KR20020008909A - Foundation method of precast easy to install a street lamp - Google Patents

Foundation method of precast easy to install a street lamp Download PDF

Info

Publication number
KR20020008909A
KR20020008909A KR1020000041850A KR20000041850A KR20020008909A KR 20020008909 A KR20020008909 A KR 20020008909A KR 1020000041850 A KR1020000041850 A KR 1020000041850A KR 20000041850 A KR20000041850 A KR 20000041850A KR 20020008909 A KR20020008909 A KR 20020008909A
Authority
KR
South Korea
Prior art keywords
concrete
precast
foundation
install
copper plate
Prior art date
Application number
KR1020000041850A
Other languages
Korean (ko)
Other versions
KR100394496B1 (en
Inventor
이용관
Original Assignee
정갑주
한국기술개발 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정갑주, 한국기술개발 주식회사 filed Critical 정갑주
Priority to KR10-2000-0041850A priority Critical patent/KR100394496B1/en
Priority to KR2020000021085U priority patent/KR200205807Y1/en
Publication of KR20020008909A publication Critical patent/KR20020008909A/en
Application granted granted Critical
Publication of KR100394496B1 publication Critical patent/KR100394496B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0038Production methods using an auger, i.e. continuous flight type
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Abstract

PURPOSE: A precast foundation method for installing a streetlamp easily is provided to install a foundation without pit excavation for a streetlamp, to have excellent economical efficiency and work efficiency by securing uniform quality of precast products, to save time and to install in a street without road-blocking. CONSTITUTION: The precast foundation method for installing a streetlamp easily comprises the steps of: excavating in almost the same size as a precast concrete by using an auger; installing a footing concrete part(90) to an excavation hole; filling up a gap between the footing concrete part(90) and the excavation hole by tamping with sand; and coupling the footing concrete part(90) and a streetlamp.

Description

가로등 설치가 용이한 프리캐스트 기초공법 및 그 구조물 {Foundation method of precast easy to install a street lamp}Precast foundation method and structure thereof for easy installation of street lamps {Foundation method of precast easy to install a street lamp}

본 발명은 가로등 설치가 용이한 프리캐스트 기초공법 및 그 구조물에 관한 것으로서, 더욱 상세하게는 가로등 기초부를 공장에서 고품질로 제품화하여 현장에서 Auger를 이용하여 기초보다 약간 여유 있게 굴착 후 기초삽입하고, 모래를 이용하여 공극을 메우면, 가로등기초를 터파기 없이 시행 가능한 가로등 설치가 용이한 프리캐스트 기초공법 및 그 구조물에 관한 것이다.The present invention relates to a precast foundation method and structure thereof, which is easy to install a street lamp, and more specifically, to a high quality product in a factory to produce high-quality products in the field using auger in the field after excavation with a little more margin than the foundation, sand insert If the gap is filled by using, it is related to the precast basic method and the structure that can be easily installed streetlight can be implemented without breaking the streetlight foundation.

현재 택지개발이나 도로 건설시 가로등은 도로의 건설과 동시에 최종적으로 설치되고 있다.Currently, streetlights are finally installed at the same time as the construction of roads.

종래의 가로등설치공법은 토목공사가 완료된 후 가로등 설치 시 가로등의 기초 콘크리트를 타설하기 위하여 터파기를 다시 시행하고 터파기한 후에 기초부를 설치하기 위해 콘크리트를 타설하고 그 기초부가 양생된 후에 가로등을 세우고 두 결합부를 고정하여 완성하였다.The conventional street lamp installation method is to re-install the trench to install the foundation concrete of the street lamp after the civil engineering is completed, and to install the foundation after the destruction, and then install concrete to install the foundation, and after the foundation is cured, the street lamp is put together The part was fixed and completed.

그러나, 이러한 종래의 가로등설치공법은 토목공사가 완료된 후 가로등 기초를 매설하기 위해서 굴착후 다시 되메우기 하면 기초주변의 다짐이 제대로 이루어지지 않으며, 현장에서 거푸집설치 및 소량의 콘크리트의 타설은 시공성이 불량하며 균질한 품질을 얻기가 곤란한 문제점이 있었다.However, in the conventional street lamp installation method, after excavation and backfilling to bury the street lamp foundation after completion of civil works, the compaction of the foundation is not made properly, and the formwork and the small amount of concrete in the field are poor in workability. There was a problem that it was difficult to obtain a homogeneous quality.

따라서, 본 발명은 상기 종래의 문제점을 감안하여 안출한 것으로서, 본 발명의 목적은, 가로등 기초부를 공장에서 고품질로 제품화하여 현장에서 앙커를 이용하여 기초보다 약간 여유 있게 굴착 후 기초삽입하고, 모래를 이용하여 공극을 메우면, 가로등기초를 터파기 없이 시행 가능한 가로등 설치가 용이한 프리캐스트 (Precast) 기초공법 및 그 구조물을 제공하는 데 그 목적이 있다.Therefore, the present invention has been made in view of the above-mentioned conventional problems, the object of the present invention is to produce a high-quality product in the factory of the street lamp base in the field using an anchor in the excavation slightly more than the foundation after inserting the foundation, sand The purpose of the present invention is to provide a precast foundation method and its structure that can easily install a street lamp that can be implemented without popping the street lamp foundation by using the gap filling.

본 발명의 다른 목적은 규격화된 크기와 균질화되어 품질이 보장되며 시공이 양호한 가로등 설치가 용이한 프리캐스트 기초공법 및 그 구조물을 제공하는 데 그 목적이 있다.Another object of the present invention is to provide a precast basic method and a structure thereof, which is homogenized with a standardized size to ensure quality and easy to install a street lamp having good construction.

이와 같은 목적을 달성하기 위한 본 발명은 오거(Auger)를 이용하여 기성콘크리트와 거의 같은 크기로 굴착하는 굴착단계와; 상기 굴착한 굴착홀에 기초콘크리트부를 내설하는 단계와; 상기 내설한 기초콘크리트부와 굴착홀 사이의 공극을 모래다짐으로 메우는 단계와; 상기 기초콘크리트부와 가로등과 결합하는 단계로 이루어지도록 달성하였다.The present invention for achieving the above object is an excavation step of digging to about the same size as a ready-made concrete using an auger; Internally laying the foundation concrete part in the excavated drilling hole; Filling the voids between the internal concrete portion and the excavation hole with sand compaction; Achieved by the step of combining with the base concrete portion and the street light.

도 1은 가로등을 도시한 사시도,1 is a perspective view of a street lamp,

도 2는 가로등을 설치하기 하기 위해 굴착도,2 is an excavation view for installing a street light,

도 3은 본 발명의 바람직한 실시예의 가로등 설치가 용이한 프리캐스트 기초공법을 이용한 구조물을 도시한 사시도,Figure 3 is a perspective view showing a structure using a precast basic method easy to install street light of the preferred embodiment of the present invention,

도 4는 본 발명의 바람직한 실시예의 가로등 설치가 용이한 프리캐스트 기초공법을 이용한 구조물의 골격을 도시한 상태도,Figure 4 is a state diagram showing a skeleton of the structure using a precast foundation method easy to install a streetlight of the preferred embodiment of the present invention,

도 5는 본 발명의 바람직한 실시예의 가로등 설치가 용이한 프리캐스트 기초공법을 이용한 구조물과 가로등과 결합된 상태도,5 is a state diagram coupled with the structure and the street lamp using a precast basic method for easy street light installation of the preferred embodiment of the present invention,

도 6은 본 발명의 기초콘크리트부의 저면에 동판을 부착한 상태도이다.6 is a state diagram in which a copper plate is attached to the bottom surface of the base concrete portion of the present invention.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

10 : 앙카볼트 20 : 고정용 철근부10: anchor bolt 20: fixing rebar portion

30 : 파이프 40 : 동판30: pipe 40: copper plate

50 : 전선 60 ; 베이스플레이트50: wire 60; Base plate

70 : 너트 80 : 돌기70: nut 80: protrusion

90 : 기초콘크리트부 100 : 가로등기둥부90: foundation concrete part 100: street lamp pillar

이하, 첨부된 도면들을 참조하여 본 발명의 바람직한 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 가로등을 도시한 사시도이고, 도 2는 가로등을 설치하기 하기 위해 굴착도이고, 도 3은 본 발명의 바람직한 실시예의 가로등 설치가 용이한 프리캐스트 기초공법을 이용한 구조물을 도시한 사시도이고, 도 4는 본 발명의 바람직한 실시예의 가로등 설치가 용이한 프리캐스트 기초공법을 이용한 구조물의 골격을 도시한 상태도이고, 도 5는 본 발명의 바람직한 실시예의 가로등 설치가 용이한 프리캐스트 기초공법을 이용한 구조물과 가로등과 결합된 상태도이고, 도 6은 본 발명의 기초콘크리트부의 저면에 동판을 부착한 상태도이다.1 is a perspective view of a street lamp, FIG. 2 is an excavation view for installing a street lamp, and FIG. 3 is a perspective view showing a structure using a precast basic method for easily installing a street lamp according to a preferred embodiment of the present invention. Figure 4 is a state diagram showing the skeleton of the structure using a precast foundation method easy to install the street lamp of the preferred embodiment of the present invention, Figure 5 is a structure using a precast foundation method easy to install the street lamp of the preferred embodiment of the present invention And a state diagram combined with a street lamp, and FIG. 6 is a state diagram in which a copper plate is attached to a bottom surface of the base concrete portion of the present invention.

먼저, 도 1내지 도 6에 도시한 본 발명의 가로등 설치가 용이한 프리캐스트 기초공법은 오거(Auger)를 이용하여 기성콘크리트와 거의 같은 크기로 굴착하는 굴착단계와; 상기 굴착한 굴착홀에 기초콘크리트부를 내설하는 단계와; 상기 내설한 기초콘크리트부와 굴착홀 사이의 공극을 모래다짐으로 메우는 단계와; 상기 기초콘크리트부와 가로등과 결합하는 단계로 이루어진 특징이 있다.First, the precast basic method easy to install the street lamp of the present invention shown in Figures 1 to 6 using an auger (Auger) excavation step of digging to approximately the same size as the ready-made concrete; Internally laying the foundation concrete part in the excavated drilling hole; Filling the voids between the internal concrete portion and the excavation hole with sand compaction; There is a characteristic consisting of the step of combining with the base concrete portion and the street light.

상기 오거를 이용하여 가로등을 설치하고자하는 부분을 굴착한다. 이때 굴착깊이는 대략 1,500㎝ 정도의 깊이로 굴착한다.Using the auger to excavate the portion to install the street light. At this time, the excavation depth is about 1,500 cm deep.

상기와 같이 굴착된 굴착홀에 하단이 걸고리형상을 한 4개의 앙카볼트(10)를 내설하고, 상기 앙카볼트를 고정하는 "ㅁ"형 고정용 철근부(20)가 다단이 설치되고, 기초콘크리트부의 외측부에서 상단 중앙부로 전선관 삽입 파이프(30)를 내설하고, 저면부에 동판(40)을 부착하여 상기 동판과 전선(50)을 연결되어 상단으로 연결한 어스부를 형성하여 콘크리트를 타설하여 제작된 기초콘크리트부 내설한다.Four anchor bolts 10 having a hooked shape at the bottom of the excavation hole excavated as described above are installed, and the "ㅁ" type fixing rebar portion 20 for fixing the anchor bolts is installed in multiple stages. Insulated conduit insertion pipe 30 from the outer portion of the upper portion to the upper center portion, the copper plate 40 is attached to the bottom surface by connecting the copper plate and the electric wire 50 to form an earth portion connected to the upper end by pouring concrete Install the foundation concrete part.

한편, 상기 기초콘크리트부(90)를 내설한 지면과의 사이 공극에 모래로 기초주변을 물다짐과 모래채움으로 다진다.On the other hand, in the gap between the ground and the ground in which the base concrete portion 90 is built, the base periphery is filled with sand and sand filling.

상기와 같이 기초콘크리트부(90)를 지면에 다져 고정하고 돌출된 앙카볼트(10)와 가로등기둥부(100)의 하면 베이스플레이트(60)와 결합하고 너트(70)로 고정하여 완성한다.As described above, the foundation concrete portion 90 is fixed to the ground, and the bottom surface of the protruding anchor bolt 10 and the street lamp pillar 100 are combined with the base plate 60 and fixed with a nut 70 to be completed.

본 발명의 가로등 설치가 용이한 프리캐스트 기초공법에 사용되는 기초콘크리트부의 구조물은 하단이 걸고리형상을 한 4개의 앙카볼트(10)를 내설하고, 상기 앙카볼트를 고정하는 고정용 철근부(20)가 다단이 설치되고, 기초콘크리트부의 외측부에서 상단 중앙부로 전선관 삽입 파이프(30)를 내설하고, 저면부에 동판(40)을 부착하여 상기 동판과 연결되어 상단으로 연결한 어스부를 형성하고 그 상단부에 콘크리트를 타설하여 성형한 특징이 있다.The structure of the foundation concrete part used in the precast foundation method that is easy to install the street light of the present invention is the bottom of the four anchor bolts (10) in the shape of the hook, and fixing the reinforcing reinforcement portion 20 for fixing the anchor bolts The multi-stage is installed, the conduit insert pipe 30 is installed from the outer portion of the base concrete portion to the upper center portion, and the copper plate 40 is attached to the bottom portion to form an earth portion connected to the copper plate and connected to the upper portion. It is characterized by pouring concrete.

상기의 저면부에 장착되는 동판은 기초부를 콘크리트로 성형하여 제작 후에 부착이 가능하다.The copper plate mounted on the bottom part may be attached after fabrication by forming the base part into concrete.

또한, 상기 기초콘크리트부(90)의 저면 측부에 다수의 돌기(80)를 형성하여 지면과의 결합력을 강하게 결합되도록 형성하였다.In addition, a plurality of protrusions 80 are formed on the bottom side of the base concrete portion 90 to form a strong coupling force with the ground.

예컨대, 본 발명은 상술한 실시예에 한정되지 아니하며, 청구범위에서 청구한 본 발명의 요지를 벗어남이 없이 본 발명이 속하는 기술분야에 통상의 지식을 가진 자라면 변형 실시가 가능한 것임은 물론이고, 그와 같은 변경은 본 발명의 청구범위 내에 있게 된다.For example, the present invention is not limited to the above-described embodiments, and a person skilled in the art without departing from the gist of the present invention claimed in the claims may be modified. Such changes are intended to fall within the scope of the present invention.

상기 실시예를 통하여 설명한 바와 같이, 본 발명의 가로등 설치가 용이한 프리캐스트 기초공법은 이미 토목공사가 시공되었거나 추가로 설치되는 가로등 기초 터파기 없이 기초 설치가 가능하며 프리케스트(Precast) 제품으로 균질한 품질보장으로 경제적성과 시공성이 양호한 효과가 있다. 또한, 시간이 절약되며 시가지 공사시 교통차단이 없이 설치가 가능한 효과가 있으므로 가로등 설치산업상 매우 유용한 발명인 것이다.As described through the above embodiments, the easy-to-install precast foundation method of the present invention can be installed without a street lamp foundation dig that is already installed or additionally installed in civil engineering, and is homogeneous as a precast product. As a result of quality guarantee, economics and workability are good. In addition, it is a time-saving and very effective invention in the streetlight installation industry because it can be installed without traffic blocking during urban area construction.

Claims (4)

오거(Auger)를 이용하여 기성콘크리트와 거의 같은 크기로 굴착하는 굴착단계와;An excavation step of digging to about the same size as a ready-made concrete using an auger; 상기 굴착한 굴착홀에 기초콘크리트부를 내설하는 단계와; 상기 내설한 기초콘크리트부와 굴착홀 사이의 공극을 모래다짐으로 메우는 단계와;Internally laying the foundation concrete part in the excavated drilling hole; Filling the voids between the internal concrete portion and the excavation hole with sand compaction; 상기 기초콘크리트부와 가로등과 결합하는 단계로 이루어진 것을 특징으로 하는 가로등 설치가 용이한 프리캐스트 기초공법.A precast basic method for easily installing a street light, characterized in that the step consisting of combining the base concrete part and the street light. 제 1 항에 있어서, 상기 기초콘크리트부는 하단이 걸고리형상을 한 4개의 앙카볼트를 내설하고, 상기 앙카볼트를 고정하는 고정용 철근부가 다단이 설치되고, 기초콘크리트부의 외측부에서 상단 중앙부로 전선관 삽입 파이프를 내설하고, 저면부에 동판을 부착하고 상기 동판과 연결되어 상단으로 연결한 어스부를 형성여 콘크리트를 타설하여 제작된 것을 특징으로 하는 가로등 설치가 용이한 프리캐스트 기초공법.According to claim 1, wherein the foundation concrete section is anchored by four anchor bolts having a hook-shaped bottom, the reinforcing reinforcing part for fixing the anchor bolt is provided with a multi-stage, the conduit insertion pipe from the outer portion of the foundation concrete portion to the upper center portion Precast basic method for easy installation of street light, characterized in that the installation, and the bottom portion attached to the copper plate and connected to the copper plate to form an earth portion connected to the top by pouring concrete. 하단이 걸고리형상을 한 4개의 앙카볼트를 내설하고, 상기 앙카볼트를 고정하는 고정용 철근부가 다단이 설치되고, 기초콘크리트부의 외측부에서 상단 중앙부로 전선관 삽입 파이프를 내설하고, 저면부에 동판을 부착하여 상기 동판과 연결되어 상단으로 연결한 어스부를 형성하고 그 상단부에 콘크리트를 타설하여 성형한 것을 특징으로 하는 가로등 설치가 용이한 구조물.Four anchor bolts with hooked lower ends are installed, and the fixing reinforcing bars for fixing the anchor bolts are installed in multiple stages. The inner conduit insertion pipe is installed from the outer side of the foundation concrete portion to the upper center portion, and the copper plate is attached to the bottom surface. And a ground portion connected to the copper plate and connected to the upper portion thereof, and easy to install the street light, characterized in that the upper portion is molded by molding concrete. 제 3 항에 있어서, 상기 기초콘크리트부는 그 저면 측부면에 돌기부를 형성함을 특징으로 하는 가로등 설치가 용이한 구조물.The structure of claim 3, wherein the foundation concrete portion has protrusions formed on side surfaces thereof.
KR10-2000-0041850A 2000-07-21 2000-07-21 Foundation of precast easy to install a street lamp KR100394496B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR10-2000-0041850A KR100394496B1 (en) 2000-07-21 2000-07-21 Foundation of precast easy to install a street lamp
KR2020000021085U KR200205807Y1 (en) 2000-07-21 2000-07-24 Precast structure easy to install a street lamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0041850A KR100394496B1 (en) 2000-07-21 2000-07-21 Foundation of precast easy to install a street lamp

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020000021085U Division KR200205807Y1 (en) 2000-07-21 2000-07-24 Precast structure easy to install a street lamp

Publications (2)

Publication Number Publication Date
KR20020008909A true KR20020008909A (en) 2002-02-01
KR100394496B1 KR100394496B1 (en) 2003-08-21

Family

ID=19679141

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0041850A KR100394496B1 (en) 2000-07-21 2000-07-21 Foundation of precast easy to install a street lamp

Country Status (1)

Country Link
KR (1) KR100394496B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100908802B1 (en) * 2009-04-07 2009-07-22 서한전기공업(주) Framework for foundation of pole and foudation and pole thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0129305Y1 (en) * 1995-05-09 1998-12-15 박병호 Individual foundation for building construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100908802B1 (en) * 2009-04-07 2009-07-22 서한전기공업(주) Framework for foundation of pole and foudation and pole thereof

Also Published As

Publication number Publication date
KR100394496B1 (en) 2003-08-21

Similar Documents

Publication Publication Date Title
KR100640716B1 (en) Precast concrete block for cantilever retaining wall and construction method using the same
KR101358985B1 (en) Pillar settling structure and construction method of the same with improved stability and workability
KR100936668B1 (en) A composite pile for earth retaining wall and centrifugal force type earth retaining wall using it
KR100828657B1 (en) Form structure for providing basic streetlight construction
KR102170998B1 (en) Excavation and lining concrete wall construction method of vertical tunnel using integral formwork and preceding excavation
KR200205807Y1 (en) Precast structure easy to install a street lamp
KR100349107B1 (en) Shaft construction system using precasted segment block
KR20020008909A (en) Foundation method of precast easy to install a street lamp
KR200420394Y1 (en) Precast concrete block for cantilever retaining wall
KR100429283B1 (en) Construction Method using Precast Concrete for Diaphragm Wall
KR100397958B1 (en) The structure timbering of cut with separating wale and the construction method thereof
KR100493516B1 (en) Micro pile and assembly foundation reinforcement structure member and its method for pier
KR100436896B1 (en) Construction method for back-fill area of abutment
KR960002378B1 (en) A working method for a protective structure
KR100779583B1 (en) Block for slope reinforcement and slope stabilization and reinforcement method using the same
KR200275363Y1 (en) The mold establishment necessit do not exist assembly road water pipe
JP2515227B2 (en) Installation method of cast-in-place concrete foundation and precast concrete wall slab
KR100355513B1 (en) Shaft construction system using pc steel wire
KR102388496B1 (en) Extension panel of cut retaining wall and its construction method
KR102610909B1 (en) Method and structure of steel pipe propulsion using anchor installation inside steel pipe to prevent sinking
KR200240016Y1 (en) Structure of reclamation type's for dection soil
KR20030089128A (en) a retaining wall construction system
KR20000059203A (en) Retaining Wall Construction Method
JPH1061266A (en) Mounting method of wall and wall construction
KR20020089687A (en) The method for carrying out synthetic precast concreted wall of bridge

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120718

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20130717

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140723

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20150729

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20160729

Year of fee payment: 14