KR19980082024A - Formwork for tunnel construction consisting of air tubes - Google Patents

Formwork for tunnel construction consisting of air tubes Download PDF

Info

Publication number
KR19980082024A
KR19980082024A KR1019980033208A KR19980033208A KR19980082024A KR 19980082024 A KR19980082024 A KR 19980082024A KR 1019980033208 A KR1019980033208 A KR 1019980033208A KR 19980033208 A KR19980033208 A KR 19980033208A KR 19980082024 A KR19980082024 A KR 19980082024A
Authority
KR
South Korea
Prior art keywords
formwork
air
tunnel
air tube
concrete
Prior art date
Application number
KR1019980033208A
Other languages
Korean (ko)
Inventor
김충환
Original Assignee
김충환
주식회사 테크노.티
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김충환, 주식회사 테크노.티 filed Critical 김충환
Priority to KR1019980033208A priority Critical patent/KR19980082024A/en
Publication of KR19980082024A publication Critical patent/KR19980082024A/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 발명은 터널공사시 터널의 콘크리트 내벽을 형성할 때 사용하는 거푸집에 관한 것으로서, 터널의 내벽에 콘크리트를 타설하기 위한 거푸집을 아치형 에어튜브로 형성하되 에어튜브의 내부에는 다수의 보강대를 구비하여 에어튜브의 내부에 공기를 주입하면 외피가 보강대에 의하여 균등한 폭의 아치형상을 가지도록 하고 에어튜브와 터널구멍사이의 공간부에 콘크리트 몰탈의 주입 후 에어튜브에 보압의 공기를 주입하여 콘크리트 몰탈의 양생이 용이하게 이루어 지도록 하며 콘크리트의 양생후 에어튜브의 공기를 배출시킴으로서 거푸집의 철시를 용이하게 할 수 있도록 하므로서 거푸집설치 및 철거에 필요한 시간을 단축시키도록 하여 공사기간을 단축시키도록 하며 거푸집의 이송이 용이하도록한 에어튜브로 이루어진 터널 시공용 거푸집을 제공하고자 하는 것이다.The present invention relates to a formwork used when forming the concrete inner wall of the tunnel during the tunnel construction, the formwork for placing concrete on the inner wall of the tunnel to form an arched air tube, but the inside of the air tube is provided with a plurality of reinforcement When the air is injected into the tube, the outer shell has an arch shape with an equal width by the reinforcing bar. After the concrete mortar is injected into the space between the air tube and the tunnel hole, the air pressure is injected into the air tube. It makes curing easy and it makes it easy to pull out formwork by releasing air of air tube after curing of concrete, so that it is possible to shorten the construction period by shortening the time required for form installation and demolition and transfer of formwork. Tunnel construction formwork made of air tubes to facilitate this It is to provide.

Description

에어튜브로 이루어진 터널 시공용 거푸집Formwork for tunnel construction consisting of air tubes

본 발명은 터널공사시 터널의 콘크리트 내벽을 형성할 때 사용하는 거푸집에 관한 것으로서, 특히 콘크리트 구조물의 형태를 유지하기 위하여 설치되는 거푸집을 내부에 보강대를 가지는 에어튜브로 형성하여 시공시 공기를 주입하는 간단한 작업으로 거푸집의 형틀을 형성하고 콘크리트 타설후 공지를 배출시키는 작업으로 간단하게 거푸집을 철거할 수 있도록 하여 작업의 효율성을 높이도록 하는 에어튜브로 이루어진 터널 시공용 거푸집에 관한 것이다.The present invention relates to a formwork used when forming the concrete inner wall of the tunnel during the tunnel construction, in particular to form the formwork installed in order to maintain the shape of the concrete structure in the air tube having a reinforcement therein to inject air during construction It relates to a tunnel construction formwork consisting of air tubes to form a form of the formwork with a simple operation and to discharge the formwork after the concrete pouring simply to remove the formwork to increase the efficiency of the work.

일반적으로 터널등의 공사를 할 때에는 터널용 굴삭기로 산중턱등에 터널구멍을 파낸 후 터널구멍의 내벽에 콘크리트를 타설하고자 하는 두께의 공간을 가지면서 콘크리트 타설용 거푸집을 설치하여 거푸집과 터널구멍의 내벽사이에 형성된 공간에 고압으로 콘크리트 몰탈을 삽입하여 이정시간동안 양생시킨 후 거푸집을 철거하고 다음공정을 위하여 거푸집을재시공하면서 터널의 내벽공사를 하여왔었다.In general, when constructing tunnels, tunnel holes are dug into the hillsides with tunnel excavators, and the concrete walls are installed on the inner wall of the tunnel hole, and the formwork for concrete placing is installed by installing the formwork and the inner wall of the tunnel hole. After inserting concrete mortar with high pressure into the space formed between them to cure for a fixed time, the formwork was demolished and reworked formwork for the next process.

그러나, 상기와 같은 콘크리트 타설용 거푸집은 소정의 크기로 이루어진 형태로사 다수개의 거푸집을 설치하여야 하고 거푸집을 설치할 때 거푸집을 지지하도록 하는 별도의 구조물을 형성하여야 하기 때문에 거푸집 설치에 상당히 많은 시간이 소요되고 콘크리트를 양생후에 거푸집을 철거할 때에도 많은 시간이 소요되므로서 많은 인력소모와 공사기간의 장기화를 초래하여 왔었다.However, the formwork for concrete placement as described above is required to install a large number of formwork in the form of a predetermined size and form a separate structure to support the formwork when installing the formwork takes a considerable time to install the formwork Since it takes much time to remove the formwork after curing concrete, it has caused a lot of manpower consumption and a prolonged construction period.

본 발명은 상기와 같은 종래의 터널시공용 거푸집에서 발생된 문제점을 개선하기위하여 창출한 발명으로서, 터널의 내벽에 콘크리트를 타설하기 위한 거푸집을 아치형 에어튜브로 형성하되 에어튜브의 내부에는 다수의 보강대를 구비하여 에어튜브의 내부에 공기를 주입하면 외피가 보강대에 의하여 균등한 폭의 아치형상을 가지도록 하고 에어튜브와 터널구멍사이의 공간부에 콘크리트 몰탈의 주입 후 에어튜브에 보압의 공기를 주입하여 콘크리트 몰탈의 양생이 용이하게 이루어 지도록 하며 콘크리트의 양생후 에어튜브의 공기를 배출시킴으로서 거푸집의 철시를 용이하게 할 수 있도록 하므로서 거푸집설치 및 철거에 필요한 시간을 단축시키도록 하여 공사기간을 단축시키도록 하며 거푸집의 이송이 용이하도록한 에어튜브로 이루어진 터널 시공용 거푸집을 제공하고자 하는 것이다.The present invention has been made to improve the problems caused in the conventional tunnel construction formwork as described above, form the formwork for placing concrete on the inner wall of the tunnel as an arched air tube, but a plurality of reinforcement in the interior of the air tube When the air is injected into the inside of the air tube, the outer shell has an arch shape with an equal width by the reinforcing rod, and after the concrete mortar is injected into the space between the air tube and the tunnel hole, the air of the holding pressure is injected into the air tube. It makes the mortar of concrete easy to cure, and the air tube is discharged after curing of concrete, so that it is easy to remove the formwork, so that the time required for the formwork installation and demolition can be shortened to shorten the construction period. Tunnel made of air tube for easy transportation of formwork It intended to provide a common mold.

도 1은 본 발명의 구성을 나타낸 사시도.1 is a perspective view showing the configuration of the present invention.

도 2는 본 발명의 구성을 나타낸 단면도.2 is a cross-sectional view showing the configuration of the present invention.

도 3은 본 발명에 따른 다른실시예의 단면도.3 is a cross-sectional view of another embodiment according to the present invention.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

(1) 터널 구멍 (2) 거푸집 (3) 콘크리트 몰탈(1) tunnel hole (2) formwork (3) concrete mortar

(4) 공간부 (5) 외피 (6) 보강대(4) Space (5) Sheath (6) Reinforcement

이하, 본 발명의 구성과 작용을 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, the configuration and operation of the present invention will be described in detail by the accompanying drawings.

산중턱등에 터널굴삭용 굴삭기로서 터널 구멍(1)을 형성한 후 터널구멍(1)의 내면에 콘크리트 몰탈(3)를 양생시키도록 하는 거푸집(2)에 있어서,In the formwork (2) for forming a concrete mortar (3) on the inner surface of the tunnel hole (1) after forming the tunnel hole (1) as a tunnel excavating excavator in the mountainside, etc.,

상기 거푸집(2)을 아치형의 형상을 가지는 에어튜브로 형성하되 에어튜브의 내부에는 다수개이 보강대(6)가 구비되어 공기를 주입하였을 때 에어튜브의 외피(5)가 아치형의 형상을 유지하도록 한 구성이다.The formwork (2) is formed of an air tube having an arcuate shape, but a plurality of reinforcing rods 6 are provided inside the air tube so that the outer shell 5 of the air tube maintains an arcuate shape when air is injected. Configuration.

상기와 같이 구성된 본 발명의 작용을 살펴보면 다음과 같다.Looking at the operation of the present invention configured as described above are as follows.

먼저 터널굴삭용 굴삭기로서 터널구멍(1)을 일정한 깊이로 형성한 다음 상기 터널구멍(1)에 에어튜브로 이루어진 거푸집(2)을 삽입하는 것으로, 이때의 거푸집(2)인 에어튜브 내부에는 공기를 주입하지 않은 상태로 삽입하고 거푸집(2)의 삽입이 완료되면 거푸집(2)인 에어튜브에 공기를 주입하여 에어튜브의 외피(5)와 터널구멍(1)의 내면과는 일정한 간격의 공간부(4)가 형성되도록 주입한다.First, as a tunnel excavator, the tunnel hole 1 is formed to a certain depth, and then the die 2 made of air tube is inserted into the tunnel hole 1. When the insert is not injected and inserting the formwork (2) is completed, the air is injected into the air tube which is the formwork (2) and spaced at regular intervals from the outer surface of the air tube (5) and the inner surface of the tunnel hole (1) Inject it so that the part 4 is formed.

이후, 상기의 공간부에 콘크리트 몰탈(3)을 고압으로 주입시키고 주입이 완료되면 거푸집(2)인 에어튜브에 다시 고압의 공기를 주입하므로서 에어튜브의 외피가 팽창되도록 하여 콘크리트 몰탈(3)에 보압작용을 하여 양생시키면 된다.Thereafter, the concrete mortar (3) is injected at a high pressure into the space, and when the injection is completed, the high pressure air is injected again into the air tube, which is the mold (2), so that the shell of the air tube is expanded to the concrete mortar (3). You can cure by holding pressure.

이때, 상기 거푸집(2)인 에어튜브의 내부에는 다수개의 보강대(6)가 에어튜브의 길이발향으로 형성되어 있어 외피(5)가 공기 압에 의하여 팽창되는 것을 방지하고 어느 특정부위에 공기압이 집중되는 것을 방지하여 외피의 형상이 아치형태를 유지하도록 하는 것이다.At this time, a plurality of reinforcement 6 is formed in the longitudinal direction of the air tube inside the air tube, which is the mold 2, to prevent the shell 5 from being expanded by air pressure and to concentrate the air pressure at a specific part. It is to prevent the shape of the shell to maintain the arch shape.

그리고, 상기 터널구멍(1)과 거푸집(2)인 에어튜브의 외피(5)와의 사이인 공간부(4)에 주입된 콘크리트 몰탈(3)의 양생이 완료되면 에어튜브에 주입된 공기를 배출시키면 거푸집(2)의 철시가 이루어 지는 것으로서 이후 상기 전술된 바와같이 굴삭기로 계속하여 굴삭한 후 재차 거푸집(2)을 설치하면 되는 것이다.When the curing of the concrete mortar 3 injected into the space 4 between the tunnel hole 1 and the shell 5 of the air tube 2 is completed, the air injected into the air tube is discharged. If it is to be made of the formwork (2) and then continue to excavate with an excavator as described above, and then install the formwork (2) again.

또한, 본 발명의 다른실시예로서는 첨부된 도면 도 3에 도시된 바와같이 거푸집(2)을 이루는 에어튜브의 바닥면을 경질의 합성수지 패널(7)로 형성하고 패널(7)의 저면에는 이송이 용이하도록 다수의 바퀴(8)를 구비하면 거푸집(2)이 이송이 용이한 것이다.In addition, according to another embodiment of the present invention, as shown in Figure 3 of the accompanying drawings, the bottom surface of the air tube forming the formwork (2) is formed of a hard synthetic resin panel (7) and the bottom of the panel 7 is easy to transfer. If a number of wheels (8) to be provided so that the formwork (2) is easy to transport.

이와같이 본 발명은 터널의 내부에 콘크리트로 내벽공사를 할 때 콘크리트를 양생하기 위하여 설치하는 거푸집을 에어튜브로 설치하므로서 거푸지의 설치시 에어튜브 내부에 공기를 주입시키는 단순한 작업으로도 가능하여 작업시간을 단축시킬 뿐만 아니라 적은 인원으로도 가능하여 인력의 효율성을 높이고 콘크리트가 완전히 양생된 후 거푸집을 철거할 때에는 에어튜브내부에 주입된 공기를 배출시키므로서 거푸집의 철거가 이루어져 철거가 용이한 장점을 가지며 공사기간의 단축 뿐만 아니라 인력낭비에 따른 효율성저하는 개선할 수 있는 유용한 발명이다.In this way, the present invention is also possible to install the formwork to cure concrete when the inner wall construction in the interior of the tunnel with air tube, so that it is possible to simply work to inject air into the air tube during installation of the work time Not only can it be shortened, but it is also possible with a small number of people to increase the efficiency of manpower, and when the formwork is completely cured, the formwork is dismantled by discharging the air injected into the air tube. In addition to the shortening of the period, the efficiency of the workforce waste is a useful invention that can be improved.

Claims (2)

산중턱등에 터널굴삭용 굴삭기로서 터널 구멍(1)을 형성한 후 터널구멍(1)의 내면에 콘크리트 몰탈(3)를 양생시키도록 하는 거푸집(2)에 있어서,In the formwork (2) for forming a concrete mortar (3) on the inner surface of the tunnel hole (1) after forming the tunnel hole (1) as a tunnel excavating excavator in the mountainside, etc., 상기 거푸집(2)을 아치형의 형상을 가지는 에어튜브로 형성하되 에어튜브의 내부에는 다수개이 보강대(6)가 구비되어 공기를 주입하였을 때 에어튜브의 외피(5)가 아치형의 형상을 유지하도록 한 것을 특징으로 하는 에어튜브로 이루어진 터널 시공용 거푸집.The formwork (2) is formed of an air tube having an arcuate shape, but a plurality of reinforcing rods 6 are provided inside the air tube so that the outer shell 5 of the air tube maintains an arcuate shape when air is injected. Formwork for tunnel construction consisting of air tubes, characterized in that. 제 1항에 있어서,The method of claim 1, 거푸집(2)을 이루는 에어튜브의 바닥면을 경질의 합성수지 패널(7)로 형성하고 패널(7)의 저면에는 이송이 용이하도록 다수의 바퀴(8)를 구비한 것을 특징으로 하는 에어튜브로 이루어진 터널 시공용 거푸집.The bottom surface of the air tube constituting the formwork (2) is formed of a hard synthetic resin panel (7) and the bottom surface of the panel (7) comprises a plurality of wheels (8) characterized by having a plurality of wheels to facilitate transport Formwork for tunnel construction.
KR1019980033208A 1998-08-17 1998-08-17 Formwork for tunnel construction consisting of air tubes KR19980082024A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019980033208A KR19980082024A (en) 1998-08-17 1998-08-17 Formwork for tunnel construction consisting of air tubes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019980033208A KR19980082024A (en) 1998-08-17 1998-08-17 Formwork for tunnel construction consisting of air tubes

Publications (1)

Publication Number Publication Date
KR19980082024A true KR19980082024A (en) 1998-11-25

Family

ID=65899212

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019980033208A KR19980082024A (en) 1998-08-17 1998-08-17 Formwork for tunnel construction consisting of air tubes

Country Status (1)

Country Link
KR (1) KR19980082024A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040022126A (en) * 2002-09-06 2004-03-11 주식회사 한길 A mold
KR101007691B1 (en) * 2009-12-03 2011-01-13 (주)이화기공 Air balloon type curing platform and curing method using thereof
KR20230167568A (en) * 2022-06-02 2023-12-11 유광산 Tunnel safety apparatus and tunnel constuction method using same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040022126A (en) * 2002-09-06 2004-03-11 주식회사 한길 A mold
KR101007691B1 (en) * 2009-12-03 2011-01-13 (주)이화기공 Air balloon type curing platform and curing method using thereof
KR20230167568A (en) * 2022-06-02 2023-12-11 유광산 Tunnel safety apparatus and tunnel constuction method using same

Similar Documents

Publication Publication Date Title
JP2007303155A (en) Construction method of underground cavity and tunnel construction method
JP6460712B2 (en) Construction method of underground continuous wall
KR19980082024A (en) Formwork for tunnel construction consisting of air tubes
KR101890737B1 (en) Construction method of underground structure wall and underground structure
KR20090011442A (en) Tunnel boring method using sheet pile and tunnel structure therof
KR100349107B1 (en) Shaft construction system using precasted segment block
KR101385971B1 (en) A construction method for tunnelling
JP5117369B2 (en) Underpass construction method
KR102392166B1 (en) Excavation method of controlling displacement using air-packer
JP6315924B2 (en) Buttress construction method
KR100557876B1 (en) Pilot tunnel for 2-arch tunnel ? method for constructing the same
JPH03279600A (en) Construction method of large cavity
CN112228076A (en) Fast excavation construction method for hard rock large-span tunnel
JP2001182477A (en) Device of partition iron plate
KR200354672Y1 (en) Wall Structure by Steel-column Pile Recovery Process
KR100322623B1 (en) An accessory for concrete block attachment
KR100771850B1 (en) Slope stabilizing rock bolt construction method using reinforcing rod having injection hole for grouting
CN114135299B (en) Combined tunnel construction method and supporting structure
KR200349441Y1 (en) The concrete form which uses the air tube
KR102078794B1 (en) An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same
KR100272838B1 (en) The method for constructing a bearing wall with variable thickness
KR100995506B1 (en) Construction method for underground wall using two rows pile
JPH0462299A (en) Larger section tunnel and construction method thereof
JP2878254B1 (en) Open shield method
JPH05287983A (en) Construction of underground space having long and large diametral dimension

Legal Events

Date Code Title Description
A201 Request for examination
G15R Request for early opening
E902 Notification of reason for refusal
E601 Decision to refuse application