KR20030003147A - Piles and Footing Construction Method Using Caisson as Waterproofing, Temporary Retaining Well and Concrete Form in Bridge Construction - Google Patents
Piles and Footing Construction Method Using Caisson as Waterproofing, Temporary Retaining Well and Concrete Form in Bridge Construction Download PDFInfo
- Publication number
- KR20030003147A KR20030003147A KR1020020066697A KR20020066697A KR20030003147A KR 20030003147 A KR20030003147 A KR 20030003147A KR 1020020066697 A KR1020020066697 A KR 1020020066697A KR 20020066697 A KR20020066697 A KR 20020066697A KR 20030003147 A KR20030003147 A KR 20030003147A
- Authority
- KR
- South Korea
- Prior art keywords
- caisson
- ground
- bridge
- construction
- pile
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/20—Caisson foundations combined with pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
Description
본 발명은 교량 하부 기초 시공공법에 관한 것으로서, 구체적으로는 전석과 호박돌이 분포하는 지반에 케이슨을 소정의 위치까지 침강시켜 설치하므로써 차수, 가설벽체 및 거푸집으로 사용할 수 있도록 하여 관입이 곤란하며 차수가 필요한 지반에서 교량 하부 기초 시공에도 적용할 수 있는 새로운 교량 하부 기초 시공 공법에 관한 것이다.The present invention relates to a foundation construction method under the bridge, specifically, by sedimenting and installing a caisson to a predetermined position in the ground where all stones and amber stones are distributed, so that it can be used as orders, temporary walls and formwork, it is difficult to intrude and It is about a new bridge underlay construction method that can be applied to underlay bridge construction in required ground.
일반적으로, 도로나 철도 같은 건설공사에 있어서, 특히 기존 건물이나 도로망이 존재하는 곳에 있어서는 하천에 인접하여 교량이 계획된다. 하천은 하천수의 흐름에 의하여 토양이 침식되지 않도록 표면에 침식 보호석을 하부에는 입자의 직경이 10cm 이상인 전석이나 호박돌을 사용하게 된다. 이러한 지반은 교량 하부 기초로 말뚝을 사용하는 경우, 물의 흐름이 자유로워 가물막이 공사 없이 굴착하여 시공하기가 곤란하여, 실제 공사시에는 가물막이 공사 시공성에 문제가 발생하게 된다.In general, in construction work such as roads and railways, bridges are planned adjacent to rivers, particularly where existing buildings and road networks exist. Rivers use eroded protective stones on the surface to prevent soil from being eroded by the flow of river water. When the pile is used as the foundation of the lower bridge, it is difficult to excavate and install the construction without the construction of the temporary barrier due to the free flow of water, which causes problems in the construction of the temporary barrier construction.
이러한 문제를 해결하기 위하여 가물막이 시공방법으로써 종래에 일반적으로 사용되는 공법이 차수성이 뛰어난 시트파일(sheet pile) 타설에 의한 시트파일 가물막이 공법이다. 시트파일 가물막이 공법은 스틸(steel)로 된 연결고리를 가진 ㄷ자형 형태의 단위 부재를 연속적으로 타설하여 벽체 강성을 가지면서 뛰어난 차수성을 얻는 공법으로서, 이 시트파일 가물막이 공법은 두부를 항타하거나 천공 장비로 프리보링(pre-boring) 한 후 항타하여 시공하게 된다. 이음새에 누수가 있는 경우에는 그라우팅 등의 방법으로 처리하여 차수성을 확보하게 된다. 그러나 시트파일 가물막이 공법을 전석이나 호박돌이 깊게 분포하는 지반에 적용하는 것은, 항타에 의한 관입이 불가능하고 천공에 의한 방법은 공사비가 너무 비싸서 적당하지 않다.In order to solve such a problem, the temporary coating method commonly used as a temporary coating method is a sheet pile temporary coating method by placing a sheet pile having excellent degree of ordering. Sheet pile clamper method is a method of obtaining the excellent rigidity while having wall rigidity by continuously placing U-shaped unit members with steel linkages. Or pre-boring with drilling equipment and then driven by construction. If there is a leak in the seam, it is treated by a method such as grouting to secure the degree of ordering. However, it is not possible to apply the sheet pile temporary shielding method to the ground where all the stones and amber stones are distributed deeply.
한편, 물유리(liquid glass)이나 시멘트 밀크 등의 주입재를 지중에 유입시키는 방법은 일명 그라우팅 공법이라고 하며, 그라우팅 단면을 연결시켜 차수하는 방법이다. 이러한 그라우팅을 이용한 방법은, 모래와 같이 간극이 작은 지반에서는 주입재가 간극에 침투하여 차수성이 있는 벽체를 형성할 수 있으나, 전석이나 호박돌이 분포하는 간극이 큰 지반에서는 벽체가 형성되지를 않아 적용이 곤란하다.Meanwhile, a method of introducing an injection material such as liquid glass or cement milk into the ground is called a grouting method, and is a method of connecting grouting sections. This grouting method can be used to form a wall with the filler material penetrating the gap in the ground where the gap is small, such as sand, but the wall is not formed in the ground where the stone or amber is large. This is difficult.
이에 본 발명은 위와 같은 종래의 교량 하부 기초 시공을 위한 가물막이 시공공법의 한계를 극복하도록 개발된 공법으로서, 케이슨을 소정의 위치까지 침강시켜 차수성을 얻을 수 있고, 굴착에 의해 주위 지반의 변형을 억제할 수 있는 강성 벽체를 형성하며, 특히 케이슨 자체를 기초 저판 시공에 거푸집으로 사용할 수 있는 새로운 교량 하부 기초 시공 공법을 제공하는 것을 목적으로 한다.Accordingly, the present invention is a construction method developed to overcome the limitations of the construction method of the conventional film for the foundation of the bridge lower foundation as described above, sedimentation of the caisson to a predetermined position to obtain a water repellency, deformation of the surrounding ground by excavation It is an object of the present invention to provide a new bridge lower foundation construction method that forms a rigid wall capable of suppressing the stiffness, and in particular, the caisson itself can be used as a formwork for foundation bottom plate construction.
도 1은 본 발명에 따른 제작된 케이슨을 거치하고자 하는 지반위에 설치하고 하부 지반을 굴착하며 케이슨을 침강시키고 있는 상태의 개략적인 단면도이다.1 is a schematic cross-sectional view of a state in which the caisson manufactured according to the present invention is installed on the ground to be mounted and the lower ground is excavated and the caisson is settled.
도 2는 본 발명에 따라 케이슨 상부가 지표면까지 완전히 관입되고, 기초저판 위치까지 되메우기된 상태의 개략적인 단면도이다.Figure 2 is a schematic cross-sectional view of the caisson top completely penetrated to the ground surface and backfilled to the base bottom position according to the present invention.
도 3은 본 발명에 따라 케이슨 상부가 완전히 관입되고, 케이슨 내부전체가 되메우기된 상태의 개략적인 단면도이다.Figure 3 is a schematic cross-sectional view of the caisson upper part is completely penetrated in accordance with the present invention, the entire caisson back filled.
도 4는 본 발명의 또 다른 실시 예에 따라 완전히 되메우기된 지반위에서 말뚝을 시공하는 상태의 개략적인 단면도이다.4 is a schematic cross-sectional view of a state in which piles are constructed on completely backfilled ground according to another embodiment of the present invention.
도 5는 본 발명에 따라 기초저판위치까지 되메우기된 후 상부에 프레임을 설치 후 말뚝을 시공하는 개략적인 단면도와 상세도이다.Figure 5 is a schematic cross-sectional view and detail of the pile after installing the frame on the top after being backfilled to the base plate position in accordance with the present invention.
도 6은 본 발명에서 이용되는 케이슨이 거푸집으로 사용되어 저판 콘크리트가 타설된 단면도이다.6 is a cross-sectional view in which the bottom plate concrete is poured by using the caisson used in the present invention as a formwork.
* 도면의 주요부분에 대한 부호설명 ** Explanation of Signs of Major Parts of Drawings *
1 : 케이슨 2 : 슈1: caisson 2: shoe
3 : 전석층 4 : 토사3: all floors 4: earth and sand
5 : 말뚝 6 : 말뚝시공장비5: pile 6: pile construction equipment
7 : 프레임 8 : H - Beam7: frame 8: H-beam
9 : 콘크리트9: concrete
상기와 같은 목적을 달성하기 위하여, 본 발명에서는, 교량 교각을 건설하고자 하는 지반의 상부에 외부에서 제작된 케이슨 거치하고,상기 케이슨 하부를 굴착하여 케이슨의 자중에 의하여 케이슨 상부가 지반에 관입될 때까지 침하시키고, 말뚝 시공을 위하여 모래 등의 토사로 되메우고 말뚝을 시공하거나 기초 저판이 위치하는 곳까지 토사를 굴착한 후 케이슨 위에 프레임을 제작하여 그 위에서 직접 말뚝을 시공하고, 케이슨을 거푸집으로 이용하여 기초 저판을 시공하는 것을 특징으로 하는 교량 하부 기초 시공공법이 제공된다.In order to achieve the above object, in the present invention, the caisson mounted on the top of the ground to build the bridge pier from the outside, excavating the caisson lower when the caisson upper part is intruded into the ground by the weight of the caisson Settle down to the ground, backfill it with sand and sand for pile construction, excavate the soil to the place where the foundation base is located, and construct the frame on the caisson and construct the pile directly on it, and use the caisson as the formwork. There is provided a bridge lower foundation construction method characterized in that the foundation base plate is constructed.
이와 같은 본 발명에 의하면, 케이슨을 하부 지반을 굴착하며 침강시켜 차수를 위한 가물막이로 전석이나 호박돌이 분포하는 지반에 사용하게 되므로, 종래 기술에서와 같이 항타 곤란이나 천공에 의한 고가의 공사비, 그라우팅 적용이 안 되는 문제점을 해결할 수 있게 된다.According to the present invention, because the caisson is excavated and sedimented the lower ground to be used in the ground where the stone or amber is distributed as a temporary barrier for the order, expensive construction cost, grouting due to difficult driving or drilling as in the prior art It can solve the problem that is not applicable.
본 발명에서는 상기한 교량 하부 기초 시공공법에서, 케이슨이 말뚝 시공을 위한 프레임의 지지점으로 사용될 수 있는 것을 특징으로 하는 시공공법이 제공되며, 또 다른 실시예로서, 케이슨이 기초 저판의 콘크리트 타설시 거푸집으로 사용될 수 있는 것을 특징으로 하는 교량 하부 기초 시공공법이 제공된다.In the present invention, in the above bridge lower foundation construction method, a construction method is provided, in which the caisson can be used as a support point of the frame for the pile construction is provided, as another embodiment, the caisson formwork during the concrete casting of the base plate Provided below the bridge construction method is characterized in that it can be used as.
위와 같은 본 발명에 의하면, 케이슨이 지반에 관입되어 있어, 말뚝시공을 위한 프레임의 무게 및 말뚝 시공 장비의 무게를 케이슨의 주면 마찰력으로 지지할 수 있으며, 케이슨 벽체가 변형을 일으키지 않으므로 거푸집으로서 사용이 가능하게 된다.According to the present invention as described above, the caisson is intruded into the ground, can support the weight of the frame and pile construction equipment for the pile construction with the frictional force of the caisson's main surface, because the caisson wall does not cause deformation, it is easy to use as a formwork It becomes possible.
이하 첨부된 예시도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
첨부도면 도 1에는 본 발명에 따른 교량 하부 기초 시공공법을 설명하기 위하여 전석이나 호박돌이 분포하는 지반(3)에 외부에서 제작된 케이슨(1)이 위치하게 되고, 상기 케이슨(1)의 하부 지반을 굴착하여 상기 케이슨이 지반에 관입되고 있는 상태의 개략적인 단면도가 도시되어 있다.In the accompanying drawings, in order to explain the foundation construction method under the bridge according to the present invention, an externally manufactured caisson 1 is located on the ground 3 where the stone or amber is distributed, and the lower ground of the caisson 1 is located. A schematic cross-sectional view of a state in which the caisson is inserted into the ground by excavating is shown.
본 발명에서 상기 케이슨(1)으로는, 구조적으로 토압에 저항력이 큰 원형 형태의 케이슨이 바람직하나, 기초 저판의 시공성이 우수하고 말뚝 배치의 용이한 장변형 또는 정방형의 케이슨의 사용이 예상된다. 상기 케이슨은 공장 또는 외부 제작장에서 제작하여지므로 고강도 콘크리트로 원하는 형태로 제작될 수 있다.In the present invention, the caisson 1 is preferably a circular caisson structurally resistant to earth pressure. However, it is expected to use a long or square caisson that is excellent in workability of the base bottom plate and easy to arrange piles. Since the caisson is manufactured in a factory or an external workshop, it may be manufactured in a desired form of high strength concrete.
도 1에 도시된 것처럼, 케이슨(1)의 지반 관입이 용이하도록 일반적으로 사용되는 슈(shoe)(2)가 케이슨의 선단에 장착되게 된다. 이 때, 상기 슈는 전석이나 호박돌층을 관입하는 도중 마모나 망실되지 않도록 충분한 강도를 갖게 된다.As shown in FIG. 1, a shoe 2 generally used to facilitate ground penetration of the caisson 1 is mounted at the tip of the caisson. At this time, the shoe has a sufficient strength so as not to wear or lose during penetration of the stone or amber stone layer.
도 2에는 케이슨의 상부가 지반에 관입되고, 후술되어지는 도 4와 도 5 같이 말뚝을 케이슨 상부까지 토사 채움을 하고 항타하는 방법 또는 케이슨 상부에 프레임을 거치하고 말뚝을 항타하는 방법에 따라 기초 저판이 설치될 위치(도2) 또는 상기 케이슨의 상부까지 모래 등의 토사로 되메우기가 이루어지는 상태도(3)의 개략적인 단면도가 도시되어 있다.In Figure 2, the upper part of the caisson penetrates into the ground, and the foundation base plate according to the method of earth-filling and driving the pile to the upper caisson as shown in Figures 4 and 5 to be described later or the method of mounting the frame on the caisson and driving the pile A schematic cross-sectional view of the state diagram (3) in which the position to be installed (Fig. 2) or the top of the caisson is backfilled with sand or the like is shown.
이와 같이 토사의 되메움은 케이슨의 근입심도가, 전석이나 호박돌 지반의하부가 모래인 지반에서는 보일링(boiling), 점성토인 지반에서는 히빙(heaving)에 의한 문제가 발생하지 않도록 예상 기초 저판의 위치보다 깊어지므로, 기초 저판까지 토사로 메우기가 필요하게 된다.As such, the backfilling of the soil is expected to prevent the problems of caisson's rooting depth from being boiled in the ground where the bottoms of all stones or amber stones are sand, and heaving in the clay soil. Since it is deeper than the position, it is necessary to fill the soil to the foundation bottom plate.
한편, 도 4와 도 5에는 케이슨 상부까지 토사로 되메워진 상태와 기초 저판까지만 되메워진 상태에서 말뚝 항타 방법의 개략적인 단면도가 도시되어 있는데, 도 5의 상세도에 도시되어 있는 것처럼, 프레임은 공사 현장의 모든 기초 저판에 적용될 수 있도록 충분한 크기로 제작될 수도 있다.On the other hand, Figure 4 and Figure 5 shows a schematic cross-sectional view of the pile driving method in the state filled with the soil back to the top of the caisson and only to the base bottom plate, as shown in the detailed view of FIG. It may be fabricated to be large enough to cover all the base plates in the field.
이와 같이, 프레임을 충분히 크게 하면, 개개의 기초 저판 시공시 기 제작된 프레임을 크레인으로 이동시켜가며 공사할 수 있어 공사비와 공사 기간의 단축에 도움이 될 수 있다.In this way, if the frame is sufficiently large, it is possible to work by moving the frame produced at the time of the individual base plate construction by a crane can help in reducing the construction cost and construction period.
다음으로는 본 발명에서 케이슨을 거푸집으로 이용하는 것을 도6을 참조하여 설명한다.Next, the use of caisson as formwork in the present invention will be described with reference to FIG.
본 발명에서 이용되는 케이슨(1)은 기초저판의 콘크리트 타설을 위하여 일반적으로 사용되는 거푸집의 역할을 대신할 수 있어 도 6과 같이 콘크리트 타설이 가능할 수 있다.The caisson (1) used in the present invention can take the role of a formwork generally used for the concrete placing of the base plate may be concrete pouring as shown in FIG.
하천주위에 교각이 설치되는 경우 하천의 높은 수위와 침식방지를 위하여 두꺼운 전석이나 호박돌로 피복층이 설치된다. 이러한 지반에 교량하부기초를 시공하기 위해서는 차수가 가능하며, 굴착시 지반을 자립하게 할 수 있는 가시설이 필요하나 전석층의 관입문제와 천공시 공사비가 비싸다는 문제점이 있다.If a piers are installed around the river, a thick layer of masonry or amber stone is installed to prevent the high water level and erosion of the river. In order to construct the foundation of the bridge under such ground, the order is possible, and the temporary facilities are needed to make the ground independent when excavating, but there are problems of intrusion of all seats and expensive construction cost.
그러나 이상 설명한 바와 같이, 본 발명에서는 케이슨을 내부 굴착하여 소정의 위치까지 침강시켜 차수와 가설벽체로 활용하게 되므로 종래 기술에서와 같이 토사 확보에 따른 문제점(관입성 문제, 비용상승 등)을 해결할 수 있게 된다.However, as described above, in the present invention, the caissons are internally excavated and sedimented to a predetermined position to be utilized as the order and the temporary wall, so as to solve the problems caused by earth and sand secured (intrusiveness problem, cost increase, etc.) as in the prior art. Will be.
특히, 케이슨이 기초저판 콘크리트 타설시 거푸집으로도 이용할 수 있으므로, 강재 거푸집설치의 공정을 배제할 수 있게 되고 그에 따라 소요되는 비용을 상당히 경감할 수 있게 된다.In particular, since the caisson can also be used as a formwork when laying the base plate concrete, it is possible to exclude the process of steel formwork installation, thereby significantly reducing the cost required.
또한, 본 발명에서는 케이슨의 형태 및 길이 강도를 조절할 수 있으므로 지반 및 주위조건에 따라 케이슨을 제작하여 공사에 사용할 수 있게 된다.In addition, in the present invention, the shape and length of the caisson can be adjusted, so that the caisson can be manufactured and used in construction according to the ground and ambient conditions.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020066697A KR20030003147A (en) | 2002-10-30 | 2002-10-30 | Piles and Footing Construction Method Using Caisson as Waterproofing, Temporary Retaining Well and Concrete Form in Bridge Construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020066697A KR20030003147A (en) | 2002-10-30 | 2002-10-30 | Piles and Footing Construction Method Using Caisson as Waterproofing, Temporary Retaining Well and Concrete Form in Bridge Construction |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20030003147A true KR20030003147A (en) | 2003-01-09 |
Family
ID=27729070
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020020066697A KR20030003147A (en) | 2002-10-30 | 2002-10-30 | Piles and Footing Construction Method Using Caisson as Waterproofing, Temporary Retaining Well and Concrete Form in Bridge Construction |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20030003147A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101351099B1 (en) * | 2013-10-21 | 2014-01-15 | 영남에너지서비스 주식회사 | A temporary structure for base concrete construction and the method of constructing thereof |
CN114086599A (en) * | 2021-12-03 | 2022-02-25 | 中铁第一勘察设计院集团有限公司 | Open excavation method for constructing dam at subway station suitable for bay hydraulic reclamation operation area |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS53116521A (en) * | 1977-03-23 | 1978-10-12 | Ishii Tekkosho Kk | Method of constructing underground tank |
JPH0393925A (en) * | 1989-09-06 | 1991-04-18 | Toda Constr Co Ltd | Simultaneous construction method of structure above or under ground |
JPH04128434A (en) * | 1990-09-19 | 1992-04-28 | Nissei Build Kogyo Co Ltd | Foundation method for sky parking device |
JP2000178983A (en) * | 1998-12-14 | 2000-06-27 | Taisei Corp | Foundation construction method |
KR200224758Y1 (en) * | 2000-12-15 | 2001-05-15 | 주식회사정도엔지니어링 | Structure of caisson soil protection four concret caisson |
KR200225641Y1 (en) * | 2000-12-21 | 2001-06-01 | 동신기술개발주식회사 | Structure of caisson soil protection four concrete caisson of bridge |
KR200291370Y1 (en) * | 2002-07-16 | 2002-10-09 | 주식회사 콘스텍발명사무소 | Concrete caisson structure for earth and sand guard of pier's basis |
-
2002
- 2002-10-30 KR KR1020020066697A patent/KR20030003147A/en not_active Application Discontinuation
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS53116521A (en) * | 1977-03-23 | 1978-10-12 | Ishii Tekkosho Kk | Method of constructing underground tank |
JPH0393925A (en) * | 1989-09-06 | 1991-04-18 | Toda Constr Co Ltd | Simultaneous construction method of structure above or under ground |
JPH04128434A (en) * | 1990-09-19 | 1992-04-28 | Nissei Build Kogyo Co Ltd | Foundation method for sky parking device |
JP2000178983A (en) * | 1998-12-14 | 2000-06-27 | Taisei Corp | Foundation construction method |
KR200224758Y1 (en) * | 2000-12-15 | 2001-05-15 | 주식회사정도엔지니어링 | Structure of caisson soil protection four concret caisson |
KR200225641Y1 (en) * | 2000-12-21 | 2001-06-01 | 동신기술개발주식회사 | Structure of caisson soil protection four concrete caisson of bridge |
KR200291370Y1 (en) * | 2002-07-16 | 2002-10-09 | 주식회사 콘스텍발명사무소 | Concrete caisson structure for earth and sand guard of pier's basis |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101351099B1 (en) * | 2013-10-21 | 2014-01-15 | 영남에너지서비스 주식회사 | A temporary structure for base concrete construction and the method of constructing thereof |
CN114086599A (en) * | 2021-12-03 | 2022-02-25 | 中铁第一勘察设计院集团有限公司 | Open excavation method for constructing dam at subway station suitable for bay hydraulic reclamation operation area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101067707B1 (en) | The earth retaining wall and waterproof construction technique for which cast in place concrete pile and grouting column was used | |
KR101545307B1 (en) | Construction method of complex temporary facility with bottom grouting for weak ground | |
CN104264688A (en) | Manual hole digging non-uniform pile support construction technology | |
KR20130081971A (en) | Precast concrete wall and method for constructing underground permanent wall using the precast concrete wall | |
CN110685286A (en) | Deep foundation pit supporting construction process for adjacent road under complex geological condition | |
CN105464074B (en) | A kind of artificial digging pile high polymer grouting safeguard structure and its construction method | |
CN110258582B (en) | Inclined support foundation pit supporting structure based on steel pipe pile and Lassen steel plate and construction method | |
CN109403340A (en) | A kind of construction method using open caisson as foundation pit enclosure structure | |
CN110159294A (en) | A kind of high steep landform tunnel immediately adjacent to bridge section spreading open cut tunnel construction method | |
CN112064751A (en) | Deep groove construction method for drainage pipeline | |
CN110485230B (en) | Treatment structure and construction method of high-water-level soft soil bridge head roadbed | |
KR100617949B1 (en) | Pile Groups Construction Method of Weak Bedding Bone Using Caission | |
CN108316283A (en) | The devices and methods therefor of influence of foundation excavation is controlled using hole rising pouring slurry ground-connecting-wall | |
JP6806465B2 (en) | Construction method of foundation structure | |
CN107700497A (en) | A kind of building basement pattern foundation pit supporting structure and earth excavation construction method | |
CN109610505A (en) | A kind of tunnel upper foundation pit construction method | |
CN105155421B (en) | Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water | |
WO2002061211A1 (en) | Integrated excavation shoring building foundation method | |
KR20030003147A (en) | Piles and Footing Construction Method Using Caisson as Waterproofing, Temporary Retaining Well and Concrete Form in Bridge Construction | |
CN114922195A (en) | Construction method of soft soil deep and large foundation pit adjacent to protected object | |
JP2726611B2 (en) | How to set up an open caisson | |
KR200224758Y1 (en) | Structure of caisson soil protection four concret caisson | |
KR100493516B1 (en) | Micro pile and assembly foundation reinforcement structure member and its method for pier | |
KR20030027346A (en) | Construction method for installing concrete underground structures | |
CN111042144A (en) | Excavation method for foundation pit of underground beam under condition of continuous flow of riverway in cold region |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application | ||
E601 | Decision to refuse application |