CN105162028A - Method for replacing linear insulator of 220kV steel pipe tower in live working state - Google Patents
Method for replacing linear insulator of 220kV steel pipe tower in live working state Download PDFInfo
- Publication number
- CN105162028A CN105162028A CN201510424669.8A CN201510424669A CN105162028A CN 105162028 A CN105162028 A CN 105162028A CN 201510424669 A CN201510424669 A CN 201510424669A CN 105162028 A CN105162028 A CN 105162028A
- Authority
- CN
- China
- Prior art keywords
- electrician
- tower
- insulating
- wire
- rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
技术领域technical field
本发明输电线路维修技术领域,具体地来讲为一种20千伏钢管型杆塔带电更换直线绝缘子的方法。The technical field of transmission line maintenance of the present invention is specifically a method for replacing linear insulators with electricity on a 20 kV steel pipe-type pole tower.
背景技术Background technique
传统220千伏输电线路带电更换直线绝缘子都是在普通铁塔上操作,由于钢管型杆塔没有人员所需工作位置及没有传统起重工具悬挂位置,所以并没有合适的方法开展此类工作,其它的带电操作方法又达不到应有的效果。220千伏输电线路上需要大力开展的带电作业操作项目,以便达到在不停电的情况下对钢管型杆塔进行直线绝缘子更换的目的,因此需要解决超高压线路长期稳定运行的实际问题以及人员操作的安全问题。The replacement of linear insulators on traditional 220 kV transmission lines is performed on ordinary iron towers. Since steel pipe towers have no working positions required for personnel and no hanging positions for traditional lifting tools, there is no suitable way to carry out such work. Others The electrified operation method can't reach the desired effect again. The 220 kV transmission line needs to vigorously carry out the live work operation project, in order to achieve the purpose of replacing the straight insulator of the steel pipe pole tower without power failure, so it is necessary to solve the practical problems of long-term stable operation of ultra-high voltage lines and the safety of personnel operations question.
发明内容Contents of the invention
本发明所要解决的技术问题在于提供一种220千伏钢管型杆塔带电更换直线绝缘子的方法,可以在220千伏输电线路上大力开展的带电作业操作项目,以便达到在不停电的情况下对钢管型杆塔进行直线绝缘子更换的目的,解决了超高压线路长期稳定运行的实际问题。The technical problem to be solved by the present invention is to provide a method for live replacement of linear insulators on 220 kV steel pipe towers, which can be carried out vigorously on the 220 kV transmission line, so as to achieve steel pipe shape without power failure. The purpose of replacing linear insulators on poles and towers is to solve the practical problem of long-term stable operation of ultra-high voltage lines.
本发明是这样实现的,一种220千伏钢管型杆塔带电更换直线绝缘子的方法,包括如下的步骤:The present invention is achieved in this way, a method for live replacement of linear insulators on a 220 kV steel pipe type pole tower, comprising the following steps:
(1)杆塔上电工携带绝缘绳上杆,将绝缘绳挂在杆塔上,地面电工利用绝缘绳将钢管型杆塔挂点卡具传递至杆塔上电工;(1) The electrician on the tower carries the insulating rope to the pole, hangs the insulating rope on the tower, and the electrician on the ground uses the insulating rope to transfer the steel pipe type pole tower hanging point fixture to the electrician on the tower;
(2)杆塔上电工将挂点卡具安装在钢管型杆塔横担头部;(2) The electrician on the pole tower installs the hanging point fixture on the head of the steel pipe type pole tower cross arm;
(3)利用绝缘绳将两套滑车组传递至杆塔上,将两套滑车组分别挂在挂点卡具的两侧;(3) Use the insulating rope to transfer the two sets of blocks to the tower, and hang the two sets of blocks on both sides of the hanging point fixture;
(4)利用绝缘绳将绝缘操作平台传递至杆塔上,将绝缘操作平台安装在钢管型杆塔横担根部;(4) Use the insulating rope to transfer the insulating operation platform to the pole tower, and install the insulating operation platform on the root of the cross arm of the steel pipe type pole tower;
(5)在绝缘操作平台上进行操作,将取销器和扶正器固定在一绝缘操作杆两端后用绝缘绳将绝缘操作杆传送至杆塔;(5) Operate on the insulating operating platform, fix the pin remover and centralizer on both ends of an insulating operating rod, and then use the insulating rope to transfer the insulating operating rod to the tower;
(6)将直线绝缘保护绳挂在滑车组外侧;(6) Hang the linear insulating protection rope on the outside of the pulley block;
(7)地面电工将滑轮组尾绳收紧并系于杆塔牢固构件上,导线脱离绝缘子串前,杆塔上电工将滑车组上的双吊线钩钩好导线;(7) The electrician on the ground tightens the tail rope of the pulley block and tie it to the firm member of the tower. Before the wire is separated from the insulator string, the electrician on the tower hooks the wire with the double suspension hook on the block block;
(8)用取销器取出导线碗头处弹簧销子后,地面电工用绝缘滑车组提升导线,配合脱离绝缘子串与碗头的连接;绝缘子串与碗头脱离后,将滑车组固定,导线位置保持不变;(8) After taking out the spring pin at the bowl head of the wire with a pin remover, the ground electrician lifts the wire with an insulated tackle set to cooperate with the connection between the insulator string and the bowl head; constant;
(9)用绝缘绳将绝缘子串绑扎,地面电工配合用力拉拽绝缘循环绳,杆塔上1号电工将绝缘子串横担头处挂点摘下;(9) Bind the insulator strings with insulating ropes, and the electrician on the ground cooperates to pull the insulating looping ropes forcefully, and the No. 1 electrician on the pole tower removes the hanging point at the head of the insulator string;
(10)安装绝缘子:地面电工用绝缘绳将检测完好的新绝缘子传递至杆塔上,杆塔上电工在横担挂点处安装新绝缘子串,装好弹簧销子,解开系在绝缘子串上的绝缘绳,杆塔上电工利用滑车组和双吊线钩钩好导线,地面电工收紧滑车组上的尾绳提升导线,使导线上的碗头靠近绝缘子串,利用绝缘操作杆上的扶正器恢复绝缘子串与碗头连接并将弹簧销复位。(10) Install insulators: The electrician on the ground uses an insulating rope to transfer the new insulators that have been tested to the pole tower. The electrician on the pole tower installs a new insulator string at the hanging point of the cross-arm, installs the spring pin, and unties the insulator string. Insulation rope, the electrician on the pole tower uses the block block and the double suspension hook to hook the wire, and the ground electrician tightens the tail rope on the block block to lift the wire, so that the bowl head on the wire is close to the insulator string, and restores the insulator with the centralizer on the insulation operating rod The string connects to the bowl head and resets the spring pin.
本发明与现有技术相比,有益效果在于:本发明操作方法使用绝缘操作平台,用于使作业人员与带电导线可处于一个水平面上,有利于作业人员使用绝缘杆对绝缘子下部的安装及拆卸;使用挂点卡具,用于起重工具的安装及提升力可得到有效的支撑。可将原来采用停电才能完成的工作在线路不停电的情况下完成,提高了工作完成率,增加了带电作业操作项目,并提高了安全性。Compared with the prior art, the present invention has the beneficial effect that: the operating method of the present invention uses an insulating operation platform, which is used to make the operator and the live wire be on a horizontal plane, which is beneficial for the operator to use the insulating rod to install and disassemble the lower part of the insulator ;Using the hanging point fixture, the installation and lifting force of the lifting tool can be effectively supported. The work that can only be completed by power failure can be completed without power failure of the line, which improves the completion rate of the work, increases the operation items of live work, and improves the safety.
附图说明Description of drawings
图1是本发明滑车组以及挂点卡具安装的结构示意图;Fig. 1 is the structural representation of block block and hanging point fixture installation of the present invention;
图2是本发明绝缘操作平台的安装结构示意图。Fig. 2 is a schematic diagram of the installation structure of the insulating operation platform of the present invention.
具体实施方式Detailed ways
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
实施例Example
一种220千伏钢管型杆塔带电更换直线绝缘子的方法,A method for live replacement of linear insulators on a 220 kV steel pipe tower,
参见图1结合图2,See Figure 1 in conjunction with Figure 2,
1)杆塔上1号电工携带绝缘传递绳上杆,将绝缘绳挂好后,地面电工利用绝缘绳先将钢管型杆塔挂点卡具3传递至1号电工;1) No. 1 electrician on the pole tower carries the insulating transfer rope to the pole. After hanging the insulating rope, the ground electrician uses the insulating rope to first pass the steel pipe type pole tower hanging point fixture 3 to the No. 1 electrician;
2)1号电工将挂点卡具3安装在在钢管型杆塔横担头部4,并安装紧固、可靠2) No. 1 electrician installs the hanging point fixture 3 on the head 4 of the steel pipe type pole tower cross arm, and installs it firmly and reliably
3)挂点卡具3安装好后,地面电工利用绝缘绳将两套起重工具5,5-5滑车组,传递至1号电工手中;3) After the hanging point fixture 3 is installed, the ground electrician uses the insulating rope to pass the two sets of lifting tools 5, 5-5 tackle groups to the hands of the No. 1 electrician;
4)1号电工将起重工具5与已经安装完毕的挂点卡具进行连接;4) No. 1 electrician connects the lifting tool 5 with the installed hanging point fixture;
5)地面电工利用绝缘绳将绝缘操作平台6递至杆塔上2号电工手中;5) The ground electrician uses the insulating rope to hand over the insulating operation platform 6 to the No. 2 electrician on the tower;
6)将绝缘操作平台安装在钢管型杆塔横担根部,绝缘操作平台6与挂点卡具安装在同一个横担上,并安装紧固、可靠;6) Install the insulating operation platform on the root of the cross arm of the steel pipe type pole tower, and install the insulating operating platform 6 and the hanging point fixture on the same cross arm, and the installation is fastened and reliable;
7)地面电工将取销器、扶正器固定在绝缘操作杆两端后,用绝缘绳将组装好的绝缘操作杆传送至杆塔上;7) After the ground electrician fixes the pin remover and centralizer at both ends of the insulating operating rod, use the insulating rope to transfer the assembled insulating operating rod to the tower;
8)挂点卡具两侧5-5滑车组及5-5滑车组上的双吊线钩安装后保证受力均匀。将直线绝缘保护绳挂在滑车组外侧,直线绝缘保护绳挂在横担与导线之间,并适当收紧,以防各受力点失灵。8) The 5-5 blocks on both sides of the hanging point fixture and the double suspension hooks on the 5-5 blocks are installed to ensure uniform force. Hang the linear insulation protection rope on the outside of the pulley block, hang the linear insulation protection rope between the cross arm and the wire, and tighten it properly to prevent failure of each stress point.
9)地面电工将滑车组尾绳1收紧并系于杆塔牢固构件上,导线脱离绝缘子串前,杆塔上1号电工检查确定双吊线钩2、直线绝缘保护绳钩好导线。9) The electrician on the ground tightens the tail rope 1 of the block block and tie it to the firm member of the tower. Before the wire is separated from the insulator string, the No. 1 electrician on the tower checks and confirms that the double wire hook 2 and the straight line insulation protection rope are hooked to the wire.
10)杆塔上2号电工用取销器取出导线碗头处弹簧销子后,地面电工用绝缘滑轮组慢慢提升导线,配合杆塔上2号电工脱离绝缘子串与碗头的连接。绝缘子串与碗头脱离后,地面电工需注意保持导线与横担间空气间隙距离及下方交叉跨越距离,将5-5滑车组固定,导线位置保持不变。10) After the No. 2 electrician on the tower uses a pin remover to take out the spring pin at the bowl head of the wire, the ground electrician slowly lifts the wire with an insulating pulley block, and cooperates with the No. 2 electrician on the tower to separate the connection between the insulator string and the bowl head. After the insulator string is separated from the bowl head, the ground electrician needs to pay attention to maintaining the air gap distance between the wire and the cross arm and the cross-over distance below, and fix the 5-5 pulley block, and the position of the wire remains unchanged.
11)杆塔上1号电工保证绝缘绳索有效长度:220kV不低于1.8m。在保证安全的前提下,杆塔上1号电工用绝缘绳将绝缘子串绑扎牢固,地面电工配合用力拉拽绝缘循环绳,杆塔上1号电工顺势将绝缘子串横担头处挂点摘下。11) No. 1 electrician on the pole tower shall ensure that the effective length of the insulating rope is not less than 1.8m at 220kV. Under the premise of ensuring safety, the No. 1 electrician on the tower uses insulating rope to bind the insulator strings firmly, and the ground electrician cooperates with forcefully pulling the insulating loop rope, and the No. 1 electrician on the tower takes advantage of the opportunity to remove the hanging point at the head of the insulator string.
12)安装绝缘子:地面电工用绝缘绳将检测完好的新绝缘子传递至杆塔上。杆塔上1号电工在横担挂点处安装新绝缘子串,装好弹簧销子,将绝缘子大口方向转至一致方向。解开系在绝缘子串上的绝缘绳。杆塔上1号电工将5-5滑车组和双吊线钩钩好导线。地面电工收紧5-5滑车组慢慢提升导线,使导线上的碗头靠近绝缘子串,杆塔上2号电工与地面电工配合,利用绝缘操作杆上的扶正器恢复绝缘子串与碗头连接并将弹簧销复位。绝缘子串恢复后应保证销子完好,瓶口方向一致。12) Install insulators: Ground electricians use insulating ropes to pass new insulators that have been tested to the tower. The No. 1 electrician on the tower installs a new insulator string at the hanging point of the cross arm, installs the spring pin, and turns the direction of the insulator's mouth to the same direction. Untie the insulating cord tied to the string of insulators. The No. 1 electrician on the pole and tower hooked the 5-5 block block and the double suspension hook to the wire. The ground electrician tightens the 5-5 pulley block and slowly lifts the wire so that the bowl head on the wire is close to the insulator string. Return the spring pins. After the insulator string is restored, it should be ensured that the pins are intact and the direction of the bottle mouth is consistent.
13)拆除工具:杆塔上电工检查绝缘子与导线、横担的连接点,检查弹簧销子是否复位。无问题后拆除杆塔上作业工器(包括挂点卡具、起重工具以及绝缘操作平台)具并用绝缘绳栓牢系下,电工解开安全带、安全绳,带绝缘绳,下杆塔。13) Removal tools: The electrician on the tower checks the connection points between the insulators, the wires and the crossarm, and checks whether the spring pins are reset. After there is no problem, dismantle the working tools (including hanging point clamps, lifting tools and insulating operation platform) on the tower and fasten them firmly with insulating ropes.
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the protection of the present invention. within range.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510424669.8A CN105162028A (en) | 2015-07-17 | 2015-07-17 | Method for replacing linear insulator of 220kV steel pipe tower in live working state |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510424669.8A CN105162028A (en) | 2015-07-17 | 2015-07-17 | Method for replacing linear insulator of 220kV steel pipe tower in live working state |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105162028A true CN105162028A (en) | 2015-12-16 |
Family
ID=54802825
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510424669.8A Pending CN105162028A (en) | 2015-07-17 | 2015-07-17 | Method for replacing linear insulator of 220kV steel pipe tower in live working state |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105162028A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106169718A (en) * | 2016-09-29 | 2016-11-30 | 国网江苏省电力公司南京供电公司 | One can charged for replacement cable termination support insulator support means |
| CN108574231A (en) * | 2018-05-02 | 2018-09-25 | 国家电网公司 | A kind of special split-pin device of M pins based on from fly block |
| CN110924734A (en) * | 2019-11-11 | 2020-03-27 | 天津送变电工程有限公司 | A special bracket for large corner tower spanning and sealing net |
| CN112670898A (en) * | 2021-01-21 | 2021-04-16 | 广东电网能源发展有限公司 | Method, device, equipment and medium for live replacement of insulator string |
| CN114188875A (en) * | 2021-11-23 | 2022-03-15 | 天津送变电工程有限公司 | Matching device for improving performance of paying-off tackle of power transmission line |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101640391A (en) * | 2009-07-15 | 2010-02-03 | 武汉科瑞德电力科技有限公司 | Live-wire operation method for replacing insulator for 35kV distribution circuit |
| CN202308916U (en) * | 2011-11-11 | 2012-07-04 | 辽宁省电力有限公司辽阳供电公司 | 220 kV power transmission line live-line work insulation operation platform |
| CN102646945A (en) * | 2012-04-27 | 2012-08-22 | 辽宁省电力有限公司辽阳供电公司 | Method for 500kV live replacement of composite insulators |
| CN202872258U (en) * | 2012-11-06 | 2013-04-10 | 湖南省电力公司长沙电业局 | Replacement tool for linear composite insulator string of 110 kV steel-pipe pole |
| CN103928867A (en) * | 2014-04-24 | 2014-07-16 | 国家电网公司 | Double-hoisting-point pole head clamp for replacing straight-line insulator of 220 kV line steel pipe pole in electrified mode |
-
2015
- 2015-07-17 CN CN201510424669.8A patent/CN105162028A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101640391A (en) * | 2009-07-15 | 2010-02-03 | 武汉科瑞德电力科技有限公司 | Live-wire operation method for replacing insulator for 35kV distribution circuit |
| CN202308916U (en) * | 2011-11-11 | 2012-07-04 | 辽宁省电力有限公司辽阳供电公司 | 220 kV power transmission line live-line work insulation operation platform |
| CN102646945A (en) * | 2012-04-27 | 2012-08-22 | 辽宁省电力有限公司辽阳供电公司 | Method for 500kV live replacement of composite insulators |
| CN202872258U (en) * | 2012-11-06 | 2013-04-10 | 湖南省电力公司长沙电业局 | Replacement tool for linear composite insulator string of 110 kV steel-pipe pole |
| CN103928867A (en) * | 2014-04-24 | 2014-07-16 | 国家电网公司 | Double-hoisting-point pole head clamp for replacing straight-line insulator of 220 kV line steel pipe pole in electrified mode |
Non-Patent Citations (2)
| Title |
|---|
| 四川省电力公司: "《高压带电作业技术》", 30 June 2003 * |
| 国家电网公司: "《带电作业操作方法:第1分册·输电线路》", 30 January 2009 * |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106169718A (en) * | 2016-09-29 | 2016-11-30 | 国网江苏省电力公司南京供电公司 | One can charged for replacement cable termination support insulator support means |
| CN108574231A (en) * | 2018-05-02 | 2018-09-25 | 国家电网公司 | A kind of special split-pin device of M pins based on from fly block |
| CN110924734A (en) * | 2019-11-11 | 2020-03-27 | 天津送变电工程有限公司 | A special bracket for large corner tower spanning and sealing net |
| CN112670898A (en) * | 2021-01-21 | 2021-04-16 | 广东电网能源发展有限公司 | Method, device, equipment and medium for live replacement of insulator string |
| CN114188875A (en) * | 2021-11-23 | 2022-03-15 | 天津送变电工程有限公司 | Matching device for improving performance of paying-off tackle of power transmission line |
| CN114188875B (en) * | 2021-11-23 | 2023-09-08 | 天津送变电工程有限公司 | Supporting device for improving paying-off pulley performance of power transmission line |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102882153B (en) | Phase replacing insulator string method in charged for replacement circuit many times towers | |
| WO2012088987A1 (en) | Maintenance tool for insulator of direct current transmission line | |
| CN104505766B (en) | The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings | |
| CN103618251A (en) | Technology for electrified overhaul of +-800kV ultrahigh voltage direct-current transmission line | |
| CN105162028A (en) | Method for replacing linear insulator of 220kV steel pipe tower in live working state | |
| CN105337217B (en) | A kind of instrument and its method of charged for replacement extra-high voltage ground electrode circuit linear insulator | |
| CN102185265B (en) | Construction method for replacing cross arm of 35kV line linear rod | |
| CN103904444B (en) | Transmission line level installing grounding wire device | |
| CN103606854A (en) | Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode | |
| CN105356371A (en) | Same-tower multi-loop power transmission line strain insulator string electrification replacing method and device | |
| CN105932601B (en) | Disconnected strand of overhead grounding wire method for repairing and mending | |
| CN107834434A (en) | Crossing method for the construction of transmission line of electricity tension stringing | |
| CN110932168B (en) | A method for replacing tensile insulators in UHV DC whole towers | |
| CN101546894B (en) | Method for replacing 220KV steel pipe tower composite insulator electrifiedly | |
| CN104868397A (en) | Tumbling pulley used for crossing horizontally-arranged double-bundled conductor spacer | |
| CN204424800U (en) | The lifting device of replacing insulator string on transmission line | |
| CN101908739B (en) | Trolley used for maintenance of electricity overhead power transmission line | |
| CN204927971U (en) | A embrace pole for electrified insulator chain that changes of transmission line | |
| CN103887735A (en) | Linear charged wire lifting device of electric transmission line | |
| CN103474909A (en) | Method for replacing multi-loop strain insulator string in drainage wire supporting distance expanding hot-line working | |
| CN104836156A (en) | Synthetic insulator simple ladder | |
| CN102623927A (en) | Tools and methods for live replacement of 220kV line multi-circuit double-split conductor insulators | |
| CN106451231B (en) | A kind of method of quick mounting power distribution network ice-melt connecting wire | |
| CN205159920U (en) | Insulator chain is dangled with insulating picture peg with many times transmission line wire jumpers in tower to electrified change | |
| CN206575086U (en) | Insulate turnbuckle plate pulling device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151216 |