KR20020075109A - System and method for managing construction information using construction integration db, and media for storing program source thereof - Google Patents

System and method for managing construction information using construction integration db, and media for storing program source thereof Download PDF

Info

Publication number
KR20020075109A
KR20020075109A KR1020010015314A KR20010015314A KR20020075109A KR 20020075109 A KR20020075109 A KR 20020075109A KR 1020010015314 A KR1020010015314 A KR 1020010015314A KR 20010015314 A KR20010015314 A KR 20010015314A KR 20020075109 A KR20020075109 A KR 20020075109A
Authority
KR
South Korea
Prior art keywords
information
construction
purchase
generated
information management
Prior art date
Application number
KR1020010015314A
Other languages
Korean (ko)
Inventor
이근영
민병의
송경준
구본훈
전종구
Original Assignee
주식회사 디디알소프트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 디디알소프트 filed Critical 주식회사 디디알소프트
Priority to KR1020010015314A priority Critical patent/KR20020075109A/en
Publication of KR20020075109A publication Critical patent/KR20020075109A/en

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE: A system and method for managing construction information are provided to extract drawing numerical value from a two-dimensional or three-dimensional construction drawing file manufactured using a CAD program by a user, create construction related information, an equipment, an electricity field using the extracted drawing numerical value, and support various kinds of services according to construction processes. CONSTITUTION: A construction drawing managing module(310) extracts drawing numerical value from a two-dimensional or three-dimensional construction drawing file manufactured using a CAD program by a user, creates object discrimination information using the extracted drawing numerical value, and stores/manages the created object discrimination information in a construction integration DB(350). An integration processing module(320) searches materials according to each constitution element from material information of a material information DB(357) using the extracted drawing numerical value, and calculates costs according to a progress processing stages using a material selected by the user. A progress managing module(330) applies materials searched through the drawing numerical value to a corresponding construction drawing file, performs a simulation according to progresses and/or portions, creates a progress result through the simulated result, and constructs a progress information DB(356) using the created progress information. A material supply and demand module(340) creates a purchase requesting document using the material information and progress information stored in the construction integration DB(350), a name and an amount of a material to be used in a corresponding progress and an appointed date of material delivery, and notifies the created purchase requesting document through a communication network.

Description

건설통합DB를 이용한 건설정보 관리 시스템 및 방법, 그 프로그램 소스를 기록한 기록매체{SYSTEM AND METHOD FOR MANAGING CONSTRUCTION INFORMATION USING CONSTRUCTION INTEGRATION DB, AND MEDIA FOR STORING PROGRAM SOURCE THEREOF}SYSTEM AND METHOD FOR MANAGING CONSTRUCTION INFORMATION USING CONSTRUCTION INTEGRATION DB, AND MEDIA FOR STORING PROGRAM SOURCE THEREOF}

본 발명은 건설통합DB를 이용한 건설정보 관리 시스템 및 방법, 그 프로그램 소스를 기록한 기록매체에 관한 것이다.The present invention relates to a construction information management system and method using a construction integrated DB, and a recording medium recording the program source.

보다 상세하게는, 사용자에 의해 CAD 프로그램을 이용하여 제작된 2차원 또는 3차원 건설도면파일로부터 도면 수치 데이터를 추출하고, 상기 추출된 도면 수치 데이터를 이용하여 건축, 설비, 전기 분야 각각에 대응하는 건설관련정보를 생성하는 한편, 상기 생성된 건설관련정보를 이용하여 건축 공정에 따른 각종 서비스를 온라인 상에서 지원하는 건설통합DB를 이용한 건설정보 관리 시스템 및 방법, 그 프로그램 소스를 기록한 기록매체에 관한 것이다.More specifically, the drawing numerical data is extracted from the two-dimensional or three-dimensional construction drawing file produced by the user using a CAD program, and corresponding to each of the building, equipment, and electrical fields using the extracted drawing numerical data. The present invention relates to a construction information management system and method using a construction integrated DB, which supports construction services online while generating construction-related information, and records the source of the program. .

일반적으로, 건설현장의 담당자는 시공에 필요한 자재를 구매하는데 설계도와 시방서, 그리고 시공 계획서를 일일이 참조하여 수작업으로 구매 요구서를 작성한 다음, 이를 본사 구매팀이나 자재업체에게 구매공고를 하고 견적서를 접수한 다음에 적합한 자재업체와 구매 계약을 체결하고, 자재를 납품 받은 다음에 자재 대금을 지불하게 된다.In general, the person in charge of the construction site purchases the materials required for the construction, and prepares a purchase request manually by referring to the design, specification, and construction plan, and then sends a purchase notice to the headquarters purchasing team or the material company and receives a quotation. Next, they enter into a purchase agreement with a suitable material supplier, pay the material after the material is delivered.

도 1은 일반적인 건설 자재의 구매 방식을 설명하기 위한 도면으로서, 건설현장(101, 105)에서 담당자(103, 107)가 설계도와 시방서 및 시공 계획서(102, 106)를 가지고 시공에 필요한 자재에 대한 정보를 추출하여 구매 계획서(104, 108)를 작성한 다음, 본사 구매팀(109)에게 온라인으로 구매 요청을 하거나 또는 자재업체(111, 112, 113)에게 오프라인으로 구매공고를 하게된다.1 is a view for explaining a general purchase method of construction materials, in the construction site (101, 105) for the personnel (103, 107) having a design and specifications and construction plans (102, 106) for the materials required for construction After extracting the information to prepare a purchase plan (104, 108), the purchase request to the headquarters purchasing team 109 online or to the material company (111, 112, 113) to buy offline.

상기 건설현장(101, 105)으로부터 온라인으로 구매 요청을 할 경우, 상기 본사 구매팀(109)에서는 건설 e-marketplace(110)에 구매공고를 하게 되며, 오프라인으로 구매 요청을 하는 경우, 자재업체에 직접 구매공고를 하게된다.When the purchase request is made online from the construction sites 101 and 105, the head office purchasing team 109 makes a purchase notification to the construction e-marketplace 110, and if the purchase request is made offline, the material company Purchase notification will be sent directly.

상기 본사 구매팀(109)에서는 자재업체로부터 온라인 또는 오프라인으로 견적서를 접수받고, 상기 접수받은 견적서에 적합한 업체와 구매 계약을 체결하고, 해당 자재를 건설현장에 공급한 다음, 자재공급업체에 자재 대금을 지불하게 된다.The head office purchasing team 109 receives a quotation online or offline from a material supplier, enters into a purchase contract with a company suitable for the received quotation, supplies the material to a construction site, and then pays the material to a material supplier. You will pay

상기 건설현장(101, 105)에서 오프라인으로 구매 요청을 하는 경우, 건설현장 담당자는 자재업체로부터 견적서를 접수받은 다음, 상기 담당자가 적합한 자재업체와 구매 계약을 체결하여 자재를 공급받은 후, 자재 대금을 자재업체에게 지불하게 된다.When making a purchase request offline at the construction site (101, 105), the person in charge of the construction site receives a quotation from the material company, and then the person in charge of the material after entering into a purchase contract with a suitable material company, the material price Will be paid to the material supplier.

따라서, 시공에 필요한 자재의 종류와 수량의 산출에서부터 구매계획서의 작성 및 견적서의 접수, 그리고 견적서에 대한 검토와 계약 체결에 매번 사람이 개입해야 하며, 건설 자재의 시공 시기에 상관없이 일괄적으로 구매함에 따라 자재 대금의 선 지급과, 구매된 자재의 보관 및 관리에 많은 인력과 비용이 소요되는 문제점이 있었다.Therefore, each person must intervene in calculating the type and quantity of materials necessary for construction, preparing a purchase plan, receiving a quotation, reviewing a quotation, and entering into a contract. As a result, a large amount of manpower and costs were required for prepayment of materials and storage and management of purchased materials.

본 발명은 상기와 같은 문제점을 해결하기 위해 안출한 것으로서, 본 발명의 목적은 보다 상세하게는, 사용자에 의해 CAD 프로그램을 이용하여 제작된 2차원 또는 3차원 건설도면파일로부터 도면 수치 데이터를 추출하고, 상기 추출된 도면 수치 데이터를 이용하여 건축, 설비, 전기 분야 각각에 대응하는 건설관련정보를 생성하는 한편, 상기 생성된 건설관련정보를 이용하여 건축 공정에 따른 각종 서비스를 온라인 상에서 지원하는 건축에 필요한 공정 시기별 자재를 자동으로 구매할 수 있도록 지원하는 건설통합DB를 이용한 건설정보 관리 시스템 및 방법, 그 프로그램 소스를 기록한 기록매체를 제공함에 있다.The present invention has been made to solve the above problems, the object of the present invention in more detail, the drawing numerical data from the two-dimensional or three-dimensional construction drawing file produced by the user using a CAD program and The construction related information corresponding to each of the fields of construction, equipment, and electricity is generated using the extracted drawing numerical data, and the construction related information is used to support various services online according to the construction process using the generated construction related information. The present invention provides a construction information management system and method using a construction integrated DB, which supports the automatic purchase of materials for each required process time, and a recording medium recording the program source.

또한, 본 발명의 목적은 자재업체로 전송된 구매요구서에 상응하는 견적서를 중개하여 구매계약을 체결할 수 있도록 지원하는 건설통합DB를 이용한 건설정보 관리 시스템 및 방법, 그 프로그램 소스를 기록한 기록매체를 제공함에 있다.In addition, an object of the present invention is to provide a construction information management system and method using a construction integrated DB to support the conclusion of a purchase contract by brokering a quotation corresponding to a purchase request sent to a material supplier, and a recording medium recording the program source thereof. In providing.

또한, 본 발명의 목적은 중개된 견적서와 구매계약을 체결하는데 일련의 행위를 사용자의 개입 없이 수행할 수 있는 건설통합DB를 이용한 건설정보 관리 시스템 및 방법, 그 프로그램 소스를 기록한 기록매체를 제공함에 있다.In addition, an object of the present invention is to provide a construction information management system and method using a construction integrated DB that can perform a series of actions without the user's involvement in entering into a purchase contract with a mediated quotation, and a recording medium recording the program source have.

또한, 본 발명의 목적은 건설에 관련 자재를 공정 진행 단계별로 필요한 자재만을 구매함으로써 자재의 보관 및 관리에 소요되는 인력과 비용을 감소시킬 수 있는 건설통합DB를 이용한 건설정보 관리 시스템 및 방법, 그 프로그램 소스를 기록한 기록매체를 제공함에 있다.In addition, an object of the present invention is to provide a construction information management system and method using a construction integrated DB that can reduce the manpower and costs required for the storage and management of materials by purchasing only the materials necessary for the construction process-related materials for the construction process, its The present invention provides a recording medium recording a program source.

상기 목적을 달성하기 위한 본 발명의 일 실시예는, 사용자의 요청에 반응하여 네트워크 통신망에 연결된 하나 이상의 사용자 단말기로 건설 관련 정보를 제공하는 시스템에 있어서, CAD로 2차원 또는 3차원으로 작성된 건축, 설비, 전기 도면파일로부터 도면수치데이터를 자동으로 추출하여 건설통합DB를 구축하는 한편, 건설정보관리 운영자로부터 입력되는 공정 설계정보를 이용하여 공정 진행 단계별 정보를 생성하고, 상기 생성된 공정 진행 단계별 정보에 따라 소요되는 자재정보가 자동으로 산출되어 구매될 수 있도록 지원하는 건설정보 관리서버를 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 시스템을 제공한다.One embodiment of the present invention for achieving the above object is a system for providing construction-related information to one or more user terminals connected to a network communication network in response to a user's request, the construction made in two or three dimensions in CAD, Automatically extract drawing numerical data from facility and electrical drawing files to build a construction integrated DB, generate process progress information using process design information input from the construction information management operator, and generate the process progress information. It provides a construction information management system using a construction integrated DB, characterized in that it comprises a construction information management server that supports the required material information is automatically calculated and purchased according to.

상기 건설정보 관리서버는, 상기 공정 진행 단계별 정보를 이용하여 시공 진행 단계에 따라 소요되는 자재정보를 추출하여 구매요구서를 생성하고, 상기 생성된 구매요구서를 식별하기 위한 구매식별자를 생성하여 상기 구매요구서에 부여하는 한편, 상기 구매요구서를 이용하여 자재업체 관리자들이 조회할 수 있는구매요구서 등록웹페이지를 제작하고, 상기 구매요구서 등록웹페이지를 통해 접수되는 견적서를 이용하여 구매 계약이 체결되도록 지원하는 것을 특징으로 한다.The construction information management server extracts material information required according to the construction progress step by using the process progress step information, generates a purchase requisition, and generates a purchase identifier for identifying the generated purchase requisition. In addition, by using the purchase requisition to create a purchase requisition registration web page that can be viewed by the material supplier managers, and to support the conclusion of the purchase contract using the quotation received through the purchase requisition registration web page It features.

상기 본 발명의 다른 실시예는, 사용자의 요청에 반응하여 네트워크 통신망에 연결된 하나 이상의 사용자 단말기로 건설 관련 정보를 제공하는 방법에 있어서, CAD로 2차원 3차원으로 작성된 건축, 설비, 전기 도면파일로부터 도면수치데이터를 자동으로 추출하여 건설통합DB를 구축하는 한편, 건설정보관리 운영자로부터 입력되는 공정 설계정보를 이용하여 공정 진행 단계별 정보를 생성하고, 상기 생성된 공정 진행 단계별 정보에 따라 소요되는 자재정보가 자동으로 산출되어 구매될 수 있도록 지원하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 방법을 제공한다.Another embodiment of the present invention is a method for providing construction related information to one or more user terminals connected to a network communication network in response to a user's request. Automatically extract drawing numerical data to build a construction integrated DB, generate process progress information using process design information input from the construction information management operator, and material information required according to the generated process progress information It provides a construction information management method using the integrated construction DB, characterized in that to automatically calculate and support the purchase.

상기 본 발명의 또 다른 실시 예는, 사용자의 요청에 반응하여 네트워크 통신망에 연결된 하나 이상의 사용자 단말기로 건설 관련 정보를 제공하는 프로그램 소스를 기록한 기록매체에 있어서, CAD로 2차원 3차원으로 작성된 건축, 설비, 전기 도면파일로부터 도면수치데이터를 자동으로 추출하여 건설통합DB를 구축하는 한편, 건설정보관리 운영자로부터 입력되는 공정 설계정보를 이용하여 공정 진행 단계별 정보를 생성하고, 상기 생성된 공정 진행 단계별 정보에 따라 소요되는 자재정보가 자동으로 산출되어 구매될 수 있도록 지원하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 프로그램 소스를 기록한 기록매체를 제공한다.According to another embodiment of the present invention, in response to a user's request, a recording medium recording a program source for providing construction-related information to one or more user terminals connected to a network communication network, the construction is made in two-dimensional three-dimensional by CAD, Automatically extract drawing numerical data from facility and electrical drawing files to build a construction integrated DB, generate process progress information using process design information input from the construction information management operator, and generate the process progress information. Provides a recording medium recording the source of the construction information management program using the integrated construction DB, characterized in that the required material information is automatically calculated and purchased to support.

도 1은 일반적인 건설 자재의 구매 방식을 설명하기 위한 도면,1 is a view for explaining a general purchase method of construction materials,

도 2는 본 발명에 따른 건설통합DB를 이용한 건설정보 관리 시스템의 일 실시 예에 대한 구성을 설명하기 위한 블록도,2 is a block diagram illustrating a configuration of an embodiment of a construction information management system using a construction integrated DB according to the present invention;

도 3, 도 4는 본 발명에 따른 건설통합DB를 이용한 건설정보 관리 시스템의 일 실시 예에 대한 상세한 구성을 설명하기 위한 블록도,3 and 4 are block diagrams for explaining a detailed configuration of an embodiment of a construction information management system using a construction integrated DB according to the present invention;

도 5는 본 발명에 따른 건설도면파일로부터 도면 수치 데이터를 추출하는 방법을 설명하기 위한 동작 흐름도,5 is an operation flowchart illustrating a method of extracting drawing numerical data from a construction drawing file according to the present invention;

도 6은 본 발명에 따른 건설 자재에 대한 물량 및 내역을 산출하는 방법을 설명하기 위한 동작 흐름도,6 is an operation flowchart for explaining a method for calculating quantities and details of construction materials according to the present invention;

도 7은 본 발명에 따른 시공 원가와 연계된 공정계획을 설계하는 방법을 설명하기 위한 동작 흐름도,7 is an operation flowchart illustrating a method of designing a process plan associated with construction costs according to the present invention;

도 8은 본 발명에 따른 공정 진행 단계 별로 시공에 소요되는 자재 발주를 처리하는 방법을 설명하기 위한 동작 흐름도.8 is a flowchart illustrating a method of processing a material order required for construction for each process step according to the present invention.

<도면 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

100 : 사용자 단말기 150 : 자재업체 관리서버100: user terminal 150: material company management server

151 : 웹서버 152 : 자재관리모듈151 web server 152: material management module

153 : 자재DB 200 : 네트워크 통신망153: Material DB 200: Network Communication Network

300 : 건설정보 관리서버 310 : 건설도면 관리모듈300: construction information management server 310: construction drawing management module

311 : 도면데이터 추출모듈 320 : 적산처리모듈311: drawing data extraction module 320: integration processing module

321 : 물량산출모듈 322 : 내역산출모듈321: quantity calculation module 322: breakdown calculation module

331 : 공정관리모듈 331 : 공정설계모듈331: process control module 331: process design module

332 : 공정시뮬레이션모듈 333 : 현장관리모듈332: process simulation module 333: field management module

340 : 자재수급모듈 341 : 자원관리모듈340: Supply and demand module 341: Resource management module

342 : 구매요구서전송모듈 343 : 견적서중개지원모듈342: Purchase Request Transfer Module 343: Quotation Broker Support Module

350 : 건설통합DB 351 : 자원DB350: construction integration DB 351: resource DB

352 : 도면수치DB 353 : 건설도면DB352: Drawing figuresDB 353: Construction drawing DB

354 : 물량DB 355 : 내역DB354: Quantity DB 355: Description DB

356 : 공정정보DB 357 : 자재정보DB356: Process Information DB 357: Material Information DB

358 : 자재업체정보DB358: Material Business Information DB

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시 예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

이하에서의 본 발명은 건설정보 관리서버에 유/무선 네트워크 통신망에 접속 가능한 사용자 단말기를 통하여 건설을 구성하는 요소인 건축, 설비, 전기 분야를 포함하는 건설 관련 정보를 제공하는 건설통합DB를 이용한 건설정보 관리 방법 및 그를 지원하도록 구현되는 시스템을 바람직한 실시 예로써 설명할 것이나, 본 발명의 기술적 사상은 이에 한정하거나 제한되지 않고 당업자에 의해 변형되어 다양하게 실시될 수 있음은 물론이다.The present invention in the following construction using the integrated construction DB to provide the construction information management server, the construction related information including the construction, equipment, electrical fields that constitute the construction through a user terminal connected to the wired / wireless network communication network An information management method and a system implemented to support the same will be described as a preferred embodiment, but the technical idea of the present invention is not limited thereto and can be variously modified and implemented by those skilled in the art.

또, 상기 본 발명의 바람직한 실시예는 본 발명의 방법을 실행하도록 프로그램된 컴퓨터 시스템 및 컴퓨터 프로그램 제품과 같은 실시예를 포함한다. 컴퓨터 시스템의 실시예에 따르면, 방법을 실행하기 위한 명령어 세트는 하나 또는 그이상의 메모리(램)에 상주하며, 이들 명령어 세트는 컴퓨터 시스템에서 필요로 할 때까지 예를 들어 하드디스크 등과 같은 다른 컴퓨터 메모리에 컴퓨터 프로그램 제품으로써 저장될 수 있다.Further, preferred embodiments of the present invention include embodiments such as computer systems and computer program products programmed to carry out the methods of the present invention. According to an embodiment of a computer system, a set of instructions for carrying out a method resides in one or more memories (RAM), which sets of other computer memory, such as, for example, a hard disk, until needed by the computer system. Can be stored as a computer program product.

도 2는 본 발명에 따른 건설통합DB를 이용한 건설정보 관리 시스템의 일 실시 예에 대한 구성을 설명하기 위한 블록도이며, 도 3 및 도 4는 본 발명에 따른 건설통합DB를 이용한 건설정보 관리 시스템의 일 실시 예에 대한 상세한 구성을 설명하기 위한 블록도이다.Figure 2 is a block diagram for explaining the configuration of an embodiment of a construction information management system using a construction integrated DB according to the present invention, Figures 3 and 4 is a construction information management system using a construction integrated DB according to the present invention. A block diagram for explaining a detailed configuration of an embodiment of the.

먼저, 도 2를 참조하면, 본 발명에 따른 건설정보 관리 서버(300)는, 상기사용자가 CAD 프로그램을 이용하여 제작된 2차원 또는 3차원 건설도면파일로부터 도면 수치 데이터를 추출하고, 상기 추출된 도면 수치 데이터를 이용하여 건축, 설비, 전기 분야 각각에 대응하는 건설관련정보를 생성하는 한편, 상기 생성된 건설관련정보를 이용하여 공정진행별로 소요되는 자재의 물량과 품량을 산출하고, 상기 산출된 물량과 품량에 해당되는 단가정보를 적용시켜 부위별, 공종별로 내역을 산출하는 한편, 상기 산출된 내역을 바탕으로 시공원가와 공정이 연계된 공정 계획을 작성하며, 상기 작성된 공정 계획을 시뮬레이션한 후, 상기 시뮬레이션된 결과와 시공에 소요되는 자재를 이용하여 구매요구서를 생성하고, 상기 생성된 구매요구서를 네트워크 통신망(200)을 통해 구매 공고 및 견적서 중개 후 낙찰되도록 지원한다.First, referring to FIG. 2, the construction information management server 300 according to the present invention extracts the numerical value data from a two-dimensional or three-dimensional construction drawing file produced by the user using a CAD program. While the construction-related information corresponding to each of the building, equipment, and electrical fields is generated using the numerical data of the drawings, the quantity and quantity of materials required for each process is calculated using the generated construction-related information, and the calculated After applying the unit price information corresponding to the quantity and quantity of the product to calculate the details for each part and the type of work, based on the calculated details, create a process plan linked to the city park price and the process, and simulates the prepared process plan In addition, the purchase request is generated using the simulated results and materials required for construction, and the generated purchase request network communication network 200 Through the purchase announcement and quotation brokerage to support the successful bid.

상기 네트워크 통신망(200)은 인터넷, 인프라, 왑(WAP) 등을 비롯한 유, 무선 통신망을 모두 포함하고 있으며, 사용자에게 온라인 상으로 건설 관련 정보가 제공될 수 있도록 지원한다.The network communication network 200 includes both wired and wireless communication networks including the Internet, infrastructure, and WAP, and supports the construction-related information to be provided to the user online.

상기 사용자 단말기(100)는 유/무선 통신 네트워크에 접속 가능하도록 지원하는 통신인터페이스 모듈을 포함한다.The user terminal 100 includes a communication interface module for supporting access to a wired / wireless communication network.

또한, 상기 사용자 단말기(100)는 업체용 단말기를 포함하며, 하나 또는 그 이상의 웹 브라우저를 탑재할 수 있다.In addition, the user terminal 100 may include a terminal for a company and may include one or more web browsers.

도 3을 참조하면, 상기 건설정보 관리 서버(300)는 건설도면 관리모듈(310), 적산처리모듈(320), 공정관리모듈(330), 자재수급모듈(340), 건설통합DB(350)을 포함한다.Referring to FIG. 3, the construction information management server 300 includes a construction drawing management module 310, an integration processing module 320, a process management module 330, a material supply and demand module 340, and a construction integrated DB 350. It includes.

상기 건설통합DB(350)에는 자원DB(351), 도면수치DB(352), 건설도면DB(353), 물량DB(354), 내역DB(355), 공정정보DB(356), 자재정보DB(357), 자재업체정보DB(358)를 포함한다.The construction integration DB 350 includes a resource DB 351, a drawing value DB 352, a construction drawing DB 353, a quantity DB 354, a detail DB 355, a process information DB 356, and a material information DB. 357, a material supplier information DB 358.

상기 건설통합DB(350)에는 건축, 설비, 전기 분야를 모두 포함하여 구축되어있다.The integrated construction DB 350 is built to include all the construction, equipment, electrical fields.

상기 건설도면DB(353)에는 상기 사용자가 CAD(CAD: Computer-Aided Design)프로그램을 이용하여 제작된 2차원 또는 3차원 건설도면파일을 저장하고 있다.The construction drawing DB 353 stores a two-dimensional or three-dimensional construction drawing file produced by the user using a computer-aided design (CAD) program.

또한, 상기 건설정보 관리 서버(300)는 상기 건설통합DB(350)에 저장된 정보 중 상기 사용자가 선택한 정보를 검색할 수 있도록 지원한다.In addition, the construction information management server 300 supports searching for the information selected by the user among the information stored in the construction integration DB (350).

또한, 건설정보 관리 서버(300)는 건설을 구성하는 각 구성요소별 자재를 공정진행 단계별로 산출하여, 상기 산출된 자재에 해당되는 비용을 서비스 요청한 사용자 단말기(100)로 전송한다.In addition, the construction information management server 300 calculates the material for each component constituting the construction step by step, and transmits the cost corresponding to the calculated material to the user terminal 100 requesting service.

상기 건설도면 관리모듈(310)은 사용자에 의해 CAD프로그램을 이용하여 제작된 2차원 또는 3차원 건설도면파일로부터 도면 수치 데이터를 추출하고, 상기 추출된 도면 수치 데이터를 이용하여 객체식별정보를 생성하고, 상기 생성된 객체식별정보를 건설통합DB(350)에 해당 건설도면파일과 대응시켜 저장 및 관리한다.The construction drawing management module 310 extracts drawing numerical data from a two-dimensional or three-dimensional construction drawing file produced by a user using a CAD program, and generates object identification information using the extracted drawing numerical data. In addition, the generated object identification information is stored and managed in correspondence with the corresponding construction drawing file in the construction integration DB 350.

상기 객체식별정보는 사업체명, 도면번호 및/또는 CAD에서 부여하는 핸들(handle)값을 조합하여 코드를 생성하고, 다시 정수로 변환하여 생성된 고유식별자이다.The object identification information is a unique identifier generated by generating a code by combining a business name, drawing number and / or handle value given by CAD, and converting the result into an integer.

상기 건설도면 관리모듈(310)을 구성하는 도면 데이터 추출모듈(311)은 CAD프로그램을 이용하여 제작된 2차원 또는 3차원 건설도면파일로부터 도면 수치 데이터를 추출하고, 상기 추출된 도면 수치 데이터를 객체화한 다음, 이를 식별할 수 있는 객체 식별자(Object ID)를 생성하여 부여한 후에 건설통합DB(350)를 구성하는 도면수치DB(352)를 구축하게 된다.The drawing data extraction module 311 constituting the construction drawing management module 310 extracts drawing numerical data from a two-dimensional or three-dimensional construction drawing file produced using a CAD program, and objectizes the extracted drawing numerical data. Next, after generating and assigning an object ID (Object ID) for identifying the same, a drawing value DB 352 constituting the construction integration DB 350 is constructed.

상기 객체 식별자는 캐드 도면에 그려져 있는 기둥, 문, 벽 등 건물을 이루고 있는 각각의 구성 요소들을 하나의 객체로 관리하기 위해서 사업과 도면단위로 유일하게 부여한 값이다.The object identifier is a value uniquely assigned to each project and drawing unit in order to manage each component constituting the building such as a column, a door, and a wall drawn in the CAD drawing as one object.

상기 객체 식별자를 부여하는 방법은 사업체명과 도면명, 그리고 도면 내 각 객체의 핸들값을 조합하여 DBMS에서 제공해주는 DBMS별로 유일한 정수 값을 부여하여 사용한다.In the method of assigning the object identifier, a unique integer value for each DBMS provided by the DBMS is used by combining a business name, a drawing name, and a handle value of each object in the drawing.

상기 적산처리모듈(320)은 상기 추출된 도면 수치 데이터를 이용하여 각 구성요소별 자재를 상기 자재정보DB(357)의 자재정보로부터 검색하고, 상기 검색된 자재 중 상기 사용자로부터 선택된 자재를 이용하여 공정진행단계별 및/또는 부위별 비용을 산출한다.The integration processing module 320 retrieves the material for each component from the material information of the material information DB 357 by using the extracted drawing numerical data, and processes using the material selected from the user among the searched materials. Calculate cost by stage and / or site.

또한, 상기 적산처리모듈(320)은 공정관리모듈(330)로부터 각 공정진행 단계별로 필요한 자재를 전송받아 비용을 산출한다.In addition, the integration processing module 320 receives the necessary materials for each process progress step from the process management module 330 to calculate the cost.

또한, 상기 적산처리모듈(320)은 상기 검색된 자재에 대한 단가가 미리 설정되어 있지 않은 경우, 상기 사용자 단말기(100)로 상기 자재에 대한 품셈 정보지를 제공하고, 상기 사용자가 품셈 정보지를 통해 선택한 단가를 통해 공정별 및/또는 부위별 비용을 산출한다.In addition, when the unit price for the searched material is not set in advance, the integration processing module 320 provides a product information sheet for the material to the user terminal 100, and the unit price selected by the user through the product information sheet. Calculate cost by process and / or site by.

또한, 상기 적산처리모듈(320)은 물량산출모듈(321), 내역산출모듈(322)을 포함한다.In addition, the integration processing module 320 includes a quantity calculation module 321, a history calculation module 322.

상기 물량산출모듈(321)은 도면데이터 추출모듈(311)로부터 추출된 도면 수치 데이터를 이용하여 건설 자재별 물량과 품량을 산출한 다음, 산출된 물량과 품량을 물량DB(354)에 저장하는데, 이때 각 객체를 시공하는 공종분류에 따라 물량을 식별할 수 있는 물량 식별자(MID: Material ID)를 부여하게 된다.The quantity calculation module 321 calculates the quantity and quantity of each building material by using the numerical value data extracted from the drawing data extraction module 311, and then stores the calculated quantity and quantity in the quantity DB 354. At this time, a material ID (MID: Material ID) is provided to identify the quantity according to the type of construction for each object.

상기 공종분류에는 가설공사, 토공사, 지정 및 기초공사, 철콘공사, ALC블록 및 패널 공사, 프리캐스트 철콘공사, 철골공사, 벽돌공사, 블록공사, 돌공사, 타일 및 테라코타공사, 목공사, 방수공사, 지붕 및 홈통공사, 금속공사, 커튼월공사, 미장공사, 온돌공사, 창호공사, 유리공사, 플라스틱공사, 칠공사, 수장공사, 조경공사, 단열공사, 특수건축공사, 해체공사, 전기공사 등이 있다The work classification includes temporary construction, earthworks, designation and foundation work, iron cone construction, ALC block and panel construction, precast iron construction, steel construction, brick construction, block construction, stone construction, tiles and terracotta construction, wood construction, waterproof construction, Roof and gutter construction, metal construction, curtain wall construction, plastering, ondol construction, window construction, glass construction, plastic construction, lacquer construction, storage construction, landscaping construction, insulation construction, special construction construction, dismantling construction, electrical construction, etc. have

상기 내역산출모듈(322)은 물량산출모듈(321)을 통해 산출된 물량 및 품량에 해당되는 단가정보를 적용시켜 부위별, 공종별 내역을 산출하고, 상기 산출된 내역을 건설통합DB(350)의 내역DB(355)에 저장한다.The details calculation module 322 is applied to the unit price information corresponding to the quantity and quantity of goods calculated through the quantity calculation module 321 to calculate the details for each part, the type of work, and the calculated details of the construction integrated DB (350) The details are stored in the DB 355.

상기 공정관리모듈(330)은 상기 도면 수치 데이터를 통해 각 구성요소별로 검색된 자재를 해당 건설도면파일에 적용시켜 공종별 및/또는 부위별로 시뮬레이션하고, 상기 시뮬레이션된 결과를 통해 공정정보를 생성하고, 상기 생성된 공정정보를 이용하여 공정정보DB(356)를 구축한다.The process management module 330 applies the material searched for each component through the numerical data of the drawing to the corresponding construction drawing file, and simulates it for each type and / or part, and generates process information through the simulated results. The process information DB 356 is constructed using the generated process information.

또한, 상기 공정관리모듈(330)은 상기 사용자의 공정정보 등록 요청신호에 반응하여, 공정 일정을 입력할 수 있는 공정일정 등록웹페이지를 사용자단말기(100)로 전송하고, 상기 사용자 단말기(100)로부터 상기 웹페이지를 통해 공정 식별정보, 활동명, 활동 예상 시작일 및/또는 예상 종료일을 입력받고, 상기 입력받은 정보를 상기 공정정보DB(356)에 해당 공정정보와 대응시켜 저장하며, 상기 공정정보를 이용하여 건설현장에서 시공과 시공결과를 이용하여 공정일정을 관리한다.In addition, the process management module 330 transmits a process schedule registration web page to the user terminal 100 in response to the user's process information registration request signal and inputs a process schedule, and the user terminal 100. Process identification information, activity name, activity start date and / or expected end date are received from the web page, and the received information is stored in correspondence with the process information in the process information DB 356, and the process information The process schedule is managed at the construction site using the construction and construction results.

또한, 상기 공정관리모듈(330)은 공정설계모듈(331), 공정시뮬레이션모듈(332), 현장관리모듈(333)을 포함한다.In addition, the process management module 330 includes a process design module 331, a process simulation module 332, a site management module 333.

상기 공정설계모듈(331)은 건설통합DB(350)의 물량DB(354), 내역DB(355), 그리고 자원DB(351)에서 필요한 데이터를 추출하여 내역 산출한 결과를 공정과 연계하여 공정계획을 설계하고, 각 공정 활동(activity)별로 각 활동을 식별하기 위한 활동 식별자(AID: Activity ID)를 부여하게 된다.The process design module 331 is a process plan to extract the necessary data from the quantity DB 354, the history DB 355, and the resource DB 351 of the construction integration DB 350 and the details of the process calculation in connection with the process In this case, each activity is assigned an activity identifier (AID) for identifying each activity.

상기 공정시뮬레이션모듈(332)은 이렇게 설계된 공정 계획을 이용하여 부위별이나 공종별 또는 금액을 기준으로 3차원 그래픽 기술을 이용하여 시뮬레이션을 수행한다.The process simulation module 332 performs a simulation using a three-dimensional graphics technology based on the part, the type of work or the amount of money using the process plan designed as described above.

상기 현장관리모듈(333)은 건설공사현장에서 공정의 실행과 시공 결과를 입력받으면 이를 공정정보DB(356)에 저장하게 된다.The site management module 333 receives the execution and construction results of the process at the construction site and stores them in the process information DB 356.

상기 활동 식별자는 건설 공사의 종류에 따라 분류한 공정을 수행하는데, 각 작업이 수행되는 활동별 분할 단위이며, 이때 각각의 활동을 유일하게 식별하기 위한 식별자이다.The activity identifier performs a process classified according to the type of construction work, and is a division unit for each activity in which each work is performed, and is an identifier for uniquely identifying each activity.

또한, 상기 활동 식별자는 사업별로 유일하게 부여되며, 9자리로 구성된 코드를 가진다. 활동은 일반적으로 해당 활동에 사용되는 자재에 따라 분류되는 특징이 있어 자재 식별자에 일련번호를 추가한 형태로 사용된다.In addition, the activity identifier is uniquely assigned to each business and has a 9-digit code. Activities are generally characterized by the materials used in the activity, so they are used in the form of a serial number appended to the material identifier.

상기 자재수급모듈(340)은 건설통합DB(350)에 저장된 자재정보, 공정정보와 해당 공정에 사용될 자재의 품명과 수량, 자재의 납기일을 이용하여 구매요구서를 생성하며, 상기 생성된 구매요구서를 네트워크 통신망(200)을 통하여 구매 공고를 한다.The supply and demand module 340 generates a purchase requisition using the material information, the process information, the item name and quantity of the material to be used in the corresponding process, the delivery date of the material, and the generated purchase requisition module 340. The purchase notification is made through the network communication network 200.

또한, 상기 자재수급모듈(340)은 자원관리모듈(341), 구매요구서전송모듈(342), 견적서중개지원모듈(343)을 포함한다.In addition, the material supply module 340 includes a resource management module 341, a purchase request transmission module 342, and a quote brokerage support module 343.

상기 자재수급모듈(340)은 상기 건설도면파일에 적용된 자재 및/또는 공정정보를 이용하여 공정진행별 구매요구서를 생성하고, 상기 생성된 구매요구서를 이용하여 구매요구서등록웹페이지를 형성한다.The material supply and demand module 340 generates a purchase request for each process progress using materials and / or process information applied to the construction drawing file, and forms a purchase request registration web page using the generated purchase request.

또한, 자재수급모듈(340)은 상기 생성된 구매요구서에 해당되는 자재업체를 상기 자재업체정보DB(358)로부터 검색한 다음, 상기 검색된 자재업체로 상기 구매요구서를 전송하는 한편, 상기 구매요구서를 전송받은 자재업체로부터 상기 구매요구서에 상응하는 견적서를 전송받고, 상기 전송받은 견적서를 중개하여 낙찰되도록 지원하고, 상기 중개된 견적서가 낙찰된 경우, 상기 낙찰된 견적서를 식별할 수 있는 거래식별정보를 생성하고, 상기 생성된 거래식별정보를 이용하여 비용이 결제되도록 지원한다.In addition, the material supply module 340 retrieves the material supplier corresponding to the generated purchase requisition from the material supplier information DB 358, and then transmits the purchase requisition to the retrieved material supplier, while the purchase requisition Receiving a quotation corresponding to the purchase request from the received material supplier, and assists the successful bid by mediating the received quotation, and if the brokered quotation is successful, the transaction identification information for identifying the successful quotation It generates and supports the payment is made using the generated transaction identification information.

상기 구매요구서는 각 공정이 실행될 일정과, 공정에 사용되는 자재 및/또는 납기에 대한 정보를 갖는다.The purchase requisition has a schedule for each process to be executed and information on materials and / or delivery date used in the process.

상기 구매요구서전송모듈(342)은 상기 건설도면파일에 적용된 자재 및/또는 공정정보를 이용하여 생성된 구매요구서에 해당되는 자재업체를 상기 자재업체정보DB(358)로부터 검색한 다음, 상기 검색된 자재업체로 상기 구매요구서를 전송한다.The purchase requisition transmission module 342 searches for a material company corresponding to the purchase requisition generated using the material and / or process information applied to the construction drawing file from the material company information DB 358, and then retrieves the retrieved material. Send the purchase requisition to the company.

또한, 상기 구매요구서전송모듈(342)은 건설통합DB(350)에 있는 자재정보DB(357)와 물량DB(354), 그리고 공정정보DB(356)를 이용하여 각 공정이 실행될 일정과, 해당 공정에 사용되는 자재의 품명과 수량, 그리고 납기 등을 참조하여 구매요구서를 생성하고, 상기 생성된 구매요구서를 식별할 수 있는 구매 식별자(PID: Purchase ID)를 부여한 다음, 자재업체정보DB(358)에 저장한다.In addition, the purchase requisition transmission module 342 is a schedule for executing each process using the material information DB 357, the quantity DB 354, and the process information DB 356 in the construction integration DB 350, and Create a purchase requisition by referring to the item name, quantity, and delivery date of the material used in the process, and give a purchase ID (PID) to identify the generated purchase requisition, and then the material supplier information DB (358). ).

상기 견적서중개지원모듈(343)은 상기 구매요구서전송모듈(342)을 통해 구매요구서를 전송받은 자재업체로부터 상기 구매요구서에 상응하는 견적서를 전송받고, 상기 전송받은 견적서를 건설관련 서비스를 요청한 해당 사용자와 중개하여 낙찰되도록 지원한다.The quotation intermediary support module 343 receives the quotation corresponding to the purchase request from the material company that received the purchase request through the purchase request transmission module 342, and the corresponding user who requested the construction related service. It supports mediating and winning bids.

또한, 상기 견적서중개지원모듈(343)은 상기 중개된 견적서가 낙찰된 경우, 상기 낙찰된 견적서를 식별할 수 있는 거래식별정보를 생성하고, 상기 생성된 거래식별정보를 이용하여 서비스 요청된 건설도면파일에 해당되는 내역에 의해 비용이 결제되도록 지원한다.In addition, the quotation intermediary support module 343, when the mediated quotation is successful, generates a transaction identification information for identifying the successful quotation, and the construction request requested for the service using the generated transaction identification information It supports to pay the cost based on the file.

그러면, 상기 자원관리모듈(341)은 구매 요구서를 주기적으로 확인하여 네트워크 통신망(200)을 통하여 구매 공고를 하며, 상기 구매 공고는 견적 요청 식별자(QID: Quotation ID)를 부여하여 각각을 식별하게 된다. 도 4를 참조하면,자재업체의 웹서버(151)에서는 구매 공고를 접수하게 되며, 자재관리모듈(152)과 자재DB(153)를 이용하여 필요한 견적서를 작성하여 네트워크 통신망(200)을 통하여 전송하게 된다.Then, the resource management module 341 periodically checks the purchase request and makes a purchase announcement through the network communication network 200, and the purchase announcement is assigned a Quotation ID (QID) to identify each. . Referring to Figure 4, the web server 151 of the material supplier receives the purchase notice, using the material management module 152 and the material DB 153 to create the necessary quotations and transmit through the network communication network 200 Done.

상기 견적 요청 식별자는 생성된 구매요구서에 대해서 자재공급업체로부터 견적서를 받는데, 각 자재업체로부터 접수된 견적서를 유일하게 식별하기 위한 식별자이며, 구매 식별자에 공급 업체별 코드를 부여한다.The quotation request identifier receives a quotation from the material supplier for the generated purchase requisition, and is an identifier for uniquely identifying the quotation received from each material supplier, and gives a supplier-specific code to the purchase identifier.

상기 자재업체 관리서버(150)는 상기 구매요구서전송모듈(342)을 통해 구매요구서를 전송받고, 상기 자재업체 관리서버(150)는 자재관리모듈(152) 및 자재DB(153)를 이용하여 구매요구서에 상응하는 견적서를 생성하고, 상기 생성된 견적서를 상기 견적서 중개지원모듈(343)로 전송한다.The material company management server 150 receives the purchase request through the purchase request transmission module 342, and the material company management server 150 purchases using the material management module 152 and the material DB 153. A quotation corresponding to the request is generated, and the generated quotation is transmitted to the quotation brokerage support module 343.

그후, 상기 건설정보 관리서버(300)는 해당 구매 요구서와 접수된 견적서를 비교하여 해당되는 견적서를 자재업체 관리서버(150)로 전송하고, 상기 자재업체 관리서버(150)는 웹서버(151)를 통해 상기 전송된 견적서를 제출한 자재업체와 구매 계약을 체결하고, 이를 해당 업체에 통보하게된다.Thereafter, the construction information management server 300 compares the purchase request with the received quotation and transmits the corresponding quotation to the material company management server 150, and the material company management server 150 is the web server 151. Through a contract with the material company submitting the quotation sent through the will be notified to the company.

이때, 각 구매 계약은 거래 식별자(TID: Transcation ID)를 부여하여 구별하게 된다. 구매 계약을 체결한 자재업체로부터 오프라인으로 해당 자재를 납품 받은 후에 네트워크 통신망(200)을 통하여 자재 대금을 결제하게 된다.At this time, each purchase contract is distinguished by giving a transaction ID (TID: Transcation ID). After receiving the material off-line from a material company that signed a purchase contract, the material price is paid through the network communication network 200.

상기 거래 식별자는 건물을 구성하는 각 객체들이 어떤 자재를 사용하는지 여부를 식별하기 위해 부여한 값이고, 7자리로 구성된 코드를 사용하며, 대분류, 중분류, 소분류, 세분류, 세세분류로 블록화된 코드로 구성된다.The transaction identifier is a value assigned to identify which materials are used by each object constituting the building, and uses a seven-digit code and consists of codes that are classified into major, medium, small, sub, and sub categories. do.

또한, 상기 거래 식별자는 특정한 구매 식별자에 대해서 자재 공급 업체와 실제 거래를 하는 경우, 각 거래를 유일하게 식별하고, 구매 식별자에 거래를 유일하게 식별하기 위한 코드를 추가하여 구성된다.In addition, the transaction identifier is configured by uniquely identifying each transaction and adding a code for uniquely identifying the transaction when the actual transaction is made with the material supplier for a specific purchase identifier.

또한, 상기 거래 식별자는 해당 구매 식별자에 대해서 자재가 제대로 납품되었는지 여부를 관리하는데 사용되며 해당 자재가 완전히 납품된 후에 자재 대금을 지급하는데 사용하게 된다.In addition, the transaction identifier is used to manage whether the material has been properly delivered to the purchase identifier and is used to pay for the material after the material is completely delivered.

상기 모듈들은 도 3에 도시된 바와 같이 건설정보 관리 서버(300)내에 모두 포함되어 있으나, 이들 모듈들은 네트워크로 구성된 시스템에 건설도면 관리모듈(310), 적산처리모듈(320), 공정관리모듈(330), 자재수급모듈(340)이 각각 분리되어 있거나, 몇 개의 모듈 단위로 네트워크 통신망(200)에 연결된 건설정보 관리 서버(300)를 구축할 수도 있다.The modules are all included in the construction information management server 300 as shown in FIG. 3, but these modules are constructed in a networked system, such as a construction drawing management module 310, an integration processing module 320, and a process management module. 330 and the material supply and demand module 340 may be separated from each other, or the construction information management server 300 connected to the network communication network 200 may be constructed in units of several modules.

도 5는 본 발명에 따른 건설도면파일로부터 도면 수치 데이터를 추출하는 방법을 설명하기 위한 동작 흐름도이다.5 is a flowchart illustrating a method of extracting drawing numerical data from a construction drawing file according to the present invention.

먼저, 상기 건설도면 관리모듈(310)의 도면데이터 추출모듈(311)은 상기 사용자 단말기(100)로부터 건설도면파일이 입력되면, AutoCAD 프로그램에서 도면 파일 열기(S401)를 한 다음, 도면 데이터 읽기 프로그램을 실행하여(S402), 도면 파일에서 직접 건축, 설비, 전기 분야를 포함하는 객체별 도면 수치 데이터를 추출한다(S403).First, the drawing data extraction module 311 of the construction drawing management module 310, when a construction drawing file is input from the user terminal 100, opens the drawing file in the AutoCAD program (S401), and then reads the drawing data reading program. In operation S402, drawing numerical data for each object including a building, equipment, and an electric field are directly extracted from the drawing file (S403).

상기 도면데이터 추출모듈(311)은 상기 추출된 도면수치데이터를 도면수치DB(352)에 이미 저장되어 있는지를 확인한다(S404). 그 후, 상기 건설도면관리모듈(310)은 도면수치DB(352)에 도면 수치 데이터가 있는지를 판단한다(S405).The drawing data extraction module 311 checks whether the extracted drawing numerical data is already stored in the drawing numerical database 352 (S404). Thereafter, the construction drawing management module 310 determines whether there is drawing numerical data in the drawing value DB 352 (S405).

상기 S405의 판단결과, 도면수치DB(352)에 도면 수치 데이터가 없는 경우, 건설도면 관리모듈(310)은 새로운 객체 데이터와 객체 식별자를 생성한다(S407).As a result of the determination in S405, when there is no figure numerical data in the drawing value DB 352, the construction drawing management module 310 generates new object data and an object identifier (S407).

상기 S405의 판단결과, 도면수치DB(352)에 도면 수치 데이터가 있는 경우, 건설도면 관리모듈(310)은 변경된 데이터를 수정한다(S406).As a result of the determination in S405, when there is numerical value data in the drawing value DB 352, the construction drawing management module 310 modifies the changed data (S406).

그 후, 상기 건설도면 관리모듈(310)은 다음 객체가 있는지를 판단하여(S408), 상기 S408의 판단결과, 다음 객체가 있는 경우, 객체별 도면 수치 데이터를 추출하는 S403으로 돌아가고, 상기 S408의 판단결과, 다음 객체가 없는 경우, 종료한다.Thereafter, the construction drawing management module 310 determines whether there is a next object (S408), and when the result of the determination of S408, if there is a next object, returns to S403 for extracting drawing numerical data for each object, and If it is determined that there is no next object, it ends

도 6은 본 발명에 따른 건설 자재에 대한 물량 및 내역을 산출하는 방법을 설명하기 위한 동작 흐름도이다.6 is an operation flowchart for explaining a method for calculating the quantity and details of construction materials according to the present invention.

상기 적산처리모듈(320)은 상기 도면데이터 추출모듈(311)에서 추출된 도면 수치데이터를 도면수치DB(352)로부터 읽어들이고(S501), 상기 읽어들인 도면수치데이터가 물량 산출 대상 객체인지를 판단한다(S502).The integration processing module 320 reads the drawing numerical data extracted by the drawing data extraction module 311 from the drawing value DB 352 (S501), and determines whether the read drawing value data is a quantity calculation target object. (S502).

상기 S502의 판단결과, 도면수치데이터가 물량 산출 대상 객체가 아닌 경우, 후술하는 물량 산출 작업이 종료되었는지를 판단한다.As a result of the determination in S502, when the figure value data is not the quantity calculation object, it is determined whether the quantity calculation operation described later is finished.

상기 S502의 판단결과, 도면수치데이터가 물량 산출 대상 객체인 경우, 상기 적산처리모듈(320)은 작업분류체계 및 공종분류체계에 따라 자원 식별자(MID)를 부여(S503)한 다음, 해당 객체에 관련된 스케줄 데이터와 리스트 데이터가 있는지를 판단한다(S504).As a result of the determination in S502, when the figure data is a quantity calculation object, the integration processing module 320 assigns a resource identifier (MID) according to the work classification system and the work classification system (S503), and then assigns the corresponding object to the corresponding object. It is determined whether there is related schedule data and list data (S504).

상기 S504의 판단결과, 해당 객체에 관련된 스케줄 데이터와 리스트 데이터가 없는 경우, 적산처리모듈(320)은 도면 및 시방서를 참조하고(S505), 상기 S504의 판단결과, 해당 객체에 관련된 스케줄 데이터와 리스트 데이터가 있는 경우, 적용할 산식이 있는지를 판단한다(S506).If there is no schedule data and list data related to the object as a result of the determination in S504, the integration processing module 320 refers to the drawing and the specification (S505). As a result of the determination in S504, the schedule data and list related to the object are determined. If there is data, it is determined whether there is a formula to be applied (S506).

상기 S506의 판단결과, 적용할 산식이 있는 경우, 물량산출모듈(321)은 물량을 자동으로 산출한다(S508). 상기 S506의 판단결과, 적용할 산식이 없는 경우, 산식을 입력하고(S507), 그 후에 물량을 자동으로 산출한다.As a result of the determination in S506, when there is a formula to be applied, the quantity calculation module 321 automatically calculates quantity (S508). As a result of the determination in S506, when there is no formula to be applied, the formula is input (S507), and then the quantity is automatically calculated.

상기 적산처리모듈(320)은 상기 물량산출모듈(321)로부터 물량이 산출되면, 물량 산출 작업이 완료되었는지를 판단하고(S509), 상기 S509의 판단결과, 물량 산출 작업이 종료되지 않은 경우, 다시 도면수치데이터를 읽어들이는 S501로 이동한다.When the quantity is calculated from the quantity calculating module 321, the integration processing module 320 determines whether the quantity calculating operation is completed (S509), and when the quantity calculating operation is not finished, the determination result of S509 is again. It moves to S501 which reads drawing numerical data.

상기 S509의 판단결과, 물량 산출 작업이 종료된 경우, 상기 내역산출모듈(322)은 내역 산출을 위하여 해당 자재에 대한 단가 정보가 있는지를 판단한다(S510). 상기 S510의 판단결과, 해당 자재에 대한 단가 정보가 없는 경우, 품셈 정보지를 해당 사용자 단말기(100)로 제공하고, 상기 제공된 품셈 정보지를 통해 상기 사용자로부터 단가 정보를 입력받는다(S511).As a result of the determination in S509, when the quantity calculation operation is finished, the details calculation module 322 determines whether there is unit price information on the corresponding material for details calculation (S510). As a result of the determination in S510, if there is no unit price information on the material, a product information sheet is provided to the user terminal 100, and the unit price information is input from the user through the provided product information sheet (S511).

상기 S510의 판단결과, 해당 자재에 대한 단가 정보가 있는 경우, 내역산출모듈(322)은 내역을 부위별, 공종별로 산출 후(S512), 내역DB(355)에 저장하고 종료한다.As a result of the determination in S510, when there is unit price information on the corresponding material, the details calculation module 322 calculates the details for each part and the work type (S512), and stores the details in the DB 355 and ends.

상기 적산처리모듈(320)은 각 공정진행 단계별로 필요한 자재를 산출하고,상기 산출된 자재에 해당되는 비용을 서비스 요청된 사용자 단말기(100)로 전송한다.The integration processing module 320 calculates a necessary material for each process progression step, and transmits the cost corresponding to the calculated material to the user terminal 100 for the service request.

도 7은 본 발명에 따른 시공 원가와 연계된 공정계획을 설계하는 방법을 설명하기 위한 동작 흐름도이다.7 is a flowchart illustrating a method of designing a process plan associated with construction costs according to the present invention.

먼저, 공정관리모듈(330)은 상기 사용자 단말기(100)로부터 공정설계 초기화 요청신호가 입력되었는지를 판단한다(S601).First, the process management module 330 determines whether a process design initialization request signal is input from the user terminal 100 (S601).

상기 S601의 판단결과, 상기 사용자 단말기(100)로부터 공정설계 초기화 요청신호가 입력되지 않은 경우, 상기 공정설계모듈(331)은 내역 산출 결과를 부위별 공종에 따라 계층구조로 나타낸 내역 계층구조 화면을 초기화한다(S608).When the process design initialization request signal is not input from the user terminal 100, the process design module 331 displays a detail hierarchical structure screen in which a detail calculation result is displayed in a hierarchical structure according to each type of work. Initialize (S608).

그러면, 공정설계모듈(331)은 내역DB(355)에서 추출된 내역 산출 결과를 추출하여 내역 산출 결과를 공종별, 부위별, 그리고 자재에 따라 계층구조로 표시하고(S609), 후술하는 액티비티에 포함되는 내역을 설정하는 S605로 이동된다.Then, the process design module 331 extracts the breakdown calculation result extracted from the breakdown DB 355 and displays the breakdown calculation results in a hierarchical structure according to the type of work, the part, and the material (S609), which is included in the activities described below. It moves to S605 to set the details.

상기 S601의 판단결과, 상기 사용자 단말기(100)로부터 공정설계 초기화 요청신호가 입력된 경우, 상기 공정설계모듈(331)은 공정 설계에 사용되는 공정 편집 화면을 초기화한다(S602).As a result of the determination in S601, when a process design initialization request signal is input from the user terminal 100, the process design module 331 initializes a process edit screen used for process design (S602).

먼저, 공정시뮬레이션모듈(332)은 빈 액티비티(Activity) 노드를 생성한다(S603). 그 다음에 해당 액티비티에 필요한 기본 데이터로 각 활동을 식별하기 위한 공정 식별자와 활동명, 그리고 해당 활동의 예상 시작일과 예상 종료일을 상기 사용자 단말기(100)로부터 입력받는다(S604).First, the process simulation module 332 generates an empty activity node (S603). Next, a process identifier and an activity name for identifying each activity as basic data required for the activity, and an expected start date and an expected end date of the corresponding activity are received from the user terminal 100 (S604).

상기 공정관리모듈(330)은 상기 사용자 단말기(100)로부터 상기 액티비티에대한 기본 데이터 입력이 끝나면, 상기 액티비티에 포함된 내역을 내역 계층구조를 이용하여 끌기와 놓기(Drag & Drop) 방식으로 필요한 내역을 해당 액티비티에 저장하게 된다. 상기 액티비티에 포함될 내역 설정이 완료되면(S605), 상기 액티비티의 앞이나 뒤 액티비티와 사이의 공정 진행 방법과 필요한 기간을 설정하면(S606), 한 액티비티에 대한 편집 작업이 끝나게 된다.When the process management module 330 finishes inputting the basic data about the activity from the user terminal 100, the details contained in the activity are dragged and dropped using a history hierarchy. Will be stored in the activity. When setting the details to be included in the activity is completed (S605), if a process progression method and a necessary period between the activity before or after the activity are set (S606), the editing operation for one activity is completed.

그 후, 상기 공정시뮬레이션모듈(332)은 다른 액티비티에 대한 편집을 계속할 것인지를 여부를 확인하여(S607), 액티비티 편집을 계속하고자 하는 경우에는 빈 액티비티 노드를 생성하는 S603으로 진행을 이동하고, 그렇지 않으면 공정 계획 편집을 종료하게 된다.Thereafter, the process simulation module 332 checks whether or not to continue editing for another activity (S607), and if it is desired to continue editing the activity, proceeds to S603 in which an empty activity node is generated. If you do not, you will end editing the process plan.

도 8은 본 발명에 따른 공정 진행 단계 별로 시공에 소요되는 자재 발주를 처리하는 방법을 설명하기 위한 동작 흐름도이다.8 is a flowchart illustrating a method of processing a material order required for construction for each process step according to the present invention.

먼저, 자재수급모듈(340)은 건축, 설비, 전기분야를 포함하는 건설도면파일로부터 추출된 도면수치데이터에 따라 내역 산출 결과와 공정 계획 데이터를 내역DB(355)와 공정정보DB(356)에서 추출(S701)한 다음, 공정 계획 단계에서 작성한 공정 액티비티 별로 공정 일정 데이터와, 각 공정에 할당된 내역 데이터에서 해당 공정에 사용할 자재의 품명과 수량, 그리고 각 자재의 납기일 등을 추출한다(S702).First, the material supply and demand module 340 stores the details calculation result and the process plan data in the detail DB 355 and the process information DB 356 according to the drawing numerical data extracted from the construction drawing file including the building, equipment, and electrical fields. After extracting (S701), the process schedule data for each of the process activities created in the process planning step, the item name and quantity of the material to be used in the process, and the delivery date of each material are extracted from the process data assigned to each process (S702). .

상기 추출된 자재에 대한 각 업체에 대한 정보와 납기일을 자원DB(351)에서 추출하여(S704), 공정 수행 예정일과 사용 자원별 납기일, 그리고 구매에 소요되는 시간 등을 고려하여 필요한 구매 요구서를 생성한다(S704).By extracting the information and delivery date for each company for the extracted material from the resource DB (351) (S704), it is necessary to consider the expected date of carrying out the process and the delivery date for each resource used, the time required for the purchase, etc. (S704).

상기 생성된 구매 요구서를 식별할 수 있도록 각 구매 요구서에 대한 고유의 구매 요구서 식별자(PID: Purchase ID)를 생성하여 부여하게 되고, 생성된 구매 요구서에 대한 구매를 승인할 것인지를 판단한다(S705).In order to identify the generated purchase requisition, a unique purchase requisition identifier (PID) is generated and assigned to each purchase requisition, and it is determined whether to approve purchase of the generated purchase requisition (S705). .

상기 S705의 판단결과, 구매 요구서에 대한 구매를 승인할 경우, 상기 자재수급모듈(340)은 상기 자재업체정보DB(358)에 진행 요청된 구매 요구서를 저장한 다음, 네트워크 통신망(200)을 통해 구매 공고 및 견적서를 접수하고(S706), 상기 S705의 판단결과, 구매 요구서에 대한 구매를 승인하지 않을 경우, 생성된 구매 요구서를 삭제한 후에 내역 산출 결과와 공정 계획 데이터를 추출하는 S701로 이동한다.As a result of the determination in S705, when approving the purchase of the purchase request, the material supply and demand module 340 stores the purchase request requested to proceed in the material company information DB 358 and then through the network communication network 200. If the purchase notification and the quotation are received (S706), and the determination result of S705 does not approve the purchase of the purchase request, the processing proceeds to S701 after deleting the generated purchase request and extracting the details calculation result and process plan data. .

상기 네트워크 통신망(200)을 통한 구매 공고 및 견적서 접수는 구매요구서전송모듈(342)을 통해 생성된 구매 요구서를 구매 공고한 다음, 견적서 접수 기간을 설정 및 견적서 접수를 대기하게 된다(S707). 구매 요구서에 대한 견적서 제출 기한이 종료되면 접수된 견적서와 구매 요구서를 비교, 검토하여(S708), 상기 구매요구서에 해당되는 견적서가 있는지를 판단한다(S709).The purchase notification and the quotation reception through the network communication network 200 announce the purchase request generated through the purchase request transmission module 342, and then set the quotation reception period and wait for the quotation reception (S707). When the deadline for submitting the quotation for the purchase requisition ends, the received quotation is compared with the purchase requisition (S708) to determine whether there is a quotation corresponding to the purchase requisition (S709).

상기 S709의 판단결과, 상기 구매요구서에 해당되는 견적서가 있는 경우, 상기 구매요구서에 해당되는 견적서를 제출한 자재업체와 구매 계약을 통보한(S710) 후, 구매 계약을 체결하게 된다.As a result of the determination in S709, if there is a quotation corresponding to the purchase request, the purchase contract is notified after the notification of the purchase contract with the material company submitting the quotation corresponding to the purchase request (S710).

이때, 상기 구매 계약을 식별하는데 필요한 거래 식별자(TID: Transaction ID)를 생성하여 이를 자재업체에 통보하게 되고, 상기 자재업체에서는 상기 거래 식별자를 가지고 계약이 체결된 구매 요구서에 명시된 자재를 오프라인으로 납품하며, 구매 계약을 체결한 자재가 납품된 후에 상기 자재수급모듈(340)은 자재업체에게 자재대금을 온라인 또는 오프라인으로 결재되도록 처리한다(S711).In this case, a transaction ID (TID: Transaction ID) necessary to identify the purchase contract is generated and notified to the material company, and the material company delivers the material specified in the purchase request contracted with the transaction identifier offline. The material supply module 340 processes the material price to be paid online or offline to the material company after the material having a purchase contract is delivered (S711).

이상의 본 발명은 상기에 기술된 실시예들에 의해 한정되지 않고, 당업자들에 의해 다양한 변형 및 변경을 가져올 수 있으며, 이는 첨부된 청구항에서 정의되는 본 발명의 취지와 범위에 포함된다.The present invention is not limited to the embodiments described above, and various modifications and changes can be made by those skilled in the art, which are included in the spirit and scope of the present invention as defined in the appended claims.

이상에서 살펴본 바와 같이, 본 발명은 사용자가 제작한 CAD 도면파일을 이용하여 각 구성요소별 도면수치데이터를 추출한 다음, 물량 및 내역의 자동 산출과 공정의 연계, 그리고 구축된 건설통합데이터베이스를 이용하여 공정 진행에 소요되는 자재에 대한 물품명과 수량의 자동 산출 및 구매요구서의 생성 및 발주를 자동으로 처리할 수 있는 효과가 있다.As described above, the present invention extracts the drawing numerical data for each component using the CAD drawing file produced by the user, and then using the automatic calculation of quantity and details, linkage of the process, and built construction integrated database There is an effect that the automatic calculation of the name and quantity of materials for the process proceeds and the generation and ordering of purchase requisitions can be automatically processed.

또한, 접수된 견적서 중 해당되는 자재업체를 선택하여 해당 구매계약을 체결하는 일련의 행위를 사용자의 개입 없이 자동적으로 수행할 수 있는 효과가 있다.In addition, there is an effect that can automatically perform a series of actions to conclude the purchase contract by selecting the appropriate material supplier among the quotes received without user intervention.

또한, 건설에 필요한 자재를 시공시기에 맞추어 필요한 자재를 구매할 수 있는 효과가 있다.In addition, there is an effect that can purchase the necessary materials in accordance with the construction time for the materials required for construction.

또한, 건설에 필요한 자재를 공정 진행 단계별로 구매함으로써 자재의 일괄 구매 방법에 비해 비용의 절감과 구매한 자재의 보관 및 유지, 관리가 용이한 효과가 있다.In addition, by purchasing the materials required for the construction process step by step, it is possible to reduce the cost and easy to store, maintain, and manage the purchased materials compared to the bulk purchase method of materials.

Claims (30)

사용자의 요청에 반응하여 네트워크 통신망에 연결된 하나 이상의 사용자 단말기로 건설 관련 정보를 제공하는 시스템에 있어서,A system for providing construction-related information to one or more user terminals connected to a network in response to a user's request, CAD로 2차원 3차원으로 작성된 건축, 설비, 전기 도면파일로부터 도면수치데이터를 자동으로 추출하여 건설통합DB를 구축하는 한편, 건설정보관리 운영자로부터 입력되는 공정 설계정보를 이용하여 공정 진행 단계별 정보를 생성하고, 상기 생성된 공정 진행 단계별 정보에 따라 소요되는 자재정보가 자동으로 산출되어 구매될 수 있도록 지원하는 건설정보 관리서버를 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 시스템.Automatically extract drawing numerical data from architectural, facility, and electrical drawing files created in 2D and 3D with CAD to build a construction integrated DB, and use process design information inputted from the construction information management operator to provide information on process progress. Construction information management system using the integrated construction DB, characterized in that it comprises a construction information management server for generating and supporting the material information required according to the generated process progress step information is automatically calculated and purchased. 제 1 항에 있어서, 상기 공정 진행 단계별 정보는,The method of claim 1, wherein the process progress information is 상기 도면 수치 데이터를 이용하여 생성된 건설에 소요되는 자재의 물량 및 품량 정보와, 상기 물량 및 품량 정보에 단가정보를 적용시켜 생성된 부위별 및/또는 공종별 내역정보와, 상기 내역정보에 상기 사용자에 의해 입력되는 공정 계획 정보가 연계되어 생성되는 공정 정보에 의해 생성되는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 시스템.The quantity and quantity information of materials required for construction generated by using the numerical data of the drawings, the unit and / or category information generated by applying unit price information to the quantity and quantity information, and the user to the detail information. Construction information management system using the integrated construction DB, characterized in that generated by the process information generated by linking the process plan information input by. 제 1 항에 있어서, 상기 건설정보 관리서버는,According to claim 1, wherein the construction information management server, 상기 공정 진행 단계별 정보를 이용하여 시공 진행 단계에 따라 소요되는 자재정보를 추출하여 구매요구서를 생성하고, 상기 생성된 구매요구서를 식별하기 위한 구매식별자를 생성하여 상기 구매요구서에 부여하는 한편, 상기 구매요구서를 이용하여 자재업체 관리자들이 조회할 수 있는구매요구서 등록웹페이지를 제작하고, 상기 구매요구서 등록웹페이지를 통해 접수되는 견적서를 이용하여 구매 계약이 체결되도록 지원하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 시스템.The purchase information is generated by extracting material information required according to the construction progress step by using the process progress step information, and a purchase identifier for identifying the generated purchase request is generated and given to the purchase request, while the purchase request is generated. Build a purchase request registration web page that can be viewed by managers of material companies by using the request form, and support the construction contract to be concluded using the quotation received through the purchase request registration web page. Construction Information Management System. 제 3 항에 있어서, 상기 구매요구서는,The method of claim 3, wherein the purchase requisition, 상기 공정이 실행될 일정에 대한 정보, 공정에 사용되는 자재의 품명, 수량에 대한 정보 및/또는 자재 납기에 대한 정보에 의해 생성되는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 시스템.Construction information management system using a construction integrated DB, characterized in that generated by the information on the schedule, the name of the material, the quantity of the material used in the process and / or information on the delivery date of the process. 제 1 항 또는 제 2 항에 있어서, 상기 건설정보 관리서버는,The construction information management server according to claim 1 or 2, 상기 건설도면파일로부터 추출된 도면수치 데이터에서 객체들을 추출하여 객체화하며, 상기 객체화된 객체를 식별하기 위한 객체 식별자를 부여하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 시스템.Construction information management system using the integrated construction DB, characterized in that to extract the object from the drawing numerical data extracted from the construction drawing file to object, and to give an object identifier for identifying the objectized object. 제 1 항 또는 제 2 항에 있어서, 상기 건설정보 관리서버는,The construction information management server according to claim 1 or 2, 상기 도면추출데이터로부터 산출된 건설 자재별 물량과 품량을 산출하고, 상기 물량을 식별할 수 있는 자재 식별자를 상기 물량이 시공되는 공종에 대응하는공종분류체계에 따라 생성하거나, 또는 상기 자원의 종류에 따라 생성하여 DB로 구축하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 시스템.The quantity and quantity of each building material calculated from the drawing extraction data are calculated, and a material identifier for identifying the quantity is generated according to the type classification system corresponding to the type of construction in which the quantity is constructed, or the kind of the resource. Construction information management system using the integrated construction DB, characterized in that to create and build according to the DB. 제 1 항에 있어서, 상기 건설정보 관리서버는,According to claim 1, wherein the construction information management server, 상기 사용자에 의해 공정설계가 요청된 경우, 상기 도면수치 데이터로부터 내역산출결과를 추출하고, 상기 내역산출결과를 공간별, 부위별 및/또는 자재에 따라 계층구조로 표시되도록 지원하는 한편, 상기 사용자의 요청에 따라 빈(empty) 공정 액티비티 노드를 생성하고, 상기 공정 액티비티에 기본 데이터를 입력할 수 있도록 지원하며, 상기 사용자가 상기 계층구조를 이용하여 상기 소정 내역이 상기 공정 액티비티에 지정될 수 있도록 지원하고, 상기 사용자가 다음 공정 액티비티를 편집하기 이전에 공정진행방법에 대한 정보 및/또는 공정기간에 대한 정보를 입력할 수 있도록 유도하여 공정 계획 편집을 할 수 있도록 지원하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 시스템.When the process design is requested by the user, the calculation result is extracted from the drawing numerical data, and the calculation result is displayed in a hierarchical structure according to space, part and / or material. Create an empty process activity node at the request of the user, support input of basic data into the process activity, and allow the user to assign the predetermined details to the process activity using the hierarchy And to allow the user to input information on the process progress method and / or information on the process period before editing the next process activity, thereby supporting the process plan editing. Construction Information Management System using DB. 제 7 항에 있어서, 상기 공정 액티비티에 입력되는 기본 데이터는,The method of claim 7, wherein the basic data input to the process activity, 공정 식별자 정보, 활동명 정보, 해당 활동의 예상 시작일 정보 및/또는 예상 종료일 정보임을 특징으로 하는 건설통합DB를 이용한 건설정보 관리시스템.Construction information management system using the integrated construction DB, characterized in that the process identifier information, activity name information, the expected start date information and / or the expected end date information of the activity. 제 3 항 또는 제 7 항에 있어서, 상기 건설정보 관리서버는,According to claim 3 or 7, wherein the construction information management server, 상기 공정 액티비티 별로 할당된 공정 일정 데이터와 각 공정에 할당된 내역데이터로부터 추출된 해당 공정에 사용될 자재의 품명, 수량 및/또는 각 자재의 납기일 정보에 공정 수행 예정일 정보, 사용 자원별 납기일 정보 및/또는 구매에 소요되는 기간에 대한 정보를 적용시켜 구매 요구서를 자동으로 생성하고, 상기 구매 요구서에 구매 식별자를 부여하여 구매 공고가 되도록 지원하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 시스템.Process schedule date information, delivery date information for each resource used, and the like, the item name, quantity, and / or delivery date information of each material to be used for the corresponding process extracted from the process schedule data allocated for each process activity and the historical data assigned to each process, and / Or construction information management system using the integrated construction DB, characterized in that by applying the information on the period required to purchase to automatically create a purchase request, and to give a purchase announcement by the purchase identifier to the purchase request. 제 9 항에 있어서, 상기 건설정보 관리서버는,10. The method of claim 9, wherein the construction information management server, 소정 자재업체와 구매 계약을 체결하게 되는 경우, 구매식별자와 연계되는 거래식별자를 부여하여 특정 구매 요구서에 대한 구매 계약 체결임을 식별할 수 있도록 지원하는 한편, 상기 구매 계약 체결 후 자재를 납품할 때 또는 자재 대금을 지불할 때 상기 거래 식별자를 이용하여 식별될 수 있도록 지원하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 시스템.When entering into a purchase contract with a predetermined material company, a transaction identifier associated with a purchase identifier can be assigned to help identify that the purchase contract is concluded for a specific purchase request. Construction information management system using the integrated construction DB, characterized in that the support to be identified using the transaction identifier when paying for the material. 사용자의 요청에 반응하여 네트워크 통신망에 연결된 하나 이상의 사용자 단말기로 건설 관련 정보를 제공하는 방법에 있어서,A method of providing construction-related information to one or more user terminals connected to a network in response to a user's request, CAD로 2차원 3차원으로 작성된 건축, 설비, 전기 도면파일로부터 도면수치데이터를 자동으로 추출하여 건설통합DB를 구축하는 한편, 건설정보관리 운영자로부터 입력되는 공정 설계정보를 이용하여 공정 진행 단계별 정보를 생성하고, 상기 생성된 공정 진행 단계별 정보에 따라 소요되는 자재정보가 자동으로 산출되어 구매될 수 있도록 지원하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리방법.Automatically extract drawing numerical data from architectural, facility, and electrical drawing files created in 2D and 3D with CAD to build a construction integrated DB, and use process design information inputted from the construction information management operator to provide information on process progress. Construction information management method using the integrated construction DB, characterized in that for generating and supporting the material information required according to the generated process progress step information is automatically calculated and purchased. 제 11 항에 있어서, 상기 공정 진행 단계별 정보는,The method of claim 11, wherein the process progress information is 상기 도면 수치 데이터를 이용하여 생성된 건설에 소요되는 자재의 물량 및 품량 정보와, 상기 물량 및 품량 정보에 단가정보를 적용시켜 생성된 부위별 및/또는 공종별 내역정보와, 상기 내역정보에 상기 사용자에 의해 입력되는 공정 계획 정보가 연계되어 생성되는 공정 정보에 의해 생성되는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 방법.The quantity and quantity information of materials required for construction generated by using the numerical data of the drawings, the unit and / or category information generated by applying unit price information to the quantity and quantity information, and the user to the detail information. Construction information management method using the integrated construction DB, characterized in that generated by the process information generated by linking the process plan information input by. 제 11 항에 있어서,The method of claim 11, 상기 공정 진행 단계별 정보를 이용하여 시공 진행 단계에 따라 소요되는 자재정보를 추출하여 구매요구서를 생성하고, 상기 생성된 구매요구서를 식별하기 위한 구매식별자를 생성하여 상기 구매요구서에 부여하는 한편, 상기 구매요구서를 이용하여 자재업체 관리자들이 조회할 수 있는구매요구서 등록웹페이지를 제작하고, 상기 구매요구서 등록웹페이지를 통해 접수되는 견적서를 이용하여 구매 계약이 체결되도록 지원하는 과정을 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 방법.The purchase information is generated by extracting material information required according to the construction progress step by using the process progress step information, and a purchase identifier for identifying the generated purchase request is generated and given to the purchase request, while the purchase request is generated. Producing a purchase request registration web page that can be viewed by the manager of the material company using the request, and further comprising the process of supporting the purchase contract is concluded using the quotation received through the purchase request registration web page Construction information management method using the integrated construction DB. 제 13 항에 있어서, 상기 구매요구서는,The method of claim 13, wherein the purchase requisition, 상기 공정이 실행될 일정에 대한 정보, 공정에 사용되는 자재의 품명, 수량에 대한 정보 및/또는 자재 납기에 대한 정보에 의해 생성되는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 방법.Construction information management method using the integrated construction DB, characterized in that the information is generated by the information on the schedule, the name of the material used in the process, the quantity information and / or information on the delivery date of the process. 제 11 항 또는 제 12 항에 있어서,The method according to claim 11 or 12, 상기 건설도면파일로부터 추출된 도면수치 데이터에서 객체들을 추출하여 객체화하며, 상기 객체화된 객체를 식별하기 위한 객체 식별자를 부여하는 과정을 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 방법.And extracting and objectifying objects from the drawing value data extracted from the construction drawing file, and assigning an object identifier for identifying the objectized object. 제 11 항 또는 제 12 항에 있어서,The method according to claim 11 or 12, 상기 도면추출데이터로부터 산출된 건설 자재별 물량과 품량을 산출하고, 상기 물량을 식별할 수 있는 자재 식별자를 상기 물량이 시공되는 공종에 대응하는 공종분류체계에 따라 생성하거나, 또는 상기 자원의 종류에 따라 생성하여 DB로 구축하는 과정을 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 방법.The quantity and quantity of each building material calculated from the drawing extraction data are calculated, and a material identifier for identifying the quantity is generated according to the type classification system corresponding to the type of construction in which the quantity is constructed, or the kind of the resource. Construction information management method using the integrated construction DB, characterized in that it further comprises the step of creating and building according to the DB. 제 11 항에 있어서,The method of claim 11, 상기 사용자에 의해 공정설계가 요청된 경우, 상기 도면수치 데이터로부터 내역산출결과를 추출하고, 상기 내역산출결과를 공간별, 부위별 및/또는 자재에 따라 계층구조로 표시되도록 지원하는 한편, 상기 사용자의 요청에 따라 빈(empty) 공정 액티비티 노드를 생성하고, 상기 공정 액티비티에 기본 데이터를 입력할 수있도록 지원하며, 상기 사용자가 상기 계층구조를 이용하여 상기 소정 내역이 상기 공정 액티비티에 지정될 수 있도록 지원하고, 상기 사용자가 다음 공정 액티비티를 편집하기 이전에 공정진행방법에 대한 정보 및/또는 공정기간에 대한 정보를 입력할 수 있도록 유도하여 공정 계획 편집을 할 수 있도록 지원하는 과정을 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 방법.When the process design is requested by the user, the calculation result is extracted from the drawing numerical data, and the calculation result is displayed in a hierarchical structure according to space, part and / or material. Create an empty process activity node at the request of the user, support input of basic data into the process activity, and allow the user to assign the predetermined details to the process activity using the hierarchy And assisting the user to enter process information and / or process duration information before editing the next process activity to edit the process plan. Construction information management method using the integrated construction DB characterized in that. 제 17 항에 있어서, 상기 공정 액티비티에 입력되는 기본 데이터는,The method of claim 17, wherein the basic data input to the process activity, 공정 식별자 정보, 활동명 정보, 해당 활동의 예상 시작일 정보 및/또는 예상 종료일 정보임을 특징으로 하는 건설통합DB를 이용한 건설정보 관리방법.Construction information management method using the integrated construction DB, characterized in that the process identifier information, activity name information, expected start date information and / or expected end date information of the activity. 제 13 항 또는 제 17 항에 있어서,The method according to claim 13 or 17, 상기 공정 액티비티 별로 할당된 공정 일정 데이터와 각 공정에 할당된 내역 데이터로부터 추출된 해당 공정에 사용될 자재의 품명, 수량 및/또는 각 자재의 납기일 정보에 공정 수행 예정일 정보, 사용 자원별 납기일 정보 및/또는 구매에 소요되는 기간에 대한 정보를 적용시켜 구매 요구서를 자동으로 생성하고, 상기 구매 요구서에 구매 식별자를 부여하여 구매 공고가 되도록 지원하는 과정을 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 방법.Process schedule date information, delivery date information for each resource used, and the like, the item name, quantity, and / or delivery date information of each material to be used for the corresponding process extracted from the process schedule data allocated for each process activity and the historical data assigned to each process, and / Or by applying the information on the period required for the purchase automatically generates a purchase request, and granting a purchase identifier to the purchase request to support the construction announcement further comprising the process of construction using the integrated DB Information management method. 제 19 항에 있어서,The method of claim 19, 소정 자재업체와 구매 계약을 체결하게 되는 경우, 구매식별자와 연계되는거래식별자를 부여하여 특정 구매 요구서에 대한 구매 계약 체결임을 식별할 수 있도록 지원하는 한편, 상기 구매 계약 체결 후 자재를 납품할 때 또는 자재 대금을 지불할 때 상기 거래 식별자를 이용하여 식별될 수 있도록 지원하는 과정을 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 방법.When entering into a purchase contract with a predetermined material company, a transaction identifier associated with a purchase identifier can be assigned to help identify that the purchase contract is concluded for a specific purchase request. The construction information management method using the integrated construction DB, characterized in that it further comprises the step of supporting the identification using the transaction identifier when paying for the material price. 사용자의 요청에 반응하여 네트워크 통신망에 연결된 하나 이상의 사용자 단말기로 건설 관련 정보를 제공하는 프로그램 소스를 기록한 기록매체에 있어서,A recording medium recording a program source for providing construction-related information to one or more user terminals connected to a network communication network in response to a user's request, CAD로 2차원 3차원으로 작성된 건축, 설비, 전기 도면파일로부터 도면수치데이터를 자동으로 추출하여 건설통합DB를 구축하는 한편, 건설정보관리 운영자로부터 입력되는 공정 설계정보를 이용하여 공정 진행 단계별 정보를 생성하고, 상기 생성된 공정 진행 단계별 정보에 따라 소요되는 자재정보가 자동으로 산출되어 구매될 수 있도록 지원하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 프로그램 소스를 기록한 기록매체.Automatically extract drawing numerical data from architectural, facility, and electrical drawing files created in 2D and 3D with CAD to build a construction integrated DB, and use process design information inputted from the construction information management operator to provide information on process progress. And a recording medium recording the construction information management program source using the integrated construction DB, wherein the material information required to be generated is automatically calculated and purchased according to the generated process progress information. 제 21 항에 있어서, 상기 공정 진행 단계별 정보는,The method according to claim 21, wherein the process progress step information, 상기 도면 수치 데이터를 이용하여 생성된 건설에 소요되는 자재의 물량 및 품량 정보와, 상기 물량 및 품량 정보에 단가정보를 적용시켜 생성된 부위별 및/또는 공종별 내역정보와, 상기 내역정보에 상기 사용자에 의해 입력되는 공정 계획 정보가 연계되어 생성되는 공정 정보에 의해 생성되는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 프로그램 소스를 기록한 기록매체.The quantity and quantity information of materials required for construction generated by using the numerical data of the drawings, the unit and / or category information generated by applying unit price information to the quantity and quantity information, and the user to the detail information. Recording medium recording the construction information management program source using the integrated construction DB, characterized in that generated by the process information generated by linking the process plan information input by the. 제 21 항에 있어서,The method of claim 21, 상기 공정 진행 단계별 정보를 이용하여 시공 진행 단계에 따라 소요되는 자재정보를 추출하여 구매요구서를 생성하고, 상기 생성된 구매요구서를 식별하기 위한 구매식별자를 생성하여 상기 구매요구서에 부여하는 한편, 상기 구매요구서를 이용하여 자재업체 관리자들이 조회할 수 있는구매요구서 등록웹페이지를 제작하고, 상기 구매요구서 등록웹페이지를 통해 접수되는 견적서를 이용하여 구매 계약이 체결되도록 지원하는 프로세스를 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 프로그램 소스를 기록한 기록매체.The purchase information is generated by extracting material information required according to the construction progress step by using the process progress step information, and a purchase identifier for identifying the generated purchase request is generated and given to the purchase request, while the purchase request is generated. It further comprises a process of making a purchase request registration web page that can be viewed by the material company managers using the request, and the purchase agreement is concluded by using the quotation received through the purchase request registration web page. Record media recording the source of the construction information management program using the integrated construction DB. 제 23 항에 있어서, 상기 구매요구서는,The method of claim 23, wherein the purchase requisition, 상기 공정이 실행될 일정에 대한 정보, 공정에 사용되는 자재의 품명, 수량에 대한 정보 및/또는 자재 납기에 대한 정보에 의해 생성되는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 프로그램 소스를 기록한 기록매체.A record of a construction information management program source using a construction integrated DB, which is generated by information on a schedule on which the process is to be executed, information on an item name, quantity of materials used in the process, and / or information on material delivery date media. 제 21 항 또는 제 22 항에 있어서,The method of claim 21 or 22, 상기 건설도면파일로부터 추출된 도면수치 데이터에서 객체들을 추출하여 객체화하며, 상기 객체화된 객체를 식별하기 위한 객체 식별자를 부여하는 프로세스를 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 프로그램 소스를 기록한 기록매체.The construction information management program source using the integrated construction DB further comprising a process of extracting and objectifying objects from the drawing numerical data extracted from the construction drawing file, and assigning an object identifier to identify the objected object. Recording medium recording the. 제 21 항 또는 제 22 항에 있어서,The method of claim 21 or 22, 상기 도면추출데이터로부터 산출된 건설 자재별 물량과 품량을 산출하고, 상기 물량을 식별할 수 있는 자재 식별자를 상기 물량이 시공되는 공종에 대응하는 공종분류체계에 따라 생성하거나, 또는 상기 자원의 종류에 따라 생성하여 DB로 구축하는 프로세스를 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 프로그램 소스를 기록한 기록매체.The quantity and quantity of each building material calculated from the drawing extraction data are calculated, and a material identifier for identifying the quantity is generated according to the type classification system corresponding to the type of construction in which the quantity is constructed, or the kind of the resource. Record medium recording the construction information management program source using the integrated construction DB, characterized in that it further comprises a process of creating and building according to the DB. 제 21 항에 있어서,The method of claim 21, 상기 사용자에 의해 공정설계가 요청된 경우, 상기 도면수치 데이터로부터 내역산출결과를 추출하고, 상기 내역산출결과를 공간별, 부위별 및/또는 자재에 따라 계층구조로 표시되도록 지원하는 한편, 상기 사용자의 요청에 따라 빈(empty) 공정 액티비티 노드를 생성하고, 상기 공정 액티비티에 기본 데이터를 입력할 수 있도록 지원하며, 상기 사용자가 상기 계층구조를 이용하여 상기 소정 내역이 상기 공정 액티비티에 지정될 수 있도록 지원하고, 상기 사용자가 다음 공정 액티비티를 편집하기 이전에 공정진행프로그램 소스를 기록한 기록매체에 대한 정보 및/또는 공정기간에 대한 정보를 입력할 수 있도록 유도하여 공정 계획 편집을 할 수 있도록 지원하는 프로세스를 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 프로그램 소스를 기록한 기록매체.When the process design is requested by the user, the calculation result is extracted from the drawing numerical data, and the calculation result is displayed in a hierarchical structure according to space, part and / or material. Create an empty process activity node at the request of the user, support input of basic data into the process activity, and allow the user to assign the predetermined details to the process activity using the hierarchy Process to assist the user in entering process information and / or process duration information for recording the process program source before editing the next process activity. Construction information management program using the integrated construction DB, characterized in that it further comprises Recording medium recording the source. 제 27 항에 있어서, 상기 공정 액티비티에 입력되는 기본 데이터는,The method of claim 27, wherein the basic data input to the process activity, 공정 식별자 정보, 활동명 정보, 해당 활동의 예상 시작일 정보 및/또는 예상 종료일 정보임을 특징으로 하는 건설통합DB를 이용한 건설정보 관리프로그램 소스를 기록한 기록매체.Recording medium recording the construction information management program source using the integrated construction DB, characterized in that the process identifier information, activity name information, the expected start date information and / or the expected end date information of the activity. 제 23 항 또는 제 27 항에 있어서,The method of claim 23 or 27, 상기 공정 액티비티 별로 할당된 공정 일정 데이터와 각 공정에 할당된 내역 데이터로부터 추출된 해당 공정에 사용될 자재의 품명, 수량 및/또는 각 자재의 납기일 정보에 공정 수행 예정일 정보, 사용 자원별 납기일 정보 및/또는 구매에 소요되는 기간에 대한 정보를 적용시켜 구매 요구서를 자동으로 생성하고, 상기 구매 요구서에 구매 식별자를 부여하여 구매 공고가 되도록 지원하는 프로세스를 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 프로그램 소스를 기록한 기록매체.Process schedule date information, delivery date information for each resource used, and the like, the item name, quantity, and / or delivery date information of each material to be used for the corresponding process extracted from the process schedule data allocated for each process activity and the historical data assigned to each process, and / Or by applying the information on the period required for the purchase automatically generates a purchase request, and granting a purchase identifier to the purchase request further comprises a process for supporting the purchase announcement construction using construction integrated DB Recording medium recording information management program source. 제 29 항에 있어서,The method of claim 29, 소정 자재업체와 구매 계약을 체결하게 되는 경우, 구매식별자와 연계되는 거래식별자를 부여하여 특정 구매 요구서에 대한 구매 계약 체결임을 식별할 수 있도록 지원하는 한편, 상기 구매 계약 체결 후 자재를 납품할 때 또는 자재 대금을 지불할 때 상기 거래 식별자를 이용하여 식별될 수 있도록 지원하는 프로세스를 더 포함하는 것을 특징으로 하는 건설통합DB를 이용한 건설정보 관리 프로그램 소스를기록한 기록매체.When entering into a purchase contract with a predetermined material company, a transaction identifier associated with a purchase identifier can be assigned to help identify that the purchase contract is concluded for a specific purchase request. And a process of supporting the identification of the transaction using the transaction identifier when paying for the material.
KR1020010015314A 2001-03-23 2001-03-23 System and method for managing construction information using construction integration db, and media for storing program source thereof KR20020075109A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020010015314A KR20020075109A (en) 2001-03-23 2001-03-23 System and method for managing construction information using construction integration db, and media for storing program source thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020010015314A KR20020075109A (en) 2001-03-23 2001-03-23 System and method for managing construction information using construction integration db, and media for storing program source thereof

Publications (1)

Publication Number Publication Date
KR20020075109A true KR20020075109A (en) 2002-10-04

Family

ID=27698534

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020010015314A KR20020075109A (en) 2001-03-23 2001-03-23 System and method for managing construction information using construction integration db, and media for storing program source thereof

Country Status (1)

Country Link
KR (1) KR20020075109A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030019992A (en) * 2001-08-28 2003-03-08 김효철 Method and system for an electronic approval for a drawing via the internet
KR100507238B1 (en) * 2001-06-15 2005-08-10 (주) 엘콘시스템 Method for processing construction information by using combination of cost/schedule/space system
KR100975213B1 (en) * 2008-04-08 2010-08-10 중앙대학교 산학협력단 The system which operates a construction data package online network in base
KR101235467B1 (en) * 2011-04-22 2013-02-22 (주) 명진소프트컨설팅 Construction work management system with four dimension
KR101204356B1 (en) * 2011-03-29 2013-03-18 (주) 명진소프트컨설팅 Construction work management system for which a matrix technique was used and method thereof
KR101406885B1 (en) * 2012-06-14 2014-06-20 거북선크루즈주식회사 Using a computer system and method for architectural design
KR20180084643A (en) 2017-01-17 2018-07-25 서울대학교산학협력단 Knowledge providing method in construction knowledge hub-center

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11110442A (en) * 1997-10-08 1999-04-23 Hitachi Ltd Sheet metal member cost estimating and ordering system
KR20010007819A (en) * 2000-04-27 2001-02-05 김승양 Building And Construction Information Providing Service Method Of Two Dimensional CAD Drawing In Communication Network
KR20010092638A (en) * 2000-03-24 2001-10-26 스가 오사무 System for calculating the prime cost of construction
KR100309582B1 (en) * 2000-04-27 2001-11-07 정평영 System And Method For Estimate Bill Of Materials Using Two Dimensional CAD Interface

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11110442A (en) * 1997-10-08 1999-04-23 Hitachi Ltd Sheet metal member cost estimating and ordering system
KR20010092638A (en) * 2000-03-24 2001-10-26 스가 오사무 System for calculating the prime cost of construction
KR20010007819A (en) * 2000-04-27 2001-02-05 김승양 Building And Construction Information Providing Service Method Of Two Dimensional CAD Drawing In Communication Network
KR100309582B1 (en) * 2000-04-27 2001-11-07 정평영 System And Method For Estimate Bill Of Materials Using Two Dimensional CAD Interface

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100507238B1 (en) * 2001-06-15 2005-08-10 (주) 엘콘시스템 Method for processing construction information by using combination of cost/schedule/space system
KR20030019992A (en) * 2001-08-28 2003-03-08 김효철 Method and system for an electronic approval for a drawing via the internet
KR100975213B1 (en) * 2008-04-08 2010-08-10 중앙대학교 산학협력단 The system which operates a construction data package online network in base
KR101204356B1 (en) * 2011-03-29 2013-03-18 (주) 명진소프트컨설팅 Construction work management system for which a matrix technique was used and method thereof
KR101235467B1 (en) * 2011-04-22 2013-02-22 (주) 명진소프트컨설팅 Construction work management system with four dimension
KR101406885B1 (en) * 2012-06-14 2014-06-20 거북선크루즈주식회사 Using a computer system and method for architectural design
KR20180084643A (en) 2017-01-17 2018-07-25 서울대학교산학협력단 Knowledge providing method in construction knowledge hub-center

Similar Documents

Publication Publication Date Title
US7096223B2 (en) Process and system for managing and reconciling field documentation data within a complex project workflow system
US6345258B1 (en) Information system for new home builders
EP1154342A2 (en) System and method for take-off of materials using two-dimensional cad interface
WO2001025993A1 (en) Process and system for matching buyers and sellers of goods and/or services
WO2001077781A2 (en) Method and system to obtain automatic quotations from manufacturing details
KR102038043B1 (en) Providing method of building cost estimate
US6938001B2 (en) Electronic legal research ordering and pricing method of defining and valuing electronic legal research instructions and electronically ordering and pricing legal research
KR20020075109A (en) System and method for managing construction information using construction integration db, and media for storing program source thereof
KR20200145369A (en) Rental service system and method for recycling of coded interior materials
JP2008123469A (en) Management system of object management information, person management information and real estate information
JP2002342456A (en) Optimal disposal system for waste from demolition work
Clayton et al. A study of information content of as-built drawings for USAA
KR100642605B1 (en) Method of Building Simulation and Construction Management Using Internet
KR20010007819A (en) Building And Construction Information Providing Service Method Of Two Dimensional CAD Drawing In Communication Network
JP2001306944A (en) Business supporting system for housing using communication web
CN108876173B (en) Event realization method and device
JP7082359B1 (en) Inventory management device and inventory management system
CN101151628A (en) Procurement preparation system and procurement preparation method
US20080034290A1 (en) System for foreign and remote architectural and engineering services for U.S. construction projects
JP4026305B2 (en) Production planning transaction system
JP7285033B1 (en) Transaction support device
CN100563866C (en) The manufacturing equipment of the thin plate light steel of steel house and method thereof
JP7193190B1 (en) Manufacturing consignment support system, manufacturing consignment support program, manufacturing consignment support method
KR100872594B1 (en) Method evaluating building cost managed by writing up daily site-reports via internet
WO2011099826A2 (en) Method and system for processing information on construction costs containing information on detailed spaces or parts