KR102668627B1 - Picking device of insulated oil for oil filled cable - Google Patents

Picking device of insulated oil for oil filled cable Download PDF

Info

Publication number
KR102668627B1
KR102668627B1 KR1020190008000A KR20190008000A KR102668627B1 KR 102668627 B1 KR102668627 B1 KR 102668627B1 KR 1020190008000 A KR1020190008000 A KR 1020190008000A KR 20190008000 A KR20190008000 A KR 20190008000A KR 102668627 B1 KR102668627 B1 KR 102668627B1
Authority
KR
South Korea
Prior art keywords
insulating
valve
connection
connector
insulating oil
Prior art date
Application number
KR1020190008000A
Other languages
Korean (ko)
Other versions
KR20200091143A (en
Inventor
김종채
강신섭
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR1020190008000A priority Critical patent/KR102668627B1/en
Publication of KR20200091143A publication Critical patent/KR20200091143A/en
Application granted granted Critical
Publication of KR102668627B1 publication Critical patent/KR102668627B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/14Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for joining or terminating cables
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B23/00Specially shaped nuts or heads of bolts or screws for rotations by a tool
    • F16B23/0076Specially shaped nuts or heads of bolts or screws for rotations by a tool causing slipping of the tool in loosening rotation, i.e. disabling unscrewing unless another tool is used
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B39/00Locking of screws, bolts or nuts
    • F16B39/02Locking of screws, bolts or nuts in which the locking takes place after screwing down
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G15/00Cable fittings
    • H02G15/08Cable junctions

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Gas Or Oil Filled Cable Accessories (AREA)

Abstract

본 발명은 유입케이블용 절연유 채취장치에 관한 것으로, 유입케이블의 절연유 채취용 커넥터부와 연결되는 커넥터접속부와, 커넥터접속부를 통한 절연유의 배출경로를 이루는 절연유로부와, 절연유로부를 개폐시키는 밸브부와, 절연체를 포함하여 이루어지고, 커넥터접속부와 밸브부의 사이에 배치되는 밸브절연부를 포함하는 것을 특징으로 한다.The present invention relates to an insulating oil sampling device for an inflow cable, which includes a connector connection part connected to the connector part for insulating oil sampling of the inflow cable, an insulating passage part forming a discharge path of insulating oil through the connector connection part, and a valve part that opens and closes the insulating oil passage part. and an insulator, and a valve insulating part disposed between the connector connection part and the valve part.

Figure R1020190008000
Figure R1020190008000

Description

유입케이블용 절연유 채취장치{PICKING DEVICE OF INSULATED OIL FOR OIL FILLED CABLE}{PICKING DEVICE OF INSULATED OIL FOR OIL FILLED CABLE}

본 발명은 유입케이블용 절연유 채취장치에 관한 것으로서, 보다 상세하게는 유입케이블의 내부에 있는 절연유를 채취하기 위한 유입케이블용 절연유 채취장치에 관한 것이다.The present invention relates to an insulating oil sampling device for an inflow cable, and more specifically, to an insulating oil sampling device for an inflow cable to sample the insulating oil inside the inflow cable.

일반적으로 지중송전선로는 가교폴리에틸렌(XLPE, Cross Linked Polyethylene)으로 선로의 절연을 유지하는 방식의 XLPE케이블과, 케이블 내부에 절연유(insulated oil)가 혼입되어 선로의 절연을 유지하는 방식의 유입(OF, Oil Filled)케이블에 해당되는 두 가지 종류로 시설되어 운영되고 있다. 유입케이블은 절연유의 절연열화 정도에 따라 그 절연성능이 결정되는데, 이를 진단하기 위해 유입케이블 내부에 있는 절연유를 주기적으로 채취하여 가스분석을 시행하고 있다.In general, underground transmission lines use XLPE cables that maintain the insulation of the line with cross-linked polyethylene (XLPE), and insulating oil is mixed inside the cable to maintain the insulation of the line. , Oil Filled) cables are installed and operated in two types. The insulation performance of the inflow cable is determined by the degree of insulation deterioration of the insulating oil. To diagnose this, the insulating oil inside the inflow cable is periodically collected and gas analysis is performed.

그러나, 종래에는 절연유 채취 작업 시 지중송전선로의 휴전이 수반될 수 밖에 없어, 휴전 및 가압(휴전종료) 시간에 따른 작업시간 제약이 발생하며, 이는 품질 및 안전관리 취약 요인이 된다. 또한, 휴전에 따른 접지 및 확인 작업이 필요해 부대 소요시간이 추가로 발생하고, 작업도중 과전압 유입 시 작업자의 안전을 확보하기 어려우며, 다회선 수용 맨홀 내 절연유 채취 시 휴전선로만 작업하게 되어 맨홀배수 중복 등으로 인한 비용이 발생된다는 문제점이 있었다.However, in the past, insulating oil extraction work was inevitably accompanied by a cease-fire of underground transmission lines, which resulted in work time constraints depending on the cease-fire and pressurization (end of cease-fire) time, which became a factor in quality and safety management vulnerabilities. In addition, grounding and confirmation work due to a ceasefire is required, which results in additional unit time, and it is difficult to ensure worker safety in the event of overvoltage during work. When collecting insulating oil from a multi-line accommodating manhole, work is done only on the ceasefire line, resulting in duplication of manhole drainage, etc. There was a problem that costs were incurred.

또한, 유입케이블의 접속함 전부에 대해 절연유 채취 및 분석을 수행함에 있어서도 어려움이 따른다. 보다 구체적으로는, 절연유 채취 시 장기간의 작업시간이 소요되고, 이에 따른 비용이 과다 발생되고 있어, 절연유를 공급하는 1개의 급유구간에 설비된 복수개의 접속함 중 1개소에서만 절연유를 채취하고 있는 실정이다. 그리고, 유입케이블 내에서 절연유의 이동성(mobility)이 낮아 열화부위에서 멀리 떨어진 개소에서 채취된 절연유 분석으로는 고장의 초기 단계를 예측하기 어렵다는 문제점이 있다.In addition, there are difficulties in collecting and analyzing insulating oil for all junction boxes of incoming cables. More specifically, it takes a long time to collect insulating oil, and the resulting costs are excessive, so insulating oil is only collected from one of the plurality of connection boxes installed in one refueling section that supplies insulating oil. am. In addition, there is a problem that it is difficult to predict the initial stage of failure by analyzing the insulating oil collected from a location far away from the deteriorated area due to the low mobility of the insulating oil within the inflow cable.

또한, 절연유 채취작업 시마다 케이블 접속함의 커넥터에 휴대형 채취밸브를 체결 및 해체해야 하는 번거로움이 따른다. 그리고, 접속함의 커넥터에 채취밸브를 체결 및 해체 시 케이블 접속함 내의 절연유가 외부로 비산, 유실되며, 케이블 내부의 절연유 유실에 따른 추가적인 절연유 공급작업이 필요할 뿐만 아니라 추가 비용이 발생된다. 또한, 절연유 유실에 따른 급격한 유압변동 발생될 가능성이 있고, 설비고장 및 휴전 장기화를 초래하는 등의 우려가 있다. 그리고, 체결 및 해체의 잦은 반복 작업 등으로 인한 밸브의 체결부 마모 등으로 인해 수밀성능이 감소된다는 문제점이 있다.In addition, it is inconvenient to fasten and dismantle the portable sampling valve to the connector of the cable junction box every time the insulating oil sampling work is performed. In addition, when fastening and dismantling the sampling valve to the connector of the connection box, the insulating oil in the cable connection box scatters to the outside and is lost, and additional insulating oil supply work is required due to the loss of insulating oil inside the cable, and additional costs are incurred. In addition, there is a possibility that rapid hydraulic pressure fluctuations may occur due to loss of insulating oil, and there are concerns that it may cause equipment failure and prolonged power outages. In addition, there is a problem in that the watertight performance is reduced due to wear of the fastening part of the valve due to frequent repeated fastening and disassembling operations.

본 발명의 배경기술은 대한민국 공개특허공보 제2004-0080281호(2004.09.18 공개, 발명의 명칭: 활선 상태에서의 오일 채취 구조)에 개시되어 있다.The background technology of the present invention is disclosed in Korean Patent Publication No. 2004-0080281 (published on September 18, 2004, title of the invention: Oil collection structure in a live wire state).

본 발명은 선로의 휴전 없이, 절연유를 상시로 채취 가능할 뿐만 아니라, 절연유의 비산, 유실을 예방할 수 있고, 접속함 커넥터를 체결, 해제하는 작업이 없이 간단하게 유입케이블용 절연유를 채취가능하게 하는 유입케이블용 절연유 채취장치를 제공하는데 그 목적이 있다.The present invention not only makes it possible to collect insulating oil at all times without a power outage of the line, but also prevents scattering and loss of insulating oil, and makes it possible to simply collect insulating oil for inflow cables without engaging or disengaging the junction box connector. The purpose is to provide an insulating oil sampling device for cables.

본 발명에 따른 유입케이블용 절연유 채취장치는, 유입케이블의 절연유 채취용 커넥터부와 연결되는 커넥터접속부; 상기 커넥터접속부를 통한 절연유의 배출경로를 이루는 절연유로부; 상기 절연유로부를 개폐시키는 밸브부; 및 절연체를 포함하여 이루어지고, 상기 커넥터접속부와 상기 밸브부의 사이에 배치되는 밸브절연부;를 포함하는 것을 특징으로 한다.The insulating oil sampling device for an inflow cable according to the present invention includes a connector connection part connected to a connector part for insulating oil sampling of an inflow cable; an insulating passage part forming a discharge path of insulating oil through the connector connection part; A valve unit that opens and closes the insulated flow path unit; and a valve insulating part that includes an insulator and is disposed between the connector connection part and the valve part.

상기 커넥터접속부는, 내부에 상기 절연유로부가 형성되는 접속본체부; 상기 접속본체부의 일단부에 형성되고, 상기 커넥터부에 체결되는 커넥터체결부; 및 상기 접속본체부의 타단부에 형성되고, 상기 밸브절연부와 결합되는 제1절연체연결부;를 포함하는 것을 특징으로 한다.The connector connection part includes a connection body part in which the insulating flow path part is formed; a connector fastening portion formed on one end of the connection body portion and fastened to the connector portion; and a first insulator connection portion formed at the other end of the connection body portion and coupled to the valve insulator portion.

상기 커넥터체결부는, 상기 접속본체부 상에 돌출되게 형성되고, 단부가 상기 커넥터부와 접하는 너트지지부; 상기 너트지지부에 회전가능하게 결합되고, 상기 커넥터부에 체결되는 접속너트부; 및 상기 너트지지부 상에 돌출되게 형성되고, 상기 접속너트부의 이탈을 구속하는 접속스토퍼부;를 포함하는 것을 특징으로 한다.The connector fastening portion includes a nut support portion formed to protrude from the connection body portion and an end of which is in contact with the connector portion; a connection nut portion rotatably coupled to the nut support portion and fastened to the connector portion; and a connection stopper portion that is formed to protrude from the nut support portion and restrains separation of the connection nut portion.

상기 절연유로부는, 상기 커넥터접속부의 내부에 형성되는 유입유로부; 상기 밸브부의 내부에 형성되는 배출유로부; 및 상기 밸브절연부의 내부에 상기 유입유로부, 상기 배출유로부와 연통되게 형성되는 중간유로부;를 포함하는 것을 특징으로 한다.The insulating passage portion may include an inflow passage portion formed inside the connector connection portion; A discharge passage portion formed inside the valve portion; and an intermediate passage portion formed inside the valve insulating portion to communicate with the inflow passage portion and the discharge passage portion.

상기 밸브부는, 내부에 상기 절연유로부가 형성되는 밸브본체부; 상기 절연유로부를 개폐시키는 밸브의 구조를 가지고, 상기 밸브본체부에 결합되는 개폐조절부; 상기 밸브본체부의 일단부에 형성되고, 상기 밸브절연부와 결합되는 제2절연체연결부; 및 상기 밸브본체부의 타단부에 착탈가능하게 결합되고, 상기 절연유로부를 폐쇄하는 캡부;를 포함하는 것을 특징으로 한다.The valve part includes a valve body part in which the insulating flow path part is formed; An opening/closing control unit having the structure of a valve that opens and closes the insulated flow path unit and coupled to the valve body unit; a second insulator connection portion formed at one end of the valve body portion and coupled to the valve insulator portion; and a cap portion detachably coupled to the other end of the valve body and closing the insulating passage portion.

상기 밸브본체부는, 상기 개폐조절부와 연결되는 제1본체부; 상기 제2절연체연결부와 연결되는 제2본체부; 및 상기 제1본체부와 상기 제2본체부를 상호 분리가능하게 연결하는 밸브관리연결부;를 포함하는 것을 특징으로 한다.The valve body portion includes a first body portion connected to the opening/closing control portion; a second body portion connected to the second insulator connection portion; and a valve management connection part that detachably connects the first body part and the second main body part to each other.

상기 밸브관리연결부는, 상기 제1본체부에 형성되는 관리볼트부; 상기 제2본체부에 회전가능하게 결합되고, 상기 관리볼트부에 체결되는 관리너트부; 및 상기 제2본체부 상에 돌출되게 형성되고, 상기 관리너트부의 이탈을 구속하는 관리스토퍼부;를 포함하는 것을 특징으로 한다.The valve management connection part includes a management bolt part formed in the first body part; a management nut portion rotatably coupled to the second body portion and fastened to the management bolt portion; and a management stopper portion formed to protrude from the second body portion and restraining the management nut portion from leaving.

상기 밸브관리연결부는, 상기 제1본체부의 내경부에 테이퍼지게 형성되는 제1테이퍼부; 및 상기 제2본체부의 외경부에 테이퍼지게 형성되며, 상기 관리볼트부와 상기 관리너트부의 체결 시 상기 제1테이퍼부와 접하는 제2테이퍼부;를 포함하는 것을 특징으로 한다.The valve management connection part includes a first tapered portion formed to be tapered on an inner diameter portion of the first body portion; and a second tapered portion that is formed to be tapered on the outer diameter portion of the second body portion and contacts the first tapered portion when the management bolt portion and the management nut portion are fastened.

상기 캡부는, 상기 밸브본체부에 접하며 상기 절연유로부를 폐쇄하는 마개부; 및 상기 마개부를 상기 밸브본체부에 착탈가능하게 결속시키는 마개고정부;를 포함하는 것을 특징으로 한다.The cap portion includes a stopper portion that contacts the valve body portion and closes the insulating passage portion; and a stopper fixing part that detachably couples the stopper to the valve body.

상기 밸브절연부는, 절연체를 포함하여 이루어지고, 상기 커넥터접속부와 상기 밸브부의 사이에 배치되는 절연관부; 상기 절연관부의 일단부를 상기 커넥터접속부와 연결하는 제1체결부재; 상기 절연관부의 타단부를 상기 밸브부와 연결하는 제2체결부재; 상기 커넥터접속부와 상기 절연관부의 사이에 배치되는 제1씰링부재; 및 상기 밸브부와 상기 절연관부의 사이에 배치되는 제2씰링부재;를 포함하는 것을 특징으로 한다.The valve insulation portion includes an insulating pipe portion that includes an insulator and is disposed between the connector connection portion and the valve portion; a first fastening member connecting one end of the insulating pipe portion with the connector connection portion; a second fastening member connecting the other end of the insulating pipe portion to the valve portion; a first sealing member disposed between the connector connection portion and the insulating pipe portion; and a second sealing member disposed between the valve portion and the insulating pipe portion.

상기 절연관부는, 양단부가 개방된 원통형상을 가지며, 상기 절연관부와 접하는 상기 커넥터접속부와 상기 밸브부의 단부는, 플랜지 형상을 가지고 상기 절연관부와 면접촉되고, 상기 제1체결부재와 상기 제2체결부재에 의해 상기 절연관부와 결합되는 것을 특징으로 한다.The insulating pipe portion has a cylindrical shape with both ends open, the connector connection portion and the end of the valve portion in contact with the insulating pipe portion have a flange shape and are in surface contact with the insulating pipe portion, and the first fastening member and the second fastening member It is characterized in that it is coupled to the insulating pipe portion by a fastening member.

본 발명은, 절연재를 포함하여 이루어지고, 상기 커넥터접속부와 상기 밸브절연부를 커버링하는 절연커버부;를 더 포함하는 것을 특징으로 한다.The present invention is characterized in that it further includes an insulating cover part that includes an insulating material and covers the connector connection part and the valve insulating part.

상기 절연커버부는, 절연재를 포함하여 이루어지고, 상기 밸브절연부를 커버링하는 제1커버부; 및 절연재를 포함하여 이루어지고, 상기 커넥터부와 상기 커넥터접속부를 연속하여 커버링하는 제2커버부;를 포함하는 것을 특징으로 한다.The insulating cover part includes a first cover part including an insulating material and covering the valve insulating part; and a second cover portion including an insulating material and continuously covering the connector portion and the connector connection portion.

상기 제2커버부는, 상기 커넥터부와 상기 커넥터접속부를 커버링하는 메인커버부; 및 상기 메인커버부와 연속하여 형성되고, 상기 제1커버부를 커버링하는 적층커버부;를 포함하는 것을 특징으로 한다.The second cover part includes a main cover part covering the connector part and the connector connection part; and a laminated cover part formed continuously with the main cover part and covering the first cover part.

본 발명에 따른 유입케이블용 절연유 채취장치는, 밸브절연부로 절연 상태를 안정되게 확보한 상태에서, 선로를 휴전시키는 과정을 생략한 채, 밸브부를 개폐시키는 간단한 조작만으로 유입케이블용 절연유를 신속하고 용이하게 채취할 수 있다.The insulating oil sampling device for inflow cables according to the present invention quickly and easily extracts insulating oil for inflow cables with a simple operation of opening and closing the valve section, omitting the process of shutting down the line while stably securing the insulation state with the valve insulating section. It can be harvested easily.

본 발명은, 절연유 채취 작업 시 선로 휴전이 수반되지 않으므로, 휴전 및 가압(휴전종료) 시간에 따른 작업시간 제약이 없고, 선로와 현장의 접지 작업 및 확인 등의 부대작업이 생략됨에 따라 작업시간을 대폭 단축시킬 수 있으며, 활선에서 맨홀 내 다회선 동시 작업이 가능해져 맨홀배수의 중복을 방지할 수 있고 이에 따른 작업시간을 단축할 수 있다. 또한, 밸브절연부(40)에 의해, 이상전압 내습 시에도 작업자의 안전을 확보할 수 있다.In the present invention, since a line cease-fire is not involved during the insulating oil extraction work, there are no restrictions on work time depending on the cease-fire and pressurization (end of cease-fire) time, and additional work such as grounding work and confirmation of the line and site are omitted, thereby reducing work time. It can be significantly shortened, and simultaneous work on multiple lines within a manhole is possible in a live line, preventing duplication of manhole drainage and shortening the work time accordingly. In addition, the valve insulation unit 40 can ensure the safety of workers even in the event of abnormal voltage or moisture.

또한, 본 발명은, 절연유 채취 작업에 소요되는 시간이 단축되고, 인건비 등의 비용을 절감할 수 있어, 유입케이블과 연결된 복수개의 접속함 전체에 걸쳐 절연유를 채취, 분석할 수 있다. 이에 따라, 절연유의 열화진단 및 유입케이블의 고장 초기단계 예측의 신뢰성을 보다 향상시킬 수 있다.In addition, the present invention reduces the time required for insulating oil sampling work and reduces costs such as labor costs, making it possible to sample and analyze insulating oil throughout a plurality of junction boxes connected to inflow cables. Accordingly, the reliability of diagnosing deterioration of insulating oil and predicting the initial stage of failure of the inflow cable can be further improved.

또한, 본 발명은, 절연유 채취 작업 시 접속함에 마련된 커넥터부를 직접적으로 개폐시키기 위해 반복적으로 이루어지던 나사 체결 및 해체 작업이 불필요하여, 나사의 잦은 체결 및 해체로 인한 체결부 마모 등의 손상을 해결할 수 있다. 또한, 커넥터부를 직접 개폐 시 절연유가 비산, 유실되던 것을 방지할 수 있고, 절연유 유실에 따른 급격한 유압 변동을 방지할 수 있어, 유입케이블 내 급격한 유압 변동으로 인한 설비고장 및 휴전 장기화를 원천적으로 방지할 수 있다.In addition, the present invention eliminates the need for repeated screw fastening and disassembly work to directly open and close the connector part provided in the connection box when collecting insulating oil, thereby solving damage such as wear of the fastening part due to frequent fastening and disassembly of screws. there is. In addition, it is possible to prevent insulating oil from scattering or being lost when opening and closing the connector part directly, and to prevent sudden hydraulic pressure fluctuations due to insulating oil loss, fundamentally preventing equipment failure and prolonged power outages due to rapid hydraulic pressure fluctuations in the inflow cable. You can.

이와 같이, 본 발명은, 선로의 휴전이 불필요하여 시공품질, 안전관리도, 전력계통 안정도를 향상시킬 수 있고, 절연유 채취 개소 확대로 유입케이블의 절연열화 진단 신뢰도를 향상시킬 수 있으며, 커넥터부를 직접 개폐시키기 위한 체결 및 해체 작업이 불필요하여 작업 편의성을 증대시킬 수 있고, 이로 인한 설비고장 요인을 제거할 수 있다.In this way, the present invention can improve construction quality, safety management, and power system stability by eliminating the need for line outages, improve the reliability of diagnosing insulation deterioration of inflow cables by expanding the insulating oil collection point, and directly connect the connector part. Because fastening and disassembly work to open and close is unnecessary, work convenience can be increased and the factors causing equipment failure can be eliminated.

도 1은 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치를 개략적으로 도시한 측면도이다.
도 2는 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치를 개략적으로 도시한 단면도이다.
도 3은 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치의 요부 분해 단면도이다.
도 4는 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치의 커넥터접속부를 도시한 부분 단면도이다.
도 5는 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치의 밸브부를 도시한 부분 단면도이다.
도 6은 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치의 밸브절연부를 도시한 부분 단면도이다.
Figure 1 is a side view schematically showing an insulating oil sampling device for an inflow cable according to an embodiment of the present invention.
Figure 2 is a cross-sectional view schematically showing an insulating oil sampling device for an inflow cable according to an embodiment of the present invention.
Figure 3 is an exploded cross-sectional view of the main part of the insulating oil sampling device for inflow cables according to an embodiment of the present invention.
Figure 4 is a partial cross-sectional view showing a connector connection portion of an insulating oil sampling device for an inflow cable according to an embodiment of the present invention.
Figure 5 is a partial cross-sectional view showing the valve portion of the insulating oil sampling device for inflow cables according to an embodiment of the present invention.
Figure 6 is a partial cross-sectional view showing the valve insulation part of the insulating oil sampling device for the inflow cable according to an embodiment of the present invention.

이하 첨부된 도면들을 참조하여 본 발명에 따른 유입케이블용 절연유 채취장치의 실시예를 설명한다. 이러한 과정에서 도면에 도시된 선들의 두께나 구성요소의 크기 등은 설명의 명료성과 편의상 과장되게 도시되어 있을 수 있다. 또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로써, 이는 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다. 그러므로, 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Hereinafter, an embodiment of an insulating oil sampling device for an inflow cable according to the present invention will be described with reference to the attached drawings. In this process, the thickness of lines or sizes of components shown in the drawings may be exaggerated for clarity and convenience of explanation. In addition, the terms described below are terms defined in consideration of functions in the present invention, and may vary depending on the intention or custom of the user or operator. Therefore, definitions of these terms should be made based on the content throughout this specification.

도 1은 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치를 개략적으로 도시한 측면도이고, 도 2는 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치를 개략적으로 도시한 단면도이며, 도 3은 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치의 요부 분해 단면도이다.Figure 1 is a side view schematically showing an insulating oil sampling device for an inflow cable according to an embodiment of the present invention, and Figure 2 is a cross-sectional view schematically showing an insulating oil sampling device for an inflow cable according to an embodiment of the present invention. Figure 3 is an exploded cross-sectional view of the main part of the insulating oil sampling device for inflow cables according to an embodiment of the present invention.

도 1 내지 도 3을 참조하면, 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치(1)는 커넥터접속부(10), 절연유로부(20), 밸브부(30), 밸브절연부(40), 절연커버부(50)를 포함하는 것을 특징으로 한다.Referring to Figures 1 to 3, the insulating oil sampling device 1 for an inflow cable according to an embodiment of the present invention includes a connector connection part 10, an insulating passage part 20, a valve part 30, and a valve insulating part ( 40), characterized in that it includes an insulating cover part 50.

커넥터접속부(10)는 유입케이블(미도시)의 접속함(2)에 마련된 절연유 채취용 커넥터부(3)와 기밀하게 연결된다. 절연유로부(20)는 본 발명에 따른 유입케이블용 절연유 채취장치(1)의 내부에 절연유 배출경로를 연통되게 형성한다. 도 2를 참조하면, 본 발명의 일실시예에 따른 절연유로부(20)는 유입유로부(21), 배출유로부(22), 중간유로부(23)를 포함한다.The connector connection part 10 is airtightly connected to the connector part 3 for insulating oil sampling provided in the connection box 2 of the inlet cable (not shown). The insulating passage portion 20 forms an insulating oil discharge path in communication with the inside of the insulating oil sampling device 1 for an inflow cable according to the present invention. Referring to FIG. 2, the insulating passage portion 20 according to an embodiment of the present invention includes an inlet passage portion 21, an discharge passage portion 22, and an intermediate passage portion 23.

유입유로부(21)는 커넥터접속부(10)의 내부에 형성된다. 배출유로부(22)는 밸브부(30)의 내부에 형성된다. 중간유로부(23)는 밸브절연부(40)의 내부에 유입유로부(21), 배출유로부(22)와 연통되게 형성된다. 즉, 절연유로부(20)는 상류측으로부터 하류측으로 갈수록 유입유로부(21), 중간유로부(23), 배출유로부(22)가 연속하여 연장된 구조를 가진다.The inflow passage portion 21 is formed inside the connector connection portion 10. The discharge passage portion 22 is formed inside the valve portion 30. The intermediate passage portion 23 is formed inside the valve insulating portion 40 to communicate with the inflow passage portion 21 and the discharge passage portion 22. That is, the insulating passage portion 20 has a structure in which the inlet passage portion 21, the middle passage portion 23, and the discharge passage portion 22 extend continuously from the upstream side to the downstream side.

커넥터접속부(10)가 커넥터부(3)에 접속된 상태에서 절연유로부(20)는 커넥터부(3)와 연통된다. 커넥터부(3)로부터 커넥터접속부(10)측으로 유동된 절연유는 절연유로부(20)의 내부를 연속하여 통과하면서 절연유로부(20)의 단부를 통해 배출된다. 밸브부(30)는 유로를 개폐시키는 밸브의 구조를 가지고, 절연유로부(20)를 개폐시킨다. 밸브부(30)를 개방 조작하면, 절연유로부(20)가 개방되며 절연유가 절연유로부(20)의 단부를 통해 접속함(2)의 외부로 배출된다. 밸브부(30)를 폐쇄 조작하면, 절연유로부(20)가 폐쇄되며 절연유의 배출이 중단된다.In a state where the connector connection portion 10 is connected to the connector portion 3, the insulating passage portion 20 communicates with the connector portion 3. The insulating oil flowing from the connector portion 3 to the connector connection portion 10 continues to pass through the inside of the insulating passage portion 20 and is discharged through the end of the insulating passage portion 20. The valve unit 30 has the structure of a valve that opens and closes the flow path, and opens and closes the insulated flow path part 20. When the valve portion 30 is opened, the insulating passage portion 20 is opened and the insulating oil is discharged to the outside of the connection box 2 through the end of the insulating passage portion 20. When the valve part 30 is closed, the insulating passage part 20 is closed and the discharge of insulating oil is stopped.

밸브절연부(40)는 밸브부(30)의 조작이 절연 상태에서 안전하게 이루어질 수 있게 밸브부(30)와 커넥터접속부(10)를 절연시키는 장치부로, 절연체를 포함하여 이루어지고, 커넥터접속부(10)와 밸브부(30)의 사이에 배치된다. 이에 따라, 작업자는 접속함(2)과 명확하게 절연된 상태로 밸브부(30)를 안전하게 조작할 수 있고, 절연유 채취 작업 중 접속함(2)측에 서지유입, 지락전류 등으로 인해 과전압이 발생되는 경우에 대해서도 안전을 확보할 수 있다.The valve insulator 40 is a device part that insulates the valve part 30 and the connector connection part 10 so that the operation of the valve part 30 can be safely performed in an insulated state, and includes an insulator, and the connector connection part 10 ) and the valve unit 30. Accordingly, the operator can safely operate the valve unit 30 in a state clearly insulated from the connection box (2), and overvoltage due to surge inflow, ground fault current, etc. on the connection box (2) side during the insulating oil collection operation. Safety can be ensured even in cases where this occurs.

절연커버부(50)는 절연재를 포함하여 이루어지고, 커넥터접속부(10)와 밸브절연부(40)를 커버링한다. 절연커버부(50)는 커넥터접속부(10), 밸브부(30), 밸브절연부(40)가 상호 조립된 상태, 또는 커넥터부(3)에 결합된 상태에서, 작업자의 조작이 필요한 밸브부(30)의 일부를, 보다 구체적으로는 개폐조절부(32)와 캡부(34)를 제외한 나머지 부분을 커버링함으로써, 밸브절연부(40)와 함께 밸브부(30)의 절연 안정성을 다중으로 확보한다.The insulating cover part 50 includes an insulating material and covers the connector connection part 10 and the valve insulating part 40. The insulating cover part 50 is a valve part that requires operator manipulation when the connector connection part 10, the valve part 30, and the valve insulating part 40 are assembled together or are coupled to the connector part 3. By covering a part of (30), more specifically, the remaining part excluding the opening/closing control part 32 and the cap part 34, the insulation stability of the valve part 30 together with the valve insulating part 40 is secured in multiple ways. do.

도 3, 도 4를 참조하면, 본 발명의 일실시예에 따른 커넥터접속부(10)는 접속본체부(11), 커넥터체결부(12), 제1절연체연결부(16)를 포함한다.Referring to Figures 3 and 4, the connector connection part 10 according to an embodiment of the present invention includes a connection body part 11, a connector fastening part 12, and a first insulator connection part 16.

접속본체부(11)는 커넥터접속부(10)의 기본 골조를 이루는 장치부로, 내부에 절연유로부(20)의 유입유로부(21)가 형성된다. 본 발명의 일실시예에 따른 접속본체부(11)는 케이블 등의 다른 장비들과 함께 접속함(2) 주변의 한정된 공간을 공유하기 위한 공간활용도와, 절연유의 원활한 배출을 고려하여, 접속함(2)의 외면으로 돌출되는 방향이 아니라 접속함(2)의 외면과 나란한 방향으로 연장되게 배치된다.The connection body part 11 is a device part that forms the basic frame of the connector connection part 10, and the inlet flow path part 21 of the insulating flow path part 20 is formed therein. The connection main body 11 according to an embodiment of the present invention is connected together with other equipment such as cables (2), taking into account space utilization for sharing limited space around and smooth discharge of insulating oil. It is arranged to extend in a direction parallel to the outer surface of the junction box (2), rather than in a direction protruding from the outer surface of the junction box (2).

커넥터체결부(12)는 커텍터부(3)와 체결되는 장치부로, 접속본체부(11)의 일단부에 형성된다. 커넥터체결부(12)는 볼트, 너트 체결구조에 의해 견고하게 결속될 수 있고, 테이퍼진 형상을 가진 단부끼리 접속시킴으로써 수밀성을 보다 안정적으로 확보할 수 있다. 도 4를 참조하면, 본 발명의 일실시예에 따른 커넥터체결부(12)는 너트지지부(13), 접속너트부(14), 접속스토퍼부(15)를 포함한다.The connector fastening portion 12 is a device portion fastened to the connector portion 3 and is formed at one end of the connection body portion 11. The connector fastening portion 12 can be firmly coupled by a bolt and nut fastening structure, and watertightness can be more stably secured by connecting the ends having a tapered shape. Referring to Figure 4, the connector fastening portion 12 according to an embodiment of the present invention includes a nut support portion 13, a connection nut portion 14, and a connection stopper portion 15.

너트지지부(13)는 접속본체부(11) 내부에 있는 유입유로부(21)의 단부에 대응되는 위치에 접속본체부(11)로부터 커넥터부(3)측으로 돌출되게 형성된다. 너트지지부(13)의 내부에는 유입유로부(21)가, 접속본체부(11) 내부의 유입유로부(21)와 연통되게 형성된다.The nut support portion 13 is formed to protrude from the connection body 11 toward the connector portion 3 at a position corresponding to the end of the inflow passage portion 21 inside the connection body 11. Inside the nut support portion 13, an inflow passage portion 21 is formed to communicate with the inflow passage portion 21 inside the connection body portion 11.

너트지지부(13)의 단부는 커넥터부(3)와 접하며, 외경부가 테이퍼진 형상을 가진다. 이러한 형상에 의해 너트지지부(13)의 단부는 말단측으로 갈수록 너비가 점차 축소되는 뾰족한 형상을 가지고, 커넥터부(3)의 내부에 일부가 인입된 상태로 커넥터부(3)와 기밀하게 밀착, 압접된다.The end of the nut support portion 13 is in contact with the connector portion 3, and the outer diameter portion has a tapered shape. Due to this shape, the end of the nut support portion 13 has a sharp shape whose width gradually decreases toward the distal end, and is in close contact and pressure contact with the connector portion 3 in a state in which a portion is retracted into the interior of the connector portion 3. do.

접속너트부(14)는 내경부에 암나사부을 구비하여 너트지지부(13)의 둘레에 회전가능하게 결합되고, 커넥터부(3)의 외경부에 형성된 수나사부에 나사체결된다. 접속스토퍼부(15)는 너트지지부(13) 상에 반경방향으로 돌출되게 형성된다. 너트지지부(13)에 끼워진 접속너트부(14)는 접속스토퍼부(15)에 걸려 너트지지부(13)로부터 이탈되는 것이 구속된다.The connection nut portion 14 has a female thread portion on the inner diameter portion and is rotatably coupled around the nut support portion 13, and is screwed to the male thread portion formed on the outer diameter portion of the connector portion 3. The connection stopper portion 15 is formed to protrude in the radial direction on the nut support portion 13. The connection nut portion 14 inserted into the nut support portion 13 is caught by the connection stopper portion 15 and is prevented from being separated from the nut support portion 13.

접속너트부(14)는 접속스토퍼부(15)와 접한 상태로 커넥터부(3)에 나사체결된다. 이때 접속스토퍼부(15)는 접속너트부(14)와 커넥터부(3)간의 체결력을 지지하게 된다. 접속너트부(14)에 커넥터부(3)측으로 작용하는 힘은 접속스토퍼부(15)로 전달되고, 접속스토퍼부(15)가 이를 지지한다.The connection nut portion 14 is screwed to the connector portion 3 while being in contact with the connection stopper portion 15. At this time, the connection stopper portion 15 supports the fastening force between the connection nut portion 14 and the connector portion 3. The force acting on the connection nut portion 14 toward the connector portion 3 is transmitted to the connection stopper portion 15, and the connection stopper portion 15 supports it.

제1절연체연결부(16)는 밸브절연부(40)와 결합되는 장치부로, 접속본체부(11)의 타단부에 형성된다. 제1절연체연결부(16)는 접속본체부(11)의 단부에 플랜지 형상으로 형성되고, 밸브절연부(40)의 절연관부(41)의 일측부와 접한다. 보다 구체적으로, 제1절연체연결부(16)는 절연관부(41)에 대응되는 너비를 가진다. 제1절연체연결부(16) 상에는 밸브절연부(40)의 제1체결부재(42)가 관통할 수 있는 복수개의 홀부가 형성된다. The first insulator connection portion 16 is a device portion coupled to the valve insulator portion 40 and is formed at the other end of the connection body portion 11. The first insulator connection portion 16 is formed in a flange shape at the end of the connection body portion 11 and contacts one side of the insulating pipe portion 41 of the valve insulating portion 40. More specifically, the first insulator connection portion 16 has a width corresponding to the insulating pipe portion 41. A plurality of holes are formed on the first insulator connecting portion 16 through which the first fastening member 42 of the valve insulating portion 40 can penetrate.

도 5는 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치의 밸브부를 도시한 부분 단면도이다.Figure 5 is a partial cross-sectional view showing the valve portion of the insulating oil sampling device for inflow cables according to an embodiment of the present invention.

도 3, 도 5를 참조하면, 본 발명의 일실시예에 따른 밸브부(30)는 밸브본체부(31), 개폐조절부(32), 제2절연체연결부(33), 캡부(34)를 포함한다.Referring to Figures 3 and 5, the valve part 30 according to an embodiment of the present invention includes a valve body part 31, an opening/closing control part 32, a second insulator connection part 33, and a cap part 34. Includes.

밸브본체부(31)는 밸브부(30)의 기본 골조를 이루는 장치부로, 내부에 절연유로부(20)의 배출유로부(22)가 형성된다. 개폐조절부(32)는 배출유로부(22)를 개폐시키는 밸브의 구조를 가지고, 밸브본체부(31)에 결합된다. 도 5 상에는 밸브본체부(31)로서 밸로우즈 밸브(bellows valve)를 적용한 구조가 개시되어 있으나, 이는 적절한 일례를 개시하고자 함이지, 본 발명의 실시예를 이로 한정하고자 하는 것은 아니다. 개폐조절부(32)는 배출유로부(22)를 개폐시킬 수 있다면 공지의 밸브를 포함하여 특정한 구조와 형상으로 한정되지 않는다.The valve body portion 31 is a device portion that forms the basic frame of the valve portion 30, and the discharge passage portion 22 of the insulating passage portion 20 is formed therein. The opening/closing control unit 32 has the structure of a valve that opens and closes the discharge passage unit 22, and is coupled to the valve body unit 31. In Figure 5, a structure using a bellows valve as the valve body portion 31 is disclosed, but this is intended to disclose a suitable example and is not intended to limit the embodiment of the present invention to this. The opening and closing control unit 32 is not limited to a specific structure and shape, including known valves, as long as it can open and close the discharge passage unit 22.

제2절연체연결부(33)는 밸브절연부(40)와 결합되는 장치부로, 밸브본체부(31)의 일단부에 형성된다. 제2절연체연결부(33)는 밸브본체부(31)의 단부에 플랜지 형상으로 형성되고, 밸브절연부(40)의 절연관부(41)의 타측부와 접한다. 보다 구체적으로, 제2절연체연결부(33)는 절연관부(41)에 대응되는 너비를 가진다.The second insulator connection portion 33 is a device portion coupled to the valve insulator portion 40 and is formed at one end of the valve body portion 31. The second insulator connecting portion 33 is formed in a flange shape at the end of the valve body portion 31 and contacts the other side of the insulating pipe portion 41 of the valve insulating portion 40. More specifically, the second insulator connection portion 33 has a width corresponding to the insulating pipe portion 41.

제2절연체연결부(33) 상에는 제2체결부재(43)가 관통할 수 있는 복수개의 홀부가 형성된다. 이때 제2절연체연결부(33) 상에 홀부를 형성함에 있어서는, 제1체결부재(42)와 제2체결부재(43)가 원주방향 및 반경방향에 대해 서로 이격된 위치에 배치되게, 제1절연체연결부(16) 상에 형성된 홀부와 서로 빗나간 위치에 형성하는 것이 바람직하다. 이에 따라, 절연관부(41)의 길이를 보다 다양하게 신축적용할 수 있고, 제1체결부재(42), 제2체결부재(43)의 체결을 위한 암나사홈부를 형성함에 따른 절연관부(41)의 강성 저하를 감소시킬 수 있다.A plurality of holes through which the second fastening member 43 can pass are formed on the second insulator connecting portion 33. At this time, when forming the hole on the second insulator connecting portion 33, the first fastening member 42 and the second fastening member 43 are disposed at positions spaced apart from each other in the circumferential and radial directions, so that the first insulator It is preferable to form the hole at a position deviating from the hole formed on the connection portion 16. Accordingly, the length of the insulating pipe portion 41 can be expanded and expanded in more diverse ways, and the insulating pipe portion 41 is formed by forming a female thread groove for fastening the first fastening member 42 and the second fastening member 43. The decrease in rigidity can be reduced.

밸브본체부(31)는 밸브의 구조를 가지는 개폐조절부(32)의 점검, 관리, 교체를 용이하게 수행가능하게, 제2절연체연결부(33)로부터 개폐조절부(32)를 분리가능한 구조를 가진다. 도 5를 참조하면, 본 발명의 일실시예에 따른 밸브본체부(31)는 제1본체부(311), 제2본체부(312), 밸브관리연결부(313)를 포함한다.The valve body part 31 has a structure that allows the opening and closing control part 32 to be separated from the second insulator connection part 33 to facilitate inspection, management, and replacement of the opening and closing control part 32 having the structure of a valve. have Referring to Figure 5, the valve body portion 31 according to an embodiment of the present invention includes a first body portion 311, a second body portion 312, and a valve management connection portion 313.

제1본체부(311)는 밸브본체부(31) 중 하류측에 배치되는 일측부로, 개폐조절부(32)와 연결된다. 제2본체부(312)는 밸브본체부(31) 중 상류측에 배치되는 타측부로, 제2절연체연결부(33)와 연결된다. 제1본체부(311)와 제2본체부(312)의 내부에는 배출유로부(22)가 연속하여 형성된다.The first body portion 311 is one side disposed on the downstream side of the valve body portion 31 and is connected to the opening/closing control portion 32. The second body portion 312 is the other side disposed on the upstream side of the valve body portion 31 and is connected to the second insulator connection portion 33. A discharge passage portion 22 is continuously formed inside the first body portion 311 and the second body portion 312.

밸브관리연결부(313)는 제1본체부(311)와 제2본체부(312)를 상호 분리가능하게 연결한다. 도 5를 참조하면, 본 발명의 일실시예에 따른 밸브관리연결부(313)는 제1테이퍼부(314), 제2테이퍼부(315), 관리볼트부(316), 관리너트부(317), 관리스토퍼부(318)를 포함한다.The valve management connection portion 313 connects the first body portion 311 and the second body portion 312 to each other in a separable manner. Referring to Figure 5, the valve management connection part 313 according to an embodiment of the present invention includes a first tapered part 314, a second tapered part 315, a management bolt part 316, and a management nut part 317. , including a management stopper unit 318.

제1테이퍼부(314)는 제1본체부(311)의 단부에, 보다 구체적으로는 내경부에 테이퍼지게 형성된다. 제2테이퍼부(315)는 제2본체부(312)의 단부에, 보다 구체적으로는 외경부에 테이퍼지게 형성되며, 관리볼트부(316)와 관리너트부(317)의 체결 시 제1테이퍼부(314)와 접한다. 제2테이퍼부(315)는 말단측으로 갈수록 너비가 점차 축소되는 뾰족한 형상을 가지고, 제1테이퍼부(314)의 내부에 인입된 상태로 제1테이퍼부(314)와 기밀하게 밀착, 압접된다.The first tapered portion 314 is formed to be tapered at the end of the first body portion 311, and more specifically, at the inner diameter portion. The second tapered portion 315 is formed to be tapered at the end of the second body portion 312, more specifically, at the outer diameter portion, and is formed to be tapered when the management bolt portion 316 and the management nut portion 317 are fastened. It is in contact with wealth (314). The second tapered portion 315 has a sharp shape whose width gradually decreases toward the distal end, and is in tight and pressure contact with the first tapered portion 314 while being inserted into the first tapered portion 314.

관리볼트부(316)는 제1본체부(311)의 외경부에 수나사부의 구조로 형성된다. 관리너트부(317)는 관리볼트부(316)에 나사체결되는 장치부로, 제2본체부(312)의 둘레에 회전가능하게 결합된다. 관리너트부(317)는 제2본체부(312)의 내경부에 암나사부의 구조로 형성되고, 관리볼트부(316)에 나사체결된다.The management bolt portion 316 is formed as a male thread portion on the outer diameter of the first body portion 311. The management nut portion 317 is a device portion screwed to the management bolt portion 316 and is rotatably coupled to the circumference of the second body portion 312. The management nut portion 317 is formed in the structure of a female thread portion on the inner diameter portion of the second body portion 312 and is screwed to the management bolt portion 316.

관리스토퍼부(318)는 관리너트부(317)의 이탈을 구속하기 위한 장치부로, 제2본체부(312) 상에 반경방향으로 돌출되게 형성된다. 제2본체부(312)에 끼워진 관리너트부(317)는 관리스토퍼부(318)에 걸려 제2본체부(312)로부터 이탈되는 것이 구속된다.The management stopper part 318 is a device part for restraining the separation of the management nut part 317, and is formed to protrude in the radial direction on the second body part 312. The management nut part 317 inserted into the second main body 312 is caught by the management stopper part 318 and is prevented from being separated from the second main body 312.

관리너트부(317)는 관리스토퍼부(318)와 접한 상태로 관리볼트부(316)에 나사체결된다. 이때 관리스토퍼부(318)는 관리너트부(317)와 관리볼트부(316)간의 체결력을 지지하게 된다. 관리너트부(317)에 제1본체부(311) 및 관리볼트부(316)측으로 작용하는 힘은 관리스토퍼부(318)로 전달되고, 관리스토퍼부(318)가 이를 지지한다.The management nut portion 317 is screwed to the management bolt portion 316 while being in contact with the management stopper portion 318. At this time, the management stopper portion 318 supports the fastening force between the management nut portion 317 and the management bolt portion 316. The force acting on the management nut part 317 toward the first body part 311 and the management bolt part 316 is transmitted to the management stopper part 318, and the management stopper part 318 supports it.

제1본체부(311)와 제2본체부(312)는 관리볼트부(316)와 관리너트부(317)간의 볼트, 너트 체결구조에 의해 견고하게 결속될 수 있고, 필요 시 나사체결을 해제함으로써 상호 분리될 수 있다. 또한, 제1본체부(311)와 제2본체부(312)는 테이퍼진 형상을 가진 단부끼리, 보다 구체적으로는 제1테이퍼부(314), 제2테이퍼부(315) 접속시킴으로써 수밀성을 보다 안정적으로 확보할 수 있다.The first main body 311 and the second main body 312 can be firmly coupled by a bolt and nut fastening structure between the management bolt part 316 and the management nut part 317, and the screw fastening can be released when necessary. By doing so, they can be separated from each other. In addition, the first body portion 311 and the second body portion 312 have tapered ends that are connected to each other, more specifically, the first tapered portion 314 and the second tapered portion 315 to ensure watertightness. It can be secured stably.

캡부(34)는 배출유로부(22)의 배출단부를 폐쇄, 개방시키기 위한 마개에 해당되는 장치부로, 밸브본체부(31)의 타단부에 착탈가능하게 결합된다. 캡부(34)를 밸브본체부(31)로부터 분리시켜, 절연유로부(20)의 개방 상태를 확보한 상태에서, 개폐조절부(32)를 이용해 절연유로부(20)를 개폐 조절하면서 절연유 채취작업을 수행할 수 있다.The cap portion 34 is a device portion corresponding to a stopper for closing and opening the discharge end of the discharge passage portion 22, and is detachably coupled to the other end of the valve body portion 31. Separate the cap part 34 from the valve body part 31, secure the open state of the insulating flow part 20, and collect insulating oil while controlling the opening and closing of the insulating flow part 20 using the opening and closing control part 32. work can be performed.

또한, 절연유 채취작업을 완료한 후에는, 개폐조절부(32)를 이용해 절연유로부(20)를 1차적으로 폐쇄시킨 상태에서, 캡부(34)를 밸브본체부(31)에 2차적으로 결합시켜 배출유로부(22)를 다단으로 차단시킴으로써, 절연유의 누유를 안정되게 방지할 수 있다. 도 5를 참조하면, 본 발명의 일실시예에 따른 캡부(34)는 마개부(35)와 마개고정부(36)를 포함한다.In addition, after completing the insulating oil sampling operation, the cap part 34 is secondarily coupled to the valve body part 31 while the insulating passage part 20 is primarily closed using the opening/closing control part 32. By blocking the discharge passage portion 22 in multiple stages, leakage of insulating oil can be stably prevented. Referring to Figure 5, the cap portion 34 according to an embodiment of the present invention includes a stopper portion 35 and a stopper fixing portion 36.

마개부(35)는 절연유로부(20)의 배출단부보다 확장된 너비를 가지고, 밸브본체부(31)의 타단부에 접하며 절연유로부(20)를 폐쇄한다. 마개부(35)의 단부는 외경부가 테이퍼진 형상을 가진다. 이러한 형상에 의해 마개부(35)의 단부는 말단측으로 갈수록 너비가 점차 축소되는 뾰족한 형상을 가지고, 배출유로부(22)의 내부에 일부가 인입된 상태로 밸브본체부(31)와 기밀하게 밀착, 압접된다.The stopper portion 35 has a wider width than the discharge end of the insulating passage portion 20, contacts the other end of the valve body portion 31, and closes the insulating passage portion 20. The end of the stopper 35 has a tapered outer diameter. Due to this shape, the end of the stopper portion 35 has a sharp shape whose width gradually decreases toward the distal end, and is in airtight contact with the valve body portion 31 with a portion of the cap portion retracted into the interior of the discharge passage portion 22. , are pressure-welded.

마개고정부(36)는 마개부(35)를 밸브본체부(31)에 착탈가능하게 결속시킨다. 본 발명의 일실시예에 따른 마개고정부(36)는 접속너트부(14), 관리너트부(317)와 동일한 구조를 가지고, 밸브본체부(31)에 나사체결된다. 이때, 마개부(35) 상에는 접속스토퍼부(15), 관리스토퍼부(318)에 대응되는 돌출부가 형성된다. 이러한 마개부(35)와 마개고정부(36)의 구조에 의해, 마개부(35)를 밸브본체부(31)의 배출단부에 결속시킴과 동시에 기밀하게 압접시킬 수 있다.The stopper fixing part 36 attaches the stopper part 35 to the valve body part 31 in a detachable manner. The stopper fixing part 36 according to an embodiment of the present invention has the same structure as the connection nut part 14 and the management nut part 317, and is screwed to the valve body part 31. At this time, protrusions corresponding to the connection stopper part 15 and the management stopper part 318 are formed on the stopper part 35. Due to the structure of the stopper portion 35 and the stopper fixing portion 36, the stopper portion 35 can be fastened to the discharge end of the valve body portion 31 and at the same time airtightly pressure-welded.

도 6은 본 발명의 일실시예에 따른 유입케이블용 절연유 채취장치의 밸브절연부를 도시한 부분 단면도이다.Figure 6 is a partial cross-sectional view showing the valve insulation part of the insulating oil sampling device for the inflow cable according to an embodiment of the present invention.

도 6을 참조하면, 본 발명의 일실시예에 따른 밸브절연부(40)는 절연관부(41), 제1체결부재(42), 제2체결부재(43), 제1씰링부재(44), 제2씰링부재(45)를 포함한다.Referring to Figure 6, the valve insulation portion 40 according to an embodiment of the present invention includes an insulating pipe portion 41, a first fastening member 42, a second fastening member 43, and a first sealing member 44. , and includes a second sealing member (45).

절연관부(41)는 에폭시 수지 등의 절연체를 포함하여 이루어지고, 커넥터접속부(10)와 밸브부(30)의 사이에 배치된다. 절연관부(41)는 반경방향으로 설정 두께를 가지는 원통 형상을 가진다. 절연관부(41)의 일단부에는 제1체결부재(42)가 체결될 수 있는 체결홈부가 형성되고, 타단부에는 제2체결부재(42)가 체결될 수 있는 체결홈부가 형성된다. 절연관부(41)의 내경부 내측에는 중간유로부(23)가 형성된다.The insulating pipe portion 41 is made of an insulator such as epoxy resin and is disposed between the connector connection portion 10 and the valve portion 30. The insulating pipe portion 41 has a cylindrical shape with a set thickness in the radial direction. A fastening groove into which the first fastening member 42 can be fastened is formed at one end of the insulating pipe portion 41, and a fastening groove into which the second fastening member 42 can be fastened is formed at the other end. An intermediate passage portion 23 is formed inside the inner diameter of the insulating pipe portion 41.

제1체결부재(42)는 절연관부(41)의 일단부를 커넥터접속부(10)와 연결한다. 제1체결부재(42)로는 볼트부재를 적용할 수 있다. 제1체결부재(42)는 플랜지 형상을 가지는 제1절연체연결부(16)를 관통하여 절연관부(41)에 체결됨으로써, 커넥터접속부(10)와 밸브절연부(40)를 상호 연결한다.The first fastening member 42 connects one end of the insulating pipe portion 41 with the connector connection portion 10. A bolt member can be applied as the first fastening member 42. The first fastening member 42 penetrates the first insulator connecting portion 16 having a flange shape and is fastened to the insulating pipe portion 41, thereby connecting the connector connecting portion 10 and the valve insulating portion 40 to each other.

제2체결부재(43)는 절연관부(41)의 타단부를 밸브부(30)와 연결한다. 제2체결부재(43)로는 볼트부재를 적용할 수 있다. 제2체결부재(43)는 플랜지 형상을 가지는 제2절연체연결부(33)를 관통하여 절연관부(42)에 체결됨으로써, 밸브부(30)와 밸브절연부(40)를 상호 연결한다.The second fastening member 43 connects the other end of the insulating pipe portion 41 with the valve portion 30. A bolt member can be used as the second fastening member 43. The second fastening member 43 penetrates the second insulator connection part 33 having a flange shape and is fastened to the insulating pipe part 42, thereby connecting the valve part 30 and the valve insulating part 40 to each other.

제1씰링부재(44)는 커넥터접속부(10)와 절연관부(41)를 상호 기밀시키는 장치부로, 고무 등과 같은 연질 탄성부재를 포함하여 이루어지고, 커넥터접속부(10)와 절연관부(41)의 사이에 배치된다. 제1절연체연결부(16)와 절연관부(41) 중 적어도 일측에는 제1씰링부재(44)를 끼울 수 있는 원형의 홈부가 형성된다. 제1씰링부재(44)는 중간유로부(23)와 설정 간격을 가지는 링 형상을 가지고, 원형의 홈부에 끼워진다.The first sealing member 44 is a device part that mutually seals the connector connection part 10 and the insulating pipe part 41, and is made of a soft elastic member such as rubber, and is a device for sealing the connector connection part 10 and the insulating pipe part 41. placed in between. A circular groove into which the first sealing member 44 can be inserted is formed on at least one side of the first insulator connection portion 16 and the insulating pipe portion 41. The first sealing member 44 has a ring shape with a set distance from the intermediate flow path portion 23 and is inserted into the circular groove.

제2씰링부재(45)는 밸브부(30)와 절연관부(41)를 상호 기밀시키는 장치부로, 고무 등과 같은 연질 탄성부재를 포함하여 이루어지고, 밸브부(30)와 절연관부(41)의 사이에 배치된다. 제2절연체연결부(33)와 절연관부(41) 중 적어도 일측에는 제2씰링부재(45)를 끼울 수 있는 원형의 홈부가 형성된다. 제2씰링부재(45)는 중간유로부(23)와 설정 간격을 가지는 링 형상을 가지고, 원형의 홈부에 끼워진다.The second sealing member 45 is a device part that mutually seals the valve part 30 and the insulating pipe part 41, and is made of a soft elastic member such as rubber, and is a device part that seals the valve part 30 and the insulating pipe part 41. placed in between. A circular groove into which the second sealing member 45 can be inserted is formed on at least one side of the second insulator connection portion 33 and the insulating pipe portion 41. The second sealing member 45 has a ring shape with a set distance from the intermediate flow passage portion 23 and is inserted into the circular groove.

도 1, 도 2를 참조하면, 본 발명의 일실시예에 따른 절연커버부(50)는 제1커버부(51)와 제2커버부(52)를 포함한다.Referring to Figures 1 and 2, the insulating cover part 50 according to an embodiment of the present invention includes a first cover part 51 and a second cover part 52.

제1커버부(51)는 절연재를 포함하여 이루어지고, 밸브절연부(40)를 커버링한다. 제1커버부(51)로는 열수축 튜브를 적용할 수 있다. 밸브절연부(40)의 양단부에 커넥터접속부(10)와 밸브부(30)를 결합시킨 상태에서, 밸브절연부(40)를 감싸도록, 보다 구체적으로는 제1절연체연결부(16), 제1체결부재(42), 절연관부(41), 제2체결부재(43), 제2절연체연결부(33)를 감싸도록 열수축 튜브를 끼운 상태에서, 고온 분위기에 노출시킴으로써, 제1커버부(51)로 밸브절연부(40)를 기밀하게 커버링할 수 있다.The first cover part 51 includes an insulating material and covers the valve insulating part 40. A heat shrinkable tube can be used as the first cover part 51. In a state in which the connector connection part 10 and the valve part 30 are coupled to both ends of the valve insulating part 40, a first insulating part 16 and a first insulating part 16 are formed to surround the valve insulating part 40. By exposing the first cover part 51 to a high-temperature atmosphere while inserting a heat shrink tube to surround the fastening member 42, the insulating pipe part 41, the second fastening member 43, and the second insulator connection part 33. The valve insulation portion 40 can be airtightly covered.

제2커버부(52)는 절연재를 포함하여 이루어지고, 커넥터부(3)와 커넥터접속부(10)를 연속하여 커버링한다. 제2커버부(52)는 커넥터접속부(10)를 커넥터부(3)에 조립, 체결한 상태에서, 커넥터부(3)와 커넥터접속부(10)를 커버링하게 설치된다. 제2커버부(52)는 자기융착 테이프, 고탄력 압박 테이프, 피브이씨(PVC) 테이프를 순차적으로 다중 결합함으로써 형성할 수 있다. 도 2를 참조하면, 본 발명의 일실시예에 따른 제2커버부(52)는 메인커버부(53)와 적층커버부(54)를 포함한다.The second cover part 52 includes an insulating material and continuously covers the connector part 3 and the connector connection part 10. The second cover part 52 is installed to cover the connector part 3 and the connector connection part 10 in a state in which the connector connection part 10 is assembled and fastened to the connector part 3. The second cover portion 52 can be formed by sequentially multiple combining a self-fusing tape, a high-elasticity compression tape, and a PVC tape. Referring to Figure 2, the second cover part 52 according to an embodiment of the present invention includes a main cover part 53 and a laminated cover part 54.

메인커버부(53)는 제2커버부(52) 중 커넥터부(3)와 커넥터접속부(10)를 커버링하는 부분이다. 적층커버부(54)는 제2커버부(52) 중 제1커버부(51)를 커버링하는 부분으로, 메인커버부(53)와 연속하여 형성된다. 적층커버부(54)를 이용해 제1커버부(51)와 제2커버부(53)의 사이에 틈새가 발생되는 것을 명확하게 방지할 수 있고, 제1커버부(51)와 제2커버부(53)가 함께 연속하여 본 발명에 따른 유입케이블용 절연유 채취장치(1)를 커버할 수 있다.The main cover part 53 is a part of the second cover part 52 that covers the connector part 3 and the connector connection part 10. The laminated cover part 54 is a part that covers the first cover part 51 of the second cover part 52, and is formed continuously with the main cover part 53. Using the laminated cover part 54, it is possible to clearly prevent a gap from occurring between the first cover part 51 and the second cover part 53, and the first cover part 51 and the second cover part 53 (53) can be continuous together to cover the insulating oil sampling device (1) for inflow cable according to the present invention.

제1커버부(51)와 제2커버부(53)는, 절연재를 포함하여 이루어지고, 본 발명에 따른 유입케이블용 절연유 채취장치(1) 중 개폐조절부(31)와 캡부(34)를 제외한 나머지부를, 보다 구체적으로는 커넥터부(3), 커넥터접속부(10), 밸브부(30) 중 개폐조절부(31)와 캡부(34)를 제외한 나머지부, 밸브절연부(40)를 연속하여 커버함으로써, 본 발명을 외부의 과전압 요인으로부터 안전하게 절연시킨다.The first cover part 51 and the second cover part 53 are made of an insulating material, and include the opening/closing control part 31 and the cap part 34 of the insulating oil sampling device 1 for an inflow cable according to the present invention. The remaining part except for the opening/closing control part 31 and the cap part 34 among the connector part 3, the connector connection part 10, and the valve part 30, and the valve insulating part 40 are continuous. By covering it, the present invention is safely insulated from external overvoltage factors.

본 발명에 따른 유입케이블용 절연유 채취장치(1)를 접속함(2)에 설치함에 있어서는, 즉 최초에, 1회 설치함에 있어서는, 선로의 휴전 여부를 확인한 상태에서 접속함(2)에 마련된 커넥터부(3)의 덮개를 제거한 후, 커넥터부(3)를 막고 있던 조정너트와 조절볼 등을 제거하고, 본 발명에 따른 유입케이블용 절연유 채취장치(1)를 커넥터부(3)와 연결한다. 다음으로, 개폐조절부(32)를 개방 조작하여 접속함(2)으로부터 나오는 절연유를 배출(overflow)시킴으로써, 절연유로부(20) 내부에 있던 잔여 공기를 제거한다. 다음으로, 제2커버부(52)를 결합하여 밀봉, 마감시키는 과정을 거쳐 설치를 완료할 수 있다.When installing the insulating oil sampling device (1) for an inflow cable according to the present invention in the connection box (2), that is, when installing it for the first time, the connector provided in the connection box (2) is checked whether the line is interrupted. After removing the cover of the part (3), the adjustment nut and adjustment ball blocking the connector part (3) are removed, and the insulating oil sampling device (1) for the inflow cable according to the present invention is connected to the connector part (3). . Next, the opening/closing control unit 32 is opened to overflow the insulating oil coming from the connection box 2, thereby removing the remaining air inside the insulating passage unit 20. Next, installation can be completed by combining the second cover part 52, sealing, and finishing.

본 발명에 따른 유입케이블용 절연유 채취장치(1)를 활용하여 절연유를 채취함에 있어서는, 절연유 채취 및 보관용 시료 캔을 준비하고, 선로를 휴전시키는 과정을 생략한 상태에서 개폐조절부(32)를 개방 조작 후 밸브부(30)의 배출단부를 통해 나오는 절연유를 시료 캔에 채취한다. 절연유 채취를 완료한 후에는 개폐조절부(32)를 폐쇄 조작함으로써, 절연유 채취 작업을 간단하고 용이하게 완료할 수 있다.When collecting insulating oil using the insulating oil sampling device (1) for inflow cable according to the present invention, prepare a sample can for insulating oil sampling and storage, and open and close the control unit (32) while omitting the process of turning off the line. After the opening operation, the insulating oil coming out through the discharge end of the valve unit 30 is collected in a sample can. After completing the insulating oil sampling, the insulating oil sampling work can be completed simply and easily by closing the opening/closing control unit 32.

상기와 같은 구성을 가지는 본 발명에 따른 유입케이블용 절연유 채취장치(1)에 의하면, 밸브절연부(40)로 절연 상태를 안정되게 확보한 상태에서, 선로를 휴전시키는 과정을 생략한 채, 밸브부(30)를 개폐시키는 간단한 조작만으로 유입케이블용 절연유를 신속하고 용이하게 채취할 수 있다.According to the insulating oil sampling device 1 for an inflow cable according to the present invention having the above-mentioned configuration, in a state in which the insulation state is stably secured by the valve insulating part 40, the process of shutting down the line is omitted, and the valve is operated. The insulating oil for the inflow cable can be quickly and easily collected with a simple operation of opening and closing the part 30.

본 발명에 의하면, 절연유 채취 작업 시 선로 휴전이 수반되지 않으므로, 휴전 및 가압(휴전종료) 시간에 따른 작업시간 제약이 없고, 선로와 현장의 접지 작업 및 확인 등의 부대작업이 생략됨에 따라 작업시간을 대폭 단축시킬 수 있으며, 활선에서 맨홀 내 다회선 동시 작업이 가능해져 맨홀배수의 중복을 방지할 수 있고 이에 따른 작업시간을 단축할 수 있다. 또한, 밸브절연부(40)에 의해, 이상전압 내습 시에도 작업자의 안전을 확보할 수 있다.According to the present invention, since a line cease-fire is not involved during the insulating oil extraction work, there are no restrictions on work time depending on the cease-fire and pressurization (end of cease-fire) time, and auxiliary work such as grounding work and confirmation of the line and site are omitted, thereby reducing the work time. can be significantly shortened, and simultaneous work on multiple lines within a manhole is possible in a live line, preventing duplication of manhole drainage and thereby shortening work time. In addition, the valve insulation unit 40 can ensure the safety of workers even in the event of abnormal voltage or moisture.

또한, 본 발명에 의하면, 절연유 채취 작업에 소요되는 시간이 단축되고, 인건비 등의 비용을 절감할 수 있어, 유입케이블과 연결된 복수개의 접속함 전체에 걸쳐 절연유를 채취, 분석할 수 있다. 이에 따라, 절연유의 열화진단 및 유입케이블의 고장 초기단계 예측의 신뢰성을 보다 향상시킬 수 있다.In addition, according to the present invention, the time required for insulating oil sampling work can be shortened, costs such as labor costs can be reduced, and insulating oil can be collected and analyzed throughout the plurality of junction boxes connected to the inflow cable. Accordingly, the reliability of diagnosing deterioration of insulating oil and predicting the initial stage of failure of the inflow cable can be further improved.

또한, 본 발명에 의하면, 절연유 채취 작업 시 접속함(2)에 마련된 커넥터부(3)를 직접적으로 개폐시키기 위해 반복적으로 이루어지던 나사 체결 및 해체 작업이 불필요하여, 나사의 잦은 체결 및 해체로 인한 체결부 마모 등의 손상을 해결할 수 있다. 또한, 커넥터부(3)를 직접 개폐 시 절연유가 비산, 유실되던 것을 방지할 수 있고, 절연유 유실에 따른 급격한 유압 변동을 방지할 수 있어, 유입케이블 내 급격한 유압 변동으로 인한 설비고장 및 휴전 장기화를 원천적으로 방지할 수 있다.In addition, according to the present invention, the repeated tightening and disassembly of screws that were performed to directly open and close the connector portion (3) provided in the connection box (2) during the insulating oil sampling operation is unnecessary, resulting in frequent tightening and disassembly of screws. Damage such as wear of fasteners can be resolved. In addition, it is possible to prevent insulating oil from scattering or being lost when opening and closing the connector part (3) directly, and to prevent sudden hydraulic pressure fluctuations due to insulating oil loss, preventing equipment failure and prolonged power outages due to rapid hydraulic pressure fluctuations in the inflow cable. It can be prevented at the source.

이와 같이, 본 발명에 의하면, 선로의 휴전이 불필요하여 시공품질, 안전관리도, 전력계통 안정도를 향상시킬 수 있고, 절연유 채취 개소 확대로 유입케이블의 절연열화 진단 신뢰도를 향상시킬 수 있으며, 커넥터부(3)를 직접 개폐시키기 위한 체결 및 해체 작업이 불필요하여 작업 편의성을 증대시킬 수 있고, 이로 인한 설비고장 요인을 제거할 수 있다.In this way, according to the present invention, construction quality, safety management, and power system stability can be improved by eliminating the need for line outages, and the reliability of diagnosing insulation deterioration of inflow cables can be improved by expanding the insulating oil collection point, and the connector part can be improved. (3) Since fastening and disassembly work to directly open and close is unnecessary, work convenience can be increased, and the factors causing equipment failure can be eliminated.

본 발명은 도면에 도시된 실시예를 참고로 하여 설명되었으나, 이는 예시적인 것에 불과하며, 당해 기술이 속하는 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다. 따라서, 본 발명의 진정한 기술적 보호범위는 아래의 특허청구범위에 의해서 정하여져야 할 것이다.The present invention has been described with reference to the embodiments shown in the drawings, but these are merely exemplary, and those skilled in the art will recognize that various modifications and other equivalent embodiments are possible therefrom. You will understand. Therefore, the true technical protection scope of the present invention should be determined by the scope of the patent claims below.

1 : 유입케이블용 절연유 채취장치 2 : 접속함
3 : 커넥터부 10 : 커넥터접속부
11 : 접속본체부 12 : 커넥터체결부
13 : 너트지지부 14 : 접속너트부
15 : 접속스토퍼부 16 : 제1절연체연결부
20 : 절연유로부 21 : 유입유로부
22 : 배출유로부 23 : 중간유로부
30 : 밸브부 31 : 밸브본체부
32 : 개폐조절부 33 : 제2절연체연결부
34 : 캡부 35 : 마개부
36 : 마개고정부 40 : 밸브절연부
41 : 절연관부 42 : 제1체결부재
43 : 제2체결부재 44 : 제1씰링부재
45 : 제2씰링부재 50 : 절연커버부
51 : 제1커버부 52 : 제2커버부
53 : 메인커버부 54 : 적층커버부
311 : 제1본체부 312 : 제2본체부
313 : 밸브관리연결부 314 : 제1테이퍼부
315 : 제2테이퍼부 316 : 관리볼트부
317 : 관리너트부 318 : 관리스토퍼부
1: Insulating oil sampling device for inflow cable 2: Connection box
3: connector part 10: connector connection part
11: main body part 12: connector fastening part
13: nut support part 14: connection nut part
15: Connection stopper part 16: First insulator connection part
20: insulating passage part 21: inflow passage part
22: discharge passage part 23: middle flow passage part
30: valve part 31: valve body part
32: opening/closing control part 33: second insulator connection part
34: cap part 35: stopper part
36: Stopper fixing part 40: Valve insulation part
41: insulating pipe part 42: first fastening member
43: second fastening member 44: first sealing member
45: second sealing member 50: insulating cover part
51: first cover part 52: second cover part
53: main cover part 54: laminated cover part
311: first main body 312: second main body
313: Valve management connection part 314: First tapered part
315: Second tapered section 316: Management bolt section
317: Management nut part 318: Management stopper part

Claims (14)

유입케이블의 절연유 채취용 커넥터부와 연결되는 커넥터접속부;
상기 커넥터접속부를 통한 절연유의 배출경로를 이루는 절연유로부;
상기 절연유로부를 개폐시키는 밸브부; 및
절연체를 포함하여 이루어지고, 상기 커넥터접속부와 상기 밸브부의 사이에 배치되는 밸브절연부;를 포함하고,
상기 밸브부는,
내부에 상기 절연유로부가 형성되는 밸브본체부;
상기 절연유로부를 개폐시키는 밸브의 구조를 가지고, 상기 밸브본체부에 결합되는 개폐조절부; 및
상기 밸브본체부의 일단부에 형성되고, 상기 밸브절연부와 결합되는 제2절연체연결부;를 포함하며,
상기 밸브본체부는,
상기 개폐조절부와 연결되는 제1본체부;
상기 제2절연체연결부와 연결되는 제2본체부; 및
상기 제1본체부와 상기 제2본체부를 상호 분리가능하게 연결하는 밸브관리연결부;를 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
A connector connection part connected to the connector part for collecting insulating oil of the inflow cable;
an insulating passage part forming a discharge path of insulating oil through the connector connection part;
A valve unit that opens and closes the insulated flow path unit; and
It includes a valve insulation portion that includes an insulator and is disposed between the connector connection portion and the valve portion,
The valve part,
A valve body portion in which the insulating passage portion is formed;
An opening/closing control unit having the structure of a valve that opens and closes the insulated flow path unit and coupled to the valve body unit; and
It includes a second insulator connection portion formed at one end of the valve body portion and coupled to the valve insulator portion,
The valve body part,
A first body part connected to the opening/closing control part;
a second body portion connected to the second insulator connection portion; and
An insulating oil sampling device for an inlet cable, comprising a valve management connection part that detachably connects the first body and the second body to each other.
제1항에 있어서,
상기 커넥터접속부는,
내부에 상기 절연유로부가 형성되는 접속본체부;
상기 접속본체부의 일단부에 형성되고, 상기 커넥터부에 체결되는 커넥터체결부; 및
상기 접속본체부의 타단부에 형성되고, 상기 밸브절연부와 결합되는 제1절연체연결부;를 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
According to paragraph 1,
The connector connection part,
a connection body portion in which the insulating passage portion is formed;
a connector fastening portion formed on one end of the connection body portion and fastened to the connector portion; and
An insulating oil sampling device for an inlet cable, comprising: a first insulator connection portion formed at the other end of the connection body portion and coupled to the valve insulator portion.
제2항에 있어서,
상기 커넥터체결부는,
상기 접속본체부 상에 돌출되게 형성되고, 단부가 상기 커넥터부와 접하는 너트지지부;
상기 너트지지부에 회전가능하게 결합되고, 상기 커넥터부에 체결되는 접속너트부; 및
상기 너트지지부 상에 돌출되게 형성되고, 상기 접속너트부의 이탈을 구속하는 접속스토퍼부;를 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
According to paragraph 2,
The connector fastening part,
a nut support portion protruding from the connection body portion and an end of which is in contact with the connector portion;
a connection nut portion rotatably coupled to the nut support portion and fastened to the connector portion; and
An insulating oil sampling device for an inlet cable, comprising a connection stopper portion that protrudes from the nut support portion and restrains separation of the connection nut portion.
제1항에 있어서,
상기 절연유로부는,
상기 커넥터접속부의 내부에 형성되는 유입유로부;
상기 밸브부의 내부에 형성되는 배출유로부; 및
상기 밸브절연부의 내부에 상기 유입유로부, 상기 배출유로부와 연통되게 형성되는 중간유로부;를 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
According to paragraph 1,
The insulating passage part,
an inflow passage portion formed inside the connector connection portion;
A discharge passage portion formed inside the valve portion; and
An insulating oil sampling device for an inlet cable, comprising: an intermediate passage part formed inside the valve insulating part to communicate with the inlet flow path part and the discharge flow path part.
제1항에 있어서,
상기 밸브부는,
상기 밸브본체부의 타단부에 착탈가능하게 결합되고, 상기 절연유로부를 폐쇄하는 캡부;를 더 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
According to paragraph 1,
The valve part,
An insulating oil sampling device for an inflow cable, further comprising a cap portion detachably coupled to the other end of the valve body portion and closing the insulating passage portion.
삭제delete 제1항에 있어서,
상기 밸브관리연결부는,
상기 제1본체부에 형성되는 관리볼트부;
상기 제2본체부에 회전가능하게 결합되고, 상기 관리볼트부에 체결되는 관리너트부; 및
상기 제2본체부 상에 돌출되게 형성되고, 상기 관리너트부의 이탈을 구속하는 관리스토퍼부;를 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
According to paragraph 1,
The valve management connection part,
A management bolt portion formed in the first body portion;
a management nut portion rotatably coupled to the second body portion and fastened to the management bolt portion; and
An insulating oil sampling device for an inflow cable, comprising a management stopper portion that protrudes from the second body portion and restrains the management nut portion from being separated.
제7항에 있어서,
상기 밸브관리연결부는,
상기 제1본체부의 내경부에 테이퍼지게 형성되는 제1테이퍼부; 및
상기 제2본체부의 외경부에 테이퍼지게 형성되며, 상기 관리볼트부와 상기 관리너트부의 체결 시 상기 제1테이퍼부와 접하는 제2테이퍼부;를 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
In clause 7,
The valve management connection part,
a first tapered portion formed to be tapered on an inner diameter portion of the first body portion; and
An insulating oil sampling device for an inflow cable comprising a second tapered portion that is formed to be tapered on an outer diameter portion of the second body portion and contacts the first tapered portion when the management bolt portion and the management nut portion are fastened.
제5항에 있어서,
상기 캡부는,
상기 밸브본체부에 접하며 상기 절연유로부를 폐쇄하는 마개부; 및
상기 마개부를 상기 밸브본체부에 착탈가능하게 결속시키는 마개고정부;를 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
According to clause 5,
The cap part,
A stopper portion that contacts the valve body portion and closes the insulating passage portion; and
An insulating oil sampling device for an inflow cable comprising a stopper fixing part that detachably fastens the stopper to the valve body.
제1항에 있어서,
상기 밸브절연부는,
절연체를 포함하여 이루어지고, 상기 커넥터접속부와 상기 밸브부의 사이에 배치되는 절연관부;
상기 절연관부의 일단부를 상기 커넥터접속부와 연결하는 제1체결부재;
상기 절연관부의 타단부를 상기 밸브부와 연결하는 제2체결부재;
상기 커넥터접속부와 상기 절연관부의 사이에 배치되는 제1씰링부재; 및
상기 밸브부와 상기 절연관부의 사이에 배치되는 제2씰링부재;를 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
According to paragraph 1,
The valve insulation part,
an insulating pipe portion including an insulator and disposed between the connector connection portion and the valve portion;
a first fastening member connecting one end of the insulating pipe portion with the connector connection portion;
a second fastening member connecting the other end of the insulating pipe portion to the valve portion;
a first sealing member disposed between the connector connection portion and the insulating pipe portion; and
A second sealing member disposed between the valve portion and the insulating pipe portion.
제10항에 있어서,
상기 절연관부는, 양단부가 개방된 원통형상을 가지며,
상기 절연관부와 접하는 상기 커넥터접속부와 상기 밸브부의 단부는, 플랜지 형상을 가지고 상기 절연관부와 면접촉되고, 상기 제1체결부재와 상기 제2체결부재에 의해 상기 절연관부와 결합되는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
According to clause 10,
The insulating pipe portion has a cylindrical shape with both ends open,
The connector connection portion and the end of the valve portion in contact with the insulating pipe portion have a flange shape and are in surface contact with the insulating pipe portion, and are coupled to the insulating pipe portion by the first fastening member and the second fastening member. Insulating oil sampling device for inflow cables.
제1항에 있어서,
절연재를 포함하여 이루어지고, 상기 커넥터접속부와 상기 밸브절연부를 커버링하는 절연커버부;를 더 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
According to paragraph 1,
An insulating oil sampling device for an inlet cable, comprising an insulating material and further comprising an insulating cover part that covers the connector connection part and the valve insulating part.
제12항에 있어서,
상기 절연커버부는,
절연재를 포함하여 이루어지고, 상기 밸브절연부를 커버링하는 제1커버부; 및
절연재를 포함하여 이루어지고, 상기 커넥터부와 상기 커넥터접속부를 연속하여 커버링하는 제2커버부;를 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
According to clause 12,
The insulating cover part,
a first cover part including an insulating material and covering the valve insulating part; and
An insulating oil sampling device for an inlet cable, comprising: a second cover portion comprising an insulating material and continuously covering the connector portion and the connector connection portion.
제13항에 있어서,
상기 제2커버부는,
상기 커넥터부와 상기 커넥터접속부를 커버링하는 메인커버부; 및
상기 메인커버부와 연속하여 형성되고, 상기 제1커버부를 커버링하는 적층커버부;를 포함하는 것을 특징으로 하는 유입케이블용 절연유 채취장치.
According to clause 13,
The second cover part,
a main cover part covering the connector part and the connector connection part; and
An insulating oil sampling device for an inlet cable, comprising a laminated cover part formed continuously with the main cover part and covering the first cover part.
KR1020190008000A 2019-01-22 2019-01-22 Picking device of insulated oil for oil filled cable KR102668627B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190008000A KR102668627B1 (en) 2019-01-22 2019-01-22 Picking device of insulated oil for oil filled cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190008000A KR102668627B1 (en) 2019-01-22 2019-01-22 Picking device of insulated oil for oil filled cable

Publications (2)

Publication Number Publication Date
KR20200091143A KR20200091143A (en) 2020-07-30
KR102668627B1 true KR102668627B1 (en) 2024-05-24

Family

ID=71839218

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190008000A KR102668627B1 (en) 2019-01-22 2019-01-22 Picking device of insulated oil for oil filled cable

Country Status (1)

Country Link
KR (1) KR102668627B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2537826Y2 (en) * 1990-09-11 1997-06-04 古河電気工業株式会社 Oil sampling connector for oil-filled electrical equipment
KR200384335Y1 (en) * 2005-02-16 2005-05-13 (주)진성하이테크 Joint piece of e.c.p pipe for ship

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH097885A (en) * 1995-06-15 1997-01-10 Nissin Electric Co Ltd Oil removing device of oil-immersed electric equipment

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2537826Y2 (en) * 1990-09-11 1997-06-04 古河電気工業株式会社 Oil sampling connector for oil-filled electrical equipment
KR200384335Y1 (en) * 2005-02-16 2005-05-13 (주)진성하이테크 Joint piece of e.c.p pipe for ship

Also Published As

Publication number Publication date
KR20200091143A (en) 2020-07-30

Similar Documents

Publication Publication Date Title
KR100777263B1 (en) Underground power cable connect unit
WO2015047851A2 (en) Threaded sleeve compressed split cable gland
KR101873957B1 (en) Protector equipment for insulation of substation
KR102668627B1 (en) Picking device of insulated oil for oil filled cable
CN101893221B (en) Lamp cable sealing structure
KR100674262B1 (en) Structure preventing water leakage of high voltage cable
KR102290377B1 (en) Monitoring apparatus of substation
KR101080373B1 (en) Sealing structure for optical cable insert hole of optical cable connecting box
KR101733482B1 (en) anti-dew condensation manhole
JP2024513224A (en) A cable entry port for waterproof and dustproof insertion of a cable, a housing with a cable entry port, and a method for inserting a cable through the cable entry port
KR100904384B1 (en) Connection apparatus for power-transmission line of transformer substation
KR20140004607U (en) Connecting device of closed conduit for electric cable
CN209642235U (en) A kind of cable tube plugging structure easy to install
KR102549348B1 (en) Underground power transmission line connection device with enhanced safety design
CN209786305U (en) Maintenance box with quick maintenance socket
KR101380413B1 (en) Pipe joint distribution of high tension cable
KR20030084251A (en) Waterproof device of pipe for wiring communication and electric power cable
KR101647368B1 (en) Pipe airtight device which is easy to construction
CN220066852U (en) Cable plugging device with protection function
KR102346091B1 (en) Waveform tube insert type tube waterproof device for underground distribution
RU86228U1 (en) CABLE INPUT PROTECTION DEVICE
KR101561602B1 (en) An external diameter indemnification sealing device for multi-function cable
US3422211A (en) Apparatus for establishing a fluid-tight bypass
CN220209847U (en) Cable pipeline plugging device
KR200216512Y1 (en) The Assembled Sealing Gasket Body

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant