KR102157205B1 - Pillar reinforcement method of parking lot structure for residential use - Google Patents

Pillar reinforcement method of parking lot structure for residential use Download PDF

Info

Publication number
KR102157205B1
KR102157205B1 KR1020170159306A KR20170159306A KR102157205B1 KR 102157205 B1 KR102157205 B1 KR 102157205B1 KR 1020170159306 A KR1020170159306 A KR 1020170159306A KR 20170159306 A KR20170159306 A KR 20170159306A KR 102157205 B1 KR102157205 B1 KR 102157205B1
Authority
KR
South Korea
Prior art keywords
column
reinforcement
base layer
reinforcing
parking lot
Prior art date
Application number
KR1020170159306A
Other languages
Korean (ko)
Other versions
KR20190061195A (en
Inventor
왕도현
탁영준
Original Assignee
왕도현
탁영준
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 왕도현, 탁영준 filed Critical 왕도현
Priority to KR1020170159306A priority Critical patent/KR102157205B1/en
Publication of KR20190061195A publication Critical patent/KR20190061195A/en
Application granted granted Critical
Publication of KR102157205B1 publication Critical patent/KR102157205B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0604Prismatic or cylindrical reinforcement cages composed of longitudinal bars and open or closed stirrup rods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings

Abstract

본 발명은 주택용 필로티구조의 주차장 기둥 보강공법에 관한 것으로, 보다 상세하게는 주택용 필로티구조를 갖는 건축물의 주차장 콘크리트기둥을 금속보강체 내부에 구성하는 방법을 제공하여 지반의 흔들림에도 주차장 기둥의 파손을 방지할 수 있도록 발명한 것이다.
본 발명의 구성은, 건축물의 크기에 맞게 종방향 및 횡방향의 기초철근을 배근하고, 둘레를 따라서 거푸집을 형성하는 기초층 제작단계(S100)와;
상기 기초층 제작단계(S100)를 통해 형성된 거푸집 내에 콘크리트를 타설 및 양생하는 기초층 형성단계(S200)와;
기초층(10)의 기초철근에서 연장된 복수개의 기둥철근(21)을 수직방향으로 배근하고, 상기 수직방향의 기둥철근(21) 내주면에 복수개의 늑근고정링(30)이 일정간격을 두고 일체 구비되는 수직기둥 제작단계(S300)와;
보강기둥(41)은 중공형 금속 파이프 형상을 갖고 하단에 받침플랜지(42)가 구비된 금속보강체(40)가, 상기 기둥철근(21)을 내부에 수용하면서 기초층(10)에 받침플랜지(42)를 안착되어 앵커볼트(43)를 이용해 상기 기초층(10)에 고정되는 금속보강체 조립단계(S400)와;
상기 금속보강체(40)의 상부에서 기둥철근(21)의 늑근고정링(30)을 통해 콘크리트주입관(F)을 기둥철근(21)의 하단까지 삽입한 다음 상기 콘크리트주입관(F)을 승강 이동시키면서 콘크리트를 타설하여 금속보강체(40)의 보강기둥(41) 내에 콘크리트를 타설 및 양생하는 주차장 기둥 형성단계(S500)를 포함해 구성된다.
The present invention relates to a method of reinforcing parking lot pillars of a piloti structure for housing, and more particularly, by providing a method of constructing a concrete pillar of a parking lot of a building having a piloti structure for housing inside a metal reinforcement to prevent damage to the parking lot pillars even when the ground shakes. It was invented to prevent it.
The configuration of the present invention, the base layer manufacturing step (S100) of arranging the base reinforcement in the longitudinal and transverse directions according to the size of the building, and forming a formwork along the perimeter;
A base layer forming step (S200) of pouring and curing concrete in the formwork formed through the base layer manufacturing step (S100);
A plurality of column reinforcing bars 21 extending from the base reinforcing bar of the base layer 10 are arranged in a vertical direction, and a plurality of rib fixing rings 30 are integrated at a predetermined interval on the inner circumferential surface of the column reinforcing bars 21 in the vertical direction. A vertical column manufacturing step (S300);
The reinforcing column 41 has a shape of a hollow metal pipe, and a metal reinforcement body 40 provided with a supporting flange 42 at the lower end of the reinforcing column 41 accommodates the column reinforcement 21 in the base layer 10 while receiving the supporting flange. A metal reinforcement assembly step (S400) in which 42 is mounted and fixed to the base layer 10 using an anchor bolt 43;
Insert the concrete injection pipe (F) through the rib fixing ring 30 of the column reinforcement (21) from the top of the metal reinforcement body (40) to the lower end of the column reinforcement (21), and then insert the concrete injection pipe (F). It is configured to include a parking lot pillar formation step (S500) of pouring and curing concrete in the reinforcement pillar 41 of the metal reinforcement body 40 by pouring concrete while moving up and down.

Description

주택용 필로티구조의 주차장 기둥 보강공법 {Pillar reinforcement method of parking lot structure for residential use} Pillar reinforcement method of parking lot structure for residential use

본 발명은 주택용 필로티구조의 주차장 기둥 보강공법에 관한 것으로, 보다 상세하게는 주택용 필로티구조를 갖는 건축물의 주차장 콘크리트기둥을 금속보강체 내부에 구성하는 방법을 제공하여 지반의 흔들림에도 주차장 기둥의 파손을 방지할 수 있도록 발명한 것이다.The present invention relates to a method of reinforcing parking lot pillars of a piloti structure for housing, and more particularly, by providing a method of constructing a concrete pillar of a parking lot of a building having a piloti structure for housing inside a metal reinforcement to prevent damage to the parking lot pillars even when the ground shakes. It was invented to prevent it.

일반적으로, 필로티구조의 건축물은 기초를 이루는 바닥면으로부터 일정 높이로 설치되는 복수개의 수직 기둥체로 상부 구조물을 지탱하면서, 상기 수직 기둥체의 높이에 따라 지상층 공간을 확보하여, 여기에 보행자나 차량의 통행공간과 주차공간으로 활용하고 있어 일반 다가구 주택이나 아파트와 같은 공동 건물에 많이 적용하고 있는 구조이다.In general, a piloti-structured building supports the upper structure with a plurality of vertical pillars installed at a certain height from the bottom surface forming the foundation, and secures a space on the ground floor according to the height of the vertical pillar. Since it is used as a passage space and parking space, it is a structure that is widely applied to common buildings such as general multi-family houses and apartments.

그러나, 아파트와 같은 공동 건물의 필로티구조는 건축물의 기초가 되는 수직 기둥체가 지중의 단단한 암반에 고정되면서 기본적으로 내진설계기준에 따라 건축되어 지진 등의 외력에도 내진성능을 갖추고 있는데 반해, 다세대, 다가구 주택의 필로티구조에는 내진설계기준이 없는 상태에서 수직 기둥체가 지중의 기초콘크리트를 통해 연결된 철골에 콘크리트를 타설 및 양생하여 형성함으로서, 수직기둥체가 지반의 수평 및 수직 흔들림에 쉽게 휘어지거나 부러지면서 주택이 무너지는 등의 문제점이 있었다.However, the piloti structure of a common building such as an apartment building is basically built according to the seismic design standard as the vertical pillars, which are the foundation of the building, are fixed to the solid rock mass of the ground, so it has seismic performance against external forces such as earthquakes. The piloti structure of the house is formed by pouring and curing concrete on the steel frame connected through the foundation concrete in the ground, and the vertical column body is formed by placing and curing concrete in the state that there is no seismic design standard, and the vertical column body is easily bent or broken due to horizontal and vertical shaking of the ground There were problems such as collapse.

또한, 주택에서 차량의 주차공간으로 활용하고 있어 차량과의 충돌이 빈번하여, 주차장 기둥에 충격이 전달되어 크랙이 발생되거나 콘크리트가 떨어져 내부 철근이 노출되는 등의 문제점이 있었다.In addition, since it is used as a parking space for vehicles in houses, collisions with vehicles are frequent, and there are problems such as impacts are transmitted to the parking lot pillars to generate cracks or to expose internal reinforcing bars by falling concrete.

[특허문헌 1]. 대한민국 등록특허공보 제10-1209363호 에이치형강 기둥의 내진보강용 콘크리트 블록 및 이를 이용한 내진보강방법 (등록일자 2012년12월06일)[Patent Document 1]. Korean Registered Patent Publication No. 10-1209363 Concrete block for seismic reinforcement of H-beam columns and seismic reinforcement method using the same (Registration date December 6, 2012)

상기와 같은 종래기술의 문제점을 해결하기 위한 것으로서, 본 발명은 주택용 필로티구조의 주차장을 구성하는 콘크리트 기둥을 금속보강체 내부에서 양생되게 하여, 주차장기둥의 변형이나 손상을 방지할 수 있도록 하는데 그 목적이 있다.In order to solve the problems of the prior art as described above, the present invention is to cure the concrete pillars constituting the parking lot of the piloti structure for houses inside the metal reinforcement, so that the deformation or damage of the parking lot pillars can be prevented. There is this.

본 발명의 다른 목적은, 주차장기둥의 뼈대인 철근을 금속보강체의 내부에 설치하여, 거푸집 설치 및 철거에 따른 공사기간 및 시간의 지연을 방지해 건축시공에 따른 비용을 절감할 수 있도록 하는데 있다.Another object of the present invention is to install a reinforcing bar, which is a skeleton of a parking lot, inside a metal reinforcement, so as to prevent delays in construction period and time due to the installation and demolition of the formwork, thereby reducing construction costs. .

이와 같은 기술적 과제를 해결하기 위해 본 발명은, In order to solve such a technical problem, the present invention,

건축물의 크기에 맞게 종방향 및 횡방향의 기초철근을 배근하고, 둘레를 따라서 거푸집을 형성하는 기초층 제작단계(S100)와;The base layer manufacturing step (S100) of arranging the foundation reinforcement in the longitudinal and transverse directions according to the size of the building and forming a formwork along the perimeter;

상기 기초층 제작단계(S100)를 통해 형성된 거푸집 내에 콘크리트를 타설 및 양생하는 기초층 형성단계(S200)와; A base layer forming step (S200) of pouring and curing concrete in the formwork formed through the base layer manufacturing step (S100);

기초층(10)의 기초철근에서 연장된 복수개의 기둥철근(21)을 수직방향으로 배근하고, 상기 수직방향의 기둥철근(21) 내주면에 복수개의 늑근고정링(30)이 일정간격을 두고 일체 구비되는 수직기둥 제작단계(S300)와;A plurality of column reinforcing bars 21 extending from the base reinforcing bar of the base layer 10 are arranged in a vertical direction, and a plurality of rib fixing rings 30 are integrated at a predetermined interval on the inner circumferential surface of the column reinforcing bars 21 in the vertical direction. A vertical column manufacturing step (S300);

보강기둥(41)은 중공형 금속 파이프 형상을 갖고 하단에 받침플랜지(42)가 구비된 금속보강체(40)가, 상기 기둥철근(21)을 내부에 수용하면서 기초층(10)에 받침플랜지(42)를 안착되어 앵커볼트(43)를 이용해 상기 기초층(10)에 고정되는 금속보강체 조립단계(S400)와;The reinforcing column 41 has a shape of a hollow metal pipe, and a metal reinforcement body 40 provided with a supporting flange 42 at the lower end of the reinforcing column 41 accommodates the column reinforcement 21 in the base layer 10 while receiving the supporting flange. A metal reinforcement assembly step (S400) in which 42 is mounted and fixed to the base layer 10 using an anchor bolt 43;

상기 금속보강체(40)의 상부에서 기둥철근(21)의 늑근고정링(30)을 통해 콘크리트주입관(F)을 기둥철근(21)의 하단까지 삽입한 다음 상기 콘크리트주입관(F)을 승강 이동시키면서 콘크리트를 타설하여 금속보강체(40)의 보강기둥(41) 내에 콘크리트를 타설 및 양생하는 주차장 기둥 형성단계(S500)를 포함해 구성된다.Insert the concrete injection pipe (F) through the rib fixing ring 30 of the column reinforcement (21) from the top of the metal reinforcement body (40) to the lower end of the column reinforcement (21), and then insert the concrete injection pipe (F). It is configured to include a parking lot column formation step (S500) of pouring and curing concrete in the reinforcement pillar 41 of the metal reinforcement body 40 by placing concrete while moving up and down.

또, 금속보강체(40)의 보강기둥(41)은, 기둥철근(21)이 내부에 수용되는 중공부를 갖으면서 원형, 사각형, 육각형, 팔각형 중에서 어느 하나의 형상으로 제작되며, 주차장 기둥 형성단계(S500) 이후에 상기 보강기둥(41)의 형상에 대응하는 끼움홀(47a)을 갖는 상판플랜지(47)가 상기 보강기둥(41)에 더 끼워진 상태에서 1층 천장벽면에 고정하는 보강기둥 상단 고정단계(S700)가 더 포함된다.In addition, the reinforcement column 41 of the metal reinforcement body 40 is manufactured in any one shape among round, square, hexagonal, and octagonal shapes while having a hollow portion in which the column reinforcement 21 is accommodated inside, and the parking lot column formation step (S500) After the top plate flange 47 having a fitting hole 47a corresponding to the shape of the reinforcing pillar 41 is further fitted to the reinforcing pillar 41, the top of the reinforcing pillar fixed to the ceiling wall surface on the first floor The fixing step (S700) is further included.

또한, 주차장 기둥 형성단계(S500) 이후에 금속보강체(40)의 받침플랜지(42) 및 앵커볼트(43)의 선단이 매립되게 바닥층(50)을 형성하는 주차장 바닥 형성단계(S600)가 더 포함된다.In addition, after the parking lot pillar forming step (S500), a parking lot floor forming step (S600) of forming a floor layer 50 such that the front ends of the support flange 42 and the anchor bolt 43 of the metal reinforcement body 40 are buried (S600) is further performed. Included.

그리고, 상기 수직기둥 제작단계(S300)에서의 기둥철근(21)은 원형의 배열을 갖고 배근되어, 원통형상을 갖는 늑근고정링(30)을 상기 기둥철근(21)의 내측에 복수개 위치시키고, 상기 늑근고정링(30)의 외경면과 기둥철근(21)을 용접해 고정시켜 상기 늑근고정링(30)의 내경면으로 콘크리트주입관(F)의 이동로가 연통되게 형성되고, 상기 늑근고정링(30)과 늑근고정링(30) 사이의 기둥철근(21)에는 외주연을 수평방향으로 감싸는 수평늑근(22)을 결합시켜 수직기둥을 제작하도록 구성된다.And, the column reinforcement 21 in the vertical column production step (S300) is arranged in a circular arrangement, and a plurality of ribs fixing rings 30 having a cylindrical shape are located inside the column reinforcement 21, The outer diameter surface of the rib fixing ring 30 and the column reinforcement 21 are welded and fixed to connect the moving path of the concrete injection pipe F to the inner diameter surface of the rib fixing ring 30, and the rib fixing The column reinforcement 21 between the ring 30 and the rib fixing ring 30 is configured to manufacture a vertical column by combining the horizontal ribs 22 surrounding the outer periphery in the horizontal direction.

이러한 본 발명에 의하면, 주택용 필로티구조의 주차장 기둥을 금속보강체 내부에 양생되게 함으로서, 차량 주차 등에 따른 주차장 기둥의 손상을 방지할 수 있고 지진 등의 흔들림에도 주차장기둥이 휘어지거나 부러지는 등의 파손을 방지할 수 있어 안전성을 극대화시킬 수 있다.According to the present invention, by curing the pillars of the parking lot of the piloti structure for houses inside the metal reinforcement, it is possible to prevent damage to the pillars of the parking lot due to vehicle parking, etc., and damage such as bending or breaking of the parking lot pillars even during shaking such as earthquakes. Can be prevented, thus maximizing safety.

또한, 주차장 기둥을 형성하기 위한 거푸집을 설치하지 않고 금속보강체에 직접 콘크리트를 타설할 수 있어 공사기간을 단축시켜 건축시공 효율을 증대시킬 수 있는 효과 등도 있다.In addition, since concrete can be directly poured onto the metal reinforcement without installing a formwork for forming the parking lot pillar, there is also an effect of increasing the construction efficiency by shortening the construction period.

도 1은 본 발명이 적용된 필로티 구조의 주차장 기둥 단면도.
도 2a 내지 도 2f는 본 발명인 주택용 필로티구조의 주차장 기둥 보강공법을 설명하기 위한 단면도.
도 3은 본 발명인 주택용 필로티구조의 주차장 기둥 보강공법의 순서도.
1 is a cross-sectional view of a parking lot pillar of a piloti structure to which the present invention is applied.
Figures 2a to 2f is a cross-sectional view for explaining a parking lot column reinforcement method of the present inventors piloti structure for housing.
Figure 3 is a flow chart of the inventors housing piloti structure parking lot column reinforcement method.

본 발명은 주택용 필로티구조의 주차장 기둥 보강공법은, 주택용 필로티구조를 갖는 건축물의 주차장 콘크리트기둥을 금속보강체 내부에 구성하는 방법을 제공하여 지반의 흔들림에도 주차장 기둥의 파손을 방지할 수 있도록 발명한 것이다.The present invention provides a method of reinforcing a parking lot pillar of a piloti structure for a house, by providing a method of constructing a concrete pillar of a parking lot of a building having a piloti structure for a housing inside a metal reinforcement, so as to prevent damage of the parking lot pillar even when the ground shakes. will be.

이하, 본 발명에 따른 주택용 필로티구조의 주차장 기둥 보강공법에 대해 첨부된 도면을 참고로 하여 상세히 기술되는 실시 예들에 의해 그 특징들을 이해할 수 있을 것이다.Hereinafter, with reference to the accompanying drawings for the parking lot column reinforcement method of the piloti structure for a house according to the present invention will be able to understand its features by the embodiments described in detail.

먼저, 본 발명은 도 1 내지 도 3에서와 같이 다세대, 다가구와 같은 주택용 필로티구조에서 1층 주차장 기둥의 보강을 위한 것으로서, 상기 주차장 기둥을 금속보강체 내에서 타설 및 양생되게 함으로서 주차장 기둥의 강성유지 및 이에 따른 지진발생 시에도 주택의 파손을 방지토록 한다.First, the present invention is for reinforcing the pillars of a parking lot on the first floor in a piloti structure for housing such as multi-family and multi-family as shown in FIGS. 1 to 3, and the rigidity of the parking pillars by placing and curing the parking pillars within a metal reinforcement. Maintain and prevent damage to the house even in the event of an earthquake.

이를 위해, 주차장 기둥을 보강하는 공법을 제시한 것으로, 먼저 도 2a와 같이 기초층 제작단계(S100)를 통해서 건축물의 크기에 맞게 종방향 및 횡방향의 기초철근을 배근하고, 둘레를 따라서 거푸집을 형성한다.To this end, a method of reinforcing the pillars of the parking lot has been proposed. First, the foundation reinforcement in the longitudinal direction and the transverse direction is arranged according to the size of the building through the base layer manufacturing step (S100) as shown in FIG. To form.

기초층 형성단계(S200)는, 상기 제작된 거푸집 내에 콘크리트를 타설 및 양생하고 둘레를 따라 형성된 거푸집을 제거하는 것으로, 상기 기초층(10)을 형성하기 위한 공법은 일반적으로 다세대 및 다가구 주택을 건설하기 위한 공지의 단계이므로 더 이상의 자세한 설명은 생략하기로 한다.The foundation layer forming step (S200) is to pour and cure concrete in the manufactured formwork and remove the formwork formed along the perimeter, and the construction method for forming the base layer 10 is generally to build multi-family and multi-family houses Since it is a known step, further detailed description will be omitted.

이때, 기초층 제작단계(S100) 및 기초층 형성단계(S200)에서 후술되는 금속보강체(40)의 고정을 위해 기초층(10)을 통과해 지반에 고정되는 앵커볼트(43)의 체결단부가 기초층(10)의 상부로 돌출되게 하며, 상기 앵커볼트(43)는 기초층(10)의 형성 이후에도 설치가 가능하다.At this time, the fastening end of the anchor bolt 43 fixed to the ground through the base layer 10 for fixing the metal reinforcement 40 to be described later in the base layer fabrication step (S100) and the base layer formation step (S200) Is to protrude above the base layer 10, and the anchor bolt 43 can be installed even after the base layer 10 is formed.

또, 상기 기초층 제작단계(S100)에서 도 2b와 같이 주택설계도면에 따라 기초층(10)의 기초철근에 연장하여 복수개의 기둥철근(21)을 수직방향으로 배근하는 수직기둥 제작단계(S300)가 포함되는데, 본 발명은 상기 수직방향의 기둥철근(21) 내주면에 원통형상을 갖는 복수개의 늑근고정링(30)이 일정간격을 두고 일체 구비되게 한다.In addition, in the base layer manufacturing step (S100), as shown in FIG. 2B, a vertical column manufacturing step (S300) of extending a plurality of column reinforcing bars 21 in a vertical direction by extending to the base reinforcing bar of the base layer 10 according to the housing design drawing (S300) ) Is included, in the present invention, a plurality of ribs fixing rings 30 having a cylindrical shape on the inner circumferential surface of the columnar reinforcing bars 21 in the vertical direction are integrally provided at regular intervals.

즉, 늑근고정링(30)의 외주면에 기둥철근(21)이 일체로 접하도록 용접 또는 철사로 고정하여 수직방향의 기둥철근(21)에 일정간격을 갖고 복수개가 구비되어 후술(後述)되는 콘크리트주입관(F)의 이동로가 형성되게 한다.That is, concrete to be described later by welding or fixing with a wire so that the column reinforcement 21 is in integral contact with the outer circumferential surface of the rib fixing ring 30 and provided with a plurality of column reinforcing bars 21 at regular intervals in the vertical direction. The flow path of the injection pipe (F) is formed.

그리고, 수직기둥 제작단계(S300)에서, 수직방향의 기둥철근(21) 외주면을 수평방향으로 감싸는 수평늑근(22)이 일정간격을 두고 연속 조립되게 하여 기둥의 강성을 더욱 증대시키는 것도 바람직하다.And, in the vertical column production step (S300), it is also preferable to further increase the rigidity of the column by allowing the horizontal ribs 22 that wrap the outer circumference of the column reinforcement 21 in the vertical direction in the horizontal direction to be continuously assembled at regular intervals.

금속보강체 조립단계(S400)는, 도 2c와 같이 중공형(中孔形) 금속 파이프 형상을 갖는 보강기둥(41)이 상기 기둥철근(21)을 감싸도록 크레인장치를 이용해 기둥철근(21) 상부에서 하부방향으로 이동시켜, 상기 보강기둥(41) 하부에 더 구비된 받침플랜지(42)가 기초층(10)의 상면에 안정적으로 안착되도록 한다.In the metal reinforcement assembly step (S400), a reinforcing column 41 having a hollow metal pipe shape as shown in FIG. 2C is used to enclose the column reinforcement 21 by using a crane device. By moving from the top to the bottom, the support flange 42 further provided under the reinforcing pillar 41 is stably seated on the upper surface of the base layer 10.

이때, 기초층(10)의 상부에는 앵커볼트(43)의 체결단부가 돌출된 상태이므로 상기 받침플랜지(42)의 볼트구멍으로 상기 체결단부가 통과되게 한 다음 너트(미부호)로 고정함으로서 금속보강체(40)의 유동을 방지하고 안정적으로 고정할 수 있다.At this time, since the fastening end of the anchor bolt 43 protrudes from the top of the base layer 10, the fastening end is passed through the bolt hole of the support flange 42 and then fixed with a nut (unsigned). It is possible to prevent the flow of the reinforcement body 40 and stably fix it.

따라서, 상기 보강기둥(41)의 내부에 기둥철근(21)이 수용되면서, 기초층(10)과는 받침플랜지(42) 및 앵커볼트(43)로 안정적으로 고정되는데, 여기에서 상기 기둥철근(21) 및 수평늑근(22)이 보강기둥(41)의 내면과 접촉되지 않고 그 사이에 콘크리트가 구비되게 설치하는 것이 바람직하다.Therefore, while the column reinforcement 21 is accommodated in the reinforcement column 41, the base layer 10 is stably fixed with the support flange 42 and the anchor bolt 43, where the column reinforcement ( 21) and the horizontal ribs 22 are preferably installed so that they do not come into contact with the inner surface of the reinforcing column 41 and concrete is provided between them.

그리고, 금속보강체(40)의 보강기둥(41)은, 기둥철근(21)이 내부에 수용되는 중공부를 갖으면서 원형, 사각형, 육각형, 팔각형 중에서 어느 하나의 형상으로 제작한데, 이를 통해 주차장기둥을 형성하기 위한 기둥철근(21)의 형상 및 늑근고정링(30)의 형상 변경에 용이하게 대응할 수 있다.And, the reinforcement column 41 of the metal reinforcement body 40, while having a hollow portion in which the column reinforcement 21 is accommodated therein, is manufactured in any one shape among round, square, hexagonal, and octagonal, through which the parking lot pillar It is possible to easily respond to the shape change of the shape of the column reinforcement 21 and the shape of the rib fixing ring 30 for forming.

주차장 기둥 형성단계(S500)는 도 2d 및 도 2e와 같이 금속보강체(40)의 상부에서 기둥철근(21)의 늑근고정링(30)을 통해 콘크리트주입관(F)을 기둥철근(21)의 하단까지 삽입한 다음 상기 콘크리트주입관(F)을 승강 이동시키면서 콘크리트를 타설하는 단계이다.The parking lot column formation step (S500) is the concrete injection pipe (F) through the rib fixing ring 30 of the column reinforcement (21) from the upper portion of the metal reinforcement body (40) as shown in Figs. 2d and 2e. It is a step of pouring concrete while inserting it to the bottom of and then lifting and moving the concrete injection pipe (F).

즉, 콘크리트를 타설하기 위한 콘크리트주입관(F)이 늑근고정링(30)의 내경을 통해 안내되어 하단까지 용이하게 삽입될 수 있으면서, 상기 하단에서 상단으로 승강되면서 콘크리트주입관(F)을 통해 콘크리트가 타설 및 양생되어 콘크리트 내부의 중공층 형성을 방지할 수 있어 견고한 기둥의 형성이 가능하다.That is, the concrete injection pipe (F) for pouring concrete is guided through the inner diameter of the rib fixing ring 30 so that it can be easily inserted to the lower end, while being elevated from the bottom to the upper end, through the concrete injection pipe (F). The concrete is poured and cured to prevent the formation of a hollow layer inside the concrete, thus enabling the formation of solid columns.

그리고, 상기 주차장 기둥 형성단계(S500) 이후에는 상기 주차장 기둥과 배근되며 거푸집을 통해 2층을 구성하는 것은 이미 일반적으로 사용되고 있는 공지의 단계이므로 더 이상의 자세한 설명은 생략하기로 한다.In addition, after the parking pillar forming step (S500), since the parking pillar and the second floor are formed through a formwork, since it is a known step that is already generally used, further detailed description will be omitted.

여기에서, 본 발명은 상기 주차장 기둥 형성단계(S500) 이후에 보강기둥 상단 고정단계(S700)를 더 추가하는 것도 가능하며, 이는 상기 보강기둥(41)의 형상에 대응하는 끼움홀(47a)을 갖는 상판플랜지(47)를 구비하여, 상기 보강기둥(41)에 상판플랜지(47)를 더 끼워조립한 상태에서, 2층 구조물의 바닥면 즉 1층 천장벽면에 상기 상판플랜지(47)를 앵커볼트 등으로 고정하여 보강기둥(41)의 상단을 더욱 보강하도록 한 단계이다.Here, the present invention may further add a fixing step (S700) on the top of the reinforcement column after the parking lot column formation step (S500), which is a fitting hole (47a) corresponding to the shape of the reinforcement column (41). In a state in which the upper plate flange 47 is provided, and the upper plate flange 47 is further inserted into the reinforcing pillar 41, the upper plate flange 47 is anchored to the bottom surface of the second floor structure, that is, the first floor ceiling wall surface. This is a step to further reinforce the upper end of the reinforcing column 41 by fixing with bolts or the like.

또한, 주차장 기둥 형성단계(S500) 이후에 도 2f와 같이 금속보강체(40)의 받침플랜지(42) 및 앵커볼트(43)의 선단이 매립되게 바닥층(50)을 형성하는 주차장 바닥 형성단계(S600)가 더 포함되는 것도 바람직하다.In addition, after the parking lot pillar formation step (S500), as shown in FIG. 2F, the parking lot floor formation step of forming the floor layer 50 so that the front ends of the support flange 42 and the anchor bolt 43 of the metal reinforcement body 40 are buried ( It is also preferable that S600) is further included.

이상에서와 같이 상술한 실시 예는 본 발명의 가장 바람직한 예에 대하여 설명한 것이지만 상기 실시 예에만 한정되는 것은 아니며, 본 발명의 기술사상을 벗어나지 않는 범위 내에서 다양한 변형이 가능하다는 것은 당업자에게 있어서 명백한 것이다.As described above, the above-described embodiment has been described with respect to the most preferable example of the present invention, but is not limited to the above embodiment, and it is obvious to those skilled in the art that various modifications can be made within the scope of the technical spirit of the present invention. .

10. 기초층 21. 기둥철근
30. 늑근고정링 40. 금속보강체
41. 보강기둥 42. 받침플랜지
50. 바닥층
S100. 기초층 제작단계 S200. 기초층 형성단계
S300. 수직기둥 제작단계 S400. 금속보강체 조립단계
S500. 주차장기둥 형성단계 S600. 주차장 바닥 형성단계
S700. 보강기둥 상단 고정단계
10. Base layer 21. Column reinforcement
30. Frame fixing ring 40. Metal reinforcement
41. Reinforcing pillar 42. Support flange
50. Bottom layer
S100. Base layer manufacturing step S200. Foundation layer formation step
S300. Vertical column production step S400. Metal reinforcement assembly step
S500. Parking pillar formation step S600. Parking floor formation stage
S700. Step of fixing the top of the reinforcement column

Claims (4)

건축물의 크기에 맞게 종방향 및 횡방향의 기초철근을 배근하고, 둘레를 따라서 거푸집을 형성하는 기초층 제작단계(S100)와;
상기 기초층 제작단계(S100)를 통해 형성된 거푸집 내에 콘크리트를 타설 및 양생하는 기초층 형성단계(S200)와;
기초층(10)의 기초철근에서 연장된 복수개의 기둥철근(21)을 수직방향으로 배근하고, 상기 수직방향의 기둥철근(21) 내주면에 복수개의 늑근고정링(30)이 일정간격을 두고 일체 구비되는 수직기둥 제작단계(S300)와;
보강기둥(41)은 중공형 금속 파이프 형상을 갖고 하단에 받침플랜지(42)가 구비된 금속보강체(40)가, 상기 기둥철근(21)을 내부에 수용하면서 기초층(10)에 받침플랜지(42)를 안착되어 앵커볼트(43)를 이용해 상기 기초층(10)에 고정되는 금속보강체 조립단계(S400)와;
상기 금속보강체(40)의 상부에서 기둥철근(21)의 늑근고정링(30)을 통해 콘크리트주입관(F)을 기둥철근(21)의 하단까지 삽입한 다음 상기 콘크리트주입관(F)을 승강 이동시키면서 콘크리트를 타설하여 금속보강체(40)의 보강기둥(41) 내에 콘크리트를 타설 및 양생하는 주차장 기둥 형성단계(S500)를 포함해 구성되되;
상기 기초층 제작단계(S100) 및 기초층 형성단계(S200)에서 앵커볼트(43)는 기초층(10)을 통과해 지반에 고정 설치되며,
상기 수직기둥 제작단계(S300)에서의 기둥철근(21)은 원형의 배열을 갖고 배근되어, 원통형상을 갖는 늑근고정링(30)을 상기 기둥철근(21)의 내측에 복수개 위치시키고, 상기 늑근고정링(30)의 외경면과 기둥철근(21)을 용접해 고정시켜 상기 늑근고정링(30)의 내경면으로 콘크리트주입관(F)의 이동로가 연통되게 형성되고,
상기 늑근고정링(30)과 늑근고정링(30) 사이의 기둥철근(21)에는 외주연을 수평방향으로 감싸는 수평늑근(22)을 결합시켜 수직기둥을 제작하도록 구성된 것을 특징으로 하는 주택용 필로티구조의 주차장 기둥 보강공법.
The base layer manufacturing step (S100) of arranging the foundation reinforcement in the longitudinal and transverse directions according to the size of the building and forming a formwork along the perimeter;
A base layer forming step (S200) of pouring and curing concrete in the formwork formed through the base layer manufacturing step (S100);
A plurality of column reinforcing bars 21 extending from the base reinforcing bar of the base layer 10 are arranged in a vertical direction, and a plurality of rib fixing rings 30 are integrated at a predetermined interval on the inner circumferential surface of the column reinforcing bars 21 in the vertical direction. A vertical column manufacturing step (S300);
The reinforcing column 41 has a shape of a hollow metal pipe, and a metal reinforcement body 40 provided with a supporting flange 42 at the lower end of the reinforcing column 41 accommodates the column reinforcement 21 in the base layer 10 while receiving the supporting flange. A metal reinforcement assembly step (S400) in which 42 is mounted and fixed to the base layer 10 using an anchor bolt 43;
Insert the concrete injection pipe (F) through the rib fixing ring 30 of the column reinforcement (21) from the top of the metal reinforcement body (40) to the lower end of the column reinforcement (21), and then insert the concrete injection pipe (F). Consisting including a parking lot pillar forming step (S500) of pouring and curing concrete in the reinforcement pillar 41 of the metal reinforcement body 40 by placing concrete while moving up and down;
In the base layer manufacturing step (S100) and the base layer forming step (S200), the anchor bolt 43 passes through the base layer 10 and is fixedly installed on the ground,
The column reinforcement 21 in the vertical column production step (S300) is arranged in a circular arrangement, and a plurality of ribs fixing rings 30 having a cylindrical shape are located inside the column reinforcement 21, and the ribs By welding and fixing the outer diameter surface of the fixing ring 30 and the column reinforcement 21, the moving path of the concrete injection pipe (F) is formed in communication with the inner diameter surface of the rib fixing ring 30,
The pilotie structure for a house, characterized in that the horizontal ribs 22 surrounding the outer periphery in the horizontal direction are coupled to the column reinforcement 21 between the rib fixing ring 30 and the rib fixing ring 30 to produce a vertical column. Parking lot column reinforcement method.
청구항 1에 있어서, 금속보강체(40)의 보강기둥(41)은, 기둥철근(21)이 내부에 수용되는 중공부를 갖으면서 원형, 사각형, 육각형, 팔각형 중에서 어느 하나의 형상으로 제작되며, 주차장 기둥 형성단계(S500) 이후에 상기 보강기둥(41)의 형상에 대응하는 끼움홀(47a)을 갖는 상판플랜지(47)가 상기 보강기둥(41)에 더 끼워진 상태에서 1층 천장벽면에 고정하는 보강기둥 상단 고정단계(S700)가 더 포함됨을 특징으로 하는 주택용 필로티구조의 주차장 기둥 보강공법.The method according to claim 1, wherein the reinforcing column 41 of the metal reinforcement body 40 is manufactured in any one shape among circular, square, hexagonal, and octagonal shapes while having a hollow portion in which the column reinforcing bar 21 is accommodated therein, and After the pillar forming step (S500), the top plate flange 47 having the fitting hole 47a corresponding to the shape of the reinforcing pillar 41 is further fitted to the reinforcing pillar 41 and fixed to the first floor ceiling wall surface. A method of reinforcing the pillars of the parking lot of the piloti structure for houses, characterized in that the fixing step on the top of the reinforcing pillar (S700) is further included. 청구항 1에 있어서, 주차장 기둥 형성단계(S500) 이후에 금속보강체(40)의 받침플랜지(42) 및 앵커볼트(43)의 선단이 매립되게 바닥층(50)을 형성하는 주차장 바닥 형성단계(S600)가 더 포함됨을 특징으로 하는 주택용 필로티구조의 주차장 기둥 보강공법.The method according to claim 1, After the parking lot pillar forming step (S500), a parking lot floor forming step (S600) of forming a floor layer 50 such that the front end of the support flange 42 and the anchor bolt 43 of the metal reinforcement body 40 are buried (S600). ) Is further included. 삭제delete
KR1020170159306A 2017-11-27 2017-11-27 Pillar reinforcement method of parking lot structure for residential use KR102157205B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170159306A KR102157205B1 (en) 2017-11-27 2017-11-27 Pillar reinforcement method of parking lot structure for residential use

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170159306A KR102157205B1 (en) 2017-11-27 2017-11-27 Pillar reinforcement method of parking lot structure for residential use

Publications (2)

Publication Number Publication Date
KR20190061195A KR20190061195A (en) 2019-06-05
KR102157205B1 true KR102157205B1 (en) 2020-09-17

Family

ID=66845027

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170159306A KR102157205B1 (en) 2017-11-27 2017-11-27 Pillar reinforcement method of parking lot structure for residential use

Country Status (1)

Country Link
KR (1) KR102157205B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102218533B1 (en) 2019-09-16 2021-02-22 박정민 pillar structure
CN114809693B (en) * 2022-03-21 2023-05-02 重庆科技学院 High-load self-restraint reinforcing device for existing reinforced concrete column

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020085652A (en) * 2001-05-09 2002-11-16 주식회사 남영이엔씨 pier execution method of an light electric railway
KR101209363B1 (en) 2011-05-02 2012-12-06 서울시립대학교 산학협력단 Concrete block for seismic reinforcement of H-shaped column and seismic reinforcing method using the same
KR20130075995A (en) * 2011-12-28 2013-07-08 경희대학교 산학협력단 Lateral supporter, composite concrete column structure having the same, and constructing method thereeof
KR20130097385A (en) * 2012-02-24 2013-09-03 재단법인 포항산업과학연구원 Structure of reinforced columns by multi-layer steel plates
KR101560884B1 (en) * 2013-11-01 2015-10-16 주식회사 포스코 Steel pipe system with fireproof coating and construction method thereof

Also Published As

Publication number Publication date
KR20190061195A (en) 2019-06-05

Similar Documents

Publication Publication Date Title
US20070062142A1 (en) Concrete structure system
KR102157205B1 (en) Pillar reinforcement method of parking lot structure for residential use
KR100955788B1 (en) A pile head reinforcement structure ofprecastconcrete pile
KR20230090300A (en) A twin wall structure using a PC panel and method for manufacturing of it
KR101355926B1 (en) Reusable waffle type slab form assembly
KR101566528B1 (en) Basement extension construction method using underground structure
JP5131645B2 (en) Construction method of steel tower foundation
JP5865567B2 (en) Connecting slab and its construction method
KR20170013009A (en) Method for constructing junction between the double wall Precast Concretes and the junction structure thereof, the construction method for underground parking using he double wall Precast Concrete, and construction method for the rainwater storage using he double wall Precast Concrete
JP4592497B2 (en) Prop base structure
KR100665210B1 (en) Concrete mold for manhole manufacture
JPH1018424A (en) Root wrapping reinforcing structure of column base of steel post or the like
KR101077971B1 (en) Elementary Block for Supporting of Steel Pipe
KR20190077888A (en) Composite phc pile for soil retaining wall
KR101576215B1 (en) Prefabricated precast concrete girder for building construction
JP2018096188A (en) Junction structure of seismic isolator to steel-pipe column, and base isolated building
JP5844579B2 (en) Tower structure
KR20220002858U (en) Base assembly for supporting steel pillar for telecommunication facilities
KR102507299B1 (en) The construction method precast prestressed concrete parking buildings with precast concrete wall panels
JP2001262586A (en) Foundation structure of dwelling house
KR101692151B1 (en) A deck support frame
JP2008223242A (en) Manufacturing method for precast concrete panel
JP2010070941A (en) Method and device for restraining horizontal force in base-isolating work
KR101781823B1 (en) Concrete slab and concrete slab manufacturing method and method for manufacturing a concrete constructure provided the same
KR101657628B1 (en) Top-down method for building undergroud structure using steel pipe

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right