KR102544952B1 - Cascading slope greening method - Google Patents

Cascading slope greening method Download PDF

Info

Publication number
KR102544952B1
KR102544952B1 KR1020220188093A KR20220188093A KR102544952B1 KR 102544952 B1 KR102544952 B1 KR 102544952B1 KR 1020220188093 A KR1020220188093 A KR 1020220188093A KR 20220188093 A KR20220188093 A KR 20220188093A KR 102544952 B1 KR102544952 B1 KR 102544952B1
Authority
KR
South Korea
Prior art keywords
fixing
network
connection
angle
retaining wall
Prior art date
Application number
KR1020220188093A
Other languages
Korean (ko)
Inventor
김남섭
Original Assignee
김남섭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김남섭 filed Critical 김남섭
Priority to KR1020220188093A priority Critical patent/KR102544952B1/en
Application granted granted Critical
Publication of KR102544952B1 publication Critical patent/KR102544952B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/40Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure
    • A01G24/44Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure in block, mat or sheet form
    • A01G24/46Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure in block, mat or sheet form multi-layered
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/025Containers and elements for greening walls
    • CCHEMISTRY; METALLURGY
    • C05FERTILISERS; MANUFACTURE THEREOF
    • C05GMIXTURES OF FERTILISERS COVERED INDIVIDUALLY BY DIFFERENT SUBCLASSES OF CLASS C05; MIXTURES OF ONE OR MORE FERTILISERS WITH MATERIALS NOT HAVING A SPECIFIC FERTILISING ACTIVITY, e.g. PESTICIDES, SOIL-CONDITIONERS, WETTING AGENTS; FERTILISERS CHARACTERISED BY THEIR FORM
    • C05G3/00Mixtures of one or more fertilisers with additives not having a specially fertilising activity
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0208Gabions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/13Geometrical or physical properties having at least a mesh portion
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form

Abstract

본 발명의 일 측면에 따른 계단식 사면녹화방법은 옹벽 구조체를 시공하는 옹벽 구조체 시공단계와, 상기 옹벽 구조체의 전면에 계단부를 형성하는 계단부 형성단계와, 상기 계단부에 메탈망을 설치하는 메탈망 설치단계와, 상기 메탈망을 매개로 하여 상기 계단부에 식물을 식생하는 식물 식생단계를 구비할 수 있다.Stepwise slope greening method according to one aspect of the present invention includes a retaining wall structure construction step of constructing a retaining wall structure, a step forming step of forming a step portion on the front surface of the retaining wall structure, and a metal mesh installing a metal mesh on the step portion. An installation step and a plant vegetation step of vegetating plants on the step portion through the metal net may be provided.

Description

계단식 사면녹화방법{Cascading slope greening method}Cascading slope greening method

본 발명은 계단식 사면녹화방법에 관한 것으로, 더욱 상세하게는 경제성 및 보급성을 향상시킬 수 있는 계단식 사면녹화방법에 관한 것이다.The present invention relates to a method for greening terraced slopes, and more particularly, to a method for greening terraced slopes capable of improving economical efficiency and spread.

옹벽은 도로의 전방 측에 옹벽블록을 설치하고 블록의 뒷면에 모래, 자갈, 조약돌 등을 사용하여 뒤 채움을 한 후 충분한 다짐을 통해 토압에 대한 안정성을 확보할 수 있게 된다.As for the retaining wall, it is possible to secure stability against earth pressure by installing a retaining wall block on the front side of the road, filling the back side of the block with sand, gravel, cobblestone, etc., and then sufficiently compacting the retaining wall.

이러한 옹벽의 형상 및 시공방법은 콘크리트 블록을 많이 사용하고 있으며, 상기 콘크리트 블록을 사용하여 시공하는 옹벽은 설치구조에 따라 콘크리트 자체의 중량으로 지반의 붕괴를 방지하는 중력식 옹벽 및 반중력식 옹벽, T형옹벽, L형 옹벽 등과 같은 다양한 형태로 분류된다.The shape and construction method of these retaining walls use a lot of concrete blocks, and the retaining walls constructed using the concrete blocks are gravity-type retaining walls and anti-gravity-type retaining walls that prevent collapse of the ground with the weight of the concrete itself, depending on the installation structure, T-shaped It is classified into various types such as retaining walls and L-shaped retaining walls.

그러나 이러한 옹벽들은 미관이 자연친화적이지 못하여 미관이 떨어지는 문제점이 있어 이에 다양한 형태의 옹벽 녹화공법이 제안되고 있다.However, these retaining walls have a problem in that the aesthetics are not friendly to nature, and thus, various types of retaining wall greening methods are proposed.

그리고 구조가 복잡할 경우 시공비가 상승하는 문제가 발생하므로 간단한 구조를 통해 시공비 상승을 억제함으로써 경제성 및 보급성을 갖춘 현실적인 대안이 요구되는 실정이다.In addition, when the structure is complicated, the problem of increasing the construction cost occurs, so a realistic alternative with economic feasibility and pervasiveness is required by suppressing the increase in construction cost through a simple structure.

대한민국 등록특허공보 제10-1095700호(2011.12.20)Republic of Korea Patent Registration No. 10-1095700 (2011.12.20)

본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로, 본 발명의 목적은 경제성 및 보급성을 향상시킬 수 있는 계단식 사면녹화방법을 제공하는 것이다.The present invention has been made to solve the above problems, and an object of the present invention is to provide a terraced slope greening method capable of improving economic feasibility and dissemination.

상기와 같은 목적을 달성하기 위한 본 발명의 일 실시 예에 따른 계단식 사면녹화방법은 옹벽 구조체를 시공하는 옹벽 구조체 시공단계와, 상기 옹벽 구조체의 전면에 계단부를 형성하는 계단부 형성단계와, 상기 계단부에 메탈망을 설치하는 메탈망 설치단계와, 상기 메탈망을 매개로 하여 상기 계단부에 식물을 식생하는 식물 식생단계를 구비할 수 있다.In order to achieve the above object, a stepwise slope greening method according to an embodiment of the present invention includes a retaining wall structure construction step of constructing a retaining wall structure, a step forming step of forming a step portion on the front surface of the retaining wall structure, and the stairs A metal net installation step of installing a metal net in the portion and a plant vegetation step of vegetating plants in the step portion through the metal net may be provided.

상기 메탈망 설치단계에서의 상기 메탈망은 상기 계단부의 바닥에 배치되고 해당 부위를 보강하는 망 바닥부와, 상기 망 바닥부에 교차하게 연결되되 상기 계단부의 측벽에 배치되고 해당 부위를 보강하는 적어도 하나의 망 측벽부와, 상기 망 바닥부와 상기 망 측벽부를 연결하는 복수의 망 연결유닛을 구비하고, 상기 망 바닥부는 상기 망 연결유닛의 일단이 걸리는 걸림고리를 구비하고, 상기 망 측벽부는 상기 망 연결유닛의 타단이 걸리는 메탈프레임을 구비하고, 상기 망 연결유닛은 유닛 샤프트와, 상기 유닛 샤프트의 일단부에 형성되고 단부가 절곡되며, 상기 걸림고리에 걸리는 바닥 걸림 후크부와, 상기 유닛 샤프트의 타단부에 형성되고 단부가 절곡되며, 상기 메탈프레임에 걸리는 측벽 걸림 후크부를 구비할 수 있다.In the metal mesh installation step, the metal mesh is disposed on the bottom of the step portion and cross-connected to the bottom portion of the mesh to reinforce the corresponding portion, and is disposed on the sidewall of the step portion and reinforces the corresponding portion. At least One network side wall portion and a plurality of network connection units connecting the network bottom portion and the network side wall portion, the network bottom portion having a hook for holding one end of the network connection unit, and the network side wall portion comprising the A metal frame to which the other end of the network connection unit is hung, and the network connection unit includes a unit shaft, a floor hook that is formed on one end of the unit shaft, has a bent end, and is caught on the hook, and the unit shaft. It is formed on the other end of the end is bent, and may be provided with a side wall hanging hook hooked to the metal frame.

한편, 상기와 같은 목적을 달성하기 위한 본 발명의 다른 실시 예에 따른 계단식 사면녹화방법은 옹벽 구조체를 시공하는 제1단계와, 상기 옹벽 구조체에 다단의 계단부를 형성하는 제2단계와, 상기 계단부에 식물을 식생하는 제3단계를 구비하고, 상기 제2단계는 상기 옹벽 구조체의 말단에 고정앵글을 시공하는 제2-1단계와, 상기 옹벽 구조체의 상면에 상기 고정앵글과 겹쳐지도록 방수시트를 시공하는 제2-2단계와, 상기 방수시트의 상면에 방근판을 시공하는 제2-3단계와, 상기 고정앵글에 얹혀지는 형태가 되도록 상기 방근판의 일단에 메탈라스 망을 시공하는 제2-4단계와, 상기 방근판 및 상기 메탈라스 망을 덮는 형태로 마감 부직포를 시공하는 제2-5단계와, 상기 고정앵글 및 상기 메탈라스 망의 길이방향 양단에 단부마감앵글을 시공하는 제2-6단계와, 이웃하는 옹벽 구조체와 상기 메탈라스 망에 의해 형성된 공간에 토양 보습제를 투입하는 제2-7단계와, 상기 토양 보습제가 매립되도록 식생토를 부설하는 제2-8단계와, 일단이 상기 식생토에 삽입되고 타단이 상기 메탈라스 망과 결합하도록 부설된 상기 식생토의 상단에 연결대를 시공하는 제2-9단계를 구비할 수 있다.On the other hand, a stepwise slope greening method according to another embodiment of the present invention for achieving the above object includes a first step of constructing a retaining wall structure, a second step of forming a multi-stage step portion on the retaining wall structure, and the steps A third step of vegetating plants is provided, and the second step is a 2-1 step of constructing a fixing angle at the end of the retaining wall structure, and a waterproof sheet so as to overlap the fixing angle on the upper surface of the retaining wall structure The 2-2 step of constructing, the 2-3 step of constructing the root plate on the upper surface of the waterproof sheet, and the construction of a metal lath network on one end of the root plate so that it is placed on the fixing angle Step 2-4, Step 2-5 of constructing a nonwoven fabric covering the root plate and the metal lath net, and Step 2-5 of constructing end finishing angles at both ends of the fixing angle and the metal lath net in the longitudinal direction. Steps 2-6, steps 2-7 of injecting a soil moisturizer into the space formed by the adjacent retaining wall structure and the metal lath net, and steps 2-8 of laying vegetation soil so that the soil moisturizer is buried; Steps 2 to 9 of constructing a connecting rod on the upper end of the vegetation soil, one end of which is inserted into the vegetation soil and the other end of which is laid to be combined with the metal lath network, may be provided.

상기 제2-1단계에서의 상기 고정앵글은 일 방향으로 길게 구비되어 상기 옹벽 구조체와 대응되는 제1고정부분과, 일 방향으로 길게 구비되고 상기 제1고정부분과 일정각도를 형성하도록 구비되어 상기 메탈라스 망과 접하는 제2고정부분을 구비하고, 상기 제2-4단계에서의 상기 메탈라스 망은 일 방향으로 길게 구비되어 상기 제1고정부분과 대응되는 제1망부분과, 면 형태로 구비되고 상기 제1망부분과 일정각도를 형성하도록 구비되어 상기 제2고정부분과 접하는 제2망부분과, 상기 제2망부분의 일단에 결합하여 상기 연결대가 고정되는 고정프레임을 구비하고, 상기 제2-6단계에서의 상기 단부마감앵글은 상기 제1고정부분의 하면과 접하는 제1단부마감부분과, 상기 제1단부마감부분과 일정각도를 형성하도록 구비되어 상기 제2고정부분 및 상기 제2망부분과 접하는 제2단부마감부분과, 상기 제1단부마감부분과 상기 제2단부마감부분을 일체화하여 상기 고정앵글과 상기 메탈라스 망의 길이방향 단부와 접하는 제3단부마감부분을 구비할 수 있다.The fixing angle in the 2-1 step is provided long in one direction and provided to form a predetermined angle with the first fixing part corresponding to the retaining wall structure, and provided long in one direction and provided to form a predetermined angle with the first fixing part. A second fixing part in contact with the metal lath net is provided, and the metal lath net in step 2-4 is provided long in one direction and is provided in the form of a surface with a first net part corresponding to the first fixing part. And a second network portion provided to form a predetermined angle with the first network portion and in contact with the second fixing portion, and a fixing frame coupled to one end of the second network portion and fixed to the connecting rod, The end closing angle in step 2-6 is provided so as to form a predetermined angle with the first end finishing portion contacting the lower surface of the first fixing portion, and the second fixing portion and the second fixing portion. A second end-finishing part in contact with the net portion and a third end-finishing part in contact with the longitudinal direction end of the fixing angle and the metal lath net by integrating the first end-finishing part and the second end-finishing part may be provided. there is.

상기 제2-9단계에서의 상기 연결대는 일단이 상기 식생토에 삽입되는 제1연결부분과, 일단이 상기 고정프레임에 고정되는 제2연결부분과, 상기 제1연결부분과 상기 제2연결부분을 연결하는 연결볼트를 구비하고, 상기 제1연결부분은 일 방향으로 길게 구비되어 상기 연결볼트가 체결되는 제1체결홀이 형성된 제1연결바와, 상기 제1연결바의 일단에 구비되어 상기 식생토에 삽입되는 삽입편을 구비하고, 상기 제2연결부분은 일 방향으로 길게 구비되어 상기 연결볼트가 체결되는 제2체결홀이 형성된 제2연결바와, 상기 제2연결바의 일단에 구비되어 상기 고정프레임에 고정되는 고정편을 구비하고, 상기 제1연결부분과 상기 제2연결부분은 상기 연결볼트를 통해 상호 간의 간격 및 각도가 조절될 수 있다.The connecting rod in step 2-9 includes a first connection part having one end inserted into the vegetation soil, a second connection part having one end fixed to the fixing frame, and the first connection part and the second connection part. A first connection bar having a first fastening hole to which the connecting bolt is fastened is provided and the first connection part is provided elongated in one direction and is provided at one end of the first connection bar to support the vegetation It has an insertion piece inserted into the toe, and the second connection part is provided long in one direction and has a second connection bar having a second fastening hole through which the connection bolt is fastened, and is provided at one end of the second connection bar to It has a fixing piece fixed to the fixing frame, and the distance and angle between the first connection part and the second connection part can be adjusted through the connection bolt.

상기 제2-9단계에서의 상기 연결대는 일단이 상기 식생토에 삽입되는 제1연결부분과, 일단이 상기 고정프레임에 고정되는 제2연결부분과, 상기 제1연결부분 및 상기 제2연결부분과 결합하여 상기 제1연결부분과 상기 제2연결부분의 각도가 조절되도록 하는 각도조절부분과, 상기 각도조절부분에 각각 구비되어 길이가 조절되도록 하는 길이조절부분을 구비하고, 상기 제1연결부분은 일 방향으로 길게 구비되는 제1연결바와, 상기 제1연결바의 길이방향 일단에 구비되어 상기 식생토에 삽입되는 삽입편과, 상기 제1연결바의 길이방향 타단에 구비되어 상기 제1연결부분이 상기 각도조절부분으로부터 이탈하는 것을 방지하는 제1이탈방지편과, 상기 길이조절부분과 대응되는 일측면에 구비되어 상기 길이조절부분과 접촉하는 다수의 제1걸림편을 구비하고, 상기 제2연결부분은 일 방향으로 길게 구비되는 제2연결바와, 상기 제2연결바의 길이방향 일단에 구비되어 상기 고정프레임에 고정되는 고정편과, 상기 제2연결바의 길이방향 타단에 구비되어 상기 제2연결부분이 상기 각도조절부분으로부터 이탈하는 것을 방지하는 제2이탈방지편과, 상기 길이조절부분과 대응되는 일측면에 구비되어 상기 길이조절부분과 접촉하는 다수의 제2걸림편을 구비하고, 상기 각도조절부분은 상기 제1연결바가 관통하는 제1결합홀을 구비하여 상기 제1연결부분과 결합하는 제1회전판과, 상기 제1회전판의 상부에 위치하고 상기 제2연결바가 관통하는 제2결합홀을 구비하여 상기 제2연결부분과 결합하는 제2회전판과, 상기 제2회전판에 체결되어 상기 제1회전판 및 상기 제2회전판의 조절된 각도를 고정하는 연결볼트를 구비하고, 상기 제2연결바에는 길이방향을 따라 길게 형성되어 상기 연결볼트가 관통하는 가이드홀이 구비되고, 상기 길이조절부분은 상기 각도조절부분에서 연장되는 연장편과, 상기 연장편에서 복수 이상 구부러져 돌출형태로 구비되는 손잡이편과, 상기 손잡이편에서 연장되어 상기 제1걸림편 또는 상기 제2걸림편과 접촉하는 접촉편을 구비할 수 있다.The connecting rod in step 2-9 includes a first connection part having one end inserted into the vegetation soil, a second connection part having one end fixed to the fixing frame, the first connection part and the second connection part An angle adjusting portion coupled to adjust an angle between the first connecting portion and the second connecting portion, and a length adjusting portion provided at each angle adjusting portion to adjust a length, wherein the first connecting portion A first connection bar provided elongated in one direction, an insertion piece provided at one end of the first connection bar in the longitudinal direction and inserted into the vegetation soil, and provided at the other end in the longitudinal direction of the first connection bar to provide the first connection A first separation prevention piece for preventing the part from departing from the angle adjusting portion, and a plurality of first catch pieces provided on one side corresponding to the length adjusting portion and in contact with the length adjusting portion, The second connecting portion includes a second connecting bar provided elongated in one direction, a fixing piece provided at one end of the second connecting bar in the longitudinal direction and fixed to the fixing frame, and provided at the other end of the second connecting bar in the longitudinal direction of the second connecting bar. A second separation prevention piece for preventing the second connection portion from departing from the angle adjusting portion, and a plurality of second catch pieces provided on one side corresponding to the length adjusting portion and in contact with the length adjusting portion, , The angle adjusting part has a first coupling hole through which the first connecting bar passes, and a first rotating plate coupled to the first connecting portion, and a second rotating plate located above the first rotating plate and passing through the second connecting bar. A second rotation plate having a coupling hole coupled to the second connection portion, and a connecting bolt fastened to the second rotation plate to fix the adjusted angles of the first rotation plate and the second rotation plate, The connecting bar is formed long along the longitudinal direction and is provided with a guide hole through which the connecting bolt passes. A handle piece and a contact piece extending from the handle piece and contacting the first gripping piece or the second gripping piece may be provided.

상기 제2-9단계 이후에는 상기 연결대에 연결링을 시공하는 제2-10단계와, 상기 연결링이 시공된 서로 이웃하는 한 쌍의 상기 연결대를 연결하는 제2-11단계가 더 구비되고, 상기 제2-10단계에서의 상기 연결대는 상기 제2회전판에 구비되어 상기 연결링이 체결되는 가이드벽을 구비하고, 상기 제2-11단계에서의 상기 연결링은 외면에 체결홈이 구비되고, 서로 이웃하는 한 쌍의 상기 연결대에 체결된 상기 연결링에는 상기 체결홈에 체결되어 서로 이웃하는 한 쌍의 상기 연결대를 연결하는 와이어가 구비될 수 있다.After step 2-9, step 2-10 of constructing a connecting ring on the connecting rod and step 2-11 of connecting a pair of adjacent connecting rods to which the connecting ring is installed are further provided, The connecting rod in step 2-10 is provided on the second rotating plate and has a guide wall to which the connecting ring is fastened, and the connecting ring in step 2-11 is provided with a fastening groove on an outer surface, The connection ring fastened to the pair of adjacent connecting rods may include a wire fastened to the fastening groove and connecting the pair of adjacent connecting rods.

본 발명의 따른 계단식 사면녹화방법에 의하면, 경제성 및 보급성을 향상시킬 수 있다.According to the terraced slope greening method according to the present invention, it is possible to improve economic feasibility and spreadability.

도 1은 본 발명의 일 실시 예에 따른 계단식 사면녹화방법의 순서도.
도 2는 도 1에 도시된 순서도에 따라 시공된 모습을 나타낸 도면.
도 3은 도 2에 도시된 메탈망과 망 연결유닛을 나타낸 도면.
도 4는 본 발명의 다른 실시 예에 따른 계단식 사면녹화방법의 순서도.
도 5는 도 4에 도시된 순서도에 따라 시공된 모습을 나타낸 도면.
도 6은 도 5에 도시된 고정앵글, 메탈라스 망 및 단부마감앵글을 나타낸 도면.
도 7은 도 5에 도시된 연결대를 나타낸 도면.
도 8은 도 7에 도시된 연결대가 작동하는 모습을 나타낸 도면.
도 9는 도 5에 도시된 연결대의 변형 예를 나타낸 도면.
도 10은 도 9에 도시된 연결대의 작동하는 모습을 나타낸 도면.
도 11은 도 4에 도시된 계단식 사면녹화방법의 변형 예를 나타낸 순서도.
도 12는 도 11에 도시된 순서도에 따라 연결링이 구비된 모습을 나타낸 도면.
1 is a flowchart of a cascading slope recording method according to an embodiment of the present invention.
Figure 2 is a view showing a construction state according to the flow chart shown in Figure 1.
Figure 3 is a view showing the metal network and network connection unit shown in Figure 2;
4 is a flowchart of a cascading slope recording method according to another embodiment of the present invention.
Figure 5 is a view showing the state of construction according to the flow chart shown in Figure 4;
Figure 6 is a view showing the fixed angle, metal lath net and end closing angle shown in Figure 5;
FIG. 7 is a view showing the connector shown in FIG. 5;
8 is a view showing how the connecting rod shown in FIG. 7 operates;
9 is a view showing a modified example of the connecting rod shown in FIG. 5;
FIG. 10 is a view showing the operation of the connecting rod shown in FIG. 9;
FIG. 11 is a flow chart showing a modified example of the cascading slope recording method shown in FIG. 4;
12 is a view showing a state in which a connection ring is provided according to the flow chart shown in FIG. 11;

이하에서는 첨부된 도면을 참조하여 본 발명의 일 실시 예에 따른 계단식 사면녹화방법에 대해 상세히 설명한다.Hereinafter, a cascading slope recording method according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 일 실시 예에 따른 계단식 사면녹화방법의 순서도이고, 도 2는 도 1에 도시된 순서도에 따라 시공된 모습을 나타낸 도면이고, 도 3은 도 2에 도시된 메탈망과 망 연결유닛을 나타낸 도면이다.1 is a flow chart of a cascading slope greening method according to an embodiment of the present invention, FIG. 2 is a view showing construction according to the flow chart shown in FIG. 1, and FIG. 3 is a metal mesh and mesh shown in FIG. It is a drawing showing the connection unit.

도 1 내지 도 3을 참조하면, 본 발명의 일 실시 예에 따른 계단식 사면녹화방법은 옹벽 구조체(110)를 시공하는 옹벽 구조체 시공단계(S110)와, 옹벽 구조체(110)의 전면에 계단부(120)를 형성하는 계단부 형성단계(S120)와, 계단부(120)에 메탈망(130)을 설치하는 메탈망 설치단계(S130)와, 메탈망(130)을 매개로 하여 계단부(120)에 식물을 식생하는 식물 식생단계(S140)를 구비할 수 있다.1 to 3, the stepwise slope greening method according to an embodiment of the present invention includes a retaining wall structure construction step (S110) of constructing a retaining wall structure 110, and a step portion on the front of the retaining wall structure 110 ( 120), a step of forming a step portion (S120), a step of installing a metal mesh (S130) for installing a metal mesh 130 on the step portion 120, and a step portion 120 via the metal mesh 130 ) may be provided with a plant vegetation step (S140) of vegetating plants.

옹벽 구조체 시공단계(S110)는 도로 사면 보강을 위해 옹벽 구조체(110)를 시공하는 공정으로써 도로 사면 보강을 위한 여러 공법이 단독으로 혹은 혼용으로 적용될 수 있다.The retaining wall structure construction step (S110) is a process of constructing the retaining wall structure 110 for road slope reinforcement, and various construction methods for road slope reinforcement may be applied alone or in combination.

계단부 형성단계(S120)는 시공된 옹벽 구조체(110)의 전면에 경사지게 계단부(120)를 형성하는 공정으로써 옹벽 구조체(110)의 규모에 따라 계단부(120)의 개수 혹은 폭이 결정될 수 있다.The step of forming the steps (S120) is a process of forming the steps 120 inclined on the front surface of the constructed retaining wall structure 110, and the number or width of the steps 120 can be determined according to the scale of the retaining wall structure 110. there is.

메탈망 설치단계(S130)는 계단부(120)마다 소정의 메탈망(130)을 설치하는 공정으로써 해당 계단부(120)를 보강하는 동시에 식물이 식생되는 자리를 형성할 수 있다.The metal mesh installation step (S130) is a process of installing a predetermined metal net 130 for each step portion 120, and it is possible to reinforce the step portion 120 and at the same time form a place where plants are vegetated.

식물 식생단계(S140)는 설치된 메탈망(130)을 매개로 해서 꽃이나 나무의 식물이 계단부(120)마다 다른 종류로 식생되게 하는 공정으로써 아래에서 위로 담쟁이, 개나리, 등나무 등을 순차적으로 식재할 수 있다.The plant vegetation step (S140) is a process of planting flowers or trees in different types for each step 120 through the installed metal net 130, and sequentially planting ivy, forsythia, wisteria, etc. from the bottom to the top. can do.

한편, 메탈망 설치단계(S130)에서의 메탈망(130)은 계단부(120)의 바닥에 배치되고 해당 부위를 보강하는 망 바닥부(141)와, 망 바닥부(141)에 교차하게 연결되되 계단부(120)의 측벽에 배치되고 해당 부위를 보강하는 적어도 하나의 망 측벽부(142)와, 망 바닥부(141)와 망 측벽부(142)를 연결하는 복수 개의 망 연결유닛(160)을 구비할 수 있다.On the other hand, in the metal mesh installation step (S130), the metal mesh 130 is disposed on the bottom of the step portion 120 and connected crosswise to the mesh bottom portion 141 reinforcing the corresponding portion and the mesh bottom portion 141. At least one mesh side wall portion 142 disposed on the side wall of the step portion 120 and reinforcing the corresponding portion, and a plurality of network connection units 160 connecting the net bottom portion 141 and the mesh side wall portion 142. ) can be provided.

망 바닥부(141)는 걸림고리(151)를 구비하고, 망 측벽부(142)는 메탈프레임(152)을 구비할 수 있다.The net bottom part 141 may include a hook 151, and the net side wall part 142 may include a metal frame 152.

본 발명의 일 실시 예에서는 망 측벽부(142)가 망 바닥부(141)의 일측면에만 형성된 것을 보였으나, 막 측벽부(142)는 망 바닥부(141)의 모든 면에 형성될 수 있다.In one embodiment of the present invention, it has been shown that the mesh side wall portion 142 is formed on only one side of the mesh bottom portion 141, but the membrane side wall portion 142 may be formed on all surfaces of the mesh bottom portion 141. .

한편, 망 연결유닛(160)은 망 바닥부(141)와 망 측벽부(142)를 연결하는 역할을 하는 것으로써 유닛 샤프트(161)와, 유닛 샤프트(161)의 일단부에 형성되고 단부가 절곡되며, 망 바닥부(141)의 걸림고리(151)에 걸리는 바닥 걸림 후크부(162)와, 유닛 샤프트(161)의 타단부에 형성되고 단부가 절곡되며, 망 측벽부(142)의 메탈프레임(152)에 걸리는 측벽 걸림 후크부(163)를 구비할 수 있다.On the other hand, the network connection unit 160 serves to connect the network bottom portion 141 and the network side wall portion 142, and is formed at one end of the unit shaft 161 and the unit shaft 161, and has an end It is bent, and is formed on the bottom hook part 162 caught on the hook 151 of the net bottom part 141 and the other end of the unit shaft 161, and the end is bent, and the metal of the net side wall part 142 The frame 152 may be provided with a side wall hanging hook 163 .

상기에서 살펴본 바와 같이, 본 발명의 일 실시 예에 따른 계단식 사면녹화공법은 종래보다 효율적인 구조로 사면녹화를 구현함으로써 저렴한 시공비로 널리 보급될 수 있는 효과를 발휘할 수 있다.As described above, the terraced slope greening method according to an embodiment of the present invention implements slope greening in a more efficient structure than the conventional method, and thus can exert an effect that can be widely spread at a low construction cost.

다음은 본 발명의 다른 실시 예에 따른 계단식 사면녹화방법에 대해 설명하도록 한다. 이하의 설명에서는 상술한 실시 예와 서로 다른 부분만을 상세하게 설명하며 동일하거나 극히 유사한 부분에 대해서는 상세한 설명을 생략한다.Next, a cascading slope recording method according to another embodiment of the present invention will be described. In the following description, only parts different from those of the above-described embodiment are described in detail, and detailed descriptions of the same or extremely similar parts are omitted.

도 4는 본 발명의 다른 실시 예에 따른 계단식 사면녹화방법의 순서도이고, 도 5는 도 4에 도시된 순서도에 따라 시공된 모습을 나타낸 도면이고, 도 6은 도 5에 도시된 고정앵글, 메탈라스 망 및 단부마감앵글을 나타낸 도면이고, 도 7은 도 5에 도시된 연결대를 나타낸 도면이고, 도 8은 도 7에 도시된 연결대가 작동하는 모습을 나타낸 도면이다.4 is a flow chart of a cascading slope greening method according to another embodiment of the present invention, FIG. 5 is a view showing construction according to the flow chart shown in FIG. 4, and FIG. 6 is a fixed angle, metal shown in FIG. It is a view showing the lath network and the end closing angle, FIG. 7 is a view showing the connecting rod shown in FIG. 5, and FIG. 8 is a view showing how the connecting rod shown in FIG. 7 operates.

도 4 내지 도 8을 참조하면, 본 발명의 다른 실시 예에 따른 계단식 사면녹화방법은 옹벽 구조체(110)를 시공하는 제1단계(S1000)와, 옹벽 구조체(110)에 다단의 계단부(120)를 형성하는 제2단계(S2000)와, 계단부(120)에 식물을 식생하는 제3단계(S3000)를 구비할 수 있다.4 to 8, the stepwise slope greening method according to another embodiment of the present invention includes a first step (S1000) of constructing a retaining wall structure 110, and a multi-stage staircase 120 on the retaining wall structure 110 ), and a third step (S3000) of planting plants on the step portion 120.

그리고 제2단계(S2000)는 옹벽 구조체(110)의 말단에 고정앵글(210)을 시공하는 제2-1단계(S2001)와, 옹벽 구조체(110)의 상면에 고정앵글(210)과 겹쳐지도록 방수시트(220)를 시공하는 제2-2단계(S2002)와, 방수시트(220)의 상면에 방근판(230)을 시공하는 제2-3단계(S2003)와, 고정앵글(210)에 얹혀지는 형태가 되도록 방근판(230)의 일단에 메탈라스 망(240)을 시공하는 제2-4단계(S2004)와, 방근판(230) 및 메탈라스 망(240)을 덮는 형태로 마감 부직포(250)를 시공하는 제2-5단계(S2005)와, 고정앵글(210) 및 메탈라스 망(240)의 길이방향 양단에 단부마감앵글(260)을 시공하는 제2-6단계(S2006)와, 이웃하는 옹벽 구조체(110)와 메탈라스 망(240)에 의해 형성된 공간에 토양 보습제(270)를 투입하는 제2-7단계(S2007)와, 토양 보습제(270)가 매립되도록 식생토(280)를 부설하는 제2-8단계(S2008)와, 일단이 식생토(280)에 삽입되고 타단이 메탈라스 망(240)과 결합하도록 부설된 식생토(280)의 상단에 연결대(300)를 시공하는 제2-9단계(S2009)를 구비할 수 있다.And the second step (S2000) is the 2-1st step (S2001) of constructing the fixing angle 210 at the end of the retaining wall structure 110, and overlapping the fixing angle 210 on the upper surface of the retaining wall structure 110. The 2-2 step (S2002) of constructing the waterproof sheet 220, the 2-3 step (S2003) of constructing the root plate 230 on the upper surface of the waterproof sheet 220, and the fixing angle 210 Steps 2-4 (S2004) of constructing the metal lath net 240 on one end of the root plate 230 so as to be placed on top of the root plate 230 and the finished nonwoven fabric in the form of covering the metal lath net 240 Step 2-5 (S2005) of constructing (250) and Step 2-6 (S2006) of constructing end closing angles (260) at both ends in the longitudinal direction of the fixing angle (210) and the metal lath net (240) And, the second to seventh steps (S2007) of injecting the soil moisturizer 270 into the space formed by the adjacent retaining wall structure 110 and the metal lath net 240, and vegetation soil (S2007) so that the soil moisturizer 270 is buried 280) is laid (S2008), and the connecting rod 300 is installed on top of the vegetation soil 280, one end of which is inserted into the vegetation soil 280 and the other end is laid to be combined with the metal lath net 240. It may be provided with a 2nd-9th step (S2009) of constructing.

제2-1단계(S2001)에서의 고정앵글(210)은 일 방향으로 길게 구비되어 옹벽 구조체(110)와 대응되는 제1고정부분(211)과, 일 방향으로 길게 구비되고 제1고정부분(211)과 일정각도를 형성하도록 구비되어 메탈라스 망(240)과 접하는 제2고정부분(212)을 구비하여 'ㄴ'자 형태로 옹벽 구조체(110)의 끝단에 위치할 수 있다.The fixing angle 210 in the 2-1 step (S2001) is provided long in one direction and corresponding to the retaining wall structure 110 and the first fixing part 211, provided long in one direction and the first fixing part ( 211) and is provided to form a certain angle and is provided with a second fixing portion 212 in contact with the metal lath net 240, so that it can be located at the end of the retaining wall structure 110 in an 'L' shape.

제2-4단계(S2004)에서의 메탈라스 망(240)은 일 방향으로 길게 구비되어 제1고정부분(211)과 대응되는 제1망부분(241)과, 면 형태로 구비되고 제1망부분(241)과 일정각도를 형성하도록 구비되어 제2고정부분(212)과 접하는 제2망부분(242)과, 제2망부분(242)의 일단에 결합하여 연결대(300)가 고정되는 고정프레임(243)을 구비할 수 있다.In step 2-4 (S2004), the metal lath network 240 is provided long in one direction and is provided in the form of a first network portion 241 corresponding to the first fixing portion 211 and the first network The second network part 242 provided to form a certain angle with the part 241 and in contact with the second fixing part 212, and the fixing to which the connecting rod 300 is fixed by being coupled to one end of the second network part 242 A frame 243 may be provided.

제1망부분(241)과 제2망부분(242)은 일체형으로 구비되어 제1망부분(241)이 제2망부분(242)으로부터 수직으로 구부러진 형태로 구비될 수 있으며, 고정프레임(243)은 제2망부분(242)으로부터 탈착되는 형태로 구비될 수 있다.The first mesh portion 241 and the second mesh portion 242 are integrally provided so that the first mesh portion 241 may be provided in a form bent vertically from the second mesh portion 242, and the fixing frame 243 ) may be provided in a form that is detachable from the second network portion 242.

제2-6단계(S2006)에서의 단부마감앵글(260)은 제1고정부분(211)의 하면과 접하는 제1단부마감부분(261)과, 제1단부마감부분(261)과 일정각도를 형성하도록 구비되어 제2고정부분(212) 및 제2망부분(242)과 접하는 제2단부마감부분(262)과, 제1단부마감부분(261)과 제2단부마감부분(262)을 일체화하여 고정앵글(210)과 메탈라스 망(240)의 길이방향 단부와 접하는 제3단부마감부분(263)을 구비할 수 있다.The end closing angle 260 in step 2-6 (S2006) is the first end closing portion 261 in contact with the lower surface of the first fixing portion 211 and the first end closing portion 261 and a predetermined angle. The second end-finishing part 262, which is provided to form and contacts the second fixing part 212 and the second netting part 242, and the first end-closing part 261 and the second end-closing part 262 are integrated. It may be provided with a third end closing portion 263 in contact with the longitudinal end of the fixing angle 210 and the metal lath net 240.

고정앵글(210), 메탈라스 망(240) 및 단부마감앵글(260)은 옹벽 구조체(110)의 상부에 일정공간을 형성하여 식생토(280)가 부설되도록 함과 동시에 부설된 식생토(280)의 유동을 방지할 수 있다.The fixing angle 210, the metal lath net 240, and the end closing angle 260 form a certain space on the upper part of the retaining wall structure 110 so that the vegetation soil 280 is laid, and at the same time the laid vegetation soil 280 ) flow can be prevented.

한편, 제2-9단계(S2009)에서의 연결대(300)는 일단이 식생토(280)에 삽입되는 제1연결부분(310)과, 일단이 고정프레임(243)에 고정되는 제2연결부분(320)과, 제1연결부분(310)과 제2연결부분(320)을 연결하는 연결볼트(330)를 구비할 수 있다.On the other hand, the connecting rod 300 in step 2-9 (S2009) has a first connection part 310 having one end inserted into the vegetation soil 280 and a second connection part having one end fixed to the fixing frame 243. 320 and a connecting bolt 330 connecting the first connecting portion 310 and the second connecting portion 320 may be provided.

제1연결부분(310)에 대해 자세히 살펴보면, 제1연결부분(310)은 일 방향으로 길게 구비되어 연결볼트(330)가 체결되는 제1체결홀(311a)이 형성된 제1연결바(311)와, 제1연결바(311)의 일단에 구비되어 식생토(280)에 삽입되는 삽입편(312)을 구비할 수 있다.Looking in detail at the first connection part 310, the first connection part 310 is provided long in one direction, and the first connection bar 311 in which the first fastening hole 311a to which the connecting bolt 330 is fastened is formed. And, an insertion piece 312 provided at one end of the first connection bar 311 and inserted into the vegetation soil 280 may be provided.

제1체결홀(311a)은 제1연결부분(310)의 길이방향을 따라 일정간격으로 구비되어 연결볼트(330)가 다양한 위치에 체결될 수 있고, 삽입편(312)은 제1연결바(311)의 일단에서 하 방향으로 구부러진 형태로 구비되어 식생토(280)에 용이하게 삽입될 수 있다.The first fastening holes 311a are provided at regular intervals along the longitudinal direction of the first connection portion 310 so that the connection bolts 330 can be fastened to various positions, and the insertion piece 312 is the first connection bar ( 311) is provided in a downwardly bent form at one end so that it can be easily inserted into the vegetation soil 280.

제2연결부분(320)은 일 방향으로 길게 구비되어 연결볼트(330)가 체결되는 제2체결홀(321a)이 형성된 제2연결바(321)와, 제2연결바(321)의 일단에 구비되어 고정프레임(243)에 고정되는 고정편(322)을 구비할 수 있다.The second connection part 320 is provided long in one direction and has a second connection bar 321 formed with a second fastening hole 321a to which the connection bolt 330 is fastened, and one end of the second connection bar 321. It may be provided with a fixing piece 322 fixed to the fixing frame 243.

제2체결홀(321a)은 제2연결부분(320)의 길이방향을 따라 일정간격으로 구비되어 연결볼트(330)가 다양한 위치에 체결될 수 있고, 고정편(322)은 제2연결바(321)의 일단에서 상 방향으로 구부러진 형태로 구비되어 고정프레임(243)과 맞대어진 후 별도의 고정부재(미도시)를 통해 고정프레임(243)에 고정될 수 있다.The second fastening holes 321a are provided at regular intervals along the longitudinal direction of the second connection part 320 so that the connection bolts 330 can be fastened to various positions, and the fixing piece 322 is the second connection bar ( 321) may be provided in an upwardly bent form at one end of the fixing frame 243 and then fixed to the fixing frame 243 through a separate fixing member (not shown).

제1연결부분(310)의 삽입편(312)이 식생토(280)에 삽입되면서 제2연결부분(320)의 고정편(322)이 고정프레임(243)에 고정됨에 따라 연결대(300)를 통한 메탈라스 망(240)의 고정력을 높일 수 있다.As the insertion piece 312 of the first connection part 310 is inserted into the vegetation soil 280 and the fixing piece 322 of the second connection part 320 is fixed to the fixing frame 243, the connecting piece 300 is formed. It is possible to increase the fixing force of the metal lath network 240 through.

그리고 제1연결바(311)와 제2연결바(321)는 연결볼트(330)를 통해 상호 간의 간격 및 각도가 조절될 수 있으므로 고정앵글(210), 메탈라스 망(240) 및 단부마감앵글(260)에 의해 옹벽 구조체(110)의 상부에 형성되는 공간의 크기에 따라 연결대(300)의 전체길이가 조절되도록 하거나 옹벽 구조체(110)의 형상에 따라 제1연결부분(310)과 제2연결부분(320)의 각도가 용이하게 조절되도록 할 수 있다.In addition, since the distance and angle between the first connecting bar 311 and the second connecting bar 321 can be adjusted through the connecting bolt 330, the fixing angle 210, the metal lath net 240 and the end finishing angle The entire length of the connecting rod 300 is adjusted according to the size of the space formed above the retaining wall structure 110 by 260, or according to the shape of the retaining wall structure 110, the first connection portion 310 and the second The angle of the connecting portion 320 can be easily adjusted.

다음은 본 발명의 일 실시 예에 따른 계단식 사면녹화방법에 사용되는 연결대(300)의 변형 예에 대해 설명하도록 한다. 이하의 설명에서는 상술한 실시 예와 서로 다른 부분만을 상세하게 설명하며 동일하거나 극히 유사한 부분에 대해서는 상세한 설명을 생략한다.Next, a modified example of the connecting rod 300 used in the cascading slope recording method according to an embodiment of the present invention will be described. In the following description, only parts different from those of the above-described embodiment are described in detail, and detailed descriptions of the same or extremely similar parts are omitted.

도 9는 도 5에 도시된 연결대의 변형 예를 나타낸 도면이고, 도 10은 도 9에 도시된 연결대의 작동하는 모습을 나타낸 도면이다.9 is a view showing a modified example of the connecting rod shown in FIG. 5, and FIG. 10 is a view showing how the connecting rod shown in FIG. 9 operates.

도 4 내지 도 10을 참조하면, 본 발명의 일 실시 예에 따른 계단식 사면녹화방법은 일단이 식생토(280)에 삽입되고 타단이 메탈라스 망(240)과 결합하도록 부설된 식생토(280)의 상단에 연결대(300)를 시공하는 제2-9단계(S2009)를 구비할 수 있다.4 to 10, in the stepwise slope greening method according to an embodiment of the present invention, one end is inserted into the vegetation soil 280 and the other end is laid so as to be combined with the metal lath network 240. It may be provided with a 2nd-9th step (S2009) of constructing the connecting rod 300 at the top of.

그리고 제2-9단계(S2009)에서의 연결대(300)는 일단이 식생토(280)에 삽입되는 제1연결부분(310)과, 일단이 고정프레임(243)에 고정되는 제2연결부분(320)과, 제1연결부분(310) 및 제2연결부분(320)과 결합하여 제1연결부분(310)과 제2연결부분(320)의 각도가 조절되도록 하는 각도조절부분(340)과, 각도조절부분(340)에 각각 구비되어 길이가 조절되도록 하는 길이조절부분(350)을 구비할 수 있다.And the connecting rod 300 in step 2-9 (S2009) has a first connection part 310 having one end inserted into the vegetation soil 280 and a second connection part having one end fixed to the fixing frame 243 ( 320), the first connection portion 310 and the second connection portion 320 coupled to the first connection portion 310 and the angle adjusting portion 340 to adjust the angle of the second connection portion 320 and , The angle adjusting portion 340 may be provided with a length adjusting portion 350 so that the length is adjusted.

제1연결부분(310)은 일 방향으로 길게 구비되는 제1연결바(311)와, 제1연결바(311)의 길이방향 일단에 구비되어 식생토(280)에 삽입되는 삽입편(312)과, 제1연결바(311)의 길이방향 타단에 구비되어 제1연결부분(310)이 각도조절부분(340)으로부터 이탈하는 것을 방지하는 제1이탈방지편(313)과, 길이조절부분(350)과 대응되는 일측면에 구비되어 길이조절부분(350)과 접촉하는 다수의 제1걸림편(314)을 구비할 수 있다.The first connection portion 310 includes a first connection bar 311 provided long in one direction and an insertion piece 312 provided at one end of the first connection bar 311 in the longitudinal direction and inserted into the vegetation soil 280. And, a first separation prevention piece 313 provided at the other end of the first connection bar 311 in the longitudinal direction to prevent the first connection portion 310 from departing from the angle adjusting portion 340, and a length adjusting portion ( 350) may be provided with a plurality of first holding pieces 314 that are provided on one side corresponding to and contact the length adjusting portion 350.

삽입편(312)은 제1연결바(311)의 일단에서 하 방향으로 구부러진 형태로 구비되어 식생토(280)에 용이하게 삽입될 수 있고, 제1이탈방지편(313)은 삽입편(312)과 마찬가지로 제1연결바(311)의 타단에서 하 방향으로 구부러진 형태로 구비되어 제1연결부분(310)이 각도조절부분(340)으로부터 이탈하는 것을 방지함과 동시에 제2연결부분(320)과 간섭이 발생하지 않도록 할 수 있으며, 제1걸림편(314)은 제1연결바(311)의 일측면으로부터 소정길이 돌출된 형태로 구비되어 길이조절부분(350)이 걸리도록 할 수 있다.The insertion piece 312 is provided in a downwardly bent form at one end of the first connection bar 311 to be easily inserted into the vegetation soil 280, and the first separation prevention piece 313 is the insertion piece 312 ), it is provided in a downwardly bent form at the other end of the first connecting bar 311 to prevent the first connecting portion 310 from being separated from the angle adjusting portion 340 and at the same time as the second connecting portion 320 and interference may not occur, and the first locking piece 314 is provided in the form of protruding a predetermined length from one side of the first connecting bar 311 so that the length adjusting part 350 can be caught.

제2연결부분(320)은 일 방향으로 길게 구비되는 제2연결바(321)와, 제2연결바(321)의 길이방향 일단에 구비되어 고정프레임(243)에 고정되는 고정편(322)과, 제2연결바(321)의 길이방향 타단에 구비되어 제2연결부분(320)이 각도조절부분(340)으로부터 이탈하는 것을 방지하는 제2이탈방지편(323)과, 길이조절부분(350)과 대응되는 일측면에 구비되어 길이조절부분(350)과 접촉하는 다수의 제2걸림편(324)을 구비할 수 있다.The second connection portion 320 includes a second connection bar 321 provided long in one direction, and a fixing piece 322 provided at one end of the second connection bar 321 in the longitudinal direction and fixed to the fixing frame 243. And, a second separation prevention piece 323 provided at the other end of the second connection bar 321 in the longitudinal direction to prevent the second connection portion 320 from departing from the angle adjusting portion 340, and a length adjusting portion ( 350) may be provided with a plurality of second gripping pieces 324 that are provided on one side corresponding to and contact the length adjusting portion 350.

고정편(322)은 제2연결바(321)의 일단에서 상 방향으로 구부러진 형태로 구비되고, 제2이탈방지편(323)은 제2연결바(321)의 타단에서 하 방향으로 구부러진 형태로 구비되어 제2연결바(321)가 각도조절부분(340)으로부터 이탈하는 것을 방지할 수 있으며, 제2걸림편(324)은 제2연결바(321)의 일측면으로부터 소정길이 돌출된 형태로 구비되어 길이조절부분(350)이 걸리도록 할 수 있다.The fixing piece 322 is provided in a form bent upward at one end of the second connecting bar 321, and the second separation prevention piece 323 is bent downward at the other end of the second connecting bar 321. It is provided to prevent the second connection bar 321 from being separated from the angle adjusting part 340, and the second locking piece 324 protrudes from one side of the second connection bar 321 by a predetermined length. It is provided so that the length adjustment part 350 can be caught.

각도조절부분(340)은 제1연결바(311)가 관통하는 제1결합홀(341a)을 구비하여 제1연결부분(310)과 결합하는 제1회전판(341)과, 제1회전판(341)의 상부에 위치하고 제2연결바(321)가 관통하는 제2결합홀(342a)을 구비하여 제2연결부분(320)과 결합하는 제2회전판(342)과, 제2회전판(342)에 체결되어 제1회전판(341) 및 제2회전판(342)의 조절된 각도를 고정하는 연결볼트(330)를 구비할 수 있다.The angle adjusting portion 340 includes a first coupling hole 341a through which the first connecting bar 311 passes, and a first rotating plate 341 coupled to the first connecting portion 310, and a first rotating plate 341 ) Located on the top of the second connecting bar 321 is provided with a second coupling hole (342a) through which the second rotating plate 342 coupled to the second connecting portion 320, and the second rotating plate 342 It may be provided with a connecting bolt 330 that is fastened to fix the adjusted angles of the first rotation plate 341 and the second rotation plate 342 .

연결볼트(330)는 제2회전판(342)을 관통하여 제1회전판(341)에 체결되고, 연결볼트(330)를 풀었을 시에는 제2회전판(342)의 회전이 가능해져 제2연결부분(320)의 각도를 조절할 수 있으며, 연결볼트(330)를 조였을 시에는 제2회전판(342)이 고정되어 조절된 각도를 유지할 수 있다.The connection bolt 330 penetrates the second rotation plate 342 and is fastened to the first rotation plate 341, and when the connection bolt 330 is released, the rotation of the second rotation plate 342 becomes possible and the second connection part The angle of 320 can be adjusted, and when the connection bolt 330 is tightened, the second rotating plate 342 is fixed to maintain the adjusted angle.

여기서, 제2연결바(321)에는 길이방향을 따라 길게 형성되어 연결볼트(330)가 관통하는 가이드홀(321b)이 구비되어 제2연결바(321)의 길이조절과 무관하게 각도조절부분(340)을 통한 각도조절이 용이하게 이루어질 수 있다.Here, the second connecting bar 321 is provided with a guide hole 321b formed long along the longitudinal direction and through which the connecting bolt 330 passes, so that the angle adjustment part (regardless of the length adjustment of the second connecting bar 321) 340) can easily adjust the angle.

길이조절부분(350)은 각도조절부분(340)에서 연장되는 연장편(351)과, 연장편(351)에서 복수 이상 구부러져 돌출형태로 구비되는 손잡이편(352)과, 손잡이편(352)에서 연장되어 제1걸림편(314) 또는 제2걸림편(324)과 접촉하는 접촉편(353)을 구비할 수 있다.The length adjusting portion 350 includes an extension piece 351 extending from the angle adjusting portion 340, a handle piece 352 provided in a protruding form by being bent over a plurality of extension pieces 351, and a handle piece 352. A contact piece 353 extending and contacting the first holding piece 314 or the second holding piece 324 may be provided.

제1연결바(311)와 제2연결바(321)가 서로 멀어지는 방향으로 길이조절이 될 시에는 접촉편(353)이 탄력적으로 움직여 용이하게 길이조절이 되고, 제1연결바(311)와 제2연결바(321)가 서로 가까워지는 방향으로 길이조절이 될 시에는 작업자가 손잡이편(352)을 통해 접촉편(353)을 제1걸림편(314) 또는 제2걸림편(324)으로부터 떨어뜨려 용이하게 길이조절이 되도록 할 수 있다.When the lengths of the first connection bar 311 and the second connection bar 321 are adjusted in the direction away from each other, the contact piece 353 moves elastically to easily adjust the length, and the first connection bar 311 and When the length of the second connecting bar 321 is adjusted in the direction of approaching each other, the operator moves the contact piece 353 through the handle piece 352 from the first catch piece 314 or the second catch piece 324. It can be dropped to make it easy to adjust the length.

상기에서 살펴본 바와 같이, 각도조절부분(340)을 구비함으로써 다양한 각도를 주는 것이 가능해져 옹벽 구조체(110)의 형상에 따른 연결대(300)의 시공이 용이하게 이루어질 수 있고, 길이조절부분(350)을 구비함으로써 고정앵글(210), 메탈라스 망(240) 및 단부마감앵글(260)에 의해 옹벽 구조체(110)의 상부에 형성되는 공간의 크기에 따라 연결대(300)의 전체길이가 용이하게 조절되도록 하는 효과를 발휘할 수 있다.As described above, by providing the angle adjusting portion 340, it is possible to give various angles, so that the construction of the connecting rod 300 according to the shape of the retaining wall structure 110 can be easily performed, and the length adjusting portion 350 The total length of the connecting rod 300 is easily adjusted according to the size of the space formed on the upper part of the retaining wall structure 110 by the fixing angle 210, the metal lath net 240, and the end finishing angle 260 by providing It can exert an effect that makes it possible.

다음은 본 발명의 일 실시 예에 따른 계단식 사면녹화방법의 변형 예에 대해 설명하도록 한다. 이하의 설명에서는 상술한 실시 예와 서로 다른 부분만을 상세하게 설명하며 동일하거나 극히 유사한 부분에 대해서는 상세한 설명을 생략한다.Next, a modified example of the cascading slope recording method according to an embodiment of the present invention will be described. In the following description, only parts different from those of the above-described embodiment are described in detail, and detailed descriptions of the same or extremely similar parts are omitted.

도 11은 도 4에 도시된 계단식 사면녹화방법의 변형 예를 나타낸 순서도이고, 도 12는 도 11에 도시된 순서도에 따라 연결링이 구비된 모습을 나타낸 도면이다.FIG. 11 is a flow chart showing a modified example of the cascading slope recording method shown in FIG. 4, and FIG. 12 is a view showing a connection ring provided according to the flow chart shown in FIG.

도 4 내지 도 12를 참조하면, 본 발명의 일 실시 예에 따른 계단식 사면녹화방법은 제2-9단계(S2009) 이후에 연결대(300)에 연결링(400)을 시공하는 제2-10단계(S2010)와, 연결링(400)이 시공된 서로 이웃하는 한 쌍의 연결대(300)를 연결하는 제2-11단계(S2011)를 더 구비할 수 있다.4 to 12, step 2-10 of constructing the connecting ring 400 on the connecting rod 300 after step 2-9 (S2009) of the stepped slope greening method according to an embodiment of the present invention. (S2010) and a 2nd-11th step (S2011) of connecting a pair of adjacent connecting rods 300 to which the connecting rings 400 are constructed may be further provided.

여기서, 연결대(300)에는 제2회전판(342)에 가이드벽(360)이 구비되고, 가이드벽(360)의 외측에는 연결링(400)이 체결될 수 있다.Here, the guide wall 360 may be provided on the second rotating plate 342 of the connecting table 300 , and the connecting ring 400 may be fastened to the outside of the guide wall 360 .

연결링(400)의 외면에는 체결홈(410)이 구비되어 와이어(500)가 체결될 수 있으므로 서로 이웃하는 한 쌍의 연결대(300)에 각각 체결된 연결링(400)에 와이어(500)를 체결하여 서로 이웃하는 한 쌍의 연결대(300)를 연결할 수 있게 됨으로써 결합력 및 고정력을 높이는 효과를 발휘할 수 있다.Since a fastening groove 410 is provided on the outer surface of the connecting ring 400 to allow the wire 500 to be fastened, the wire 500 is connected to the connecting ring 400 respectively fastened to a pair of connecting rods 300 adjacent to each other. It is possible to connect a pair of connecting rods 300 adjacent to each other by fastening, thereby exhibiting an effect of increasing bonding force and fixing force.

이상에서는 본 발명의 일 실시 예에 따른 계단식 사면녹화방법에 대해 설명하였으나, 본 발명의 사상은 본 명세서에 제시되는 실시 예에 제한되지 아니한다. 그리고 본 발명의 사상을 이해하는 당업자는 동일한 사상의 범위 내에서 구성요소의 부가, 변경, 삭제, 추가 등에 의해서 다른 실시 예를 용이하게 제안할 수 있을 것이나, 이 또한 본 발명의 사상범위 내에 든다고 할 것이다.In the above, the cascading slope recording method according to an embodiment of the present invention has been described, but the spirit of the present invention is not limited to the embodiment presented herein. And those skilled in the art who understand the spirit of the present invention can easily suggest other embodiments by adding, changing, deleting, adding, etc., components within the scope of the same spirit, but it can be said that this also falls within the spirit of the present invention. will be.

110: 옹벽 구조체 120: 계단부
130: 메탈망 141: 망 바닥부
142: 망 측벽부 151: 걸림고리
152: 메탈프레임 160: 망 연결유닛
161: 유닛 샤프트 162: 바닥 걸림 후크부
163: 측벽 걸림 후크부 210: 고정앵글
211: 제1고정부분 212: 제2고정부분
220: 방수시트 230: 방근판
240: 메탈라스 망 241: 제1망부분
242: 제2망부분 243: 고정프레임
250: 마감 부직포 260: 단부마감앵글
261: 제1단부마감부분 262: 제2단부마감부분
263: 제3단부마감부분 270: 토양 보습제
280: 식생토 300: 연결대
310: 제1연결부분 311: 제1연결바
311a: 제1체결홀 312: 삽입편
313: 제1이탈방지편 314: 제1걸림편
320: 제2연결부분 321: 제2연결바
321a: 제2체결홀 321b: 가이드홀
322: 고정편 323: 제2이탈방지편
324: 제2걸림편 330: 연결볼트
340: 각도조절부분 341: 제1회전판
341a: 제1결합홀 342: 제2회전판
342a: 제2결합홀 350: 길이조절부분
351: 연장편 352: 손잡이편
353: 접촉편 360: 가이드벽
400: 연결링 410: 체결홈
500: 와이어
110: retaining wall structure 120: stairs
130: metal mesh 141: mesh bottom
142: mesh side wall portion 151: hook
152: metal frame 160: network connection unit
161: unit shaft 162: bottom hook part
163: side wall hanging hook 210: fixing angle
211: first fixing part 212: second fixing part
220: waterproof sheet 230: root plate
240: metal lath net 241: first net portion
242: second network part 243: fixed frame
250: finishing nonwoven fabric 260: end closing angle
261: first end closing portion 262: second end closing portion
263: third end finishing part 270: soil moisturizer
280: Vegetation soil 300: Connecting zone
310: first connection part 311: first connection bar
311a: first fastening hole 312: insertion piece
313: first departure prevention piece 314: first jamming piece
320: second connection part 321: second connection bar
321a: second fastening hole 321b: guide hole
322: fixed piece 323: second departure prevention piece
324: second hooking piece 330: connecting bolt
340: angle adjustment part 341: first rotating plate
341a: first coupling hole 342: second rotating plate
342a: second coupling hole 350: length adjustment part
351: extension 352: handle
353: contact piece 360: guide wall
400: connecting ring 410: fastening groove
500: wire

Claims (7)

옹벽 구조체를 시공하는 옹벽 구조체 시공단계와,
상기 옹벽 구조체의 전면에 계단부를 형성하는 계단부 형성단계와,
상기 계단부에 메탈망을 설치하는 메탈망 설치단계와,
상기 메탈망을 매개로 하여 상기 계단부에 식물을 식생하는 식물 식생단계를 구비하고,
상기 메탈망 설치단계에서의 상기 메탈망은 상기 계단부의 바닥에 배치되고 해당 부위를 보강하는 망 바닥부와, 상기 망 바닥부에 교차하게 연결되되 상기 계단부의 측벽에 배치되고 해당 부위를 보강하는 적어도 하나의 망 측벽부와, 상기 망 바닥부와 상기 망 측벽부를 연결하는 복수의 망 연결유닛을 구비하고, 상기 망 바닥부는 상기 망 연결유닛의 일단이 걸리는 걸림고리를 구비하고, 상기 망 측벽부는 상기 망 연결유닛의 타단이 걸리는 메탈프레임을 구비하고, 상기 망 연결유닛은 유닛 샤프트와, 상기 유닛 샤프트의 일단부에 형성되고 단부가 절곡되며, 상기 걸림고리에 걸리는 바닥 걸림 후크부와, 상기 유닛 샤프트의 타단부에 형성되고 단부가 절곡되며, 상기 메탈프레임에 걸리는 측벽 걸림 후크부를 구비하고,
상기 옹벽 구조체에 다단의 계단부를 형성하는 제2단계와, 상기 계단부에 식물을 식생하는 제3단계를 구비하고, 상기 제2단계는 상기 옹벽 구조체의 말단에 고정앵글을 시공하는 제2-1단계와, 상기 옹벽 구조체의 상면에 상기 고정앵글과 겹쳐지도록 방수시트를 시공하는 제2-2단계와, 상기 방수시트의 상면에 방근판을 시공하는 제2-3단계와, 상기 고정앵글에 얹혀지는 형태가 되도록 상기 방근판의 일단에 메탈라스 망을 시공하는 제2-4단계와, 상기 방근판 및 상기 메탈라스 망을 덮는 형태로 마감 부직포를 시공하는 제2-5단계와, 상기 고정앵글 및 상기 메탈라스 망의 길이방향 양단에 단부마감앵글을 시공하는 제2-6단계와, 이웃하는 옹벽 구조체와 상기 메탈라스 망에 의해 형성된 공간에 토양 보습제를 투입하는 제2-7단계와, 상기 토양 보습제가 매립되도록 식생토를 부설하는 제2-8단계와, 일단이 상기 식생토에 삽입되고 타단이 상기 메탈라스 망과 결합하도록 부설된 상기 식생토의 상단에 연결대를 시공하는 제2-9단계를 구비하고,
상기 제2-1단계에서의 상기 고정앵글은 일 방향으로 길게 구비되어 상기 옹벽 구조체와 대응되는 제1고정부분과, 일 방향으로 길게 구비되고 상기 제1고정부분과 일정각도를 형성하도록 구비되어 상기 메탈라스 망과 접하는 제2고정부분을 구비하고, 상기 제2-4단계에서의 상기 메탈라스 망은 일 방향으로 길게 구비되어 상기 제1고정부분과 대응되는 제1망부분과, 면 형태로 구비되고 상기 제1망부분과 일정각도를 형성하도록 구비되어 상기 제2고정부분과 접하는 제2망부분과, 상기 제2망부분의 일단에 결합하여 상기 연결대가 고정되는 고정프레임을 구비하고, 상기 제2-6단계에서의 상기 단부마감앵글은 상기 제1고정부분의 하면과 접하는 제1단부마감부분과, 상기 제1단부마감부분과 일정각도를 형성하도록 구비되어 상기 제2고정부분 및 상기 제2망부분과 접하는 제2단부마감부분과, 상기 제1단부마감부분과 상기 제2단부마감부분을 일체화하여 상기 고정앵글과 상기 메탈라스 망의 길이방향 단부와 접하는 제3단부마감부분을 구비하고,
상기 제2-9단계에서의 상기 연결대는 일단이 상기 식생토에 삽입되는 제1연결부분과, 일단이 상기 고정프레임에 고정되는 제2연결부분과, 상기 제1연결부분과 상기 제2연결부분을 연결하는 연결볼트를 구비하고, 상기 제1연결부분은 일 방향으로 길게 구비되어 상기 연결볼트가 체결되는 제1체결홀이 형성된 제1연결바와, 상기 제1연결바의 일단에 구비되어 상기 식생토에 삽입되는 삽입편을 구비하고, 상기 제2연결부분은 일 방향으로 길게 구비되어 상기 연결볼트가 체결되는 제2체결홀이 형성된 제2연결바와, 상기 제2연결바의 일단에 구비되어 상기 고정프레임에 고정되는 고정편을 구비하고, 상기 제1연결부분과 상기 제2연결부분은 상기 연결볼트를 통해 상호 간의 간격 및 각도가 조절되는 것을 특징으로 하는 계단식 사면녹화방법.
A retaining wall structure construction step of constructing a retaining wall structure;
A step of forming a step portion on the front surface of the retaining wall structure;
A metal mesh installation step of installing a metal mesh to the step portion;
A plant vegetation step of vegetating plants on the step portion through the metal net,
In the metal mesh installation step, the metal mesh is disposed on the bottom of the step portion and cross-connected to the bottom portion of the mesh to reinforce the corresponding portion, and is disposed on the sidewall of the step portion and reinforces the corresponding portion. At least One network side wall portion and a plurality of network connection units connecting the network bottom portion and the network side wall portion, the network bottom portion having a hook for holding one end of the network connection unit, and the network side wall portion comprising the A metal frame to which the other end of the network connection unit is hung, and the network connection unit includes a unit shaft, a floor hook that is formed on one end of the unit shaft, has a bent end, and is caught on the hook, and the unit shaft. It is formed at the other end of the end and has a bent end, and has a side wall hanging hook hooked to the metal frame,
A second step of forming a multi-stage step on the retaining wall structure, and a third step of vegetating plants on the step, wherein the second step is to construct a fixing angle at the end of the retaining wall structure. 2-1 Step 2-2 of constructing a waterproof sheet on the upper surface of the retaining wall structure so as to overlap with the fixing angle, step 2-3 of constructing a root plate on the upper surface of the waterproof sheet, and resting on the fixing angle Step 2-4 of constructing a metal lath network on one end of the root plate to form a losing form, step 2-5 of constructing a finished nonwoven fabric in a form covering the root plate and the metal lath net, and the fixing angle And Steps 2-6 of constructing end closing angles at both ends of the metal lath network in the longitudinal direction, and Steps 2-7 of injecting a soil moisturizer into the space formed by the adjacent retaining wall structure and the metal lath network, Steps 2-8 of laying vegetation soil so that the soil moisturizer is buried, and steps 2-9 of constructing a connecting rod on top of the vegetation soil, one end of which is inserted into the vegetation soil and the other end is laid to combine with the metal lath net. to provide,
The fixing angle in the 2-1 step is provided long in one direction and provided to form a predetermined angle with the first fixing part corresponding to the retaining wall structure, and provided long in one direction and provided to form a predetermined angle with the first fixing part. A second fixing part in contact with the metal lath net is provided, and the metal lath net in step 2-4 is provided long in one direction and is provided in the form of a surface with a first net part corresponding to the first fixing part. And a second network portion provided to form a predetermined angle with the first network portion and in contact with the second fixing portion, and a fixing frame coupled to one end of the second network portion and fixed to the connecting rod, The end closing angle in step 2-6 is provided so as to form a predetermined angle with the first end finishing portion contacting the lower surface of the first fixing portion, and the second fixing portion and the second fixing portion. A second end-finishing portion in contact with the net portion and a third end-finishing portion in contact with the longitudinal direction end of the fixing angle and the metal lath net by integrating the first end-finishing portion and the second end-finishing portion,
The connecting rod in step 2-9 includes a first connection part having one end inserted into the vegetation soil, a second connection part having one end fixed to the fixing frame, and the first connection part and the second connection part. A first connection bar having a first fastening hole to which the connecting bolt is fastened is provided and the first connection part is provided elongated in one direction and is provided at one end of the first connection bar to support the vegetation It has an insertion piece inserted into the toe, and the second connection part is provided long in one direction and has a second connection bar having a second fastening hole through which the connection bolt is fastened, and is provided at one end of the second connection bar to A stepwise slope recording method comprising a fixing piece fixed to a fixing frame, wherein a distance and an angle between the first connection part and the second connection part are adjusted through the connection bolt.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020220188093A 2022-12-29 2022-12-29 Cascading slope greening method KR102544952B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220188093A KR102544952B1 (en) 2022-12-29 2022-12-29 Cascading slope greening method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220188093A KR102544952B1 (en) 2022-12-29 2022-12-29 Cascading slope greening method

Publications (1)

Publication Number Publication Date
KR102544952B1 true KR102544952B1 (en) 2023-06-20

Family

ID=86994721

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220188093A KR102544952B1 (en) 2022-12-29 2022-12-29 Cascading slope greening method

Country Status (1)

Country Link
KR (1) KR102544952B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100005980A (en) * 2008-07-08 2010-01-18 성 무 김 Construction method of roof top greenization and structure thereof
KR101063992B1 (en) * 2011-03-18 2011-09-08 조문선 Greening block makig method by greening mat
KR101095700B1 (en) 2009-09-16 2011-12-20 박강호 Retaining Wall Structure and Constructing Method thereof
KR101141197B1 (en) * 2011-12-02 2012-05-04 주식회사 경호엔지니어링 종합건축사사무소 A vertical garden using a expanded metal that is established at old-retaining wall, and construction method of it

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100005980A (en) * 2008-07-08 2010-01-18 성 무 김 Construction method of roof top greenization and structure thereof
KR101095700B1 (en) 2009-09-16 2011-12-20 박강호 Retaining Wall Structure and Constructing Method thereof
KR101063992B1 (en) * 2011-03-18 2011-09-08 조문선 Greening block makig method by greening mat
KR101141197B1 (en) * 2011-12-02 2012-05-04 주식회사 경호엔지니어링 종합건축사사무소 A vertical garden using a expanded metal that is established at old-retaining wall, and construction method of it

Similar Documents

Publication Publication Date Title
US6715965B2 (en) Retaining wall blocks and retaining walls constructed from such blocks
KR100981258B1 (en) The retaining wall block and the construction method of retaining wall with retaining wall block and geogrid
EP0574233A1 (en) Method for forming vegetated slopes in strengthened ground and a product obtained by such method
CA2532647C (en) Composite form for stabilizing earthen embankments
KR102544952B1 (en) Cascading slope greening method
KR100899037B1 (en) Block assembly
US5584602A (en) Method for landscape and hardscape edging
KR20100047485A (en) Slope reinforcement structure with reinforce frame of dividing
KR101018903B1 (en) Stabilizing assembly for preventing soil-flow of slope and greening
KR100650066B1 (en) Equipment for intercepting sliding of slope in apartment house
JP3266876B2 (en) Soil / cover soil block and construction method
JP5108744B2 (en) Greening road surface forming block and greening road surface on which the block is laid
JPS6232290B2 (en)
KR19990046526A (en) A structure for establing a slope and execution method using it
KR102490289B1 (en) Mattress type planting mat and afforestation method using thereof
CN220284869U (en) Ecological barricade is restoreed to mine trace land vegetation
JP2947542B2 (en) Construction method of extension of vegetation shelf structure on the lawn
JPH09144008A (en) Measuring coil for forming cast-in-place sloped form
CN218813795U (en) Curved geogrid ecological slope protection structure
JPH0376373B2 (en)
KR20060032271A (en) Vegetation reinforcement panel and the construction method of retaining wall for the same
KR101009915B1 (en) Afforestation apparatus of vertical wall
JP3025094U (en) Frame for forming legal frame
JPH0351371Y2 (en)
JP3088648U (en) Inspection frame for legal frame formation

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant