KR102372310B1 - Indirect hot-line working method using supporting bar for indirect hot-line work - Google Patents

Indirect hot-line working method using supporting bar for indirect hot-line work Download PDF

Info

Publication number
KR102372310B1
KR102372310B1 KR1020190095275A KR20190095275A KR102372310B1 KR 102372310 B1 KR102372310 B1 KR 102372310B1 KR 1020190095275 A KR1020190095275 A KR 1020190095275A KR 20190095275 A KR20190095275 A KR 20190095275A KR 102372310 B1 KR102372310 B1 KR 102372310B1
Authority
KR
South Korea
Prior art keywords
wire
power line
insulator
indirect live
stick
Prior art date
Application number
KR1020190095275A
Other languages
Korean (ko)
Other versions
KR20210016895A (en
Inventor
한윤상
권호상
이우상
민병수
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR1020190095275A priority Critical patent/KR102372310B1/en
Publication of KR20210016895A publication Critical patent/KR20210016895A/en
Application granted granted Critical
Publication of KR102372310B1 publication Critical patent/KR102372310B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines

Landscapes

  • Electric Cable Installation (AREA)

Abstract

본 발명은 간접활선용 완철을 이용한 간접활선 작업방법에 관한 것으로, 활선작업차의 버킷에 설치된 완철승강장치에 간접활선용 완철을 장착하는 가완철준비단계와, 스틱형 절연공구를 사용해 전력선을 간접활선용 완철에 결속하는 가완철및전선결속단계와, 애자와 전력선을 결속하는 바인드선 또는 바인드리스커버를 스틱형 절연공구를 사용해 애자로부터 분리하고, 완철승강장치의 작동에 의해 간접활선용 완철을 상승시켜 전력선을 애자로부터 이격시키는 바인더제거단계와, 애자를 포함한 전력설비를 점검하거나 교체하는 본작업단계와, 완철승강장치의 작동에 의해 간접활선용 완철을 하강시켜 전력선을 애자측으로 하강시키고, 스틱형 절연공구를 사용해 바인드리스커버로 전력선과 애자를 결속하는 바인드리스커버설치단계와, 스틱형 절연공구를 사용해 전력선을 간접활선용 완철로부터 분리하는 가완철결속해제단계를 포함하는 것을 특징으로 한다.The present invention relates to an indirect live wire working method using a long iron for indirect live wire. In the stage of binding the live wire and wire binding to the strong wire for live wire, and the bind wire or bindless cover that binds the insulator and the power line is separated from the insulator using a stick-type insulation tool, the slow wire for indirect live wire is lifted by the operation of the slow steel lifting device. The binder removal step of separating the power line from the insulator by using the It is characterized in that it includes a bindless cover installation step of binding the power line and the insulator with a bindless cover using a tool, and a flexible iron binding releasing step of separating the power line from the indirect live wire using a stick-type insulation tool.

Description

간접활선용 완철을 이용한 간접활선 작업방법{INDIRECT HOT-LINE WORKING METHOD USING SUPPORTING BAR FOR INDIRECT HOT-LINE WORK}Indirect live wire work method using hard iron for indirect live wire {INDIRECT HOT-LINE WORKING METHOD USING SUPPORTING BAR FOR INDIRECT HOT-LINE WORK}

본 발명은 간접활선용 완철을 이용한 간접활선 작업방법에 관한 것으로서, 보다 상세하게는 간접활선 공법에 의해 전력설비 점검, 교체를 수행할 수 있는 간접활선용 완철을 이용한 간접활선 작업방법에 관한 것이다.The present invention relates to a working method for an indirect live wire using a long iron for an indirect live wire, and more particularly, to a method for working with an indirect live wire using a full iron for an indirect live wire that can check and replace power facilities by the indirect live wire method.

일반적으로 핀장주의 가공배전선로에서 전선이선, 완철교체, 전주교체, LP애자교체를 수행하는 작업은 활선용 완철공법에 의해 전력선을 LP애자로부터 분리하여 상향 이격시킨 상태에서 이루어진다. 이는, 활선용 완철을 이용해 애자, 완철 등의 기자재를 교체하는 공법을 말한다.In general, the work of rewiring wires, replacing steel wires, replacing poles, and replacing LP insulators in an overhead distribution line with a pin length is performed in a state in which the power line is separated from the LP insulators and spaced upward by the full iron method for live wires. This refers to a method of replacing equipment such as insulators and arm irons using full iron for live wire.

종래에, 이러한 공법은 작업자가 절연장갑, 절연복을 착용하고, 절연담요 등을 이용해 전력설비나 본인을 임시적으로 보호한 상태에서, 작업자가 전력선과 직접 접촉한 상태로 전력선을 활선용 완철과 결합시키는 작업, 전력선을 LP애자로부터 분리시키는 작업, 기자재 교체 후 전력선을 다시 LP애자와 결합하는 작업, 전력선을 활선용 완철과 분리하는 작업을 수행하는 직접활선 공법으로 시행되고 있다.Conventionally, in this method, in a state in which the worker wears insulating gloves and an insulating suit, and temporarily protects the power facility or himself using an insulating blanket, etc., the worker directly contacts the power line, and the power line is combined with a steel wire for a live wire. It is implemented as a direct live wire construction method that performs the work of removing the power line from the LP insulator, the work of separating the power line from the LP insulator, the work of reconnecting the power line with the LP insulator after replacing the equipment, and the work of separating the power line from the full iron for the live wire.

그러나 이러한 직접활선 공법에 의하면, 작업자의 현장 판단에 따라 절연담요 등을 이용해 임의로 절연 상태를 조성하고 있어, 작업자의 안전을 확보하기 어려울 뿐만 아니라, 특히 여름철 등에 절연장갑, 절연복을 착용상태에서 작업자가 느끼는 불편함으로 인해 작업 여건이 열악할 수 밖에 없고, 작업 효율이 낮다는 문제점이 있었다. 따라서, 이를 개선할 필요성이 요청된다.However, according to this direct live wire method, it is difficult to secure the safety of the worker because the insulation condition is arbitrarily created using an insulation blanket according to the operator's on-site judgment. Due to the discomfort felt by workers, the working conditions were inevitably poor and the work efficiency was low. Therefore, there is a need to improve it.

본 발명의 배경기술은 대한민국 공개특허공보 제10-2018-0002403호(2018.01.08 공개, 발명의 명칭: 활선용 절연 고소작업 붐장치)에 개시되어 있다.The background technology of the present invention is disclosed in Korean Patent Application Laid-Open No. 10-2018-0002403 (published on Jan. 8, 2018, title of the invention: Insulated high-place work boom device for live wires).

본 발명은 작업자가 활선상태의 전력선과 직접 접촉하지 않고 안전하게 전력설비 점검, 교체를 수행할 수 있는 간접활선용 완철을 이용한 간접활선 작업방법을 제공하는데 그 목적이 있다.An object of the present invention is to provide an indirect live wire working method using a full iron for an indirect live wire that allows an operator to safely inspect and replace power facilities without direct contact with the live power line.

본 발명에 따른 간접활선용 완철을 이용한 간접활선 작업방법은, 활선작업차의 버킷에 설치된 완철승강장치에 간접활선용 완철을 장착하는 가완철준비단계; 스틱형 절연공구를 사용해 전력선을 상기 간접활선용 완철에 결속하는 가완철및전선결속단계; 애자와 상기 전력선을 결속하는 바인드선 또는 바인드리스커버를 상기 스틱형 절연공구를 사용해 상기 애자로부터 분리하고, 상기 완철승강장치의 작동에 의해 상기 간접활선용 완철을 상승시켜 상기 전력선을 상기 애자로부터 이격시키는 바인더제거단계; 상기 애자를 포함한 전력설비를 점검하거나 교체하는 본작업단계; 상기 완철승강장치의 작동에 의해 상기 간접활선용 완철을 하강시켜 상기 전력선을 상기 애자측으로 하강시키고, 상기 스틱형 절연공구를 사용해 상기 바인드리스커버로 상기 전력선과 상기 애자를 결속하는 바인드리스커버설치단계; 및 상기 스틱형 절연공구를 사용해 상기 전력선을 상기 간접활선용 완철로부터 분리하는 가완철결속해제단계;를 포함하는 것을 특징으로 한다.According to the present invention, an indirect live wire working method using a slow wire for an indirect live wire is provided, comprising the steps of: a step of preparing for an indirect live wire by installing a full wire for an indirect live wire in a hard wire elevating device installed in a bucket of a live wire working vehicle; a step of binding the power line to the steel wire for the indirect live wire using a stick-type insulation tool and a wire binding step; A bind wire or a bindless cover that binds the insulator and the power line is separated from the insulator using the stick-type insulation tool, and the arm steel for the indirect live wire is raised by the operation of the lifting device to separate the power line from the insulator. binder removal step; This operation step of checking or replacing the power equipment including the insulator; A bindless cover installation step of lowering the steel wire for the indirect live wire by the operation of the steel lifting device to lower the power line toward the insulator, and binding the power line and the insulator with the bindless cover using the stick-type insulation tool; And it characterized in that it comprises a; and a moving iron binding releasing step of separating the power line from the steel for the indirect live wire by using the stick-type insulation tool.

상기 간접활선용 완철은, 수직방향으로 연장된 형상을 가지고 상기 완철승강장치에 장착되며, 상기 완철승강장치의 작동에 의해 승강되는 수직연장부; 상기 수직연장부의 상부에 수평방향으로 연장되게 형성되는 수평연장부; 및 상기 전력선을 결속가능한 구조를 가지고 상기 수평연장부에 설치되는 전선홀더부;를 포함하는 것을 특징으로 한다.The indirect live wire arm has a shape extending in a vertical direction and is mounted on the arm steel elevating device, and includes: a vertical extension part that is lifted by the operation of the slow arm elevating device; a horizontal extension portion formed to extend in a horizontal direction on an upper portion of the vertical extension portion; and a wire holder unit having a structure capable of binding the power line and installed in the horizontal extension unit.

상기 전선홀더부는, 상기 수평연장부의 둘레를 감싸며 설치되고, 상기 수평연장부를 따라 슬라이딩 이동되는 이동지지부; 상기 이동지지부의 상부에 결합되고, 상기 전력선이 하향 인입가능한 형상을 가지는 전선삽입부; 상기 전선삽입부에 회동가능하게 연결되고, 회동위치에 따라 상기 전선삽입부의 개방부를 개폐시키며, 상기 스틱형 절연공구를 걸 수 있는 제1걸림고리가 형성되는 개폐회동부; 및 상기 이동지지부를 관통하여 상기 수평연장부에 압접되고, 상기 스틱형 절연공구를 걸 수 있는 상기 제2걸림고리가 형성되는 압접체결부;를 포함하는 것을 특징으로 한다.The wire holder part is installed to surround the periphery of the horizontal extension part, the movable support part is slidably moved along the horizontal extension part; a wire insertion part coupled to the upper part of the movable support part and having a shape in which the power line can be drawn downward; an opening/closing rotation part rotatably connected to the wire insertion part, opening and closing the opening part of the wire insertion part according to a rotational position, and having a first locking ring for hanging the stick-type insulation tool; and a pressure-welding fastening part that passes through the movable support part and is press-contacted to the horizontal extension part, the second locking ring for hanging the stick-type insulating tool is formed.

상기 개폐회동부는, 상기 전선삽입부의 일측부에 회동가능하게 힌지연결되는 회동본체부; 상기 회동본체부의 단부에 슬라이딩 이동가능하게 설치되고, 상기 회동본체부의 회동 각도에 따라 상기 전선삽입부의 타측부에 형성된 걸림홈부에 끼워지거나 상기 걸림홈부로부터 이격되는 인출이동부; 상기 회동본체부의 내부에 설치되고, 상기 인출이동부를 상기 회동본체부의 내측으로 탄성가압하는 탄성부재; 및 상기 인출이동부의 단부에 상기 걸림홈부보다 확장된 너비로 형성되고, 상기 탄성부재의 탄성력에 의해 상기 전선삽입부와 압접되며, 상기 제1걸림고리가 형성되는 걸림단부;를 포함하는 것을 특징으로 한다.The opening/closing rotation unit may include: a rotating body unit hinged rotatably to one side of the wire insertion unit; a pull-out moving part that is slidably installed at the end of the pivoting body and fitted into a locking groove formed on the other side of the wire insertion part or spaced apart from the locking groove according to a rotation angle of the pivoting body; an elastic member installed inside the rotating body part and elastically pressing the withdrawal moving part to the inside of the rotating body part; and a locking end formed at an end of the withdrawal moving part with a width wider than the locking groove part, in pressure contact with the wire insertion part by the elastic force of the elastic member, and having the first locking ring formed thereon. do it with

상기 가완철및전선결속단계는, 상기 제2걸림고리에 상기 스틱형 절연공구를 걸고, 상기 수평연장부를 따라 이동시키면서, 상기 전선홀더부의 위치를 상기 전력선에 대응되게 조절하는 단계; 상기 전선삽입부를 개방시킨 상태로 상기 간접활선용 완철을 상승시켜 상기 전력선을 상기 전선삽입부에 인입시키는 단계; 및 상기 제1걸림고리에 상기 스틱형 절연공구를 걸고, 상기 개폐회동부를 폐쇄위치로 회동시켜 상기 전력선을 상기 전선삽입부에 결속하는 단계;를 포함하는 것을 특징으로 한다.The step of gawancheol and wire binding step includes: adjusting the position of the wire holder to correspond to the power line while hanging the stick-type insulating tool on the second hook and moving it along the horizontal extension; elevating the arm iron for indirect live wire in a state in which the wire insertion part is opened, and inserting the power line into the wire insertion part; and fastening the stick-type insulating tool to the first locking ring, and binding the power line to the wire insertion unit by rotating the opening/closing rotating unit to a closed position.

상기 가완철결속해제단계는, 상기 제1걸림고리에 상기 스틱형 절연공구를 걸고, 상기 개폐회동부를 개방위치로 회동시키는 단계; 및 상기 전선삽입부를 개방시킨 상태로 상기 간접활선용 완철을 하강시켜 상기 전력선과 상기 전선삽입부를 분리하는 단계;를 포함하는 것을 특징으로 한다.The step of releasing the gawan iron binding includes: hooking the stick-type insulating tool to the first locking ring, and rotating the opening and closing rotating part to an open position; and separating the power line and the wire insertion part by lowering the arm iron for the indirect live wire in a state in which the wire insertion part is opened.

상기 바인더제거단계는, 상기 스틱형 절연공구를 사용해 상기 바인드선을 상기 애자측으로 밀어 상기 바인드선의 권취 상태를 헐겁게 하고, 상기 바인드선과 상기 애자의 사이에 갭(gap)을 형성하는 단계; 상기 스틱형 절연공구를 상기 갭에 인입하여 상기 바인드선을 절단하고, 상기 전력선과 상기 애자간의 결속 상태를 해제하는 단계; 상기 간접활선용 완철을 상승시켜 상기 전력선과 상기 바인드선을 상기 애자로부터 이격시키는 단계; 및 상기 스틱형 절연공구를 이용해 상기 전력선으로부터 상기 바인드선을 제거하는 단계;를 포함하는 것을 특징으로 한다.The binder removing step may include: pushing the bind wire toward the insulator using the stick-type insulating tool to loosen the wound state of the bind wire, and forming a gap between the bind wire and the insulator; cutting the bind wire by inserting the stick-type insulating tool into the gap, and releasing the bonding state between the power line and the insulator; separating the power line and the bind wire from the insulator by raising the arm iron for the indirect live wire; and removing the bind wire from the power line using the stick-type insulating tool.

상기 바인드리스커버는, 상기 전력선의 일측부를 감싸는 제1전선커버부; 상기 제1전선커버부와 연결되고, 상기 전력선의 타측부를 감싸는 제2전선커버부; 상기 제1전선커버부와 연결되고, 상기 애자의 일측부를 감싸는 제1애자커버부; 상기 제2전선커버부와 연결되고, 상기 애자의 타측부를 감싸는 제2애자커버부; 상기 전력선을 감싼 상태에서 중첩되게 배치되는 상기 제1전선커버부와 상기 제2전선커버부의 하부에 형성되는 암체결부; 및 상기 암체결부에 체결되며, 상기 제1전선커버부와 상기 제2전선커버부를 상호 결속시키는 결속부재;를 포함하는 것을 특징으로 한다.The bindless cover may include: a first electric wire cover part surrounding one side of the electric power line; a second wire cover part connected to the first wire cover part and surrounding the other side of the power line; a first insulator cover part connected to the first electric wire cover part and surrounding one side of the insulator; a second insulator cover part connected to the second electric wire cover part and surrounding the other side part of the insulator; an arm fastening part formed under the first electric wire cover part and the second electric wire cover part overlappingly arranged in a state in which the power line is wrapped; and a binding member that is fastened to the arm fastening part and binds the first electric wire cover part and the second electric wire cover part to each other.

상기 바인더제거단계는, 상기 스틱형 절연공구를 사용해 상기 결속부재를 상기 암체결부로부터 분리하는 단계; 상기 간접활선용 완철을 상승시켜 상기 전력선과 상기 제1전선커버부, 상기 제2전선커버부를 상기 애자로부터 이격시키는 단계; 및 상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부를 상기 전력선으로부터 분리하는 단계;를 포함하는 것을 특징으로 한다.The binder removing step may include: separating the binding member from the female fastening part using the stick-type insulating tool; separating the power line, the first electric wire cover part, and the second electric wire cover part from the insulator by elevating the arm iron for the indirect live wire; and separating the first electric wire cover part and the second electric wire cover part from the power line using the stick-type insulating tool.

상기 바인드리스커버설치단계는, 상기 간접활선용 완철을 하강시켜 상기 전력선을 상기 애자까지 하향 이동시키는 단계; 상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부를 상기 전력선에 걸치는 단계; 및 상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부의 하부를 겹쳐지게 홀딩한 상태로, 상기 암체결부에 상기 결속부재를 체결하며, 상기 전력선을 상기 애자에 결속시키는 단계;를 포함하는 것을 특징으로 한다.The step of installing the bindless cover includes the steps of moving the power line down to the insulator by lowering the arm iron for the indirect live wire; using the stick-type insulating tool to span the first electric wire cover part and the second electric wire cover part on the power line; and fastening the binding member to the arm fastening part in a state in which the lower parts of the first electric wire cover part and the second electric wire cover part are held overlappingly by using the stick-type insulating tool, and binding the power line to the insulator. It is characterized in that it contains;

본 발명에 따른 간접활선용 완철을 이용한 간접활선 작업방법은, 작업자가 활선상태의 전력선과 직접 접촉하지 않고, 전력선으로부터 이격된 위치에서 간접활선용 완철과 스틱형 절연공구, 바인드리스커버를 이용해 전력설비를 안전하게 점검하거나 교체할 수 있다. 이에 따라, 작업자가 전력선에 접촉함에 따라 발생되는 안전사고를 예방할 수 있고, 여름철에도 작업자가 절연장갑, 절연복 등을 착용해야 하던 기존과 비교해, 작업자의 작업 여건과 작업 효율을 현저히 향상시킬 수 있다.In the indirect live wire working method using the long iron for indirect live wire according to the present invention, the operator does not directly contact the live power line and uses a strong wire for indirect live wire, a stick-type insulation tool, and a bindless cover at a location spaced apart from the power line. Equipment can be safely inspected or replaced. Accordingly, it is possible to prevent a safety accident that occurs when the worker comes into contact with the power line, and compared to the existing where the worker had to wear insulating gloves, insulating clothes, etc. even in summer, the working conditions and work efficiency of the worker can be significantly improved. .

도 1은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법을 설명하고자 도시한 플로우차트이다.
도 2는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계를 설명하고자 도시한 플로우차트이다.
도 3은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 간접활선용 완철을 개략적으로 도시한 사시도이다.
도 4는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 가완철및전선결속단계를 설명하고자 도시한 개념도이다.
도 5는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계에 따라 바인드선을 제거하는 과정을 설명하고자 도시한 개념도이다.
도 6은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 바인드리스커버를 개략적으로 도시한 요부 분해사시도이다.
도 7은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 바인드리스커버를 설치한 상태를 개략적으로 도시한 사시도이다.
도 8은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계에서 전력선을 애자로부터 이격시킨 상태를 도시한 개념도이다.
도 9는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인드리스커버설치단계에서 전력선을 애자까지 하강시킨 상태를 도시한 개념도이다.
도 10은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 가완철결속해제단계를 설명하고자 도시한 개념도이다.
1 is a flowchart illustrating an indirect live wire working method using a long iron for indirect live wire according to an embodiment of the present invention.
2 is a flowchart illustrating the binder removal step of the indirect live wire working method using the slow iron for indirect live wire according to an embodiment of the present invention.
FIG. 3 is a perspective view schematically illustrating a long iron for indirect live wire used in an indirect live wire working method using a hard wire for indirect live wire according to an embodiment of the present invention.
FIG. 4 is a conceptual diagram illustrating the step of binding the wire and the wire of the indirect live wire working method using the slow wire for indirect live wire according to an embodiment of the present invention.
5 is a conceptual diagram illustrating a process of removing a bind wire according to a binder removal step of an indirect live wire working method using a hard iron for indirect live wire according to an embodiment of the present invention.
6 is an exploded perspective view schematically illustrating a bindless cover used in an indirect live wire working method using a long iron for indirect live wire according to an embodiment of the present invention.
7 is a perspective view schematically illustrating a state in which a bindless cover used for an indirect live wire working method using a full iron for indirect live wire according to an embodiment of the present invention is installed.
8 is a conceptual diagram illustrating a state in which the power line is spaced apart from the insulator in the binder removal step of the indirect live wire working method using the full iron for the indirect live wire according to an embodiment of the present invention.
9 is a conceptual diagram illustrating a state in which the power line is lowered to the insulator in the bindless cover installation step of the indirect live wire working method using the full iron for indirect live wire according to an embodiment of the present invention.
FIG. 10 is a conceptual diagram illustrating the step of releasing the binding iron of an indirect live wire using a long iron for an indirect live wire according to an embodiment of the present invention.

이하 첨부된 도면들을 참조하여 본 발명에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 실시예를 설명한다. 이러한 과정에서 도면에 도시된 선들의 두께나 구성요소의 크기 등은 설명의 명료성과 편의상 과장되게 도시되어 있을 수 있다. 또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로써, 이는 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다. 그러므로, 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Hereinafter, an embodiment of an indirect live wire working method using a full iron for indirect live wire according to the present invention will be described with reference to the accompanying drawings. In this process, the thickness of the lines or the size of the components shown in the drawings may be exaggerated for clarity and convenience of explanation. In addition, the terms to be described later are terms defined in consideration of functions in the present invention, which may vary according to intentions or customs of users and operators. Therefore, definitions of these terms should be made based on the content throughout this specification.

도 1은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법을 설명하고자 도시한 플로우차트이고, 도 2는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계를 설명하고자 도시한 플로우차트이며, 도 3은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 간접활선용 완철을 개략적으로 도시한 사시도이다.1 is a flowchart illustrating an indirect live wire working method using a hard iron for indirect live wire according to an embodiment of the present invention, and FIG. 2 is an indirect live wire work using a hard wire for indirect live wire according to an embodiment of the present invention. It is a flowchart illustrating the binder removal step of the method, and FIG. 3 is a perspective view schematically showing the hard iron for indirect live wire used in the working method for indirect live wire using hard iron for indirect live wire according to an embodiment of the present invention.

도 4는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 가완철및전선결속단계를 설명하고자 도시한 개념도이고, 도 5는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계에 따라 바인드선을 제거하는 과정을 설명하고자 도시한 개념도이다.4 is a conceptual diagram illustrating the step of tying the straight wire and the wire of the indirect live wire working method using the slow wire for indirect live wire according to an embodiment of the present invention, and FIG. 5 is an indirect live wire for indirect live wire according to an embodiment of the present invention It is a conceptual diagram to explain the process of removing the bind wire according to the binder removal step of the indirect live wire working method using the slow iron.

도 6은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 바인드리스커버를 개략적으로 도시한 요부 분해사시도이고, 도 7은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 바인드리스커버를 설치한 상태를 개략적으로 도시한 사시도이며, 도 8은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계에서 전력선을 애자로부터 이격시킨 상태를 도시한 개념도이다.6 is an exploded perspective view schematically showing a bindless cover used in an indirect live wire working method using a hard iron for indirect live wire according to an embodiment of the present invention, and FIG. 7 is an indirect live wire according to an embodiment of the present invention. It is a perspective view schematically showing a state in which a bindless cover used for an indirect live wire working method using an indirect live wire is installed, and FIG. It is a conceptual diagram showing the state in which the power line is separated from the insulator in the step.

도 9는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인드리스커버설치단계에서 전력선을 애자까지 하강시킨 상태를 도시한 개념도이고, 도 10은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 가완철결속해제단계를 설명하고자 도시한 개념도이다.9 is a conceptual diagram illustrating a state in which the power line is lowered to the insulator in the bindless cover installation step of the indirect live wire working method using the full iron for indirect live wire according to an embodiment of the present invention, and FIG. 10 is an embodiment of the present invention. It is a conceptual diagram to explain the step of unbonding the indirect live wire using the slow iron for the indirect live wire according to the following.

본 발명의 일실시예에 따른 간접활선용 완철(20)을 이용한 간접활선 작업방법은, 작업자가 활선상태의 전력선(44)과 직접 접촉하지 않고, 간접활선용 완철(20)과 스틱형 절연공구(30), 바인드리스커버(46)를 이용해 전력설비(40)를 점검하거나 교체하는 작업방법에 관한 것이다.In the indirect live wire working method using the slow wire 20 for indirect live wire according to an embodiment of the present invention, the operator does not directly contact the live wire 44, and the indirect live wire hard wire 20 and the stick-type insulation tool (30), it relates to a work method of inspecting or replacing the power facility 40 using the bindless cover (46).

도 1을 참조하면, 본 발명의 일실시예에 따른 간접활선용 완철(20)을 이용한 간접활선 작업방법은 가완철준비단계(S1), 가완철및전선결속단계(S2), 바인더제거단계(S3), 본작업단계(S4), 바인드리스커버설치단계(S5), 가완철결속해제단계(S6)를 순차적으로 거친다.Referring to Figure 1, the indirect live wire working method using the slow wire for indirect live wire 20 according to an embodiment of the present invention includes a step for preparing a step (S1), a step for binding the wire and wire (S2), and a binder removal step ( S3), the main operation step (S4), the bindless cover installation step (S5), and the temporary binding release step (S6) are sequentially performed.

가완철준비단계(S1)에서는 활선작업차의 버킷(11)에 설치된 완철승강장치(12)에 간접활선용 완철(20)을 장착한다(도 3 참조). 가완철및전선결속단계(S2)에서는 스틱형 절연공구(30)를 사용해 전력선(44)을 간접활선용 완철(20)에 결속한다(도 3, 도 4 참조).In the gawancheol preparation step (S1), the indirect live wire rod 20 is mounted on the full wire lifting device 12 installed in the bucket 11 of the live wire work vehicle (refer to FIG. 3). In the step (S2) of binding the wire and the wire, the power line 44 is bound to the steel wire 20 for the indirect live wire using the stick-type insulating tool 30 (see FIGS. 3 and 4).

바인더제거단계(S3)에서는 애자(43)와 전력선(44)을 결속하는 바인드선(45) 또는 바인드리스커버(46)를 스틱형 절연공구(30)를 사용해 애자(43)로부터 분리하고, 완철승강장치(12)의 작동에 의해 간접활선용 완철(20)을 상승시켜 전력선(44)을 애자(43)로부터 이격시킨다(도 5, 도 6, 도 7, 도 8 참조).In the binder removal step (S3), the bind wire 45 or the bindless cover 46 that binds the insulator 43 and the power line 44 is separated from the insulator 43 using a stick-type insulation tool 30, By the operation of the lifting device 12, the indirect live wire arm 20 is raised to separate the power line 44 from the insulator 43 (refer to FIGS. 5, 6, 7, and 8).

본작업단계(S4)에서는 애자(43)를 포함한 전력설비(40)를 점검하거나 교체한다. 바인드리스커버설치단계(S5)는 완철승강장치(12)의 작동에 의해 간접활선용 완철(20)을 하강시켜 전력선(44)을 애자(43)측으로 하강시키고, 스틱형 절연공구(30)를 사용해 바인드리스커버(46)로 전력선(44)과 애자(43)를 결속한다(도 7, 도 9 참조). 가완철결속해제단계(S6)에서는 스틱형 절연공구(30)를 사용해 전력선(44)을 간접활선용 완철(20)로부터 분리한다(도 10 참조).In this work step (S4), the power equipment 40 including the insulator 43 is checked or replaced. In the bindless cover installation step (S5), the arm steel 20 for indirect live wire is lowered by the operation of the steel lifting device 12 to lower the power line 44 to the insulator 43 side, and the stick-type insulation tool 30 is removed. Using a bindless cover 46, the power line 44 and the insulator 43 are bound (refer to FIGS. 7 and 9). In the step S6, the power line 44 is separated from the indirect live wire 20 by using a stick-type insulating tool 30 (see FIG. 10).

도 3을 참조하면, 본 발명의 일실시예에 따른 간접활선용 완철(20)은 수직연장부(21), 수평연장부(22), 전선홀더부(23)를 포함한다.Referring to FIG. 3 , the arm 20 for indirect live wire according to an embodiment of the present invention includes a vertical extension part 21 , a horizontal extension part 22 , and a wire holder part 23 .

수직연장부(21)는 수직방향으로 연장된 형상을 가지고 완철승강장치(12)에 장착되며, 완철승강장치(12)의 작동에 의해 승강된다. 활선작업차의 버킷(11)은 활선작업차의 붐의 단부에 배치되고, 작업자는 버킷(11)에 탑승한 상태에서 간접활선 작업을 수행하게 된다. 완철승강장치(12)로는 버킷(11)에 장착된 윈치를 적용할 수 있다. 윈치(winch)는 로프를 감거나 풀어낼 수 있는 권양기의 구조를 가진다.The vertical extension unit 21 has a shape extending in the vertical direction and is mounted on the wrought iron elevating device 12 , and is lifted by the operation of the wrought iron elevating device 12 . The bucket 11 of the live-line working vehicle is disposed at the end of the boom of the live-line working vehicle, and the operator performs the indirect live work while riding on the bucket 11 . A winch mounted on the bucket 11 can be applied as the hoisting device 12 for buckling. A winch has a structure of a hoist that can wind or unwind a rope.

로프의 단부를 수직연장부(21)의 하부에 형성된 고리(미도시)에 걸어 결속한 상태에서 윈치를 작동시키면, 로프의 단부의 위치 이동에 연동하여 수직연장부(21)가 위로 당겨져 상승하거나, 자중에 의해 하강하게 된다. 본 발명에 따른 완철승강장치(12)는 간접활선용 완철(20)을 승강이동시킬 수만 있다면, 상기와 같은 구성을 가지는 윈치를 포함하여 특정한 구조와 형상으로 한정되지 않는다.When the winch is operated in a state in which the end of the rope is hooked to a ring (not shown) formed at the lower part of the vertical extension 21, the vertical extension 21 is pulled upward in conjunction with the position movement of the end of the rope to rise or , it descends by its own weight. As long as it can lift and move the arm steel 20 for indirect live wire according to the present invention, it is not limited to a specific structure and shape, including a winch having the above configuration.

수평연장부(22)는 완철(42)에 대응되는 바 형상을 가지고, 수직연장부(21)의 상부에 수평방향으로 연장되게 형성된다. 전선홀더부(23)는 전력선(44)을 결속가능한 구조를 가지고, 수평연장부(22)에 설치된다. 전선홀더부(23)는 간접활선용 완철(20)측으로 이선하고자 하는 전력선(44)의 개수에 대응되는 복수개가 구비된다. 도 3을 참조하면, 본 발명의 일실시예에 따른 전선홀더부(23)는 이동지지부(24), 전선삽입부(25), 개폐회동부(28), 압접체결부(29)를 포함한다.The horizontal extension portion 22 has a bar shape corresponding to the arm convex portion 42 and is formed to extend in the horizontal direction on the upper portion of the vertical extension portion 21 . The wire holder part 23 has a structure capable of binding the power line 44 and is installed in the horizontal extension part 22 . A plurality of wire holder units 23 are provided corresponding to the number of power lines 44 to be moved toward the slow iron 20 side for indirect live wires. Referring to FIG. 3 , the wire holder part 23 according to an embodiment of the present invention includes a movable support part 24 , a wire insertion part 25 , an opening/closing rotation part 28 , and a press-fitting part 29 . .

이동지지부(24)는 전선홀더부(23) 중 수평연장부(22)에 장착되는 장치부로, 수평연장부(22)를 따라 슬라이딩 이동가능하게 설치된다. 수평연장부(22)는 사각형 단면 형상을 가지고, 이동지지부(24)는 전선홀더부(23)의 둘레를 감싸는 사각형 프레임 형상을 가진다. 이동지지부(24)는 작업자가 작용시키는 외력에 의해 수평연장부(22) 상의 목적한 위치로 자유롭게 직선 이동될 수 있다.The movable support part 24 is a device part mounted on the horizontal extension part 22 of the wire holder part 23 , and is installed to be slidably movable along the horizontal extension part 22 . The horizontal extension part 22 has a rectangular cross-sectional shape, and the movable support part 24 has a rectangular frame shape surrounding the circumference of the wire holder part 23 . The movable support part 24 can be freely linearly moved to a desired position on the horizontal extension part 22 by an external force applied by the operator.

전선삽입부(25)는 상부가 개방된 프레임 형상을 가지고, 이동지지부(24)의 상부에 결합된다. 전선삽입부(25)는 상부가 개방된 'ㄷ'자 단면 형상을 가진다. 즉 전선삽입부(25)이 상부에는 개방부(26)가 형성된다. 개방부(26)의 일측에는 개폐회동부(28)가 힌지결합되고, 개방부(26)의 타측에는 걸림홈부(27)가 형성된다. 전력선(44)은 전선삽입부(25)의 상부에 형성된 개방부(26)를 통해 전선삽입부25)의 내부로 하향 인입된다.The wire insertion part 25 has a frame shape with an open upper part, and is coupled to the upper part of the movable support part 24 . The wire insertion part 25 has a 'C'-shaped cross-sectional shape with an open top. That is, the open part 26 is formed in the upper part of the wire insertion part 25 . An opening/closing rotation part 28 is hinge-coupled to one side of the opening part 26 , and a locking groove part 27 is formed on the other side of the opening part 26 . The power line 44 is drawn downwardly into the wire inserting part 25 through the opening 26 formed at the upper part of the wire inserting part 25 .

개폐회동부(28)는 전선삽입부(25)의 개방부(26)를 개폐시키는 장치부로, 개방부(26)를 가로지를 수 있는 연장길이를 가지고, 전선삽입부(25)에 회동가능하게 연결된다. 개폐회동부(28)의 단부에는 스틱형 절연공구(30)를 걸 수 있는 제1걸림고리(285)가 형성된다. 도 3을 참조하면, 본 발명의 일실시예에 따른 개폐회동부(28)는 회동본체부(281), 인출이동부(282), 탄성부재(283), 걸림단부(284)를 포함한다.The opening/closing part 28 is a device part that opens and closes the opening 26 of the wire insertion part 25, has an extended length that can cross the opening 26, and is rotatable to the wire insertion part 25 connected A first locking ring 285 capable of hanging the stick-type insulating tool 30 is formed at an end of the opening and closing rotational part 28 . Referring to FIG. 3 , the opening/closing rotation unit 28 according to an embodiment of the present invention includes a rotating body unit 281 , a withdrawal moving unit 282 , an elastic member 283 , and a locking end portion 284 .

회동본체부(281)는 내부가 중공된 실린더 형상을 가지고, 전선삽입부(25)의 일측부에 회동가능하게 힌지연결된다. 인출이동부(282)는 회동본체부(281)의 단부에 슬라이딩 이동가능하게 설치된다. 인출이동부(282) 중 회동본체부(281)의 외부로 돌출되는 단부는 걸림홈부(27)를 통과할 수 있는 너비(직경)를 가진다. 인출이동부(282)는 회동본체부(281)의 회동 각도에 따라 전선삽입부(25)의 타측부에 형성된 걸림홈부(27)에 끼워지거나, 걸림홈부(27)로부터 이격된다.The rotating body 281 has a hollow cylinder shape and is hinged rotatably to one side of the wire insertion unit 25 . The withdrawal moving part 282 is installed slidably at the end of the rotating body part 281 . The end protruding to the outside of the rotating body portion 281 of the withdrawal moving portion 282 has a width (diameter) that can pass through the engaging groove portion 27 . The withdrawal moving part 282 is fitted in the locking groove part 27 formed on the other side of the wire insertion part 25 according to the rotation angle of the rotational body part 281 or is spaced apart from the locking groove part 27 .

회동본체부(281)가 하향 회동되어 인출이동부(282)가 걸림홈부(27)에 끼워진 상태에서, 전선삽입부(25)의 개방부(26)는 폐쇄된다. 회동본체부(281)가 상향 회동되어 인출이동부(282)가 걸림홀부(27)의 외부로 이격된 상태에서, 전선삽입부(25)의 개방부(26)는 개방된다.In a state in which the pivoting body 281 is rotated downward so that the withdrawing moving part 282 is fitted in the engaging groove part 27, the open part 26 of the wire inserting part 25 is closed. In a state in which the rotating body portion 281 is rotated upward so that the withdrawing moving portion 282 is spaced apart from the engaging hole portion 27, the open portion 26 of the wire insertion portion 25 is opened.

탄성부재(283)는 인출이동부(282)를 회동본체부(281)의 내측으로 탄성가압하는 장치부로, 코일스프링의 구조를 가지고 회동본체부(281)의 내부에 설치된다. 탄성부재(283)는 인출이동부(282)의 둘레에 끼워진 상태로 회동본체부(281)의 내부에 설치될 수 있다. 탄성부재(283)의 일단부는 회동본체부(281)의 일단부와 접하고, 탄성부재(283)의 타단부는 인출이동부(282)의 내측단부와 접하게 설치된다.The elastic member 283 is a device part for elastically pressing the withdrawal moving part 282 to the inside of the rotating body part 281 , and has a coil spring structure and is installed inside the rotating body part 281 . The elastic member 283 may be installed inside the rotating body 281 in a state of being fitted around the withdrawing moving part 282 . One end of the elastic member 283 is in contact with one end of the rotating body portion 281 , and the other end of the elastic member 283 is installed in contact with the inner end of the withdrawal moving unit 282 .

걸림단부(284)는 인출이동부(282)의 회동단부에 걸림홈부(27)보다 확장된 너비로 형성된다. 걸림단부(284)에는 제1걸림고리(285)가 형성된다. 제1걸림고리(285)를 잡아당기면, 인출이동부(282)가 회동본체부(281)의 외부로 당겨져 이동되며, 회동본체부(281)와 함께 이루는 길이가 신장된다.The locking end 284 is formed with a wider width than the locking groove 27 at the pivoting end of the withdrawal moving part 282 . A first engaging ring 285 is formed at the engaging end 284 . When the first locking ring 285 is pulled, the withdrawal moving part 282 is pulled out of the rotating body part 281 and moved, and the length formed together with the rotating body part 281 is extended.

이와 같이 인출이동부(282)를 회동본체부(281)의 외부로 당겨 이동시킨 상태에서, 인출이동부(282)를 걸림단부(284)에 끼우고, 제1걸림고리(285)를 당기는 힘을 해제하면, 탄성부재(283)의 탄성력에 의해 걸림단부(284)가 전선삽입부(25)와 압접되며, 개폐회동부(28)가 전선삽입부(25)의 개방부(26)를 폐쇄시킴과 동시에 전선삽입부(25)와 결속된다.In this way, in the state in which the withdrawal moving part 282 is pulled to the outside of the rotating body part 281 and moved, the withdrawing moving part 282 is inserted into the locking end 284, and the force of pulling the first locking ring 285 When released, the locking end 284 is in press-contact with the wire insertion portion 25 by the elastic force of the elastic member 283 , and the opening/closing rotating portion 28 closes the open portion 26 of the wire insertion portion 25 . Simultaneously, it is coupled with the wire insertion unit 25 .

압접체결부(29)는 이동지지부(24)의 하부를 관통하여 수평연장부(22)의 하부에 압접된다. 압접체결부(29)에는 스틱형 절연공구(30)를 걸 수 있는 제2걸림고리(295)가 형성된다. 이동지지부(24)를 목적한 위치로 이동시킨 상태에서 제2걸림고리(295)에 스틱형 절연공구(30)를 걸어 회전시킴으로써 이동지지부(24)를 수평연장부(22)상의 설정 위치에 견고하게 고정시킬 수 있다.The press-fitting part 29 penetrates the lower part of the movable support part 24 and is press-contacted to the lower part of the horizontal extension part 22 . A second locking ring 295 on which the stick-type insulating tool 30 can be hung is formed in the pressure-bonding part 29 . In a state in which the movable support part 24 is moved to the desired position, the stick-type insulating tool 30 is hung on the second locking ring 295 and rotated to make the movable support part 24 firm at the set position on the horizontal extension part 22 . can be fixed firmly.

도 1을 참조하면, 본 발명의 일실시예에 따른 가완철및전선결속단계(S2)에서는, 전선홀더부(23)의 위치를 전력선(44)에 대응되게 조절하는 단계(S2-1)와, 간접활선용 완철(20)을 상승시켜 전력선(44)을 전선삽입부(25)에 인입시키는 단계(S2-2)와, 전력선(44)을 상기 전선삽입부(25)에 결속하는 단계(S2-3)를 순차적으로 거쳐 이루어진다.Referring to Figure 1, in the step (S2) of gawancheol and wire binding according to an embodiment of the present invention, adjusting the position of the wire holder part 23 to correspond to the power wire 44 (S2-1) and , the step of raising the arm iron 20 for indirect live wire and inserting the power line 44 into the wire insertion part 25 (S2-2), and the steps of binding the power line 44 to the wire insertion part 25 ( S2-3) is sequentially performed.

전선홀더부(23)의 위치를 전력선(44)에 대응되게 조절하는 단계(S2-1)에서는 수평연장부(22) 상의 임의의 지점에 위치한 복수개의 전선홀더부(23)를 복수개의 전력선(44) 각각에 대응되는 위치로 이동시킨다. 이러한 작업은, 작업자가 제2걸림고리(295)에 갈고리 형상의 선단부를 가지는 스틱형 절연공구(30)를 걸고, 수평연장부(22)를 따라 목적한 위치로 이동시킨 후, 제2걸림고리(295)를 회전시켜 압압체결부(29)를 수평연장부(22)에 압접, 고정시키는 과정을 거쳐 이루어질 수 있다.In the step (S2-1) of adjusting the position of the wire holder part 23 to correspond to the power line 44, a plurality of wire holder parts 23 located at any point on the horizontal extension part 22 are connected to a plurality of power lines ( 44) Move it to the position corresponding to each. In this operation, the operator hangs the stick-type insulating tool 30 having a hook-shaped tip on the second locking ring 295 and moves it to the desired position along the horizontal extension 22, then the second locking ring By rotating the 295, it can be achieved through a process of press-contacting the press-fitting part 29 to the horizontal extension part 22 and fixing it.

간접활선용 완철(20)을 상승시켜 전력선(44)을 전선삽입부(25)에 인입시키는 단계(S2-2)는, 전선삽입부(25)를 개방시킨 상태에서, 도 4에 도시된 바와 같이 전력선(44)이 전선삽입부(25)에 인입되는 위치까지 간접활선용 완철(20)을 상승시키는 과정을 거쳐 이루어질 수 있다. 간접활선용 완철(20)을 상승시키는 작업은, 완철승강장치(12)를 상승 작동시킴으로써, 보다 구체적으로는 로프가 감기는 방향으로 풀리를 정회전시킴으로써 이루어질 수 있다. The step (S2-2) of raising the stiff wire 20 for indirect live wire and inserting the power line 44 into the wire insertion part 25 is as shown in FIG. 4 with the wire insertion part 25 open. As such, it can be achieved through a process of raising the armrest 20 for indirect live wire to a position where the power line 44 is inserted into the wire insertion unit 25 . The operation of raising the arm iron 20 for indirect live wire may be performed by operating the arm iron elevating device 12 upward, and more specifically, by rotating the pulley forward in the direction in which the rope is wound.

전력선(44)을 전선삽입부(25)에 결속하는 단계(S2-3)는 도 3에 도시된 바와 같이 제1걸림고리(285)에 갈고리 형상의 선단부를 가지는 스틱형 절연공구(30)를 걸고, 스틱형 절연공구(30)를 이용해 인출이동부(282)를 회동본체부(281)의 외부로 보다 인출되게 당긴 상태에서, 개폐회동부(28)를 폐쇄위치로 하향 회동시키는 과정을 거쳐 이루어질 수 있다. 인출이동부(282)가 걸림홈부(27)에 끼워진 상태에서, 작업자가 인출이동부(282)를 당기고 있던 외력을 해제하면, 걸림단부(284)가 탄성부재(283)의 탄성력에 의해 전선삽입부(25)에 자연히 밀착, 압접된다.The step (S2-3) of binding the power line 44 to the wire insertion part 25 is a stick-type insulation tool 30 having a hook-shaped tip on the first locking ring 285 as shown in FIG. 3 . In a state in which the withdrawing moving part 282 is pulled out more to the outside of the rotating body 281 using the stick-type insulating tool 30, the opening/closing rotating unit 28 is rotated downwardly to the closed position. can be done When the worker releases the external force pulling the withdrawal moving part 282 in a state where the withdrawing moving part 282 is inserted into the engaging groove part 27 , the engaging end 284 is inserted into the wire by the elastic force of the elastic member 283 . It is naturally in close contact with the part 25 and press-contacted.

도 2의 (a)를 참조하면, 본 발명의 일실시예에 따른 바인더제거단계(S3)는 바인드선(45)과 애자(43)의 사이에 갭(gap)을 형성하는 단계(S3-1)와, 전력선(44)과 애자(43)간의 결속 상태를 해제하는 단계(S3-2)와, 전력선(44)과 바인드선(45)을 애자(43)로부터 이격시키는 단계(S3-3)와, 전력선(44)으로부터 바인드선(45)을 제거하는 단계(S3-4)를 순차적으로 거쳐 이루어질 수 있다. Referring to Figure 2 (a), the binder removal step (S3) according to an embodiment of the present invention is a step of forming a gap (gap) between the bind wire 45 and the insulator (43) (S3-1) ) and releasing the bonding state between the power line 44 and the insulator 43 (S3-2), and separating the power line 44 and the bind wire 45 from the insulator 43 (S3-3) and removing the bind line 45 from the power line 44 ( S3 - 4 ) in sequence.

기존에 애자(43)와 전력선(44)을 상호 결속시킴에 있어서는, 주로 바인드선(45) 또는 바인드리스커버(46)이 이용되고 있다. 바인드선(45)을 이용해 애자(43)와 전력선(44)을 상호 결속시킴에 있어서는, 도 5의 (a)에 도시된 바와 같이 바인드선(45)의 중간부를 애자(43)의 둘레에 밀착되게 권취하고, 바인드선(45)의 양단부를 전력선(44)의 둘레에 밀착되게 권취시킨 구조를 가진다.Conventionally, in binding the insulator 43 and the power line 44 to each other, the bind wire 45 or the bindless cover 46 is mainly used. When the insulator 43 and the power line 44 are mutually bound using the bind wire 45, the middle part of the bind wire 45 is in close contact with the insulator 43 as shown in FIG. It has a structure in which both ends of the bind wire 45 are wound in close contact with the periphery of the power line 44 .

바인드선(45)과 애자(43)의 사이에 갭(gap)을 형성하는 단계(S3-1)에서는, 도 5의 (b)에 도시된 바와 같이 전력선(44)을 감쌀 수 있는 집게 구조의 선단부를 가지는 스틱형 절연공구(30)를 사용해 전력선(44)에 권취된 바인드선(45)의 양단부를 애자(43)측으로 밀어낸다. 상기와 같이 바인드선(45)의 양단부를 애자(43)측으로 보다 밀집되게 밀어내면, 바인드선(45)의 권취 상태가 헐거워짐과 동시에 바인드선(45)과 애자(43)의 사이에 갭(gap)이 형성된다.In the step (S3-1) of forming a gap between the bind wire 45 and the insulator 43, as shown in FIG. Both ends of the bind wire 45 wound around the power line 44 are pushed toward the insulator 43 side using a stick-type insulating tool 30 having a tip end. As described above, when both ends of the bind wire 45 are pushed more densely toward the insulator 43, the winding state of the bind wire 45 is loosened and a gap between the bind wire 45 and the insulator 43 ( gap) is formed.

전력선(44)과 애자(43)간의 결속 상태를 해제하는 단계(S3-2)에서는, 커터 구조의 선단부를 가지는 스틱형 절연공구(30)의 일측 절단날부를, 도 5의 (c)에 도시된 바와 같이 바인드선(45)과 애자(43)의 사이에 형성된 갭에 인입하여 바인드선(45)을 절단한다. 상기와 같이 바인드선(45)을 절단함으로써, 전력선(44)과 애자(43)간의 결속 상태가 해제된다. 이때, 바인드선(45)의 중간부는 애자(43)의 둘레에 권취된 상태로 잔류될 수 있고, 바인드선(45)의 양단부는 전력선(44)에 권취된 상태로 잔류될 수 있다.In the step (S3-2) of releasing the bonding state between the power line 44 and the insulator 43, the cutting blade on one side of the stick-type insulating tool 30 having the tip of the cutter structure is shown in FIG. 5(c). As shown, the bind wire 45 is cut by entering the gap formed between the bind wire 45 and the insulator 43 . By cutting the bind wire 45 as described above, the bonding state between the power line 44 and the insulator 43 is released. In this case, the middle portion of the bind wire 45 may remain wound around the insulator 43 , and both ends of the bind wire 45 may remain wound around the power line 44 .

전력선(44)과 바인드선(45)을 애자(43)로부터 이격시키는 단계(S3-3)에서는 도 4에 도시된 바와 같이 전력선(44)의 설치 높이에 대응되는 높이에 위치되는 간접활선용 완철(20)을, 도 8에 도시된 바와 같이 보다 상승시켜 전력선(44)을 애자(43)로부터 이격시킨다. 간접활선용 완철(20)을 상승시키는 작업은, 완철승강장치(12)를 상승 작동시킴으로써, 보다 구체적으로는 로프가 감기는 방향으로 풀리를 정회전시킴으로써 이루어질 수 있다. In the step (S3-3) of separating the power line 44 and the bind wire 45 from the insulator 43, as shown in FIG. (20), as shown in FIG. 8, more elevated to separate the power line 44 from the insulator (43). The operation of raising the arm iron 20 for indirect live wire may be performed by operating the arm iron elevating device 12 upward, and more specifically, by rotating the pulley forward in the direction in which the rope is wound.

전력선(44)으로부터 바인드선(45)을 제거하는 단계(S3-4)는, 작업자가 갈고리 구조의 선단부, 집게 구조의 선단부, 커터 구조의 선단부를 가지는 스틱형 절연공구(30)를 선택적, 복합적으로 활용하여, 전력선(44)에 권취된 상태로 잔류된 바인드선(45)의 양단부를 전력선(44)으로부터 분리시키는 이탈력, 하향력을 작용시킴으로써 이루어질 수 있다.In the step (S3-4) of removing the bind wire 45 from the power line 44, the operator selects a stick-type insulating tool 30 having a tip of a hook structure, a tip of a tongs structure, and a tip of a cutter structure. This can be achieved by applying a breakaway force and a downward force that separates both ends of the bind wire 45 remaining in a state wound on the power line 44 from the power line 44 .

도 6, 도 7을 참조하면, 본 발명의 일실시예에 따른 바인드리스커버(46)는 제1전선커버부(461), 제2전선커버부(462), 제1애자커버부(463), 제2애자커버부(464), 암체결부(465), 결속부재(466)를 포함한다.6 and 7, the bindless cover 46 according to an embodiment of the present invention includes a first wire cover part 461, a second wire cover part 462, and a first insulator cover part 463. , and a second insulator cover portion 464 , an arm fastening portion 465 , and a binding member 466 .

제1전선커버부(461)는 전력선(44)의 일측부를 커버하는 장치부로, 반원형 단면 형상을 가지고 직선형으로 연장되게 형성된다. 제2전선커버부(462)는 전력선(44)의 타측부를 커버하는 장치부로, 제1전선커버부(461)와 대칭되는 형상을 가지며, 상부가 제1전선커버부(461)와 연결된다. 제1전선커버부(461)와 제2전선커버부(462)는 도 6에 도시된 바와 같이 상호간의 연결부를 중심으로 하여 하부가 서로 이격되게 벌어질 수 있다.The first electric wire cover part 461 is a device part that covers one side of the electric power line 44, has a semicircular cross-sectional shape and is formed to extend in a straight line. The second electric wire cover part 462 is a device part that covers the other side of the power line 44 , and has a shape symmetrical to the first electric wire cover part 461 , and the upper part is connected to the first electric wire cover part 461 . . As shown in FIG. 6 , the lower portions of the first electric wire cover part 461 and the second electric wire cover part 462 may be spaced apart from each other with respect to the mutual connection part.

제1애자커버부(463)는 애자(43)의 일측부를 감싸는 장치부로, 제1전선커버부(461)의 중간부에 제1전선커버부(461)와 일체로 형성된다. 제2애자커버부(464)는 에자(43)의 타측부를 감싸는 장치부로, 제2전선커버부(462)의 중간부에 제2전선커버부(462)와 일체로 형성된다.The first insulator cover part 463 is a device part surrounding one side of the insulator 43 , and is integrally formed with the first wire cover part 461 in the middle part of the first wire cover part 461 . The second insulator cover part 464 is a device part surrounding the other side of the Ezar 43 , and is integrally formed with the second wire cover part 462 in the middle of the second wire cover part 462 .

암체결부(465)는 도 7에 도시된 바와 같이 전력선(44)을 감싼 상태에서 중첩되게 배치되는 제1전선커버부(461)와 제2전선커버부(462)에 형성된다. 제1전선커버부(461)와 제2전선커버부(462)의 하부가 겹쳐진 상태에서 제1전선커버부(461) 상에 형성된 암체결부(465)와 제2전선커버부(462) 상에 형성된 암체결부(465)는 상호 연통된다. 암체결부(465)는 암나사부의 구조를 가진다. 결속부재(466)는 수나사부의 구조를 가지고 암체결부(465)에 체결되며, 제1전선커버부(461)와 제2전선커버부(462)의 하부를 상호 결속시킨다.The female fastening part 465 is formed in the first electric wire cover part 461 and the second electric wire cover part 462 which are overlapped in a state that the electric power line 44 is wrapped, as shown in FIG. On the first wire cover part 461 and the second wire cover part 462, the lower portions of the first wire cover part 465 and the second wire cover part 462 are formed on the first wire cover part 461 in an overlapping state. The formed arm fastening portions 465 communicate with each other. The female fastening part 465 has a structure of a female screw part. The binding member 466 has a structure of a male screw part and is fastened to the female fastening part 465 , and binds the lower portions of the first wire cover part 461 and the second wire cover part 462 to each other.

도 2의 (b)를 참조하면, 본 발명의 다른 일실시예에 따른 바인더제거단계(S3)는 결속부재(466)를 바인드리스커버(46)로부터 분리하는 단계(S3-5)와, 전력선(44)과 바인드리스커버(46)를 애자(43)로부터 이격시키는 단계(S3-6)와, 바인드리스커버(46)를 전력선(44)으로부터 분리하는 단계(S3-7)를 순차적으로 거쳐 이루어질 수 있다. Referring to Figure 2 (b), the binder removal step (S3) according to another embodiment of the present invention is a step (S3-5) of separating the binding member 466 from the bindless cover 46, and the power line Step 44 and the step of separating the bindless cover 46 from the insulator 43 (S3-6) and the step of separating the bindless cover 46 from the power line 44 (S3-7) are sequentially passed through can be done

기존에 애자(43)와 전력선(44)을 상호 결속시키기 위해 설치된 바인드리스커버(46)는 다양한 형상과 구조의 실시예가 적용되고 있으며, 각각의 실시예들은 서로 다른 장착 방법 및 장착해제 방법을 가진다. 이에 따라 바인드리스커버(46)를 해제함에 있어서는, 다양한 실시예로 구현가능하다. 본 발명의 다른 일실시예에 따른 바인더제거단계(S3)는, 결속부재(466)를 포함하는 구조를 가지는 바인드리스커버(46)를 대상으로 한다.Existing embodiments of various shapes and structures are applied to the bindless cover 46 installed to mutually bind the insulator 43 and the power line 44, and each embodiment has a different mounting method and a different mounting method. . Accordingly, in releasing the bindless cover 46, it can be implemented in various embodiments. In the binder removal step (S3) according to another embodiment of the present invention, the bindless cover 46 having a structure including the binding member 466 is targeted.

결속부재(466)를 바인드리스커버(46)로부터 분리하는 단계(S3-5)에서는 바인드리스커버(46)의 암체결부(465)로부터 결속부재(466)를 분리한다. 도 7에 도시된 바와 같이 집게 구조의 선단부를 가지는 스틱형 절연공구(30)를 사용해 바인드리스커버(46)를 공중에서 홀딩, 지지한 상태에서, 볼트부재에 회전력을 부여할 수 있는 전동복스 구조의 선단부를 가지는 스틱형 절연공구(30)를 사용해 결속부재(466)에 회전력을 작용시킴으로써, 결속부재(466)를 회전시키고, 암체결부(465)로부터 분리할 수 있다. 결속부재(466)가 분리되면, 바인드리스커버(46)는 제1전선커버부(461)와 제2전선커버부(462)가 상호 이격되게 벌어진 상태로 전력선(44)에 걸쳐진 상태가 된다.In the step of separating the binding member 466 from the bindless cover 46 ( S3-5 ), the binding member 466 is separated from the female fastening portion 465 of the bindless cover 46 . As shown in FIG. 7 , a power box structure capable of imparting rotational force to a bolt member while holding and supporting the bindless cover 46 in the air using a stick-type insulating tool 30 having a tip end of a tongs structure By applying a rotational force to the binding member 466 using a stick-type insulating tool 30 having a tip of When the binding member 466 is separated, the bindless cover 46 is in a state spanning the power line 44 with the first wire cover part 461 and the second wire cover part 462 spaced apart from each other.

전력선(44)과 바인드리스커버(46)를 애자(43)로부터 이격시키는 단계(S3-6)에서는, 간접활선용 완철(20)을 상승시켜 전력선(44)과 전력선(44)에 걸쳐진 바인드리스커버(46)를 도 6에 도시된 바와 같이 애자(43)로부터 이격시킨다. 간접활선용 완철(20)을 상승시키는 작업은, 완철승강장치(12)를 상승 작동시킴으로써, 보다 구체적으로는 로프가 감기는 방향으로 풀리를 정회전시킴으로써 이루어질 수 있다. In the step (S3-6) of separating the power line 44 and the bindless cover 46 from the insulator 43, the bindingless wire spanning the power line 44 and the power line 44 by elevating the stiff wire 20 for the indirect live wire. The cover 46 is spaced apart from the insulator 43 as shown in FIG. 6 . The operation of raising the arm iron 20 for indirect live wire may be performed by operating the arm iron elevating device 12 upward, and more specifically, by rotating the pulley forward in the direction in which the rope is wound.

바인드리스커버(46)를 전력선(44)으로부터 분리하는 단계(S3-7)에서는, 집게 구조의 선단부, 갈고리 구조의 선단부를 가지는 스틱형 절연공구(30)를 선택적, 복합적으로 활용해, 바인드리스커버(46)에 이탈력, 하향력을 작용시켜 전력선(44)으로부터 분리한다.In the step (S3-7) of separating the bindless cover 46 from the power line 44, a stick-type insulating tool 30 having a tip of a tongs structure and a tip of a hook structure is selectively and complexly utilized, and bindless Separation force and downward force are applied to the cover 46 to separate it from the power line 44 .

본 발명에 따른 바인더제거단계(S3)를 거치면, 전력선(44)은 도 8에 도시된 바와 같이 애자(43)로부터 상향 이격되게 배치된 상태가 되고, 애자(43)를 포함한 전력설비(40)의 상측 및 주변에 작업에 필요한 여유공간부가 확보된다. 본작업단계(S4)에서는, 상기와 같이 확보된 여유공간을 활용하여 애자(43), 완철(42), 전주(41)를 포함한 전력설비(40)를 점검하거나 교체한다.After the binder removal step (S3) according to the present invention, the power line 44 is in a state arranged to be upwardly spaced apart from the insulator 43 as shown in FIG. 8, and the power facility 40 including the insulator 43 Free space necessary for work is secured on the upper side and around the . In this work step (S4), using the free space secured as described above to check or replace the power facility 40 including the insulator 43, the arm iron 42, the electric pole 41.

도 1을 참조하면, 본 발명의 일실시예에 따른 바인드리스커버설치단계(S5)는, 전력선(44)을 애자(43)까지 하향 이동시키는 단계(S5-1)와, 바인드리스커버(46)를 전력선(44)에 걸치는 단계(S5-2)와, 전력선(44)을 애자(43)에 결속시키는 단계(S5-3)를 포함한다.Referring to FIG. 1 , the binding-less cover installation step (S5) according to an embodiment of the present invention includes the steps of moving the power line 44 downward to the insulator 43 (S5-1), and the bindless cover 46 ) spanning the power line 44 (S5-2) and binding the power line 44 to the insulator 43 (S5-3).

전력선(44)을 애자(43)까지 하향 이동시키는 단계(S5-1)에서는 도 9에 도시된 바와 같이 간접활선용 완철(20)을 하강시켜 전력선(44)을 애자(43)까지 하향 이동시킨다. 간접활선용 완철(20)을 하강시키는 작업은, 완철승강장치(12)를 하강 작동시킴으로써, 보다 구체적으로는 로프가 풀리는 방향으로 풀리를 역회전시킴으로써 이루어질 수 있다.In the step (S5-1) of moving the power line 44 down to the insulator 43, as shown in FIG. 9, the arm 20 for indirect live wire is lowered to move the power line 44 down to the insulator 43. . The operation of lowering the arm iron 20 for indirect live wire may be performed by lowering the arm iron lifting device 12, and more specifically, by rotating the pulley in a reverse direction in the direction in which the rope is unwound.

바인드리스커버(46)를 전력선(44)에 걸치는 단계(S5-2)에서는 집게 구조의 선단부를 가지는 스틱형 절연공구(30)를 사용해 도 6에 도시된 바와 같이 바인드리스커버(46)를 전력선(44)에 걸친다.In the step (S5-2) of spanning the bindless cover 46 to the power line 44, as shown in FIG. 6, the bindless cover 46 is applied to the power line using a stick-type insulating tool 30 having a tip of a tongs structure. (44).

전력선(44)을 애자(43)에 결속시키는 단계(S5-3)에서는, 제1애자커버부(463)와 제2애자커버부(464)로 애자(43)의 상부를 감싼 상태에서, 집게 구조의 선단부를 가지는 스틱형 절연공구(30)를 사용해 제1전선커버부(461)와 제2전선커버부(462)의 하부를 겹쳐지게 홀딩하고, 암체결부(465)에 결속부재(466)를 체결한다. 상기와 같은 과정을 거쳐 바인드리스커버(46)를 이용해 전력선(44)을 애자(43)에 결속시킬 수 있다.In the step (S5-3) of binding the power line 44 to the insulator 43, the first insulator cover part 463 and the second insulator cover part 464 in the state wrapped the upper part of the insulator 43, tongs Hold the lower portions of the first wire cover part 461 and the second wire cover part 462 by using a stick-type insulating tool 30 having a tip of the structure to overlap, and the binding member 466 to the female fastening part 465 to conclude Through the process as described above, the power line 44 can be bound to the insulator 43 using the bindless cover 46 .

도 1을 참조하면, 본 발명의 일실시예에 따른 가완철결속해제단계(S6)는 전선삽입부(25)를 개방시키는 단계(S6-1)와, 전력선(44)과 전선삽입부(25)를 분리하는 단계(S6-2)를 포함한다.Referring to FIG. 1 , the step (S6) of releasing the gawan iron binding according to an embodiment of the present invention includes the step (S6-1) of opening the wire inserting part 25 (S6-1), the power line 44 and the wire inserting part 25 ) and separating (S6-2).

전선삽입부(25)를 개방시키는 단계(S6-1)에서는 도 3에 도시된 바와 같이 제1걸림고리(285)에 갈고리 구조의 선단부를 가지는 스틱형 절연공구(30)를 걸고, 개폐회동부(28)를 개방위치로 상향 회동시킨다. 전력선(44)과 상기 전선삽입부(25)를 분리하는 단계(S6-2)에서는 도 10에 도시된 바와 같이 전선삽입부(25)를 개방시킨 상태로 간접활선용 완철(20)을 하강시켜 전력선(44)으로부터 전선삽입부(25)를 분리한다.In the step (S6-1) of opening the wire insertion part 25, as shown in FIG. 3, the stick-type insulating tool 30 having the tip of the hook structure is hung on the first locking ring 285, and the opening and closing rotation part Rotate (28) upward to the open position. In the step (S6-2) of separating the power line 44 and the wire inserting part 25, as shown in FIG. 10, with the wire inserting part 25 open, the arm steel 20 for indirect live wire is lowered. Separate the wire insertion part 25 from the power line 44 .

상기와 같은 구성을 가지는 본 발명에 따른 간접활선용 완철(20)을 이용한 간접활선 작업방법에 의하면, 작업자가 활선상태의 전력선(44)과 직접 접촉하지 않고, 전력선(44)으로부터 이격된 위치에서 간접활선용 완철(20)과 스틱형 절연공구(30), 바인드리스커버(46)를 이용해 전력설비(40)를 안전하게 점검하거나 교체할 수 있다. 이에 따라, 작업자가 전력선에 접촉함에 따라 발생되는 안전사고를 예방할 수 있고, 여름철에도 작업자가 절연장갑, 절연복 등을 착용해야 하던 기존과 비교해, 작업자의 작업 여건과 작업 효율을 현저히 향상시킬 수 있다.According to the indirect live wire working method using the slow wire 20 for indirect live wire according to the present invention having the above configuration, the operator does not directly contact the live power line 44, but at a position spaced from the power line 44 The electric power equipment 40 can be safely inspected or replaced by using the steel wire 20 for indirect live wire, the stick-type insulating tool 30 and the bindless cover 46 . Accordingly, it is possible to prevent a safety accident that occurs when the worker comes into contact with the power line, and compared to the existing where the worker had to wear insulating gloves, insulating clothes, etc. even in summer, the working conditions and work efficiency of the worker can be significantly improved. .

본 발명은 도면에 도시된 실시예를 참고로 하여 설명되었으나, 이는 예시적인 것에 불과하며, 당해 기술이 속하는 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다. 따라서, 본 발명의 진정한 기술적 보호범위는 아래의 특허청구범위에 의해서 정하여져야 할 것이다.Although the present invention has been described with reference to the embodiment shown in the drawings, this is merely an example, and those skilled in the art to which various modifications and equivalent other embodiments are possible. will understand Accordingly, the true technical protection scope of the present invention should be defined by the following claims.

12 : 완철승강장치 20 : 간접활선용 완철
21 : 수직연장부 22 : 수평연장부
23 : 전선홀더부 24 : 이동지지부
25 : 전선삽입부 26 : 개방부
27 : 걸림홈부 28 : 개폐회동부
29 : 압접체결부 30 : 스틱형 절연공구
40 : 전력설비 41 : 전주
42 : 완철 43 : 애자
44 : 전력선 45 : 바인드선
46 : 바인드리스커버 281 : 회동본체부
282 : 인출이동부 283 : 탄성부재
284 : 걸림단부 285 : 제1걸림고리
295 : 제2걸림고리 461 : 제1전선커버부
462 : 제2전선커버부 463 : 제1애자커버부
464 : 제2애자커버부 465 : 암체결부
466 : 결속부재
12: full iron elevating device 20: full iron for indirect live wire
21: vertical extension 22: horizontal extension
23: wire holder part 24: moving support part
25: wire insertion part 26: open part
27: locking groove 28: opening and closing rotation part
29: pressure welding part 30: stick type insulation tool
40: power equipment 41: Jeonju
42: Wancheol 43: Insulator
44: power line 45: bind line
46: bindless cover 281: rotating body part
282: withdrawal moving part 283: elastic member
284: locking end 285: first locking ring
295: second hook 461: first wire cover part
462: second wire cover portion 463: first insulator cover portion
464: second insulator cover part 465: female fastening part
466: binding member

Claims (10)

활선작업차의 버킷에 설치된 완철승강장치에 간접활선용 완철을 장착하는 가완철준비단계;
스틱형 절연공구를 사용해 전력선을 상기 간접활선용 완철에 결속하는 가완철및전선결속단계;
애자와 상기 전력선을 결속하는 바인드선 또는 바인드리스커버를 상기 스틱형 절연공구를 사용해 상기 애자로부터 분리하고, 상기 완철승강장치의 작동에 의해 상기 간접활선용 완철을 상승시켜 상기 전력선을 상기 애자로부터 이격시키는 바인더제거단계;
상기 애자를 포함한 전력설비를 점검하거나 교체하는 본작업단계;
상기 완철승강장치의 작동에 의해 상기 간접활선용 완철을 하강시켜 상기 전력선을 상기 애자측으로 하강시키고, 상기 스틱형 절연공구를 사용해 상기 바인드리스커버로 상기 전력선과 상기 애자를 결속하는 바인드리스커버설치단계; 및
상기 스틱형 절연공구를 사용해 상기 전력선을 상기 간접활선용 완철로부터 분리하는 가완철결속해제단계;를 포함하고,
상기 간접활선용 완철은,
상기 전력선이 하향 인입가능한 형상을 가지는 전선삽입부; 및
상기 전선삽입부에 회동가능하게 연결되고, 회동위치에 따라 상기 전선삽입부의 개방부를 개폐시키며, 상기 스틱형 절연공구를 걸 수 있는 제1걸림고리가 형성되는 개폐회동부;를 포함하고,
상기 개폐회동부는,
내부가 중공된 실린더 형상을 가지고, 일단부가 상기 전선삽입부의 일측부에 회동가능하게 힌지연결되는 회동본체부;
상기 회동본체부의 타단부에 슬라이딩 이동가능하게 설치되고, 상기 회동본체부의 내부에 위치되는 내측단부와, 상기 회동본체부의 회동 각도에 따라 상기 전선삽입부의 타측부에 형성된 걸림홈부에 끼워지거나 상기 걸림홈부로부터 이격되고, 상기 걸림홈부에 끼워진 상태에서 상기 걸림홈부를 측방향으로 통과하는 회동단부가 구비되는 인출이동부;
상기 회동본체부의 내부에 설치되고 상기 인출이동부의 둘레에 끼워지며, 일단부는 상기 회동본체부의 타단부와 접하고, 타단부는 상기 인출이동부의 내측단부와 접하게 설치되어 상기 인출이동부를 상기 회동본체부의 내측으로 탄성가압하는 탄성부재; 및
상기 인출이동부의 회동단부 중 상기 걸림홈부를 측방향으로 통과하는 단부 상에 상기 걸림홈부보다 확장된 너비로 형성되고, 상기 제1걸림고리가 형성되며, 상기 회동단부가 상기 걸림홈부에 끼워진 상태에서 상기 전선삽입부의 외부에 측방향으로 돌출된 형태로 노출되고, 상기 탄성부재의 탄성력에 의해 상기 전선삽입부 중 외부에 노출되는 외측면과 압접되는 걸림단부;를 포함하며,
상기 가완철및전선결속단계는,
상기 제1걸림고리에 상기 스틱형 절연공구를 걸고, 상기 개폐회동부를 폐쇄위치로 회동시켜 상기 전력선을 상기 전선삽입부에 결속하는 단계;를 포함하되, 상기 제1걸림고리에 상기 스틱형 절연공구를 걸어 상기 회동본체부로부터 이격되는 방향으로 당긴 상태에서, 상기 개폐회동부를 하향 이동시킨 후, 상기 제1걸림고리를 당기는 힘을 해제하는 과정을 거쳐, 상기 회동단부를 상기 걸림홈부에 끼우고, 상기 걸림단부를 상기 전선삽입부의 외측면에 압접시키며,
상기 바인드리스커버는,
상기 전력선의 일측부를 감싸는 제1전선커버부;
상기 제1전선커버부와 연결되고, 상기 전력선의 타측부를 감싸는 제2전선커버부;
상기 제1전선커버부와 연결되고, 상기 애자의 일측부를 감싸는 제1애자커버부;
상기 제2전선커버부와 연결되고, 상기 애자의 타측부를 감싸는 제2애자커버부;
상기 전력선을 감싼 상태에서 중첩되게 배치되는 상기 제1전선커버부와 상기 제2전선커버부의 하부에 형성되고, 상기 제1전선커버부와 상기 제2전선커버부 상에 연속하여 연통되게 형성되고, 암나사의 구조를 가지는 암체결부; 및
수나사의 구조를 가지고 상기 암체결부에 체결되며, 상기 제1전선커버부와 상기 제2전선커버부를 상호 결속시키는 결속부재;를 포함하고,
상기 바인드리스커버설치단계는,
집게 구조를 가지는 상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부의 하부를 겹쳐지게 홀딩한 상태로, 상기 결속부재에 회전력을 작용시킬 수 있는 다른 상기 스틱형 절연공구를 사용해 상기 암체결부에 상기 결속부재를 체결하며, 상기 전력선을 상기 애자에 결속시키는 단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
a step of preparing for indirect live wire by attaching a steel rod for indirect live wire to the lifting device installed in the bucket of the live wire working vehicle;
Gawancheol and wire binding step of binding the power line to the indirect live wire using a stick-type insulation tool;
A bind wire or a bindless cover that binds the insulator and the power line is separated from the insulator using the stick-type insulation tool, and the arm steel for the indirect live wire is raised by the operation of the lifting device to separate the power line from the insulator. binder removal step;
This operation step of checking or replacing the power equipment including the insulator;
A bindless cover installation step of lowering the steel wire for the indirect live wire by the operation of the steel lifting device to lower the power line toward the insulator, and binding the power line and the insulator with the bindless cover using the stick-type insulation tool; and
Including; and a step of disconnecting the power line from the steel wire for the indirect live wire by using the stick-type insulation tool.
The full iron for the indirect live wire,
a wire insertion unit having a shape in which the power line can be drawn downward; and
It includes; an opening/closing rotation part which is rotatably connected to the wire insertion part, opens and closes the opening part of the wire insertion part according to the rotational position, and is formed with a first locking ring for hanging the stick-type insulation tool,
The opening and closing rotation part,
a rotating body part having a hollow cylinder shape, and one end of which is rotatably hinged to one side of the wire insertion part;
Installed slidably on the other end of the rotating body part, the inner end positioned inside the rotating body part, and the engaging groove formed on the other side of the wire insertion part according to the rotation angle of the rotating body part, or the engaging groove part a withdrawal moving unit spaced apart from and provided with a rotating end that passes through the engaging groove in a lateral direction while being fitted into the engaging groove;
It is installed inside the rotating body part and fitted around the withdrawing moving part, one end is in contact with the other end of the rotating body part, and the other end is installed in contact with the inner end of the withdrawing moving part to rotate the withdrawing moving part. An elastic member for elastically pressing the inside of the body portion; and
Among the pivoting ends of the withdrawal moving part, the first engaging ring is formed on an end passing through the engaging groove in the lateral direction, the width is wider than the engaging groove, the first engaging ring is formed, and the rotating end is fitted in the engaging groove Including; a locking end exposed in a protruding form to the outside of the wire insertion portion in the lateral direction, and press-contacted with an outer surface of the wire insertion portion exposed to the outside by the elastic force of the elastic member,
The Gawan-cheol and wire binding step,
Hanging the stick-type insulation tool on the first locking ring, and rotating the opening/closing rotation part to a closed position to bind the power line to the wire insertion part; including, the stick-type insulation on the first locking ring In a state where the tool is hung and pulled in a direction away from the rotational body, the opening and closing rotational part is moved downward, and then, through a process of releasing the force pulling the first locking ring, the rotational end is inserted into the locking groove and press-contact the engaging end to the outer surface of the wire insertion part,
The bindless cover,
a first wire cover part surrounding one side of the power line;
a second wire cover part connected to the first wire cover part and surrounding the other side of the power line;
a first insulator cover part connected to the first electric wire cover part and surrounding one side of the insulator;
a second insulator cover part connected to the second electric wire cover part and surrounding the other side part of the insulator;
It is formed under the first electric wire cover part and the second electric wire cover part which are overlapped in a state that the electric power line is wrapped, and is formed in continuous communication on the first electric wire cover part and the second electric wire cover part, a female fastening part having a female screw structure; and
It has a male screw structure and is fastened to the female fastening part, and includes a binding member for binding the first electric wire cover part and the second electric wire cover part to each other,
The step of installing the bindless cover,
Another stick-type insulation tool capable of applying a rotational force to the binding member while holding the lower portions of the first wire cover part and the second wire cover part overlappingly by using the stick-type insulation tool having a tongs structure Indirect live wire working method using a full iron for indirect live wire, comprising the step of fastening the binding member to the arm fastening part by using and binding the power line to the insulator.
제1항에 있어서,
상기 간접활선용 완철은,
수직방향으로 연장된 형상을 가지고 상기 완철승강장치에 장착되며, 상기 완철승강장치의 작동에 의해 승강되는 수직연장부;
상기 수직연장부의 상부에 수평방향으로 연장되게 형성되는 수평연장부; 및
상기 전력선을 결속가능한 구조를 가지고 상기 수평연장부에 설치되며, 상기 전선삽입부와 상기 개폐회동부가 구비되는 전선홀더부;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
According to claim 1,
The full iron for the indirect live wire,
a vertical extension part having a shape extending in a vertical direction and mounted on the wrought iron lifting device, which is lifted by the operation of the wrought iron hoisting device;
a horizontal extension portion formed to extend in a horizontal direction on an upper portion of the vertical extension portion; and
and a wire holder part having a structure capable of binding the power line and installed on the horizontal extension part, the wire inserting part and the opening/closing rotating part being provided.
제2항에 있어서,
상기 전선홀더부는,
상기 수평연장부의 둘레를 감싸며 설치되고, 상기 수평연장부를 따라 슬라이딩 이동되며, 상부에 상기 전선삽입부가 결합되는 이동지지부; 및
상기 이동지지부를 관통하여 상기 수평연장부에 압접되고, 상기 스틱형 절연공구를 걸 수 있는 제2걸림고리가 형성되는 압접체결부;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
3. The method of claim 2,
The wire holder part,
a moving support part installed to surround the periphery of the horizontal extension part, slidingly moved along the horizontal extension part, and to which the wire insertion part is coupled to the upper part; and
Indirect live wire work using a full iron for indirect live wire, comprising a; pressure-contacting part through the movable support part and being press-contacted to the horizontal extension part and having a second locking ring for hanging the stick-type insulating tool method.
삭제delete 제3항에 있어서,
상기 가완철및전선결속단계는,
상기 제2걸림고리에 상기 스틱형 절연공구를 걸고, 상기 수평연장부를 따라 이동시키면서, 상기 전선홀더부의 위치를 상기 전력선에 대응되게 조절하는 단계; 및
상기 전선삽입부를 개방시킨 상태로 상기 간접활선용 완철을 상승시켜 상기 전력선을 상기 전선삽입부에 인입시키는 단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
4. The method of claim 3,
The Gawan-cheol and wire binding step,
adjusting the position of the wire holder to correspond to the power line while hanging the stick-type insulation tool on the second hook and moving it along the horizontal extension; and
Indirect live wire working method using a hard wire for indirect live wire, comprising the; step of elevating the steel wire for the indirect live wire in a state in which the wire insertion part is opened to introduce the power line into the wire insertion part.
제1항에 있어서,
상기 가완철결속해제단계는,
상기 제1걸림고리에 상기 스틱형 절연공구를 걸고, 상기 개폐회동부를 개방위치로 회동시키는 단계; 및
상기 전선삽입부를 개방시킨 상태로 상기 간접활선용 완철을 하강시켜 상기 전력선과 상기 전선삽입부를 분리하는 단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
According to claim 1,
The Gawan iron binding release step is,
hooking the stick-type insulating tool to the first locking ring and rotating the opening/closing rotating part to an open position; and
and separating the power line and the wire insertion part by lowering the arm iron for the indirect live wire in a state where the wire insertion part is opened.
제1항에 있어서,
상기 바인더제거단계는,
상기 스틱형 절연공구를 사용해 상기 바인드선을 상기 애자측으로 밀어 상기 바인드선의 권취 상태를 헐겁게 하고, 상기 바인드선과 상기 애자의 사이에 갭(gap)을 형성하는 단계;
상기 스틱형 절연공구를 상기 갭에 인입하여 상기 바인드선을 절단하고, 상기 전력선과 상기 애자간의 결속 상태를 해제하는 단계;
상기 간접활선용 완철을 상승시켜 상기 전력선과 상기 바인드선을 상기 애자로부터 이격시키는 단계; 및
상기 스틱형 절연공구를 이용해 상기 전력선으로부터 상기 바인드선을 제거하는 단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
According to claim 1,
The binder removal step is
pushing the bind wire toward the insulator by using the stick-type insulating tool to loosen a wound state of the bind wire, and forming a gap between the bind wire and the insulator;
cutting the bind wire by inserting the stick-type insulating tool into the gap, and releasing the bonding state between the power line and the insulator;
separating the power line and the bind wire from the insulator by elevating the stiff wire for the indirect live wire; and
removing the bind wire from the power line using the stick-type insulating tool;
삭제delete 제1항에 있어서,
상기 바인더제거단계는,
상기 스틱형 절연공구를 사용해 상기 결속부재를 상기 암체결부로부터 분리하는 단계;
상기 간접활선용 완철을 상승시켜 상기 전력선과 상기 제1전선커버부, 상기 제2전선커버부를 상기 애자로부터 이격시키는 단계; 및
상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부를 상기 전력선으로부터 분리하는 단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
According to claim 1,
The binder removal step is
separating the binding member from the female fastening part using the stick-type insulating tool;
separating the power line, the first electric wire cover part, and the second electric wire cover part from the insulator by elevating the arm iron for the indirect live wire; and
and separating the first electric wire cover part and the second electric wire cover part from the power line using the stick-type insulating tool.
제1항에 있어서,
상기 바인드리스커버설치단계는,
상기 간접활선용 완철을 하강시켜 상기 전력선을 상기 애자까지 하향 이동시키는 단계; 및
상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부를 상기 전력선에 걸치는 단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
According to claim 1,
The step of installing the bindless cover,
moving the power line downward to the insulator by lowering the arm steel for the indirect live wire; and
Using the stick-type insulating tool to span the first electric wire cover part and the second electric wire cover part over the power line;
KR1020190095275A 2019-08-06 2019-08-06 Indirect hot-line working method using supporting bar for indirect hot-line work KR102372310B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190095275A KR102372310B1 (en) 2019-08-06 2019-08-06 Indirect hot-line working method using supporting bar for indirect hot-line work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190095275A KR102372310B1 (en) 2019-08-06 2019-08-06 Indirect hot-line working method using supporting bar for indirect hot-line work

Publications (2)

Publication Number Publication Date
KR20210016895A KR20210016895A (en) 2021-02-17
KR102372310B1 true KR102372310B1 (en) 2022-03-10

Family

ID=74731784

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190095275A KR102372310B1 (en) 2019-08-06 2019-08-06 Indirect hot-line working method using supporting bar for indirect hot-line work

Country Status (1)

Country Link
KR (1) KR102372310B1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220113110A (en) 2021-02-05 2022-08-12 주식회사 엘지에너지솔루션 Lamination Device Comprising Lamination Roll Capable of Adjusting Pressing Force and Electrode Assembly Manufactured Using the Same
KR102289230B1 (en) * 2021-04-14 2021-08-13 부성기술단 주식회사 Insulator utilization fixing device for installation of processing distribution line
KR102289231B1 (en) * 2021-04-20 2021-08-13 대승전력기술 (주) Auxiliary device for live wire work for maintenance of overhead distribution lines
KR102298331B1 (en) * 2021-04-28 2021-09-07 주식회사 민정테크 Device For Overhead Distribution Line
KR102373900B1 (en) * 2021-08-05 2022-03-18 (주)제이비씨 Overhead distribution line fixing mechanism with collision prevention function between wires
CN114284930B (en) * 2021-10-15 2023-08-29 国网浙江省电力有限公司衢州供电公司 Live working insulator replacement working method
KR102412949B1 (en) * 2022-01-04 2022-06-24 주식회사 세종이앤지 LP insulator indirect live wire replacement method
CN117154594B (en) * 2023-10-30 2024-01-12 天津滨电电力工程有限公司 Insulator binding wire dismantling tool for 10KV cable live working
CN117886206A (en) * 2024-03-18 2024-04-16 国网山东省电力公司东明县供电公司 Auxiliary replacing device for column type insulator

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200381079Y1 (en) * 2005-01-12 2005-04-11 대원전기 주식회사 Insulating wire-stranding roller for switching live wire
KR101963635B1 (en) 2018-06-15 2019-03-29 서광전기통신공사(주) Method for fixing power line using bindless line post cover instead of bind

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101974862B1 (en) * 2016-05-26 2019-05-03 양희성 Wire guide roller
KR101873421B1 (en) * 2016-11-08 2018-07-02 양희성 Spatial Extendible Mechanization Working Device Using Live line Working Vehicle
KR20180129622A (en) * 2017-05-26 2018-12-05 제룡산업 주식회사 Bindless cover

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200381079Y1 (en) * 2005-01-12 2005-04-11 대원전기 주식회사 Insulating wire-stranding roller for switching live wire
KR101963635B1 (en) 2018-06-15 2019-03-29 서광전기통신공사(주) Method for fixing power line using bindless line post cover instead of bind

Also Published As

Publication number Publication date
KR20210016895A (en) 2021-02-17

Similar Documents

Publication Publication Date Title
KR102372310B1 (en) Indirect hot-line working method using supporting bar for indirect hot-line work
CN100367589C (en) Electric wire removing roller for LP insulator and power distribution method of construction
KR102246338B1 (en) Overhead distribution facility for easy branching of overhead distribution lines to transformers
KR102228755B1 (en) Bypass cable pulling device for indirect live wire with temporary hook with automatic detachable fixing hook and cable head rotating connection clamp and installation method using it
KR102246336B1 (en) Overhead distribution line support facility equipped with overhead distribution line connection clamps
AU2002303016A1 (en) Electric wire removing roller for LP insulator and power distribution method of construction
JP5908774B2 (en) Low-voltage lead-in wire overhead method, removal method for power consumers, and lead-in tools used in these methods
CN110120643B (en) Uninterrupted power operation method for power line of ground potential distribution network
KR102327599B1 (en) Trap type live wire terminal insulation cap and indirect live wire insulation method of jumper wire using the same
KR101593000B1 (en) Crossarm lifting apparatus for live line work and live line job method
JP5065814B2 (en) Electric wire replacement method
CN214755178U (en) Bypass cable and electrified wire connecting device
CN105356371A (en) Same-tower multi-loop power transmission line strain insulator string electrification replacing method and device
CN105162028A (en) Method for replacing linear insulator of 220kV steel pipe tower in live working state
JP2020137268A (en) Cable clamp temporarily depositing tool and cable connection method for construction
KR102390332B1 (en) Apparatus and method for installing bypass cable to power pole
JP2000143190A (en) Device for wire connecting work
JP7422589B2 (en) Wire rope guide device for hanging insulators
KR102548499B1 (en) Fixing Equipment of Overhead Electric Power Line
JP5883729B2 (en) Overhead work method and support net
KR102644279B1 (en) Top-down fastening wire clamp for bypass cable head capable of safe indirect live wire operation and indirect live wire elastic connection method using the same
KR102519700B1 (en) Fixing Equipment of Overhead Transmission Line
CN216038145U (en) Composite insulator hoisting device for ultra-high voltage transmission line
CN217281254U (en) Auxiliary device for distribution network line
KR102437136B1 (en) Temporary hook for indirect live bypass cable pulling device with brake capable of adjusting the descending speed and indirect live bypass cable installation method using the same

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right