CN220284869U - Ecological barricade is restoreed to mine trace land vegetation - Google Patents

Ecological barricade is restoreed to mine trace land vegetation Download PDF

Info

Publication number
CN220284869U
CN220284869U CN202321554086.3U CN202321554086U CN220284869U CN 220284869 U CN220284869 U CN 220284869U CN 202321554086 U CN202321554086 U CN 202321554086U CN 220284869 U CN220284869 U CN 220284869U
Authority
CN
China
Prior art keywords
planting
mine
planting pool
net
pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321554086.3U
Other languages
Chinese (zh)
Inventor
康芹
杨静
刘入瑜
邱晨
李明明
徐超
易义君
李小平
王琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Kanghui Garden Group Co ltd
Original Assignee
Sichuan Kanghui Garden Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Kanghui Garden Group Co ltd filed Critical Sichuan Kanghui Garden Group Co ltd
Priority to CN202321554086.3U priority Critical patent/CN220284869U/en
Application granted granted Critical
Publication of CN220284869U publication Critical patent/CN220284869U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses an ecological retaining wall for repairing mine trace vegetation, which comprises a mine body, wherein the surface layer of the mine body is covered with a blocking net, the blocking net is fixed on the surface layer of the mine by driving expansion bolts into the mine body, a non-woven fabric layer is paved on the upper layer of the blocking net, a first planting pool, a second planting pool and a third planting pool are paved above the non-woven fabric in sequence from top to bottom, and a fixing layer is fixedly arranged below the third planting pool. Through laying the fender net at mine body top layer, fix the rubble by the fender net, lay the non-woven fabrics at the fender net top layer again and be used for sucking the supplementary vegetation of rainwater and take root, can also prevent soil erosion simultaneously, just so can avoid constructing the later stage at ecological barricade and lead to the barricade damage because of long-time rain wash.

Description

Ecological barricade is restoreed to mine trace land vegetation
Technical Field
The utility model relates to the field of ecological retaining walls, in particular to an ecological retaining wall for repairing mine trace vegetation.
Background
After mining, a large number of slope structures with unstable geological structures, reduced vegetation coverage and higher soil pollution are easily caused around the mine, and if the slope structures cannot be effectively treated in time, geological disasters such as collapse, landslide and the like are easily caused, dust is easily caused, and environmental pollution is easily caused.
According to the chinese patent literature of publication No. CN211646462U, an ecological barricade of plant mat for mine plant restoration is disclosed, including building the main part, the right side of building the main part has set gradually first planting pond, second planting pond and third planting pond from last to down, the bottom in first planting pond, second planting pond and third planting pond all with build main part fixed connection, the right side fixedly connected with first gusset plate of first planting pond, the right side of first gusset plate and the left side fixed connection of second planting pond, the left side fixedly connected with second gusset plate of third planting pond, the left side of second gusset plate and the right side fixed connection of second planting pond, the top fixedly connected with installing strip in first planting pond left side, the installing port has been seted up at the top of installing strip. According to the ecological retaining wall for repairing mine plants, the ecological retaining wall for filling up plants is achieved through the mutual matching of the masonry main body, the first planting pool, the second planting pool, the third planting pool, the first reinforcing plate, the second reinforcing plate, the mounting strips and the mounting openings, the stability of the retaining wall is greatly improved, the retaining wall has the function of beautifying the environment, the retaining wall also has the function of layered landscaping, and the process of mounting warning boards or propaganda boards is convenient and rapid, so that the ecological retaining wall is high in practicability. However, the inventor considers that broken stone easily flows downwards along with rainwater when more broken stone of the mine rains, so that the ecological retaining wall landslide is damaged.
Disclosure of Invention
(one) solving the technical problems
In order to overcome the defects of the prior art, the utility model provides an ecological retaining wall for repairing mine trace vegetation, which solves the problems in the background art.
(II) technical scheme
In order to solve the technical problems, the utility model provides the following technical scheme: the utility model provides an ecological barricade is restoreed to mine trace ground vegetation, includes the mine body, the mine body top layer covers has the fender net, the fender net is fixed in the mine top layer through driving into expansion bolts in the mine body, the non-woven fabrics layer has been laid on the fender net upper strata, first planting pond, second planting pond and third planting pond have been laid down in proper order from last to the non-woven fabrics top, the fixed layer that is provided with in third planting pond below.
As a preferable scheme of the mine site vegetation restoration ecological retaining wall, the utility model comprises the following steps: the baffle net is an iron wire net, more than two expansion bolts are uniformly driven into the mine body.
As a preferable scheme of the mine site vegetation restoration ecological retaining wall, the utility model comprises the following steps: the first planting pool, the second planting pool and the third planting pool are irregularly shaped, and the first planting pool, the second planting pool and the third planting pool can be connected in an inserting mode.
As a preferable scheme of the mine site vegetation restoration ecological retaining wall, the utility model comprises the following steps: the fixed layer drives the part of the reinforcing steel bars into the mine body, and the exposed reinforcing steel bars are mixed with concrete.
As a preferable scheme of the mine site vegetation restoration ecological retaining wall, the utility model comprises the following steps: the first planting pool and the third planting pool are used for sowing grass seeds or shrubs easy to survive, and the second planting pool is used for planting trees.
As a preferable scheme of the mine site vegetation restoration ecological retaining wall, the utility model comprises the following steps: the first planting pool, the second planting pool, the third planting pool and the fixed layer are combined, and the first planting pool, the second planting pool, the third planting pool and the fixed layer are continuously arranged below the fixed layer and sequentially downwards until the first planting pool, the second planting pool, the third planting pool and the fixed layer are finished.
(III) beneficial effects
Compared with the prior art, the utility model has the following beneficial effects:
through laying the fender net at mine body top layer, fix the rubble by the fender net, lay the non-woven fabrics at the fender net top layer again and be used for sucking the supplementary vegetation of rainwater and take root, can also prevent soil erosion simultaneously, just so can avoid constructing the later stage at ecological barricade and lead to the barricade damage because of long-time rain wash.
Drawings
FIG. 1 is a cross-sectional view of the present utility model;
FIG. 2 is a top view of the present utility model;
FIG. 3 is an expanded view of the planting pool of the present utility model;
wherein: 1. a mine body; 2. a blocking net; 3. an expansion bolt; 4. a nonwoven fabric; 5. a first planting pool; 6. a second planting pool; 7. a third planting pool; 8. a fixed layer; 9. reinforcing steel bars.
Detailed Description
In order that the manner in which the above recited features, objects and advantages of the present utility model are obtained will become readily apparent, a more particular description of the utility model will be rendered by reference to specific embodiments thereof which are illustrated in the appended drawings. Based on the examples in the embodiments, those skilled in the art can obtain other examples without making any inventive effort, which fall within the scope of the utility model. The experimental methods in the following examples are conventional methods unless otherwise specified, and materials, reagents, etc. used in the following examples are commercially available unless otherwise specified.
Examples:
as shown in fig. 1-3, the utility model provides an ecological retaining wall for repairing vegetation on a mine plot, which comprises a mine body 1, wherein the surface layer of the mine body 1 is covered with a blocking net 2, the blocking net 2 is fixed on the surface layer of the mine by driving expansion bolts 3 into the mine body 1, a non-woven fabric 4 layer is paved on the upper layer of the blocking net 2, a first planting pool 5, a second planting pool 6 and a third planting pool 7 are paved above the non-woven fabric 4 in sequence from top to bottom, and a fixing layer 8 is fixedly arranged below the third planting pool 7.
Specifically, in order to make the service life of the blocking net 2 long, the blocking net 2 is made of an iron wire net, and the iron wire net has the characteristics of smooth net surface, firm structure, low price, durability and good corrosion resistance and oxidation resistance, and the blocking net 2 is used for fixing broken stone, so that the iron wire net is fixed on the mine body 1 through the expansion bolts 3, and the expansion bolts 3 are uniformly driven into the mine body 1.
Specifically, for construction convenience and rapidness with first planting pond 5, second planting pond 6 and third planting pond 7 set up to the irregular shape that can peg graft, during the construction only need splice can, splice together in addition and form a whole more firm than single.
Specifically, in order to prevent that pond 5 is planted to first planting, pond 6 is planted to the second and pond 7 landslide is planted to the third, set up fixed layer 8 in the below of pond 7 is planted to the third, fixed layer 8 is with reinforcing bar 9 part position drive-in mine body 1, the reinforcing bar 9 that exposes mixes with concrete, reinforcing bar 9 and concrete can be stronger, the effect is better, according to mine height with first planting pond 5, second planting pond 6, pond 7 is planted to the third and fixed layer 8 is established to a combination, fixed layer 8 below continues to set up first planting pond 5, pond 6 is planted to the second and pond 7 is planted to the third and fixed layer 8, down in proper order, until the end.
Specifically, in order to cover the vegetation of the mine body 1, the first planting pool 5 and the third planting pool 7 are used for sowing grass seeds or easily survival shrubs, the second planting pool is used for sowing 6 kinds of trees, the grass seeds or the easily survival shrubs grow fast, the survival rate is high, the trees are easy to root, broken stones and soil on the surface of the mine can be locked in the shortest time, landslide and soil erosion are prevented, the trees can prick the roots into the mine, and better survival of the vegetation can be achieved through alternate planting.
Working principle: firstly, paving a shielding net 2 on a mine body 1 to lock broken stones, paving a non-woven fabric 4 on the surface layer of the shielding net 2, absorbing rainwater when the non-woven fabric 4 rains, providing moisture for vegetation, then paving a first planting pool 5, a second planting pool 6 and a third planting pool 7 from top to bottom, after paving, implanting reinforcing steel bars 9 in a part of positions of the mine body 1, pouring concrete at the exposed positions to form a fixed layer 8, paving the first planting pool 5, the second planting pool 6 and the third planting pool 7, implanting the reinforcing steel bars 9, sequentially performing the steps in sequence, and finally planting vegetation in the first planting pool 5, the second planting pool 6 and the third planting pool 7.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides an ecological barricade is restoreed to mine trace vegetation, includes mine body (1), its characterized in that: the mine body (1) top layer covers has keeps off net (2), keep off net (2) and be fixed in the mine top layer through driving into expansion bolts (3) in mine body (1), non-woven fabrics (4) layer has been laid on keeping off net (2) upper strata, first planting pond (5), second planting pond (6) and third planting pond (7) have been laid in proper order from last to lower in non-woven fabrics (4) top, the fixed layer (8) that is provided with in third planting pond (7) below.
2. The mine site vegetation restoration ecological retaining wall according to claim 1, wherein: the blocking net (2) is an iron wire net, and more than two expansion bolts (3) are uniformly driven into the mine body (1).
3. The mine site vegetation restoration ecological retaining wall according to claim 1, wherein: the fixing layer (8) drives part of the reinforcing steel bars (9) into the mine body (1), and the exposed reinforcing steel bars (9) are mixed with concrete.
4. The mine site vegetation restoration ecological retaining wall according to claim 1, wherein: the first planting pool (5) and the third planting pool (7) are used for sowing grass seeds or shrubs easy to survive, and the second planting pool (6) is used for planting arbor.
5. The mine site vegetation restoration ecological retaining wall according to claim 1, wherein: the first planting pool (5), the second planting pool (6), the third planting pool (7) and the fixed layer (8) are combined, and the first planting pool (5), the second planting pool (6), the third planting pool (7) and the fixed layer (8) are continuously arranged below the fixed layer (8) and downwards in sequence until the end.
CN202321554086.3U 2023-06-16 2023-06-16 Ecological barricade is restoreed to mine trace land vegetation Active CN220284869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321554086.3U CN220284869U (en) 2023-06-16 2023-06-16 Ecological barricade is restoreed to mine trace land vegetation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321554086.3U CN220284869U (en) 2023-06-16 2023-06-16 Ecological barricade is restoreed to mine trace land vegetation

Publications (1)

Publication Number Publication Date
CN220284869U true CN220284869U (en) 2024-01-02

Family

ID=89325759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321554086.3U Active CN220284869U (en) 2023-06-16 2023-06-16 Ecological barricade is restoreed to mine trace land vegetation

Country Status (1)

Country Link
CN (1) CN220284869U (en)

Similar Documents

Publication Publication Date Title
CN103774679B (en) A kind of method of rock slope linked network
KR100920027B1 (en) Vegetation Method Reinforced Soil Slopes with Geotextile Curtain Wall combined with steel buckel and anchor Nails
CN206681021U (en) Multi-functional side slope reinforced structure
CN113235623A (en) Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof
CN106958264A (en) A kind of highway greenbelt and its construction method
CN106522244B (en) A kind of embankment combination binding structure and its construction method
CN105544567A (en) Civil engineering structure for total slope greening construction method of abrupt rock slope
CN220284869U (en) Ecological barricade is restoreed to mine trace land vegetation
US3412561A (en) Reed-trench terracing
CN113529754B (en) Granular-body slope ecological slope protection structure and construction method
KR101018903B1 (en) Stabilizing assembly for preventing soil-flow of slope and greening
CN212561559U (en) Green protection architecture in steep hillside based on biological stake and tendril plant
CN213897161U (en) Rock slope ecological slope protection structure in high and cold overcast and humid area
KR100884017B1 (en) Method of Constructing Bank Walls with Recovering Natural Environment
CN114635432A (en) Construction method of composite ecological slope protection of foundation pit
KR19990046526A (en) A structure for establing a slope and execution method using it
Schiechtl FAO watershed management field manual: vegetative and soil treatment measures
KR20090075476A (en) Slope greening method
CN217580226U (en) Collect drainage, reinforcement and ecological afforestation in side slope ecological protection structure of an organic whole
CN2177335Y (en) Honeycomb type frame for stabilizing and planting green trees, etc. of rock slope
CN218779424U (en) Ecological concrete bank protection
CN221297921U (en) Ecological restoration structure of side slope
CN220666250U (en) Ecological support system suitable for soil high slope
CN220414274U (en) Surface mine ecological restoration shallow aquifer construction structure
CN220080053U (en) Urban planning and designing ecological slope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant