KR200197360Y1 - Moving facility for check and maintenance of bridges with horizontal boom moving up and down - Google Patents
Moving facility for check and maintenance of bridges with horizontal boom moving up and down Download PDFInfo
- Publication number
- KR200197360Y1 KR200197360Y1 KR2020000012765U KR20000012765U KR200197360Y1 KR 200197360 Y1 KR200197360 Y1 KR 200197360Y1 KR 2020000012765 U KR2020000012765 U KR 2020000012765U KR 20000012765 U KR20000012765 U KR 20000012765U KR 200197360 Y1 KR200197360 Y1 KR 200197360Y1
- Authority
- KR
- South Korea
- Prior art keywords
- bridge
- boom
- horizontal boom
- moving
- work
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/106—Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forklifts And Lifting Vehicles (AREA)
Abstract
본 고안은 아취교의 점검 및 보수용 이동장치에 관한 것으로, 상판을 지지하는 스틸박스형 빔이 아취형으로 형성된 교량에 설치되는 점검 및 보수용 이동식 장치에 관한 것이다.The present invention relates to a mobile device for inspection and repair of arch bridge, and a mobile device for inspection and repair installed in a bridge formed of a steel box-type beam supporting the upper plate.
본 고안은 설치하는 레일의 구조가 아취로 형성된 교량의 컨틸레버에 설치되며 작업차가 레일을 따라 이동하면서 수평붐과 작업대가 상. 하 이동과 상. 하 신축이 용이하도록 구성하여 이동 및 작업을 용이하게 할 수 있도록 작업대의 높. 낮이 조종이 가능한 점검 및 보수용 이동 작업장치를 제공하는 것이다.The present invention is installed on the bridge of the bridge formed by the arch structure of the rail to be installed, the horizontal boom and the workbench as the work car moves along the rail. Ha and Sang. It is designed to be easy to stretch and move so that it can be easily moved and operated. It is to provide a mobile work tool for inspection and repair that can be controlled during the day.
Description
본 고안은 아취교의 점검 및 보수용 이동장치에 관한 것으로, 특히 상판을 지지하는 스틸박스형 빔이 아취형으로 형성된 교량에 설치되는 작업차의 수평붐과 작업대를 상. 하 이동과 상. 하 신축이 용이하도록 구성하여 빔의 높은 부분과 낮은 부분을 용이하게 작업하면서 전 교량을 이동할 수 있는 점검 및 보수용 이동식 장치에 관한 것이다.The present invention relates to a mobile device for inspection and repair of arch bridges, and in particular, a horizontal boom and a work platform of a work vehicle installed in a bridge formed of a steel box beam supporting the upper plate in a jade shape. Ha and Sang. The present invention relates to a mobile device for inspection and repair, which is configured to be easy to expand and contract, and which can move the whole bridge while easily working the high and low parts of the beam.
종래 아취형 교량은 상판을 지지하는 스틸박스형 빔의 형상이 윗 부분은 평면을 형성하고 아랫부분은 아취를 형성하여 구성되는 것으로, 아취의 정점에서 상판까지 빔의 두께가 얇고 아취의 저점 즉 교각 부분에서 상판 까지의 빔 두께는 두터운 모양으로 형성되므로 아취형 교량을 점검 및 보수하기 위해서는 중장비를 동원하여 교량의 상판 하부에 아취를 따라 계단식 비계를 설치하거나 본인이 동일자로 출원하는 교량의 단경간에서 아취를 따라 이동하는 작업차에 의해 작업을 해 왔던 것이 사실이다.In the conventional arch bridge, the shape of the steel box beam supporting the upper plate is formed by forming the upper part of the plane and the lower part by forming the arch. Since the beam thickness from the top to the top is thick, it is necessary to use heavy equipment to install stepped scaffolding along the arch under the top of the bridge to check and repair the arch. It is true that the work has been done by the working vehicle moving along.
상기와 같은 작업은 많은 시간을 요할 뿐 아니라 많은 비용이 요구되며 작업 지원이 교량의 상판에서 이루어지는 것이므로 교통 통제를 해야하는 되는 문제점이 있고 단경간에 설치되는 이동 작업차는 교량당 많은 작업차가 요구되는 문제점이 있다.As the above work is not only time-consuming but also expensive, and the work support is performed at the top of the bridge, there is a problem that traffic control is required, and a mobile work vehicle installed in a short span has a problem that requires many work cars per bridge. .
상기와 같은 문제점을 고려하여 본 고안은 교량의 양측 상판의 저부에 설치되는 레일을 이동하는 같은 구조의 작업차를 구성하고 작업대가 형성된 수평붐이 수직붐에 지지되어 상. 하로 이동하고 90도 각으로 회전하면서 작업 및 이동을 각각 또는 동시에 작동할 수 있는 작업차를 제공하는데 그 목적이 있다.In consideration of the above problems, the present invention constitutes a work vehicle of the same structure for moving a rail installed at the bottom of both top plates of a bridge, and a horizontal boom on which a work table is formed is supported on a vertical boom. The object is to provide a work vehicle capable of operating the work and the movement individually or simultaneously while moving downward and rotating at an angle of 90 degrees.
상기와 같은 목적을 달성하기 위해 수평붐은 수직붐에 충분히 지지되게 구성하고 수직붐은 턴테이블에 지지되도록 구성하며, 테이블은 턴테이블을 지지하고 회동할 수 있도록 구성한다.In order to achieve the above object, the horizontal boom is configured to be sufficiently supported on the vertical boom and the vertical boom is configured to be supported on the turntable, the table is configured to support and turn the turntable.
상기 테이블은 행거에 지지되도록 구성하며, 행거는 2쌍의 롤러에 지지되도록 구성하고 수평붐의 중력 작용에 의한 수직붐의 횡력에 견디기 위해 2개의 행거와 2개의 레일을 교량의 길이 방향으로 설치토록 한다.The table is configured to be supported by a hanger, the hanger is configured to be supported by two pairs of rollers, and to install two hangers and two rails in the longitudinal direction of the bridge to withstand the lateral force of the vertical boom caused by the gravity action of the horizontal boom. do.
도 1의 a는 빔의 높은 부분의 작업도1 a is a working view of the high part of the beam
도 1의 b는 빔의 낮은 부분의 작업도1b is a working view of the lower part of the beam
도 2는 본 고안의 이동 상태도2 is a moving state diagram of the present invention
[도면의 주요부분에 대한 부호의 설명][Explanation of symbols on the main parts of the drawings]
11 : 수평붐 12 : 수직붐11: horizontal boom 12: vertical boom
13 : 테이블 14 : 레일13: table 14: rail
15 : 롤러 16 : 상판15: roller 16: the top plate
17 : 빔 18 : 작업대17 beam 18 working table
19 : 와이어 21 : 동력(a,b,c)19: wire 21: power (a, b, c)
22 : 사다리(a,b) 23 : 고정구22: ladder (a, b) 23: fixture
24 : 발란스웨이트 25 : 턴테이블24: Balance weight 25: Turntable
첨부된 도면을 참고하여 본 고안에 대해서 상세히 설명하고자 한다.The present invention will be described in detail with reference to the accompanying drawings.
본 고안은 교량의 양측 상판(16) 하부에 대칭으로 설치되는 것으로, 일측의 상판(16) 하부에 교량의 길이 방향으로 설치되는 2개의 레일(14)과 레일(14)에 지지되는 테이블(13)과 상기 테이블(13)에 회동할 수 있도록 지지되는 턴테이블(25)과 상기 턴테이블(25)과 연계되어 아랫 방향으로 형성된 트러스 모양의 4각 수직붐(12)과 상기 수직붐(12)을 가이드로 하여 상. 하 이동할 수 있도록 형성된 수평붐(11)과 상기 수평붐(11) 일측에 상. 하 신축이 가능하게 형성된 작업대(18)로 구성된다.The present invention is symmetrically installed on both sides of the upper plate 16 lower portion of the bridge, two rails 14 installed in the longitudinal direction of the bridge below the upper plate 16 on one side and the table 13 supported on the rail 14 And the truss-shaped quadruple vertical boom 12 and the vertical boom 12 formed in a downward direction in connection with the turntable 25 and the turntable 25 supported to rotate on the table 13. By award. The horizontal boom 11 and the horizontal boom 11 formed on one side so as to move downward. It consists of a worktable 18 formed to be able to stretch.
도 1은 본 고안에 의한 작업차의 작업상태를 도시하고자 한 것이고, 도 2는 본 고안에 의한 작업차의 이동상태를 도시한 것이다.Figure 1 is intended to show the working state of the work vehicle according to the present invention, Figure 2 shows a moving state of the work vehicle according to the present invention.
도 1에 도시된 것과 같이 작업을 충분히 할 수 있는 크기로 테이블이 형성되고, 상기 테이블(13)과 일체로 형성되고 테이블(13) 면 보다 약간 높은 위치에 2개 씩의 롤러(15)가 설치되며, 상판(16) 하부에 설치된 2개의 레일(14)에 도 1에 도시된 것과 같이 결합되어 수평붐(11)의 중력으로 수직붐(12)에 발생하는 횡력에 의해 테이블(13)이 전. 후 좌. 우로 요동되는 것이 방지되며 상기 테이블(13) 윗 부분에는 롤러(15)를 구동시키는 동력(21a)이 구비된다.As shown in FIG. 1, a table is formed to a size sufficient to work, and two rollers 15 are provided at a position formed integrally with the table 13 and slightly higher than the surface of the table 13. Table 13 is moved to the two rails 14 installed under the upper plate 16 as shown in FIG. 1 by the lateral force generated on the vertical boom 12 by the gravity of the horizontal boom 11. . After left. It is prevented from rocking to the right and the upper portion of the table 13 is provided with a power 21a for driving the roller 15.
상기 테이블(13) 일측에는 교량의 상판(16)으로 출입할 수 있는 사다리(22a)가 도 1에 도시된 것과 같이 형성되며, 테이블(13) 일측에는 테이블(13)에 지지되면서 회동할 수 있는 턴테이블(25)이 형성되고 상기 턴테이블(25)에는 일정한 길이의 수직붐(12)이 결착 고정된다.One side of the table 13 is formed with a ladder 22a for entering and exiting the upper plate 16 of the bridge as shown in FIG. 1, and one side of the table 13 is rotatable while being supported by the table 13. A turntable 25 is formed and a vertical boom 12 of a fixed length is fixed to the turntable 25.
상기 수직붐(12)의 외부에는 수직붐(12)에 지지되면서 수직붐(12)의 상. 하를 이동할 수 있도록 수평붐(11)이 상기 수직붐(12)과 직각으로 결합 고정된다. 상기 수직붐(12)을 기점으로 일측은 상판(16) 하부를 작업할 수 있도록 통로가 형성되고 상기 통로에는 상. 하 신축용 작업대(18)가 설치되며, 다른 일측은 수평붐(11)의 밸런스를 유지하기 위한 밸런스 웨이트(24)가 형성된다.The outside of the vertical boom 12 is supported on the vertical boom 12, the image of the vertical boom 12. The horizontal boom 11 is fixedly coupled at right angles to the vertical boom 12 so as to move downward. Starting from the vertical boom 12, one side is formed with a passage so that the upper plate 16 can be worked on the upper passage. Lower stretch work platform 18 is installed, the other side is formed with a balance weight 24 for maintaining the balance of the horizontal boom (11).
상기 턴테이블(25)의 평면에는 동력(21b)이 설치되고 상기 동력(21b)에는 와이어(19)가 연계되며 와이어(19) 일단은 수평붐(11)의 고정구(23)에 고정된다.A power 21b is installed on the plane of the turntable 25, a wire 19 is connected to the power 21b, and one end of the wire 19 is fixed to the fixture 23 of the horizontal boom 11.
작용을 실시 예로 설명하면,If the operation is described as an example,
교량의 구조가 다양하게 구성되는데 따라 효과적인 작업을 하기 위해서는 교량의 점검 및 보수용 이동 작업차 역시 다양하게 구성할 수 밖에 없으며, 특히 본 고안과 같이 상판(16)을 지지하는 스틸박스형 빔이 아취형으로 형성될 때는 아취에 따라 빔의 높. 낮이가 상이하므로 작업대(18)가 고정되었을 경우에는 작업이 용이하지 않은 문제점이 있다.As the structure of the bridge is configured in various ways, in order to effectively work, the mobile work vehicle for inspection and repair of the bridge must also be configured in various ways, and in particular, the steel box-type beam supporting the upper plate 16 as in the present invention is jade type. When formed into the height of the beam according to the arch. Since the day is different, there is a problem that the work is not easy when the work table 18 is fixed.
본 고안은 상기와 같은 문제점을 고려한 것이다.The present invention considers the above problems.
작업차가 교각을 통과하여 작업 위치에 있게 되면 작업차는 레일(14) 이동이 정지되고, 상기와 같이 작업차가 정지된 위치는 빔(17)의 두께가 가장 큰 곳에 위치하므로 턴테이블(25) 위의 동력(21b)을 작동하여 동력(21b)에 감긴 와이어(19)를 풀게되면 상기 와이어(19)는 수평대(11)의 고정구(23)에 고정되어 수평대(11)를 지지하므로 수평대(11)는 하강하여 빔(17)의 가장 낮은 부분의 저부를 작업할 수 있는 위치에 멈추게 된다.When the work vehicle passes through the piers and is in the working position, the work vehicle stops moving the rails 14, and the position where the work vehicle is stopped is located at the position where the thickness of the beam 17 is greatest, so that the power on the turntable 25 is increased. When the wires 19 wound on the power 21b are released by operating the 21b, the wires 19 are fixed to the fasteners 23 of the horizontal bar 11 to support the horizontal bar 11 and thus the horizontal bar 11 ) Is lowered and stopped at a position where the bottom of the lowest portion of the beam 17 can be worked.
상기와 같이 수평대(11)가 멈추게 되면 동력(21c)을 작동하여 턴테이블(25)을 회전시켜 수직붐(12)과 수평붐(11)을 회전시키고 수평붐(11)이 교량의 내측 방향으로 향하여 교량과 직각을 형성토록 하고 수평붐(11)의 일단에 형성된 작업대(18)를 신장시키면서 빔(17)의 아랫부분에서 윗 부분 까지 효과적으로 작업할 수 있고 빔(17) 아취의 높이에 따라 수평붐(11)의 높. 낮이를 조절하면서 이동하여 작업하도록 하였다.When the horizontal stand 11 is stopped as described above, by operating the power 21c to rotate the turntable 25 to rotate the vertical boom 12 and the horizontal boom 11 and the horizontal boom 11 in the inward direction of the bridge Forming a right angle to the bridge and extending the work platform 18 formed at one end of the horizontal boom 11 can effectively work from the lower part to the upper part of the beam 17 and the horizontal according to the height of the height of the beam 17 Height of the boom 11. The day was adjusted while moving to work.
상기와 같은 방법으로 수평대(11)는 동력(21b)의 작동에 의해 높. 낮이를 조종한다.In the same manner as above, the horizontal stage 11 is raised by the operation of the power 21b. Manipulate the day.
상기와 같이 작업차의 작업시는 사다리(22a)를 통해 작업자가 승차하고 작업의 위치에 따라 작업자는 테이블(13), 수평붐(11), 작업대(18)에서 작업하게 되며 작업자의 작업 통로는 상판(16)에서 출입사다리(22a)를 통과하고 테이블(13)에 위치할 수 있고, 테이블(13)에서 턴테이블(25)을 통과하고 수직붐(12)의 통과하여 수평붐(11)에 이르게 되고 수평붐(11)에서 자유로운 통행으로 작업대(18)를 이용하여 작업하도록 하였다.As described above, the worker rides through the ladder 22a and the worker works on the table 13, the horizontal boom 11, and the work table 18 according to the position of the work vehicle. It can pass through the access ladder 22a at the top plate 16 and can be located on the table 13, from the table 13 through the turntable 25 and through the vertical boom 12 to the horizontal boom 11. And to work using the work platform 18 in a free passage on the horizontal boom (11).
수직붐(12)을 기점으로 수평붐(11)의 일측이 길게 형성되어 수직붐(12)에 횡력이 발생하게 하였다One side of the horizontal boom 11 is formed long from the vertical boom 12 to cause the lateral force to occur in the vertical boom 12.
상기와 같은 수직붐(12)의 횡력은 테이블(13)에 그대로 전달되므로 레일(14)을 일정한 간격으로 2개를 구성하여 2개의 롤러(15)와 결합하도록 하여 레일(14)과 롤러(15)가 수직붐(12)의 횡력에 견디도록 하였다.Since the lateral force of the vertical boom 12 as described above is transmitted to the table 13 as it is, the rail 14 and the roller 15 by combining the two rollers 15 by forming two rails 14 at regular intervals. ) To withstand the lateral force of the vertical boom (12).
본 고안에 의한 이동 작업차는 상판을 지지하는 빔이 아취형으로 구성된 교량에서 교통량과 기후에 관계없이 작업할 수 있으며 아취를 따라 이동하면서 빔의 높. 낮이에 따라 효과적으로 작업할 수 있도록 수평붐과을 상. 하이동이 가능하도록 구성되고 작업대가 신축할 수 있도록 구성되어 적은 비용으로 교량의 점검 및 보수작업을 할 수 있다.In the mobile work vehicle according to the present invention, the beam supporting the upper plate can work regardless of the traffic volume and the weather in the bridge formed of the arch type, and move along the arch to raise the height of the beam. Lift the horizontal boom and lift to work effectively during the day. It is configured to enable high moving, and the worktable can be expanded to perform inspection and repair work on the bridge at low cost.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020000012765U KR200197360Y1 (en) | 2000-05-04 | 2000-05-04 | Moving facility for check and maintenance of bridges with horizontal boom moving up and down |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020000012765U KR200197360Y1 (en) | 2000-05-04 | 2000-05-04 | Moving facility for check and maintenance of bridges with horizontal boom moving up and down |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200197360Y1 true KR200197360Y1 (en) | 2000-09-15 |
Family
ID=19654991
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020000012765U KR200197360Y1 (en) | 2000-05-04 | 2000-05-04 | Moving facility for check and maintenance of bridges with horizontal boom moving up and down |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200197360Y1 (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100488467B1 (en) * | 2002-04-23 | 2005-05-11 | 주식회사 용마엔지니어링 | Up and down turnning apparatus for auto maintenance trolley |
KR100553223B1 (en) * | 2005-10-14 | 2006-02-22 | (주)경동기술공사 | Structure of establishing working booth for pier well tube |
KR100823859B1 (en) | 2006-12-07 | 2008-04-21 | 정재룡 | Inspection & repair method and the device for an elevated road |
KR100833751B1 (en) * | 2007-03-19 | 2008-05-29 | 주식회사 엠코리아 | Moving and supporting apparatus of vehicle for working of bridge slab |
KR100833750B1 (en) * | 2007-03-19 | 2008-05-29 | 주식회사 엠코리아 | Rotating apparatus of vehicle for working of bridge slab |
CN108103932A (en) * | 2017-12-22 | 2018-06-01 | 中铁第四勘察设计院集团有限公司 | It turns round closed type Flexible arch bridge with steel truss beam and checks vehicle |
CN108408005A (en) * | 2018-04-03 | 2018-08-17 | 上海圭目机器人有限公司 | A kind of bridge pier underwater detecting robot mechanical system |
CN110373995A (en) * | 2019-07-29 | 2019-10-25 | 成都市新筑路桥机械股份有限公司 | A kind of deck railway arch bridge crosses pier bridge-checking vehicle |
CN114108458A (en) * | 2021-12-06 | 2022-03-01 | 浙江中诚工程管理科技有限公司 | Bridge detection device and detection method thereof |
CN114438878A (en) * | 2021-12-27 | 2022-05-06 | 上海市政养护管理有限公司 | Walking operation platform for maintaining steel box girder arch bridge |
-
2000
- 2000-05-04 KR KR2020000012765U patent/KR200197360Y1/en not_active IP Right Cessation
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100488467B1 (en) * | 2002-04-23 | 2005-05-11 | 주식회사 용마엔지니어링 | Up and down turnning apparatus for auto maintenance trolley |
KR100553223B1 (en) * | 2005-10-14 | 2006-02-22 | (주)경동기술공사 | Structure of establishing working booth for pier well tube |
KR100823859B1 (en) | 2006-12-07 | 2008-04-21 | 정재룡 | Inspection & repair method and the device for an elevated road |
KR100833751B1 (en) * | 2007-03-19 | 2008-05-29 | 주식회사 엠코리아 | Moving and supporting apparatus of vehicle for working of bridge slab |
KR100833750B1 (en) * | 2007-03-19 | 2008-05-29 | 주식회사 엠코리아 | Rotating apparatus of vehicle for working of bridge slab |
CN108103932A (en) * | 2017-12-22 | 2018-06-01 | 中铁第四勘察设计院集团有限公司 | It turns round closed type Flexible arch bridge with steel truss beam and checks vehicle |
CN108408005A (en) * | 2018-04-03 | 2018-08-17 | 上海圭目机器人有限公司 | A kind of bridge pier underwater detecting robot mechanical system |
CN108408005B (en) * | 2018-04-03 | 2024-04-19 | 上海圭目机器人有限公司 | Pier underwater detection robot system |
CN110373995A (en) * | 2019-07-29 | 2019-10-25 | 成都市新筑路桥机械股份有限公司 | A kind of deck railway arch bridge crosses pier bridge-checking vehicle |
CN114108458A (en) * | 2021-12-06 | 2022-03-01 | 浙江中诚工程管理科技有限公司 | Bridge detection device and detection method thereof |
CN114438878A (en) * | 2021-12-27 | 2022-05-06 | 上海市政养护管理有限公司 | Walking operation platform for maintaining steel box girder arch bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR200197360Y1 (en) | Moving facility for check and maintenance of bridges with horizontal boom moving up and down | |
JPH0230851A (en) | Device for work at structure's wall surface | |
JP2008156015A (en) | Mobile crane | |
KR20000049885A (en) | Working automobile for check and maintenance of bridges | |
JP6917948B2 (en) | Lifting device for heavy objects and lifting method | |
CN110937555A (en) | Track maintenance car | |
CN112921718B (en) | Continuous jacking and mounting device for light rail track beam and using method thereof | |
KR200197362Y1 (en) | Moving facility for check and maintenance of arch-shaped bridges | |
KR20040024358A (en) | A working device for assembly tunnel soundproofed wall | |
KR100377529B1 (en) | Working platform for bridge construction | |
KR200197364Y1 (en) | Moving work facility for check and maintenance of bridges | |
JP3827674B2 (en) | Construction method for structures straddling railway tracks | |
JPH0892916A (en) | Construction method of raising and lowering of bridge girder and raising machine and bent member | |
KR0150273B1 (en) | Turning apparatus and system for making steel box girder | |
JP2519842B2 (en) | Multi-level parking device | |
JP4598454B2 (en) | Crane girder / saddle assembly equipment | |
CN221396927U (en) | Special container cover top plate platform | |
KR200197369Y1 (en) | Working automobile for check and maintenance of bridges | |
CN219689051U (en) | Elevator installation strutting arrangement | |
CN221398665U (en) | Prefabricated box girder limiting device for lifting next to high-speed rail double-machine | |
JP2019189447A (en) | High place work device and work method in tunnel | |
JP2002356813A (en) | Movable scaffolding device and construction method thereof | |
CN107165052A (en) | A kind of horizontal assembling system for packaged type bridges precast pier template | |
JP2004169475A (en) | Inspection work bench for bridge structure | |
JPH0235167A (en) | Building scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20090713 Year of fee payment: 10 |
|
EXPY | Expiration of term |