KR20010063932A - Engineering method of a large size complex unit for shortage of term to construct at the upper part in purifier room of engine room - Google Patents

Engineering method of a large size complex unit for shortage of term to construct at the upper part in purifier room of engine room Download PDF

Info

Publication number
KR20010063932A
KR20010063932A KR1019990062038A KR19990062038A KR20010063932A KR 20010063932 A KR20010063932 A KR 20010063932A KR 1019990062038 A KR1019990062038 A KR 1019990062038A KR 19990062038 A KR19990062038 A KR 19990062038A KR 20010063932 A KR20010063932 A KR 20010063932A
Authority
KR
South Korea
Prior art keywords
unit
block
room
purifier
factory
Prior art date
Application number
KR1019990062038A
Other languages
Korean (ko)
Inventor
최승현
Original Assignee
김형벽ㅂ
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김형벽ㅂ, 현대중공업 주식회사 filed Critical 김형벽ㅂ
Priority to KR1019990062038A priority Critical patent/KR20010063932A/en
Publication of KR20010063932A publication Critical patent/KR20010063932A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/02Hulls assembled from prefabricated sub-units

Landscapes

  • Automatic Assembly (AREA)

Abstract

PURPOSE: Unit construction method is provided to dissolve a problem of mutual interference, work efficiency decrease generated by arranging by each unit and to concentrate and structure an article on a top of purifier room. CONSTITUTION: In advanced block(10) assemblage, a withdrawal beam and a support are installed for withdrawing the block(10) to an advanced factory. Pull-up beam for repairing machine assembles a small sized unit while loading the small unit inside a purifier room(12) in a state of advanced block(10). Moreover, the pull-up beam, a support and the small unit are performed in advanced block. An engine room of ship is narrow and component is densely arranged. A large quantity of components are integrated and mounted in a block for enhancing productivity and reducing a block stone period. Components are assembled and mounted in advanced block by assembling in a large unit.

Description

기관실 퓨리파이어 룸 상부 선행 공기 단축을 위한 대형 복합 유니트 공법{Engineering method of a large size complex unit for shortage of term to construct at the upper part in purifier room of engine room}Engineering method of a large size complex unit for shortage of term to construct at the upper part in purifier room of engine room}

본 발명은 기관실 퓨리파이어 룸 상부 선행 공기 단축을 위한 대형 복합 유니트 공법에 관한 것으로서, 더욱 상세하게는 퓨리파이어 룸 상부에 설치되는 기계수리용 인양빔과 배관, 철의장, 전장품 등의 의장품 모두를 한꺼번에 대형화하여 작업조건이 좋은 유니트 공장내에서 완전히 조립한 다음 블록 사이드로 이동해 한번에 설치하도록 함으로써 물류비를 절감할 수 있으며 선행 공기를 단축시킬 수 있는 공법에 관한 것이다.The present invention relates to a large composite unit method for shortening the preceding air in the engine room purifier room, and more particularly, the equipment for lifting the beam and pipes, iron equipment, electrical equipment, etc., installed at the upper part of the purifier room at once. It is about the construction method that can reduce the logistics cost and shorten the preceding air by large-scaled and fully assembled in the unit factory with good working conditions, and then moved to the block side and installed at once.

일반적으로, 종래의 기계 수리용 인양빔은 선체내업에서 설치하고 일부에만소형 유니트를 적용하고 유니트가 되지 않는 다른 부분은 선행공장에서 의장품을 설치하게 되어 룸 안의 협소한 작업조건으로 인해 업무효율이 떨어지는 등의 문제 및 의장품 설치시 먼저 설치된 선체부재와의 간섭, 의장품 설치순서에 의한 상호간섭 등으로 작업의 어려움과 재작업을 하게 되는 문제점이 있었다.In general, the conventional machine repair lifting beam is installed in the hull industry and only a small unit is applied to a part, and the other part that is not a unit is installed in a pre-fabricated factory, resulting in poor work efficiency due to narrow working conditions in the room. There was a problem that the difficulty of work and rework due to the interference with the hull member installed first, the mutual interference by the equipment installation order, etc. when installing the equipment.

본 발명은 상기한 문제점을 해결하기 위하여 안출한 것으로서, 그 목적은 선행 블록 상태에서 탑재 여건이 좋은 퓨리파이어 룸 구역 상부에 설치되는 의장품을 종합으로 유니트 공장에서 조립하는 공법으로 개선하여 낱개 설치로 파생되는 상호 간섭, 작업 효율 저하 등의 문제를 개선하고 퓨리파이어 룸 상부에 설치되는 의장품을 집중화 및 구조화시킬 수 있는 기관실 퓨리파이어 룸 상부 선행 공기 단축을 위한 대형 복합 유니트 공법을 제공하는 것이다.The present invention has been made to solve the above problems, the object of which is improved by the method of assembling in the unit factory comprehensively assembled in the unit factory, which is installed on the top of the purifier room area with good mounting conditions in the prior block state derived from the individual installation It is to provide a large composite unit process for reducing the preceding air in the upper part of the engine room purifier room, which can improve the problems such as mutual interference, lower working efficiency, and centralize and structure the equipment installed in the upper part of the purifier room.

도 1 은 선체내업에서 기계수리용 인양빔과 서포트를 설치하는 것을 나타낸 개략도Figure 1 is a schematic diagram showing the installation of the lifting beam and support for repair in the hull industry

도 2 는 소형 유니트 조립 단위를 나타낸 개략도2 is a schematic view showing a small unit assembly unit

도 3 은 선행 블록(퓨리파이어 룸내)에 소형 유니트 설치하는 것을 나타낸 개략도3 is a schematic diagram showing the installation of a small unit in a preceding block (in the purifier room);

도 4 는 선행 블록에 기타 의장품을 설치하는 것을 나타낸 개략도4 is a schematic diagram showing the installation of other equipment in the preceding block;

도 5 는 선체내업에서 블록 반출되는 상태를 나타낸 개략도5 is a schematic diagram showing a state in which a block is taken out of the hull industry

도 6 은 대형 복합 유니트를 조립한 상태를 나타낸 개략도6 is a schematic view showing a state in which a large composite unit is assembled;

도 7 은 선행 블록(퓨리파이어 룸내)에 대형 복합 유니트를 탑재한 개략도7 is a schematic diagram of mounting a large composite unit in a preceding block (in the purifier room).

도 8 은 주위 연결 의장 작업을 나타낸 개략도8 is a schematic diagram showing a peripheral connection design work

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

(10) : 선행 블록(10): preceding block

(12) : 퓨리파이어 룸(12): Purifier Room

(14) : 인양빔(14): lifting beam

(16) : 서포트(16): Support

(18) : 소형 유니트(18): small unit

(20) : 복합 유니트(20): compound unit

(22) : 의장품(22): Design

이하, 첨부된 도면을 참조하여 본 발명의 구성 및 작용을 설명하면 다음과 같다.Hereinafter, the configuration and operation of the present invention with reference to the accompanying drawings.

도 1 은 선체내업에서 기계수리용 인양 빔과 서포트를 설치하는 것을 나타낸 개략도를,Figure 1 is a schematic diagram showing the installation of the lifting beam and support for repair in the hull industry,

도 2 는 소형 유니트 조립 단위를 나타낸 개략도를,2 is a schematic view showing a small unit assembly unit,

도 3 은 선행 블록(퓨리파이어 룸내)에 소형 유니트 설치하는 것을 나타낸개략도를,3 is a schematic view showing the installation of a small unit in a preceding block (in the purifier room);

도 4 는 선행 블록에 기타 의장품을 설치하는 것을 나타낸 개략도를 도시한 것으로서, 선행 블록(10) 조립시 선체내업에서 기계수리용 인양빔(14) 및 서포트(16)를 설치하여 선행공장으로 블록(10)이 반출되고 이 상태에서 기계수리용 인양빔(14) 좌,우측으로 유니트 가능한 부분에 대한 소형 유니트(18)를 조립하며 유니트 공장에서 조립한 소형 유니트(18)를 선행 블록(10) 상태에서 퓨리파이어 룸(12)내로 탑재하고 또한 기계수리용 인양빔(14) 및 서포트(16)와 소형 유니트(18)는 제외한 기타 의장품(22) 전부를 선행에서 설치한다.Figure 4 is a schematic diagram showing the installation of other equipment in the preceding block, when the assembly of the preceding block 10, the installation of the lifting beam 14 and the support 16 for repairing the machine in the hull industry to block the preceding factory ( 10) is taken out, and in this state, the small unit 18 is assembled to the left and right parts of the lifting beam 14 for machine repair, and the small unit 18 assembled at the unit factory is in the state of the preceding block 10. In the purifier room 12 and all the equipment 22 except for the mechanical repair lifting beam 14 and the support 16 and the small unit 18 are installed in advance.

도 5 는 선체내업에서 블록 반출되는 상태를 나타낸 개략도를,5 is a schematic view showing a state in which a block is taken out of the hull industry;

도 6 은 대형 복합 유니트를 조립한 상태를 나타낸 개략도를,6 is a schematic view showing a state in which a large composite unit is assembled;

도 7 은 선행 블록(퓨리파이어 룸내)에 대형 복합 유니트를 탑재한 개략도를,7 is a schematic view of mounting a large composite unit in a preceding block (in the purifier room),

도 8 은 주위 연결 의장 작업을 나타낸 개략도를 도시한 것으로서, 선행 블록(10)을 조립하여 선행공장으로 반출한 후 기관실, 퓨리파이어 룸(12) 상부에 설치되는 의장품(서포트, 빔, 덕트, 파이프, 시트 등) 전체를 한 셋트로 구조화 조립한 대형 복합 유니트(20)를 형성하여 한 셋트로 구조화 한 대형 복합 유니트(20)를 선행 블록(10) 상태에서 한 번에 탑재하며 또한 기타 선행 연결 작업을 수행하는 것이다.FIG. 8 is a schematic view showing the peripheral connection design work, the assembly (support, beam, duct, pipe) installed in the engine room, the upper room of the purifier room 12 after assembling the preceding block 10 to be taken out to the preceding factory. , Sheets, etc.) to form a large composite unit 20 structured and assembled in one set to mount the large composite unit 20 structured in one set at a time in the state of the preceding block 10, and also to perform other preliminary connection work. To do.

본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

본 발명은 선박의 기관실은 협소하고 의장품이 조밀하게 설치되는 구역으로 가능한 한 유니트 공장(지상)에서 많은 양을 종합화/일체화하여 블록에 탑재함으로써 생산성이 향상되고 블록 스톤 기간을 단축시킬 수 있음과 또한 의장품이 집중 설치되는 기관실 퓨리파이어 룸 상부에 의장품(기계수리용 인양빔, 배관, 철의장, 전장품 등)을 지상에서 대형 유니트로 조립하여 선행에서 한번에 탑재함으로써 인양빔과 의장품 등이 부딪침으로 인한 수정작업을 방지할 수 있고 유니트 대형화에 따른 취급과 이동 횟수를 줄여 물류비 절감 및 선행공기를 단축시킬 수 있도록 한 매우 유용한 발명인 것이다.The present invention is an area in which the engine room of the ship is narrow and the equipment is densely installed, thereby increasing productivity and shortening the block stone period by assembling / integrating a large amount in the unit factory (ground) as much as possible. Modifications due to bumping of lifting beams and equipment by assembling the equipment (lifting beam for machine repair, plumbing, iron rig, electrical equipment, etc.) into large units on the ground at the top of the engine room where the equipment is concentrated. It is a very useful invention that can prevent the work and to reduce the number of handling and movements due to the large size of the unit to reduce the logistics cost and shorten the preceding air.

Claims (1)

선행 블록(10) 조립시 선체내업에서 기계수리용 인양빔(14) 및 서포트(16)를 설치하여 선행공장으로 블록(10)이 반출되고 이 상태에서 기계수리용 인양빔(14) 좌,우측으로 유니트 가능한 부분에 대한 소형 유니트(18)를 조립하며 유니트 공장에서 조립한 소형 유니트(18)를 선행 블록(10) 상태에서 퓨리파이어 룸(12)내로 탑재하고 또한 기계수리용 인양빔(14) 및 서포트(16)와 소형 유니트(18)는 제외한 의장품(22) 전부를 선행에서 설치함과 선행 블록(10)을 조립하여 선행공장으로 반출한 후 기관실, 퓨리파이어 룸(12) 상부에 설치되는 의장품 전체를 한 셋트로 구조화 조립한 대형 복합 유니트(20)를 형성하여 한 셋트로 구조화 한 대형 복합 유니트(20)를 선행 블록(10) 상태에서 한 번에 탑재하여 선행 연결 작업을 수행하는 것을 특징으로 하는 기관실 퓨리파이어 룸 상부 선행 공기 단축을 위한 대형 복합 유니트 공법.When assembling the preceding block 10, the installation of the lifting beam 14 and the support 16 for repair of the machine in the hull industry is carried out and the block 10 is taken out to the preceding factory. In this state, the lifting beam 14 for the machine repair is left and right. Assemble the small unit (18) for the unit that can be installed in the unit, and mount the small unit (18) assembled in the unit factory into the purifier room (12) in the state of the preceding block (10), and also the lifting beam (14) for the repair of the machine. And the support (16) and the small unit (18) is installed in the front of all the fittings (22) and the preceding block 10 assembled to the leading factory after the assembly of the engine room, the purifier room 12 is installed Forming a large composite unit 20 structured and assembled as a set of the entire design of the large-size composite unit 20 structured in one set in the state of the preceding block 10 at a time to perform a preliminary connection work Engine room purifier room Large complex unit formulations for unit preceding the air speed.
KR1019990062038A 1999-12-24 1999-12-24 Engineering method of a large size complex unit for shortage of term to construct at the upper part in purifier room of engine room KR20010063932A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019990062038A KR20010063932A (en) 1999-12-24 1999-12-24 Engineering method of a large size complex unit for shortage of term to construct at the upper part in purifier room of engine room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990062038A KR20010063932A (en) 1999-12-24 1999-12-24 Engineering method of a large size complex unit for shortage of term to construct at the upper part in purifier room of engine room

Publications (1)

Publication Number Publication Date
KR20010063932A true KR20010063932A (en) 2001-07-09

Family

ID=19629595

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019990062038A KR20010063932A (en) 1999-12-24 1999-12-24 Engineering method of a large size complex unit for shortage of term to construct at the upper part in purifier room of engine room

Country Status (1)

Country Link
KR (1) KR20010063932A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107323610A (en) * 2017-06-30 2017-11-07 广船国际有限公司 Main engine bed, the installation method in gear block block stage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107323610A (en) * 2017-06-30 2017-11-07 广船国际有限公司 Main engine bed, the installation method in gear block block stage

Similar Documents

Publication Publication Date Title
CN109551506B (en) Welding head assembling and disassembling device
CN201824080U (en) Turning work bench for welding by robot
KR100938844B1 (en) Jig for engine overhaul
CN105458324B (en) A kind of efficient automation hole-drilling system
CN109057219A (en) A kind of construction method of assembled decoration wall
KR20010063932A (en) Engineering method of a large size complex unit for shortage of term to construct at the upper part in purifier room of engine room
CN102733614A (en) Method for constructing room module of nuclear power plant
CN210524319U (en) Tipping arrangement of guide rail steel footboard welding usefulness
CN208322536U (en) A kind of welding tooling of vehicle-mounted air conditioner compressor bracket
CN209243940U (en) A kind of assembled-type house connection sleeve
CN208195906U (en) A kind of arc welding robot pedestal
CN205985786U (en) Distribution cabinet
KR200341929Y1 (en) Wire feeder for welding
CN203345935U (en) Hoisting fixture of blast furnace shell
CN207389984U (en) A kind of steel pipe rack for construction site
CN209256379U (en) A kind of large-scale wind driven generator casting cabin floor Special processing tooling
CN219975087U (en) Reverse bolting device
CN219453612U (en) Integrated oil mist lubrication system and drill jumbo
CN203656493U (en) Large base cross groove connection device
CN208935027U (en) Integral digital energy-saving fan
CN219503938U (en) Multifunctional integrated machine for laser processing of surface of metal material
CN213814100U (en) Prism connecting device and prism structure for subway shield interval
CN204959853U (en) Swivel joint package assembly of excavator central authorities
CN220278868U (en) Mounting structure of machine tool spindle box
CN203607713U (en) Large outdoor power distribution room

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination