KR200221897Y1 - Mud-plastered wall structure using cast-in-place bar for prevention of earth and sand from being collapsed - Google Patents

Mud-plastered wall structure using cast-in-place bar for prevention of earth and sand from being collapsed Download PDF

Info

Publication number
KR200221897Y1
KR200221897Y1 KR2020000031008U KR20000031008U KR200221897Y1 KR 200221897 Y1 KR200221897 Y1 KR 200221897Y1 KR 2020000031008 U KR2020000031008 U KR 2020000031008U KR 20000031008 U KR20000031008 U KR 20000031008U KR 200221897 Y1 KR200221897 Y1 KR 200221897Y1
Authority
KR
South Korea
Prior art keywords
wall
hole
construction
cast
pile
Prior art date
Application number
KR2020000031008U
Other languages
Korean (ko)
Inventor
최한순
Original Assignee
주식회사경기기술단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사경기기술단 filed Critical 주식회사경기기술단
Priority to KR2020000031008U priority Critical patent/KR200221897Y1/en
Application granted granted Critical
Publication of KR200221897Y1 publication Critical patent/KR200221897Y1/en

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

본 고안은 흙막이용 현장 타설막대의 시공방법에 의한 구조에 관한 것으로서, 흙막이 C.I.P(CAST-IN PLACEMENT PILE) 공사 및 터파기 완료 후 합벽구조물 시공을 위해 현장타설하여 절취사면을 절취하지 않고도 흙막이 벽을 설치할 수 있는 흙막이용 현장 타설막대의 시공방법을 얻기 위한 것인 바,The present invention relates to the structure by the construction method of the site pour rod for the earthquake block, and after the earthquake CIP (CAST-IN PLACEMENT PILE) construction and the completion of the excavation, the earthwork wall without cutting the slope It is to get construction method of on-site pouring rod which we can install,

흙막이 공사에 사용되는 현장 타설막대의 시공방법에 의한 흙막이벽의 구조에 있어서,In the structure of the retaining wall by the construction method of the field pouring rod used for the retaining work,

상기 현장의 흙막이 공사시에 지면을 굴착하여 천공하여 홀(Hole)을 형성하고, 상기 홀이 포함되도록 연속적으로 천공하고 상기 천공된 홀에 철근과 콘크리트를 삽입하여 기초말뚝벽을 형성하고, 상기 기초말뚝벽으로 흙막이 벽을 하여 절취한 후에 흙막벽에 시멘트 페이스 뿜칠을 하여 이물질의 탈락을 방지하도록 시공하고, 철근 구조물을 형성하여 콘크리트를 타설하여 합벽구조물을 형성하도록 이루어짐으로 써, 연약지반의 완경사면을 절취하여 토사를 이송하지 않고 경사면을 그 대로 살리므로 토사가 붕괴되지 않아 안정성이 뛰어난 효과가 있으며, 또한 공기를 대폭 줄일 수 있어 공사비용이 적게 들고 절취시 주변 환경에 영향을 적게 받아 공사가 편리한 뛰어난 효과가 있다.Excavate the ground at the time of construction of the site to drill the hole to form a hole (Hole), and continuously drilled to include the hole and insert the reinforcement and concrete into the perforated hole to form a foundation pile wall, the foundation After cutting the earthen wall with a pile wall, apply cement face to the earthen wall to prevent debris from falling off, and form reinforcement to cast concrete to form a plywood structure. Since the slope is kept as it is without transferring the soil, the soil is not collapsed, so the stability of the soil is not collapsed, and the air can be greatly reduced, so the construction cost is low and the surrounding environment is less affected. Excellent effect.

Description

흙막이용 현장 타설막대를 이용한 흙막이벽의 구조 {Mud-plastered wall structure using cast-in-place bar for prevention of earth and sand from being collapsed}Mud-plastered wall structure using cast-in-place bar for prevention of earth and sand from being collapsed}

본 고안은 흙막이용 현장 타설막대를 이용한 흙막이벽의 구조에 관한 것으로서, 더욱 상세하게는 흙막이 C.I.P(CAST-IN PLACEMENT PILE) 공사 및 터파기 완료 후 합벽구조물 시공을 위해 현장타설하여 절취사면을 절취하지 않고도 흙막이 벽을 설치할 수 있는 흙막이용 현장 타설막대의 시공방법에 의해 이루어진 흙막이벽의 구조에 관한 것이다.The present invention relates to the structure of the earthen wall using the site-pouring rod for the earthen block, and more specifically, to cut the cut off surface by placing the field for the construction of the plywood structure after completion of the CIP (CAST-IN PLACEMENT PILE) construction and dig. It relates to the structure of the retaining wall made by the construction method of the field pour rod for the retaining fence that can install the retaining wall without having to.

종래의 경사면의 흙막이 시공방법은 경사면의 양측면을 절취하고 절취한 토사를 운반하여 흙막이 벽을 시공하였다.In the conventional method of constructing the retaining wall of the inclined surface, the retaining wall was cut by carrying both sides of the inclined surface.

이러한 종래의 흙막이 시공방법에 의한 구조는 경사면이 급경사를 이루거나 절취사면이 적을 때 사용할 수 있는 공법으로 절취면의 크거나, 완만한 경사를 이루는 양옆의 경사면을 절취시에는 토사의 운반 및 절취하는 공사시간이 길고 공정에 소요되는 시공비용이 큰 문제점이 있었다.The conventional construction using the earthen construction method is a method that can be used when the inclined surface makes a steep incline or a small inclined surface, and transports and cuts the soil when cutting the inclined sides of a large or gentle inclined surface. The construction time is long and the construction cost required for the process was a big problem.

따라서, 본 고안은 상기 종래의 문제점을 감안하여 안출한 것으로서, 본 고안의 목적은 절취사면 절취하지 않고도 흙막이 벽을 설치할 수 있는 흙막이용 현장 타설막대를 이용한 흙막이벽의 구조를 제공하는 데 있다.Accordingly, the present invention has been made in view of the above-mentioned conventional problems, and an object of the present invention is to provide a structure of the earth wall using the site pour rod for the earth wall, which can install the earth wall without cutting the cut slope.

본 고안의 다른 목적은 흙막이 벽의 시공기간 및 시공비용을 최소화시키는 흙막이용 현장 타설막대를 이용한 흙막이벽의 구조를 제공하는 데 있다.Another object of the present invention is to provide a structure of the wall of the mud using the site pouring rod for the mud to minimize the construction period and construction cost of the mud wall.

본 고안의 또 다른 목적은 현장타설막대의 이 물질 탈락 방지하기 위한 흙막이 벽의 현장 타설막대에 시멘트 페이스 뿜칠하는 흙막이용 현장 타설막대를 이용한 흙막이벽의 구조를 제공하는 데 있다.Another object of the present invention is to provide a structure of the wall using the site pour rod for the mud to spray the cement face on the site pour rod of the mud wall to prevent the foreign material falling off.

이와 같은 목적을 달성하기 위한 본 고안은 흙막이 공사시 타공한 천공구에 철근과 시멘트를 타설하여 형성된 현장타설말뚝을 이용한 구조물에 있어서, 상기 구멍을 연속적으로 연결하여 천공한 천공홀(Hole)(10)에 '' 형상의 말뚝벽(20)을 형성하고 현장타설말뚝의 벽면에 시멘트 페이스트 뿜칠(40)하고 그 외부에 철근 구조물을 형성하여 콘크리트를 타설한 3중 구조의 합벽구조물(50)을 형성하도록 이루어지도록 달성하였다.The present invention for achieving the above object is a structure using a cast-in-place pile formed by reinforcing reinforcing bars and cement in the perforated drilled hole at the time of construction, perforated hole (Hole) (10) by continuously connecting the holes ) On " 'To form a pile wall (20) of the shape and sprayed cement paste (40) on the wall surface of the cast-in-place pile and to form a reinforcement structure on the outside to form a plywood structure (50) of the three-structured concrete Achieved.

도 1은 본 고안의 바람직한 실시예의 흙막이용 벽을 형성하기 위한 천공상태를 도시한 측면도,1 is a side view showing a perforated state for forming the wall for the earthenware of the preferred embodiment of the present invention,

도 2는 본 고안의 흙막이용 현장 타설벽을 형성하기 위한 타설단계 및 양생단계를 도시한 측면도,Figure 2 is a side view showing the pour step and curing step for forming the site pour wall for the mudstone of the present invention,

도 3은 본 고안의 절토한 상태를 도시한 측면도,Figure 3 is a side view showing the cut state of the present invention,

도 4는 본 고안의 흙막이용 현장 타설벽에 보강벽을 시공하는 것을 도시한 측면도,Figure 4 is a side view showing the construction of a reinforcement wall on the site pour wall for the present invention,

도 5는 본 고안의 흙막이용 현장 타설벽에 합벽구조물을 시공한 상태의 절개 사시도이다.Figure 5 is a cutaway perspective view of the construction of the plywood structure on the site pour wall for the mudstone of the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10 : 홀(Hole) 20 : 말뚝벽10: Hole 20: Pile wall

30 : 절취 40 : 뿜칠30: cut off 40: spout

50 : 합벽구조물50: plywood structure

이하, 첨부된 도면들을 참조하여 본 고안의 바람직한 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 고안의 바람직한 실시예의 흙막이용 벽을 형성하기 위한 천공상태를 도시한 측면도이고, 도 2는 본 고안의 흙막이용 현장 타설벽을 형성하기 위한 타설단계 및 양생단계를 도시한 측면도이고, 도 3은 본 고안의 절토한 상태를 도시한 측면도이고, 도 4는 본 고안의 흙막이용 현장 타설벽에 보강벽을 시공하는 것을 도시한 측면도이고, 도 5는 본 고안의 경사면에 합벽구조물을 시공한 상태의 절개 사시도이다.Figure 1 is a side view showing a perforated state for forming the wall for the mudstone of the preferred embodiment of the present invention, Figure 2 is a side view showing the pouring step and curing step for forming the site pour wall for the present invention, Figure 3 is a side view showing the cut state of the present invention, Figure 4 is a side view showing the construction of the reinforcement wall on the site pour wall for the present invention, Figure 5 is a construction of the sump wall structure on the inclined surface of the present invention Incision perspective view of one state.

도 1 내지 도 5에 도시한 본 고안의 흙막이 공사시 타공한 천공구에 철근과 시멘트를 타설하여 형성된 현장타설말뚝을 이용한 구조물에 있어서, 상기 구멍을 연속적으로 연결하여 천공한 천공홀(Hole)(10)에 '' 형상의 말뚝벽 (20)을 형성하고 현장타설말뚝의 벽면에 시멘트 페이스트 뿜칠(40)하고 그 외부에 철근 구조물을 형성하여 콘크리트를 타설한 3중 구조의 합벽구조물(50)을 형성하도록 이루어진 특징이 있다.1 to 5 in the structure using the site-placed pile formed by pouring reinforcing bars and cement in the perforated drilled hole construction of the present invention shown in Figures 1 to 5, a hole (Hole) perforated by continuously connecting the holes ( 10) on 'Formed pile wall (20) of the shape and the cement paste on the wall surface of the cast-in-place pile (40) and the reinforcement structure formed on the outside to form a concrete wall structure of the triple structure (50) There is this.

상기 합벽구조물(50)을 제공하는 콘크리트로 성형된 말뚝의 타설은 지하수위가 낮은 곳이나 건습차가 큰 곳에 쓰이며, 내구성이 크고 임의의 길이와 임의의 단면적으로 만들 수 있다.The casting of the pile formed of concrete to provide the plywood structure 50 is used where the groundwater level is low or where the wet and dry car is large, and it is durable and can be made of arbitrary length and arbitrary cross-sectional area.

본 고안의 흙막이용 현장 타설막대의 시공방법에 의한 구조는 흙막이 공사시 타공한 천공 홀(Hole)(10)에 철근과 시멘트를 타설하여 형성된 현장타설말뚝을 이용한 구조물에 있어서,In the construction by the construction method of the field pour rod for the mud wall of the present invention, in the structure using the cast-in-place pile formed by reinforcing steel and cement in the perforated hole (10)

상기 구멍을 연속적으로 연결하여 천공한 천공 홀(Hole)에 ''형상의 말뚝벽(20)을 형성하고, 현장타설 콘크리트 말뚝의 벽면에 시멘트 페이스트 뿜칠(20)하고 그 외부에 철근 구조물을 형성하여 콘크리트를 타설한 3중 구조의 합벽구조물(50)로 구성한 경사면의 흙막이 공사기 현장타설 말뚝을 이용한 흙막이 구조물을 갖는다.The hole is continuously connected to the drilled hole (Hole) 'Sloped surface consisting of a triple-walled structure (50) formed by forming a concrete pile wall (20), spraying cement paste (20) on the wall surface of the cast-in-place concrete pile and forming a reinforcing steel structure outside thereof It has a block structure using the site casting pile.

본 고안은 콘크리트 말뚝벽(20)과 합벽구조물(50) 사이에 시멘트 페이스트 뿔칠한 구조를 같은 흙막이 벽(70)을 갖는 특징이 있다.The present invention is characterized in that the concrete wall has a mud wall 70, such as cement paste horn-like structure between the pile wall 20 and the plywood structure 50.

본 고안은 경사면과 연약한 지반에서 굴착작업과 굴착토 및 절삭토를 이송하지 않는 시공방법으로 현장에서 타설한 시멘트 파일을 연속적으로 형성하여 벽체를 이루도록하고 그 파일면에 뿜칠하여 합벽구조물과 접합력 향상시키는 작용을 갖는 다.The present invention is a construction method that does not transfer excavation work and excavation soil and cutting soil on slope and soft ground to form cement pile continuously in the field to form a wall and spray on the pile surface to improve the joining wall structure and bonding force. Have action.

예컨대, 본 고안은 상술한 실시예에 한정되지 아니하며, 실용신안등록청구범위에서 청구한 본 고안의 요지를 벗어남이 없이 본 고안이 속하는 기술분야에 통상의 지식을 가진 자라면 다양한 변형 실시가 가능한 것임은 물론이고, 그와 같은 변경은 본 고안의 청구범위내에 있게 된다.For example, the present invention is not limited to the above-described embodiment, and various modifications can be made by those skilled in the art without departing from the gist of the present invention claimed in the utility model registration claims. Of course, such changes are within the scope of the present invention.

상기 실시예를 통하여 설명한 바와 같이, 본 고안은 연약지반의 완경사면을 절취하여 토사를 이송하지 않고 경사면을 그대로 살리므로 토사가 붕괴되지 않아 안정성이 뛰어난 효과가 있다. 또한 공기를 대폭 줄일 수 있어 공사비용이 적게 들고 절취시 주변 환경에 영향을 적게 받는 공사가 편리한 효과가 있으므로 건설산업상 매우 유용한 고안인 것이다.As described through the above embodiment, the present invention cuts the inclined slope of the soft ground and keeps the inclined surface as it is without transporting the soil. In addition, the air can be significantly reduced construction cost is low, and the construction is less useful to the surrounding environment when cut, because the convenient effect is a very useful design for the construction industry.

Claims (2)

흙막이 공사시 타공한 천공구에 철근과 시멘트를 타설하여 형성된 현장타설말뚝을 이용한 구조물에 있어서,In the structure using the cast-in-place pile formed by pouring reinforcing bars and cement in the perforated drilled hole at the time of construction 상기 구멍을 연속적으로 연결하여 천공한 천공홀(Hole)(10)에 '' 형상의 말뚝벽(20)을 형성하고 현장타설말뚝의 벽면에 시멘트 페이스트 뿜칠(40)하고 그 외부에 철근 구조물을 형성하여 콘크리트를 타설한 3중 구조의 합벽구조물(50)로 형성된 것을 특징으로 하는 경사면의 흙막이 공사기 현장타설말뚝을 이용한 흙막이 구조.In the hole (10) drilled by continuously connecting the holes' 'Formed pile wall 20, the cement paste on the wall surface of the cast-in-place pile (40) and the reinforcement structure is formed on the outside of the three-structured plywood structure (50) Retaining structure using the site casting stake on the slope. 제 1 항에 있어서, 상기 콘크리트 말뚝벽(20)과 합벽구조물(50) 사이에 시멘트 페이스트 뿔칠한 구조를 같은 흙막이 벽(70)을 갖는 것을 특징으로 하는 경사면의 흙막이 공사기 현장타설말뚝을 이용한 흙막이 구조.According to claim 1, wherein between the concrete pile wall 20 and the plywood structure 50, the earthquake wall using the slope of the earthquake construction machine cast-in-placement stake, characterized in that it has the same mud wall 70 with a cement paste-horned structure. rescue.
KR2020000031008U 2000-11-06 2000-11-06 Mud-plastered wall structure using cast-in-place bar for prevention of earth and sand from being collapsed KR200221897Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000031008U KR200221897Y1 (en) 2000-11-06 2000-11-06 Mud-plastered wall structure using cast-in-place bar for prevention of earth and sand from being collapsed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000031008U KR200221897Y1 (en) 2000-11-06 2000-11-06 Mud-plastered wall structure using cast-in-place bar for prevention of earth and sand from being collapsed

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020000065402A Division KR20020035215A (en) 2000-11-04 2000-11-04 Constructing method of cast-in-place bar for prevention of earth and sand from being collapsed and the bar structure thereof

Publications (1)

Publication Number Publication Date
KR200221897Y1 true KR200221897Y1 (en) 2001-04-16

Family

ID=73060155

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000031008U KR200221897Y1 (en) 2000-11-06 2000-11-06 Mud-plastered wall structure using cast-in-place bar for prevention of earth and sand from being collapsed

Country Status (1)

Country Link
KR (1) KR200221897Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100401330B1 (en) * 2001-05-04 2003-10-17 주식회사 정진종합엔지니어링건축사사무소 A method of construction for earth-protection walls of building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100401330B1 (en) * 2001-05-04 2003-10-17 주식회사 정진종합엔지니어링건축사사무소 A method of construction for earth-protection walls of building

Similar Documents

Publication Publication Date Title
KR200221897Y1 (en) Mud-plastered wall structure using cast-in-place bar for prevention of earth and sand from being collapsed
KR100322844B1 (en) tubular roof tunnel construction method
KR20020035215A (en) Constructing method of cast-in-place bar for prevention of earth and sand from being collapsed and the bar structure thereof
JPH03206212A (en) Construction method of earth support in tubular pile and tubular pile
JP2004060266A5 (en)
JP3904881B2 (en) Construction method of existing roadbed surface support
JPS598826A (en) Construction of underground wall by excavation of inside of pc plate
JPH0747899B2 (en) Self-supporting utility pole and its construction method
JPH0718174B2 (en) Construction method of tunnel entrance
CN106567370A (en) Ecological channel for agricultural irrigation and application of ecological channel
JP2804422B2 (en) Foundation construction method
JPS6011165Y2 (en) Continuous column pile drilling bit
JPH0121288B2 (en)
JPH0343518A (en) Continuous underground wall having enlarged bottom
JPH0260809B2 (en)
JPH11210004A (en) Reinforcing retaining wall construction method for slope
JP2004278250A (en) Method for positioning concrete pile
JP2799845B2 (en) Construction method of underground seepage type gutter
JP3171716B2 (en) Foundation construction method on inclined surface
JP3105706B2 (en) Construction method of piled raft foundation using existing foundation
JP3245776B2 (en) Slope protection method
JPH0434209Y2 (en)
IE990399A1 (en) "A Digging Tool"
JPH0259889B2 (en)
JPH05321244A (en) Method of constructing self-standing sheathing wall

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T601 Decision on revocation of utility model registration
LAPS Lapse due to unpaid annual fee