KR19990073741A - Train and automatic alarm of railroad crossing - Google Patents

Train and automatic alarm of railroad crossing Download PDF

Info

Publication number
KR19990073741A
KR19990073741A KR1019980006832A KR19980006832A KR19990073741A KR 19990073741 A KR19990073741 A KR 19990073741A KR 1019980006832 A KR1019980006832 A KR 1019980006832A KR 19980006832 A KR19980006832 A KR 19980006832A KR 19990073741 A KR19990073741 A KR 19990073741A
Authority
KR
South Korea
Prior art keywords
train
alarm
crossing
unit
entry
Prior art date
Application number
KR1019980006832A
Other languages
Korean (ko)
Inventor
노행식
Original Assignee
노행식
주식회사 애드프로젝트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 노행식, 주식회사 애드프로젝트 filed Critical 노행식
Priority to KR1019980006832A priority Critical patent/KR19990073741A/en
Publication of KR19990073741A publication Critical patent/KR19990073741A/en

Links

Abstract

본 발명은 철도 건널목의 열차통과 자동 경보장치에 관한 것으로, 건널목으로 진입하는 열차를 경보하는 장치에 있어서, 상기 건널목 이전 소정위치에 설치되며, 열차의 진입을 감지하기 위한 열차진입감지부와, 상기 건널목 이후 소정위치에 설치되며, 열차의 통과여부를 감지하기 위한 열차통과감지센서와, 상기 열차진입감지부를 통해 열차진입이 감지되면 열차통과를 경보하기 위한 제어신호를 발생한 다음, 상기 열차통과감지센서를 통해 열차가 완전히 통과되었다고 판단되면 이를 해제하기 위한 제어신호를 발생하는 제어부와, 상기 건널목의 차량진입구 양측에 각각 설치되며, 상기 제어부로부터의 경보 제어신호에 의해 건널목의 열차통과를 경보하는 열차통과경보부와, 상기 제어부를 초기화시키고 상기 열차통과경보부의 동작조건을 설정하며, 상기 각 센서 및 열차통과경보부의 고장여부를 표시하는 메인 콘트롤러 및, 상기 메인콘트롤러와 상기 제어부간의 데이터를 송수신하기 위한 데이터 송수신부로 구성되어, 철도 건널목의 차량진입구 전방에서 사전에 열차통과를 시청각적으로 강력하게 경각시켜 건널목에서의 열차사고를 미연에 방지할 수 있도록 한 것이다.The present invention relates to a train passage and an automatic alarm device of a railroad crossing, in a device for alarming a train entering a railroad crossing, installed at a predetermined position before the railroad crossing, and a train entry detection unit for detecting the entry of a train, and It is installed at a predetermined position after the crossing, and a train pass detection sensor for detecting whether the train passes, and when a train entry is detected through the train entry detection unit, generates a control signal for alarming the train passage, and then the train pass detection sensor. If it is determined that the train is completely passed through the control unit for generating a control signal for releasing it, respectively installed on both sides of the vehicle entrance of the crossing, the train passage for alarming the train passage of the crossing by the alarm control signal from the control unit Initializes an alarm unit, the control unit and sets the operating conditions of the train passing alarm unit And a main controller for indicating whether the respective sensors and the train passing alarm are broken, and a data transmitting / receiving unit for transmitting and receiving data between the main controller and the control unit. It was strongly alerted to prevent accidents of trains at crossings.

Description

철도 건널목의 열차통과 자동 경보장치Train and automatic alarm of railroad crossing

본 발명은 철도 건널목의 열차통과 자동 경보장치에 관한 것으로, 특히 열차의 진입여부를 사전에 감지하여 건널목을 횡단하는 차량의 운전자 또는 보행자에게 자동으로 미리 경보하여 경각심을 줌으로써, 부주의로 인한 차량과 열차간의 추돌사고 및 인명사고를 미연에 방지할 수 있도록 한 철도 건널목의 열차통과 자동 경보장치에 관한 것이다.The present invention relates to a train passage and an automatic alarm device of a railroad crossing, in particular, by detecting in advance the entry of the train in advance to give warning to the driver or pedestrian of the vehicle crossing the railroad in advance, the vehicle and train due to carelessness The present invention relates to a railroad crossing and an automatic alarm system for preventing a collision between a liver and a human accident in advance.

일반적으로, 열차가 지나가는 철로와 차량이 지나가는 차로 및 보행자가 지나가는 인도의 교차지점에는 건널목이 설치되어 있고, 이 건널목의 양쪽 차량진입구 부근에는 건널목으로 열차가 진입하는 경우에 건널목을 횡단하는 차량과 보행자의 안전을 위해 차량과 보행자의 횡단을 사전에 차단하기 위한 차단기가 각각 설치되어 있다.In general, crossings are installed at railroad crossings where trains pass, lanes through which vehicles pass, and sidewalks where pedestrians pass by. In order to ensure safety, breakers are installed to block the crossing of vehicles and pedestrians in advance.

상기한 차단기 이외에, 차량과 보행자의 통행량이 많은 건널목에는 건널목 안내원이 건널목 주변에 상주하면서, 주야간에 건널목으로 열차가 진입하는 경우에, 이를 안내경보함과 아울러 차단기를 내려 차량과 보행자의 횡단을 차단시키고 있다.In addition to the above-mentioned breakers, crossing guides are located around the crossings where there is a lot of traffic between vehicles and pedestrians. Blocking

한편, 상기와 같이 건널목의 차량진입구 측에 차단기를 설치하고, 건널목 안내원을 상주시켜 열차의 건널목 통과시 이를 안내하고 차량의 보행자의 횡단을 차단시키고 있지만, 건널목에서의 열차사고가 빈번하여 소중한 인명을 잃거나, 막대한 재산피해를 유발하고 있다.On the other hand, as described above, a breaker is installed at the vehicle entrance side of the crosswalk, and a crosswalk resident is guided when the train crosses the crossing and blocks the pedestrian crossing of the vehicle. To lose money or cause huge property damage.

이와 같은 건널목에서의 발생되는 열차사고의 유형을 살펴보면 일예로서, 대한민국에서 1991년부터 1995년까지 발생된 전체 열차사고의 68.0%가 열차통과직전에 발생된 열차사고이고, 20.3%는 운전부주의로 발생된 열차사고로서, 이러한 열차사고는 건널목을 횡단하는 차량이나 보행자에게 열차의 건널목 통과를 사전에 강력하게 경보하면 미연에 방지할 수 있는 것이다.Looking at the types of train accidents that occur at these crossings, for example, 68.0% of train accidents occurred in Korea from 1991 to 1995 were train accidents just before the train passed, and 20.3% were inadvertent. As a train accident, such a train accident can be prevented by violently warning the crossing of a train to a vehicle or a pedestrian crossing a railroad crossing.

따라서, 본 발명은 상기한 바와 같은 점에 착안하여 안출한 것으로, 건널목으로 진입하는 열차를 미리 감지하여 건널목의 차량진입구에서 열차통과를 사전에 시청각적으로 강력하게 경보하여 운전자와 보행자에게 경각심을 주어, 건널목에서의 열차사고를 방지함으로써, 인명 및 재산피해를 최소화시킬 수 있는 철도 건널목의 열차통과 자동 경보장치를 제공하는 데에 그 목적이 있다.Accordingly, the present invention has been devised in view of the above point, by detecting in advance the train entering the crossing, giving a warning to the driver and pedestrians in advance and visually strong warning of the passage of the train at the vehicle entrance of the crossing. The aim is to provide railroad crossings and automatic alarm systems that can prevent accidents at train crossings, thereby minimizing human and property damage.

상기 목적을 달성하기 위하여 본 발명에 따른 철도 건널목의 열차통과 자동 경보장치는, 건널목으로 진입하는 열차를 경보하는 장치에 있어서, 상기 건널목 이전 소정위치에 설치되며, 열차의 진입을 감지하기 위한 열차진입감지부와, 상기 건널목 이후 소정위치에 설치되며, 열차의 통과여부를 감지하기 위한 열차통과감지센서와, 상기 열차진입감지부를 통해 열차진입이 감지되면 열차통과를 경보하기 위한 제어신호를 발생한 다음, 상기 열차통과감지센서를 통해 열차가 완전히 통과되었다고 판단되면 이를 해제하기 위한 제어신호를 발생하는 제어부와, 상기 건널목의 차량진입구 양측에 각각 설치되며, 상기 제어부로부터의 경보 제어신호에 의해 건널목의 열차통과를 경보하는 열차통과경보부와, 상기 제어부를 초기화시키고 상기 열차통과경보부의 동작조건을 설정하며, 상기 각 센서 및 열차통과경보부의 고장여부를 표시하는 메인 콘트롤러 및, 상기 메인콘트롤러와 상기 제어부간의 데이터를 송수신하기 위한 데이터 송수신부로 구성되는 것을 특징으로 한다.In order to achieve the above object, a train passage and an automatic alarm device of a railroad crossing according to the present invention are provided in a device for alarming a train entering a railroad crossing, and are installed at a predetermined position before the railroad crossing, and train entry for detecting entry of a train. A detector is installed at a predetermined position after the crossing, and a train pass detection sensor for detecting whether a train passes, and a control signal for alarming a train pass when a train entry is detected through the train entry detector, The control unit for generating a control signal for releasing the train when it is determined that the train has passed completely through the train passing sensor, and are installed at both sides of the vehicle entrance of the crossing, and the train passing through the crossing by the alarm control signal from the controller. Train passing alarm unit for alarming, and initialize the control unit and the train passing alarm It is characterized in that it comprises a main controller for setting the negative operating conditions, indicating whether the sensor and the train passing alarm unit failure, and a data transceiver for transmitting and receiving data between the main controller and the control unit.

도 1은 본 발명의 바람직한 실시예에 따른 철도 건널목의 열차통과 자동 경보장치의 개략적인 블럭구성도,1 is a schematic block diagram of a train passage and an automatic alarm device of a railroad crossing in accordance with a preferred embodiment of the present invention;

도 2는 각 감지센서를 통해 감지되는 열차감지신호 및 이를 이용하여 열차통과를 경보하는 것을 설명하기 위한 도면,FIG. 2 is a diagram illustrating a train detection signal detected through each detection sensor and alarm of a train passing using the same; FIG.

도 3은 본 발명에 따른 철도 건널목의 열차통과 자동 경보장치가 설치된 철도 건널목 주변을 개략적으로 도시한 도면.Figure 3 is a view schematically showing the railway crossings and railroad crossings around the railroad crossing is installed according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

110 : 열차진입감지부 112 : 제1열차감지센서110: train entry detection unit 112: first train detection sensor

114 : 제2열차감지센서 120 : 열차통과감지센서114: second train detection sensor 120: train passing detection sensor

130 : 제어부 140 : 열차통과경보부130 control unit 140 train passing alarm unit

142 : 경보문 표시부 144 : 경보등 구동부142: alarm door display unit 144: alarm light drive unit

146 : 경보음 발생부 148 : 형광등 구동부146: alarm sound generating unit 148: fluorescent lamp driving unit

150 : 신호등 제어부 160 : 데이터 송수신부150: traffic light control unit 160: data transmission and reception unit

200 : 메인콘트롤러200: main controller

이하 본 발명의 바람직한 실시예에 대하여 첨부된 도면을 참조하여 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 바람직한 실시예에 따른 철도 건널목의 열차통과 자동 경보장치의 개략적인 블럭구성도로서, 열차진입감지부(110), 열차통과감지센서(120), 제어부(130), 열차통과경보부(140), 신호등 제어부(150), 데이터 송수신부(160) 및, 메인콘트롤러(200)로 구성된다.1 is a schematic block diagram of a train passing through the railroad crossing automatic alarm device according to a preferred embodiment of the present invention, train entry detection unit 110, train passing detection sensor 120, control unit 130, train passing The alarm unit 140, the traffic light control unit 150, the data transmission and reception unit 160, and the main controller 200.

도 1에 있어서, 열차진입감지부(110)는 열차의 건널목 도달시간을 연산하기 위해 제1열차감지센서(112)와 제2열차감지센서(114)로 구성되는데, 각 감지센서(112, 114)는 건널목으로 진입하는 열차의 진입여부를 각각 감지하여 그에 상응하는 감지신호를 제어부(130)로 입력시키는데, 제1열차감지센서(112)는 건널목 이전 제1소정위치(바람직하게는, 2Km 정도)에 설치되고, 제2열차감지센서(114)는 건널목 이전 제2소정위치(바람직하게는, 1Km 정도)에 설치된다.In FIG. 1, the train entry detection unit 110 includes a first train detection sensor 112 and a second train detection sensor 114 to calculate a crossing time of a train crossing. ) Detects each entry of the train entering the railroad crossing, and inputs a corresponding detection signal to the controller 130. The first train detection sensor 112 is a first predetermined position (preferably, about 2 km) before the railroad crossing. ), And the second train detection sensor 114 is installed at a second predetermined position (preferably, about 1 km) before the crossing.

상기 열차통과감지센서(120)는 건널목 이후 소정위치(바람직하게는, 100m 정도)에 설치되며, 열차의 통과여부를 감지하여 그에 상응하는 감지신호를 제어부(130)로 입력시킨다.The train passing detection sensor 120 is installed at a predetermined position (preferably, about 100m) after the crossing, and detects whether the train passes, and inputs a corresponding detection signal to the controller 130.

그리고, 제어부(130)는 후술될 데이터 송수신부(160)를 통해 송신되는 메인콘트롤러(200)로부터의 명령데이터에 의해 초기화되어 열차통과경보부(140)와 신호등 제어부(150)를 초기상태로 전환시키기 위한 제어신호를 발생하고, 열차통과경보부(140)의 동작조건을 설정하는 한편, 현재상태(예를 들면, 각 센서의 고장여부 또는 열차통과경보부(140)와 신호등 제어부(150)의 고장여부 등)를 데이터 송수신부(160)를 통해 메인콘트롤러(200)로 송신한다.Then, the controller 130 is initialized by the command data from the main controller 200 transmitted through the data transmission and reception unit 160 to be described later to switch the train passing alarm unit 140 and the traffic light controller 150 to the initial state. Generating a control signal for setting the operating conditions of the train passing alarm unit 140, and the current state (e.g., failure of each sensor or failure of the train passing alarm unit 140 and the traffic light controller 150, etc.) ) Is transmitted to the main controller 200 through the data transmission / reception unit 160.

또한, 제어부(130)는 열차진입감지부(110)로부터의 각 감지신호에 의해 건널목으로 진입되는 열차의 진입여부를 판단하여, 열차통과시에 이를 경보하기 위한 각 제어신호를 발생하는 한편, 열차의 진입속도를 연산함으로써, 건널목까지의 도달시간을 예측하여 이를 표시하기 위한 제어신호를 발생한다.In addition, the controller 130 determines whether the train enters the railroad crossing by the respective detection signals from the train entry detection unit 110 and generates each control signal for alarming the train when the train passes. By calculating the speed of entry, the predicted arrival time to the crossing is generated and a control signal for displaying it is generated.

상기 열차통과경보부(140)는 제어부(130)로부터의 제어신호에 의해 각각 구동제어되는 경보문 표시부(142), 경보등 구동부(144), 경보음 발생부(146) 및 형광등 구동부(148)로 구성된다.The train passing alarm unit 140 includes an alarm door display unit 142, an alarm lamp driver 144, an alarm sound generator 146, and a fluorescent lamp driver 148, each of which is driven and controlled by a control signal from the controller 130. do.

여기에서, 경보문 표시부(142)는 열차의 통과여부에 따른 각 메시지(예를 들면, 평상시는 "일단정지", "확인후 통과", "안전운전", "과속금지" 중 교통상황에 대응하는 메시지, 그리고 열차통과시는 "열차통과중" 등)를 표시하는 한편, 열차진입시에 건널목까지 도달하는 시간을 표시하고, 경보등 구동부(144)는 열차의 통과여부에 따른 경보등(예를 들면, 황색등, 빨간색등)을 점등 또는 점멸시키는데, 평상시는 황색등을 점등시키고, 열차통과시에 빨간색등을 반복적으로 점등시킨 다음 점멸시킨다.Here, the alarm door display unit 142 responds to the traffic conditions of each message (for example, "stop once", "pass after confirmation", "safe driving", "no speeding" depending on whether the train passes or not) Message, and when the train passes, it displays the "train passing", etc., the time to reach the crossing at the time of entering the train, the alarm light drive unit 144 is an alarm light (for example, Yellow light, red light) is turned on or blinking normally, yellow light is turned on normally, red light is repeatedly turned on and then blinks when passing the train.

또한, 경보등 발생부(146)는 열차통과시 파상형태로 경보음을 발생하고, 형광등 구동부(148)는 야간시에 건널목 안내판 내부에 설치된 형광등을 점등시키는 것으로, 이는 야간에 건널목을 횡단하는 차량의 운전자 또는 보행자에게 시각적으로 경각심을 주기 위한 것이다.In addition, the alarm light generating unit 146 generates an alarm sound in the form of a wave at the time of passing the train, the fluorescent lamp driving unit 148 to turn on the fluorescent lamp installed inside the crosswalk guide plate at night, which is the To visually alert the driver or pedestrian.

한편, 신호등 제어부(150)는 제어부(130)로부터의 제어신호에 의해 신호등을 구동제어하는데, 이러한 신호등은 상기한 바와 같은 열차통과경보부(140)를 통해 건널목으로의 열차진입을 1차적으로 경보하는데(시청각적 경보), 운전자 또는 보행자가 1차경보를 보거나 듣지 못하는 만일의 사태를 대비하여 건널목의 차량진입구 부근에서 열차진입을 2차적으로 경보하기 위한 것이다(시각적 경보).On the other hand, the traffic light control unit 150 controls the driving of the traffic light by the control signal from the control unit 130, the traffic light through the train passing alarm unit 140 as described above primarily to warn the entrance to the crossing. (Visual audible alarm), intended to provide secondary warning of train entry near vehicle entrances at crossings in case of drivers or pedestrians not seeing or hearing primary alarms (visual alarms).

상게하게는, 신호등 제어부(150)는 제어부(130)로부터의 제어신호에 의해 녹색등이 점등시키고, 열차진입시 황색등을 점등시킨 다음 빨간색등을 점등시킨다.Preferably, the traffic light controller 150 turns on the green light by the control signal from the controller 130, turns on the yellow light when the train enters, and then turns on the red light.

상기 데이터 송수신부(150)는 제어부(130)와 메인콘트롤러(200)와의 데이터를 송수신하기 위한 것이고, 메인콘트롤러(200)는 보수반원에 의해 조작되며, 제어부(130)를 초기화시켜 열차통과경보부(140)와 신호등 제어부(150)의 초기상태 및 동작조건을 설정하는 한편, 제어부(130)로부터 송신되는 데이터에 의해 시스템의 현재상태(예를 들면, 각 센서의 고장여부 또는 열차통과경보부(140)의 고장여부 등)를 알 수 있도록 한 것이다.The data transmitting and receiving unit 150 is for transmitting and receiving data between the control unit 130 and the main controller 200, the main controller 200 is operated by a maintenance class member, and initializes the control unit 130 to the train passing alarm unit ( 140 and the initial state and operating conditions of the traffic light control unit 150, and the current state of the system (for example, failure of each sensor or train passing alarm unit 140) by the data transmitted from the control unit 130 To see if there is any breakdown, etc.).

상기한 바와 같이 구성된 본 발명에 따른 철도 건널목의 열차통과 자동 경보장치의 동작과정에 대하여 도 1 내지 도 3을 참조하여 상세하게 설명하기로 한다.With reference to Figures 1 to 3 will be described in detail with respect to the operation of the railroad crossing and the automatic alarm system of the railroad crossing according to the present invention configured as described above.

도 2는 각 감지센서를 통해 감지되는 열차감지신호 및 이를 이용하여 열차통과를 경보하는 것을 설명하기 위한 도면이고, 도 3은 본 발명에 따른 철도 건널목의 열차통과 자동 경보장치가 설치된 철도 건널목 주변을 개략적으로 도시한 도면이다.Figure 2 is a view for explaining the alarm signal detected by the train detection signal and the same using each sensor, Figure 3 is a railroad crossing of the railroad crossing in accordance with the present invention is installed around the railroad crossings with automatic alarm system It is a schematic drawing.

도 2에서 (가)는 제1열차감지센서(112)를 통해 감지되는 열차감지신호를, (나)는 제2열차감지센서(114)를 통해 감지되는 열차감지신호를, (다)는 열차통과감지센서(120)를 통해 감지되는 열차감지신호를, (라)는 각 센서(112, 114, 120)를 통해 감지되는 감지신호에 따라 열차통과를 경보하는 구간을 각각 나타낸다.In Figure 2 (a) is a train detection signal detected through the first train detection sensor 112, (b) is a train detection signal detected through the second train detection sensor 114, (c) is a train The train detection signal detected through the passage detection sensor 120, (D) represents a section for alerting the train passage in accordance with the detection signal detected through each sensor (112, 114, 120).

도 2의 (가) 내지 (다)에 있어서, 구간(T1, T2, T3)는 열차감지구간으로서, 이는 열차(50)의 길이와 속도에 따라 변경된다.In FIGS. 2A to 2C, the sections T1, T2, and T3 are train detection sections, which are changed depending on the length and speed of the train 50.

다음에, 보수반원에 의해 메인콘트롤러(200)가 초기조작되면, 데이터 송수신부(160)를 통해 그에 상응하는 명령데이터가 제어부(130)로 송신되고, 이 명령데이터에 의해 제어부(130)는 열차통과경보부(140)와 신호등 제어부(150)를 초기상태로 전환시키기 위한 제어신호를 발생하고, 동작조건을 설정한다.Next, when the main controller 200 is initially operated by the maintenance staff, command data corresponding to the main controller 200 are transmitted to the control unit 130 through the data transmitting / receiving unit 160. A control signal for switching the passage alarm unit 140 and the traffic light control unit 150 to an initial state is generated, and an operating condition is set.

따라서, 제어부(130)로부터의 제어신호에 의해 열차통과경보부(140)와 신호등 제어부(150)는 초기화되고, 열차통과경보부(140)의 동작조건(예를 들어, 경보음 발생부(146)를 통해 경보음을 발생시킬건지 아닌지에 대한 여부 등)이 설정된다.Accordingly, the train passing alarm unit 140 and the traffic light control unit 150 are initialized by the control signal from the controller 130, and the operating conditions (for example, the alarm sound generating unit 146) of the train passing alarm unit 140 are initialized. Whether to generate an alarm sound or not).

즉, 평상시에는 경보문 표시부(142)를 통해 "일단정지", "확인후 통과", "안전운전", "과속금지" 중 교통상황에 대응하는 메시지가 표시되는 한편, 경보등 구동부(144)를 통해 황색등(152)이 점등되고, 신호등 제어부(150)를 통해 신호등(155)에는 녹색등이 점등된다.That is, the message corresponding to the traffic situation among the "single stop", "pass after confirmation", "safe driving", "no speeding" is normally displayed through the alarm door display unit 142, and the alarm lamp driving unit 144 is displayed. The yellow light 152 is turned on, and the green light is turned on at the traffic light 155 through the traffic light controller 150.

한편, 열차(50)가 건널목(60)으로 진입하게 되는 경우, 건널목(60) 이전 제1소정위치(바람직하게는, 2Km 정도)에 설치된 제1열차감지센서(112)를 통해 열차진입이 감지되어(도 2의 (가)에서 A시점) 그에 상응하는 감지신호가 제어부(130)로 입력되는데, 이 감지신호는 열차(50)가 제1열차감지센서(112)를 통과할 때까지 계속적으로 감지되어 제어부(130)로 입력된다(도 2의 (가)).On the other hand, when the train 50 enters the crossing 60, train entry is detected through the first train detection sensor 112 installed at the first predetermined position (preferably, about 2 km) before the crossing 60. (A point in FIG. 2A), a corresponding detection signal is input to the controller 130, which is continuously transmitted until the train 50 passes through the first train detection sensor 112. It is detected and input to the controller 130 ((a) of FIG. 2).

그리고, 제어부(130)는 제1열차감지센서(112)로부터의 감지신호에 의해 열차통과를 경보하기 위한 각 제어신호를 발생하고, 제어부(130)로부터의 제어신호에 의해 열차통과경보부(140) 내의 경보문 표시부(142), 경보등 표시부(144), 경보음 발생부(146) 및, 신호등 제어부(150)가 각각 구동제어되어 열차통과를 경보한다.In addition, the controller 130 generates each control signal for alarming the train passing by the detection signal from the first train detection sensor 112, and the train passing alarm unit 140 by the control signal from the controller 130. The alarm door display unit 142, the alarm lamp display unit 144, the alarm sound generating unit 146, and the traffic light control unit 150 in the interior are driven to alarm the train passing.

상세하게는, 제어부(130)로부터의 제어신호에 의해 경보문 표시부(142)를 통해 열차통과에 대한 경보메시지(예를 들면, "열차통과중")가 표시되고, 경보등 표시부(144)를 통해 경보등(빨간색등)이 점등과 점멸을 반복하며, 경보음 발생부(146)를 통해 스피커(156)로부터 경보음이 파상형태로 발생된다.In detail, an alarm message (for example, "train passing") is displayed through the alarm door display unit 142 by the control signal from the controller 130, and is displayed through the alarm light display unit 144. The alarm light (red light) is repeatedly turned on and blinking, and the alarm sound is generated in a wave form from the speaker 156 through the alarm sound generator 146.

이때, 경보음 발생부(146)를 통해 스피커(156)로부터 발생되는 경보음은 메인콘트롤러(200)에서의 초기화시에, 설정된 동작조건(예를 들면, 설치지역(도심지 또는 한적한 시골길)에 따라 경보음을 발생할건지 안할 건지에 대한 동작조건)에 따라 선택적으로 경보음을 발생한다.At this time, the alarm sound generated from the speaker 156 through the alarm sound generating unit 146 is set at the time of initialization in the main controller 200 in a set operating condition (for example, an installation area (city area or a quiet country road)). According to the operating conditions (whether or not to generate an alarm sound), an alarm sound is selectively generated.

또한, 제어부(130)로부터의 제어신호에 의해 신호등 제어부(150)를 통해 신호등(155)이 구동제어되는데, 즉 녹색등이 점멸되는 한편, 황색등이 점등된 다음 빨간색등이 점등된다.In addition, the traffic light 155 is driven by the control signal from the control unit 130 through the traffic light control unit 150, that is, the green light is blinking, while the yellow light is turned on and then the red light is turned on.

따라서, 건널목(60)으로의 열차진입시에 열차통과경보부(140)를 통해 시청각적으로 1차적으로 경보되는 한편, 이를 보거나 듣지 못한 차량의 운전자와 보행자를 2차적으로 경보하기 위해 건널목(60) 부근에 설치된 신호등(155)이 빨간색등으로 점등된다.Therefore, while the train enters the railroad crossing 60, it is primarily visually and visually alarmed through the train passing alarm unit 140, while the vehicle 60 and the pedestrians near the railroad crossing to secondly alert the driver and pedestrian who did not see or hear it. Signal light 155 installed in the red light is turned on.

한편, 열차(50)가 건널목(60) 측으로 더 진행되면 건널목(60) 이전 제2소정위치(바람직하게는, 1Km 정도)에 설치된 제2열차감지센서(114)를 통해 열차진입이 감지되어(도 2의 (나)에서 B시점) 제어부(130)로 입력되는데, 이 감지신호는 열차(50)가 제2열차감지센서(114)를 통과할 때까지 계속적으로 감지되어 제어부(130)로 입력된다(도 2의 (나)).On the other hand, when the train 50 proceeds further to the crossing 60 side, the train entry is detected through the second train detection sensor 114 installed at the second predetermined position (preferably, about 1 km) before the crossing 60 ( In Figure 2 (b) B is input to the control unit 130, this detection signal is continuously detected until the train 50 passes through the second train detection sensor 114 is input to the control unit 130 (FIG. 2B).

그리고, 제어부(130)는 제1열차감지센서(112)를 통해 감지된 열차(50)의 진입시점(A시점)과 제2열차감지센서(114)를 통해 감지된 열차(50)의 진입시점(B시점) 간의 시간차(T4)에 따라 열차(50)의 진입속도를 연산하여 건널목(60)까지의 도달시간을 예측하여 이를 표시하기 위한 제어신호를 발생하고, 제어부(130)로부터의 제어신호에 의해 경보문 표시부(142)의 일측에 열차(50)의 건널목(60) 도달시간이 표시된다.Then, the controller 130 is the entry point (A point) of the train 50 detected through the first train detection sensor 112 and the entry point of the train 50 detected through the second train detection sensor 114. Computing the speed of entry of the train 50 according to the time difference (T4) between (B time point) to predict the arrival time to the crossing 60, generates a control signal for displaying this, and the control signal from the controller 130 The arrival time of the crossing 60 of the train 50 is displayed on one side of the alarm door display unit 142 by.

상세하게는, 열차진입감지부(110) 내의 제1열차감지센서(112)와 제2열차감지센서(114)는 설치시에 건널목(60) 이전 설정된 제1소정위치(2Km 정도)와 제2소정위치(1Km 정도)에 각각 이격되어 설치되어 있으므로, 각 센서(112, 114) 간의 거리(1Km)는 미리 알고 있고, 열차(50)가 감지되는 진입시점(A시점과 B시점) 간의 시간차에 의해 열차(50)의 진입속도가 연산되므로, 건널목(60)까지 도달시간을 예측할 수 있는 것이다.In detail, the first train detection sensor 112 and the second train detection sensor 114 in the train entry detection unit 110 are installed at the first predetermined position (about 2 km) before the crossing 60 at the time of installation and the second. Since the distances (1Km) between the sensors (112, 114) are known in advance, and are installed at predetermined positions (about 1Km), the time difference between the entry points (A and B) at which the train 50 is detected in advance. Since the entrance speed of the train 50 is calculated, the arrival time to the crossing 60 can be predicted.

따라서, 열차통과경보부(140) 내의 경보문 표시부(142)를 통해 열차통과에 대한 메시지("열차통과중")가 표시되는 한편, 그 일측에 열차(50)의 건널목(60) 도달시간이 표시된다.Accordingly, a message (“train passing”) for the train passing is displayed through the alarm door display unit 142 in the train passing alarm unit 140, while the arrival time of the crossing 60 of the train 50 is displayed on one side thereof. do.

다음에, 열차(50)가 건널목(60)을 통과하게 되면 열차통과감지센서(120)를 통해 열차(50)가 감지되어 그에 상응하는 감지신호가 제어부(130)로 입력되고(도 2의 (다)), 제어부(130)는 열차통과감지센서(120)를 통해 열차(50)가 완전히 통과된 것으로 감지되면(도 2의 (다)에서 C시점), 열차통과경보를 해제하기 위한 제어신호를 발생하고, 제어부(130)로부터의 제어신호에 의해 열차통과경보부(140)와 신호등 제어부(150)의 열차통과경보가 해제된다.Next, when the train 50 passes the railroad crossing 60, the train 50 is detected through the train passing sensor 120, and a corresponding detection signal is input to the controller 130 (FIG. C)), when the control unit 130 detects that the train 50 is completely passed through the train pass detection sensor 120 (C point in FIG. 2C), a control signal for releasing the train pass alarm. Is generated, and the train passing alarm of the train passing alarm unit 140 and the traffic light controller 150 is released by the control signal from the controller 130.

즉, 경보문 표시부(142)를 통해 표시되는 열차통과에 대한 메시지("열차통과중")가 평상시 메시지("일단정지", "확인후 통과", "안전운전", "과속금지" 중 교통상황에 대응하는 메시지)로 바뀌어 표시되고, 경보등 구동부(144)를 통해 반복적으로 점등 및 점멸되던 경보등(빨간색등)이 평상시 경보등(황색)으로 점등되며, 경보음 발생부(146)를 통해 스피커(156)로부터 경보되던 경보음이 해제되는 한편, 신호등 제어부(150)에 의해 신호등(155)의 빨간색등이 녹색등으로 점등된다.That is, the message ("train passing") for the train passage displayed through the alarm door display unit 142 is the usual message ("stop once", "pass after confirmation", "safe driving", "no speeding" traffic) A message corresponding to a situation) is displayed, the alarm light (red light) that is repeatedly turned on and flashing through the alarm light driver 144 is turned on as an alarm light (yellow), and the speaker ( While the alarm sound alarmed from 156 is released, the red light of the traffic light 155 is lit by the green light by the traffic light controller 150.

한편, 메인 콘트롤러(200)로부터 데이터 송수신부(160)를 통해 공급되는 시간데이터에 따라 제어부(130)는 현재시간을 체크하고, 현재시간이 야간이라고 판단되면 건널목 안내판(158) 내에 설치된 형광등을 구동시키기 위한 제어신호를 발생하며, 제어부(130)로부터의 제어신호에 의해 형광등구동부(148)를 통해 형광등이 구동되어 건널목 안내판(158) 내의 형광등이 점등되어 야간시에 건널목(60)임을 쉽게 알 수 있을 뿐만 아니라, 야간에 운전자와 보행자에게 시각적으로 경각심을 줄 수 있다.On the other hand, according to the time data supplied from the main controller 200 through the data transmission and reception unit 160, the controller 130 checks the current time, and if it is determined that the current time is night, driving the fluorescent lamp installed in the crosswalk guide plate 158 It generates a control signal to make, and the fluorescent signal is driven through the fluorescent lamp driver 148 by the control signal from the control unit 130, the fluorescent lamp in the crosswalk guide plate 158 is easily lit to know that the crossing 60 at night. In addition, it can visually alert drivers and pedestrians at night.

상기한 바와 같은 철도 건널목의 열차통과 자동 경보장치는 건널목의 차량진입구 양쪽에 열차통과경보부(140)와 신호등(155)이 대칭적으로 각각 설치되어 건널목의 진입구 양측에서 열차통과를 경보한다.As described above, the train passage and the automatic alarm device of the railroad crossing are provided with a symmetrical train passing alarm unit 140 and a traffic light 155 at both sides of the vehicle entrance of the railroad crossing to alarm the passage of the train at both sides of the entrance of the railroad crossing.

따라서, 본 발명을 이용하면, 철도 건널목의 차량진입구 전방에서 열차통과를 시청각적으로 1차경보하고, 건널목 부근에서 신호등을 점등시켜 2차경보함으로써, 건널목을 횡단하는 차량의 운전자와 보행자에게 철도 건널목임을 강력하게 경각시켜 줌은 물론, 야간에 건널목 안내판을 점등시켜 사전에 효과적으로 경보함으로써, 건널목에서의 열차사고를 미연에 방지할 수 있는 효과가 있다.Therefore, according to the present invention, the first railroad visually alarms the train passing in front of the vehicle entrance of the railroad crossing, and turns on the traffic light near the railroad crossing to make the second alarm, thereby providing the railroad crossing to the driver and pedestrian of the vehicle crossing the railroad crossing. In addition to violently alarming, as well as effectively turn on the crossing at night when the information on the crosswalk effectively, there is an effect that can prevent the train accident at the crosswalk in advance.

Claims (5)

건널목으로 진입하는 열차를 경보하는 장치에 있어서,In the device for alerting the train entering the crossing, 상기 건널목 이전 소정위치에 설치되며, 열차의 진입을 감지하기 위한 열차진입감지부와;A train entry detection unit installed at a predetermined position before the crossing and detecting entry of a train; 상기 건널목 이후 소정위치에 설치되며, 열차의 통과여부를 감지하기 위한 열차통과감지센서와;A train passage detection sensor installed at a predetermined position after the crossing and detecting a passage of the train; 상기 열차진입감지부를 통해 열차진입이 감지되면 열차통과를 경보하기 위한 제어신호를 발생한 다음, 상기 열차통과감지센서를 통해 열차가 완전히 통과되었다고 판단되면 이를 해제하기 위한 제어신호를 발생하는 제어부와;A control unit for generating a control signal for alarming the passage of the train when the train entry is detected through the train entry detection unit, and generating a control signal for releasing the train when it is determined that the train has completely passed through the train passage detection sensor; 상기 건널목의 차량진입구 양측에 각각 설치되며, 상기 제어부로부터의 경보 제어신호에 의해 건널목의 열차통과를 경보하는 열차통과경보부와;A train passing alarm unit which is installed at both sides of the vehicle entrance of the crossing and alerts the train of the crossing by the alarm control signal from the controller; 상기 제어부를 초기화시키고 상기 열차통과경보부의 동작조건을 설정하며, 상기 각 센서 및 열차통과경보부의 고장여부를 표시하는 메인 콘트롤러 및;A main controller for initializing the control unit, setting operating conditions of the train passing alarm unit, and indicating whether the respective sensors and the train passing alarm unit are broken; 상기 메인콘트롤러와 상기 제어부간의 데이터를 송수신하기 위한 데이터 송수신부로 구성되는 것을 특징으로 하는 철도 건널목의 열차통과 자동 경보장치.A train and automatic alarm system of a railroad crossing, characterized in that the data transmission and reception unit for transmitting and receiving data between the main controller and the control unit. 제 1 항에 있어서, 열차진입시에 상기 제어부로부터의 제어신호에 의해 상기 건널목의 소정부근에 설치된 신호등을 구동하는 신호등 제어부가 더 포함되어 구성되는 것을 특징으로 하는 철도 건널목의 열차통과 자동 경보장치.2. A train and automatic warning device for a railroad crossing as claimed in claim 1, further comprising a traffic light control unit for driving a traffic light installed near a predetermined area of the crossing by a control signal from the control unit at the time of train entry. 제 1 항 또는 제 2 항에 있어서, 상기 열차통과경보부는 상기 제어부로부터의 제어신호에 의해 경보문을 표시하는 경보문 표시부와, 경보등을 점등하는 경보등 구동부와, 경보음을 발생하는 경보음 발생부 및, 건널목 안내판 내에 설치된 형광을 점등시키기 위한 형광등 구동부로 구성되는 것을 특징으로 하는 철도 건널목의 열차통과 자동 경보장치.The alarm passage display unit according to claim 1 or 2, wherein the train passing alarm unit displays an alarm door in response to a control signal from the control unit, an alarm lamp driving unit that lights an alarm lamp, and an alarm sound generating unit that generates an alarm sound. And a fluorescent lamp driving unit for lighting the fluorescent lamp installed in the railroad crossing guide plate. 제 3 항에 있어서, 상기 열차진입감지부는, 상기 건널목 이전 제1소정위치에 설치되는 제1열차감지센서와, 상기 건널목 이전 제2소정위치에 설치되는 제2열차감지센서로 구성되며, 상기 제어부는 상기 각 열차감지센서로부터의 감지신호에 의해 열차의 진입속도를 연산하고, 상기 건널목까지의 도달시간을 예측한 다음, 이를 상기 경보문 표시부로 표시하기 위한 제어신호를 발생하는 것을 특징으로 하는 철도 건널목의 열차통과 자동 경보장치.According to claim 3, The train entry detection unit, the first train detecting sensor is installed in the first predetermined position before the crossing, and the second train detecting sensor is installed in the second predetermined position before the crossing, the control unit The train calculates the speed of entry of the train based on the detected signals from each train detecting sensor, predicts the arrival time to the crossing, and then generates a control signal for displaying the alarm door display unit. Railroad crossing and automatic alarm. 제 3 항에 있어서, 상기 경보음 발생부는 상기 메인콘트롤러의 동작조건선택에 의해 선택적으로 경보음을 발생하는 것을 특징으로 하는 철도 건널목의 열차통과 자동 경보장치.According to claim 3, wherein the alarm sound generating section of the railroad crossing railroad passing automatic alarm device, characterized in that for selectively generating an alarm sound by selecting the operating conditions of the main controller.
KR1019980006832A 1998-03-02 1998-03-02 Train and automatic alarm of railroad crossing KR19990073741A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019980006832A KR19990073741A (en) 1998-03-02 1998-03-02 Train and automatic alarm of railroad crossing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019980006832A KR19990073741A (en) 1998-03-02 1998-03-02 Train and automatic alarm of railroad crossing

Publications (1)

Publication Number Publication Date
KR19990073741A true KR19990073741A (en) 1999-10-05

Family

ID=65894058

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019980006832A KR19990073741A (en) 1998-03-02 1998-03-02 Train and automatic alarm of railroad crossing

Country Status (1)

Country Link
KR (1) KR19990073741A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100970429B1 (en) * 2007-12-27 2010-07-16 삼중테크 주식회사 System for Sensing Regular Stop-Position of An Electric Railcar and Method for Controlling Thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100970429B1 (en) * 2007-12-27 2010-07-16 삼중테크 주식회사 System for Sensing Regular Stop-Position of An Electric Railcar and Method for Controlling Thereof

Similar Documents

Publication Publication Date Title
US5864304A (en) Wireless railroad grade crossing warning system
KR101921092B1 (en) Street lamp for providing safe driving information, and system for providing safe driving information using street lamp
US4704610A (en) Emergency vehicle warning and traffic control system
CA2343435C (en) Dynamic work zone safety system
KR101507451B1 (en) System for the converse driving prevention
KR100907107B1 (en) Safety system on a crosswalk
US9082305B2 (en) Emergency vehicle notification system
KR101663929B1 (en) Method for preventing accident in cross road of school zone, and system of the same
KR101750008B1 (en) Method for preventing accident in cross road for signal violation and overspeed
KR101673211B1 (en) Method for preventing accident in cross road
KR20160135597A (en) Alarming system for dilemma and hazard zone and traffic light for the same
KR20160092957A (en) Method of controlling traffic signal of crossroad capable of preventing traffic accidents for signal violation in crossroad, and system of the same
KR101819420B1 (en) Highway Shelter Entry and Exit Notification System
JPS62184600A (en) Display unit for signal inside automobile
KR19990073741A (en) Train and automatic alarm of railroad crossing
KR20200059986A (en) System to inform the approach of emergency vehicles in crossroad
KR20030080842A (en) Devicd for warning the over speed of car and dispalying the condition of road
KR100402908B1 (en) Door type interception System for a railway crossing
RU2137644C1 (en) Railway crossing automatic protection device
GB2320601A (en) Safety system for railways
KR100753117B1 (en) System for preventing falling on platform
TWI630131B (en) System for indicating vehicular safe following distance
KR200212272Y1 (en) Traffic signal control system
JP2006021644A (en) Crossing accident prevention system
KR200234368Y1 (en) Door type interception system for a railway crossing

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application
AMND Amendment
J201 Request for trial against refusal decision
B601 Maintenance of original decision after re-examination before a trial
J301 Trial decision

Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20010309

Effective date: 20020830