 높이기 위하여 LW(Labile Washer Glass)공법을 추가한 것으로서, H파일을 항타(직타)하여 설치하고 터파기를 진행하면서 토류판을 설치한 후 그라우팅 공을 H파일의 후면과 인접되도록 하되 인접하는 것과는 중첩되도록 뚫어주며, 케이싱을 설치한 상태에서 맨젯 튜브(MANJET TUBE)를 삽입한 후 더블파카(DOUBLE PACKER)를 설치하고 규산 소다(WATER GLASS)와 같은 SEAL제를 주입시켜주는 공법이다.Conventional H pile earthwork method for LW is the addition of LW (Labile Washer Glass) method to increase the order effect on the H pile earth wall, grind after installing the earth plate while driving and drilling the H file. The ball should be adjacent to the back of the H pile, but overlapped with the adjacent one. Insert the MANJET TUBE with the casing installed, install the double packer and install WATER GLASS and WATER GLASS. It is a method of injecting the same SEAL.

이는 강자성체로서의 토류벽 및 차수역할을 기대할 수 있고, 특히 사질자갈 호박돌층과 같이 대체로 공극률이 큰 지층에 용이하게 적용할 수 있으나, 모든 H파일들을 직타(항타)하여 설치해야 하므로 소음이 극심하게 발생하는 문제가 있고, H파일토류공법과 LW공법을 이중으로 실시하여야하므로 시간과 비용이 많이 소요되는 문제도 있으며, 공극률이 작은 지층에서도 LW주입효과가 감소되므로 토질조건 등을 시공 전에 검사 확인하여야하는 번거로움이 있었다.This can be expected as a ferromagnetic earth wall and the order role, especially can be easily applied to a large porosity layer, such as sand gravel amber stone, but because all the H piles must be installed in direct blow (drive), noise is extremely generated There is a problem, and the H pile soil method and the LW method must be carried out in double, so there is a problem that it takes a lot of time and money, and the LW injection effect is reduced even in the strata with small porosity. There was a feeling.

종래의 SCW병용 H파일토류벽공법은 H파일 토류벽에 차수효과와 토류벽의 배면지반이 이완되는 것을 억제할 수 있도록 하는 효과를 추가시키고자 할 때 적용하는 공법으로서, 병용되는 S. C. W(SOIL CEMENT WALL)공법에서는 응력재(H파일)를 삽입시키지 않는 무근 주열식 지중 벽으로 형성하게 되는데, H파일을 항타(직타)하여 설치하되 H파일은 가능한 한 근접되게 설치하고 토류판을 설치한 상태에서 H파일의 배면에 안정제주입공을 중첩되게 뚫어준 후 흙(SOIL)과 시멘트(CEMENT)를 혼합 시켜서 된 안정제를 주입시켜 고형화 시켜 준다.Conventional SC pile H-wall earth wall method is a method applied to add to the H pile earth wall effect to suppress the order effect and the back ground of the earth wall, SC W (SOIL CEMENT WALL) used together In the construction method, it is formed by a column-free underground underground wall that does not insert a stress material (H pile). The H pile is installed by driving (direct stroke), but the H pile is installed as close as possible and the earth plate is installed. Drill the stabilizer injection hole on the back to overlap and inject the stabilizer that is mixed with soil and cement to solidify.

상기 S. C. W병용 H파일 토류벽시공법은 H파일 및 토류판으로 되는 벽체와 지중에 연속된 주열벽체가 이중으로 형성되므로 토류벽 및 차수의 효과가 우수하기는 하지만 H파일을 항타(직타)에 의해 설치하여야 하므로 H파일을 설치할 때 소음이 극심하게 발생하는 문제가 있고, 대형크레인과 믹서렵·펌프와 같은 대형장비를 구비하여 시공하여야 하므로 장비비용이 많이 소요되고 시공효율이 낮아 공기가 길어질 뿐만 아니라 시공비용이 많이 소요되는 문제가 있었다.The H pile earth wall construction method for SC W combined has the H pile and the wall consisting of the earth plate and a continuous main heat wall in the ground, so the effect of the earth wall and the order is excellent, but the H pile should be installed by driving (direct stroke). When installing the pile, there is a problem of excessive noise, and it is necessary to equip it with large equipment such as large cranes and mixers and pumps. Therefore, the equipment cost is high and the construction efficiency is low. There was a lot of trouble.

종래의 S. C. W(SOIL CEMENT WALL)공법은 주열식 지중벽으로 계획심도까지 안정제주입공을 천공한 후 안정제(SOIL CEMENT)를 주입시켜 벽체를 형성하고 H파일을 응력재로 삽입하여 토류벽을 향상시키는 공법이다. 이와 같은 공법은 연속벽체가 차수와 토류의 2중 역할을 하게 되지만, 시공을 위해서는 대형크레인과 믹서·펌프와 같은 대형장치를 구비하여야 하고 시공효율이 감소하여 시공기간 길어져 결국 설비비용이 높아지게 되는 문제가 있었다.Conventional SC W (SOIL CEMENT WALL) method is to drill the stabilizer injection hole to the planned depth with the main heat type underground wall, and then insert the stabilizer (SOIL CEMENT) to form the wall and insert the H pile as the stress material to improve the earth wall. It is a construction method. In this method, the continuous wall plays a dual role of the order and the earth, but for the construction, it is necessary to have large equipment such as large cranes and mixers and pumps. There was.

종래의 C.I.P(CAST-IN-PLACED-PILE)공법은 주열식으로 철근콘크리트 기둥을 현장에서 타설 설치하는 것으로서, 기둥설치공을 뚫어 케이싱을 설치하고 케이싱 내부에 철근을 설치한 후 시멘트, 자갈, 모래 등으로 된 몰타르를 충진시켜 기둥으로 고형화시키며, 케이싱을 해제시켜 주되 H파일(4)을 소정의 간격에 위치하는 기둥에 삽입시켜주는 공법이다.Conventional CIP (CAST-IN-PLACED-PILE) method is to install reinforcement concrete pillars on site by casting heat, and install the casing through the pillar installation hole and install reinforcing bars inside the casing, then cement, gravel, sand Filling the mortar of the back to solidify the pillar, and release the casing, but inserts the H-ply 4 into the pillar located at a predetermined interval.

이와 같은 C.I.P공법은 철근콘크리트기둥을 설치할 때마다 기둥설치공을 뚫어 거푸집을 설치하고 철근을 설치한 상태에서 몰타르를 충진시키며 몰타르가 고형화된 후 거푸집을 제거하여야 하는 일련의 과정을 매번 반복적으로 실시하여야 하므로 설치기간이 장기간 소요되고, 기둥과 기둥 사이가 밀폐상태로 되지 못하고 누수 되는 현상이 발생되는 문제점이 있었다.In this CIP method, each time a reinforced concrete column is installed, a series of processes must be performed every time to install the formwork through the pillar installation holes, fill the mortar with the rebar installed, and remove the formwork after the mortar has solidified. Therefore, the installation takes a long time, there was a problem that the leak between the pillar and the pillar does not become a sealed state occurs.

종래의 보조그라이팅 병용 C.I.P공법은 전술한 C.I.P공법에 의해 철근콘크리트기둥을 설치하고 소정의 철근콘크리트 기둥에 H파일을 삽입시켜주며, 각 철근콘크리트기둥 사이에 배면부에 차수용 보조 그라우팅(GROUTING)을 실시해주는 공법으로서, 이는 설치비용과 시간이 많이 소요되는 C.I.P공법을 먼저 실시한 다음에 차수용 보조그라우팅을 재차 실시하여 토류벽과 차수의 기능은 확보할 수 있으나 설치비용과 시간이 더욱 더 많이 소요되는 문제가 있었다.Conventional auxiliary grinding combined CIP method is to install the reinforced concrete pillar by the above-described CIP method, insert the H pile into the predetermined reinforced concrete column, and the secondary grouting (GROUTING) for the back portion between each reinforced concrete pillar As a method to implement, it is possible to secure the functions of earth wall and order by performing CIP method that requires a lot of installation cost and time, and then perform auxiliary auxiliary grouting again, but it takes more installation cost and time. There was.

이와 같은 공법 중에서 시트파일공법과 워터제트병용 시트파일공법을 제외한 공법들은 흙막이 공사를 실시할 때 토압과 지반의 조건에 따라 몇 가지의 공법을 병행시켜서 시행하게 된다.Among these methods, except for the sheet pile method and the sheet pile method for the water jet bottle, the construction method is carried out in parallel with several methods depending on the soil pressure and the ground conditions when the earthquake construction is carried out.

또 다른 종래의 흙막이 공사는 토압이 높고 지반침하의 우려가 현저히 높을때의 흙막이 공사를 들 수 있다.Another conventional clogging construction includes a clogging construction when the soil pressure is high and the ground subsidence is very high.

이는 지반부와 터파기부의 경계선상에 흙막이를 설치하게 되는데, 토압이 높고 지반침하의 우려가 높으므로 터파기부의 경계선상에 바이블로 해머에 의해 항타(직타)하여 H파일을 소정의 등간격으로 설치하고, H파일의 내부양측으로 LW공법에 의해 SEAL제를 주입하여 설치하며, 그 사이에 C.I.P공법을 병행하여 실시한 다음 이들의 외측, 즉 지반부의 경계선 상에는 J.S.P공법을 실시하여 지반부를 더욱 견실하게 지지시켜주어야 한다.This is because of the high earth pressure and high ground subsidence due to the high earth pressure and high ground subsidence, the H pile is driven by a bible hammer on the boundary line of the trench so that the H pile is spaced at predetermined equal intervals. It installs and injects SEAL agent into the inside of both sides of H pile by LW method, and performs CIP method in parallel, and then performs JSP method on the outside of them, that is, on the boundary line of the ground, to make the ground part more robust. It must be supported.

또한 토압이 낮고 지반침하의 우려가 현저히 적을 때에는 터파기부와 지반부의 경계선상에 C.I.P공법을 실시하여 주고 보강이 필요한 면에 C.I.P공법에 의해 설치된 철근콘크리트기둥의 후측에 LW공법을 실시하여 SEAL제(규산 소다)를 그라우팅 시켜 주게 된다.When the earth pressure is low and the ground subsidence is very low, the CIP method is applied on the boundary line of the trench and the ground part, and the LW method is applied to the rear side of the reinforced concrete column installed by the CIP method on the surface that needs to be reinforced. Grouting soda).

이와 같이 흙막이 공사를 실시할 때 종래의 공법들은 시트파일을 직타(항타)하여 설치하는 공법 외에는 토압과 지반의 상태에 따라 여러 가지의 공법을 병행하여 실시해주어야 하므로 시간과 비용이 많이 소요되는 문제가 있었고, H파일을 강제적으로 직타(항타)하여 설치하는 공법을 활용하고 있기 때문에 흙막이 공사를 실시할 때 소음이 극심하게 발생하게 되는 문제가 있었다.In this way, when constructing the earthquake construction, the conventional construction methods need to be carried out in parallel with various construction methods depending on the earth pressure and the ground condition, except for the installation method by directly seating (driving) the seat pile. There was a problem that the noise is generated excessively when the construction of the earthquake, because the use of the method of forcibly hitting and installing the H-file.

이와 같은 문제들을 해소할 수 있도록 하기 위하여 본인은 특허등록 제375020호 "흙막이 설치용 원통기둥 및 그 것을 이용한 흙막이 설치공법"을 제안하였다.In order to solve such problems, I proposed a patent registration No. 375020 "Cylinder for installing the earthen membrane and earthen installation method using the same".

이는 통상의 굴삭용 천공기를 이용하여 원형의 구멍을 소정의 깊이만큼 뚫어주고, 그 구멍에 일면이 내향원호면으로 된 원통기둥을 삽입시키며, 원통기둥에서 내향원호면의 근접 전방에 내향원호면과 중첩되도록 원형구멍을 재차 뚫어 원통기둥을 당접되게 삽입하여 설치하는 것을 반복적으로 실시하되, 원통기중이 소정의 개수만큼 설치되면 최 선단에 설치된 설치되어 있는 원통기둥을 인발하여 최종원통기둥의 선단에 뚫어진 원통구멍에 삽입하는 과정을 반복적으로 실시하며, 이와 같이 실시에 의해 원통기둥이 제거되어 연통되는 복수개의 원통구멍이 노출되면 원통구멍들에 시트파일을 연속적으로 연결시키면서 설치하도록 된 것이다.This drills a circular hole by a predetermined depth using a conventional drilling machine, and inserts a cylindrical column having an inward arc surface into one of the holes, and the inward arc surface in front of the inward arc surface in the cylindrical cylinder. Drill the circular hole again to be overlapped and insert the cylinder pillar in contact with each other repeatedly.If a predetermined number of cylinder cylinders are installed, draw the cylindrical cylinder installed at the top end and draw the cylinder drilled at the end of the final cylinder cylinder. The process of inserting the holes is repeatedly performed. When the plurality of cylindrical holes are removed and the cylindrical pillars are exposed by the above-described implementation, the sheet piles are continuously connected to the cylindrical holes.

그러나 상기와 같은 "흙막이 설치용 원통기둥 및 그 것을 이용한 흙막이 설치공법"은 원통기둥을 인발하여 생성된 원통구멍에 시트파일을 서로 연결시켜 설치하더라도 시트파일의 양측(내외면)에는 원통구멍의 내주와의 사이에 공간부가 발생하게 되고, 이와 같이 생성된 공간부에 지반에서 발생된 지하수가 침투하여 충진되어지므로 시트의 양측에 위치하는 지반의 약해지게 되며, 시트파일을 연속적으로 연결시켜 설치하더라도 시트파일끼리 접속되는 연결부분에 틈이 발생할 뿐만 아니라 진동 등에 의해 파일끼리의 연결(접속)부분의 접속 상태가 해제되면서 차수효과가 떨어질 뿐만 아니라 공간부에 충진된 지하수가 누수 되어 지반을 약화시키고 그로 인하여 지반이 침하하게 되는 문제가 있었다.However, as described above, the "cylinder mounting cylinder pillar and the earthquake installation method using the same" are installed on the two sides (inner and outer surfaces) of the sheet pile even when the sheet pile is connected to each other in the cylindrical hole generated by drawing the cylinder pillar. The space part is generated between the ground parts, and the ground water generated in the ground part is filled and penetrated, thus weakening the grounds located on both sides of the sheet. Not only does a gap occur in the connection part connected to each other, but the connection state of the connection (connection) part between the piles is released due to vibration, etc., and the order effect is not only reduced, and the groundwater filled in the space is leaked, thereby weakening the ground. There was a problem sinking.

본 발명은 상기와 같은 문제를 해소할 수 있도록 더욱 개선된 원통기둥을 이용한 주열식 차수벽 및 그 설치공법을 제공하려는 것이다.The present invention is to provide a heat-receiving order wall using the cylindrical cylinder further improved to solve the above problems and the installation method thereof.

본 발명은 통상의 굴삭용 천공기를 이용하여 원형의 구멍을 소정의 깊이만큼수직으로 뚫어주면서 외주에 내접호면이 직선상으로 형성된 내접원통기둥(OVERLAP CASING)을 설치하되, 인접하는 내접원통기둥은 내접호면과 외주를 밀접하게 당접되어 겹쳐지도록 하면서 연속적으로 설치하고, 연속적으로 설치되는 각 내접원통기둥의 내부에 콘크리트 또는 고화재 혼합토 또는 모르타르로 되는 차수벽물질을 충진시키되 소정의 간격에 위치하는 내접원통기둥의 내부에 철근과 H빔을 각각 삽입시켜 주며, 소정의 시간이 경과한 후에 내접원통기둥을 인발하여 줌으로서 주열식차수벽이 형성되어지도록 하는 원통기둥을 이용한 주열식 차수벽 및 그 설치공법을 제공하려는데 그 목적이 있다.The present invention is to install an inscribed cylindrical cylinder (OVERLAP CASING) formed in a straight line on the outer periphery while drilling a circular hole vertically by a predetermined depth using a conventional drilling machine, the adjacent inscribed cylindrical cylinder and the inscribed surface The outer periphery is placed in close contact with each other and overlaps, and is continuously installed. Filling the inner wall of each inclined cylinder cylinder with continuous or wall material made of concrete or solid fire mixture soil or mortar, the reinforcing bars are in the inner cylinder cylinder at predetermined intervals The purpose of the present invention is to provide a columnar ordered wall using a cylindrical column and a method of installing the same, by inserting and H beams respectively, and drawing an inscribed cylindrical column after a predetermined time elapses so that the columnar ordered wall is formed.

본 발명의 다른 목적은 연속적으로 설치되는 각 내접원통기둥의 내부에 충진되는 콘크리트 또는 고화재 혼합토 또는 모르타르에 의해 차수벽을 형성하여 줌으로서 기밀(밀폐)성과 중첩되는 겹침 면적을 증대시켜 차수효과를 증대 강화시킬 수 있도록 된 원통기둥을 이용한 주열식 차수벽 및 그 설치공법을 제공하는데 있다.Another object of the present invention is to increase the overlapping effect by increasing the overlapping area overlapping the airtightness (sealing) by forming the order wall by the concrete or solidified mixture soil or mortar filled in each of the inscribed cylindrical cylinders are installed continuously The present invention provides a heat-strained order wall using a cylindrical column that can be made and its installation method.

본 발명의 또 다른 목적은 콘크리트 또는 고화재 혼합토 또는 모르타르에 의해 형성되는 차수벽의 강도(강성)를 장소 및 길이 등의 설치조건에 따라 적절하게 조절하면서 선택적으로 설치할 수 있도록 된 원통기둥을 이용한 주열식 차수벽 및 그 설치공법을 제공하는데 있다.Still another object of the present invention is a casting type using a cylindrical column that can be selectively installed while appropriately adjusting the strength (stiffness) of the order wall formed by concrete or solidified mixed soil or mortar according to the installation conditions such as location and length. To provide a water barrier and its installation method.

본 발명의 또 다른 목적은 원통기둥에 의해 형성되어지는 원통구멍의 내부에 차수벽 물질을 완전히 충진시켜 공간이나 틈이 발생되지 않도록 하여 줌으로서 지반을 강화시키는 효과를 얻을 수 있도록 된 원통기둥을 이용한 주열식 차수벽 및 그 설치공법을 제공하는데 있다.Still another object of the present invention is to completely fill the inner wall of the cylindrical hole formed by the cylindrical column to prevent the occurrence of spaces or gaps by using a cylindrical column to obtain the effect of strengthening the ground by zooming To provide a thermal order wall and its installation method.

본 발명의 상기 및 기타 목적은,The above and other objects of the present invention,

지중에 콘크리트 등의 차수벽을 설치한 것에 있어서,In installing underground wall of concrete such as concrete,

통상의 굴삭용 천공기(5)를 이용하여 원형구멍을 소정의 깊이만큼 수직으로 뚫어주고, 원형구멍의 내부에는 외주에 내접호면(11)이 직선상으로 형성된 내접원통기둥(10)을 설치하되 인접하는 내접원통기둥(10)끼리는 내접호면(11)과 외주를 밀접하게 연접되도록 연속적으로 설치하며, 연속적으로 설치되는 각 내접원통기둥(10)의 내부에 차수벽형성물질(15)을 충진시키며, 차수벽물질(15)이 충진된 내접원통기둥(10)의 내부에는 소정의 간격마다 철근(16)과 H빔(17)을 각각 삽입시켜 주며, 차수벽형성물질(15)을 충진시키고 소정의 시간이 경과한 후에 내접원통기둥(10)을 인발하여 차수벽형성물질(15)들이 주열식차수벽(20)을 형성하도록 된 것을 특징으로 하는 원통기둥을 이용한 주열식 차수벽 및 그 설치공법에 의해 달성된다.Drill a circular hole vertically by a predetermined depth using a conventional drilling machine (5), and the inner cylindrical cylinder (10) having an inner circumferential surface (11) formed in a straight line on the outer periphery, but adjacent to The inscribed cylinder columns 10 are continuously installed to closely connect the inscribed arc face 11 and the outer circumference, and fill the order wall forming material 15 in each of the inscribed cylinder pillars 10 that are continuously installed, and the order wall material 15 Reinforcing bar 16 and the H beam 17 is inserted at predetermined intervals inside the inscribed cylindrical cylinder 10 filled with), and filled with the order wall forming material 15 and after a predetermined time elapses. By pulling 10, the order wall forming materials 15 are formed by the order column order wall using the cylindrical column, and the installation method thereof, characterized in that to form the order column order wall 20.

도 1은 본 발명에 따른 원통기둥을 이용한 주열식 차수벽 설치공정도.1 is a flow chart of the order of the row order type wall using a cylindrical column according to the present invention.

도 2는 본 발명에 따른 원통기둥을 이용한 주열식 차수벽 설치공정에서 원통 기둥을 연접시켜 연속적으로 지중에 설치한 상태도.Figure 2 is a state that is continuously installed in the ground by connecting the cylindrical column in the column-type order wall installation process using a cylindrical column according to the present invention.

도 3은 본 발명에 따른 원통기둥을 이용한 주열식 차수벽 설치공정에서 연속 적으로 설치된 원통기둥에 콘크리트를 충진시킨 상태도.Figure 3 is a state filled with concrete in a cylindrical column continuously installed in the column-type order wall installation process using a cylindrical column according to the present invention.

도 4는 본 발명에 따른 원통기둥을 이용한 차수벽 설치공정에서 원통기둥을 인발하여 형성되어지는 주열식차수벽의 설치 상태도.Figure 4 is an installation state of the column-type order wall is formed by drawing a cylindrical column in the order wall installation process using a cylindrical column according to the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1. 주열식차수벽형성공정도 2. 인접공천공 및 케이싱설치공정1. Main heat order wall forming process 2. Adjacent hole drilling and casing installation process

3. 차수벽형성물질충진공정 4. 케이싱인발공정3. Filling process for order wall forming material 4. Casing drawing process

10. 내접원통기둥 11. 내접호면10. Inscribed cylindrical cylinder 11. Inscribed arc

15. 콘크리트 20. 주열식차수벽15. Concrete 20. Heated water order wall

본 발명의 상기 및 기타 목적과 특징은 첨부도면에 의거한 다음의 상세한 설명에 의해 더욱 명확하게 이해 할 수 있을 것이다.The above and other objects and features of the present invention will be more clearly understood by the following detailed description based on the accompanying drawings.

첨부도면 도 1 내지 도 4는 본 발명에 따른 원통기둥을 이용한 주열식 차수벽 및 그 설치공법을 보인 예시도로서, 도 1은 본 발명에 따른 원통기둥을 이용한 주열식 차수벽 설치공정도이고, 도 2는 본 발명에서 원통기둥을 연접시켜 연속적으로 지중에 설치한 상태도이며, 도 3은 본 발명에서 연속적으로 설치된 원통기둥에 콘크리트를 충진시킨 상태도이며, 도 4는 본 발명에서 원통기둥을 인발하여 형성되어지는 주열식차수벽의 설치 상태도이다.1 to 4 are exemplified diagrams showing the columnar ordered wall using the cylindrical column and the installation method thereof according to the present invention, Figure 1 is a process diagram of the columnar ordered wall using the cylindrical column according to the present invention, Figure 2 In the present invention, the cylindrical column is connected to the state diagram continuously installed in the ground, Figure 3 is a state diagram filled with a concrete cylinder in the continuously installed cylinder in the present invention, Figure 4 is formed by drawing a cylindrical cylinder in the present invention It is a state diagram of the installation of a main row order wall.

본 발명은 도 1에 예시된바와 같이 주열식 차수벽 형성공정도(1)에 의해 공정이 실시되며, 주열식 차수벽 형성공정도(1)는 원형구멍천공 및 내접원통기둥설치공정(2)과 차수벽형성물질충진공정(3)과 내접원통인발공정(4)과 주열식차수벽(20)이 형성되어지는 공정으로 이루어진다.The present invention is a process is carried out by the column ordered wall forming process diagram (1) as illustrated in Figure 1, the process line ordered wall forming process diagram (1) is a circular hole perforation and inscribed cylinder column installation process (2) and the order wall formation It consists of a material filling process (3), an inscribed cylinder drawing process (4), and a columnar ordered wall (20).

원형구멍천공 및 내접원통기둥설치공정(2)은 통상의 굴삭용 천공기(5)를 이용하여 내접원통기둥(10)을 근입시킬 수 있도록 원통기둥설치공을 소정의 깊이만큼 뚫어주고 뚫어진 원통기둥설치공에 내접원통기둥(10)을 근입시켜 설치하는 것을 반복적으로 실시하여, 도 2에 예시된바와 같이 인접하는 내접원통기둥(10)끼리는 원호의 원주면과 내접호면(11)이 연접되어지도록 하면서 연속적으로 설치하여 주는 공정이며, 특히 원주면과 내접호면(11)과의 사이에 스피럴(SPIRAL)주입호스를 미리 설치하여 공극을 형성시킬 수 있다.In the circular hole drilling and inscribed cylindrical column installation process (2), the cylindrical cylinder mounting hole is drilled to a predetermined depth so that the inscribed cylindrical cylinder 10 can be inserted by using a conventional drilling drill (5). By repeatedly installing the inscribed cylindrical column 10, the adjacent inscribed cylindrical columns 10 are continuously installed while the circumferential surface and the inscribed arc surface 11 of the arc are connected as illustrated in FIG. This is a step of forming, in particular, a space can be formed by installing a spiral injection hose in advance between the circumferential surface and the internal arc surface 11.

차수벽형성물질충진공정(3)은 도 3에 예시된바와 같이, 원형구멍천공 및 내접원통기둥설치공정(2)에 의해 인접하여 연속적으로 설치된 내접원통기둥(10)의 내부에 콘크리트 ㆍ 고화재 혼합토 ㆍ 모르타르와 같은 차수벽성형물질(3)을 충진시키고, 다수개씩의 내접원통기둥(10)마다 철근(16) 과 H빔(17)을 삽입 설치하여 주며, 소정의 시간동안 방치하여 차수벽성형물질(3)이 적절하게 고형화 되어지도록 하는 공정이다.As shown in Fig. 3, the order wall filling material filling process 3 includes concrete, solid mixture mixed soil and mortar in the inner cylindrical cylinder 10 which are continuously installed adjacently by the circular hole drilling and the inner cylindrical cylinder installation process (2). Fill the order wall forming material (3), and inserts the reinforcing bar 16 and the H beam (17) for each of a plurality of inscribed cylindrical cylinders (10), and left for a predetermined time, the order wall forming material (3) It is a process to solidify properly.

예컨대 내접원통기둥(10)에 충진된 차수벽성형물질(3)은 대체로 2 ~ 3시간이 경과하면 경화가 이루어지므로 경화전도를 수시로 체크하여 초기경화 이전에 내접원통기둥(10)을 인발할 수 있도록 한다.For example, the order wall molding material 3 filled in the inscribed cylindrical column 10 is generally hardened after 2 to 3 hours, so that the inducted cylindrical pillar 10 may be drawn before the initial curing by checking the hardening conductivity at any time.

내접원통인발공정(4)은 차수벽형성물질충진공정(3)에 의해 차수벽성형물질(3)을 내접원통기둥(10)에 충진시키고 적정한 시간이 경과한 후에 통상의 크레인(5)을 이용하여 내접원통기둥(10)을 인발하여 주는 공정으로서, 내접원통기둥(10)을 인발하여 제거시킬 때에 바이브로 해머(VIBRO HAMMER)를 이용하여 인발을 실시하여 인접하여 충진된 차수벽성형물질(3)들이 주열식의 겹침 밀착이 이루어지도록 하여 준다.The inscribed cylindrical drawing process (4) fills the inscribed cylindrical wall forming material (3) in the inscribed cylindrical cylinder (10) by the filling wall forming material filling step (3), and after the appropriate time has elapsed, the inscribed cylindrical cylinder using the ordinary crane (5). (10) is a process for drawing out, when drawing out and removing the inline cylinder column (10) by using a vibro hammer (VIBRO HAMMER) to be filled with adjacent wall-filled material forming material (3) overlapping the columnar type Ensure close contact.

바이브로 해머(VIBRO HAMMER)를 이용하여 내접원통기둥(10)을 인발하여 적정한 기간동안 방치하게 되면 차수벽성형물질(3)은 도 4에 예시된바와 같이 주열식차수벽(20)을 형성하게 된다.When the inscribed cylindrical column 10 is drawn and left for a suitable period using a VIBRO HAMMER, the order wall forming material 3 forms the main order column wall 20 as illustrated in FIG. 4.

이상에서와 같이 본 발명에 따른 원통기둥을 이용한 주열식 차수벽 및 그 설치공법은, 연속적으로 설치되는 각 내접원통기둥의 내부에 충진되는 콘크리트 또는 고화재 혼합토 또는 모르타르에 의해 차수벽을 형성하여 줌으로서 기밀(밀폐)성과 중첩되는 겹침 면적을 증대시켜 차수효과를 증대 강화시킬 수 있고, 콘크리트 또는 고화재 혼합토 또는 모르타르와 같은 차수벽형성물질에 의해 형성되는 차수벽의 강도(강성)를 장소 및 길이 등의 설치조건에 따라 적절하게 조절하면서 선택적으로 설치할 수 있으며, 원통기둥에 의해 형성되어지는 원통구멍의 내부에 차수벽 물질을 완전히 충진시켜 공간이나 틈이 발생되지 않도록 하여 지반을 강화시키는 효과를 얻을 수 있게 된다.As described above, the main order type wall and the installation method using the cylindrical column according to the present invention, by forming the order wall by the concrete or solid mixture mixture soil or mortar filled in the interior of each inscribed cylindrical cylinder to be installed airtight ( It is possible to increase and enhance the order effect by increasing the overlapped overlapping area and the strength (stiffness) of the order wall formed by the order wall forming materials such as concrete or solidified mixture soil or mortar to the installation conditions such as the location and length. According to the present invention, it can be selectively installed while adjusting appropriately, and it is possible to obtain the effect of strengthening the ground by completely filling the inner wall material of the cylinder wall formed by the cylinder column so that no space or gap is generated.

Claims (5)

지중에 설치되는 콘크리트와 같은 차수벽에 있어서,In the order wall such as concrete installed underground, 통상의 굴삭용 천공기(5)를 이용하여 원형구멍을 소정의 깊이만큼 수직으로 뚫어주고, 원형구멍의 내부에는 외주에 내접호면(11)이 직선상으로 형성된 내접원통기둥(10)을 설치하되 인접하는 내접원통기둥(10)끼리는 내접호면(11)과 외주를 밀접하게 연접되도록 연속적으로 설치하며, 연속적으로 설치되는 각 내접원통기둥(10)의 내부에 차수벽형성물질(15)을 충진시키며, 차수벽물질(15)이 충진된 내접원통기둥(10)의 내부에는 소정의 간격마다 철근(16)과 H빔(17)을 각각 삽입시켜 주며, 차수벽형성물질(15)을 충진시키고 소정의 시간이 경과한 후에 내접원통기둥(10)을 인발하여 차수벽형성물질(15)들이 주열식차수벽(20)을 형성하도록 된 것을 특징으로 하는 원통기둥을 이용한 주열식 콘크리트차수벽.Drill a circular hole vertically by a predetermined depth using a conventional drilling machine (5), and the inner cylindrical cylinder (10) having an inner circumferential surface (11) formed in a straight line on the outer periphery, but adjacent to The inscribed cylinder columns 10 are continuously installed to closely connect the inscribed arc face 11 and the outer circumference, and fill the order wall forming material 15 in each of the inscribed cylinder pillars 10 that are continuously installed, and the order wall material 15 Reinforcing bar 16 and the H beam 17 is inserted at predetermined intervals inside the inscribed cylindrical cylinder 10 filled with), and filled with the order wall forming material 15 and after a predetermined time elapses. The order heat concrete order wall using the cylindrical column, it characterized in that the ordered wall forming materials 15 to form a heat ordered order wall 20 by drawing (10). 지중에 콘크리트 등의 차수벽을 설치하는 것에 있어서,In installing ground wall such as concrete in the ground, 통상의 굴삭용 천공기(5)를 이용하여 원형구멍을 소정의 깊이만큼 수직으로 뚫어주고, 원형구멍의 내부에는 외주에 내접호면(11)이 직선상으로 형성된 내접원통기둥(10)을 설치하되 인접하는 내접원통기둥(10)끼리는 내접호면(11)과 외주를 밀접하게 연접되도록 연속적으로 설치하여 주는 원형구멍천공 및 내접원통기둥설치공정(2)과,Drill a circular hole vertically by a predetermined depth using a conventional drilling machine (5), and the inner cylindrical cylinder (10) having an inner circumferential surface (11) formed in a straight line on the outer periphery, but adjacent to Circular hole perforation and inscribed cylindrical column installation step (2) to continuously install so that the inscribed cylindrical surface (10) and the inner circumferential surface 11 and the outer circumference closely contact; 연속적으로 설치되는 각 내접원통기둥(10)의 내부에 차수벽형성물질(15)을충진시켜 주는 차수벽형성물질충진공정(3)과,An order wall forming material filling process (3) which fills the order wall forming material 15 in each of the inscribed cylindrical cylinders 10 which are continuously installed; 차수벽형성물질(15)을 충진시키고 소정의 시간이 경과한 후에 내접원통기둥(10)을 인발하여 주는 내접원통기둥인발공정(4)과,An inscribed cylinder pillar drawing step (4) of filling the order wall forming material 15 and drawing the inscribed cylinder cylinder 10 after a predetermined time has elapsed; 내접원통기둥(10)이 인발된 차수벽형성물질(15)이 고형화 되어 주열식차수벽(20)으로 형성되어지도록 하는 공정으로 이루지는 것을 특징으로 하는 원통기둥을 이용한 주열식 콘크리트차수벽 설치공법.A column-type concrete order wall installation method using a cylindrical column, characterized in that the inscribed cylindrical column (10) is made of a process to make the drawn wall forming material (15) is solidified to be formed as the main ordered order wall (20). 청구항 1에 있어서, 내접원통기둥(10)에 충진되는 차수벽물질(15)은, 콘크리트 ㆍ 고화재 혼합토 ㆍ 모르타르 중에서 어느 하나 인 것을 특징으로 하는 원통기둥을 이용한 주열식 콘크리트차수벽.The order-order concrete order wall using the cylindrical column according to claim 1, wherein the order wall material (15) filled in the inscribed cylindrical column (10) is any one of concrete, solidified mixed soil, and mortar. 청구항 2에 있어서, 차수벽물질(15)을 충진시키는 차수벽형성물질충진공정(3)에 있어, 차수벽물질(15)을 충진되는 내접원통기둥(10)은 소정의 간격마다 철근(16)과 H빔(17)을 각각 삽입시켜 주는 것을 특징으로 하는 원통기둥을 이용한 주열식 콘크리트차수벽 설치공법.The method of claim 2, wherein in the order wall filling material filling process 3 for filling the order wall material 15, the inscribed cylindrical column 10 filled with the order wall material 15 is provided with reinforcing bars 16 and H beams at predetermined intervals. 17. A method for installing a heat-retaining concrete order wall using a cylindrical column, characterized by inserting 17) each. 청구항 2에 있어서, 내접호면(11)과 외주를 밀접하게 연접되도록 하면서 연속적으로 내접원통기둥(10)을 설치함에 있어, 인접하는 내접원통기둥(10)의 원주면과 내접호면(11)과의 사이에 스피럴(SPIRAL)주입호스를 설치하여서 된 것을 특징으로 하는 원통기둥을 이용한 주열식 콘크리트차수벽 설치공법.3. The method of claim 2, wherein the inscribed cylindrical column 10 is disposed between the circumferential surface of the adjacent inscribed cylindrical column 10 and the inscribed circular surface 11 while continuously providing the inscribed cylindrical column 10 while closely contacting the inner circumferential surface 11 and the outer circumference. A method for installing a heat-retaining concrete order wall using a cylindrical column, characterized by installing a spiral injection hose.
KR1020030051460A 2003-07-25 2003-07-25 A Continuous and Cut Off wall And Foundation Method By Overlap Casing KR20030091836A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030051460A KR20030091836A (en) 2003-07-25 2003-07-25 A Continuous and Cut Off wall And Foundation Method By Overlap Casing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030051460A KR20030091836A (en) 2003-07-25 2003-07-25 A Continuous and Cut Off wall And Foundation Method By Overlap Casing

Publications (1)

Publication Number Publication Date
KR20030091836A true KR20030091836A (en) 2003-12-03

Family

ID=32388490

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030051460A KR20030091836A (en) 2003-07-25 2003-07-25 A Continuous and Cut Off wall And Foundation Method By Overlap Casing

Country Status (1)

Country Link
KR (1) KR20030091836A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100832490B1 (en) * 2006-12-29 2008-05-26 김광민 A foundation method of continuous and cut off wall by overlap casing
WO2009139510A1 (en) * 2008-05-14 2009-11-19 Kwang Min Kim Construction method for continuous cut-off wall using overlap casing
WO2018212449A1 (en) * 2017-05-18 2018-11-22 김사문 Incasing structure for constructing concrete soil retaining wall
KR102299540B1 (en) 2021-06-30 2021-09-07 한미기초기술 주식회사 Construction method of cross-sectional expansion type columnar barrier wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100832490B1 (en) * 2006-12-29 2008-05-26 김광민 A foundation method of continuous and cut off wall by overlap casing
WO2009139510A1 (en) * 2008-05-14 2009-11-19 Kwang Min Kim Construction method for continuous cut-off wall using overlap casing
WO2018212449A1 (en) * 2017-05-18 2018-11-22 김사문 Incasing structure for constructing concrete soil retaining wall
CN109477323A (en) * 2017-05-18 2019-03-15 金思文 It is used to form the insertion cannula structure of concrete retaining wall
KR102299540B1 (en) 2021-06-30 2021-09-07 한미기초기술 주식회사 Construction method of cross-sectional expansion type columnar barrier wall

Similar Documents

Publication Publication Date Title
KR100866162B1 (en) Chair-type self-supported earth retaining wall constructing method
KR101067707B1 (en) The earth retaining wall and waterproof construction technique for which cast in place concrete pile and grouting column was used
JP6166264B2 (en) How to build a retaining wall
KR20100068597A (en) A shoring method using arch plate pile and h-pile
KR100832490B1 (en) A foundation method of continuous and cut off wall by overlap casing
KR100415809B1 (en) precast pile for braced wall and the method using the same
KR20140055639A (en) A execution method of architecture beam
KR100652558B1 (en) Guide pipe for sheet pile and construction method using the same
KR100375020B1 (en) a pole for mud wall and constrution method of fence for mud
KR101065017B1 (en) A shoring method using arch plate pile and H-Pile
KR100960603B1 (en) Construction method of retaining wall using phc pile
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR102097919B1 (en) Melioration wall and replacement wall mixed retaining wall construction method
KR100779988B1 (en) Method for constructing micropile
JP2007009505A (en) Foundation reinforcing method
KR102317138B1 (en) Construction method of cast in place concrete pile for retaining wall
JP2019015100A (en) Removing method of earth retaining wall
KR102113291B1 (en) Soil retaining wall using phc pile and construction method thererof
JP4485006B2 (en) Construction method for underground structures
JP2009180035A (en) Method of connecting caisson
KR200362565Y1 (en) Earth Retaining Wall Structure Using Precast Concrete Pile and Construction Method Thereof
KR20030091836A (en) A Continuous and Cut Off wall And Foundation Method By Overlap Casing
KR101021913B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR200403694Y1 (en) Guide pipe for sheet pile
WO2009139510A1 (en) Construction method for continuous cut-off wall using overlap casing

Legal Events

Date Code Title Description
A201 Request for examination
G15R Request for early opening
N231 Notification of change of applicant
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
J201 Request for trial against refusal decision
E801 Decision on dismissal of amendment
B601 Maintenance of original decision after re-examination before a trial
J301 Trial decision

Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20060420

Effective date: 20061120

Free format text: TRIAL NUMBER: 2006101003404; TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20060420

Effective date: 20061120