KR100507238B1 - Method for processing construction information by using combination of cost/schedule/space system - Google Patents

Method for processing construction information by using combination of cost/schedule/space system Download PDF

Info

Publication number
KR100507238B1
KR100507238B1 KR10-2001-0033960A KR20010033960A KR100507238B1 KR 100507238 B1 KR100507238 B1 KR 100507238B1 KR 20010033960 A KR20010033960 A KR 20010033960A KR 100507238 B1 KR100507238 B1 KR 100507238B1
Authority
KR
South Korea
Prior art keywords
cost
common
classification
item
construction
Prior art date
Application number
KR10-2001-0033960A
Other languages
Korean (ko)
Other versions
KR20020095767A (en
Inventor
김우영
Original Assignee
(주) 엘콘시스템
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 엘콘시스템 filed Critical (주) 엘콘시스템
Priority to KR10-2001-0033960A priority Critical patent/KR100507238B1/en
Publication of KR20020095767A publication Critical patent/KR20020095767A/en
Application granted granted Critical
Publication of KR100507238B1 publication Critical patent/KR100507238B1/en

Links

Abstract

본 발명은 특정한 건축 및 건설공사의 항목에 비용과 일정 및 공간의 체계가 통합적으로 적용된 건축 및 건설공사의 최소작업 요소에 대한 데이터베이스정보를 컴퓨터장치를 이용하여 자동적으로 생성할 수 있도록 하는 비용/일정/공간 체계를 조합한 건설정보 처리방법을 제공한다.The present invention provides a cost / schedule for automatically generating database information on a minimum work element of a building and construction work in which a cost, schedule, and space system is integrated to a specific building and construction work item. Provide construction information processing method that combines / space system.

이를 위해 본 발명은 소정 건축 및 건설항목의 원가 데이터와 공종데이터 및 공간 데이터에 대해서 원가계산을 위한 최하위 요소로서 원가항목의 정보를 추출하는 단계와, 상기 추출된 각 원가항목에 대한 공종분류를 적용하여 공통분류항목을 생성하는 단계, 상기 추출된 각 원가항목에 대하여 해당 건축 및 건설항목에 대한 반복되는 기준평면의 원가항목 별로 물량을 산출하는 단계, 상기 원가항목별 물량산출 데이터를 보유하고 있는 기준평면의 정보에 기초하여 공간분류에 따른 공간별 원가항목을 개체화하는 단계, 상기 원가항목과 연관된 공종분류값을 각각 연계시켜서 공통자(중간공통자)를 생성하는 단계, 상기 건축 및 건설항목에 대해 특정한 공간분류 레벨과 공종분류 레벨을 결정하여 공정관리요소를 생성하는 단계 및, 상기 공정관리요소와 동일한 분류조합을 갖는 공통자를 추출하고, 각 공통자에 대해 공정관리요소를 연계하여 공통자(최종공통자) 데이터베이스를 작성하는 단계로 이루어진 것을 특징으로 한다.To this end, the present invention is to extract the information of the cost item as the lowest element for cost calculation for the cost data, the work data and the spatial data of the predetermined building and construction items, and apply the work classification for each cost item extracted Generating a common classification item, calculating a quantity for each cost item of a repeated reference plane for a corresponding building and construction item for each extracted cost item, and having a quantity calculation data for each cost item Individualizing the cost items for each space according to the space classification based on the information of the plane, generating a common person (intermediate common person) by linking the work classification values associated with the cost items, respectively, for the building and construction items Creating a process control element by determining a specific spatial classification level and a work classification level; and Extracts the common and having the same classification, and in combination, characterized in that in connection to process control elements for each of the common characters consisting of the steps to create a database common character (final common words).

Description

비용/일정/공간 체계를 조합한 건설정보 처리방법{Method for processing construction information by using combination of cost/schedule/space system}Method for processing construction information by using combination of cost / schedule / space system}

본 발명은 비용/일정/공간 체계를 조합한 건설정보 처리방법에 관한 것으로서, 보다 상세하게는 건축 및 건설항목의 원가와 공종 및 공간데이터에 포함된 비용요소 및 작업요소에 대한 비용과 일정 및 공간의 체계를 이용하여 건축 및 건설에 필요한 건설정보를 생성할 수 있도록 하는 비용/일정/공간 체계를 조합한 건설정보 처리방법에 관한 것이다.The present invention relates to a construction information processing method combining a cost / schedule / space system, and more specifically, the cost, schedule and space for the cost and work elements included in the cost, type and spatial data of construction and construction items The construction information processing method combines the cost / schedule / spatial system that enables the construction and construction of construction information.

일반적으로, 아파트나 업무용 빌딩, 운동 경기장 등과 같은 건축물 또는 교량, 도로, 항만시설 등과 같은 건설공사에 있어서는 건축 및 건설 분야의 설계자가 2차원 또는 3차원의 캐드 프로그램을 이용하여 캐드 설계도면을 작성하게 되면, 그 2차원 또는 3차원의 캐드 설계도면에 의거하여 각종 자재의 원가항목에 대한 물량을 산출하고, 공사일정의 내역서를 작성하도록 되어 있다. Generally, in construction such as apartments, business buildings, sports stadiums, or construction sites such as bridges, roads, and port facilities, designers in the construction and construction fields use CAD programs in two or three dimensional programs to create CAD design drawings. In this case, based on the two-dimensional or three-dimensional CAD design drawings, quantities of the cost items of various materials are calculated, and details of the construction schedule are prepared.

또한, 해당 건축 및 건설공사의 공정계획 담당자는 그러한 물량산출서와 공사일정의 내역서에 기초하여 해당 공사의 공정계획에 따라 각 원가항목에 대해 공간분류 레벨 및 공종분류 레벨을 수작업에 의해 정하여 공정관리 요소를 생성하고, 그 공정관리 요소를 포함하는 공정표를 작성함에 의해, 그 공정표에 입각하여 각 공사부문별 담당자에게 공사지시를 수행할 수 있도록 되어 있다. In addition, the person in charge of the process plan of the relevant construction and construction work shall manually manage the space classification level and the type classification level for each cost item according to the process plan of the relevant construction, based on such a quantity statement and the schedule of the construction schedule. By creating an element and creating a process schedule including the process control element, the construction instruction can be given to the person in charge of each construction sector based on the process schedule.

그러나, 이러한 종래의 건축 및 건설항목의 공정계획 방식에서는 공정계획 및 관리 담당자가 수작업에 의해 임의적으로 공간분류의 레벨 및 공종분류 레벨을 정하여 공정표를 작성할 수 있도록 되어 있기 때문에, 그 공정표 상에는 비용요소 및 작업요소에 대한 정확한 데이터가 포함될 수 없다는 문제점이 있다. However, in the conventional process planning method for building and construction items, the process planner and the person in charge of the process plan can create the process table by arbitrarily setting the level of the space classification and the work classification level by manual labor. The problem is that accurate data on work elements cannot be included.

따라서, 본 발명은 상기한 종래의 문제점을 해결하기 위해 이루어진 것으로서, 그 목적은 특정한 건축 및 건설공사의 항목에 비용과 일정 및 공간의 체계가 통합적으로 적용된 건축 및 건설공사의 최소작업 요소에 대한 데이터베이스정보를 컴퓨터장치를 이용하여 자동적으로 생성할 수 있도록 하는 비용/일정/공간 체계를 조합한 건설정보 처리방법을 제공하는 것이다.Accordingly, the present invention has been made to solve the above-mentioned conventional problems, the object of which is a database for the minimum work element of the construction and construction work in which the system of cost, schedule and space is integrated to the specific construction and construction items It is to provide a construction information processing method combining cost / schedule / spatial system that can generate information automatically using computer device.

본 발명의 다른 목적은 건설작업 항목의 비용분류 구조(Cost Breakdown Structure; CBS)와 작업분류 구조(Work Breakdown Structure; WBS)에 대한 공간분류(Space Hierarchy)와 원가분류(Cost Hierarchy) 및 공종분류(Work Hierarchy)를 적용하여 공통자 및 공정관리요소를 생성하고, 그 공통자 및 공정관리요소를 연계적으로 통합처리하여 건축 및 건설공사의 최소작업 요소에 대한 데이터베이스정보로 활용할 수 있도록 하는 비용/일정/공간 체계를 조합한 건설정보 처리방법을 제공하는 것이다.Another object of the present invention is to provide a space breakdown, cost hierarchy and cost classification for Cost Breakdown Structure (CBS) and Work Breakdown Structure (WBS) of construction work items. Work Hierarchy) is applied to create common and process control elements, and the common and process control elements are integrated and processed to be used as database information on the minimum work elements of construction and construction work. It is to provide construction information processing method that combines / space system.

상기한 목적을 달성하기 위해 본 발명에 따르면, 소정 건축 및 건설항목의 원가 데이터에 대해서 원가계산을 위한 최하위 요소로서 원가항목의 정보를 추출하는 원가항목추출단계와, 상기 추출된 각 원가항목에 대한 공종분류를 적용하여 공통분류항목을 생성하는 공통분류항목 생성단계, 상기 추출된 각 원가항목에 대하여 해당 건축 및 건설항목에 대한 반복되는 기준평면의 원가항목 별로 물량을 산출하는 원가항목별 물량산출단계, 상기 원가항목별 물량산출 데이터를 보유하고 있는 기준평면의 정보에 기초하여 공간분류에 따른 공간별 원가항목을 개체화하는 원가항목 개체화단계, 상기 원가항목과 연관된 공종분류값을 각각 연계시켜서 공통자(중간공통자)를 생성하는 공통자(중간공통자)생성단계, 상기 건축 및 건설항목에 대해 특정한 공간분류 레벨과 공종분류 레벨을 결정하여 공정관리요소를 생성하는 공정관리요소생성단계 및, 상기 공정관리요소와 동일한 분류조합을 갖는 공통자(중간공통자)를 추출하고, 각 공통자(중간공통자)에 대해 공정관리요소를 연계하여 공통자(최종공통자) 데이터베이스를 작성하는 공통자(최종공통자)완성단계로 이루어진 비용/일정/공간 체계를 조합한 건설정보 처리방법이 제공된다.본 발명에서 사용되는 용어의 의미는 다음과 같다.공간분류(space hierarchy)는 비용분류구조(CBS)와 작업분류구조(WBS)에서 공통적으로 사용되는 공간에 대한 계층적 분류체계로서, 비용분류구조(CBS) 와 작업분류구조(WBS)에서 사용하는 계층적 레벨은 다를수 있으며, 여기에는 공간의 기준평면에대한 정의가 포함된다.원가분류(cost hierarchy)는 견적을 위하여 물량을 산출하고 원가관리를 수행하는 담당자에 의해 생성되고 사용되어지는 추상화된 분류정보로서, 내역서를 분류하는 분류기준이며, 상기 공간분류와 조합함으로써 비용분류구조(CBS)가 생성된다.공종분류(work hierarchy)는 공정표를 계획하고 관리하는 담당자에 의해 사용되어지는 추상화된 분류정보로서, 공사를 구성하는 각 작업의 범위를 정하고 작업간의 선,후행관계를 정의하는데 사용되며, 공간분류와 조합함으로써 작업분류구조(WBS)가 생성된다.이하, 상기한 바와 같이 구성된 본 발명에 대해 첨부도면을 참조하여 상세히 설명한다.According to the present invention for achieving the above object, a cost item extraction step of extracting the information of the cost item as the lowest element for the cost calculation for the cost data of the predetermined building and construction items, and for each of the extracted cost items A common classification item generation step of generating common classification items by applying a work classification, and a cost calculation step for each cost item for calculating the quantity of each cost item of the repeated reference plane for the corresponding building and construction item for each extracted cost item The cost item individualization step of individualizing the cost items for each space according to the space classification based on the information of the reference plane which holds the quantity calculation data for each cost item, and the common classification value associated with the cost classification associated with the cost items, respectively. The common person (intermediate common person) generation step of creating a common person), a specific space for the building and construction items The process control element creation step of generating a process control element by determining the classification level and the work classification level, and extracting a common person (intermediate common person) having the same classification combination as the process control element, and extracting each common person (intermediate common person). There is provided a construction information processing method combining a cost / schedule / spatial system consisting of a common (final common) completion step of creating a common (final common) database by linking process control elements. The meaning of the terms used in the following is as follows. The space hierarchy is a hierarchical classification system for spaces commonly used in the cost breakdown structure (CBS) and the work breakdown structure (WBS). ) And the hierarchical levels used by the WBS can vary, including the definition of the reference plane of space. A cost hierarchy is used to calculate quantities and estimate costs Abstracted classification information generated and used by the person in charge of performing the transaction, which is a classification criterion for classifying the statement, and by combining with the above space classification, a cost classification structure (CBS) is generated. This is abstracted classification information used by the person in charge of planning and managing the project.It is used to define the scope of each work constituting the construction and to define the pre and post relationships between the work. The present invention constructed as described above will now be described in detail with reference to the accompanying drawings.

삭제delete

즉, 도 1은 본 발명에 따른 비용/일정/공간 체계를 조합한 건설정보 처리방법을 설명하기 위한 시스템 도면이다.That is, Figure 1 is a system diagram for explaining the construction information processing method combining the cost / schedule / space system according to the present invention.

도 1에 도시된 바와 같이, 본 발명의 시스템은 키보드(102)와 위치좌표 입력장치(106)가 연결된 컴퓨터장치(100)가 구성되고, 그 컴퓨터장치(100)에는 입력부(2)와, 원가항목 추출부(4), 공종분류 적용처리부(6), 물량 산출부(8), 원가요소 추출부(10), 공통자 및 공정관리요소 생성부(12), 공통자 및 공정관리요소 연계처리부(14), 정보 데이터베이스(16), 키보드 인터페이스(104) 및, 위치좌표 인터페이스(108)로 구성된다. As shown in FIG. 1, the system of the present invention includes a computer device 100 connected to a keyboard 102 and a position coordinate input device 106, and the computer device 100 includes an input unit 2 and a cost. Item extraction unit 4, work classification application processing unit 6, quantity calculation unit 8, cost element extraction unit 10, common and process management element generation unit 12, common and process management element linked processing unit (14), the information database 16, the keyboard interface 104, and the position coordinate interface 108. As shown in FIG.

동 도면의 컴퓨터장치(100)에 있어서, 상기 입력부(2)는 소정의 건축 및 건설항목에 대한 원가 데이터와 공종 데이터 및 공간 데이터를 입력받게 되는 바, 상기 원가와 공종 및 공간 데이터는 캐드시스템으로부터 작성된 2차원 또는 3차원 캐드 데이터에서 물량산출을 위한 형상 및 위치정보의 추출과정에서 생성되는 데이터를 사용하는 것도 가능하고, 사용자의 입력에 의해 해당 건축 및 건설항목에 대한 기초적인 데이터정보로서 입력받는 것도 가능하다. In the computer device 100 of the figure, the input unit 2 receives the cost data, the model data, and the spatial data for a predetermined building and construction item, and the cost, the model, and the spatial data are received from the CAD system. It is also possible to use the data generated in the process of extracting the shape and location information for quantity calculation from the created two-dimensional or three-dimensional CAD data, which is input as basic data information on the building and construction items by the user's input. It is also possible.

여기서, 상기 원가 데이터와 공종 데이터 및 공간 데이터에 있어서, 상기 원가 데이터에 대한 원가분류(Cost Hierarchy)는 소정의 건축 및 건설항목에 대한 견적을 위하여 물량을 산출하고 원가관리를 수행하는 담당자에 의해 생성되고 사용되는 추상화된 분류정보로서, 내역서를 작성하는 분류기준에 해당되고, 공간 데이터에 의한 공간분류와 조합하여 비용분류 구조(CBS)가 생성된다. Here, in the cost data, the type data, and the spatial data, cost hierarchy of the cost data is generated by a person who calculates the quantity and estimates the cost for a predetermined building and construction item. As the abstracted classification information used, it corresponds to the classification criteria for preparing a statement, and a cost classification structure (CBS) is generated in combination with the spatial classification by the spatial data.

또한, 상기 공종 데이터에 대한 공종분류(Work Hierarchy)는 공사를 계획하고 관리하는 담당자에 의해 사용되는 추상화된 분류정보로서, 공사를 구성하는 각 작업의 범위를 정하고 각 작업간의 선후행 관계를 정의하는데 사용되고, 상기 공간 데이터에 의한 공간분류와 조합하여 공종분류 구조(WBS)가 생성된다. In addition, the Work Hierarchy of the work data is abstracted classification information used by the person in charge of planning and managing the work. The work hierarchy is used to define the scope of each work constituting the work and to define the predecessor relationship between the work. A co-classification structure (WBS) is used in combination with the spatial classification by the spatial data.

또, 상기 공간 데이터에 의한 공간분류(Space Hierarchy)는 비용분류 구조와 공종분류 구조에서 공통적으로 사용되는 공간에 대한 계층적 분류체계로서, 공간의 기준평면에 대한 정의가 포함되고, 그 비용분류 구조와 공종분류 구조에서 사용되는 계층적 레벨이 다를 수 있다. In addition, the space classification based on the spatial data is a hierarchical classification system for a space commonly used in a cost classification structure and a co-classification structure, and includes a definition of a reference plane of a space. The hierarchical levels used in the and taxonomy structures may be different.

동 도면에서, 상기 원가항목 추출부(4)는 상기 입력부(2)로부터의 원가 데이터에서 물량산출을 위한 원가계산의 최하위 요소로서의 원가항목을 추출하게 되는 바, 상기 물량산출의 원가항목은 그 발생시점으로부터 원가분류를 내재하게 된다. In the figure, the cost item extraction unit 4 extracts the cost item as the lowest element of the cost calculation for the quantity calculation from the cost data from the input unit 2, where the cost item of the quantity calculation is generated. Cost classification is inherent from this point in time.

상기 공종분류 적용처리부(6)에서는 해당 건축 및 건설공사에서 상기 원가항목에 대해 수행되는 작업의 종류를 분석하여 각 원가항목에 대한 공종분류를 적용하게 되는 바, 상기 각 원가항목에 대한 공종분류의 적용처리는 상기 키보드(102)와 위치좌표 입력장치(106)의 사용자 조작에 따라 수작업에 의해 인위적으로 진행된다. The work classification application processing unit 6 applies the work classification for each cost item by analyzing the type of work performed on the cost item in the corresponding building and construction work. The application process is performed artificially by manual operation in accordance with user operations of the keyboard 102 and the position coordinate input device 106.

상기 물량 산출부(8)는 상기 정보 데이터베이스(16)의 물량산출 정보에 의거하여, 해당 건축 및 건설항목에서 반복되는 기준평면(예컨대 아파트 공사에서의 각 층별 각 호수별로 반복되는 실내평면)에 포함되는 원가항목에 대한 물량을 각각 산출하게 된다. The quantity calculating unit 8 is included in a reference plane (for example, an indoor plane repeated for each lake for each floor in an apartment construction), which is repeated in the building and construction items based on the quantity calculation information of the information database 16. The quantity of each cost item will be calculated.

상기 원가요소 추출부(10)는 상기 정보 데이터베이스(16)의 테이블정보를 기초로, 상기 물량 산출부(8)에 의해 물량이 산출된 기준평면 별의 원가항목 데이터를 공간분류에 적용하여 각 공간별 원가항목을 개체화시키게 되는 바, 이러한 구체적인 공간에 적용되는 작업요소를 원가요소(Cost Element)로서 추출하게 된다. The cost element extracting unit 10 applies the cost item data for each reference plane whose quantity is calculated by the quantity calculating unit 8 to the spatial classification based on the table information of the information database 16. As individual cost items are individualized, work elements applied to such specific spaces are extracted as cost elements.

여기서, 상기 정보 데이터베이스(16)의 공간분류 테이블(18)에는 원가항목별 물량산출 데이터를 보유하고 있는 기준평면의 정보를 담고 있으며, 상기 원가요소 추출부(10)는 상기 공간분류 테이블(18)의 기준평면 정보에 기초하여 공간분류 별로 원가항목별 물량산출 데이터를 배분할 수 있도록 되어 있는 바, 하기한 표 1과 같이 데이터 테이블 간의 식에 의하여 SQL 명령어로 처리할 수 있게 된다.Here, the spatial classification table 18 of the information database 16 contains information of a reference plane that holds quantity calculation data for each cost item, and the cost element extraction unit 10 includes the spatial classification table 18. Based on the reference plane information, the cost calculation data for each cost item can be distributed according to the space classification. As shown in Table 1 below, the data can be processed by the SQL command by the expression between the data tables.

INSERT INTO [원가요소] SELECT [공간분류].공간분류코드,[기준평면].원가항목코드,[기준평면].물량 FROM [공간분류] INNER JOIN [기준평면] ON [공간분류].기준평면코드=[기준평면].기준평면코드; INSERT INTO [cost element] SELECT [spatial classification] .spatial classification code, [reference plane] .cost item code, [reference plane] .volume FROM [spatial classification] INNER JOIN [reference plane] ON [spatial classification] .reference plane Code = [reference plane]. Reference plane code;

단, 상기 표 1의 SQL 명령어에서 "원가요소"는 각 공간별로 개체화된 원가항목을 담는 테이블로서, 상기 원가요소 추출부(10)에 의해 개체화된 원가요소의 정보에 의해서 상기 정보 데이터베이스(16)에 원가요소 테이블(20)이 생성된다.However, in the SQL command of Table 1, the "cost element" is a table containing cost items individualized for each space, and the information database 16 is based on the information of the cost elements individualized by the cost element extractor 10. The cost element table 20 is created.

상기 공통자 및 공정관리요소 생성부(12)는 상기 원가요소 테이블(20)의 개체화된 공간별 원가항목의 데이터에 상기 공종분류 적용처리부(6)에서 적용처리된 공종분류를 적용하여 공통분류 항목으로 변환함에 의해, 이러한 공종항목에 공간분류가 적용된 공종요소(Work Element)를 공통자(Common Denominator)로서 생성하게 된다.이때, 공통자는 공정관리요소의 내용이 포함되지 않은 공통자(중간공통자)로서 다음과 같은 방법에 의하여 최종적인 공통자(최종공통자)로 완성된다.The common and process management element generating unit 12 applies a common classification applied by the industrial classification applying processing unit 6 to the data of the individualized cost items for each space in the cost element table 20, thereby providing a common classification item. By converting to, the work elements with spatial classification applied to these work items are created as common denominators. In this case, the common people do not include the contents of the process control elements. ) To be the final common (final common) by the following method.

즉, 상기 공통자 및 공정관리요소 생성부(12)에서는 공정계획 및 관리 담당자의 키보드(102) 및 위치좌표 입력장치(106)에 의한 입력조작에 따라, 검출 및 건설공사의 작업순위에 따라 결정되는 특정한 공간분류 레벨과 공종분류 레벨을 정하여 공정관리요소(Activity)를 담고 있는 공정관리요소 테이블(24)을 생성하고, 그에 따른 공정표가 작성된다.That is, the common and process management element generation unit 12 is determined according to the operation order of the detection and construction work according to the input operation by the keyboard 102 and the position coordinate input device 106 of the process planning and management personnel The specific spatial classification level and the type classification level are determined to generate a process management element table 24 containing process management elements, and a process table is created accordingly.

상기 공통자 및 공정관리요소 연계처리부(14)는 상기 공통자 테이블(22)의 공통자(중간공통자)로부터 상기 공정관리요소 테이블(24)의 공정관리요소와 동일한 공간분류 및 공종분류를 갖는 공통자(중간공통자)를 추출하여 각각 연계처리함에 의해서 공통자(최종공통자) 데이터베이스를 생성하게 되는 바, 그러한 공통자(최종공통자) 데이터베이스를 이용하여 건축 및 건설공사의 담당자가 공사에 대한 공정계획 및 공사관리를 수행하게 되고, 준공 이후의 사후 품질관리에 적용할 수 있게 된다.The common and process management element linkage processing unit 14 has the same space classification and work classification as the process management element of the process management element table 24 from the common person (intermediate common person) of the common table 22. The commons (final commons) database is created by extracting commons (intermediate commons) and linking them to each other.A person in charge of building and construction works on the construction by using the commons (final commons) database. It will be able to carry out the process planning and management of the construction and apply it to the post quality control after the completion.

여기서, 상기 공통자(최종공통자)는 상기 공간분류 테이블(18)의 기준평면 원가항목별 물량산출 데이터에 대해 상기 공종분류 적용처리부(6)를 통해 적용처리된 공종분류에 의해서 기준평면의 공통분류별 물량산출 테이블이 생성되고, 상기 원가요소 추출부(10)에서 상기 공통분류별 물량산출 테이블의 원가요소를 개체화하여 생성할 수 있도록 하는 것이 바람직하다.Here, the common person (the last common person) is common to the reference plane by the work classification applied through the work classification application processing unit 6 for the quantity calculation data for each reference plane cost item of the spatial classification table 18. A classification calculation table is generated, and it is preferable that the cost element extraction unit 10 can generate and generate the cost elements of the common classification calculation table.

한편, 상기 공통자(최종공통자)는 상기 원가항목에 대해 물량 산출부(8)에서 기준평면의 원가항목별 물량산출이 이루어져서 그 물량산출 데이터를 담는 공간분류 테이블(18)이 생성된 상태에서, 원가요소 추출부(10)에 의해 기준평면 원가항목의 원가요소에 대한 개체화가 수행된 다음에, 상기 공종분류 적용처리부(6)에 의해 연관된 공종분류값이 각각 연계되어 생성되도록 하는 것도 가능하도록 되어 있다. On the other hand, the common person (final common person) in the state in which the quantity calculation for each cost item of the reference plane is made in the quantity calculation unit 8 with respect to the cost item, the spatial classification table 18 containing the quantity calculation data is generated After the individualization of the cost elements of the reference plane cost item by the cost element extraction unit 10 is performed, the associated work classification values may be associated with each other by the work classification application processing unit 6 so as to be generated. It is.

이어, 상기한 바와 같이 이루어진 본 발명의 동작에 대해 도 2 및 도 3의 플로우차트를 참조하여 상세히 설명한다. Next, the operation of the present invention made as described above will be described in detail with reference to the flowcharts of FIGS. 2 and 3.

먼저, 컴퓨터장치(100)의 원가항목 추출부(4)에서는 입력부(2)를 통해 입력받은 소정의 건축 및 건설항목에 대한 원가 데이터에 대해서, 물량산출을 위한 원가계산의 항목으로서 원가항목을 추출하게 되는 바, 그러한 원가항목은 그 발생시점으로부터 원가분류를 내재하게 된다(단계 S10). First, the cost item extraction unit 4 of the computer device 100 extracts the cost item as an item of cost calculation for quantity calculation, for the cost data for a predetermined building and construction item received through the input unit 2. As such, such cost items are inherent in the cost classification from the time of their occurrence (step S10).

그 상태에서, 공종분류 적용처리부(6)에서는 담당자의 키보드(102) 및 위치좌표 입력장치(106)를 이용한 조작에 따라, 상기 원가항목 추출부(4)로부터 추출된 각 원가항목이 어떠한 종류의 작업(즉, 공종분류)에 의해 수행되는 지를 분석하여 각 원가항목에 대한 공종분류를 적용처리하게 되는 바, 원가항목과 공종분류의 관계가 "M:1" 또는 "1:N"으로 처리될 수 있다(단계 S11).상기 원가분류와 공종분류는 더 이상 나누어지지 않는 최소단위의 분류항목이 생성되는 데, 이는 통상적으로 "M:1"의 관계에 의해 형성되지만, 예외적으로 "1:N"의 관계를 갖는 항목이 존재할 수도 있다. 즉, 상기 원가분류와 공종분류가 "M:1"의 관계인 경우에, 하나의 공종분류가 예컨대 "경량 칸막이벽 설치"이면 그 "경량 칸막이벽 설치"에 필요한 다수의 원가항목(예컨대, 페인트칠, 시멘트, 벽돌 등)이 연관되는 것이다.여기서, 상기 원가항목과 공종분류의 관계가 "M:1"인 경우에는 복수의 원가항목에 대해서 단일의 공종분류가 적용될 수 있지만, 특이하게도 원가항목과 공종분류의 관계가 "1:N"으로 성립되는 경우에는 하나의 원가항목에 대해서 적어도 2가지 이상의 공종분류를 갖는 작업으로 나누어서 적용해야 하는 바, 그러한 원가항목은 공사의 진행방식과 순서에 따라 담당자의 수작업에 의해서 다시 분할함으로써 공종분류를 적용하게 된다. 이와 같은 공종분류작업이 끝나면, 원가분류와 공종분류를 동시에 가지게 되는 분류항목이 생성되는데 이것이 공통분류항목이다.(단계S11)In this state, in the work classification application processing section 6, in accordance with an operation using the keyboard 102 and the position coordinate input device 106 of the person in charge, each cost item extracted from the cost item extracting section 4 is of some kind. Analyzing whether the work is performed by work (ie, work classification) and applying work classification to each cost item, the relationship between cost items and work classification is treated as "M: 1" or "1: N". (S11). The cost classification and the work classification are generated with a classification item of the minimum unit which is no longer divided, which is usually formed by the relationship of "M: 1", except for "1: N". May exist. That is, in the case where the cost classification and the work classification are "M: 1", if one work classification is, for example, "light partition wall installation", a number of cost items required for the "light partition wall installation" (eg, painting) , Cement, brick, etc.). In the case where the relationship between the cost items and the work classification is "M: 1", a single work classification may be applied to a plurality of cost items, but specifically, In the case where the relationship of work classification is established as "1: N", the work should be divided into work having at least two work classifications for one cost item. The manual classification is applied by dividing by manual hand. After such work classification, a classification item having both cost classification and work classification is created, which is a common classification item (step S11).

삭제delete

또한, 물량산출부(8)에서는 정보 데이터베이스(16)의 물량산출 정보에 기초하여 소정의 건축 및 건설항목에서 동일하게 반복되는 기준평면에 투입될 원가항목을 추출하고, 그 원가항목에 대한 물량을 산출하여 각 원가항목별 물량산출 데이터를 공간분류 테이블(18)의 기준평면 정보에 저장하게 된다(단계 S12).In addition, the quantity calculating section 8 extracts the cost items to be input to the reference plane that is repeated in the same building and construction items on the basis of the quantity calculating information of the information database 16, and calculates the quantity of the cost items. It calculates and stores the quantity calculation data for each cost item in the reference plane information of the space classification table 18 (step S12).

한편, 원가요소 추출부(10)에서는 상기 정보 데이터베이스(16)의 공간분류 테이블(18)에 저장되어 있는 원가항목별 물량산출 데이터의 기준평면 정보를 기초로 공간분류 별로 원가항목을 개체화함에 의해, 구체적인 작업요소로서 원가요소를 추출하게 된다. 즉, 상기 원가항목이 예컨대 "페인트칠"인 경우에 공간분류의 개념을 적용하여 예컨대 "A타입 벽면"으로 개체화함에 의해, "A타입 벽면의 페인트칠" 과같은 원가요소를 추출하게 되고, 그러한 원가요소의 데이터는 상기 정보 데이터베이스(16)의 원가요소 테이블(20)을 생성하게 된다(단계 S13).On the other hand, the cost element extraction unit 10 by individualizing the cost items by space classification based on the reference plane information of the quantity calculation data for each cost item stored in the space classification table 18 of the information database 16, Cost elements are extracted as concrete work elements. That is, when the cost item is, for example, "painting", by applying the concept of spatial classification, for example, by individualizing it into "type A wall", cost elements such as "painting of type A wall surface" are extracted. The data of the cost elements generates the cost element table 20 of the information database 16 (step S13).

이 때, 공통자 및 공정관리요소 생성부(12)에서는 상기 원가요소 추출부(10)에 의해 개체화된 공간분류 별 원가항목에 공종분류를 적용하여 상기 원가항목을 공통분류항목으로 변환함에 의해, 공간분류 및 공종항목이 동시에 적용된 공종요소 즉, 공통자(중간공통자)를 생성하여 상기 정보 데이터베이스(16)의 공통자 테이블(22)에 저장하게 되는 바, 상기 공종분류와 원가분류는 작업의 단계에 따라 계층적 구조를 갖추고 있고, 각 분류의 최하위 계층 항목이 상호 연관되어 있다(단계 S14).이것은 도2에 옵션1로 도시된 방법에 의하여 공통자(중간공통자)를 생성하는 것이다.공통자(중간공통자)를 생성하는 다른 방법은 도2에 옵션2로 도시된 것과 같이 우선 물량산출부(8)에서 산출된 원가항목별 물량산출 데이터의 원가항목을 상기 공종분류 적용처리부(6)에서 생성된 공통분류항목으로 변경하는 방법에 의하여 공종분류를 적용하여 기준평면의 공통분류별 물량산출 테이블을 생성하고, 상기 공통분류별 물량산출 테이블의 원가항목을 개체화하여 공통자(중간공통자)를 생성하는 것을 특징으로 한다.이와 같이 도2에 도시된 옵션1, 또는 옵션2의 방법에 의해 생성된 공통자(중간공통자)는 아직 공정관리 관련정보를 갖고있지 않는 중간단계의 공통자이다.In this case, the common and process management element generation unit 12 converts the cost item into a common classification item by applying a coarse classification to the cost items for each spatial classification, which are individualized by the cost element extraction unit 10, The work factor, that is, the common factor (intermediate common part), which is applied to the spatial classification and the work item at the same time, is generated and stored in the common table 22 of the information database 16. Step by step has a hierarchical structure, and the lowest hierarchical items of each classification are correlated (step S14). This is to create a common (intermediate common) by the method shown as option 1 in FIG. Another method of generating a common person (intermediate common person) is to first apply the cost item of the item cost data calculated by the item cost calculation unit 8, as shown by option 2 in FIG. )on The method of changing the generated common classification item to generate a table of quantity calculation for each common classification of the reference plane by applying the work classification, and to generate the common person (intermediate common person) by individualizing the cost items of the quantity calculation table of the common classification. As described above, the commons (intermediate commons) generated by the method of option 1 or option 2 shown in FIG. 2 are intermediate stages of common who do not yet have process management related information.

또한, 공통자(중간공통자)의 생성과는 병렬적으로 해당 공정계획 및 관리 담당자에 의한 키보드(102) 및 위치좌표 입력장치(106)의 입력조작에 따라 공간분류 레벨과 공종분류 레벨에 의해 결정되는 공정관리요소가 추출되어 공정관리요소 테이블(24)을 생성하게 된다(단계 S16).In addition, in accordance with the creation of the common person (intermediate common person), the spatial classification level and the work classification level are determined in accordance with the input operation of the keyboard 102 and the position coordinate input device 106 by the corresponding process planner and manager. The determined process management element is extracted to generate the process management element table 24 (step S16).

삭제delete

그 다음에, 공통자 및 공정관리요소 연계처리부(14)에서는 상기 공통자 테이블(22)의 공통자(중간공통자)에서 공정관리요소 테이블(24)의 공간분류 및 공종분류가 조합된 공정관리요소와 동일한 분류조합의 공통자(중간공통자)를 추출하고, 그 추출된 공통자(중간공통자)를 해당 공정관리요소와 연계시킴에 의해, 공통자(최종공통자) 데이터베이스를 생성하게 된다(단계 S17).Next, the common and process management element linkage processor 14 combines the process management element table 24 with the space classification and the work classification in the common (intermediate common) of the common table 22. By extracting the commons (intermediate commons) of the same classification combination as the elements, and associating the extracted commons (intermediate commons) with the process control elements, the commons (final commons) database is created. (Step S17).

한편, 상기 공통자 및 공정관리요소 연계처리부(14)에서의 공통자와 공정관리요소의 연계작업에 대한 동작을 도 3에 도시된 플로우차트를 통해 보다 상세히 설명하기로 한다. On the other hand, the operation of the common and the process management element linkage processing unit 14 in the common and process management element linkage processing unit 14 will be described in more detail through the flowchart shown in FIG.

먼저, 공통자 및 공정관리요소 연계처리부(14)에서는 정보 데이터베이스(16)의 공정관리요소 테이블(24)의 첫 번째 레코드로 이동하게 되고(단계 S20), 그 첫 번째 레코드 상에서 공정관리요소의 코드데이터를 추출하게 된다(단계 S21).First, the common and process management element linkage processing unit 14 is moved to the first record of the process management element table 24 of the information database 16 (step S20), and the code of the process management element on the first record. Data is extracted (step S21).

그 상태에서, 공정관리요소의 공간분류값과 공종분류값을 각각 추출하게 되고(단계 S22), 그 공정관리요소의 공간분류값과 동일한 공통자 테이블(22)에서의 공통자의 공간분류값이 존재하는지 비교하고, 그 공정관리요소의 공종분류값과 동일한 공통자의 공종분류값이 존재하는 지를 비교하여, 각각의 동일한 공간분류값 및 공종분류값을 내포하는 공정관리요소와 동일한 값을 갖는 공통자를 찾아내어 공통자 리스트를 추출하게 된다(단계 S23).In this state, the spatial classification value and the work classification value of the process management element are respectively extracted (step S22), and the spatial classification value of the common in the common table 22 is the same as the spatial classification value of the process management element. Compares the common classification of the process control element with the same common classification value, and finds a common person with the same value as the process control element containing the same spatial classification value and the common classification value. The common list is extracted (step S23).

한편, 상기 공통자 및 공정관리요소 연계처리부(14)에서는 상기 추출된 공통자 리스트에 공정관리요소 테이블(24)의 공정관리요소 코드를 적용하게 되고(단계 S24), 해당 공정관리요소의 레코드가 마지막 레코드인지의 여부를 판단하게 된다(단계 S25). On the other hand, the common and process management element linkage processing unit 14 applies the process management element code of the process management element table 24 to the extracted common list (step S24), the record of the process management element is It is judged whether or not it is the last record (step S25).

상기 판단 결과, 상기 공통자 및 공정관리요소 연계처리부(14)에서는 상기 공정관리요소의 코드가 마지막 레코드가 아닌 것으로 판단하게 되면, 상기 공정관리요소 테이블(24)의 다음 레코드로 이동하게 되고(단계 S26), 그 다음 레코드의 공정관리요소 코드데이터를 추출한 상태에서 상기 단계 S21∼S24의 동작을 반복적으로 실행하게 된다. As a result of the determination, when it is determined that the code of the process management element is not the last record, the common and process management element linkage processor 14 moves to the next record of the process management element table 24 (step S26) Then, the operations of steps S21 to S24 are repeatedly executed in the state in which the process management element code data of the next record is extracted.

한편, 상기 공통자 및 공정관리요소 연계처리부(14)에서는 상기 공통자와 공정관리요소의 연계처리가 완료되면, 공통자(최종공통자) 데이터베이스가 최종적으로 구축되어 해당 건축 및 건설항목의 공사에 대한 공정계획 및 공사관리에 이용할 수 있게 되고, 건축 및 건설공사의 준공 이후에 실행되는 품질관리에도 광범위하게 활용할 수 있게 된다. On the other hand, when the common and process management element linkage processing unit 14 completes the linkage process between the common and the process control element, a common (final common) database is finally built to the construction of the building and construction items It can be used for process planning and construction management, and it can be widely used for quality control that is performed after completion of building and construction work.

상기한 실시예를 갖는 본 발명은 그 실시양태에 구애받지 않고 그 요지를 벗어나지 않는 한도 내에서 얼마든지 다양하게 변형하여 실시할 수 있도록 되어 있음은 물론이다. It is a matter of course that the present invention having the above-described embodiments can be variously modified and implemented without departing from the gist of the present invention without departing from the gist thereof.

이상과 같이 본 발명에 따르면, 소정의 건축 및 건설공사에 대한 공간분류와 원가분류 및 공종분류를 상호 조합하여 공정계획 및 공사관리 뿐만 아니라 차후의 품질관리 등에 광범위하게 활용할 수 있는 공통자(최종공통자) 데이터베이스를 구축할 수 있도록 함에 따라, 공정표 상에 비용요소 및 작업요소에 대한 정확한 데이터가 포함시킬 수 있다는 효과를 갖게 된다.As described above, according to the present invention, a common person that can be widely used for future quality control as well as process planning and construction management by combining space classification, cost classification and industrial classification for a predetermined construction and construction work (final common) I) As the database can be built, accurate data on cost and work elements can be included in the schedule.

도 1은 본 발명에 따른 비용/일정/공간 체계를 조합한 건설정보 처리방법을 설명하기 위한 시스템 도면, 1 is a system diagram for explaining a construction information processing method combining a cost / schedule / space system according to the present invention,

도 2는 본 발명에 따른 비용/일정/공간 체계를 조합한 건설정보 처리방법의 동작을 설명하기 위한 플로우차트, 2 is a flowchart for explaining the operation of the construction information processing method combining the cost / schedule / space system according to the present invention,

도 3은 본 발명의 바람직한 실시예에 따라 공통자와 공정관리요소의 연계처리 동작을 설명하기 위한 플로우차트이다.3 is a flowchart for explaining the operation of the association process between the common and the process management element according to the preferred embodiment of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

2:입력부, 4:원가항목 추출부,2: input unit, 4: cost item extraction unit,

6:공종분류 적용처리부, 8:물량산출부,6: Industrial classification processing part, 8: quantity calculation part,

10:원가요소 추출부, 12:공통자 및 공정관리요소 생성부,10: cost element extraction unit, 12: common and process control element generation unit,

14:공통자 및 공정관리요소 연계처리부,14: processing unit linked to common people and process control elements,

16:정보 데이터베이스, 18:공간분류 테이블,16: information database, 18: spatial classification table,

20:원가요소 테이블, 22:공통자 테이블,20: cost element table, 22: common table,

24:공정관리요소 테이블.24: Process control element table.

Claims (7)

소정 건축 및 건설항목의 원가데이터, 공종데이터 및 공간데이터가 탑재된 컴퓨터 시스템 상에서 건축 및 건설에 필요한 건설정보를 생성함에,To generate construction information necessary for building and construction on a computer system equipped with cost data, industrial data and spatial data of a certain building and construction item. 상기 원가데이터로부터 원가계산을 위한 최하위 요소로서 원가항목의 정보를 추출하여 저장하는 원가항목추출단계와, A cost item extraction step of extracting and storing information of a cost item as the lowest element for cost calculation from the cost data; 상기 추출된 각 원가항목에 대하여 공종데이터에 의한 공종분류를 링크하여 공통분류항목을 생성하는 공통분류항목생성단계,A common classification item creation step of generating a common classification item by linking the work classification by the work data for each of the extracted cost items; 상기 추출된 각 원가항목에 대하여 해당 건축 및 건설항목에 대한 반복되는 기준평면의 원가항목 별로 물량을 산출하여 기준평면별 원가항목데이터를 생성하는 원가항목별물량산출단계,For each cost item extracted step of calculating the cost of each item of cost of the repeated reference planes for the corresponding construction and construction items, the cost item quantity calculation step of generating cost item data for each reference plane, 상기 기준평면별 원가항목데이터를 공간데이터에 의한 공간분류에 링크하여 공간별 원가항목으로 개체화하는 원가항목개체화단계, Cost item personalization step of linking the cost item data for each reference plane to the space classification by the spatial data to individualize the cost item for each space; 상기 개체화된 공간별 원가항목과 연관된 공종분류값을 각각 연계시켜서 원가, 공종 및 공간정보가 포함된 공통자(중간공통자)를 생성하는 공통자(중간공통자)생성단계, A common person (intermediate common person) generation step of generating a common person (intermediate common person) including cost, work type, and spatial information by associating a common classification value associated with the individualized cost items for each space; 상기 건축 및 건설항목에 대해 특정한 공간분류 레벨과 공종분류 레벨을 등록하면 등록된 특정 레벨의 공정관리요소를 생성하는 공정관리요소생성단계 및, A process management element generation step of generating a process control element of a specific level registered when a specific space classification level and a work classification level are registered for the building and construction items; 상기 공정관리요소와 동일한 분류조합을 갖는 공통자(중간공통자)를 추출하고, 추출된 각 공통자(중간공통자)에 대해 공정관리요소를 연계하여 공통자(최종공통자) 데이터베이스를 구축하는 공통자(최종공통자)완성단계로 이루어진 것을 특징으로 하는 비용/일정/공간 체계를 조합한 건설정보 처리방법.Extracting the commons (intermediate commons) who have the same classification combination as the process control elements, and constructing the commons (final commons) database by linking the process management elements to each extracted commons (intermediate commons) Construction information processing method combining the cost / schedule / space system, characterized in that the common (final common) completion step. 제 1 항에 있어서, 상기 원가항목별물량산출단계에서 기준평면별 원가항목데이터는 원가항목별 물량산출 데이터가 기준평면 정보에 저장된 공간분류 테이블로 생성되는 것을 특징으로 하는 비용/일정/공간 체계를 조합한 건설정보 처리방법.The method of claim 1, wherein the cost item data for each reference plane in the cost item quantity calculation step is a cost / schedule / space system, characterized in that the cost calculation data for each cost item is generated as a spatial classification table stored in the reference plane information. Combined construction information processing method. 제 2 항에 있어서, 상기 원가항목개체화단계는 상기 공간분류 테이블의 기준평면 정보를 기초로 공간분류 별로 원가항목별 물량산출 데이터를 배분하여 개체화된 원가요소 테이블을 생성하는 단계로 이루어진 것을 특징으로 하는 비용/일정/공간 체계를 조합한 건설정보 처리방법.The method according to claim 2, wherein the cost item objectifying step comprises generating an individualized cost element table by distributing quantity calculation data for each cost item based on the reference plane information of the spatial classification table. Construction information processing method combining cost, schedule and space system. 제 3 항에 있어서, 상기 공통자(중간공통자)생성단계에서, According to claim 3, In the common (intermediate common) generation step, 상기 공통자(중간공통자)는 공간 별로 개체화된 원가요소 테이블의 원가항목을 공통분류 항목으로 변경하여 생성하도록 이루어진 것을 특징으로 하는 비용/일정/공간 체계를 조합한 건설정보 처리방법.The common person (intermediate common person) is a construction information processing method combining the cost / schedule / space system, characterized in that it is configured to create by changing the cost item of the individual cost element table for each space. 제 2 항에 있어서,The method of claim 2, 상기 원가항목 개체화단계는 상기 원가항목별 물량산출단계에서 산출된 원가항목별 물량산출 데이터의 원가항목을 상기 공통분류항목생성단계에서 생성된 공통분류항목으로 변경하는 방법에 의하여 공종분류를 기준평면의 공통분류별 물량산출 테이블을 생성하는 단계를 더 포함하고, In the cost item individualization step, the work classification is changed to the common classification item generated by the common classification item generation step by changing the cost item of the cost calculation data for each cost item calculated in the cost calculation step for each cost item. Generating a quantity calculation table for each common classification; 상기 공통자(중간공통자)생성단계는 상기 공통분류별 물량산출 테이블의 원가항목을 개체화하여 공통자(중간공통자)를 생성하는 것을 특징으로 하는 비용/일정/공간 체계를 조합한 건설정보 처리방법.The common person (intermediate common person) generation step is a construction information processing method combining the cost / schedule / space system, characterized in that to create a common person (intermediate common person) by individualizing the cost items of the quantity calculation table for each common classification . 제 1 항에 있어서, 상기 공통자(중간공통자)생성단계는 공종분류값에 공간분류가 적용된 공통자(중간공통자)를 담는 공통자 테이블을 생성하는 단계를 더 포함하여 이루어지고; 2. The method of claim 1, wherein the common (intermediate common) generation step further comprises the step of generating a common table containing common (intermediate common) to which the spatial classification is applied to the type classification value; 상기 공정관리요소생성단계는 공정관리요소를 담는 공정관리요소 테이블을 생성하는 단계를 더 포함하여 이루어진 것을 특징으로 하는 비용/일정/공간 체계를 조합한 건설정보 처리방법.The process management element generation step is a construction information processing method combining the cost / schedule / space system, characterized in that further comprising the step of generating a process management element table containing the process management elements. 제 6 항에 있어서, 상기 공통자(최종공통자)완성단계는, The method of claim 6, wherein the common (final common) completion step, 상기 공정관리요소 테이블의 레코드를 순차적으로 이동하여 공정관리요소의 공간분류와 공종분류 값을 추출하는 단계와, Extracting the space classification and the work classification value of the process management element by sequentially moving the records of the process management element table; 상기 공통자 테이블에서 상기 공정관리요소에서 추출한 공간분류 및 공종분류 값과 동일한 공간분류 및 공종분류 값을 갖는 공통자(중간공통자)의 리스트를 추출하는 단계 및, Extracting, from the common table, a list of common persons (intermediate common persons) having the same spatial classification and species classification values as those extracted from the process management element; 상기 추출된 공통자(중간공통자) 리스트에 공정관리요소의 코드값을 적용하여 연계처리하는 단계를 포함하여 이루어진 것을 특징으로 하는 비용/일정/공간 체계를 조합한 건설정보 처리방법.And applying the code value of the process management element to the extracted common person (intermediate common person) list.
KR10-2001-0033960A 2001-06-15 2001-06-15 Method for processing construction information by using combination of cost/schedule/space system KR100507238B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0033960A KR100507238B1 (en) 2001-06-15 2001-06-15 Method for processing construction information by using combination of cost/schedule/space system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0033960A KR100507238B1 (en) 2001-06-15 2001-06-15 Method for processing construction information by using combination of cost/schedule/space system

Publications (2)

Publication Number Publication Date
KR20020095767A KR20020095767A (en) 2002-12-28
KR100507238B1 true KR100507238B1 (en) 2005-08-10

Family

ID=27709476

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0033960A KR100507238B1 (en) 2001-06-15 2001-06-15 Method for processing construction information by using combination of cost/schedule/space system

Country Status (1)

Country Link
KR (1) KR100507238B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101167849B1 (en) 2010-02-12 2012-07-24 이기상 Method on Ranking Information Processing of Construction Cost Including Small Space or Element Information

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060065838A (en) * 2004-12-10 2006-06-14 주식회사 디디알소프트 Management method for integrating construction cost and process and recording media for storing program source thereof
KR100800547B1 (en) * 2006-12-28 2008-02-04 주식회사 포스코건설 Method of construction process management connecting cost information by element

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09305644A (en) * 1996-05-14 1997-11-28 Ohbayashi Corp Method for supporting construction cost calculation in architecture and civil engineering design
KR20000013775A (en) * 1998-08-13 2000-03-06 이계철 Design process and construction materials automatic extraction method in design drawing
KR20000072245A (en) * 2000-08-22 2000-12-05 강윤환 Method of analysis and control of construction drawing using computer
KR20010007819A (en) * 2000-04-27 2001-02-05 김승양 Building And Construction Information Providing Service Method Of Two Dimensional CAD Drawing In Communication Network
KR20010092638A (en) * 2000-03-24 2001-10-26 스가 오사무 System for calculating the prime cost of construction
KR100309582B1 (en) * 2000-04-27 2001-11-07 정평영 System And Method For Estimate Bill Of Materials Using Two Dimensional CAD Interface
KR20020075109A (en) * 2001-03-23 2002-10-04 주식회사 디디알소프트 System and method for managing construction information using construction integration db, and media for storing program source thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09305644A (en) * 1996-05-14 1997-11-28 Ohbayashi Corp Method for supporting construction cost calculation in architecture and civil engineering design
KR20000013775A (en) * 1998-08-13 2000-03-06 이계철 Design process and construction materials automatic extraction method in design drawing
KR20010092638A (en) * 2000-03-24 2001-10-26 스가 오사무 System for calculating the prime cost of construction
KR20010007819A (en) * 2000-04-27 2001-02-05 김승양 Building And Construction Information Providing Service Method Of Two Dimensional CAD Drawing In Communication Network
KR100309582B1 (en) * 2000-04-27 2001-11-07 정평영 System And Method For Estimate Bill Of Materials Using Two Dimensional CAD Interface
KR20000072245A (en) * 2000-08-22 2000-12-05 강윤환 Method of analysis and control of construction drawing using computer
KR20020075109A (en) * 2001-03-23 2002-10-04 주식회사 디디알소프트 System and method for managing construction information using construction integration db, and media for storing program source thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101167849B1 (en) 2010-02-12 2012-07-24 이기상 Method on Ranking Information Processing of Construction Cost Including Small Space or Element Information

Also Published As

Publication number Publication date
KR20020095767A (en) 2002-12-28

Similar Documents

Publication Publication Date Title
Eastman Modeling of buildings: evolution and concepts
Chau et al. Four-dimensional visualization of construction scheduling and site utilization
US6996503B2 (en) System and method for take-off of materials using two-dimensional CAD interface
Davidson et al. Simulation of automated data collection in buildings
Mohamed et al. Knowledge based-system for alternative design, cost estimating and scheduling
KR20200082816A (en) Building quantity take-off apparatus and method based on inducing consequential work items, and system using the same
Rehman et al. A framework for design for sustainable future-proofing
Baalousha et al. An integrated web-based data warehouse and artificial neural networks system for unit price analysis with inflation adjustment
Jägbeck MDA planner: interactive planning tool using product models and construction methods
JP6395092B2 (en) Light environment design support device, light environment design support system, program
KR100507238B1 (en) Method for processing construction information by using combination of cost/schedule/space system
Foulds et al. Integrating the analytic hierarchy process andgraph theory to model facilities layout
US8635100B2 (en) System and method for generating multi-phase construction plans
Costa et al. A simulation analysis of sequencing rules in a flexible flowline
Brown et al. An integrated approach to CAD: modelling concepts in building design and construction
Mohamed Knowledge based approach for productivity adjusted construction schedule
CN112818432A (en) Method and device for generating tile laying design, electronic equipment and storage medium
CN113962494A (en) Business space people flow simulation method and device based on ABM model
Zawidzki Discrete optimization in architecture: Architectural & urban layout
Kamara et al. Computer-based application for the processing of clients' requirements
Horman et al. A lean approach to construction: an historical case study
Ismaeel et al. Classifying the Heritage Elements Using Shape Grammars-Openings and Windows in Traditional Residential Facades in Old Mosul-A Case Study
Knoke et al. Square foot range estimating
Elzarka et al. Enhancing value engineering by integrating CAD and estimating software
Cooper et al. Integrating points of view through information modelling

Legal Events

Date Code Title Description
N231 Notification of change of applicant
A201 Request for examination
AMND Amendment
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
J201 Request for trial against refusal decision
AMND Amendment
B701 Decision to grant
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee