KR20030047437A - Support apparatus for casting concrete in the slope of a embankment - Google Patents
Support apparatus for casting concrete in the slope of a embankment Download PDFInfo
- Publication number
- KR20030047437A KR20030047437A KR1020010077929A KR20010077929A KR20030047437A KR 20030047437 A KR20030047437 A KR 20030047437A KR 1020010077929 A KR1020010077929 A KR 1020010077929A KR 20010077929 A KR20010077929 A KR 20010077929A KR 20030047437 A KR20030047437 A KR 20030047437A
- Authority
- KR
- South Korea
- Prior art keywords
- dam
- concrete
- support
- vehicle
- ready
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
- E02B3/121—Devices for applying linings on banks or the water bottom
Abstract
Description
본 발명은 댐 법면 콘크리트 타설작업 지원장치에 관한 것으로, 특히 콘크리트 타설작업을 위한 각종 자재를 운반하거나 부수작업을 지원하기 위한 지원차와, 지원차를 견인 및 이송시키기 위한 이송차를 설치하고 이송차에는 지원차를 다른 작업구간으로 이송시킬 때에 간편하게 탑재시킬 수 있도록 탑재수단을 구비하여 타설작업의 전 공정이 원활하게 진행될 수 있도록 한 댐 법면 콘크리트 타설작업 지원장치에 관한 것이다.The present invention relates to a device for supporting concrete placing works on dam surface, and in particular, a support truck for transporting various materials for supporting concrete pouring work or supporting auxiliary work, and a transport truck for transporting and transporting the support car. The present invention relates to a dam front concrete placing work support device provided with a mounting means so that it can be easily mounted when transferring a supporting vehicle to another work section so that the whole process of the placing work can proceed smoothly.
일반적으로 댐의 법면에 콘크리트를 타설함에 있어서는 재래 방식에 의한 거푸집을 설치한 후 콘크리트를 타설하는 방법이 사용되고 있으나 이 경우 공기가 길어지는문제점이 있을 뿐만 아니라 급경사면에서 작업을 해야 하므로 안전사고의 위험이 있었다.In general, when placing concrete on the dam's surface, concrete is installed after conventional formwork is installed, but in this case, there is a problem that the air is long and there is a problem of safety accident because the work must be performed on a steep slope. There was this.
따라서 이러한 문제점을 개선하여 개발된 공법으로서 슬립 폼(Slip Form)을 이용한 콘크리트 타설방법이 있다.Therefore, there is a concrete pouring method using the slip form (Slip Form) as a method developed to improve these problems.
슬립 폼을 이용한 콘크리트 타설공법은 댐 등의 경사면에 상하로 일정 간격을 두고 한 쌍의 안내레일을 설치하고, 이 안내레일 위로 구동할 수 있도록 슬립 폼을 설치하여 경사면의 하부로부터 일정 높이만큼의 구간에 콘크리트를 타설하고, 일정 시간 경과 후 슬립 폼을 안내레일을 따라 끌어올려 다음 구간에 콘크리트를 연속작업으로 타설하는 식으로 댐 상단부까지 콘크리트를 타설하게 되는 것이다.In the concrete pouring method using slip foam, a pair of guide rails are installed on the inclined surface such as a dam at regular intervals up and down, and a slip foam is installed to drive the guide rail so that a section of a certain height from the bottom of the inclined surface is provided. After the concrete is poured in, and after a certain period of time, the concrete is poured to the top of the dam by pulling up the slip form along the guide rail and placing the concrete in the next section.
이러한 슬립 폼을 이용한 콘크리트 타설방법으로서는 대한민국 특허 제43256호로서 알려져 있다.As a concrete pouring method using such a slip foam is known as Korean Patent No. 43256.
그러나 이 특허 방법에서는 슬립 폼 포장차에 의해 행하여지는 타설작업을 행하기 위하여 필요로 하는 철근, 슈트, 가이드 레일, 시멘트, 몰탈과 같은 각종 자재를 타설작업을 행하는 슬립폼 포장차에 적재하여 운반하고, 슬립폼 포장차에 각종 부수작업을 행하기 위한 작업자가 탑승하여 철근의 배근작업, 슈트 설치작업, 가이드 레일 설치작업과 같은 각종 작업을 슬리폼 포장차를 이용하여 행함으로써 타설작업이 원활하게 진행되지 못하고, 작업시간과 비용이 증대되는 문제점이 있었다.However, in this patent method, various materials such as reinforcing bars, chutes, guide rails, cement, mortar, etc., which are needed for the pouring work performed by the slip foam packing machine are loaded and transported in the slip foam packing machine which performs the pouring work. In order to carry out various additional work on slip foam packing machine, various operations such as reinforcing bar reinforcement work, chute installation work, and guide rail installation work are performed by using slip packing machine to smoothly pour the work. There was a problem that the work time and costs are increased.
본 발명은 위와 같은 종래의 결함 및 문제점을 해소하기 위하여 창안한 것으로, 콘크리트 타설작업을 위한 각종 자재를 운반하거나 부수작업을 지원하기 위한 지원차와, 지원차를 견인 및 이송시키기 위한 이송차를 설치하고, 이송차에는 지원차를 다른 작업구간으로 이송시킬 때에 간편하게 탑재시킬 수 있도록 탑재수단을 구비하여 타설작업의 전 공정을 원활하게 진행할 수 있게 하는 댐 법면 콘크리트 타설작업 지원장치를 제공하고자 함에 목적이 있다.The present invention was devised to solve the above-mentioned conventional defects and problems, and install a support vehicle for transporting various materials for concrete placement or supporting an auxiliary work, and a transport vehicle for towing and transporting the support vehicle. The purpose of the present invention is to provide a dam-front concrete placing work support device which is equipped with a mounting means so that it can be easily mounted when transferring the supporting car to another work section. have.
도 1 내지 도 11은 본 발명에 의한 댐 법면 콘크리트 타설작업 지원장치가 채용된 타설장치에 관한 것으로,1 to 11 relates to a pouring apparatus employing a dam concrete concrete pouring operation support apparatus according to the present invention,
도 1은 댐 법면에 콘크리트를 타설하는 시공장면을 보인 정면도.1 is a front view showing a factory surface for placing concrete on the dam surface.
도 2는 슬립폼 포장장치의 측면도.Figure 2 is a side view of the slip foam packaging device.
도 3은 레미콘 공급부와 이송차를 보인 정면도.Figure 3 is a front view showing the ready-mixed concrete supply unit and the transport.
도 4는 레미콘 타설부와 슬립폼 포장차를 보인 정면도.Figure 4 is a front view showing a ready-mixed concrete pouring portion and slip foam packaging.
도 5는 레미콘 공급부의 이송차에 슬립폼 포장차가 탑재된 형태를 보인 측면도.Figure 5 is a side view showing a form in which the slip foam packaging vehicle is mounted on the conveying truck of the ready-mixed concrete supply unit.
도 6은 레미콘 공급부의 이송차에 레미콘 공급 컨베이어와 가이드 레일이 결합된 형태를 보인 측면도.Figure 6 is a side view showing the form of the ready-mixed conveyor conveyor and the guide rail coupled to the transport truck of the ready-mixed concrete supply unit.
도 7은 이송차의 평면도.7 is a plan view of a transport vehicle.
도 8a는 지원장치의 측면도.8A is a side view of the support device.
도 8b는 지원장치의 정면도.8B is a front view of the support device.
도 9a은 지원장치의 다른 형태를 보인 측면도.Figure 9a is a side view showing another form of the support device.
도 9b는 지원차에 몰탈 탱크가 결합된 형태를 보인 측면도.Figure 9b is a side view showing the mortar tank coupled to the support vehicle.
도 10은 지원차를 이송차에 탑재시키는 탑재수단의 구성 및 작용을 보인 측면도.Figure 10 is a side view showing the configuration and action of the mounting means for mounting the support vehicle on the transport.
도 11은 탑재수단의 요부 저면도.11 is a bottom view of main parts of the mounting means.
< 도면의 주요부분에 대한 부호의 설명><Description of the reference numerals for the main parts of the drawings>
1 : 댐 2 : 법면1: Dam 2: Surface
3 : 정상면11 : 철근3: normal plane 11: rebar
300 : 슬립폼 포장차410 : 윈치300: slip foam packaging 410: winch
500 : 지원차501 : 대차500: Support car 501: Balance
502 : 바퀴510 : 연결편502 wheel 510 connecting piece
511 : 연결공600 : 탑재수단511: connection hole 600: mounting means
610 : 견인레버613 : 연결공610: towing lever 613: connector
620 : 실린더623 : 플런저620: cylinder 623: plunger
624 : 연결부630 : 지지바624: connecting portion 630: support bar
640 : 연결핀650 : 안내롤러640: connecting pin 650: guide roller
이와 같은 목적을 달성하기 위하여 본 발명에 의한 댐 법면 콘크리트 타설작업 지원장치는 댐의 정상면에 구비된 레미콘 공급부에서 레미콘을 공급하고, 슬립폼 포장차가 철근이 배근된 법면을 따라 상승하면서 상기 레미콘을 타설하는 것에있어서, 댐의 정상면에 설치된 가이드 레일에 윈치가 구비된 이송차를 설치하고, 상기 윈치에 의해 댐의 법면을 바퀴로 굴러 승강하면서 각종 자재를 운반하고 부수작업을 행하도록 하는 지원차를 설치하여 구성된다.In order to achieve the above object, the dam concrete concrete placing work support device according to the present invention supplies the ready-mixed concrete from the ready-mixed concrete supply unit provided on the top surface of the dam, and the slip-formed pavement is placed along the normal surface where the reinforcing bar is placed to lay the ready-mixed concrete. In the process, a feeder equipped with a winch is installed on a guide rail installed on the top surface of the dam, and a support car for transporting various materials and carrying out auxiliary work by rolling up and lifting the dam surface of the dam by the winch. It is configured by.
상기 이송차에는 상기 지원차를 대차 위로 탑재시키기 위한 탑재수단이 구비되며, 이 탑재수단은 상기 이송차의 대차에 후단부가 회전 가능하게 힌지 결합된 견인레버와, 대차에 힌지 결합되어 견인레버를 회전시키기 위한 실린더와, 이송차의 대차의 양측부에 설치되어 상기 지원차가 견인레버에 의해 들어 올려질 때에 원활하게 이동하도록 안내하는 안내롤러를 포함하여 구성된다.The transport vehicle is provided with a mounting means for mounting the support vehicle on the trolley, the mounting means is a rear end hinged rotatably coupled to the trolley of the transport vehicle, the hinge is coupled to the trolley to rotate the towing lever It is configured to include a cylinder for guiding, and guide rollers which are installed at both sides of the trolley of the transport vehicle to guide the moving smoothly when the support vehicle is lifted by the traction lever.
상기 지원차는 하부에 바퀴가 달려 있기 때문에 작업자들이 인력으로 지원차를 움직여 다른 위치로 이동할 수도 있으나, 상기 탑재수단을 이용하게 되면, 이송차에 자동으로 싣고 이송시킬 수 있으므로 보다 작업이 간편하게 행하여진다.Since the support car has wheels at the bottom, workers can move the support car by manpower and move to another position. However, when the mounting means is used, the vehicle can be loaded and transported in a transport vehicle more easily.
이하, 본 발명을 첨부한 도면에 실시예를 들어 보다 상세히 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in more detail as follows.
도 1 내지 도 11은 본 발명에 의한 댐 법면 콘크리트 타설작업 지원장치가 채용된 타설장치에 관한 것으로, 도 1에는 댐 법면에 콘크리트를 타설하는 시공장면을 보인 정면도가 도시되고, 도 2에는 슬립폼 포장장치의 측면도가 도시되어 있다.1 to 11 relates to a placing apparatus employing a dam concrete concrete placing operation support apparatus according to the present invention, Figure 1 is a front view showing a factory surface for placing concrete on the dam surface, Figure 2 is a slip foam A side view of the packaging device is shown.
또한, 도 3에는 레미콘 공급부와 이송차를 보인 정면도, 도 4에는 레미콘 타설부와 슬립폼 포장차를 보인 정면도가 각각 도시되고, 도 5에는 레미콘 공급부의 이송차에 슬립폼 포장차가 탑재된 형태를 보인 측면도가 도시되어 있으며, 도 6에는 레미콘 공급부의 이송차에 레미콘 공급 컨베이어와 가이드 레일이 결합된 형태를 보인 측면도가 도시되어 있다.In addition, FIG. 3 is a front view showing the ready-mixed concrete supply unit and the transport truck, and FIG. 4 is a front view showing the ready-mixed concrete pouring unit and the slip foam packaging vehicle, respectively, and FIG. A side view is shown, and FIG. 6 is a side view showing a form in which a ready-mixed concrete supply conveyor and a guide rail are coupled to a transport vehicle of the ready-mixed concrete supply unit.
먼저, 도 1을 참조하면 도면에서 부호 1은 댐을 보인 것이고, 2는 댐(1)의 법면(2)을 보인 것으로 본 발명이 관련된 포장장치는 댐(1)의 법면(2)에 콘크리트층을 시공하기 위한 것이며, 개념적으로 댐(1)의 정상면(頂上面)(3)에서 레미콘을 공급하는 레미콘 공급부와, 법면(2)에 레미콘을 타설하여 콘크리트층을 형성하는 레미콘 타설부로 이루어진다.First, referring to FIG. 1, reference numeral 1 in the drawing shows a dam, and 2 shows a normal surface 2 of a dam 1. The packaging apparatus according to the present invention has a concrete layer on the surface 2 of the dam 1. It is intended for construction, and conceptually consists of a ready-mixed concrete supply unit for supplying the ready-mixed concrete from the top surface (頂 上面) (3) of the dam (1), and the concrete surface by pouring the ready-mixed concrete on the legal surface (2).
이하, 도 2 내지 도 5를 참조하면, 상기 레미콘 공급부는 정상면(3)에 길이방향으로 설치되는 가이드 레일(110)을 따라 이동되는 이송차(100)가 설치되고, 이송차(100)에는 레미콘 트럭(4)으로부터 배출되는 레미콘을 공급하기 위한 레미콘 공급수단(200)이 설치된다.Hereinafter, referring to FIGS. 2 to 5, the ready-mixed concrete supply unit may be provided with a transport vehicle 100 moving along a guide rail 110 installed in the longitudinal direction on the top surface 3, and the ready-mixed vehicle may be installed in the transport vehicle 100. The ready-mixed concrete supply means 200 for supplying ready-mixed concrete discharged from the truck 4 is installed.
상기 레미콘 타설부는 법면(2)에 상하방향으로 설치되는 가이드 레일(310)을 따라 이동하면서 상기 레미콘 공급수단(200)에서 공급되는 레미콘을 철근(11)이 배근된 법면(2)에 타설하는 슬립폼 포장차(300)가 설치되고, 상기 가이드 레일(310)의 중간부에 상하방향으로 설치되어 레미콘 공급수단(200)으로부터 공급되는 레미콘을 슬립폼 포장차(300)까지 이송하는 슈트(330)가 설치된다.The ready-mixed concrete pouring portion slips to place the ready-mixed concrete, which is supplied from the ready-mixed concrete supply means 200, on the surface 2 where the reinforcing bars 11 are moved while moving along the guide rail 310 installed in the vertical direction on the normal surface 2. Foam packer 300 is installed, the chute 330 is installed in the middle portion of the guide rail 310 in the vertical direction to transfer the ready-mixed concrete supplied from the ready-mixed concrete supply means 200 to the slip-formed packed vehicle 300 Is installed.
상기 슬립폼 포장차(300)는 도 2, 도 4 및 도 5와 같이 대차(320)의 양단부에 가이드 레일(310)과 대응되는 지지바(325)가 각각 고정되고, 양쪽 지지바(325)의 하부에는 가이드 레일(310)을 따라 이동하는 롤러(326)가 결합되어 있으며, 대차(320)의 하부에는 흙손과 같이 콘크리트면을 반반하게 하는 슬립 폼(340)이 결합되어 있다.The slip foam packaging vehicle 300 is a support bar 325 corresponding to the guide rail 310 is fixed to both ends of the cart 320, respectively, as shown in Figures 2, 4 and 5, both support bars 325 The lower portion of the roller 326 is moved along the guide rail 310 is coupled, the lower portion of the cart 320 is coupled to the slip foam 340 to smooth the concrete surface, such as trowel.
이 슬립폼 포장차(300)는 법면(2)의 하부에서 포장작업을 하면서 가이드 레일(310)을 따라 상부로 이동하고 포장작업이 완료되면 이송차(100)의 가이드 레일(311) 위에 탑재되어 다음 구간으로 이동된다.The slip foam packaging vehicle 300 is moved to the upper side along the guide rail 310 while the packaging work in the lower portion of the surface (2) and is mounted on the guide rail 311 of the transport vehicle 100 when the packaging work is completed You are moved to the next section.
상기 슬립폼 포장차(300)를 콘크리트 타설구간의 하부에서 상부까지 이동시키는 구동수단(400)은 도 7과 같이 이송차(100)에 윈치(410)가 설치되고 도 4와 같이 슬립폼 포장차(300)의 대차(320)에 결합된 풀리(420)에 로프(421)가 권회되어 윈치(410)에 의해 승강되도록 되어 있다.The driving means 400 for moving the slip foam packaging vehicle 300 from the lower portion to the upper portion of the concrete pouring section is a winch 410 is installed in the transport vehicle 100 as shown in FIG. The rope 421 is wound on the pulley 420 coupled to the trolley 320 of the 300 to be lifted by the winch 410.
다시 도 1을 참조하면, 상기 슬립폼 포장차(300)의 주변에는 포장이 원활하게 진행되도록 지원하기 위한 지원장치가 설치되며, 이 지원장치는 철근(11), 가이드 레일(310), 슈트(330) 등의 필요한 자재를 운반하고 타설에 수반된 작업을 지원하기 위한 지원차(500)를 포함하여 구성된다.Referring back to FIG. 1, a support device is installed around the slip foam packaging vehicle 300 to smoothly proceed the packaging. The support device includes reinforcing bars 11, guide rails 310, and chute ( And a support car 500 for transporting necessary materials such as 330 and supporting work associated with placing.
상기 지원차(500)는 대차(501)의 하부에 바퀴(502)가 결합되어 댐(1)의 법면(2)을 바퀴(502)로 굴러 승강하도록 구성되고, 댐(1)의 정상면(3)에는 이송차(150)가 설치되며 이송차(150)에는 지원차(500)를 승강시키기 위한 윈치(410)가 설치된다.The support vehicle 500 is configured such that the wheel 502 is coupled to the lower portion of the trolley 501 so as to roll up and move the legal surface 2 of the dam 1 with the wheel 502, and the top surface 3 of the dam 1 ), A transporter 150 is installed, and the transporter 150 is provided with a winch 410 for elevating the support vehicle 500.
상기 지원차(500)는 운반하기 위한 자재 및 부수작업의 종류에 따라 적합한 형태로 복수대가 설치된다.The support vehicle 500 is installed in a plurality of suitable forms according to the type of material and the auxiliary work for transport.
상기 레미콘 공급부의 이송차(100) 및 레미콘 공급수단(200), 그리고 레미콘 타설부의 슈트(330) 및 슬립폼 포장차(300)는 법면 콘크리트 시공을 위한 중추적인구성이며, 지원장치는 공사가 원활하게 하고 시공비용 및 시공기간이 감소되도록 지원하여 시공이 유리하게 진행되도록 기여한다.The transfer truck 100 and ready-mixed concrete supply means 200, and the ready-mixed concrete pouring chute 330 and slip foam packaging 300 is a pivotal configuration for construction of the concrete surface, the support device is smooth construction It helps to reduce the construction cost and construction period and contributes to the favorable construction.
도 7은 이송차의 평면도를 보인 것으로, 도 3, 6, 7을 함께 참조하면, 상기 이송차(100)는 대차(101)의 하부에 롤러(102)가 결합되어 정상면(3)에 설치된 가이드 레일(110)을 따라 이동되도록 되어 있고, 대차(101)의 양단부에는 상기 슬립폼 포장차(300)를 탑재하기 위한 한 쌍의 가이드 레일(311)이 법면(2) 위의 가이드 레일(310)과 동일선상에 위치하도록 연장된 형태로 지지바(312)의 위에 고정되어 있다.7 is a plan view showing a transport vehicle. Referring to FIGS. 3, 6, and 7 together, the transport vehicle 100 includes a guide installed on the top surface 3 by a roller 102 coupled to a lower portion of the truck 101. It is to be moved along the rail 110, a pair of guide rails 311 for mounting the slip foam packaging (300) on both ends of the trolley 101, the guide rail 310 on the surface (2) It is fixed on the support bar 312 in an extended form so as to be located on the same line as.
또, 상기 이송차(100)에는 도 3, 6, 7과 같이 슬립폼 포장차(300)가 인상되면서 작용되는 힘에 의해 전복되지 않도록 무게를 조절하기 위한 웨이트 박스(140)가 양쪽에 구비되고, 이 웨이트 박스(140)에 모래와 같은 중량 조절재를 담아 무게를 조절하게 된다.In addition, the transport vehicle 100 is provided with a weight box 140 for adjusting the weight so as not to be overturned by the force acting while the slip foam packaging vehicle 300 is lifted as shown in Figs. In this weight box 140, a weight adjusting material such as sand is contained to adjust the weight.
또한, 상기 레미콘 공급수단(200)은 이송차(100)의 대차(101) 중간부에 공급 컨베이어(210)를 대차(101)의 폭방향으로 설치하여, 레미콘 트럭(4)에서 배출되는 레미콘이 공급 컨베이어(210)의 일단부에 구비된 호퍼(211)로 유입되고, 타단부에 구비된 호퍼(212)로 배출되어 법면(2)에 설치된 슈트(330)로 투입되도록 되어 있다. 슈트(330)는 법면(2)의 양쪽 가이드 레일(310) 중간부에 설치되고, 그 상단부가 공급 컨베이어(210)의 배출 호퍼(212) 하부에 위치하도록 설치된다.In addition, the ready-mixed concrete supply means 200 is installed in the width direction of the truck 101, the supply conveyor 210 in the middle portion of the truck 101 of the transport truck 100, the ready-mixed concrete discharged from the ready-mixed truck (4) It flows into the hopper 211 provided at one end of the supply conveyor 210, is discharged to the hopper 212 provided at the other end, and is input to the chute 330 provided on the legal surface 2. The chute 330 is installed in the middle of both guide rails 310 of the front surface 2, and the upper end thereof is installed below the discharge hopper 212 of the supply conveyor 210.
상기 슬립폼 포장차(300)에는 상기 슈트(330)로 공급되는 레미콘을 철근(11)이 소정 폭으로 배근된 법면(2)에 고르게 투입하기 위한 자주형 레미콘 투입 컨베이어(350)가 설치되어 있다.The slip foam packaging vehicle 300 is provided with a self-contained ready-mixed concrete loading conveyor 350 for evenly feeding the ready-mixed concrete supplied to the chute 330 to the surface (2) where the reinforcing bars 11 are arranged to a predetermined width. .
그리고, 자주형 레미콘 투입 컨베이어(350)는 양단부에 투입호퍼(351)가 결합되고, 대차(320)의 골조(321)에 설치된 가이드 레일(322)을 따라 좌우로 이동하도록 구성되어 있다.In addition, the self-contained ready-mixed concrete input conveyor 350 is configured to move from side to side along the guide rail 322 installed on the frame 321 of the trolley 320, the input hopper 351 is coupled to both ends.
도 8a는 지원장치의 한 형태를 보인 측면도를 보인 것이고, 도 8b는 지원차에 몰탈 탱크가 결합된 형태를 보인 측면도를 보인 것으로, 상기 지원차(500)는 바퀴(502)가 달린 대차(501)에 가이드 레일(310) 등을 싣기 위한 적재틀(510)이 형성되고 대차(501)의 양측 선단부에는 견인용 풀리(503)가 회전 가능하게 결합된 형태로 제작된다. 그리고, 지원차(500)의 대차(501)에 고정된 호이스트 프레임(531)에는 레일(310) 등의 자재를 들어 옮기기 위한 호이스트(530)가 설치되어 있다.Figure 8a is a side view showing a form of the support device, Figure 8b is a side view showing a mortar tank coupled to the support vehicle, the support vehicle 500 is a cart 501 with a wheel 502 A loading frame 510 for loading the guide rail 310 or the like is formed, and the pulleys 503 are rotatably coupled to both front ends of the trolley 501. And the hoist frame 531 fixed to the trolley | bogie 501 of the support vehicle 500 is provided with the hoist 530 for lifting and moving materials, such as the rail 310. As shown in FIG.
도 9a은 지원장치의 다른 형태를 보인 측면도를 보인 것이고, 도 9b는 지원차에 몰탈 탱크가 결합된 형태를 보인 측면도를 보인 것으로, 이에 도시된 지원차(500)는 대차(501)에 철근(11), 가이드 레일(310), 단위 슈트(331) 등의 자재를 싣기 위한 적재틀(510)이 복수 칸으로 구분 형성되고, 적재틀(510)의 전방부에는 몰탈 탱크(520) 등이 결합된 형태로 되어 있다.Figure 9a is a side view showing another form of the support device, Figure 9b is a side view showing a form in which the mortar tank is coupled to the support car, the support car 500 shown therein is a rebar (501) 11), the loading frame 510 for loading materials such as the guide rail 310, the unit chute 331 is formed into a plurality of compartments, mortar tank 520 and the like coupled to the front of the loading frame 510 In the form of one.
도 10에는 지원차의 또 다른 형태가 보이고 있으며, 이 지원차(500)는 대차(501)에 철근(11), 가이드 레일(310), 단위 슈트(331) 등을 싣기 위한 적재틀(510)이 복수 칸으로 구분 형성되고, 몰탈 탱크(520)가 구비되지 않은 형태로 구성되어 있다.10 shows another form of the support vehicle. The support vehicle 500 includes a loading frame 510 for loading the reinforcing bar 11, the guide rail 310, the unit chute 331, etc. on the trolley 501. It is divided into two or more compartments, and is comprised in the form which the mortar tank 520 is not provided.
위의 실시형태와 같이 상기 지원차(500)는 운반 및 취급하고자 하는 자재에따라 여러 가지 형태로 구성될 수 있으며, 몰탈 탱크(520)는 용도에 따라 결합하지 않을 수도 있다.As in the above embodiment, the support vehicle 500 may be configured in various forms according to the material to be transported and handled, and the mortar tank 520 may not be coupled according to the purpose.
그리고, 상기 댐 정상면(3)의 가이드 레일(110) 위에 설치된 이송차(150)의 대차(101) 하부에는 롤러(102)가 결합되어 있으며, 대차(101)의 상부에는 윈치(410)가 설치되고 상기 대차(501)의 풀리(503)와 로프(421)로 연결되어 상기 지원차(500)가 윈치(410)에 의해 법면(2) 위를 바퀴(502)로 굴러 승강하도록 되어 있다.In addition, the roller 102 is coupled to the lower portion of the trolley 101 of the transport vehicle 150 installed on the guide rail 110 of the dam top surface 3, and the winch 410 is installed on the upper portion of the trolley 101. And the pulley 503 and the rope 421 of the trolley 501 is connected to the support car 500 by the winch 410 is to roll up on the surface (2) by the wheel 502.
또, 상기 이송차(150)에는 모래 등이 채워져 무게가 조절되는 웨이트 박스(140)가 설치되어 있다.In addition, the transport truck 150 is provided with a weight box 140 is filled with sand and the weight is adjusted.
상기 슬립폼 포장차(300)와, 지원차(500)를 법면(2)에서 견인하여 정상면(3)에서 좌우로 이송시키기 위한 각각의 이송차(100),(150)의 대차(101)와 윈치(410)는 각각의 작업량에 따라 적정한 규격품으로 조립된다.And the trolley 101 of each of the transport vehicles 100 and 150 for towing the slip foam packaging vehicle 300 and the support vehicle 500 from the top surface 2 to be moved left and right on the top surface 3. The winch 410 is assembled into an appropriate standard product according to each workload.
도 10은 지원차를 이송차에 탑재시키는 탑재수단의 구성 및 작용을 보인 측면도이고, 도 11은 탑재수단의 요부 저면도로서, 이에 도시한 바와 같이 상기 이송차(150)에는 탑재수단(600)이 구비되어 상기 지원차(500)를 이송차(150) 위로 탑재시키도록 되어 있다.10 is a side view showing the configuration and operation of the mounting means for mounting the support vehicle on the transport vehicle, Figure 11 is a bottom view of the main portion of the mounting means, as shown in the mounting means 600 in the transport vehicle 150 Is provided to mount the support car 500 on the transport vehicle 150.
이 탑재수단(600)은 이송차(150)의 대차(101)에 고정된 축지부(611)에 후단부가 힌지(612)로 결합되고, 선단부에는 연결공(613)이 형성되어 상기 지원차(500)의 선단 중간부에 고정된 연결편(510)의 연결공(511)에 연결핀(640)으로 연결되는 견인레버(610)와, 상기 대차(101)의 축지부(621)에 후단부가 힌지(622)로 결합되고, 플런저(623)의 선단 연결부(624)가 상기 견인레버(610)의 중간 축지부(625)에 힌지(626)로 연결되어 상기 견인레버(610)를 회동시키는 실린더(620)와, 상기 이송차(150)의 대차(101)의 양측부에 고정된 지지바(630)의 상단부에 회전 가능하게 결합되어 상기 지원차(500)가 견인레버(610)에 의해 들어 올려질 때에 대차(501)의 프레임 양측단부가 구름 접촉되어 이동되도록 안내하는 안내롤러(650)를 포함하여 구성되어 있다.The mounting means 600 has a rear end coupled to the hinge 612 fixed to the bogie 611 fixed to the trolley 101 of the transport vehicle 150, and a connection hole 613 is formed at the front end of the support vehicle ( Traction lever 610 connected to the connecting hole 511 of the connecting piece 510 fixed to the front end middle of the 500 by a connecting pin 640, and the rear end hinged to the shaft portion 621 of the trolley 101 622 is coupled, the front end connecting portion 624 of the plunger 623 is connected to the intermediate bearing portion 625 of the towing lever 610 by a hinge 626 to rotate the towing lever 610 ( 620 and the support vehicle 500 is rotatably coupled to the upper end of the support bar 630 fixed to both sides of the trolley 101 of the transport vehicle 150 so that the support vehicle 500 is lifted by the towing lever 610. It is configured to include a guide roller 650 for guiding the frame side sides of the trolley 501 so as to move in contact with the rolling.
이상에서 설명한 바와 같은 본 발명에 의한 댐 법면 콘크리트 타설작업 지원장치가 채용된 콘크리트 타설작업의 작용을 설명하면 다음과 같다.Referring to the operation of the concrete placing work is adopted as the dam concrete concrete placing support device according to the present invention as described above are as follows.
댐(1)의 법면(2)의 일정한 타설구간에 콘크리트층을 타설함에 있어서는 정상면(3)의 가이드 레일(110) 위에 설치된 이송차(150)에 지원차(500)를 탑재하고 작업하고자 하는 구간으로 이송시킨 후, 지원차(500)에 가이드 레일(310), 단위 슈트(331) 및 철근(11) 등을 싣고 윈치(410)의 로프(421)를 풀어주면 지원차(500)가 법면(2) 위를 바퀴(502)로 굴러 하강한다.In the case of placing the concrete layer in a certain casting section of the normal surface 2 of the dam 1, the section to mount the support car 500 on the transport vehicle 150 installed on the guide rail 110 of the top surface 3 to work After transporting to the support vehicle 500, the guide rail 310, the unit chute 331 and the reinforcing bars 11, etc. are loaded and the rope 421 of the winch 410 is released. 2) Roll down on the wheel 502.
이와 같이 지원차(500)로 가이드 레일(310)을 이송하여 타설하고자 하는 법면(2) 위에 가이드 레일(310)을 설치한 후, 이송차(100)에 슬립폼 포장차(300)를 탑재하여 타설하고자 하는 구간으로 이송시킨다.In this way, the guide rail 310 is transferred to the support vehicle 500, and the guide rail 310 is installed on the surface 2 to be placed, and then the slip foam packaging vehicle 300 is mounted on the transport vehicle 100. Transfer to the section to be poured.
이어서, 이송차(100)에 구비된 윈치(410)를 작동시켜 로프(421)를 풀어주면 슬립폼 포장차(300)가 가이드 레일(310)을 따라 대차(320)의 하부에 결합된 롤러(326)로 굴러 하강된다.Subsequently, when the winch 410 provided in the transport vehicle 100 is operated to release the rope 421, the slip foam packaging vehicle 300 is coupled to the lower portion of the trolley 320 along the guide rail 310 ( 326) to descend.
그리고, 이와 같이 슬립폼 포장차(300)를 하강시켜 법면(2)의 하부로 이동시킨 후 레미콘 타설작업을 시작하기 전 단계에서 법면(2)의 양쪽 가이드 레일(310) 사이의 타설구간에 지원차(500)로 이송한 철근(11)을 배근하고, 철근(11)이 배근된 영역의 양쪽 변부에 거푸집을 형성하며, 타설구간의 중간부에 다수개의 레이콘 이송용 단위 슈트(331)를 직선상으로 설치한다.In this way, the slip foam packaging vehicle 300 is lowered and moved to the lower part of the surface 2 to support the pouring section between both guide rails 310 of the surface 2 at the stage before the ready-mixing work is started. Reinforce the reinforcing bar 11 transferred to the car 500, forms the formwork on both sides of the area where the reinforcing bar 11 is placed, and straightens the plurality of racon transfer unit chutes 331 in the middle of the pouring section. Install onto the bed.
이때 각 단위 슈트(331)는 다수개의 받침부재(332)가 양쪽으로 결합되어 있으므로 타설구간에 조합하여 세워두는 형태로 설치한다.At this time, each unit chute 331 is installed in a form of standing in combination in the pouring section because a plurality of supporting members 332 are coupled to both sides.
이와 같이 타설구간에 철근(11)이 배근되고, 슈트(330)가 설치됨과 아울러 거푸집이 설치된 후, 댐(1)의 정상면(3)에서 레미콘 트럭(4)으로 운반된 레미콘을 이송차(100)에 설치된 공급 컨베이어(210)에 공급하면 레미콘이 공급 컨베이어(210)의 회동에 의해 슈트(330)로 공급되고, 슈트(330)를 타고 하부로 이동되어 슬립폼 포장차(300)에 설치된 자주형 레미콘 투입 컨베이어(350) 위로 투입된다.In this way, the reinforcing bar 11 is placed in the pouring section, the chute 330 is installed and the formwork is installed, and the ready-mixed concrete transported by the ready-mixed truck (4) from the top surface (3) of the dam (1) transport vehicle (100) When supplied to the supply conveyor 210 installed in the) ready-mixed concrete is supplied to the chute 330 by the rotation of the supply conveyor 210, the chute 330 is moved to the lower portion frequently installed in the slip foam packaging (300) It is injected onto the type ready-mixed concrete loading conveyor 350.
그리고, 슬립폼 포장차(300)의 자주형 레미콘 투입 컨베이어(350)에 투입된 레미콘은 컨베이어 벨트(354)가 회동함에 따라 투입호퍼(357)를 통하여 법면(2) 좌우로 고르게 투입된다.Then, the ready-mixed concrete injector ready-to-use ready-mixed concrete conveyor 300 of the slip foam packaging vehicle 300 is evenly introduced from the left and right sides of the front surface (2) through the input hopper 357 as the conveyor belt 354 rotates.
상기 슬립폼 포장차(300)에는 자주형 레미콘 투입 컨베이어(350)를 조작하는 등 필요한 작업을 위한 작업자가 탑승하여, 철근(11)이 배근된 법면(2) 위로 레미콘이 투입되면 통상의 바이브레이터를 이용하여 콘크리트를 다져 넣는 작업 등을 행한다.When the worker for necessary work such as manipulating the self-contained ready-mixed concrete input conveyor 350, the slip-form packaging vehicle 300, the ready-made vibrator when the ready-mixed concrete is put on the law (2) where the reinforcing bar 11 is placed Work to crush concrete.
이와 같이 타설작업을 하면서 슬립폼 포장차(300)가 이송차(100)의윈치(410)에 의해 서서히 상승하게 되면 슬립폼 포장차(300)의 하부에 결합된 슬립 폼(340)이 콘크리트의 표면에 접촉되어 위로 이동함에 따라 콘크리트의 표면이 흙손으로 미는 것처럼 반반하게 된다.When the slip foam packaging vehicle 300 gradually rises by the winch 410 of the transport vehicle 100 while pouring, the slip foam 340 coupled to the lower portion of the slip foam packaging vehicle 300 is formed of concrete. As you touch the surface and move up, the surface of the concrete smooths as if you were pushing it with a trowel.
또, 슬립폼 포장차(300)에 탑승한 작업자는 슬립폼 포장차(300)의 후방부에 설치된 가림부재 롤에서 캔버스와 같은 가림부재를 풀어 평탄하게 된 콘크리트 표면 위를 덮어 양생이 잘 되도록 한다.In addition, the operator who rides on the slip foam packaging (300) is to release the cover member, such as canvas from the cover member roll installed in the rear of the slip foam packaging (300) to cover the surface on the flat concrete surface to cure well. .
이와 같은 작업을 행하면서 슬립폼 포장차(300)가 법면(2)의 정상부까지 이동하여 타설작업이 완료된 후, 윈치(410)를 작동시켜 로프(421)를 더 감아 주게 되면 슬립폼 포장차(300)가 이송차(100) 위로 연장 설치된 가이드 레일(311) 위로 탑재되며, 이와 같이 이송차(100) 위에 슬립폼 포장차(300)가 탑재되면 다음 타설구간으로 이송시켜 타설작업을 반복하여 행하게 된다.When the slip foam packaging (300) moves to the top of the surface (2) and finishes the pouring operation while operating the winch (410) to wind the rope (421) further, the slip foam packaging ( 300 is mounted on the guide rails 311 extending above the transport vehicle 100, and when the slip foam packaging vehicle 300 is mounted on the transport vehicle 100, it is transferred to the next pouring section to repeat the pouring operation. do.
상기한 바와 같은 슬립폼 포장차(300)에 의한 콘크리트 타설 작업은 댐(1)의 법면(2)을 일정한 폭으로 여러 구간으로 나누어 한 구간을 타설한 후에는 인접한 타설구간을 건너 뛰어 다음의 타설구간을 동일한 방법으로 타설하게 된다.In the concrete pouring work by the slip foam pavers 300 as described above, after the one surface is divided by dividing the surface 2 of the dam 1 into a predetermined width and then crossing the adjacent pouring section, the next casting is performed. The sections are poured in the same way.
그리고, 지원차(500)가 각종 자재의 운반 및 부수작업을 수행한 후, 이 지원차(500)를 다른 작업구간으로 이송시키고자 하는 경우에는 도 10 및 도 11와 같이 이송차(150)에 구비된 탑재수단(600)의 견인레버(610)의 선단부를 지원차(500)의 대차(501)에 연결핀(640)으로 연결하고, 탑재수단(600)의 실린더(620)를 작동시켜 견인레버(610)를 회동시키면 지원차(500)가 견인레버(610)에 끌려 이송차(150) 위로 탑재되며, 이 때 지원차(500)의 대차(501)의 양측단부가 이송차(150)에 결합된안내롤러(650)에 안내되면서 굴름 접촉되어 원활하게 탑재된다.In addition, when the support vehicle 500 carries out various materials and carries out the auxiliary work, and the support vehicle 500 is to be transferred to another work section, the support vehicle 500 may be transferred to the transport vehicle 150 as shown in FIGS. 10 and 11. The front end of the towing lever 610 of the mounting means 600 provided is connected to the cart 501 of the support vehicle 500 with a connecting pin 640, and the cylinder 620 of the mounting means 600 is operated to tow. When the lever 610 is rotated, the support vehicle 500 is dragged by the towing lever 610 to be mounted on the transport vehicle 150. At this time, both ends of the cart 501 of the support vehicle 500 are transported to the transport vehicle 150. Guided to the guide roller 650 coupled to the rolling contact is smoothly mounted.
상술한 바와 같이 상기 레미콘 공급부의 이송차(100) 및 레미콘 공급수단(200), 그리고 레미콘 이송용 슈트(330) 및 슬립폼 포장차(300)는 법면 콘크리트 타설공사를 위한 중추적인 구성이며, 지원장치는 콘크리트 타설에 필요한 철근(11), 가이드 레일(310), 단위 슈트(331), 시멘트, 거푸집 등의 각종 자재를 운반하고 타설 위한 각종 부수작업을 지원하게 된다.As described above, the transport truck 100 and the ready-mixed concrete supply unit 200, and the ready-mixed concrete transport chute 330 and slip foam packaging 300 is a pivotal configuration for the concrete concreting work, support The device supports various auxiliary operations for transporting and placing various materials such as reinforcing bars 11, guide rails 310, unit chute 331, cement, formwork, etc. necessary for concrete pouring.
상기 지원차(500)의 형태는 도시된 형태에 한정되지 않고, 운반되는 자재 및 작업의 종류에 따라 여러 가지 형태로 다양하게 변형되어 실시될 수 있다.The shape of the support vehicle 500 is not limited to the illustrated form, and may be variously modified and implemented in various forms depending on the type of material and work being carried.
이상에서 설명한 바와 같은 본 발명에 의한 댐 법면 콘크리트 타설작업 지원장치는 댐(1)의 법면(2)에 바퀴(502)로 굴러 승강되는 지원차(500)를 설치하고, 댐(1)의 정상면(3)에는 지원차(500)를 견인하기 위한 이송차(150)를 가이드 레일(110) 위에 설치하여, 지원차(500)로 철근, 가이드 레일, 단위슈트, 시멘트, 몰탈과 같은 각종 자재를 운반하거나 타설을 지원하기 위한 부수작업을 행함으로써 공사의 전 공정이 원활하게 진행되도록 하고 시공비용 및 시공기간을 감소되도록 하여 시공이 유리하게 되도록 기여하는 효과가 있다.Dam concrete concrete placing support device according to the present invention as described above is installed on the support surface 500 of the dam (1) by rolling the wheel 502 to the elevating surface of the dam (1), the top surface of the dam (1) In (3), the transport vehicle 150 for towing the support vehicle 500 is installed on the guide rail 110, and various materials such as reinforcing bars, guide rails, unit chutes, cement, and mortar are used as the support vehicle 500. By carrying out additional work for transporting or supporting casting, the entire process of the construction can be smoothly performed, and the construction cost and construction period can be reduced, thereby contributing to the construction being advantageous.
상술한 바와 같이 상기 레미콘 공급부의 이송차(100) 및 레미콘 공급수단(200), 그리고 레미콘 이송용 슈트(330) 및 슬립폼 포장차(300)는 법면 콘크리트 타설공사를 위한 중추적인 구성이며, 지원장치는 콘크리트 타설에 필요한 철근(11), 가이드 레일(310), 시멘트, 거푸집 등의 각종 자재를 운반하고 콘크리트타설을 위한 각종 부수작업을 지원하게 되므로 공사의 전 공정이 원활하게 진행되도록 하고 시공비용 및 시공기간을 감축시켜 유리한 시공을 할 수 있게 하는 효과가 있다.As described above, the transport truck 100 and the ready-mixed concrete supply unit 200, and the ready-mixed concrete transport chute 330 and slip foam packaging 300 is a pivotal configuration for the concrete concreting work, support The device carries various materials such as rebar (11), guide rail (310), cement, formwork, etc. necessary for concrete placement, and supports various additional work for concrete placement, so that the whole process of construction works smoothly and construction cost And reducing the construction period has the effect of enabling an advantageous construction.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0077929A KR100476478B1 (en) | 2001-12-10 | 2001-12-10 | Support apparatus for casting concrete in the slope of a embankment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0077929A KR100476478B1 (en) | 2001-12-10 | 2001-12-10 | Support apparatus for casting concrete in the slope of a embankment |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20030047437A true KR20030047437A (en) | 2003-06-18 |
KR100476478B1 KR100476478B1 (en) | 2005-03-17 |
Family
ID=29574055
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2001-0077929A KR100476478B1 (en) | 2001-12-10 | 2001-12-10 | Support apparatus for casting concrete in the slope of a embankment |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100476478B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100476477B1 (en) * | 2001-12-10 | 2005-03-17 | 삼부토건주식회사 | Slip form paver casting concrete in the slope of a embankment |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100975113B1 (en) | 2008-03-12 | 2010-08-11 | 오세하 | Curb element concrete placing apparatus and the method of construction Thereof |
CN111501666B (en) * | 2020-04-26 | 2021-07-06 | 于思志 | Full-automatic construction equipment of ecological concrete is administered in water conservancy river lake |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5918804A (en) * | 1982-07-22 | 1984-01-31 | Kajima Corp | Construction of concrete cut-off wall for dam slope |
KR910000982B1 (en) * | 1987-12-28 | 1991-02-19 | 롯데건설 주식회사 | Method and apparatus of dam concrete-pavement |
JP2603852B2 (en) * | 1988-04-21 | 1997-04-23 | 大成建設株式会社 | Concrete supply equipment for slip forms for slopes such as dams |
KR900001932A (en) * | 1988-07-04 | 1990-02-27 | 조태형 | Concrete water line wall construction device of dam |
KR19980072144A (en) * | 1998-07-25 | 1998-10-26 | 이태옥 | Front Concrete Pourer |
JP3057490B2 (en) * | 1998-10-14 | 2000-06-26 | 大成建設株式会社 | Slope concrete paving equipment |
KR100448987B1 (en) * | 2001-12-10 | 2004-09-18 | 삼부토건주식회사 | Apparatus to supply remicon for casting concrete in the slope of a embankment |
-
2001
- 2001-12-10 KR KR10-2001-0077929A patent/KR100476478B1/en active IP Right Grant
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100476477B1 (en) * | 2001-12-10 | 2005-03-17 | 삼부토건주식회사 | Slip form paver casting concrete in the slope of a embankment |
Also Published As
Publication number | Publication date |
---|---|
KR100476478B1 (en) | 2005-03-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210657840U (en) | Municipal administration way bed stone laying device | |
KR101731414B1 (en) | Rail stations Concrete Supply | |
KR100476478B1 (en) | Support apparatus for casting concrete in the slope of a embankment | |
KR100476477B1 (en) | Slip form paver casting concrete in the slope of a embankment | |
KR100448987B1 (en) | Apparatus to supply remicon for casting concrete in the slope of a embankment | |
KR101851779B1 (en) | Construction device of All-in-one boundary stone having caterpillar track | |
KR910000982B1 (en) | Method and apparatus of dam concrete-pavement | |
CN107288347A (en) | A kind of concrete placing installation and the concreting method using the equipment | |
JPS5922846B2 (en) | Concrete placement method and equipment for dam construction work | |
JP3622890B2 (en) | Mesh laying type continuous pavement method and its construction machine | |
JP3395565B2 (en) | Dam concrete placement device and method | |
CN217174269U (en) | Distributing device for concrete pavement construction | |
CN217267274U (en) | Construction and laying work vehicle of geomembrane laying system | |
KR102097600B1 (en) | Concrete pavement equipment and concrete pavement method by using the same | |
CN207793772U (en) | A kind of subway solid concrete roabed concreting conveyer | |
JP2779185B2 (en) | Underwater casting equipment for dry mix materials | |
JPH07300842A (en) | Construction method of dam | |
CN214651598U (en) | Sand and stone material conveyor | |
CN220079882U (en) | Concrete belt conveying and pouring device for revetment engineering | |
CN113293737A (en) | Construction and laying work vehicle and method of geomembrane laying system | |
CN217267251U (en) | Geomembrane laying system | |
CN216688904U (en) | Double-machine double-layer continuous slip form paving concrete conveying device | |
JPH08260413A (en) | Shifting device for mixture bucket | |
JPS6323454Y2 (en) | ||
CN113293736A (en) | Geomembrane laying system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130321 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20140404 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20150304 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20160325 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20170320 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20180305 Year of fee payment: 14 |
|
FPAY | Annual fee payment |
Payment date: 20190304 Year of fee payment: 15 |