KR200283076Y1 - Mobile tunel mold with a system for adjusting position of upper mold - Google Patents

Mobile tunel mold with a system for adjusting position of upper mold Download PDF

Info

Publication number
KR200283076Y1
KR200283076Y1 KR2020020010484U KR20020010484U KR200283076Y1 KR 200283076 Y1 KR200283076 Y1 KR 200283076Y1 KR 2020020010484 U KR2020020010484 U KR 2020020010484U KR 20020010484 U KR20020010484 U KR 20020010484U KR 200283076 Y1 KR200283076 Y1 KR 200283076Y1
Authority
KR
South Korea
Prior art keywords
formwork
main body
sides
jack
hydraulic
Prior art date
Application number
KR2020020010484U
Other languages
Korean (ko)
Inventor
장영식
Original Assignee
장영식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 장영식 filed Critical 장영식
Priority to KR2020020010484U priority Critical patent/KR200283076Y1/en
Application granted granted Critical
Publication of KR200283076Y1 publication Critical patent/KR200283076Y1/en

Links

Abstract

본 고안은 차량이 지나는 터널을 굴착하면서 콘크리트 타설을 할 수 있게 한 상부 거푸집 위치 조정장치를 구비한 이동식 터널거푸집에 관한 것이다.The present invention relates to a movable tunnel formwork having an upper formwork positioning device that enables concrete pouring while excavating a tunnel through a vehicle.

상기 목적은 바닥의 양측으로 종설되는 레일을 따라 주행할 수 있게 롤러를 하부에 설치하고, 일정 간격으로 다수의 빔들로 짜여진 틀체 구조로써 이를 보강하는 가새 등으로 짜여진 본체;The object is to install the roller to the lower portion to run along the rails that extend to both sides of the floor, the main body is woven by a brace, etc. to reinforce it with a frame structure woven with a plurality of beams at regular intervals;

상기 본체의 양측면에는 상하 및 길이방향 일정 간격으로 복수의 고정대를 설치하여 여기에 설치되는 유압잭 및 잭볼트를 교대로 배치되게 함과 동시에, 상기 유압잭 및 잭볼트의 로드단에 핀으로 연결 고정되는 호형의 판넬을 경사재로 연결한 프레임으로 지지 고정하는 트러스 구조로써 상부 거푸집의 양측 하단에 힌지 결합될 측면 거푸집;Both sides of the main body is provided with a plurality of fixing rods at regular intervals in the vertical direction and longitudinally arranged to alternately arrange the hydraulic jack and jack bolts installed thereon, and at the same time connected to the rod end of the hydraulic jacks and jack bolts pin type fixed Side trusses to be hinged to the bottom of both sides of the upper formwork as a truss structure to support and secure the panel connected to the inclined frame;

상기 본체의 상부 가로빔 상면 양측에는 복수의 유압잭 및 잭볼트를 교대로 배치되게 설치함과 동시에, 상기 유압잭 및 잭볼트의 로드단이 본체 상부에 고정되고 각각의 실린더 바디가 본체 양측으로 종설되는 종부재에 체결고정됨과 동시에, 상부 호형의 판넬을 경사재 및 수직재로 연결한 프레임으로 지지 고정하여 양측 측면 거푸집의 상부와 힌지 결합시키는 트러스 구조의 상부 거푸집; 및A plurality of hydraulic jacks and jack bolts are alternately arranged on both sides of the upper horizontal beam upper surface of the main body, and rod ends of the hydraulic jacks and jack bolts are fixed to the upper part of the main body and each cylinder body is extended to both sides of the main body. The upper formwork of the truss structure that is fastened to the member and at the same time, the upper arc-shaped panel is hinged to the upper side of both side formwork by holding and fixing the frame of the upper arc-shaped panel connected with the inclined material and the vertical material; And

상기 본체 전후의 상부 가로빔의 유압잭 및 잭볼트 사이의 양측에는 상부 선단에 롤러를 구비한 고정대를 세워 설치함과 동시에, 상기 상부 거푸집의 일 고정대의 일측 이격 위치에 하향 돌출 설치된 지지대와, 이 지지대와 상기 고정대 사이에 유압 실린더가 개재 설치하되 상기 고정대의 일측면에 상하 장공을 형성한 꺽쇠를 세워 설치하여 상기 지지대에 고정된 유압잭의 로드단이 상기 장공에 승강 안내 되게 고정된 것을 특징으로 한다.Supports installed on both sides between the hydraulic jack and the jack bolts of the upper horizontal beam before and after the main body upright and equipped with a roller having a roller at the upper end, protruding downward in one spaced apart position of the one of the upper formwork; The hydraulic cylinder is interposed between the fixing stand and the up and down mounting brackets formed on the one side of the fixing stand, characterized in that the rod end of the hydraulic jack fixed to the support is fixed to be elevated to guide the long hole.

Description

상부 거푸집 위치조정장치를 구비한 이동식 터널거푸집{Mobile tunel mold with a system for adjusting position of upper mold}Mobile tunel mold with a system for adjusting position of upper mold

본 고안은 차량이 지나는 터널을 굴착하면서 콘크리트 타설을 할 수 있게 한 상부 거푸집 위치조정장치를 구비한 이동식 터널거푸집에 관한 것이다.The present invention relates to a movable tunnel formwork having an upper formwork positioning device that enables concrete pouring while excavating a tunnel through a vehicle.

종래의 거푸집은 시공시 상하를 구분하여 거푸집을 치는 방식으로 시공후 터널의 길이방향으로 이음매가 생기는 문제가 있다.Conventional formwork has a problem in that seams are generated in the longitudinal direction of the tunnel after the construction by separating the upper and lower sides during construction.

상기 문제를 해결하기 위해 1987년 실용신안등록출원 제2221호가 이음매의 문제는 해결하였으나, 이 역시 거푸집의 설치와 타설에 구조적인 어려움이 있으며, 이를 이동시키는데 따라 하부 구조와 상부 구조의 좌우 어긋남 공차가 발생하는 문제가 있다. 이는 이동식 터널거푸집을 이동시키기 위한 레일을 설치하는 것과 굴착할 터널의 설계에 맞추기 위한 것에 따른 작업 현장에서의 작업환경 등과 같은 외부적 조건 등에 의해 필연적으로 발생될 수밖에 없는 것으로 이를 보완하기 위한 어려움이 있다.In order to solve the above problem, Utility Model Registration No. 2221 in 1987 solved the problem of the seam, but this also has structural difficulties in installing and placing the formwork. There is a problem that occurs. This is inevitably caused by external conditions such as installing a rail for moving the movable tunnel formwork and adjusting the design of the tunnel to be excavated. .

따라서 본 고안은 이동식 터널 거푸집 장치에 있어서 이 장치를 정위치 중앙에서 벗어나는 오차 등을 비교적 간단한 구성의 장치로 바로잡도록 한 것에 그 목적이 있다.Therefore, the present invention aims to correct the error of deviation from the center of the fixed position in the mobile tunnel formwork device with a device of a relatively simple configuration.

상기 목적은 바닥의 양측으로 종설되는 레일을 따라 주행할 수 있게 롤러를 하부에 설치하고, 일정 간격으로 다수의 빔들로 짜여진 틀체 구조로써 이를 보강하는 가새 등으로 짜여진 본체;The object is to install the roller to the lower portion to run along the rails that extend to both sides of the floor, the main body is woven by a brace, etc. to reinforce it with a frame structure woven with a plurality of beams at regular intervals;

상기 본체의 양측면에는 상하 및 길이방향 일정 간격으로 복수의 고정대를 설치하여 여기에 설치되는 유압잭 및 잭볼트를 교대로 배치되게 함과 동시에, 상기 유압잭 및 잭볼트의 로드단에 핀으로 연결 고정되는 호형의 판넬을 경사재로 연결한 프레임으로 지지 고정하는 트러스 구조로써 상부 거푸집의 양측 하단에 힌지 결합될 측면 거푸집;Both sides of the main body is provided with a plurality of fixing rods at regular intervals in the vertical direction and longitudinally arranged to alternately arrange the hydraulic jack and jack bolts installed thereon, and at the same time connected to the rod end of the hydraulic jacks and jack bolts pin type fixed Side trusses to be hinged to the bottom of both sides of the upper formwork as a truss structure to support and secure the panel connected to the inclined frame;

상기 본체의 상부 가로빔 상면 양측에는 복수의 유압잭 및 잭볼트를 교대로 배치되게 설치 함과 동시에, 상기 유압잭 및 잭볼트의 로드단이 본체 상부에 고정되고 각각의 실린더 바디가 본체 양측으로 종설되는 종부재에 체결 고정됨과 동시에, 상부 호형의 판넬을 경사재 및 수직재로 연결한 프레임으로 지지 고정하여 양측 측면 거푸집의 상부와 힌지 결합시키는 트러스 구조의 상부 거푸집; 및A plurality of hydraulic jacks and jack bolts are alternately arranged on both sides of the upper horizontal beam upper surface of the main body, and rod ends of the hydraulic jacks and jack bolts are fixed to the upper part of the main body and each cylinder body is extended to both sides of the main body. The upper formwork of the truss structure is fastened and fixed to the member, and the upper arc-shaped panel is hinged to the upper side of the two side formwork by holding and fixing with a frame connecting the inclined material and the vertical material; And

상기 본체 전후의 상부 가로빔의 유압잭 및 잭볼트 사이의 양측에는 상부 선단에 롤러를 구비한 고정대를 세워 설치함과 동시에, 상기 상부 거푸집의 일 고정대의 일측 이격 위치에 하향 돌출 설치된 지지대와, 이 지지대와 상기 고정대 사이에 유압 실린더를 개재 설치하되 상기 고정대의 일측면에 상하 장공을 형성한 꺽쇠를 세워 설치하여 상기 지지대에 고정된 유압잭의 로드단이 상기 장공에 승강 안내되게 고정된 것에 의해 달성된다.Supports installed on both sides between the hydraulic jack and the jack bolts of the upper horizontal beam before and after the main body upright and equipped with a roller having a roller at the upper end, protruding downward in one spaced apart position of the one of the upper formwork; It is achieved by installing a hydraulic cylinder between the and the stator through the installation of the up and down clamps forming the upper and lower long holes on one side of the stator to be fixed by the rod end of the hydraulic jack fixed to the support.

도 1은 본 고안의 정 단면도.1 is a cross-sectional view of the subject innovation.

도 2는 본 고안의 측 단면도.2 is a side cross-sectional view of the present invention.

도 3은 도 1의 A부 상세도.3 is a detailed view of portion A of FIG. 1;

도 4는 도 3의 사시도.4 is a perspective view of FIG.

이하에서 본 고안을 바람직한 실시예의 첨부도면에 의해 보다 상세히 설명하기로 한다.Hereinafter, the present invention will be described in more detail by the accompanying drawings of preferred embodiments.

도 1은 본 고안의 정 단면도이고 도 2는 본 고안의 측 단면도이며, 도 3은 도 1의 A부 상세도이고 도 4는 도 3의 사시도이다.1 is a cross-sectional view of the present invention and Figure 2 is a side cross-sectional view of the present invention, Figure 3 is a detailed view of the portion A of Figure 1 and Figure 4 is a perspective view of FIG.

바닥의 양측으로 종설되는 레일(100)을 따라 주행할 수 있게 롤러(11)를 하부에 설치하고, 일정간격으로 상부 가로빔(A), 수직빔(B) 및 이들 수직빔을 지지하는 양측의 종빔(C)과 이들 틀체 구조를 보강하는 가새 등으로 짜여진 틀체를 이루는 본체(10);The roller 11 is installed at the lower portion so as to travel along the rail 100 which is extended to both sides of the floor, and the upper horizontal beam A, the vertical beam B, and the two sides supporting these vertical beams at regular intervals. A main body 10 constituting a frame body woven by a longitudinal beam C and braces for reinforcing these frame structures;

상기 본체(10)의 양 측면에는 상하 및 길이방향 일정 간격으로 복수의 고정대(21)를 설치하여 여기에 설치되는 유압잭(HJ) 및 잭볼트(JB)를 교대로 배치되게 함과 동시에, 상기 유압잭(HJ) 및 잭볼트(JB)의 로드(R)단에 핀(P)으로 연결 고정되는 호형의 판넬(31)을 경사재(32a)로 연결한 프레임(32)으로 지지 고정하는 트러스 구조로써 상부 거푸집의 양측 하단에 힌지 결합될 측면 거푸집(30);Both side surfaces of the main body 10 are provided with a plurality of fixing brackets 21 at regular intervals in the vertical direction and in the longitudinal direction to alternately arrange the hydraulic jacks HJ and the jack bolts JB installed therein, and at the same time, the hydraulic jacks. It is a truss structure for supporting and fixing the arc-shaped panel 31 connected to the rod R end of the HJ and the jack bolt JB with the frame 32 connected with the inclined material 32a. Side formwork 30 to be hinged to both lower ends of the upper formwork;

상기 본체(10)의 상부 가로빔(A) 상면 양측에는 복수의 유압잭(HJ) 및 잭볼트(JB)를 교대로 배치되게 설치함과 동시에, 상기 유압잭(HJ) 및 잭볼트(JB)의 로드(R)단이 본체 상부에 고정되고 각각의 실린더바디(S)가 본체 양측으로 종설되는 종부재(D)에 체결 고정됨과 동시에, 상부 호형의 판넬(41)을 경사재 및 수직재(42a)로 연결한 프레임(42)으로 지지 고정하여 양측 측면 거푸집(30)의 상부와 힌지 결합시키는 트러스 구조의 상부 거푸집(40); 및On both sides of the upper horizontal beam A of the main body 10, a plurality of hydraulic jacks HJ and jack bolts JB are alternately arranged, and at the same time, the rods of the hydraulic jacks HJ and jack bolts JB are installed. (R) end is fixed to the upper part of the body and each cylinder body (S) is fastened and fixed to the longitudinal member (D) extending to both sides of the main body, and the upper arc panel 41 to the inclined material and vertical member (42a) An upper formwork 40 of a truss structure which is hinged to the upper portions of both side formwork 30 by being fixed and supported by the connected frame 42; And

상기 본체(10) 전후의 상부 가로빔(A)의 유압잭(HJ) 및 잭볼트(JB) 사이의 양측에는 상부 선단에 롤러(51)를 구비한 고정대(52)를 세워 설치함과 동시에, 상기 상부 거푸집(40)의 일 고정대(52)의 일측 이격 위치에 하향 돌출설치된 지지대(44)와, 이 지지대와 상기 고정대(52) 사이에 유압 실린더(HJ)를 개재 설치하되, 상기 고정대(52)의 일 측면에 상하 장공(53a)을 형성한 꺽쇠(53)를 세워 설치하여 상기 지지대(44)에 고정된 유압잭(HJ)의 로드단이 상기 장공에 승강 안내 되게 고정된 것을 특징으로 한다.On both sides between the hydraulic jacks HJ and jack bolts JB of the upper horizontal beam A before and after the main body 10, a fixing table 52 having rollers 51 is installed at the upper end, and The support 44 is protruded downward at one side spaced apart position of the one support 52 of the upper formwork 40 and the hydraulic cylinder (HJ) is installed between the support and the support 52, the support 52 It is characterized in that the rod end of the hydraulic jack (HJ) fixed to the support 44 is installed so as to stand up and down to install the cramps 53 formed in the upper and lower long holes (53a) on one side.

상기 본체(10)는 도 2에서와 같이 전방에 전후진 유압잭(HJ)을 부설하여 레일(100)에 고정하거나 해제시키는 클램프(CL)를 갖고 있다. 그리고 상기 롤러(11) 사이사이에는 스크류잭(SJ)을 설치하여 이동간에는 그 길이를 축소하여 롤러(11)에 의해 레일(100) 위를 전후진 유압잭(HJ)의 동작으로 이동되게 한다.As shown in FIG. 2, the main body 10 includes a clamp CL that fixes the rail 100 to the rail 100 by installing the front and rear hydraulic jacks HJ. In addition, a screw jack (SJ) is installed between the rollers (11) to reduce the length between the movement so that the roller 11 is moved on the rail 100 by the forward and backward hydraulic jack (HJ).

이때 본체는 도 1 및 도 2에서와 같이 H형 빔으로 가로재와 세로재를 일정 간격으로 배열하고 가새 등을 대는 조립 구조물로 통상의 틀체를 구성하는 방식과 대동하다.In this case, as shown in FIGS. 1 and 2, the main body has an H-beam, which is arranged at regular intervals, and corresponds to a method of forming a conventional frame with an assembly structure for applying braces.

한편 측면 거푸집은 상기 유압잭(HJ) 및 잭볼트(JB)의 조작으로 핀(P)을 중심으로 내측으로 당겨서 콘크리트 양생후 타설을 한다.On the other hand, the formwork is poured after curing the concrete by pulling inwards around the pin (P) by the operation of the hydraulic jack (HJ) and jack bolt (JB).

그리고 상부 거푸집(40)은 상기 유압잭(HJ) 및 잭볼트(JB)를 이용하여 하강 시켜서 탈형을 이룬다. 이때 잭볼트(JB)는 단순히 지지하는 작용만 하는 것으로 탈형시 잭볼트를 먼저 축소 작업시킨 후에 유압잭을 하강시키면 된다.And the upper formwork 40 is lowered by using the hydraulic jack (HJ) and jack bolt (JB) to form a demoulding. At this time, the jack bolt (JB) is merely to support the act of reducing the jack bolt first when the demoulding, and then the hydraulic jack is lowered.

이때 지지대(44)와 유압잭(HJ)은 고정 상태이고, 유압잭의 로드는 상부 거푸집(40)의 승강에 따라와 고정대(52)에 부착 설치된 꺽쇠(53)의 상하 장공(53a)을 따라 가이드된다.At this time, the support 44 and the hydraulic jack (HJ) is in a fixed state, the rod of the hydraulic jack is guided along the upper and lower holes 53a of the clamp 53 installed attached to the holder 52 and the lifting of the upper formwork 40. .

힌편 본 고안의 주요한 작용인 상부 거푸집의 좌우 조정을 위한 작용을 설명하면 다음과 같다.When the operation for the left and right adjustment of the upper formwork, which is the main action of the present invention.

상기 거푸집(40)의 하강으로 고정대(52) 상의 롤러(51)가 상부 거푸집(40)의 하부 구조인 프레임(42) 저면과 접촉하게 된다. 이후 상부 거푸집(40)의 좌우 정밀 센터링 작업을 위해 유압잭(HJ)을 가동함에 따라 좌우 위치 이동시켜서 세팅할 수 있다.The lowering of the formwork 40 causes the roller 51 on the holder 52 to come into contact with the bottom surface of the frame 42, which is a lower structure of the upper formwork 40. Since the hydraulic jack (HJ) for the left and right precision centering operation of the upper formwork 40 can be set by moving the left and right positions.

상기에서 도 1에서와 같이 좌우 양측으로 유압잭과 잭볼트가 있으나, 이는 전후 일정간격으로 교대로 배치되어 있는 구성이다.In the above, there is a hydraulic jack and a jack bolt on both the left and right sides as shown in FIG.

도면중 미설명 부호 A1은 콘크리트를 주입하기 위한 주입관이다.In the figure, reference numeral A1 denotes an injection tube for injecting concrete.

한편 상기의 구성에서 본 고안 장치의 강도 계산과 단가에 따른 실용적인 배치로써, 경우에 따라서는 유압잭 전부로, 또는 두개 건너 하나씩을 배치하든 간에 이는 설계적 변경에 해당된다 할 것이다.On the other hand, as the practical arrangement according to the strength calculation and unit price of the device of the present invention in the above configuration, in some cases, whether the hydraulic jack all or one over two will be a design change.

이상과 같이 구성되고 작용되는 본 고안은 이동식 터널 거푸집 장치에 있어서 이 장치가 정위치 중앙에서 벗어나는 오차 등을 비교적 간단한 구성의 장치로 손쉽게 바로 잡는 효과가 있다.The present invention constructed and operated as described above has an effect of easily correcting a device having a relatively simple configuration such as a deviation from the center of a fixed position in the mobile tunnel formwork device.

Claims (1)

바닥의 양측으로 종설되는 레일(100)을 따라 주행할 수 있게 롤러(11)를 하부에 설치하고, 일정 간격으로 상부 가로빔(A), 수직빔(B) 및 이들 수직빔을 지지하는 양측의 종빔(C)과 이들 틀체 구조를 보강하는 가새 등으로 짜여진 틀체를 이루는 본체(10);The roller 11 is installed at the lower portion so as to travel along the rails 100 which are extended to both sides of the floor, and the upper horizontal beam A, the vertical beam B, and the two sides supporting these vertical beams at regular intervals. A main body 10 constituting a frame body woven by a longitudinal beam C and braces for reinforcing these frame structures; 상기 본체(10)의 양 측면에는 상하 및 길이방향 일정 간격으로 복수의 고정대(21)를 설치하여 여기에 설치되는 유압잭(HJ) 및 잭볼트(JB)를 교대로 배치되게 함과 동시에, 상기 유압잭(HJ) 및 잭볼트(JB)의 로드(R)단에 핀(P)으로 연결 고정되는 호형의 판넬(31)을 경사재(32a)로 연결한 프레임(32)으로 지지 고정하는 트러스 구조로써 상부 거푸집의 양측 하단에 힌지 결합될 측면 거푸집(30);Both side surfaces of the main body 10 are provided with a plurality of fixing brackets 21 at regular intervals in the vertical direction and in the longitudinal direction to alternately arrange the hydraulic jacks HJ and the jack bolts JB installed therein, and at the same time, the hydraulic jacks. It is a truss structure for supporting and fixing the arc-shaped panel 31 connected to the rod R end of the HJ and the jack bolt JB with the frame 32 connected with the inclined material 32a. Side formwork 30 to be hinged to both lower ends of the upper formwork; 상기 본체(10)의 상부 가로빔(A) 상면 양측에는 복수의 유압잭(HJ) 및 잭볼트(JB)를 교대로 배치되게 설치함과 동시에, 상기 유압잭(HJ) 및 잭볼트(JB)의 로드(R)단이 본체 상부에 고정되고 각각의 실린더바디(S)가 본체 양측으로 종설되는 종부재(D)에 체결 고정됨과 동시에, 상부 호형의 판넬(41)을 경사재 및 수직재(42a)로 연결한 프레임(42)으로 지지 고정하여 양측 측면 거푸집(30)의 상부와 힌지 결합시키는 트러스 구조의 상부 거푸집(40); 및On both sides of the upper horizontal beam A of the main body 10, a plurality of hydraulic jacks HJ and jack bolts JB are alternately arranged, and at the same time, the rods of the hydraulic jacks HJ and jack bolts JB are installed. (R) end is fixed to the upper part of the body and each cylinder body (S) is fastened and fixed to the longitudinal member (D) extending to both sides of the main body, and the upper arc panel 41 to the inclined material and vertical member (42a) An upper formwork 40 of a truss structure which is hinged to the upper portions of both side formwork 30 by being fixed and supported by the connected frame 42; And 상기 본체(10) 전후의 상부 가로빔(A)의 유압잭(HJ) 및 잭볼트(JB) 사이의 양측에는 상부 선단에 롤러(51)를 구비한 고정대(52)를 세워 설치함과 동시에, 상기 상부 거푸집(40)의 일 고정대(52)의 일측 이격 위치에 하향 돌출 설치된지지대(44)와, 이 지지대와 상기 고정대(52) 사이에 유압 실린더(HJ)를 개재 설치하되 상기 고정대(52)의 일 측면에 상하 장공(53a)을 형성한 꺽쇠(53)를 세워 설치하여 상기 지지대(44)에 고정된 유압잭(HJ)의 로드단이 상기 장공에 승강 안내되게 고정된 것을 특징으로 한 상부 거푸집 위치 조정장치를 구비한 이동식 터널거푸집.On both sides between the hydraulic jacks HJ and jack bolts JB of the upper horizontal beam A before and after the main body 10, a fixing table 52 having rollers 51 is installed at the upper end, and The support 44 is installed downwardly protruded at one side spaced apart position of the one support 52 of the upper formwork 40, and the hydraulic cylinder (HJ) is installed between the support and the support 52, but of the support 52 The upper formwork position, characterized in that the rod end of the hydraulic jack (HJ) fixed to the support 44 by installing the cramps (53) formed up and down long holes (53a) on one side is fixed to be elevated guided to the long hole Movable tunnel formwork with adjusting device.
KR2020020010484U 2002-04-08 2002-04-08 Mobile tunel mold with a system for adjusting position of upper mold KR200283076Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020010484U KR200283076Y1 (en) 2002-04-08 2002-04-08 Mobile tunel mold with a system for adjusting position of upper mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020010484U KR200283076Y1 (en) 2002-04-08 2002-04-08 Mobile tunel mold with a system for adjusting position of upper mold

Publications (1)

Publication Number Publication Date
KR200283076Y1 true KR200283076Y1 (en) 2002-07-26

Family

ID=73120769

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020010484U KR200283076Y1 (en) 2002-04-08 2002-04-08 Mobile tunel mold with a system for adjusting position of upper mold

Country Status (1)

Country Link
KR (1) KR200283076Y1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100770014B1 (en) 2006-07-24 2007-10-25 한미란 Frame for architectural tunnel
KR100920534B1 (en) 2007-11-15 2009-10-08 하철용 Construction method of multiple arch tunnel
KR101056249B1 (en) 2011-03-07 2011-08-11 양현기 A structure for transporting the tunnel steel lining foam
KR101130923B1 (en) 2009-08-01 2012-03-28 동우건설(주) the mold with self-propelled type trolley for construction of continuous structure and the construction method of continuous structure therewith
KR101202784B1 (en) * 2010-05-31 2012-11-19 선산철강공업(주) A Travelling Steel Form
KR101824061B1 (en) * 2015-12-30 2018-01-31 주식회사 용하건설 Construction method of powder magazine
KR101824062B1 (en) * 2015-12-30 2018-01-31 주식회사 용하건설 Construction method of powder magazine
CN108005695A (en) * 2018-01-31 2018-05-08 中铁北京工程局集团第工程有限公司 The fast-supporting device and method of branch large deformation at the beginning of for punishing tunnel weak surrounding rock
CN109304795A (en) * 2018-11-30 2019-02-05 中铁八局集团桥梁工程有限责任公司 The hydraulic gliding model of T beam and operating method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100770014B1 (en) 2006-07-24 2007-10-25 한미란 Frame for architectural tunnel
KR100920534B1 (en) 2007-11-15 2009-10-08 하철용 Construction method of multiple arch tunnel
KR101130923B1 (en) 2009-08-01 2012-03-28 동우건설(주) the mold with self-propelled type trolley for construction of continuous structure and the construction method of continuous structure therewith
KR101202784B1 (en) * 2010-05-31 2012-11-19 선산철강공업(주) A Travelling Steel Form
KR101056249B1 (en) 2011-03-07 2011-08-11 양현기 A structure for transporting the tunnel steel lining foam
KR101824061B1 (en) * 2015-12-30 2018-01-31 주식회사 용하건설 Construction method of powder magazine
KR101824062B1 (en) * 2015-12-30 2018-01-31 주식회사 용하건설 Construction method of powder magazine
CN108005695A (en) * 2018-01-31 2018-05-08 中铁北京工程局集团第工程有限公司 The fast-supporting device and method of branch large deformation at the beginning of for punishing tunnel weak surrounding rock
CN109304795A (en) * 2018-11-30 2019-02-05 中铁八局集团桥梁工程有限责任公司 The hydraulic gliding model of T beam and operating method
CN109304795B (en) * 2018-11-30 2024-01-05 中铁八局集团第七工程有限公司 T-beam hydraulic sliding model and operation method

Similar Documents

Publication Publication Date Title
KR101657994B1 (en) Form traveler, and bridge construction method for using the same
JP6902184B2 (en) Work equipment and overhang erection method
KR200283076Y1 (en) Mobile tunel mold with a system for adjusting position of upper mold
JP2012202076A (en) Construction device of overhead viaduct and construction method of overhead viaduct
CN210658011U (en) Steel truss arch bridge installation system
JP3177904B2 (en) Mobile work vehicle for PC cable-stayed bridge
JP4329535B2 (en) Mobile work vehicle for overhanging slabs
JP4980257B2 (en) Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge
KR20050045951A (en) The mold apparatus for center wall of two archi tunnel
CN110952434B (en) Variable-span double-support large-displacement front end support transverse moving device and transverse moving method for trestle
JPH03275803A (en) Moving construction device for high level structure
JP3326724B2 (en) Construction method of concrete cable-stayed bridge and form support trolley used for it
KR102288409B1 (en) A Carrier For Tunnel Working
CN111749144A (en) Movable cast-in-place beam side mold device and using method thereof
JP3657544B2 (en) Construction work vehicle
CN214944312U (en) Steel case assembled mould building trolley
CN116557007B (en) Tunnel arch frame installation device
JP2879248B2 (en) Traveling formwork support
CN214221207U (en) Lining car is supported in high-speed railway tunnel construction
JPH0639878B2 (en) Moving mechanism for mobile formwork for lining
CN216640287U (en) Supporting device for mounting first-section steel anchor beam in cable-stayed bridge cable tower
KR200151563Y1 (en) Supporting device for concrete slab forms
CN214005428U (en) Anti-tilting support for precast beam
CN216894438U (en) Support for assisting shield launching
RU2725194C1 (en) Elements of metal arched support in form of cantilevers, which form cantilever part of support, providing continuity of support

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20020801

Year of fee payment: 3

LAPS Lapse due to unpaid annual fee