KR20210016895A - Indirect hot-line working method using supporting bar for indirect hot-line work - Google Patents

Indirect hot-line working method using supporting bar for indirect hot-line work Download PDF

Info

Publication number
KR20210016895A
KR20210016895A KR1020190095275A KR20190095275A KR20210016895A KR 20210016895 A KR20210016895 A KR 20210016895A KR 1020190095275 A KR1020190095275 A KR 1020190095275A KR 20190095275 A KR20190095275 A KR 20190095275A KR 20210016895 A KR20210016895 A KR 20210016895A
Authority
KR
South Korea
Prior art keywords
wire
power line
insulator
indirect live
wancheol
Prior art date
Application number
KR1020190095275A
Other languages
Korean (ko)
Other versions
KR102372310B1 (en
Inventor
한윤상
권호상
이우상
민병수
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR1020190095275A priority Critical patent/KR102372310B1/en
Publication of KR20210016895A publication Critical patent/KR20210016895A/en
Application granted granted Critical
Publication of KR102372310B1 publication Critical patent/KR102372310B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The present invention relates to an indirect live wire working method using an indirect live wire arm, which comprises: a temporal arm preparing step of mounting an indirect live wire arm on an arm lifting device installed in a bucket of a live wire working vehicle; a temporal arm and electric line binding step of binding a power line with the indirect live wire arm using a stick-type insulating tool; a binder removal step of separating a binding line or a binding-less cover for binding an insulator and the power line from the insulator using the stick-type insulating tool, and elevating the indirect live wire arm by an operation of the arm lifting device to separate the power line from the insulator; a main working step of inspecting or replacing a power facility including the insulator; a binding-less cover installing step of lowering the indirect live wire arm by the operation of the arm lifting device to lower the power line to an insulator side, and binding the power line and the insulator with the binding-less cover using the stick-type insulating tool; and a temporal arm unbinding step of separating the power line from the indirect live wire arm using the stick-type insulating tool. Accordingly, the working conditions and working efficiency of a worker can be remarkably improved.

Description

간접활선용 완철을 이용한 간접활선 작업방법{INDIRECT HOT-LINE WORKING METHOD USING SUPPORTING BAR FOR INDIRECT HOT-LINE WORK}Indirect live line work method using complete indirect live line {INDIRECT HOT-LINE WORKING METHOD USING SUPPORTING BAR FOR INDIRECT HOT-LINE WORK}

본 발명은 간접활선용 완철을 이용한 간접활선 작업방법에 관한 것으로서, 보다 상세하게는 간접활선 공법에 의해 전력설비 점검, 교체를 수행할 수 있는 간접활선용 완철을 이용한 간접활선 작업방법에 관한 것이다.The present invention relates to an indirect live line work method using wancheol for indirect live line, and more particularly, to an indirect live line work method using wancheol for indirect live line that can perform power facility inspection and replacement by indirect live line construction method.

일반적으로 핀장주의 가공배전선로에서 전선이선, 완철교체, 전주교체, LP애자교체를 수행하는 작업은 활선용 완철공법에 의해 전력선을 LP애자로부터 분리하여 상향 이격시킨 상태에서 이루어진다. 이는, 활선용 완철을 이용해 애자, 완철 등의 기자재를 교체하는 공법을 말한다.In general, the work of performing wire transfer, replacement of electric poles, replacement of electric poles, and replacement of LP insulators in the overhead distribution line of the pinnacle is performed in the state of separating the power line from the LP insulator by the complete ironing method for live wires and spaced upwards. This refers to a method of replacing equipment such as insulator and wancheol using live wire wancheol.

종래에, 이러한 공법은 작업자가 절연장갑, 절연복을 착용하고, 절연담요 등을 이용해 전력설비나 본인을 임시적으로 보호한 상태에서, 작업자가 전력선과 직접 접촉한 상태로 전력선을 활선용 완철과 결합시키는 작업, 전력선을 LP애자로부터 분리시키는 작업, 기자재 교체 후 전력선을 다시 LP애자와 결합하는 작업, 전력선을 활선용 완철과 분리하는 작업을 수행하는 직접활선 공법으로 시행되고 있다.Conventionally, such a construction method combines the power line with the live wire while the worker is in direct contact with the power line while the worker wears insulating gloves and clothing and temporarily protects the power equipment or the person using an insulation blanket. It is being implemented as a direct live wire construction method that performs the task of separating the power line from the LP insulator, combining the power line with the LP insulator after replacing equipment, and separating the power line from the live wire.

그러나 이러한 직접활선 공법에 의하면, 작업자의 현장 판단에 따라 절연담요 등을 이용해 임의로 절연 상태를 조성하고 있어, 작업자의 안전을 확보하기 어려울 뿐만 아니라, 특히 여름철 등에 절연장갑, 절연복을 착용상태에서 작업자가 느끼는 불편함으로 인해 작업 여건이 열악할 수 밖에 없고, 작업 효율이 낮다는 문제점이 있었다. 따라서, 이를 개선할 필요성이 요청된다.However, according to this direct live wire construction method, it is difficult to secure the safety of the worker, as the insulation state is arbitrarily created by using an insulation blanket according to the judgment of the worker on the site. Due to the discomfort felt, the working conditions were inevitably poor, and there was a problem that the work efficiency was low. Therefore, there is a need to improve this.

본 발명의 배경기술은 대한민국 공개특허공보 제10-2018-0002403호(2018.01.08 공개, 발명의 명칭: 활선용 절연 고소작업 붐장치)에 개시되어 있다.The background technology of the present invention is disclosed in Korean Patent Laid-Open Publication No. 10-2018-0002403 (published on January 8, 2018, title of invention: insulated high place work boom device for live wire).

본 발명은 작업자가 활선상태의 전력선과 직접 접촉하지 않고 안전하게 전력설비 점검, 교체를 수행할 수 있는 간접활선용 완철을 이용한 간접활선 작업방법을 제공하는데 그 목적이 있다.An object of the present invention is to provide an indirect live line work method using wancheol for indirect live lines that enables an operator to safely check and replace power facilities without direct contact with a live power line.

본 발명에 따른 간접활선용 완철을 이용한 간접활선 작업방법은, 활선작업차의 버킷에 설치된 완철승강장치에 간접활선용 완철을 장착하는 가완철준비단계; 스틱형 절연공구를 사용해 전력선을 상기 간접활선용 완철에 결속하는 가완철및전선결속단계; 애자와 상기 전력선을 결속하는 바인드선 또는 바인드리스커버를 상기 스틱형 절연공구를 사용해 상기 애자로부터 분리하고, 상기 완철승강장치의 작동에 의해 상기 간접활선용 완철을 상승시켜 상기 전력선을 상기 애자로부터 이격시키는 바인더제거단계; 상기 애자를 포함한 전력설비를 점검하거나 교체하는 본작업단계; 상기 완철승강장치의 작동에 의해 상기 간접활선용 완철을 하강시켜 상기 전력선을 상기 애자측으로 하강시키고, 상기 스틱형 절연공구를 사용해 상기 바인드리스커버로 상기 전력선과 상기 애자를 결속하는 바인드리스커버설치단계; 및 상기 스틱형 절연공구를 사용해 상기 전력선을 상기 간접활선용 완철로부터 분리하는 가완철결속해제단계;를 포함하는 것을 특징으로 한다.An indirect live line working method using wancheol for indirect live line according to the present invention includes: a gawan-cheol preparation step of mounting wan-cheol for indirect live line on a wan-cheol lifting device installed in a bucket of a live line work vehicle; Ga Wan iron and wire binding step of binding the power line to the indirect live wire using a stick-type insulation tool; A bind wire or a bindless cover that binds the insulator and the power line is separated from the insulator using the stick-type insulating tool, and the insulator for indirect live wire is raised by the operation of the wan-cheol lifting device to separate the power line from the insulator. Binder removal step; A main operation step of inspecting or replacing power equipment including the insulator; A bindless cover installation step of lowering the wancheol for indirect live line by the operation of the wancheol lifting device to lower the power line toward the insulator side, and binding the power line and the insulator with the bindless cover using the stick-type insulation tool; And a temporary disengagement step of separating the power line from the indirect live line by using the stick-type insulation tool.

상기 간접활선용 완철은, 수직방향으로 연장된 형상을 가지고 상기 완철승강장치에 장착되며, 상기 완철승강장치의 작동에 의해 승강되는 수직연장부; 상기 수직연장부의 상부에 수평방향으로 연장되게 형성되는 수평연장부; 및 상기 전력선을 결속가능한 구조를 가지고 상기 수평연장부에 설치되는 전선홀더부;를 포함하는 것을 특징으로 한다.The indirect railroad Wancheol has a shape extending in a vertical direction and is mounted on the Wancheol elevating device, and a vertical extension part that is elevated by the operation of the Wancheol elevating device; A horizontal extension part formed to extend in a horizontal direction above the vertical extension part; And a wire holder part having a structure capable of binding the power line and installed in the horizontal extension part.

상기 전선홀더부는, 상기 수평연장부의 둘레를 감싸며 설치되고, 상기 수평연장부를 따라 슬라이딩 이동되는 이동지지부; 상기 이동지지부의 상부에 결합되고, 상기 전력선이 하향 인입가능한 형상을 가지는 전선삽입부; 상기 전선삽입부에 회동가능하게 연결되고, 회동위치에 따라 상기 전선삽입부의 개방부를 개폐시키며, 상기 스틱형 절연공구를 걸 수 있는 제1걸림고리가 형성되는 개폐회동부; 및 상기 이동지지부를 관통하여 상기 수평연장부에 압접되고, 상기 스틱형 절연공구를 걸 수 있는 상기 제2걸림고리가 형성되는 압접체결부;를 포함하는 것을 특징으로 한다.The wire holder unit may include: a moving support unit installed to surround the horizontal extension unit and sliding along the horizontal extension unit; A wire insertion portion coupled to the upper portion of the movable support portion and having a shape in which the power line can be drawn downward; An opening/closing and rotating part which is rotatably connected to the wire insertion part, opens and closes the open part of the wire insertion part according to the rotation position, and has a first locking ring through which the stick-type insulation tool can be hooked; And a pressure-contacting part which penetrates the moving support part and is press-contacted to the horizontal extension part, and is formed with the second locking ring through which the stick-type insulating tool can be hooked.

상기 개폐회동부는, 상기 전선삽입부의 일측부에 회동가능하게 힌지연결되는 회동본체부; 상기 회동본체부의 단부에 슬라이딩 이동가능하게 설치되고, 상기 회동본체부의 회동 각도에 따라 상기 전선삽입부의 타측부에 형성된 걸림홈부에 끼워지거나 상기 걸림홈부로부터 이격되는 인출이동부; 상기 회동본체부의 내부에 설치되고, 상기 인출이동부를 상기 회동본체부의 내측으로 탄성가압하는 탄성부재; 및 상기 인출이동부의 단부에 상기 걸림홈부보다 확장된 너비로 형성되고, 상기 탄성부재의 탄성력에 의해 상기 전선삽입부와 압접되며, 상기 제1걸림고리가 형성되는 걸림단부;를 포함하는 것을 특징으로 한다.The opening/closing and rotating part may include a rotating body part hingedly connected to one side of the wire insertion part; A pull-out moving part that is installed to be slidably movable at an end of the rotating body part, and is fitted into a locking groove formed on the other side of the wire insertion part or spaced apart from the locking groove according to a rotation angle of the rotating body part; An elastic member installed inside the rotating body part and elastically pressing the withdrawal moving part toward the inside of the rotating body part; And a locking end portion formed at an end of the withdrawal movable portion with a width greater than that of the locking groove portion, press-contacted with the wire insertion portion by an elastic force of the elastic member, and having the first locking ring formed therein. To do.

상기 가완철및전선결속단계는, 상기 제2걸림고리에 상기 스틱형 절연공구를 걸고, 상기 수평연장부를 따라 이동시키면서, 상기 전선홀더부의 위치를 상기 전력선에 대응되게 조절하는 단계; 상기 전선삽입부를 개방시킨 상태로 상기 간접활선용 완철을 상승시켜 상기 전력선을 상기 전선삽입부에 인입시키는 단계; 및 상기 제1걸림고리에 상기 스틱형 절연공구를 걸고, 상기 개폐회동부를 폐쇄위치로 회동시켜 상기 전력선을 상기 전선삽입부에 결속하는 단계;를 포함하는 것을 특징으로 한다.The step of connecting the wire and wire may include adjusting the position of the wire holder to correspond to the power line while hanging the stick-type insulating tool on the second hook and moving along the horizontal extension; Introducing the power line into the wire insertion part by raising the wancheol for the indirect live wire while the wire insertion part is opened; And fastening the stick-type insulating tool to the first hook and rotating the opening/closing rotation part to a closed position to bind the power line to the wire insertion part.

상기 가완철결속해제단계는, 상기 제1걸림고리에 상기 스틱형 절연공구를 걸고, 상기 개폐회동부를 개방위치로 회동시키는 단계; 및 상기 전선삽입부를 개방시킨 상태로 상기 간접활선용 완철을 하강시켜 상기 전력선과 상기 전선삽입부를 분리하는 단계;를 포함하는 것을 특징으로 한다.The temporary iron binding releasing step may include: hooking the stick-type insulating tool to the first hook and rotating the opening/closing part to an open position; And separating the power line and the wire insertion part by lowering the indirect live wire wancheol while the wire insertion part is opened.

상기 바인더제거단계는, 상기 스틱형 절연공구를 사용해 상기 바인드선을 상기 애자측으로 밀어 상기 바인드선의 권취 상태를 헐겁게 하고, 상기 바인드선과 상기 애자의 사이에 갭(gap)을 형성하는 단계; 상기 스틱형 절연공구를 상기 갭에 인입하여 상기 바인드선을 절단하고, 상기 전력선과 상기 애자간의 결속 상태를 해제하는 단계; 상기 간접활선용 완철을 상승시켜 상기 전력선과 상기 바인드선을 상기 애자로부터 이격시키는 단계; 및 상기 스틱형 절연공구를 이용해 상기 전력선으로부터 상기 바인드선을 제거하는 단계;를 포함하는 것을 특징으로 한다.The binder removing step may include: pushing the bind wire toward the insulator using the stick-type insulating tool to loosen the wound state of the bind wire, and forming a gap between the bind wire and the insulator; Cutting the bind wire by inserting the stick-type insulating tool into the gap, and releasing a bonded state between the power line and the insulator; Separating the power line and the bind line from the insulator by raising the wancheol for the indirect live line; And removing the bind wire from the power line using the stick-type insulating tool.

상기 바인드리스커버는, 상기 전력선의 일측부를 감싸는 제1전선커버부; 상기 제1전선커버부와 연결되고, 상기 전력선의 타측부를 감싸는 제2전선커버부; 상기 제1전선커버부와 연결되고, 상기 애자의 일측부를 감싸는 제1애자커버부; 상기 제2전선커버부와 연결되고, 상기 애자의 타측부를 감싸는 제2애자커버부; 상기 전력선을 감싼 상태에서 중첩되게 배치되는 상기 제1전선커버부와 상기 제2전선커버부의 하부에 형성되는 암체결부; 및 상기 암체결부에 체결되며, 상기 제1전선커버부와 상기 제2전선커버부를 상호 결속시키는 결속부재;를 포함하는 것을 특징으로 한다.The bindless cover may include a first wire cover part surrounding one side of the power line; A second wire cover part connected to the first wire cover part and surrounding the other side of the power line; A first insulator cover part connected to the first wire cover part and surrounding one side of the insulator; A second insulator cover part connected to the second wire cover part and surrounding the other side of the insulator; An arm fastening part formed under the first wire cover part and the second wire cover part disposed to overlap while surrounding the power line; And a binding member fastened to the arm fastening portion and binding the first wire cover portion and the second wire cover portion to each other.

상기 바인더제거단계는, 상기 스틱형 절연공구를 사용해 상기 결속부재를 상기 암체결부로부터 분리하는 단계; 상기 간접활선용 완철을 상승시켜 상기 전력선과 상기 제1전선커버부, 상기 제2전선커버부를 상기 애자로부터 이격시키는 단계; 및 상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부를 상기 전력선으로부터 분리하는 단계;를 포함하는 것을 특징으로 한다.The binder removing step may include separating the binding member from the arm fastening portion using the stick-type insulating tool; Elevating the wancheol for the indirect live wire to separate the power line from the first wire cover part and the second wire cover part from the insulator; And separating the first wire cover part and the second wire cover part from the power line by using the stick-type insulation tool.

상기 바인드리스커버설치단계는, 상기 간접활선용 완철을 하강시켜 상기 전력선을 상기 애자까지 하향 이동시키는 단계; 상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부를 상기 전력선에 걸치는 단계; 및 상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부의 하부를 겹쳐지게 홀딩한 상태로, 상기 암체결부에 상기 결속부재를 체결하며, 상기 전력선을 상기 애자에 결속시키는 단계;를 포함하는 것을 특징으로 한다.The bindless cover installation step includes the steps of lowering the wancheol for indirect livelines to move the power line downward to the insulator; Straddling the first wire cover part and the second wire cover part over the power line using the stick-type insulating tool; And fastening the binding member to the arm fastening part while holding the lower part of the first wire cover part and the second wire cover part overlappingly using the stick-type insulation tool, and binding the power line to the insulator. It characterized in that it includes;

본 발명에 따른 간접활선용 완철을 이용한 간접활선 작업방법은, 작업자가 활선상태의 전력선과 직접 접촉하지 않고, 전력선으로부터 이격된 위치에서 간접활선용 완철과 스틱형 절연공구, 바인드리스커버를 이용해 전력설비를 안전하게 점검하거나 교체할 수 있다. 이에 따라, 작업자가 전력선에 접촉함에 따라 발생되는 안전사고를 예방할 수 있고, 여름철에도 작업자가 절연장갑, 절연복 등을 착용해야 하던 기존과 비교해, 작업자의 작업 여건과 작업 효율을 현저히 향상시킬 수 있다.In the indirect live wire working method using wancheol for indirect live wire according to the present invention, the operator does not directly contact the live power line, but at a position separated from the power line, power using wancheol for indirect live wire, stick-type insulation tool, and bindless cover. Equipment can be safely checked or replaced. As a result, it is possible to prevent safety accidents that occur when a worker contacts the power line, and compared to the past, when the worker has to wear insulating gloves, insulating clothing, etc., even in summer, the working conditions and work efficiency of the worker can be significantly improved. .

도 1은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법을 설명하고자 도시한 플로우차트이다.
도 2는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계를 설명하고자 도시한 플로우차트이다.
도 3은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 간접활선용 완철을 개략적으로 도시한 사시도이다.
도 4는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 가완철및전선결속단계를 설명하고자 도시한 개념도이다.
도 5는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계에 따라 바인드선을 제거하는 과정을 설명하고자 도시한 개념도이다.
도 6은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 바인드리스커버를 개략적으로 도시한 요부 분해사시도이다.
도 7은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 바인드리스커버를 설치한 상태를 개략적으로 도시한 사시도이다.
도 8은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계에서 전력선을 애자로부터 이격시킨 상태를 도시한 개념도이다.
도 9는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인드리스커버설치단계에서 전력선을 애자까지 하강시킨 상태를 도시한 개념도이다.
도 10은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 가완철결속해제단계를 설명하고자 도시한 개념도이다.
1 is a flowchart illustrating an indirect live line working method using wancheol for indirect live line according to an embodiment of the present invention.
Figure 2 is a flow chart illustrating a binder removal step of the indirect live wire working method using wancheol for indirect live wire according to an embodiment of the present invention.
Figure 3 is a perspective view schematically showing the indirect live line wancheol used in the indirect liveline work method using indirect liveline wancheol according to an embodiment of the present invention.
FIG. 4 is a conceptual diagram illustrating a step of connecting a wire and a wire connection in an indirect live wire working method using a wire for indirect live wire according to an embodiment of the present invention.
5 is a conceptual diagram illustrating a process of removing a bind wire according to a binder removal step of an indirect live wire working method using wancheol for indirect live wire according to an embodiment of the present invention.
6 is an exploded perspective view schematically illustrating a bindless cover used in an indirect live wire working method using wancheol for indirect live wire according to an embodiment of the present invention.
7 is a perspective view schematically showing a state in which a bindless cover used in an indirect live wire working method using wancheol for indirect live wire according to an embodiment of the present invention is installed.
8 is a conceptual diagram showing a state in which a power line is separated from an insulator in a binder removal step of an indirect live wire working method using wancheol for indirect live wire according to an embodiment of the present invention.
9 is a conceptual diagram showing a state in which the power line is lowered to the insulator in the bindless cover installation step of the indirect live wire working method using wancheol for indirect live wire according to an embodiment of the present invention.
FIG. 10 is a conceptual diagram illustrating a step of releasing temporary iron binding in an indirect live line work method using a complete indirect live line according to an embodiment of the present invention.

이하 첨부된 도면들을 참조하여 본 발명에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 실시예를 설명한다. 이러한 과정에서 도면에 도시된 선들의 두께나 구성요소의 크기 등은 설명의 명료성과 편의상 과장되게 도시되어 있을 수 있다. 또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로써, 이는 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다. 그러므로, 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Hereinafter, an embodiment of an indirect live line working method using wancheol for indirect live line according to the present invention will be described with reference to the accompanying drawings. In this process, the thickness of the lines or the size of components shown in the drawings may be exaggerated for clarity and convenience of description. In addition, terms to be described later are terms defined in consideration of functions in the present invention, and may vary according to the intention or custom of users or operators. Therefore, definitions of these terms should be made based on the contents throughout the present specification.

도 1은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법을 설명하고자 도시한 플로우차트이고, 도 2는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계를 설명하고자 도시한 플로우차트이며, 도 3은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 간접활선용 완철을 개략적으로 도시한 사시도이다.1 is a flowchart illustrating an indirect live line work method using wancheol for indirect live line according to an embodiment of the present invention, and FIG. 2 is an indirect live line work using wancheol for indirect live line according to an embodiment of the present invention It is a flowchart illustrating the binder removal step of the method, and FIG. 3 is a perspective view schematically showing a wancheol for indirect livelines used in an indirect liveline work method using wancheol for indirect livelines according to an embodiment of the present invention.

도 4는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 가완철및전선결속단계를 설명하고자 도시한 개념도이고, 도 5는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계에 따라 바인드선을 제거하는 과정을 설명하고자 도시한 개념도이다.FIG. 4 is a conceptual diagram illustrating a step of connecting a wire and a wire connection in an indirect live wire working method using a wire for indirect live wire according to an embodiment of the present invention, and FIG. 5 is for indirect live wire according to an embodiment of the present invention. It is a conceptual diagram illustrating a process of removing a bind line according to the binder removal step of the indirect live line work method using wancheol.

도 6은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 바인드리스커버를 개략적으로 도시한 요부 분해사시도이고, 도 7은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법에 이용되는 바인드리스커버를 설치한 상태를 개략적으로 도시한 사시도이며, 도 8은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인더제거단계에서 전력선을 애자로부터 이격시킨 상태를 도시한 개념도이다.6 is an exploded perspective view schematically showing a bindless cover used in an indirect live wire working method using an indirect live wire according to an embodiment of the present invention, and FIG. 7 is an indirect live wire according to an embodiment of the present invention It is a perspective view schematically showing a state in which the bindless cover used in the indirect live wire work method using Yong Wan-cheol is installed, and FIG. 8 is a binder removal of the indirect live wire work method using indirect live wire work according to an embodiment of the present invention. It is a conceptual diagram showing a state in which the power line is separated from the insulator in the step.

도 9는 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 바인드리스커버설치단계에서 전력선을 애자까지 하강시킨 상태를 도시한 개념도이고, 도 10은 본 발명의 일실시예에 따른 간접활선용 완철을 이용한 간접활선 작업방법의 가완철결속해제단계를 설명하고자 도시한 개념도이다.9 is a conceptual diagram showing a state in which the power line is lowered to the insulator in the bindless cover installation step of the indirect live line work method using wancheol for indirect live line according to an embodiment of the present invention, and FIG. 10 is an embodiment of the present invention It is a conceptual diagram illustrating the step of disengaging the temporary iron binding of the indirect live line work method using the indirect live line according to

본 발명의 일실시예에 따른 간접활선용 완철(20)을 이용한 간접활선 작업방법은, 작업자가 활선상태의 전력선(44)과 직접 접촉하지 않고, 간접활선용 완철(20)과 스틱형 절연공구(30), 바인드리스커버(46)를 이용해 전력설비(40)를 점검하거나 교체하는 작업방법에 관한 것이다.In the indirect live wire work method using the indirect live wire wancheol 20 according to an embodiment of the present invention, the worker does not directly contact the live power line 44, and the indirect live wire wancheol 20 and the stick-type insulation tool (30), it relates to a working method of inspecting or replacing the power equipment 40 using the bindless cover 46.

도 1을 참조하면, 본 발명의 일실시예에 따른 간접활선용 완철(20)을 이용한 간접활선 작업방법은 가완철준비단계(S1), 가완철및전선결속단계(S2), 바인더제거단계(S3), 본작업단계(S4), 바인드리스커버설치단계(S5), 가완철결속해제단계(S6)를 순차적으로 거친다.Referring to Figure 1, the indirect live wire working method using the indirect live wire for indirect live wire 20 according to an embodiment of the present invention is a temporary iron preparation step (S1), a temporary iron and wire binding step (S2), a binder removal step ( S3), the main operation step (S4), the bindless cover installation step (S5), and the temporary iron binding release step (S6) are sequentially performed.

가완철준비단계(S1)에서는 활선작업차의 버킷(11)에 설치된 완철승강장치(12)에 간접활선용 완철(20)을 장착한다(도 3 참조). 가완철및전선결속단계(S2)에서는 스틱형 절연공구(30)를 사용해 전력선(44)을 간접활선용 완철(20)에 결속한다(도 3, 도 4 참조).In the wan-cheol preparation step (S1), the wan-cheol 20 for indirect live-line is mounted to the wan-cheol elevating device 12 installed in the bucket 11 of the live-line work vehicle (see FIG. 3). In the step of tying the wires and wires (S2), the power line 44 is bound to the wires 20 for indirect live wires using a stick-type insulating tool 30 (see FIGS. 3 and 4).

바인더제거단계(S3)에서는 애자(43)와 전력선(44)을 결속하는 바인드선(45) 또는 바인드리스커버(46)를 스틱형 절연공구(30)를 사용해 애자(43)로부터 분리하고, 완철승강장치(12)의 작동에 의해 간접활선용 완철(20)을 상승시켜 전력선(44)을 애자(43)로부터 이격시킨다(도 5, 도 6, 도 7, 도 8 참조).In the binder removal step (S3), the bind wire 45 or the bindless cover 46 that binds the insulator 43 and the power line 44 is separated from the insulator 43 using a stick-type insulating tool 30, and By the operation of the lifting device 12, the wancheol 20 for indirect livelines is raised to separate the power line 44 from the insulator 43 (see FIGS. 5, 6, 7, and 8).

본작업단계(S4)에서는 애자(43)를 포함한 전력설비(40)를 점검하거나 교체한다. 바인드리스커버설치단계(S5)는 완철승강장치(12)의 작동에 의해 간접활선용 완철(20)을 하강시켜 전력선(44)을 애자(43)측으로 하강시키고, 스틱형 절연공구(30)를 사용해 바인드리스커버(46)로 전력선(44)과 애자(43)를 결속한다(도 7, 도 9 참조). 가완철결속해제단계(S6)에서는 스틱형 절연공구(30)를 사용해 전력선(44)을 간접활선용 완철(20)로부터 분리한다(도 10 참조).In the main operation step (S4), the power equipment 40 including the insulator 43 is checked or replaced. In the bindless cover installation step (S5), the wancheol 20 for indirect live wire is lowered by the operation of the wancheol lifting device 12 to lower the power line 44 toward the insulator 43, and the stick-type insulating tool 30 Using the bindless cover 46, the power line 44 and the insulator 43 are bound (see Figs. 7 and 9). In the temporary iron binding release step (S6), the power line 44 is separated from the wancheol 20 for indirect live wire using the stick-type insulation tool 30 (see FIG. 10).

도 3을 참조하면, 본 발명의 일실시예에 따른 간접활선용 완철(20)은 수직연장부(21), 수평연장부(22), 전선홀더부(23)를 포함한다.Referring to FIG. 3, the wancheol 20 for indirect livelines according to an embodiment of the present invention includes a vertical extension part 21, a horizontal extension part 22, and a wire holder part 23.

수직연장부(21)는 수직방향으로 연장된 형상을 가지고 완철승강장치(12)에 장착되며, 완철승강장치(12)의 작동에 의해 승강된다. 활선작업차의 버킷(11)은 활선작업차의 붐의 단부에 배치되고, 작업자는 버킷(11)에 탑승한 상태에서 간접활선 작업을 수행하게 된다. 완철승강장치(12)로는 버킷(11)에 장착된 윈치를 적용할 수 있다. 윈치(winch)는 로프를 감거나 풀어낼 수 있는 권양기의 구조를 가진다.The vertical extension part 21 has a shape extending in the vertical direction and is mounted on the wancheol lifting device 12, and is elevated by the operation of the wancheol lifting device 12. The bucket 11 of the live line work vehicle is disposed at the end of the boom of the live line work car, and the operator performs indirect live line work while boarding the bucket 11. The winch mounted on the bucket 11 may be applied as the wancheol lifting device 12. The winch has a structure of a winder capable of winding or unwinding a rope.

로프의 단부를 수직연장부(21)의 하부에 형성된 고리(미도시)에 걸어 결속한 상태에서 윈치를 작동시키면, 로프의 단부의 위치 이동에 연동하여 수직연장부(21)가 위로 당겨져 상승하거나, 자중에 의해 하강하게 된다. 본 발명에 따른 완철승강장치(12)는 간접활선용 완철(20)을 승강이동시킬 수만 있다면, 상기와 같은 구성을 가지는 윈치를 포함하여 특정한 구조와 형상으로 한정되지 않는다.When the winch is operated while the end of the rope is tied to a ring (not shown) formed under the vertical extension part 21, the vertical extension part 21 is pulled upward and rises in connection with the position of the end of the rope. , It descends by its own weight. Wancheol elevating device 12 according to the present invention is not limited to a specific structure and shape, including a winch having the above-described configuration, as long as it can lift and move the wancheol 20 for indirect travel.

수평연장부(22)는 완철(42)에 대응되는 바 형상을 가지고, 수직연장부(21)의 상부에 수평방향으로 연장되게 형성된다. 전선홀더부(23)는 전력선(44)을 결속가능한 구조를 가지고, 수평연장부(22)에 설치된다. 전선홀더부(23)는 간접활선용 완철(20)측으로 이선하고자 하는 전력선(44)의 개수에 대응되는 복수개가 구비된다. 도 3을 참조하면, 본 발명의 일실시예에 따른 전선홀더부(23)는 이동지지부(24), 전선삽입부(25), 개폐회동부(28), 압접체결부(29)를 포함한다.The horizontal extension part 22 has a bar shape corresponding to the wancheol 42 and is formed to extend in the horizontal direction above the vertical extension part 21. The wire holder part 23 has a structure capable of binding the power line 44 and is installed in the horizontal extension part 22. The wire holder part 23 is provided with a plurality of wires corresponding to the number of power lines 44 to be wired toward the wancheol 20 side for indirect livelines. Referring to FIG. 3, the wire holder part 23 according to an embodiment of the present invention includes a moving support part 24, a wire insertion part 25, an opening/closing part 28, and a pressure-contacting part 29. .

이동지지부(24)는 전선홀더부(23) 중 수평연장부(22)에 장착되는 장치부로, 수평연장부(22)를 따라 슬라이딩 이동가능하게 설치된다. 수평연장부(22)는 사각형 단면 형상을 가지고, 이동지지부(24)는 전선홀더부(23)의 둘레를 감싸는 사각형 프레임 형상을 가진다. 이동지지부(24)는 작업자가 작용시키는 외력에 의해 수평연장부(22) 상의 목적한 위치로 자유롭게 직선 이동될 수 있다.The moving support part 24 is a device part mounted on the horizontal extension part 22 of the wire holder part 23 and is installed to be slidably movable along the horizontal extension part 22. The horizontal extension portion 22 has a rectangular cross-sectional shape, and the moving support portion 24 has a rectangular frame shape surrounding the wire holder portion 23. The movement support part 24 may be freely linearly moved to a desired position on the horizontal extension part 22 by an external force applied by an operator.

전선삽입부(25)는 상부가 개방된 프레임 형상을 가지고, 이동지지부(24)의 상부에 결합된다. 전선삽입부(25)는 상부가 개방된 'ㄷ'자 단면 형상을 가진다. 즉 전선삽입부(25)이 상부에는 개방부(26)가 형성된다. 개방부(26)의 일측에는 개폐회동부(28)가 힌지결합되고, 개방부(26)의 타측에는 걸림홈부(27)가 형성된다. 전력선(44)은 전선삽입부(25)의 상부에 형성된 개방부(26)를 통해 전선삽입부25)의 내부로 하향 인입된다.The wire insertion part 25 has a frame shape with an open top, and is coupled to the upper part of the moving support part 24. The wire insertion part 25 has a cross-sectional shape of a'C' shape with an open top. That is, the wire insertion part 25 is formed with an open part 26 at the top. One side of the opening portion 26 is hinged to the opening and closing rotation portion 28, and the other side of the opening portion 26 is formed with a locking groove (27). The power line 44 is drawn downward into the inside of the electric wire insertion part 25 through the opening 26 formed on the upper part of the electric wire insertion part 25.

개폐회동부(28)는 전선삽입부(25)의 개방부(26)를 개폐시키는 장치부로, 개방부(26)를 가로지를 수 있는 연장길이를 가지고, 전선삽입부(25)에 회동가능하게 연결된다. 개폐회동부(28)의 단부에는 스틱형 절연공구(30)를 걸 수 있는 제1걸림고리(285)가 형성된다. 도 3을 참조하면, 본 발명의 일실시예에 따른 개폐회동부(28)는 회동본체부(281), 인출이동부(282), 탄성부재(283), 걸림단부(284)를 포함한다.The opening and closing rotation unit 28 is a device that opens and closes the opening 26 of the electric wire insertion unit 25, has an extended length that can cross the opening 26, and is rotatable to the electric wire insertion unit 25 Connected. At the end of the opening/closing rotation part 28, a first locking ring 285 through which the stick-type insulating tool 30 can be hung is formed. Referring to FIG. 3, the opening/closing and rotating part 28 according to an embodiment of the present invention includes a rotating body part 281, a pull-out moving part 282, an elastic member 283, and a locking end 284.

회동본체부(281)는 내부가 중공된 실린더 형상을 가지고, 전선삽입부(25)의 일측부에 회동가능하게 힌지연결된다. 인출이동부(282)는 회동본체부(281)의 단부에 슬라이딩 이동가능하게 설치된다. 인출이동부(282) 중 회동본체부(281)의 외부로 돌출되는 단부는 걸림홈부(27)를 통과할 수 있는 너비(직경)를 가진다. 인출이동부(282)는 회동본체부(281)의 회동 각도에 따라 전선삽입부(25)의 타측부에 형성된 걸림홈부(27)에 끼워지거나, 걸림홈부(27)로부터 이격된다.The rotating body 281 has a cylindrical shape with a hollow inside, and is hingedly connected to one side of the wire insertion part 25 so as to be rotatable. The withdrawal moving part 282 is installed to be slidably movable at the end of the rotating body part 281. An end of the pull-out moving part 282 protruding to the outside of the rotating body part 281 has a width (diameter) that can pass through the locking groove part 27. The withdrawal moving part 282 is fitted into the locking groove 27 formed on the other side of the wire insertion part 25 or spaced apart from the locking groove 27 according to the rotation angle of the rotating body part 281.

회동본체부(281)가 하향 회동되어 인출이동부(282)가 걸림홈부(27)에 끼워진 상태에서, 전선삽입부(25)의 개방부(26)는 폐쇄된다. 회동본체부(281)가 상향 회동되어 인출이동부(282)가 걸림홀부(27)의 외부로 이격된 상태에서, 전선삽입부(25)의 개방부(26)는 개방된다.In a state in which the rotating body portion 281 is rotated downward so that the withdrawal moving portion 282 is fitted into the locking groove portion 27, the opening portion 26 of the electric wire insertion portion 25 is closed. In a state in which the rotating body portion 281 is rotated upward so that the withdrawal moving portion 282 is spaced apart from the locking hole portion 27, the opening portion 26 of the electric wire insertion portion 25 is opened.

탄성부재(283)는 인출이동부(282)를 회동본체부(281)의 내측으로 탄성가압하는 장치부로, 코일스프링의 구조를 가지고 회동본체부(281)의 내부에 설치된다. 탄성부재(283)는 회동본체부(281)의 둘레에 끼워진 상태로 회동본체부(281)의 내부에 설치될 수 있다. 탄성부재(283)의 일단부는 회동본체부(281)의 일단부와 접하고, 탄성부재(283)의 타단부는 인출이동부(282)의 내측단부와 접하게 설치된다.The elastic member 283 is a device that elastically presses the withdrawal moving part 282 into the inside of the rotating body 281, and is installed inside the rotating body 281 having a structure of a coil spring. The elastic member 283 may be installed inside the rotating body 281 while being fitted around the rotating body 281. One end of the elastic member 283 is in contact with one end of the rotating body portion 281, and the other end of the elastic member 283 is installed in contact with the inner end of the withdrawal moving portion 282.

걸림단부(284)는 인출이동부(282)의 회동단부에 걸림홈부(27)보다 확장된 너비로 형성된다. 걸림단부(284)에는 제1걸림고리(285)가 형성된다. 제1걸림고리(285)를 잡아당기면, 인출이동부(282)가 회동본체부(281)의 외부로 당겨져 이동되며, 회동본체부(281)와 함께 이루는 길이가 신장된다.The locking end portion 284 is formed at a pivoting end portion of the withdrawal moving portion 282 with a width greater than that of the locking groove portion 27. A first locking ring 285 is formed at the locking end 284. When the first locking ring 285 is pulled, the withdrawal moving part 282 is pulled and moved to the outside of the rotating body part 281, and the length formed together with the rotating body part 281 is elongated.

이와 같이 인출이동부(282)를 회동본체부(281)의 외부로 당겨 이동시킨 상태에서, 인출이동부(282)를 걸림단부(284)에 끼우고, 제1걸림고리(285)를 당기는 힘을 해제하면, 탄성부재(283)의 탄성력에 의해 걸림단부(284)가 전선삽입부(25)와 압접되며, 개폐회동부(28)가 전선삽입부(25)의 개방부(26)를 폐쇄시킴과 동시에 전선삽입부(25)와 결속된다.In this way, in a state in which the withdrawal moving part 282 is pulled to the outside of the rotating body part 281 and moved, the pulling moving part 282 is inserted into the locking end 284, and the force to pull the first locking ring 285 When released, the locking end portion 284 is press-contacted with the wire insertion portion 25 by the elastic force of the elastic member 283, and the opening and closing rotation portion 28 closes the opening portion 26 of the wire insertion portion 25. At the same time, it is bound with the electric wire insertion part 25.

압접체결부(29)는 이동지지부(24)의 하부를 관통하여 수평연장부(22)의 하부에 압접된다. 압접체결부(29)에는 스틱형 절연공구(30)를 걸 수 있는 제2걸림고리(295)가 형성된다. 이동지지부(24)를 목적한 위치로 이동시킨 상태에서 제2걸림고리(295)에 스틱형 절연공구(30)를 걸어 회전시킴으로써 이동지지부(24)를 수평연장부(22)상의 설정 위치에 견고하게 고정시킬 수 있다.The pressure connection part 29 penetrates the lower part of the moving support part 24 and is press-contacted to the lower part of the horizontal extension part 22. A second locking ring 295 through which the stick-type insulating tool 30 can be hung is formed in the pressure-contacting portion 29. With the moving support part 24 moved to the desired position, the stick-type insulation tool 30 is hooked to the second locking ring 295 and rotated to secure the moving support part 24 to the set position on the horizontal extension part 22. Can be fixed.

도 1을 참조하면, 본 발명의 일실시예에 따른 가완철및전선결속단계(S2)에서는, 전선홀더부(23)의 위치를 전력선(44)에 대응되게 조절하는 단계(S2-1)와, 간접활선용 완철(20)을 상승시켜 전력선(44)을 전선삽입부(25)에 인입시키는 단계(S2-2)와, 전력선(44)을 상기 전선삽입부(25)에 결속하는 단계(S2-3)를 순차적으로 거쳐 이루어진다.Referring to FIG. 1, in the provisional iron and wire bonding step (S2) according to an embodiment of the present invention, adjusting the position of the wire holder part 23 to correspond to the power line 44 (S2-1) and , The step of inserting the power line 44 into the wire insertion unit 25 by raising the wancheol 20 for indirect livelines (S2-2), and the step of binding the power line 44 to the wire insertion unit 25 ( It is made through sequentially through S2-3).

전선홀더부(23)의 위치를 전력선(44)에 대응되게 조절하는 단계(S2-1)에서는 수평연장부(22) 상의 임의의 지점에 위치한 복수개의 전선홀더부(23)를 복수개의 전력선(44) 각각에 대응되는 위치로 이동시킨다. 이러한 작업은, 작업자가 제2걸림고리(295)에 갈고리 형상의 선단부를 가지는 스틱형 절연공구(30)를 걸고, 수평연장부(22)를 따라 목적한 위치로 이동시킨 후, 제2걸림고리(295)를 회전시켜 압압체결부(29)를 수평연장부(22)에 압접, 고정시키는 과정을 거쳐 이루어질 수 있다.In the step (S2-1) of adjusting the position of the wire holder part 23 to correspond to the power line 44, a plurality of wire holder parts 23 located at arbitrary points on the horizontal extension part 22 are connected to a plurality of power lines. 44) Move to the corresponding position. In this work, the operator hooks the stick-type insulation tool 30 having a hook-shaped tip end to the second hook 295, moves it to a desired position along the horizontal extension 22, and then moves the second hook By rotating the 295, it may be achieved through a process of pressing and fixing the pressure-fitting portion 29 to the horizontal extension portion 22.

간접활선용 완철(20)을 상승시켜 전력선(44)을 전선삽입부(25)에 인입시키는 단계(S2-2)는, 전선삽입부(25)를 개방시킨 상태에서, 도 4에 도시된 바와 같이 전력선(44)이 전선삽입부(25)에 인입되는 위치까지 간접활선용 완철(20)을 상승시키는 과정을 거쳐 이루어질 수 있다. 간접활선용 완철(20)을 상승시키는 작업은, 완철승강장치(12)를 상승 작동시킴으로써, 보다 구체적으로는 로프가 감기는 방향으로 풀리를 정회전시킴으로써 이루어질 수 있다. Step (S2-2) of raising the wancheol 20 for indirect livelines to insert the power line 44 into the wire insertion unit 25 is, as shown in FIG. 4, in a state where the wire insertion unit 25 is opened. Likewise, the power line 44 may be made through a process of raising the wancheol 20 for indirect livelines to a position where it is inserted into the wire insertion unit 25. The operation of raising the wancheol 20 for indirect gliding may be accomplished by raising the wancheol lifting device 12, and more specifically, by rotating the pulley forward in the direction in which the rope is wound.

전력선(44)을 전선삽입부(25)에 결속하는 단계(S2-3)는 도 3에 도시된 바와 같이 제1걸림고리(285)에 갈고리 형상의 선단부를 가지는 스틱형 절연공구(30)를 걸고, 스틱형 절연공구(30)를 이용해 인출이동부(282)를 회동본체부(281)의 외부로 보다 인출되게 당긴 상태에서, 개폐회동부(28)를 폐쇄위치로 하향 회동시키는 과정을 거쳐 이루어질 수 있다. 인출이동부(282)가 걸림홈부(27)에 끼워진 상태에서, 작업자가 인출이동부(282)를 당기고 있던 외력을 해제하면, 걸림단부(284)가 탄성부재(283)의 탄성력에 의해 전선삽입부(25)에 자연히 밀착, 압접된다.In the step (S2-3) of binding the power line 44 to the wire insertion part 25, as shown in FIG. 3, a stick-type insulation tool 30 having a hook-shaped tip portion in the first locking ring 285 is provided. After hanging and pulling the pull-out moving part 282 to the outside of the rotating body part 281 by using the stick-type insulating tool 30, the opening and closing part 28 is rotated downward to the closed position. Can be done. When the operator releases the external force pulling the pull-out moving part 282 while the pull-out moving part 282 is inserted into the catching groove 27, the catching end 284 is inserted by the elastic force of the elastic member 283. It is naturally in close contact and pressure contact with the part 25.

도 2의 (a)를 참조하면, 본 발명의 일실시예에 따른 바인더제거단계(S3)는 바인드선(45)과 애자(43)의 사이에 갭(gap)을 형성하는 단계(S3-1)와, 전력선(44)과 애자(43)간의 결속 상태를 해제하는 단계(S3-2)와, 전력선(44)과 바인드선(45)을 애자(43)로부터 이격시키는 단계(S3-3)와, 전력선(44)으로부터 바인드선(45)을 제거하는 단계(S3-4)를 순차적으로 거쳐 이루어질 수 있다. Referring to Figure 2 (a), the binder removal step (S3) according to an embodiment of the present invention is a step of forming a gap (gap) between the bind line 45 and the insulator 43 (S3-1). ), and the step of releasing the bonded state between the power line 44 and the insulator 43 (S3-2), and the step of separating the power line 44 and the bind line 45 from the insulator 43 (S3-3) Wow, it may be performed sequentially through the step (S3-4) of removing the bind line 45 from the power line 44.

기존에 애자(43)와 전력선(44)을 상호 결속시킴에 있어서는, 주로 바인드선(45) 또는 바인드리스커버(46)이 이용되고 있다. 바인드선(45)을 이용해 애자(43)와 전력선(44)을 상호 결속시킴에 있어서는, 도 5의 (a)에 도시된 바와 같이 바인드선(45)의 중간부를 애자(43)의 둘레에 밀착되게 권취하고, 바인드선(45)의 양단부를 전력선(44)의 둘레에 밀착되게 권취시킨 구조를 가진다.Conventionally, in binding the insulator 43 and the power line 44 to each other, the bind line 45 or the bindless cover 46 is mainly used. When binding the insulator 43 and the power line 44 to each other using the bind wire 45, the middle portion of the bind wire 45 is closely attached to the circumference of the insulator 43 as shown in FIG. 5A. It has a structure in which both ends of the bind wire 45 are wound in close contact with the circumference of the power line 44.

바인드선(45)과 애자(43)의 사이에 갭(gap)을 형성하는 단계(S3-1)에서는, 도 5의 (b)에 도시된 바와 같이 전력선(44)을 감쌀 수 있는 집게 구조의 선단부를 가지는 스틱형 절연공구(30)를 사용해 전력선(44)에 권취된 바인드선(45)의 양단부를 애자(43)측으로 밀어낸다. 상기와 같이 바인드선(45)의 양단부를 애자(43)측으로 보다 밀집되게 밀어내면, 바인드선(45)의 권취 상태가 헐거워짐과 동시에 바인드선(45)과 애자(43)의 사이에 갭(gap)이 형성된다.In the step (S3-1) of forming a gap between the bind line 45 and the insulator 43, a clamp structure capable of wrapping the power line 44 as shown in FIG. 5B Both ends of the bind wire 45 wound around the power line 44 are pushed toward the insulator 43 by using a stick-type insulating tool 30 having a tip portion. When the both ends of the bind wire 45 are pushed more densely toward the insulator 43 as described above, the wound state of the bind wire 45 becomes loose and at the same time, there is a gap between the bind wire 45 and the insulator 43. gap) is formed.

전력선(44)과 애자(43)간의 결속 상태를 해제하는 단계(S3-2)에서는, 커터 구조의 선단부를 가지는 스틱형 절연공구(30)의 일측 절단날부를, 도 5의 (c)에 도시된 바와 같이 바인드선(45)과 애자(43)의 사이에 형성된 갭에 인입하여 바인드선(45)을 절단한다. 상기와 같이 바인드선(45)을 절단함으로써, 전력선(44)과 애자(43)간의 결속 상태가 해제된다. 이때, 바인드선(45)의 중간부는 애자(43)의 둘레에 권취된 상태로 잔류될 수 있고, 바인드선(45)의 양단부는 전력선(44)에 권취된 상태로 잔류될 수 있다.In the step of releasing the bonded state between the power line 44 and the insulator 43 (S3-2), a cutting blade on one side of the stick-type insulating tool 30 having the tip of the cutter structure is shown in FIG. 5C. As described above, the bind line 45 is cut by entering the gap formed between the bind line 45 and the insulator 43. By cutting the bind line 45 as described above, the bonded state between the power line 44 and the insulator 43 is released. At this time, the middle portion of the bind line 45 may remain wound around the insulator 43, and both ends of the bind line 45 may remain wound around the power line 44.

전력선(44)과 바인드선(45)을 애자(43)로부터 이격시키는 단계(S3-3)에서는 도 4에 도시된 바와 같이 전력선(44)의 설치 높이에 대응되는 높이에 위치되는 간접활선용 완철(20)을, 도 8에 도시된 바와 같이 보다 상승시켜 전력선(44)을 애자(43)로부터 이격시킨다. 간접활선용 완철(20)을 상승시키는 작업은, 완철승강장치(12)를 상승 작동시킴으로써, 보다 구체적으로는 로프가 감기는 방향으로 풀리를 정회전시킴으로써 이루어질 수 있다. In the step of separating the power line 44 and the bind line 45 from the insulator 43 (S3-3), as shown in FIG. 4, the indirect live line is located at a height corresponding to the installation height of the power line 44. The power line 44 is separated from the insulator 43 by raising (20) as shown in FIG. 8. The operation of raising the wancheol 20 for indirect gliding may be accomplished by raising the wancheol lifting device 12, and more specifically, by rotating the pulley forward in the direction in which the rope is wound.

전력선(44)으로부터 바인드선(45)을 제거하는 단계(S3-4)는, 작업자가 갈고리 구조의 선단부, 집게 구조의 선단부, 커터 구조의 선단부를 가지는 스틱형 절연공구(30)를 선택적, 복합적으로 활용하여, 전력선(44)에 권취된 상태로 잔류된 바인드선(45)의 양단부를 전력선(44)으로부터 분리시키는 이탈력, 하향력을 작용시킴으로써 이루어질 수 있다.In the step of removing the bind wire 45 from the power line 44 (S3-4), the operator selectively selects a stick-type insulating tool 30 having a tip of a hook structure, a tip of a clamp structure, and a tip of a cutter structure. As a result, it can be achieved by applying a pulling force and a downward force to separate both ends of the bind line 45 remaining wound around the power line 44 from the power line 44.

도 6, 도 7을 참조하면, 본 발명의 일실시예에 따른 바인드리스커버(46)는 제1전선커버부(461), 제2전선커버부(462), 제1애자커버부(463), 제2애자커버부(464), 암체결부(465), 결속부재(466)를 포함한다.6 and 7, the bindless cover 46 according to an embodiment of the present invention includes a first wire cover part 461, a second wire cover part 462, and a first insulator cover part 463. , A second insulator cover part 464, an arm fastening part 465, and a fastening member 466.

제1전선커버부(461)는 전력선(44)의 일측부를 커버하는 장치부로, 반원형 단면 형상을 가지고 직선형으로 연장되게 형성된다. 제2전선커버부(462)는 전력선(44)의 타측부를 커버하는 장치부로, 제1전선커버부(461)와 대칭되는 형상을 가지며, 상부가 제1전선커버부(461)와 연결된다. 제1전선커버부(461)와 제2전선커버부(462)는 도 6에 도시된 바와 같이 상호간의 연결부를 중심으로 하여 하부가 서로 이격되게 벌어질 수 있다.The first electric wire cover part 461 is a device that covers one side of the power line 44 and has a semicircular cross-sectional shape and is formed to extend in a straight line. The second wire cover part 462 is a device that covers the other side of the power line 44, has a shape symmetrical with the first wire cover part 461, and the upper part is connected to the first wire cover part 461. . As shown in FIG. 6, the first wire cover part 461 and the second wire cover part 462 may have their lower portions separated from each other around the connection part.

제1애자커버부(463)는 애자(43)의 일측부를 감싸는 장치부로, 제1전선커버부(461)의 중간부에 제1전선커버부(461)와 일체로 형성된다. 제2애자커버부(464)는 에자(43)의 타측부를 감싸는 장치부로, 제2전선커버부(462)의 중간부에 제2전선커버부(462)와 일체로 형성된다.The first insulator cover part 463 is a device part surrounding one side of the insulator 43 and is integrally formed with the first wire cover part 461 in the middle of the first wire cover part 461. The second insulator cover part 464 is a device part that surrounds the other side of the keyboard 43 and is integrally formed with the second wire cover part 462 in the middle of the second wire cover part 462.

암체결부(465)는 도 7에 도시된 바와 같이 전력선(44)을 감싼 상태에서 중첩되게 배치되는 제1전선커버부(461)와 제2전선커버부(462)에 형성된다. 제1전선커버부(461)와 제2전선커버부(462)의 하부가 겹쳐진 상태에서 제1전선커버부(461) 상에 형성된 암체결부(465)와 제2전선커버부(462) 상에 형성된 암체결부(465)는 상호 연통된다. 암체결부(465)는 암나사부의 구조를 가진다. 결속부재(466)는 수나사부의 구조를 가지고 암체결부(465)에 체결되며, 제1전선커버부(461)와 제2전선커버부(462)의 하부를 상호 결속시킨다.The arm fastening part 465 is formed on the first wire cover part 461 and the second wire cover part 462 which are disposed to overlap while surrounding the power line 44 as shown in FIG. 7. On the arm fastening part 465 and the second wire cover part 462 formed on the first wire cover part 461 in a state where the lower part of the first wire cover part 461 and the second wire cover part 462 overlap The formed arm fastening portions 465 communicate with each other. The arm fastening portion 465 has a structure of a female screw portion. The binding member 466 has a structure of a male threaded portion and is fastened to the arm fastening portion 465, and binds the lower portions of the first wire cover portion 461 and the second wire cover portion 462 to each other.

도 2의 (b)를 참조하면, 본 발명의 다른 일실시예에 따른 바인더제거단계(S3)는 결속부재(466)를 바인드리스커버(46)로부터 분리하는 단계(S3-4)와, 전력선(44)과 바인드리스커버(46)를 애자(43)로부터 이격시키는 단계(S3-5)와, 바인드리스커버(46)를 전력선(44)으로부터 분리하는 단계(S3-6)를 순차적으로 거쳐 이루어질 수 있다. Referring to Figure 2 (b), the binder removal step (S3) according to another embodiment of the present invention is the step of separating the binding member 466 from the bindless cover 46 (S3-4) and the power line Step 44 and the bindless cover 46 are separated from the insulator 43 (S3-5) and the bindless cover 46 is separated from the power line 44 (S3-6). Can be done.

기존에 애자(43)와 전력선(44)을 상호 결속시키기 위해 설치된 바인드리스커버(46)는 다양한 형상과 구조의 실시예가 적용되고 있으며, 각각의 실시예들은 서로 다른 장착 방법 및 장착해제 방법을 가진다. 이에 따라 바인드리스커버(46)를 해제함에 있어서는, 다양한 실시예로 구현가능하다. 본 발명의 다른 일실시예에 따른 바인더제거단계(S3)는, 결속부재(466)를 포함하는 구조를 가지는 바인드리스커버(46)를 대상으로 한다.The existing bindless cover 46 installed to bind the insulator 43 and the power line 44 to each other has various shapes and structures, and each of the embodiments has a different mounting method and a different mounting method. . Accordingly, in releasing the bindless cover 46, it can be implemented in various embodiments. The binder removal step (S3) according to another embodiment of the present invention targets the bindless cover 46 having a structure including a binding member 466.

결속부재(466)를 바인드리스커버(46)로부터 분리하는 단계(S3-4)에서는 바인드리스커버(46)의 암체결부(465)로부터 결속부재(466)를 분리한다. 도 7에 도시된 바와 같이 집게 구조의 선단부를 가지는 스틱형 절연공구(30)를 사용해 바인드리스커버(46)를 공중에서 홀딩, 지지한 상태에서, 볼트부재에 회전력을 부여할 수 있는 전동복스 구조의 선단부를 가지는 스틱형 절연공구(30)를 사용해 결속부재(466)에 회전력을 작용시킴으로써, 결속부재(466)를 회전시키고, 암체결부(465)로부터 분리할 수 있다. 결속부재(466)가 분리되면, 바인드리스커버(46)는 제1전선커버부(461)와 제2전선커버부(462)가 상호 이격되게 벌어진 상태로 전력선(44)에 걸쳐진 상태가 된다.In the step (S3-4) of separating the binding member 466 from the bindless cover 46, the binding member 466 is separated from the arm fastening portion 465 of the bindless cover 46. An electric box structure capable of imparting rotational force to the bolt member while holding and supporting the bindless cover 46 in the air using a stick-type insulating tool 30 having a tip of a clamp structure as shown in FIG. 7 By applying a rotational force to the binding member 466 using the stick-type insulating tool 30 having the tip of the, it is possible to rotate the binding member 466 and separate it from the arm fastening portion 465. When the binding member 466 is separated, the bindless cover 46 is in a state where the first wire cover part 461 and the second wire cover part 462 are spaced apart from each other and spanned the power line 44.

전력선(44)과 바인드리스커버(46)를 애자(43)로부터 이격시키는 단계(S3-5)에서는, 간접활선용 완철(20)을 상승시켜 전력선(44)과 전력선(44)에 걸쳐진 바인드리스커버(46)를 도 6에 도시된 바와 같이 애자(43)로부터 이격시킨다. 간접활선용 완철(20)을 상승시키는 작업은, 완철승강장치(12)를 상승 작동시킴으로써, 보다 구체적으로는 로프가 감기는 방향으로 풀리를 정회전시킴으로써 이루어질 수 있다. In the step (S3-5) of separating the power line 44 and the bindless cover 46 from the insulator 43 (S3-5), the bindless spanning the power line 44 and the power line 44 by raising the wancheol 20 for indirect live wire. The cover 46 is spaced apart from the insulator 43 as shown in FIG. 6. The operation of raising the wancheol 20 for indirect gliding may be accomplished by raising the wancheol lifting device 12, and more specifically, by rotating the pulley forward in the direction in which the rope is wound.

바인드리스커버(46)를 전력선(44)으로부터 분리하는 단계(S3-6)에서는, 집게 구조의 선단부, 갈고리 구조의 선단부를 가지는 스틱형 절연공구(30)를 선택적, 복합적으로 활용해, 바인드리스커버(46)에 이탈력, 하향력을 작용시켜 전력선(44)으로부터 분리한다.In the step of separating the bindless cover 46 from the power line 44 (S3-6), a stick-type insulating tool 30 having a tip of a tong structure and a tip of a hook structure is selectively and complexly utilized, The cover 46 is separated from the power line 44 by applying a release force and a downward force.

본 발명에 따른 바인더제거단계(S3)를 거치면, 전력선(44)은 도 8에 도시된 바와 같이 애자(43)로부터 상향 이격되게 배치된 상태가 되고, 애자(43)를 포함한 전력설비(40)의 상측 및 주변에 작업에 필요한 여유공간부가 확보된다. 본작업단계(S4)에서는, 상기와 같이 확보된 여유공간을 활용하여 애자(43), 완철(42), 전주(41)를 포함한 전력설비(40)를 점검하거나 교체한다.After the binder removal step (S3) according to the present invention, the power line 44 is in a state disposed upwardly from the insulator 43 as shown in FIG. 8, and the power equipment 40 including the insulator 43 Free space required for work is secured above and around the machine. In the main operation step (S4), the power equipment 40 including the insulator 43, the wancheol 42, and the electric pole 41 is inspected or replaced by utilizing the free space secured as described above.

도 1을 참조하면, 본 발명의 일실시예에 따른 바인드리스커버설치단계(S5)는, 전력선(44)을 애자(43)까지 하향 이동시키는 단계(S5-1)와, 바인드리스커버(46)를 전력선(44)에 걸치는 단계(S5-2)와, 전력선(44)을 애자(43)에 결속시키는 단계(S5-3)를 포함한다.Referring to Figure 1, the bindless cover installation step (S5) according to an embodiment of the present invention, the step of moving the power line 44 downward to the insulator 43 (S5-1), and the bindless cover 46 ) Over the power line 44 (S5-2) and binding the power line 44 to the insulator 43 (S5-3).

전력선(44)을 애자(43)까지 하향 이동시키는 단계(S5-1)에서는 도 9에 도시된 바와 같이 간접활선용 완철(20)을 하강시켜 전력선(44)을 애자(43)까지 하향 이동시킨다. 간접활선용 완철(20)을 하강시키는 작업은, 완철승강장치(12)를 하강 작동시킴으로써, 보다 구체적으로는 로프가 풀리는 방향으로 풀리를 역회전시킴으로써 이루어질 수 있다.In the step of moving the power line 44 downward to the insulator 43 (S5-1), the power line 44 is moved downward to the insulator 43 by lowering the wancheol 20 for indirect live wire as shown in FIG. 9. . The operation of lowering the wancheol 20 for indirect walk can be accomplished by lowering the wancheol lifting device 12, and more specifically, by rotating the pulley in a direction in which the rope is unwound.

바인드리스커버(46)를 전력선(44)에 걸치는 단계(S5-2)에서는 집게 구조의 선단부를 가지는 스틱형 절연공구(30)를 사용해 도 6에 도시된 바와 같이 바인드리스커버(46)를 전력선(44)에 걸친다.In the step (S5-2) of attaching the bindless cover 46 to the power line 44, as shown in FIG. 6, the bindless cover 46 is attached to the power line using a stick-type insulating tool 30 having a tip of a clamp structure. (44).

전력선(44)을 애자(43)에 결속시키는 단계(S5-3)에서는, 제1애자커버부(463)와 제2애자커버부(464)로 애자(43)의 상부를 감싼 상태에서, 집게 구조의 선단부를 가지는 스틱형 절연공구(30)를 사용해 제1전선커버부(461)와 제2전선커버부(462)의 하부를 겹쳐지게 홀딩하고, 암체결부(465)에 결속부재(466)를 체결한다. 상기와 같은 과정을 거쳐 바인드리스커버(46)를 이용해 전력선(44)을 애자(43)에 결속시킬 수 있다.In the step (S5-3) of binding the power line 44 to the insulator 43, the first insulator cover portion 463 and the second insulator cover portion 464 cover the upper portion of the insulator 43, and forceps The lower portions of the first wire cover part 461 and the second wire cover part 462 are overlapped by using a stick-type insulating tool 30 having a front end of the structure, and a binding member 466 is attached to the arm fastening part 465. To conclude. Through the above process, the power line 44 may be bound to the insulator 43 using the bindless cover 46.

도 1을 참조하면, 본 발명의 일실시예에 따른 가완철결속해제단계(S6)는 전선삽입부(25)를 개방시키는 단계(S6-1)와, 전력선(44)과 전선삽입부(25)를 분리하는 단계(S6-2)를 포함한다.Referring to FIG. 1, the provisional iron releasing step (S6) according to an embodiment of the present invention includes a step of opening the wire insertion part 25 (S6-1), and the power line 44 and the wire insertion part 25 ) And separating (S6-2).

전선삽입부(25)를 개방시키는 단계(S6-1)에서는 도 3에 도시된 바와 같이 제1걸림고리(285)에 갈고리 구조의 선단부를 가지는 스틱형 절연공구(30)를 걸고, 개폐회동부(28)를 개방위치로 상향 회동시킨다. 전력선(44)과 상기 전선삽입부(25)를 분리하는 단계(S6-2)에서는 도 10에 도시된 바와 같이 전선삽입부(25)를 개방시킨 상태로 간접활선용 완철(20)을 하강시켜 전력선(44)으로부터 전선삽입부(25)를 분리한다.In the step of opening the wire insertion part 25 (S6-1), as shown in FIG. 3, a stick-type insulating tool 30 having a tip of a hook structure is hooked to the first hook 285, and the opening and closing rotation part Turn (28) upward to the open position. In the step of separating the power line 44 and the wire insertion part 25 (S6-2), as shown in FIG. 10, the wancheol 20 for indirect livelines is lowered while the wire insertion part 25 is opened. The electric wire insertion part 25 is separated from the power line 44.

상기와 같은 구성을 가지는 본 발명에 따른 간접활선용 완철(20)을 이용한 간접활선 작업방법에 의하면, 작업자가 활선상태의 전력선(44)과 직접 접촉하지 않고, 전력선(44)으로부터 이격된 위치에서 간접활선용 완철(20)과 스틱형 절연공구(30), 바인드리스커버(46)를 이용해 전력설비(40)를 안전하게 점검하거나 교체할 수 있다. 이에 따라, 작업자가 전력선에 접촉함에 따라 발생되는 안전사고를 예방할 수 있고, 여름철에도 작업자가 절연장갑, 절연복 등을 착용해야 하던 기존과 비교해, 작업자의 작업 여건과 작업 효율을 현저히 향상시킬 수 있다.According to the indirect live wire working method using the indirect live wire wancheol 20 according to the present invention having the configuration as described above, the operator does not directly contact the power line 44 in the live wire state, but at a position separated from the power line 44 The power equipment 40 can be safely inspected or replaced by using the wancheol (20) for indirect livelines, the stick-type insulation tool (30), and the bindless cover (46). As a result, it is possible to prevent safety accidents that occur when a worker contacts the power line, and compared to the past, when the worker has to wear insulating gloves, insulating clothing, etc., even in summer, the working conditions and work efficiency of the worker can be significantly improved. .

본 발명은 도면에 도시된 실시예를 참고로 하여 설명되었으나, 이는 예시적인 것에 불과하며, 당해 기술이 속하는 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다. 따라서, 본 발명의 진정한 기술적 보호범위는 아래의 특허청구범위에 의해서 정하여져야 할 것이다.Although the present invention has been described with reference to the embodiments shown in the drawings, this is only illustrative, and those of ordinary skill in the field to which the technology pertains, various modifications and other equivalent embodiments are possible. I will understand. Therefore, the true technical protection scope of the present invention should be determined by the following claims.

12 : 완철승강장치 20 : 간접활선용 완철
21 : 수직연장부 22 : 수평연장부
23 : 전선홀더부 24 : 이동지지부
25 : 전선삽입부 26 : 개방부
27 : 걸림홈부 28 : 개폐회동부
29 : 압접체결부 30 : 스틱형 절연공구
40 : 전력설비 41 : 전주
42 : 완철 43 : 애자
44 : 전력선 45 : 바인드선
46 : 바인드리스커버 281 : 회동본체부
282 : 인출이동부 283 : 탄성부재
284 : 걸림단부 285 : 제1걸림고리
295 : 제2걸림고리 461 : 제1전선커버부
462 : 제2전선커버부 463 : 제1애자커버부
464 : 제2애자커버부 465 : 암체결부
466 : 결속부재
12: complete lifting device 20: complete indirect live line
21: vertical extension 22: horizontal extension
23: wire holder 24: moving support
25: wire insertion part 26: open part
27: locking groove 28: opening and closing pivot
29: pressure bonding part 30: stick-type insulation tool
40: power equipment 41: Jeonju
42: Wancheol 43: Insulator
44: power line 45: bind line
46: bindless cover 281: rotating body
282: withdrawal moving part 283: elastic member
284: locking end 285: first locking ring
295: second locking ring 461: first wire cover part
462: second wire cover part 463: first insulator cover part
464: second insulator cover part 465: arm fastening part
466: binding member

Claims (10)

활선작업차의 버킷에 설치된 완철승강장치에 간접활선용 완철을 장착하는 가완철준비단계;
스틱형 절연공구를 사용해 전력선을 상기 간접활선용 완철에 결속하는 가완철및전선결속단계;
애자와 상기 전력선을 결속하는 바인드선 또는 바인드리스커버를 상기 스틱형 절연공구를 사용해 상기 애자로부터 분리하고, 상기 완철승강장치의 작동에 의해 상기 간접활선용 완철을 상승시켜 상기 전력선을 상기 애자로부터 이격시키는 바인더제거단계;
상기 애자를 포함한 전력설비를 점검하거나 교체하는 본작업단계;
상기 완철승강장치의 작동에 의해 상기 간접활선용 완철을 하강시켜 상기 전력선을 상기 애자측으로 하강시키고, 상기 스틱형 절연공구를 사용해 상기 바인드리스커버로 상기 전력선과 상기 애자를 결속하는 바인드리스커버설치단계; 및
상기 스틱형 절연공구를 사용해 상기 전력선을 상기 간접활선용 완철로부터 분리하는 가완철결속해제단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
A wan-cheol preparation step of mounting wan-cheol for indirect live line to the wan-cheol lifting device installed in the bucket of the live line work vehicle;
Ga Wan iron and wire binding step of binding the power line to the indirect live wire using a stick-type insulation tool;
A bind wire or a bindless cover that binds the insulator and the power line is separated from the insulator using the stick-type insulating tool, and the insulator for indirect live wire is raised by the operation of the wan-cheol lifting device to separate the power line from the insulator. Binder removal step;
A main operation step of inspecting or replacing power equipment including the insulator;
A bindless cover installation step of lowering the wancheol for indirect live line by the operation of the wancheol lifting device to lower the power line toward the insulator side, and binding the power line and the insulator with the bindless cover using the stick-type insulation tool; And
Indirect live line work method using a wancheol for indirect livelines, characterized in that comprising; separating the power line from the indirect liveline wancheol using the stick-type insulation tool.
제1항에 있어서,
상기 간접활선용 완철은,
수직방향으로 연장된 형상을 가지고 상기 완철승강장치에 장착되며, 상기 완철승강장치의 작동에 의해 승강되는 수직연장부;
상기 수직연장부의 상부에 수평방향으로 연장되게 형성되는 수평연장부; 및
상기 전력선을 결속가능한 구조를 가지고 상기 수평연장부에 설치되는 전선홀더부;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
The method of claim 1,
Wancheol for the indirect live line,
A vertical extension unit that has a shape extending in a vertical direction and is mounted on the wancheol lifting device, and is raised and lowered by the operation of the wancheol lifting device;
A horizontal extension part formed to extend in a horizontal direction above the vertical extension part; And
An indirect live wire working method using wancheol for indirect live wire comprising; a wire holder part having a structure capable of binding the power line and installed in the horizontal extension part.
제2항에 있어서,
상기 전선홀더부는,
상기 수평연장부의 둘레를 감싸며 설치되고, 상기 수평연장부를 따라 슬라이딩 이동되는 이동지지부;
상기 이동지지부의 상부에 결합되고, 상기 전력선이 하향 인입가능한 형상을 가지는 전선삽입부;
상기 전선삽입부에 회동가능하게 연결되고, 회동위치에 따라 상기 전선삽입부의 개방부를 개폐시키며, 상기 스틱형 절연공구를 걸 수 있는 제1걸림고리가 형성되는 개폐회동부; 및
상기 이동지지부를 관통하여 상기 수평연장부에 압접되고, 상기 스틱형 절연공구를 걸 수 있는 상기 제2걸림고리가 형성되는 압접체결부;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
The method of claim 2,
The wire holder part,
A moving support unit installed to surround the circumference of the horizontal extension and slidably move along the horizontal extension;
A wire insertion portion coupled to the upper portion of the movable support portion and having a shape in which the power line can be drawn downward;
An opening/closing and rotating part which is rotatably connected to the wire insertion part, opens and closes the open part of the wire insertion part according to the rotation position, and has a first locking ring through which the stick-type insulation tool can be hooked; And
Indirect live wire using wancheol for indirect live wire, characterized in that it includes; a pressure-contacting part which penetrates through the moving support part and is press-contacted to the horizontal extension part and is formed with the second locking ring through which the stick-type insulation tool can be hung. work method.
제3항에 있어서,
상기 개폐회동부는,
상기 전선삽입부의 일측부에 회동가능하게 힌지연결되는 회동본체부;
상기 회동본체부의 단부에 슬라이딩 이동가능하게 설치되고, 상기 회동본체부의 회동 각도에 따라 상기 전선삽입부의 타측부에 형성된 걸림홈부에 끼워지거나 상기 걸림홈부로부터 이격되는 인출이동부;
상기 회동본체부의 내부에 설치되고, 상기 인출이동부를 상기 회동본체부의 내측으로 탄성가압하는 탄성부재; 및
상기 인출이동부의 단부에 상기 걸림홈부보다 확장된 너비로 형성되고, 상기 탄성부재의 탄성력에 의해 상기 전선삽입부와 압접되며, 상기 제1걸림고리가 형성되는 걸림단부;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
The method of claim 3,
The opening and closing rotation part,
A rotating body unit hingedly connected to one side of the wire insertion unit;
A pull-out moving part that is installed to be slidably movable at an end of the rotating body part, and is fitted into a locking groove formed on the other side of the wire insertion part or spaced apart from the locking groove according to a rotation angle of the rotating body part;
An elastic member installed inside the rotating body part and elastically pressing the withdrawal moving part toward the inside of the rotating body part; And
And a locking end portion formed at an end of the withdrawal movable portion with a width greater than that of the locking groove portion, press-contacted with the wire insertion portion by an elastic force of the elastic member, and having the first locking ring formed therein. Indirect live line work method using wancheol for indirect live line.
제3항 또는 제4항에 있어서,
상기 가완철및전선결속단계는,
상기 제2걸림고리에 상기 스틱형 절연공구를 걸고, 상기 수평연장부를 따라 이동시키면서, 상기 전선홀더부의 위치를 상기 전력선에 대응되게 조절하는 단계;
상기 전선삽입부를 개방시킨 상태로 상기 간접활선용 완철을 상승시켜 상기 전력선을 상기 전선삽입부에 인입시키는 단계; 및
상기 제1걸림고리에 상기 스틱형 절연공구를 걸고, 상기 개폐회동부를 폐쇄위치로 회동시켜 상기 전력선을 상기 전선삽입부에 결속하는 단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
The method according to claim 3 or 4,
The Gawan Iron and wire bonding step,
Adjusting the position of the wire holder to correspond to the power line while hooking the stick-type insulating tool to the second hook and moving along the horizontal extension part;
Introducing the power line into the wire insertion part by raising the wancheol for the indirect live wire while the wire insertion part is opened; And
And engaging the stick-type insulating tool on the first hook and rotating the opening/closing rotation part to a closed position to bind the power line to the wire insertion part; Live line work method.
제3항에 있어서,
상기 가완철결속해제단계는,
상기 제1걸림고리에 상기 스틱형 절연공구를 걸고, 상기 개폐회동부를 개방위치로 회동시키는 단계; 및
상기 전선삽입부를 개방시킨 상태로 상기 간접활선용 완철을 하강시켜 상기 전력선과 상기 전선삽입부를 분리하는 단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
The method of claim 3,
The provisional iron binding release step,
Hooking the stick-type insulating tool to the first hook and rotating the opening/closing part to an open position; And
And separating the power line and the wire insertion part by descending the indirect live wire while the wire inserting part is opened. Indirect live wire working method using wancheol for indirect live wire, comprising: a.
제1항에 있어서,
상기 바인더제거단계는,
상기 스틱형 절연공구를 사용해 상기 바인드선을 상기 애자측으로 밀어 상기 바인드선의 권취 상태를 헐겁게 하고, 상기 바인드선과 상기 애자의 사이에 갭(gap)을 형성하는 단계;
상기 스틱형 절연공구를 상기 갭에 인입하여 상기 바인드선을 절단하고, 상기 전력선과 상기 애자간의 결속 상태를 해제하는 단계;
상기 간접활선용 완철을 상승시켜 상기 전력선과 상기 바인드선을 상기 애자로부터 이격시키는 단계; 및
상기 스틱형 절연공구를 이용해 상기 전력선으로부터 상기 바인드선을 제거하는 단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
The method of claim 1,
The binder removal step,
Pushing the bind wire toward the insulator using the stick-type insulating tool to loosen the wound state of the bind wire, and forming a gap between the bind wire and the insulator;
Cutting the bind wire by inserting the stick-type insulating tool into the gap, and releasing a bonded state between the power line and the insulator;
Separating the power line and the bind line from the insulator by raising the wancheol for the indirect live line; And
Removing the bind wire from the power line using the stick-type insulating tool; Indirect live wire working method using a wancheol for indirect live wire comprising a.
제1항에 있어서,
상기 바인드리스커버는,
상기 전력선의 일측부를 감싸는 제1전선커버부;
상기 제1전선커버부와 연결되고, 상기 전력선의 타측부를 감싸는 제2전선커버부;
상기 제1전선커버부와 연결되고, 상기 애자의 일측부를 감싸는 제1애자커버부;
상기 제2전선커버부와 연결되고, 상기 애자의 타측부를 감싸는 제2애자커버부;
상기 전력선을 감싼 상태에서 중첩되게 배치되는 상기 제1전선커버부와 상기 제2전선커버부의 하부에 형성되는 암체결부; 및
상기 암체결부에 체결되며, 상기 제1전선커버부와 상기 제2전선커버부를 상호 결속시키는 결속부재;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
The method of claim 1,
The bindless cover,
A first wire cover part surrounding one side of the power line;
A second wire cover part connected to the first wire cover part and surrounding the other side of the power line;
A first insulator cover part connected to the first wire cover part and surrounding one side of the insulator;
A second insulator cover part connected to the second wire cover part and surrounding the other side of the insulator;
An arm fastening part formed under the first wire cover part and the second wire cover part disposed to overlap while surrounding the power line; And
And a binding member that is fastened to the arm fastening part and binds the first wire cover part and the second wire cover part to each other.
제8항에 있어서,
상기 바인더제거단계는,
상기 스틱형 절연공구를 사용해 상기 결속부재를 상기 암체결부로부터 분리하는 단계;
상기 간접활선용 완철을 상승시켜 상기 전력선과 상기 제1전선커버부, 상기 제2전선커버부를 상기 애자로부터 이격시키는 단계; 및
상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부를 상기 전력선으로부터 분리하는 단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
The method of claim 8,
The binder removal step,
Separating the binding member from the arm fastening portion using the stick-type insulating tool;
Elevating the wancheol for the indirect live wire to separate the power line from the first wire cover part and the second wire cover part from the insulator; And
Separating the first wire cover part and the second wire cover part from the power line by using the stick-type insulation tool; indirect live wire working method using wancheol for indirect live wire, characterized in that it comprises a.
제8항에 있어서,
상기 바인드리스커버설치단계는,
상기 간접활선용 완철을 하강시켜 상기 전력선을 상기 애자까지 하향 이동시키는 단계;
상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부를 상기 전력선에 걸치는 단계; 및
상기 스틱형 절연공구를 사용해 상기 제1전선커버부와 상기 제2전선커버부의 하부를 겹쳐지게 홀딩한 상태로, 상기 암체결부에 상기 결속부재를 체결하며, 상기 전력선을 상기 애자에 결속시키는 단계;를 포함하는 것을 특징으로 하는 간접활선용 완철을 이용한 간접활선 작업방법.
The method of claim 8,
The bindless cover installation step,
Moving the power line downward to the insulator by lowering the wancheol for the indirect live line;
Straddling the first wire cover part and the second wire cover part over the power line using the stick-type insulating tool; And
Fastening the fastening member to the arm fastening part while holding the lower part of the first wire cover part and the second wire cover part overlappingly using the stick-type insulating tool, and binding the power line to the insulator; Indirect live line work method using wancheol for indirect live line, characterized in that it comprises a.
KR1020190095275A 2019-08-06 2019-08-06 Indirect hot-line working method using supporting bar for indirect hot-line work KR102372310B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190095275A KR102372310B1 (en) 2019-08-06 2019-08-06 Indirect hot-line working method using supporting bar for indirect hot-line work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190095275A KR102372310B1 (en) 2019-08-06 2019-08-06 Indirect hot-line working method using supporting bar for indirect hot-line work

Publications (2)

Publication Number Publication Date
KR20210016895A true KR20210016895A (en) 2021-02-17
KR102372310B1 KR102372310B1 (en) 2022-03-10

Family

ID=74731784

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190095275A KR102372310B1 (en) 2019-08-06 2019-08-06 Indirect hot-line working method using supporting bar for indirect hot-line work

Country Status (1)

Country Link
KR (1) KR102372310B1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102289230B1 (en) * 2021-04-14 2021-08-13 부성기술단 주식회사 Insulator utilization fixing device for installation of processing distribution line
KR102289231B1 (en) * 2021-04-20 2021-08-13 대승전력기술 (주) Auxiliary device for live wire work for maintenance of overhead distribution lines
KR102298331B1 (en) * 2021-04-28 2021-09-07 주식회사 민정테크 Device For Overhead Distribution Line
KR102373900B1 (en) * 2021-08-05 2022-03-18 (주)제이비씨 Overhead distribution line fixing mechanism with collision prevention function between wires
CN114284930A (en) * 2021-10-15 2022-04-05 国网浙江省电力有限公司衢州供电公司 Live working insulator replacement working method
KR102412949B1 (en) * 2022-01-04 2022-06-24 주식회사 세종이앤지 LP insulator indirect live wire replacement method
WO2022169237A1 (en) 2021-02-05 2022-08-11 주식회사 엘지에너지솔루션 Lamination device comprising pressure roll capable of adjusting pressing force and electrode assembly manufactured by using same
CN117154594A (en) * 2023-10-30 2023-12-01 天津滨电电力工程有限公司 Insulator binding wire dismantling tool for 10KV cable live working
CN117886206A (en) * 2024-03-18 2024-04-16 国网山东省电力公司东明县供电公司 Auxiliary replacing device for column type insulator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200381079Y1 (en) * 2005-01-12 2005-04-11 대원전기 주식회사 Insulating wire-stranding roller for switching live wire
KR20170133586A (en) * 2016-05-26 2017-12-06 양희성 Wire guide roller
KR20180051298A (en) * 2016-11-08 2018-05-16 양희성 Spatial Extendible Mechanization Working Device Using Live line Working Vehicle
KR20180129622A (en) * 2017-05-26 2018-12-05 제룡산업 주식회사 Bindless cover
KR101963635B1 (en) * 2018-06-15 2019-03-29 서광전기통신공사(주) Method for fixing power line using bindless line post cover instead of bind

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200381079Y1 (en) * 2005-01-12 2005-04-11 대원전기 주식회사 Insulating wire-stranding roller for switching live wire
KR20170133586A (en) * 2016-05-26 2017-12-06 양희성 Wire guide roller
KR20180051298A (en) * 2016-11-08 2018-05-16 양희성 Spatial Extendible Mechanization Working Device Using Live line Working Vehicle
KR20180129622A (en) * 2017-05-26 2018-12-05 제룡산업 주식회사 Bindless cover
KR101963635B1 (en) * 2018-06-15 2019-03-29 서광전기통신공사(주) Method for fixing power line using bindless line post cover instead of bind

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022169237A1 (en) 2021-02-05 2022-08-11 주식회사 엘지에너지솔루션 Lamination device comprising pressure roll capable of adjusting pressing force and electrode assembly manufactured by using same
KR102289230B1 (en) * 2021-04-14 2021-08-13 부성기술단 주식회사 Insulator utilization fixing device for installation of processing distribution line
KR102289231B1 (en) * 2021-04-20 2021-08-13 대승전력기술 (주) Auxiliary device for live wire work for maintenance of overhead distribution lines
KR102298331B1 (en) * 2021-04-28 2021-09-07 주식회사 민정테크 Device For Overhead Distribution Line
KR102373900B1 (en) * 2021-08-05 2022-03-18 (주)제이비씨 Overhead distribution line fixing mechanism with collision prevention function between wires
CN114284930A (en) * 2021-10-15 2022-04-05 国网浙江省电力有限公司衢州供电公司 Live working insulator replacement working method
CN114284930B (en) * 2021-10-15 2023-08-29 国网浙江省电力有限公司衢州供电公司 Live working insulator replacement working method
KR102412949B1 (en) * 2022-01-04 2022-06-24 주식회사 세종이앤지 LP insulator indirect live wire replacement method
CN117154594A (en) * 2023-10-30 2023-12-01 天津滨电电力工程有限公司 Insulator binding wire dismantling tool for 10KV cable live working
CN117154594B (en) * 2023-10-30 2024-01-12 天津滨电电力工程有限公司 Insulator binding wire dismantling tool for 10KV cable live working
CN117886206A (en) * 2024-03-18 2024-04-16 国网山东省电力公司东明县供电公司 Auxiliary replacing device for column type insulator

Also Published As

Publication number Publication date
KR102372310B1 (en) 2022-03-10

Similar Documents

Publication Publication Date Title
KR20210016895A (en) Indirect hot-line working method using supporting bar for indirect hot-line work
CN100367589C (en) Electric wire removing roller for LP insulator and power distribution method of construction
KR101955155B1 (en) Uninterruptible power method and Indirect live lifting device for Electronic pole for power line
KR101473822B1 (en) Method for hot line work of power distribution equipment
KR102249164B1 (en) Insulation insulator clip for indirect live wire and LP insulator, suspension insulator, Cut Out Switch, Lightning Arrester replacement indirect live wire method using the same
KR101873421B1 (en) Spatial Extendible Mechanization Working Device Using Live line Working Vehicle
KR102228755B1 (en) Bypass cable pulling device for indirect live wire with temporary hook with automatic detachable fixing hook and cable head rotating connection clamp and installation method using it
JP5908774B2 (en) Low-voltage lead-in wire overhead method, removal method for power consumers, and lead-in tools used in these methods
AU2002303016A1 (en) Electric wire removing roller for LP insulator and power distribution method of construction
KR101593000B1 (en) Crossarm lifting apparatus for live line work and live line job method
CN110120643B (en) Uninterrupted power operation method for power line of ground potential distribution network
KR102240478B1 (en) Insulator clip for indirect live wire and LP insulator replacement indirect live wire method using the same
JP5065814B2 (en) Electric wire replacement method
CN105356371A (en) Same-tower multi-loop power transmission line strain insulator string electrification replacing method and device
CN214755178U (en) Bypass cable and electrified wire connecting device
JP2004056837A (en) Temporary cable support
CN114725829B (en) Live working method for changing double-circuit line triangular arrangement straight line pole into tension pole
KR100987530B1 (en) The device for revision of electric wire which is used from electric wire tension method and that method
KR102437136B1 (en) Temporary hook for indirect live bypass cable pulling device with brake capable of adjusting the descending speed and indirect live bypass cable installation method using the same
KR102644279B1 (en) Top-down fastening wire clamp for bypass cable head capable of safe indirect live wire operation and indirect live wire elastic connection method using the same
KR102532796B1 (en) Supporting Equipment of Overhead Electric Power Line
KR102247151B1 (en) Apparatus for controlling cable distance
KR102548499B1 (en) Fixing Equipment of Overhead Electric Power Line
KR200247341Y1 (en) Electric wire removing roller for LP insulator
JP2022114185A (en) Train cable hanging tool and feeder exchanging method using the same

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right