KR102317443B1 - Construction method of apartment electric facility - Google Patents
Construction method of apartment electric facility Download PDFInfo
- Publication number
- KR102317443B1 KR102317443B1 KR1020190129106A KR20190129106A KR102317443B1 KR 102317443 B1 KR102317443 B1 KR 102317443B1 KR 1020190129106 A KR1020190129106 A KR 1020190129106A KR 20190129106 A KR20190129106 A KR 20190129106A KR 102317443 B1 KR102317443 B1 KR 102317443B1
- Authority
- KR
- South Korea
- Prior art keywords
- image
- electrical equipment
- wiring diagram
- projection
- electrical wiring
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
- E04F17/08—Vertical ducts; Channels, e.g. for drainage for receiving utility lines, e.g. cables, pipes
Abstract
본 발명은 아파트 전기설비 시공방법에 관한 것으로서, 설계도면 상 기준좌표에 도면투사수단을 설치하는 단계(S10); 도면투사수단을 이용해 투사면에 전기배선도 영상을 투사하는 단계(S20); 투사면에 투사된 전기배선도에 따라 전기설비를 설치하는 단계(S30); 를 포함하는 것을 특징으로 한다.
본 발명에 따르면, 도면투사수단을 이용해 구조물의 슬라브 및 벽체에 전기설비 설계도면을 투사하여 투사된 도면에 따라 전기설비의 시공이 이루어짐으로써 작업자가 설계도면을 소지하거나, 설계도면을 완전히 숙지하지 못한 상태에서도 복잡한 전기설비의 신속하고, 간편하며, 정확한 시공이 가능케 되는 효과가 있다.The present invention relates to a method for constructing electrical equipment for an apartment, comprising: installing a drawing projection means on a reference coordinate on a design drawing (S10); Projecting the electrical wiring diagram image on the projection surface using the drawing projection means (S20); Installing electrical equipment according to the electrical wiring diagram projected on the projection surface (S30); It is characterized in that it includes.
According to the present invention, the electric equipment design drawings are projected on the slabs and walls of the structure by using the drawing projection means, and the construction of the electric equipment is made according to the projected drawings, so that the operator has the design drawings or does not fully understand the design drawings. It has the effect of enabling quick, simple, and accurate construction of complex electrical equipment even in a state of affairs.
Description
본 발명은 아파트 전기설비 시공방법에 관한 것으로, 특히 도면투사수단을 이용해 구조물의 슬라브 및 벽체에 전기설비 설계도면을 투사하여 투사된 도면에 따라 전기설비의 시공이 이루어지도록 함으로써 복잡한 전기설비의 신속하고, 간편하며, 정확한 시공이 가능케 한 아파트 전기설비 시공방법에 관한 것이다. The present invention relates to a method for constructing electrical equipment in an apartment building, and in particular, by projecting the electrical equipment design drawings on the slabs and walls of the structure using the drawing projection means so that the construction of the electric equipment is made according to the projected drawings, it is possible to rapidly and , it relates to a method of constructing electrical equipment in an apartment that enables simple and accurate construction.
철근 콘크리트로 된 대표적인 주거용 건축물인 아파트의 골조공사의 세부공정은, 철근공사, 형틀공사, 콘크리트 타설공사로 구성되며, 이와 함께 전기설비공사가 이루어진다. The detailed process of framing construction of an apartment, which is a typical residential building made of reinforced concrete, consists of reinforcement construction, formwork construction, and concrete pouring construction, along with electrical installation construction.
즉, 아파트 골조공사 시 전기설비공사는 각 층의 슬라브 철근의 배근이 완료되면, 설계도면에 따른 슬라브 상면의 특정 위치에 허브커넥터를 설치하고, 각 허브커넥터 간을 연결하는 전선관을 연결하게 된다.That is, in the case of apartment frame construction, when the reinforcement of the slab reinforcing bars on each floor is completed, the hub connector is installed at a specific location on the upper surface of the slab according to the design drawing, and the conduit connecting each hub connector is connected.
또한, 벽체용 철근의 배근이 완료되면, 설계도면에 따른 위치에 콘센트박스를 설치하고, 콘센트박스에도 필요한 전선관을 연결하게 된다.In addition, when the reinforcement of the wall reinforcement is completed, the outlet box is installed at the location according to the design drawing, and the necessary conduit is connected to the outlet box.
그런데 종래에는 허브커넥터나 콘센트박스의 설치 시 작업자가 설계도면을 숙지하고, 설계도면에 따라 지정된 위치에 허브커넥터나 콘센트박스를 설치해야 하지만, 아파트의 면적이 넓어 슬라브 상면에서 허브커넥터나 콘센트박스 및 이에 연결되는 전선관의 수가 많아지는 경우에 작업자가 일일이 그 위치를 정확하게 숙지하기 어려운 단점이 있다.However, in the prior art, when installing a hub connector or outlet box, an operator must be familiar with the design drawing and install the hub connector or outlet box at a designated location according to the design drawing. When the number of conduits connected thereto increases, there is a disadvantage in that it is difficult for the operator to know the exact location of each one.
또한, 근래에는 첨부도면 도 1 및 도 2와 같이 통신, 소방, 전기 등 용도에 따라 서로 다른 색상의 전선관이 서로 다른 위치의 허브커넥터 및 콘센트박스로 연결되기 때문에 전선관의 용도별로 색상 및 연결 위치를 작업자가 모두 숙지해야 하는데 이 또한 아파트의 면적에 비례하여 허브커넥터나 콘센트박스 및 이에 연결되는 전선관의 수가 많아지는 경우에 작업자가 일일이 그 위치를 정확하게 숙지하기 어려운 단점이 있다. In addition, in recent years, as shown in the accompanying drawings 1 and 2, conduits of different colors are connected to hub connectors and outlet boxes in different locations depending on the purpose of communication, firefighting, electricity, etc. Operators must be fully aware of this, but also, when the number of hub connectors or outlet boxes and conduits connected thereto increases in proportion to the area of the apartment, there is a disadvantage in that it is difficult for the operator to accurately understand the location one by one.
따라서, 허브커넥터나 콘센트박스의 정확한 설치 위치 및 전선관의 종류나 전선관의 연결 위치를 정확하게 숙지하지 못한 상태에서 일일이 설계도면을 확인해가며 전기설비공사를 진행하는 경우에 작업시간의 지연이 불가피한 단점이 있다.Therefore, when performing electrical installation work while checking the design drawings one by one without knowing the exact installation location of the hub connector or outlet box, the type of conduit, or the connection location of the conduit, there is a disadvantage in that the work time is unavoidable. .
또한, 작업자가 설계도면을 잘못 이해하여 잘못된 곳에 허브커넥터나 콘센트박스 및 전선관이 설치된 후 콘크리트 타설공사가 이루어지는 경우에, 잘못 설치된 허브커넥터나 콘센트박스 및 전선관의 설치를 위하여 양생이 완료된 콘크리트를 깨부순 후 허브커넥터나 콘센트박스 및 전선관을 다시 설치해야 함으로써 작업능률 저하 및 작업시간의 지연에 따른 공사 지연 및 공사비 인상의 요인이 되는 단점도 있다. In addition, in the case where concrete pouring work is performed after a hub connector or outlet box and conduit are installed in the wrong place due to an incorrect understanding of the design drawing by the operator, the concrete that has been cured is broken for installation of the incorrectly installed hub connector or outlet box and conduit. There is also the disadvantage that the work efficiency is lowered and the work time is delayed due to the need to re-install the hub connector, the outlet box, and the conduit, which causes a delay in the construction and an increase in the construction cost.
상술한 바와 같은 종래의 단점을 해결하기 위하여 본 발명은 기준좌표에 도면투사수단을 설치한 후, 도면투사수단을 이용해 구조물의 슬라브 및 벽체에 전기설비 설계도면을 투사하여 투사된 도면에 따라 전기설비의 시공이 이루어지게 한 아파트 전기설비 시공방법을 제공하는 것을 목적으로 한다. In order to solve the disadvantages of the prior art as described above, the present invention installs the drawing projection means on the reference coordinates, and then projects the electrical equipment design drawings on the slab and wall of the structure using the drawing projection means, according to the projected drawings. The purpose of the present invention is to provide a method of constructing electrical equipment for an apartment that allows the construction of
상술한 바와 같은 목적의 달성을 위하여 본 발명의 아파트 전기설비 시공방법은, 설계도면 상 기준좌표에 도면투사수단을 설치하는 단계(S10);In order to achieve the above object, the apartment electrical equipment construction method of the present invention includes the steps of installing a drawing projection means on a reference coordinate on a design drawing (S10);
상기 도면투사수단을 이용해 투사면에 전기배선도 영상을 투사하는 단계(S20);Projecting the electrical wiring diagram image on the projection surface using the drawing projection means (S20);
상기 투사면에 투사된 전기배선도에 따라 전기설비를 설치하는 단계(S30); 를 포함한다.installing electrical equipment according to the electrical wiring diagram projected on the projection surface (S30); includes
상기 도면투사수단은,The drawing projection means,
슬라브 상면에 안착되는 스탠드(10);a stand (10) that is seated on the upper surface of the slab;
상기 스탠드(10)의 상단부에 형성된 브래킷(103)에 탈부착 가능케 설치되어 전기배선도 영상을 투사하는 영상투사모듈(20); 을 포함하되,an
상기 영상투사모듈(20)은, The
전기배선도 영상을 투사하는 영상투사부(201);an
상기 영상투사부(201)를 제어하는 제어부(203); 를 포함하는 것을 특징으로 한다.a
상기 전기배선도 영상을 투사하는 단계(S20)는, Projecting the electrical wiring diagram image (S20),
도면데이터를 로딩하여 영상투사부(201)에 전송하는 단계(S201);Loading the drawing data and transmitting it to the image projection unit 201 (S201);
상기 영상투사부(201)에 로딩된 도면데이터를 기반으로 전기배선도 영상을 투사면에 투사하는 단계(S202); 를 포함하는 것을 특징으로 한다.Projecting an electrical wiring diagram image on the projection surface based on the drawing data loaded in the image projection unit 201 (S202); It is characterized in that it includes.
상기 영상투사모듈(20)은, The
사용자가 설치한 전기설비의 위치를 감지하는 비전감지부(207);a
비전감지부(207)의 비전 처리 결과를 표시하는 출력수단(208);output means 208 for displaying the vision processing result of the
사용자에 의한 데이터 입력을 위한 입력수단(209); 이 더 구비되는 것을 특징으로 한다.input means 209 for data input by a user; It is characterized in that it is further provided.
본 발명에 따른 일 실시 예는, An embodiment according to the present invention,
상기 투사면에 투사된 전기배선도 영상에 따라 사용자가 설치한 전기설비의 위치를 감지하는 단계(S40);Sensing the location of the electrical equipment installed by the user according to the image of the electrical wiring diagram projected on the projection surface (S40);
상기 감지된 전기설비의 위치좌표와, 사전 저장된 전기설비의 기준좌표에 따른 기준좌표를 비교하여 매칭 여부를 판별하는 단계(S50);Comparing the sensed location coordinates of the electrical equipment with reference coordinates according to the pre-stored reference coordinates of the electrical equipment to determine whether matching (S50);
상기 위치좌표와 기준좌표의 매칭 결과를 표시하는 단계(S60);displaying the matching result of the position coordinates and the reference coordinates (S60);
시공완료데이터를 입력하는 단계(S70); 를 더 포함하는 것을 특징으로 한다.inputting construction completion data (S70); It is characterized in that it further comprises.
본 발명에 따르면, 도면투사수단을 이용해 구조물의 슬라브 및 벽체에 전기설비 설계도면을 투사하여 투사된 도면에 따라 전기설비의 시공이 이루어짐으로써 작업자가 설계도면을 소지하거나, 설계도면을 완전히 숙지하지 못한 상태에서도 복잡한 전기설비의 신속하고, 간편하며, 정확한 시공이 가능케 되는 효과가 있다.According to the present invention, the electric equipment design drawings are projected on the slabs and walls of the structure using the drawing projection means, and the construction of the electric equipment is made according to the projected drawings, so that the operator has the design drawings or does not fully understand the design drawings. It has the effect of enabling quick, simple, and accurate construction of complex electrical equipment even in a state of affairs.
또한, 작업능률 향상을 통해 작업시간이 대폭 단축됨으로써 공기 단축을 통해 공사비를 절감할 수 있는 효과도 있다.In addition, there is an effect of reducing the construction cost by shortening the construction period by significantly shortening the working time through the improvement of the working efficiency.
도 1, 도 2는 종래의 아파트 전기설비 시공 상태를 나타낸 예시도.
도 3은 발명의 아파트 전기설비 시공방법의 한 실시 예에 따른 블록도.
도 4는 본 발명의 아파트 전기설비 시공방법의 한 실시 예에 따른 도면투사수단을 나타낸 사시도.
도 5는 본 발명의 아파트 전기설비 시공방법의 한 실시 예에 따른 영상투사모듈을 나타낸 블록도.
도 6은 본 발명의 아파트 전기설비 시공방법의 한 실시 예에 따른 도면투사수단이 슬라브 상면에 전기배선도를 투사하는 상태를 나타낸 예시도.
도 7은 본 발명의 아파트 전기설비 시공방법의 한 실시 예에 따른 도면투사수단이 벽체 내면에 전기배선도를 투사하는 상태를 나타낸 예시도.
도 8은 본 발명의 아파트 전기설비 시공방법의 또 다른 실시 예에 따른 블록도.
도 9는 본 발명의 아파트 전기설비 시공방법의 또 다른 실시 예에 따른 영상투사모듈을 나타낸 블록도.1 and 2 are exemplary views showing a conventional apartment electrical equipment construction state.
Figure 3 is a block diagram according to an embodiment of the apartment electrical equipment construction method of the present invention.
Figure 4 is a perspective view showing a drawing projection means according to an embodiment of the apartment electrical equipment construction method of the present invention.
5 is a block diagram showing an image projection module according to an embodiment of the apartment electrical equipment construction method of the present invention.
6 is an exemplary view showing a state in which the drawing projection means projects the electrical wiring diagram on the upper surface of the slab according to an embodiment of the apartment electrical equipment construction method of the present invention.
7 is an exemplary view showing a state in which the drawing projection means projects the electrical wiring diagram on the inner surface of the wall according to an embodiment of the apartment electrical equipment construction method of the present invention.
8 is a block diagram according to another embodiment of the apartment electrical equipment construction method of the present invention.
9 is a block diagram showing an image projection module according to another embodiment of the apartment electrical equipment construction method of the present invention.
아래에서는 첨부한 도면을 참고로 하여 본 발명의 실시 예에 대하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 그러나 본 발명에 관한 설명은 구조적이나 기능적 설명을 위한 실시 예에 불과하므로, 본 발명의 권리범위는 본문에 설명된 실시 예에 의하여 제한되는 것으로 해석되어서는 아니 된다. 즉, 실시 예는 다양한 변경이 가능하고 여러 가지 형태를 가질 수 있으므로 본 발명의 권리범위는 기술적 사상을 실현할 수 있는 균등물들을 포함하는 것으로 이해되어야 한다. 또한, 본 발명에서 제시된 목적 또는 효과는 특정 실시예가 이를 전부 포함하여야 한다거나 그러한 효과만을 포함하여야 한다는 의미는 아니므로, 본 발명의 권리범위는 이에 의하여 제한되는 것으로 이해되어서는 아니 될 것이다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those of ordinary skill in the art to which the present invention pertains can easily implement them. However, since the description of the present invention is merely an embodiment for structural or functional description, the scope of the present invention should not be construed as being limited by the embodiment described in the text. That is, since the embodiment may have various changes and may have various forms, it should be understood that the scope of the present invention includes equivalents capable of realizing the technical idea. In addition, since the object or effect presented in the present invention does not mean that a specific embodiment should include all of them or only such effects, it should not be understood that the scope of the present invention is limited thereby.
본 발명에서 서술되는 용어의 의미는 다음과 같이 이해되어야 할 것이다.The meaning of the terms described in the present invention should be understood as follows.
"제1", "제2" 등의 용어는 하나의 구성요소를 다른 구성요소로부터 구별하기 위한 것으로, 이들 용어에 의해 권리범위가 한정되어서는 아니 된다. 예를 들어, 제1 구성요소는 제2 구성요소로 명명될 수 있고, 유사하게 제2 구성요소도 제1 구성요소로 명명될 수 있다. 어떤 구성요소가 다른 구성요소에 "연결되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결될 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다고 언급된 때에는 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. 한편, 구성요소 간의 관계를 설명하는 다른 표현들, 즉 "~사이에" 와 "바로 ~사이에" 또는 "~에 이웃하는" 과 "~에 직접 이웃하는" 등도 마찬가지로 해석되어야 한다.Terms such as “first” and “second” are for distinguishing one component from other components, and the scope of rights should not be limited by these terms. For example, a first component may be termed a second component, and similarly, a second component may also be termed a first component. When a component is referred to as being “connected” to another component, it may be directly connected to the other component, but it should be understood that other components may exist in between. On the other hand, when it is mentioned that a certain element is "directly connected" to another element, it should be understood that the other element does not exist in the middle. On the other hand, other expressions describing the relationship between elements, that is, "between" and "in between" or "neighboring to" and "directly adjacent to", etc., should be interpreted similarly.
단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한 복수의 표현을 포함하는 것으로 이해되어야 하고, "포함하다" 또는 "가지다" 등의 용어는 설시된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이며, 하나 또는 그 이상의 다른 특징이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The singular expression is to be understood as including the plural expression unless the context clearly dictates otherwise, and terms such as "comprises" or "have" refer to the described feature, number, step, action, component, part or these It is intended to indicate that a combination exists, and it should be understood that it does not preclude the possibility of the existence or addition of one or more other features or numbers, steps, operations, components, parts, or combinations thereof.
여기서 사용되는 모든 용어는 다르게 정의되지 않는 한, 본 발명이 속하는 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미가 있다. 일반적으로 사용되는 사전에 정의된 용어들은 관련 기술의 문맥상 가지는 의미와 일치하는 것으로 해석되어야 하며, 본 발명에서 명백하게 정의하지 않는 한 이상적이거나 과도하게 형식적인 의미를 지니는 것으로 해석될 수 없다.All terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, unless otherwise defined. Terms defined in general used in the dictionary should be interpreted as being consistent with the meaning in the context of the related art, and cannot be interpreted as having an ideal or excessively formal meaning unless explicitly defined in the present invention.
도 3은 본 발명의 아파트 전기설비 시공방법의 한 실시 예에 따른 블록도이다.3 is a block diagram according to an embodiment of the apartment electrical equipment construction method of the present invention.
도 3을 참조하여 설명한다. It will be described with reference to FIG. 3 .
본 발명의 아파트 전기설비 시공방법은 도면투사수단을 이용해 구조물의 슬라브 및 벽체에 전기설비 설계도면을 투사하여 투사된 도면에 따라 전기설비의 시공이 이루어지도록 도면투사수단을 설치하는 단계(S10); 전기배선도 영상을 투사하는 단계(S20); 전기설비를 설치하는 단계(S30); 를 포함한다. The apartment electrical equipment construction method of the present invention includes the steps of projecting the electrical equipment design drawings on the slab and wall of the structure using the drawing projection means, and installing the drawing projection means so that the construction of the electrical equipment is made according to the projected drawings (S10); Projecting the electrical wiring diagram image (S20); Installing electrical equipment (S30); includes
상기 도면투사수단을 설치하는 단계(S10)는 설계도면 상 기준좌표에 도면투사수단을 설치한다. In the step (S10) of installing the drawing projection means, the drawing projection means is installed on the reference coordinates on the design drawing.
이때 설계도면 상 기준좌표는 슬라브 상면의 일측에 위치하는 것이 바람직할 것이나 이에 한정하는 것은 아님을 미리 밝혀둔다.In this case, the reference coordinates on the design drawing are preferably located on one side of the upper surface of the slab, but it is not limited thereto.
즉, 아파트 설계 시, 층별로 형성되는 슬라브의 상면 일측에 기준좌표를 설정하고, 그 설정된 기준좌표의 위치에 해당하는 지점에 도면투사수단을 설치하게 된다. That is, when designing an apartment, a reference coordinate is set on one side of the upper surface of the slab formed for each floor, and the drawing projection means is installed at a point corresponding to the position of the set reference coordinate.
상기 전기배선도 영상을 투사하는 단계(S20)는 기준좌표에 설치된 도면투사수단을 이용해 투사면에 전기배선도 영상을 투사하기 위하여 도면데이터를 로딩하여 영상투사부(201)에 전송하는 단계(S201); 상기 영상투사부(201)에 로딩된 도면데이터를 기반으로 전기배선도 영상을 투사면에 투사하는 단계(S202)를 포함한다.The step of projecting the electrical wiring diagram image (S20) includes the steps of loading the drawing data to project the electrical wiring diagram image on the projection surface using the drawing projection means installed in the reference coordinates and transmitting it to the image projection unit 201 (S201); and projecting an electrical wiring diagram image on the projection surface based on the drawing data loaded into the image projection unit 201 (S202).
즉, 전기배선도 영상을 투사면에 투사하기 위해서는 먼저 이용자가 원하는 도면데이터 즉, 투사면에 투사하기 위한 전기배선도에 해당하는 도면데이터를 로딩한 후, 로딩된 도면데이터를 기반으로 전기배선도 영상을 투사면에 투사한다.That is, in order to project the electrical wiring diagram image on the projection surface, first, the drawing data desired by the user is loaded, that is, the drawing data corresponding to the electrical wiring diagram for projection on the projection surface, and then the electrical wiring diagram image is projected based on the loaded drawing data. Projected on all sides.
일 예로서, 슬라브에 전기설비를 설치하는 경우에는 슬라브 상면에 전기배선도를 투사하고, 벽체에 전기설비를 설치하는 경우에는 벽체 내면에 전기배선도를 투사한다.As an example, when installing electrical equipment on the slab, the electrical wiring diagram is projected on the upper surface of the slab, and when installing the electrical equipment on the wall, the electrical wiring diagram is projected on the inner surface of the wall.
이때 투사되는 전기배선도에는 각 전기설비의 위치, 경로, 색상 중 어느 하나 이상이 표시되는 것이 바람직할 것이나, 이에 한정하는 것은 아님을 미리 밝혀둔다.At this time, it is preferable that at least one of the location, path, and color of each electrical equipment is displayed on the projected electrical wiring diagram, but it is not limited thereto.
상기 투사면에 투사된 전기배선도에 따라 전기설비를 설치하는 단계(S30)는 사용자가 투사면에 투사되는 전기배선도를 따라 전기설비를 설치한다.In the step (S30) of installing the electrical equipment according to the electrical wiring diagram projected on the projection surface, the user installs the electrical equipment according to the electrical wiring diagram projected on the projection surface.
이때 설치되는 전기설비는 통상의 아파트 전기설비 시공 과정에서 설치되는 허브커넥터, 콘센트박스 및 전선관을 포함하는 것이 바람직할 것이나, 이에 한정하는 것은 아님을 미리 밝혀둔다.At this time, the electrical equipment to be installed will preferably include a hub connector, an outlet box, and a conduit that are installed in a typical apartment electrical equipment construction process, but is not limited thereto.
따라서 사용자는 투사면에 투사되는 전기배선도에 따라 허브커넥터, 콘센트박스 및 전선관 등과 같은 전기설비를 설치함으로써 설계도면을 소지하거나, 설계도면을 완전히 숙지하지 못한 상태에서도 복잡한 전기설비의 신속하고, 간편하며, 정확한 시공이 가능케 된다.Therefore, the user installs electrical equipment such as hub connectors, outlet boxes, and conduits according to the electrical wiring diagram projected on the projection surface, so that the user can quickly, conveniently, , and accurate construction is possible.
도 4는 본 발명의 아파트 전기설비 시공방법의 한 실시 예에 따른 도면투사수단을 나타낸 사시도이고, 도 5는 본 발명의 아파트 전기설비 시공방법의 한 실시 예에 따른 영상투사모듈을 나타낸 블록도이며, 도 6은 본 발명의 아파트 전기설비 시공방법의 한 실시 예에 따른 도면투사수단이 슬라브 상면에 전기배선도를 투사하는 상태를 나타낸 예시도이고, 도 7은 본 발명의 아파트 전기설비 시공방법의 한 실시 예에 따른 도면투사수단이 벽체 내면에 전기배선도를 투사하는 상태를 나타낸 예시도이다. 4 is a perspective view showing a drawing projection means according to an embodiment of the apartment electrical equipment construction method of the present invention, and FIG. 5 is a block diagram showing an image projection module according to an embodiment of the apartment electrical equipment construction method of the present invention. , Figure 6 is an exemplary view showing a state in which the drawing projection means projects the electrical wiring diagram on the upper surface of the slab according to an embodiment of the apartment electrical equipment construction method of the present invention, and Figure 7 is one of the apartment electrical equipment construction method of the present invention It is an exemplary view showing a state in which the drawing projection means according to the embodiment projects the electrical wiring diagram on the inner surface of the wall.
도 4 내지 도 7을 참조하여 설명하되, 전술한 실시 예와 중복되는 구성 및 동일부호를 갖는 구성에 대한 상세한 설명은 생략한다.Although it will be described with reference to FIGS. 4 to 7 , detailed descriptions of components having the same reference numerals and components overlapping those of the above-described embodiment will be omitted.
한편, 상기 도면투사수단은 투사면에 전기배선도를 투사하기 위하여 스탠드(10), 영상투사모듈(20)을 포함한다. On the other hand, the drawing projection means includes a
상기 스탠드(10)는, 메인보디(101), 상부지주(102), 브래킷(103), 지지다리(104)를 포함한다. The
상기 메인보디(101)는 둘레에 방사형으로 다수의 힌지부에 형성된다.The
상기 상부지주(102)는 메인보디(101)의 중심공에서 상하로 높이 조절 가능케 설치된다.The
이때, 상하로 높이가 조절된 상부지주(102)를 고정하기 위하여 메인보디(101)의 중심공 일측에는 고정수단이 구비된다.At this time, a fixing means is provided at one side of the center hole of the
상기 브래킷(103)은 탈부착수단, 관절연결부를 포함한다.The
상기 탈부착수단은 브래킷(103)의 상면에 형성되어 영상투사모듈(20)이 탈부착 가능케 결합된다.The detachable means is formed on the upper surface of the
상기 관절연결부는 브래킷(103)의 하부에 형성되어 상부지주(102)의 상단부에 관절 운동이 가능케 결합됨으로써 상부지주(102)의 상단부에서 전후좌우로 자유로운 각도 조절이 가능케 된다.The joint connection part is formed in the lower part of the
상기 지지다리(104)는 메인보디(101)의 각 힌지부에서 내외향으로 절첩 가능케 힌지 결합되되, 길이가 신축 가능한 안테나형 다단 구조로 형성되고, 일측에는 조절된 길이를 고정하기 위한 잠금수단이 구비된다.The
상기 영상투사모듈(20)은 투사면에 전기배선도 영상을 투사하기 위하여 영상투사부(201), 메모리부(202), 제어부(203)를 포함한다.The
상기 영상투사부(201)는 투사면에 전기배선도 영상을 투사하기 위하여 영상투사수단이 구비된다.The
상기 영상투사수단은 전기배선도 영상을 소정의 투사면에 투사하는 것으로서, 프로젝터를 사용하는 것이 바람직할 것이나 이에 한정하는 것은 아님을 미리 밝혀둔다. The image projection means projects the electrical wiring diagram image on a predetermined projection surface, and it is preferable to use a projector, but it is not limited thereto.
또한, 영상투사수단에 의해 투사면에 투사되는 전기배선도의 영상은 자체 제어를 통해 확대, 축소 및 전후좌우 방향 이동, 시계 및 반시계 방향의 회전이 가능함을 미리 밝혀둔다.In addition, it is clarified in advance that the image of the electrical wiring diagram projected on the projection surface by the image projection means can be enlarged, reduced, moved forward and backward, left and right, and rotated clockwise and counterclockwise through self-control.
상기 투사면은 수평의 슬라브 상면 또는 수직의 벽체 내면 중 어느 하나인 것이 바람직할 것이나 이에 한정하는 것은 아니며 전기배선도 영상이 투사되어 사용자가 영상 내용을 확인할 수 있는 면이라면 어떠한 면이든 가능함은 물론이다. The projection surface is preferably any one of a horizontal slab upper surface or a vertical wall inner surface, but is not limited thereto, and any surface is possible as long as the electric wiring diagram image is projected so that the user can check the image contents.
상기 메모리부(202)는 전기배선도에 관한 도면데이터를 저장하고, 영상투사수단에 제공한다. The
이때 메모리부(202)에 도면데이터를 저장하기 위하여 USB와 같은 데이터 입력용 접속단자가 더 구비되는 것이 바람직할 것이나 이에 한정하는 것은 아님을 미리 밝혀둔다.At this time, it is preferable that a connection terminal for data input such as USB is further provided in order to store the drawing data in the
또한, 메모리부(202)는 도면데이터를 저장 및 삭제할 수 있음을 미리 밝혀둔다.In addition, it is noted in advance that the
상기 제어부(203)는 메모리부(202) 및 영상투사수단에 대한 제어신호를 생성하여 메모리부(202)에 저장된 도면데이터가 영상투사수단으로 제공되어 영상투사수단에 의해 투사면에 전기배선도가 투사되게 한다. The
또한, 제어부(203)가 메모리부(202)에 저장된 도면데이터를 로딩한 후 처리하여 영상투사수단으로 제공함으로써 영상투사수단에 의해 투사면에 전기배선도가 투사되게 할 수 있다. In addition, the
상기 영상투사모듈(20)은 통신부(204)를 더 구비할 수 있다.The
상기 통신부(204)는 유선 또는 무선 통신수단을 구비하여, 도면데이터가 저장 및 관리되는 원거리의 도면서버(S)에 유선 또는 무선으로 접속되어 통신부(204)를 통해 전기배선도에 관한 도면데이터를 전송받아 메모리부(202)에 저장할 수 있다.The
따라서 대용량의 도면데이터를 도면서버(S)에 저장하고, 필요한 도면데이터만 선택적으로 메모리부(202)에 저장 관리함으로써 대용량의 도면데이터를 보다 효율적으로 사용, 관리할 수 있게 된다. Therefore, by storing a large amount of drawing data in the drawing server (S) and selectively storing and managing only the necessary drawing data in the
상기 영상투사모듈(20)은 센서부(205)를 더 구비할 수 있다.The
상기 센서부(205)는 영상투사모듈(20)의 높이 및 기울기를 감지하여 그 감지값을 제어부(203)에 제공하고, 사용자가 인지할 수 있도록 디스플레이 등의 표시수단으로 통해 표시함으로써 영상투사모듈(20)을 정확한 자세로 설정할 수 있게 되어 투사면에 보다 정확한 영상을 투사할 수 있게 된다.The
한편, 높이 및 기울기를 감지하는 센서부(205)에 사용되는 센서수단은 주지된 다양한 센서를 선택적으로 사용할 수 있으며, 그러한 센서의 작동 원리는 주지된 바, 그에 대한 구체적인 설명은 생략한다.On the other hand, the sensor means used in the
상기 영상투사모듈(20)은 GPS모듈(206)을 더 구비할 수 있다.The
상기 GPS모듈(206) 영상투사모듈(20)의 위치를 감지하여 그 감지값을 제어부(203)에 제공함으로써 영상투사모듈(20)의 정확한 위치 측정을 통해 투사면에 보다 정확한 영상을 투사할 수 있게 된다.The
아울러, 전기배선도 영상을 투사할 때, 도면서버(S)에 사전 저장된 수많은 도면데이터에서 영상투사모듈(20)이 설치된 GPS 위치값과 동일한 위치값의 도면데이터를 신속하고 정확하게 찾아서 영상투사모듈(20)에 제공할 수 있게 되므로 잘못된 전기배선도 영상의 투사를 방지할 수 있게 된다.In addition, when projecting the electrical wiring diagram image, the
도 8은 본 발명의 아파트 전기설비 시공방법의 또 다른 실시 예에 따른 블록도이다.8 is a block diagram according to another embodiment of the apartment electrical equipment construction method of the present invention.
도 8을 참조하여 설명하되, 전술한 실시 예와 중복되는 구성 및 동일부호를 갖는 구성에 대한 상세한 설명은 생략한다.Although it will be described with reference to FIG. 8, a detailed description of the configuration overlapping with the above-described embodiment and the configuration having the same reference numerals will be omitted.
본 발명의 아파트 전기설비 시공방법은, 사용자가 설치한 전기설비의 위치를 감지하는 단계(S40); 감지된 전기설비의 위치좌표와, 사전 저장된 전기설비의 기준좌표를 비교하여 매칭 여부를 판별하는 단계(S50); 위치좌표와 기준좌표의 매칭 결과를 표시하는 단계(S60); 시공완료데이터를 입력하는 단계(S70); 를 더 포함할 수 있다. The apartment electrical equipment construction method of the present invention includes the steps of detecting the location of the electric equipment installed by the user (S40); Comparing the detected location coordinates of the electrical equipment with the reference coordinates of the electric equipment stored in advance to determine whether or not matching (S50); displaying the matching result of the location coordinates and the reference coordinates (S60); inputting construction completion data (S70); may further include.
상기 사용자가 설치한 전기설비의 위치를 감지하는 단계(S40)는, 투사면에 투사된 전기배선도 영상에 따라 사용자가 설치한 전기설비의 설치 여부 및 설치 위치를 감지한다.In the step (S40) of detecting the location of the electric equipment installed by the user, whether the electric equipment installed by the user is installed and the installation position are detected according to the image of the electric wiring diagram projected on the projection surface.
상기 감지된 전기설비의 위치좌표와, 사전 저장된 전기설비의 기준좌표를 비교하여 매칭 여부를 판별하는 단계(S50)는, 사용자가 설치한 전기설비의 위치를 감지하는 단계(S40)에서 생성된 전기설비의 위치좌표와, 사전 저장된 전기설비의 기준좌표를 비교함으로써 설계도면에 따라 전기설비가 바르게 설치되었는지를 판별한다.Comparing the sensed position coordinates of the electrical equipment with the reference coordinates of the electric equipment stored in advance to determine whether or not matching (S50) is the electricity generated in the step (S40) of detecting the location of the electric equipment installed by the user By comparing the location coordinates of the equipment with the reference coordinates of the electric equipment stored in advance, it is determined whether the electric equipment is installed correctly according to the design drawing.
상기와 같이 사용자가 설치한 전기설비의 위치를 감지하는 단계(S40) 및 감지된 전기설비의 위치좌표와, 사전 저장된 전기설비의 기준좌표를 비교하여 매칭 여부를 판별하는 단계(S50)는 비전감지부(207)를 사용하는 것이 바람직할 것이나 이에 한정하는 것은 아님을 미리 밝혀둔다.The step (S40) of detecting the location of the electrical equipment installed by the user as described above and the step (S50) of determining whether to match by comparing the detected location coordinates of the electrical equipment with the reference coordinates of the electric equipment stored in advance (S50) include vision detection It should be noted in advance that it would be preferable to use the
상기 위치좌표와 기준좌표의 매칭 결과를 표시하는 단계(S60)는, 비전감지부(207)에 의해 처리된 위치좌표와 기준좌표의 매칭 결과를 디스플레이에 표시함으로써 사용자가 설계도면을 확인하지 않고, 설계도면을 완전히 숙지하지 못한 상태에서도 전기설비가 올바르게 설치되었는지 여부를 신속하고, 간편하며, 정확하게 확인할 수 있게 된다. In the step (S60) of displaying the matching result of the location coordinates and the reference coordinates, the user does not check the design drawings by displaying the matching results of the location coordinates and the reference coordinates processed by the
상기 시공완료데이터를 입력하는 단계(S70)는 출력수단(208)을 통해 비전 처리 결과를 확인한 사용자가 입력수단(209)을 통해 시공 완료를 확인하는 시공완료데이터를 입력함으로써 시공완료데이터에 의해 영상투사부(201)의 영상 투사가 정지된다In the step (S70) of inputting the construction completion data, the user, who has confirmed the vision processing result through the output means 208, inputs the construction completion data confirming the construction completion through the input means 209, so that the image is generated by the construction completion data. The image projection of the
이때, 시공완료데이터는 도면서버(S)에 저장되게 함으로써 전기설비 공사의 진행 상황을 효과적으로 관리할 수 있게 된다. At this time, the construction completion data is stored in the drawing server (S), so that it is possible to effectively manage the progress of the electrical equipment construction.
도 9는 본 발명의 아파트 전기설비 시공방법의 또 다른 실시 예에 따른 영상투사모듈을 나타낸 블록도이다. 9 is a block diagram showing an image projection module according to another embodiment of the apartment electrical equipment construction method of the present invention.
도 9를 참조하여 설명하되, 전술한 실시 예와 중복되는 구성 및 동일부호를 갖는 구성에 대한 상세한 설명은 생략한다.Although it will be described with reference to FIG. 9 , a detailed description of components having the same reference numerals and components overlapping those of the above-described embodiment will be omitted.
상기 영상투사모듈(20)은 사용자가 설치한 전기설비의 위치를 감지하는 비전감지부(207)를 더 구비할 수 있다.The
상기 비전감지부(207)는 사용자가 설치한 전기설비의 위치를 감지하기 위하여 카메라(207a), 비전모듈(207b)을 포함한다.The
상기 카메라(207a)는 사용자가 설치한 전기설비의 위치를 감지하기 위하여 전기배선도 영상이 투사된 투사면을 촬영하고, 그 촬영된 영상데이터를 비전모듈(207b)에 제공한다.The
상기 비전모듈(207b)은 카메라(207a)에서 제공되는 영상데이터를 분석하여 투사면에 설치된 전기설비의 위치좌표를 산출한 후, 전기배선도의 설계에 따라 사전 저장된 표준좌표와 상기 위치좌표를 비교하여 전기설비가 설치 위치 및 설치 수를 분석한다.The
이때, 비전모듈(207b)은 영상 기술을 접목하여 3차원적인 물리량을 측정하여 자동화에 적용할 수 있는 머신 비전 시스템(Machine Vision System)이 적용된다.In this case, a machine vision system that can be applied to automation by measuring a three-dimensional physical quantity by grafting image technology is applied to the
일반적으로 널리 알려진 머신 비전 시스템은 산업 현장에서 부정확한 사람의 눈을 대신해 가시광 카메라(207a)로 제품을 촬영하여 컴퓨터로 전송하고 이를 비전 소프트웨어로 분석하여 제품의 불량 등을 시각적으로 구별해 내는 기술이다.In general, a widely known machine vision system is a technology that takes products with a
비전모듈(207b)은 프로그램이 내장된 비전컨트롤러를 기반으로 하며, 비전컨트롤러에 내장된 프로그램에 의해 카메라(207a)가 촬영한 영상데이터를 획득하여 이에 대한 비전 처리를 수행하고, 이를 통해 전기설비의 설치 여부 및 위치를 분석하게 된다. The
상기 영상투사모듈(20)은 출력수단(208) 및 입력수단(209)을 더 구비할 수 있다.The
상기 출력수단(208)은 비전모듈(207b)에 의해 처리된 전기설비의 설치 위치 및 설치 수를 분석하는 비전 처리 결과를 출력하기 위하여 액정디스플레이를 구비하는 것이 바람직하다. Preferably, the output means 208 is provided with a liquid crystal display to output a vision processing result for analyzing the installation positions and the number of installations of the electrical equipment processed by the
상기 입력수단(209)은 출력수단(208)을 통해 비전 처리 결과를 확인한 사용자가 시공 완료를 확인하는 시공완료데이터를 입력하기 위하여 버튼식 스위치 또는 터치스크린을 구비하는 것이 바람직하다.Preferably, the input means 209 is provided with a button-type switch or a touch screen so that the user who has confirmed the vision processing result through the output means 208 inputs construction completion data for confirming the construction completion.
따라서, 입력수단(209)을 통한 시공완료데이터에 의해 영상투사부(201)의 영상 투사가 정지되며, 시공완료데이터는 도면서버(S)에 저장되는 것이 바람직할 것이나, 이에 한정하는 것은 아님을 미리 밝혀둔다. Therefore, the image projection of the
한편, 상기 비전모듈(207b), 입력수단(209), 출력수단(208)은 개별적으로 형성될 수 있으나, 전체 연동이 용이하도록 일체로 구성되는 것이 더 바람직하며, 각각 또는 동시에 제어부(203)에 의해 통합적으로 제어되는 것이 바람직하다.On the other hand, the
이상, 본 발명의 실시 예는 상술한 장치 및/또는 운용방법을 통해서만 구현이 되는 것은 아니며, 본 발명의 실시 예의 구성에 대응하는 기능을 실현하기 위한 프로그램, 그 프로그램이 기록된 기록 매체 등을 통해 구현될 수도 있으며, 이러한 구현은 앞서 설명한 실시 예의 기재로부터 본 발명이 속하는 기술분야의 전문가라면 쉽게 구현할 수 있는 것이다. As mentioned above, the embodiment of the present invention is not implemented only through the above-described apparatus and/or operation method, but through a program for realizing a function corresponding to the configuration of the embodiment of the present invention, a recording medium in which the program is recorded, etc. It may be implemented, and such an implementation can be easily implemented by an expert in the technical field to which the present invention pertains from the description of the above-described embodiments.
또한, 본 발명의 실시 예에 대하여 상세하게 설명하였지만 본 발명의 권리범위는 이에 한정되는 것은 아니고 다음의 청구범위에서 정의하고 있는 본 발명의 기본 개념을 이용한 당업자의 여러 변형 및 개량 형태 또한 본 발명의 권리범위에 속하는 것이다.In addition, although the embodiment of the present invention has been described in detail, the scope of the present invention is not limited thereto, and various modifications and improvements by those skilled in the art using the basic concept of the present invention defined in the following claims are also provided. is within the scope of the right.
10: 스탠드
101: 메인보디
102: 상부지주
103: 브래킷
104: 지지다리
20: 영상투사모듈
201: 영상투사부
202: 메모리부
203: 제어부
204: 통신부
205: 센서부
206: GPS모듈
207: 비전감지부
207a: 카메라
207b: 비전모듈
208: 출력수단
209: 입력수단10: stand
101: main body
102: upper pole
103: bracket
104: support legs
20: image projection module
201: image projection unit
202: memory unit
203: control unit
204: communication department
205: sensor unit
206: GPS module
207: vision detection unit
207a: camera
207b: vision module
208: output means
209: input means
Claims (5)
상기 도면투사수단을 이용해 투사면에 전기배선도 영상을 투사하는 단계(S20);
상기 투사면에 투사된 전기배선도에 따라 전기설비를 설치하는 단계(S30); 를 포함하여 아파트 전기설비 시공방법을 구성하고,
도면투사수단은,
슬라브 상면에 안착되는 스탠드(10);
상기 스탠드(10)의 상단부에 형성된 브래킷(103)에 탈부착 가능케 설치되어 전기배선도 영상을 투사하는 영상투사모듈(20); 을 포함하되,
상기 영상투사모듈(20)은,
전기배선도 영상을 투사하는 영상투사부(201);
상기 영상투사부(201)를 제어하는 제어부(203); 를 포함하고,
상기 영상투사모듈(20)은,
사용자가 설치한 전기설비의 위치를 감지하는 비전감지부(207);
비전감지부(207)의 비전 처리 결과를 표시하는 출력수단(208);
사용자에 의한 데이터 입력을 위한 입력수단(209); 이 더 구비되는 것을 특징으로 하는 아파트 전기설비 시공방법.
Installing the drawing projection means on the reference coordinates on the design drawing (S10);
Projecting the electrical wiring diagram image on the projection surface using the drawing projection means (S20);
installing electrical equipment according to the electrical wiring diagram projected on the projection surface (S30); Including the construction method of apartment electrical equipment,
drawing projection means,
a stand (10) that is seated on the upper surface of the slab;
an image projection module 20 that is detachably installed on the bracket 103 formed at the upper end of the stand 10 and projects an image of the electrical wiring diagram; including,
The image projection module 20,
an image projection unit 201 for projecting an electrical wiring diagram image;
a control unit 203 for controlling the image projection unit 201; including,
The image projection module 20,
a vision sensing unit 207 for detecting the location of the electrical equipment installed by the user;
output means 208 for displaying the vision processing result of the vision sensing unit 207;
input means 209 for data input by a user; Apartment electrical equipment construction method, characterized in that it is further provided.
상기 전기배선도 영상을 투사하는 단계(S20)는,
도면데이터를 로딩하여 영상투사부(201)에 전송하는 단계(S201);
상기 영상투사부(201)에 로딩된 도면데이터를 기반으로 전기배선도 영상을 투사면에 투사하는 단계(S202); 를 포함하는 것을 특징으로 하는 아파트 전기설비 시공방법.
According to claim 1,
Projecting the electrical wiring diagram image (S20),
Loading the drawing data and transmitting it to the image projection unit 201 (S201);
Projecting an electrical wiring diagram image on the projection surface based on the drawing data loaded in the image projection unit 201 (S202); Apartment electrical equipment construction method comprising a.
상기 투사면에 투사된 전기배선도 영상에 따라 사용자가 설치한 전기설비의 위치를 감지하는 단계(S40);
상기 감지된 전기설비의 위치좌표와, 사전 저장된 전기설비의 기준좌표에 따른 기준좌표를 비교하여 매칭 여부를 판별하는 단계(S50);
상기 위치좌표와 기준좌표의 매칭 결과를 표시하는 단계(S60);
시공완료데이터를 입력하는 단계(S70); 를 더 포함하는 것을 특징으로 하는 아파트 전기설비 시공방법.
According to claim 1,
Sensing the location of the electrical equipment installed by the user according to the image of the electrical wiring diagram projected on the projection surface (S40);
Comparing the sensed position coordinates of the electrical equipment with the reference coordinates according to the pre-stored reference coordinates of the electric equipment to determine whether matching (S50);
displaying the matching result of the position coordinates and the reference coordinates (S60);
inputting construction completion data (S70); Apartment electrical equipment construction method, characterized in that it further comprises.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020190129106A KR102317443B1 (en) | 2019-10-17 | 2019-10-17 | Construction method of apartment electric facility |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020190129106A KR102317443B1 (en) | 2019-10-17 | 2019-10-17 | Construction method of apartment electric facility |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20210045722A KR20210045722A (en) | 2021-04-27 |
KR102317443B1 true KR102317443B1 (en) | 2021-10-25 |
Family
ID=75726062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020190129106A KR102317443B1 (en) | 2019-10-17 | 2019-10-17 | Construction method of apartment electric facility |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102317443B1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102374358B1 (en) | 2021-09-14 | 2022-03-15 | 정석만 | Cable laying equipment |
KR102374360B1 (en) | 2021-09-14 | 2022-03-15 | 정석만 | electrical work equipment |
KR102588818B1 (en) * | 2021-10-01 | 2023-10-16 | 이백산 | method and system for outputs design drawings as 3D images using IoT image processing devices at the construction site |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007021613A (en) | 2005-07-13 | 2007-02-01 | Hitachi Plant Technologies Ltd | Construction support method and system therefor |
JP2016522905A (en) * | 2013-03-28 | 2016-08-04 | ヒルティ アクチエンゲゼルシャフト | Method and apparatus for displaying design object and object data |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100433842B1 (en) | 2002-02-25 | 2004-06-04 | (주) 종합건축사사무소 동일건축 | Electric wiring structure for a building and wiring operation method thereof |
EP2477000A1 (en) * | 2011-01-14 | 2012-07-18 | Leica Geosystems AG | Measuring device with an automatic imaging swap function |
KR101724441B1 (en) * | 2015-09-01 | 2017-04-07 | 삼성중공업(주) | Apparatus for projecting drawing image |
-
2019
- 2019-10-17 KR KR1020190129106A patent/KR102317443B1/en active IP Right Grant
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007021613A (en) | 2005-07-13 | 2007-02-01 | Hitachi Plant Technologies Ltd | Construction support method and system therefor |
JP2016522905A (en) * | 2013-03-28 | 2016-08-04 | ヒルティ アクチエンゲゼルシャフト | Method and apparatus for displaying design object and object data |
Also Published As
Publication number | Publication date |
---|---|
KR20210045722A (en) | 2021-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102317443B1 (en) | Construction method of apartment electric facility | |
US7825908B2 (en) | Method for resetting configuration on a touchscreen interface | |
US10406645B2 (en) | Calibration approach for camera placement | |
EP3982081A1 (en) | Infrastructure positioning camera system | |
US20060268108A1 (en) | Video surveillance system, and method for controlling the same | |
JP5490304B2 (en) | Electric discharge machining apparatus and electric discharge machining system | |
JP7053019B2 (en) | Structure inspection system and inspection method | |
JP6425586B2 (en) | Optical displacement measurement system, imaging condition optimization method and imaging condition optimization program | |
US20210103741A1 (en) | Detection method and apparatus for automatic driving sensor, and electronic device | |
US10618773B2 (en) | Elevator operation control device and method using monitor | |
CN110146035B (en) | Embedded part detection method, device, equipment and system for component production line | |
CN109689992B (en) | Monitoring system and method for controlling a construction surface treatment process | |
JP2019191748A (en) | Productivity improvement support system and productivity improvement support program | |
JP2020008423A (en) | Construction management system | |
JP5631648B2 (en) | Toilet use display device | |
JP6670580B2 (en) | Architectural systems | |
KR101764847B1 (en) | Monitoring method for cultural structure | |
US10690499B2 (en) | Analysis system, analysis method, and storage medium in which analysis program is stored | |
NO20191244A1 (en) | System and method for measuring and aligning roof bolts | |
CA3000897A1 (en) | Design system for aiding the design of a kitchen refurbishment | |
WO2020202720A1 (en) | Projection system, projection device and projection method | |
KR101764849B1 (en) | System for monitoring cultural structure | |
JP7336253B2 (en) | Installation method | |
JP2017116437A (en) | Steel frame erection measurement system, method thereof, and program | |
JP2007010419A (en) | Three-dimensional shape of object verifying system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |