KR102150274B1 - Apparaurs for constructing slab of building and method for the same - Google Patents
Apparaurs for constructing slab of building and method for the same Download PDFInfo
- Publication number
- KR102150274B1 KR102150274B1 KR1020190001501A KR20190001501A KR102150274B1 KR 102150274 B1 KR102150274 B1 KR 102150274B1 KR 1020190001501 A KR1020190001501 A KR 1020190001501A KR 20190001501 A KR20190001501 A KR 20190001501A KR 102150274 B1 KR102150274 B1 KR 102150274B1
- Authority
- KR
- South Korea
- Prior art keywords
- supporter
- slab
- prop head
- panel
- building
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
- E04G11/486—Dropheads supporting the concrete after removal of the shuttering; Connecting means on beams specially adapted for dropheads
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
- E04G11/50—Girders, beams, or the like as supporting members for forms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Joining Of Building Structures In Genera (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
본 발명은 벽 패널의 상단의 소피트 랭스에 슬라이딩에 장착되는 코너 브라켓에 결합되는 빔 고정용 브라켓과, 상단에 프롭 헤드가 결합된 존치형 서포터와, 각 단부가 상기 빔 고정용 브라켓이나 상기 프롭 헤드에 결합되어 상기 서포터에 의해 지지되는 빔과, 소피트 랭스와 상기 빔에 의해 구획된 공간 내부의 안착되어 슬라브 바닥면을 형성하는 슬라브 패널과, 상기 빔과 프롭 헤드를 일체로 연결하여 빔의 하중이 서포터에 의해 지지되도록 하는 빔 고정부재와, 상기 빔 고정부재와 함께 빔이 서포터에 지지되도록 함과 아울러 프롭 헤드로부터 분리된 빔이 서포터를 따라 하강하도록 하는 분리형 가이드와, 상기 분리형 가이드의 하강시 서포터 외주면과의 마찰에 의해 빔의 점진적인 하강이 이루어지도록 하는 완강부재와 및 서포터 상의 소정의 높이에 돌출되게 형성되어 상기 빔과 슬라브 패널의 하강을 멈추도록 하는 스토퍼를 포함하여 이루어지는 건축용 슬라브 시공 장치와 동 장치를 이용한 시공 방법을 제공한다.The present invention relates to a beam fixing bracket coupled to a corner bracket mounted on sliding to a small fit length of a wall panel, a supported supporter having a prop head coupled to the upper end, and each end of the beam fixing bracket or the prop The beam coupled to the head and supported by the supporter, the slab panel seated in the space partitioned by the small pit length and the beam to form the slab bottom surface, and the beam and the prop head are integrally connected to the beam A beam fixing member for supporting a load by a supporter, a detachable guide for supporting the beam together with the beam fixing member on the supporter and for allowing the beam separated from the prop head to descend along the supporter, and the descending of the detachable guide Construction slab construction apparatus comprising a stiffening member for gradual descending of the beam by friction with the outer peripheral surface of the supporter, and a stopper formed to protrude to a predetermined height on the supporter to stop the descending of the beam and the slab panel Provides a construction method using a vortex device.
Description
본 발명은 건축물의 콘크리트 슬라브 시공에 관한 것으로, 보다 자세하게는 거푸집을 이용한 슬라브 콘크리트 타설 후 양생과정을 거쳐 거푸집 해체에 이르는 슬라브 시공에서 사용되는 슬라브 패널의 조립과 해체가 상단부에 콘크리트 슬라브의 무게를 지지하는 프롭 헤드가 결합된 존치형 서포트와 이에 결합되어 슬라브 패널의 점진적인 하강을 안내하는 분리형 가이드에 의해서 신속하면서도 간편하게 이루어질 수 있도록 한 건축물의 슬라브 시공 장치 및 방법에 관한 것이다. The present invention relates to the construction of a concrete slab of a building, and more specifically, the assembly and dismantling of the slab panel used in the slab construction from the slab construction to the dismantling of the formwork after the slab concrete pouring using a formwork is poured to support the weight of the concrete slab at the upper end. The present invention relates to an apparatus and method for constructing a slab of a building so that it can be quickly and simply performed by a stand-up support to which a prop head is coupled and a separate guide that is coupled thereto to guide the gradual lowering of the slab panel.
일반적으로 아파트나 빌딩과 같은 다층(多層) 구조의 콘트리트 건축물 시공시에는 벽체 및 슬라브 구축을 위한 거푸집을 설치하고 콘크리트를 타설하여 양생시킨 후 거푸집을 해체하고 거푸집 자재를 상부층으로 인양하여 설치, 콘크리트 타설 및 해체하는 작업을 반복하게 된다.In general, when constructing a multi-layered concrete structure such as an apartment or building, a form for building walls and slabs is installed, concrete is poured to cure, and the form is dismantled and the formwork is lifted to the upper layer for installation, and concrete is poured. And the dismantling operation is repeated.
일반적으로 최근의 건축용 거푸집은 주로 철이나 알루미늄 등의 금속 재질로 이루어진 패널의 조립체로 이루어지는바, 벽체 거푸집은 시공될 벽체의 두께만큼의 간격을 두고 상하 길이가 폭에 비해 상대적으로 큰 직사각형으로 형성된 단위 벽패널들을 해당 벽체의 면적을 커버하도록 연속적으로 결합함에 의해 조립되며, 슬라브 거푸집은 바닥으로부터 수직으로 세워진 서포터와 상기 벽체 거푸집의 상단에 지지되는 빔들 사이에 사각형의 단위 슬라브 패널들이 단일 평면상에 연속되게 배치됨으로써 콘크리트 타설을 위한 지지 바닥면을 구성하게 된다. In general, the recent building formwork is mainly composed of an assembly of panels made of metal materials such as iron or aluminum, and the wall formwork is a unit formed in a rectangle whose top and bottom length is relatively large compared to the width with an interval equal to the thickness of the wall to be constructed. The wall panels are assembled by successively combining the wall panels to cover the area of the wall, and the slab formwork consists of square unit slab panels on a single plane between the supporter erected vertically from the floor and the beams supported on the top of the wall formwork. It is arranged so that it constitutes a supporting floor surface for concrete pouring.
이와 같은 벽체 거푸집과 슬라브 거푸집의 설치가 완료된 상태에서 거푸집 내로 콘트리트가 타설되어 양생이 완료되면 거푸집을 해체하게 되는데, 대부분의 건축물에서는 바닥면과 천정 사이의 높이(층고)는 작업자의 키를 훨씬 넘기 때문에 슬라브 패널의 해체를 위해서는 작업자가 사다리를 이용하여 연결 조립된 판넬을 분리해서 해체하는 과정에서 분리된 슬라브 패널이 자중에 의해 바닥으로 떨어져 내리게 되고, 그러한 과정에서 금속재로 이루어진 패널의 손상과 안전사고의 위험 불가피하게 됨은 물론 바닥면과의 충돌과정에서 발생되는 소음과 분진의 발생으로 인해 공사장은 물론 그 주변의 환경을 악화시키는 요인으로 작용하여 왔다.In the state that such wall formwork and slab formwork are installed, concrete is poured into the formwork and the formwork is dismantled when curing is completed.In most buildings, the height (floor height) between the floor surface and the ceiling exceeds the height of the worker. Therefore, in order to dismantle the slab panel, the separated slab panel falls to the floor by its own weight while the operator separates and dismantles the assembled panel using a ladder. In this process, the panel made of metal is damaged and safety accidents. As well as being inevitable, the noise and dust generated during the collision process with the floor surface have acted as a factor of deteriorating the construction site as well as the surrounding environment.
기존의 건축물 공사에서 적용되는 거푸집 시공 방식에서 제기되는 상기의 문제점을 해결하기 위한 방안으로 대한민국 특허등록 제10-0484512호에는 거푸집을 통한 벽체와 슬라브 형성용 콘크리트 타설과 양생이 완료된 후에 거푸집을 해체함에 있어서 슬라브 패널이 천정으로부터 바닥으로 곧바로 떨어지지 않고 작업자가 사다리를 이용할 필요가 없을 정도의 높이만큼 하강한 상태로 지지되되도록 슬라브 패널 지지용 빔 구조를 개선해서 작업자로 하여금 패널을 직접 바닥으로 들어 내릴 수 있도록 한 새로운 방식의 슬라브 시공용 거푸집의 시공방법이 개시된바 있다.As a method to solve the above problems raised in the formwork construction method applied in the existing building construction, Korean Patent Registration No. 10-0484512 discloses that the formwork is dismantled after the concrete placement and curing for forming walls and slabs through the formwork are completed. Therefore, the beam structure for supporting the slab panel has been improved so that the slab panel does not fall directly from the ceiling to the floor and is supported in a state that is lowered to a height that does not require the operator to use a ladder, so that the operator can directly lift the panel down to the floor. A new method of constructing a formwork for slab construction has been disclosed.
상기 특허의 슬라브 시공용 거푸집은 기존의 거푸집에서 지적되어 왔던 제반 문제점이 일거에 해소되고 또한 거푸집의 설치 및 해체에 특별한 숙련도를 필요로 함이 없이도 손쉽고도 신속하게 패널의 손상이 최소화된 가운데 안정적인 해체작업을 도모할 수 있다는 장점에 기인하여 관련 업계에서는 소위 "드롭 시공 공법"으로 명명된 가운데 친환경적인 거푸집 시공법으로서 아파트를 비롯한 고층 건축물의 건축시에 이를 이용한 시공이 지속적으로 확대되어 오고 있다.The above patented formwork for slab construction solves all the problems pointed out in the existing formwork at once, and without the need for special skill in installing and dismantling the formwork, it is easy and quick to dismantle the panel while minimizing damage to the panel. Due to the advantage of being able to achieve work, the so-called "drop construction method" in the related industry has been continuously expanded to use it as an eco-friendly formwork construction method when building high-rise buildings including apartments.
이와 같은 '드롭 시공 공법'의 활성화 경향에 따라서 동 공법과 관련한 기술의 개발도 병행해서 이루어지고 있는바, 그러한 몇가지 예로서 특허등록 제10-1127008호에는 벽 패널 상단의 슬라브 코너 브라켓 상에 일측이 회동가능하게 장착된 슬라브 패널 지지빔이 타이로드를 따라 하강하는 과정에서 슬라브 패널도 함께 하강하도록 한 기술이 개시되고 있으며, 특허등록 제10-1491074호에는 슬라브 패널이 지지되는 멍에를 슬라브 코너 브라켓으로부터 분리시시킴에 따라 슬라브 패널이 수평상태를 유지한 가운데 서포터를 따라 하향 이동하도록 거푸집 해체 방법이 알려지고 있다.In accordance with this trend of activating the'drop construction method', the development of technology related to the same method is also being carried out. As a few examples, Patent Registration No. 10-1127008 has one side on the slab corner bracket at the top of the wall panel. A technology has been disclosed that allows the slab panel to also descend while the support beam of the slab panel mounted rotatably descends along the tie rod, and patent registration No. 10-1491074 provides a yoke for supporting the slab panel from the slab corner bracket. A method of dismantling the formwork is known to move downward along the supporter while the slab panel remains horizontal as it is separated.
그리고 특허등록 제10-1514395호에는 서포터에 슬라이딩 가능하게 장착된 브래킷에 의해서 빔의 중앙부가 지지되도록 하고 상기 빔이 양단은 슬라브 코너 브라켓에 의해 링크 연동이 가능하도록 구성하여 슬라브 패널의 해체시에 서포터에 장착된 브래킷이 서포터의 외주면을 따라 슬라이딩 하강하는 과정에서 슬라브 빔과 이에 지지되는 슬라브 패널이 함께 하강되도록 한 기술이 개시되고 있다.In addition, in Patent Registration No. 10-1514395, the central part of the beam is supported by a bracket that is slidably mounted on the supporter, and the beam is configured to be linked by a slab corner bracket at both ends, so that the supporter when the slab panel is dismantled. A technology in which a slab beam and a slab panel supported therein descend together in the process of sliding down the bracket mounted on the outer circumferential surface of the supporter.
이와 같은 현재까지 알려진 바의 "드롭 시공 공법" 관련 기술은 종전에 비해서 작업성이나 환경적인 측면을 비롯한 구조의 간편성 등에서 훨씬 향상된 면모를 드러내고 있긴 하나, 거푸집의 해체 과정에서 슬라브 패널과 이를 지지하는 빔이 서포터를 타고 하강하도록 유도하는 구성이 간단치만은 않을 뿐 아니라 충격발생이 없는 완만한 하강이 제대로 이루어지고 있지는 못하고, 또한 슬라브 콘크리트의 양생이 완전히 이루어질 때까지 슬라브 패널 설치용 잭 서포트 외에 별도의 필러 서포트를 필요로 하고 있는 실정이어서 이에 대한 개선이 요청되고 있는 실정이다.The technology related to the “drop construction method” as known so far shows much improved aspects in terms of workability, environmental aspects, and structural simplicity than before, but in the process of dismantling the formwork, the slab panel and the beam supporting it The structure to induce the descending by riding this supporter is not simple, and the gentle descent without impact is not properly performed.In addition, a separate filler support in addition to the jack support for slab panel installation until the curing of the slab concrete is completed. The situation is in need of, so improvement is being requested.
본 발명은 상기 종래 기술의 문제점을 해결하기 위한 것으로서, 벽 패널 상단의 소피트 랭스(sofit length)에 장착되어 빔의 외측 단부와 결합되는 코너 브라켓이 거푸집의 해체시에 소피트 랭스 및 빔으로부터 용이하게 분리되도록 하는 한편 바닥면으로부터 지지되는 서포터 상단에는 빔과 연결되는 프롭헤드(prop head)를, 그 아래로는 빔의 지지 및 하강을 안내하는 슬라이딩 가이드를 분리형으로 형성하고 슬라브 패널과 빔의 자중에 의한 하강이 분리형 슬라이딩 가이드에 구비된 완강부재를 통해서 안정적으로 이루어질 수 있도록 한 건축물의 슬라브 시공 장치르 제공하는데 있다.The present invention is to solve the problems of the prior art, and a corner bracket mounted on a sofit length at the top of a wall panel and coupled with the outer end of the beam is easy to remove from the sofit length and the beam when dismantling the formwork. On the other hand, a prop head connected to the beam is formed at the top of the supporter supported from the bottom surface, and a sliding guide that guides the support and descending of the beam is formed in a separate type. The slab panel and the weight of the beam It is to provide a slab construction device for a building so that the descent by the stiffening member provided in the detachable sliding guide can be stably made.
본 발명의 다른 목적은 벽 패널 상단의 빔 외측단부와 결합되는 코너 브라켓이 소피트 랭스 및 빔과 용이하게 결합 및 분리되도록 하는 한편 존치형 서포터의 프롭헤드 아래의 서포터 외주면 상에서 고정편과 함께 빔을 지지하는 분리형 슬라이딩 가이드에 완강장치를 부가하여 거푸집의 해체시에 슬라브 패널과 빔의 자중에 의한 하강이 슬라이딩 가이드에 구비된 완강부재를 통해서 서서히 그리고 안정적으로 이루어질 수 있도록 함으로써 건축물의 슬라브 시공을 위한 거푸집의 설치 및 해체 작업이 단순하면서도 신속하게 이루어질 수 있도록 한 건축물 슬라브 시공 방법을 제공하는데 있다.Another object of the present invention is to ensure that the corner bracket that is coupled with the outer end of the beam at the top of the wall panel is easily coupled and separated from the small fit length and the beam, while the beam together with the fixing piece on the outer circumferential surface of the supporter under the prop head of the standing supporter A formwork for slab construction of a building by adding a stiffening device to the supporting separable sliding guide so that when the formwork is dismantled, the descending by the slab panel and the beam's own weight can be made gradually and stably through the stiffening member provided in the sliding guide. It is to provide a structural slab construction method that enables the installation and dismantling of the building to be performed simply and quickly.
본 발명의 상기 목적들과 그 외의 목적은, 벽 패널 상단의 소피트 랭스에 슬라이딩 가능하게 장착되는 코너 브라켓에 힌지핀에 의해 결합되는 빔 고정용 브라켓과, 바닥으로부터 수직으로 세워지는 서포터와, 상기 서포터의 상단에 결합되며 빔과 동일한 단면을 갖는 프롭 헤드와, 각 외측단부가 상기 빔 고정용 브라켓이나 상기 프롭 헤드에 고정되어 대향하는 벽 판넬 사이에서 상기 서포터에 의해 수평상태로 지지되는 빔과, 상기 소피트 랭스와 상기 빔에 의해 구획된 공간 내부의 동일 평면 내에 격자상으로 결합되어 슬라브 바닥면을 형성하는 슬라브 패널과, 상기 빔과 프롭 헤드를 일체로 연결하여 빔의 하중이 서포터에 의해 지지되도록 하는 빔 고정부재와, 상기 빔 고정부재와 함께 빔이 서포터에 지지되도록 함과 아울러 프롭 헤드로부터 분리된 빔이 서포터를 따라 하강하도록 하는 분리형 가이드와, 상기 분리형 가이드의 하강시 서포터 외주면과의 마찰에 의해 빔의 점진적인 하강이 이루어지도록 하는 완강부재와 및 서포터 상의 소정의 높이에 고정되어 상기 빔과 슬라브 패널의 하강을 멈추도록 하는 스토퍼를 포함하여 이루어지는 건축용 슬라브 시공 장치에 의해서 달성된다.The above and other objects of the present invention are a bracket for fixing a beam coupled by a hinge pin to a corner bracket that is slidably mounted on a small pit at the top of a wall panel, a supporter standing vertically from the floor, the A prop head coupled to the upper end of the supporter and having the same cross-section as the beam, and a beam whose outer ends are fixed to the beam fixing bracket or the prop head and supported in a horizontal state by the supporter between opposite wall panels, A slab panel that is combined in a grid form in the same plane inside the space partitioned by the small pit length and the beam to form a slab bottom surface, and the beam and the prop head are integrally connected to support the load of the beam by a supporter. A beam fixing member that allows the beam fixing member to be supported, a separate guide that allows the beam separated from the prop head to descend along the supporter while supporting the beam together with the beam fixing member, and friction with the outer peripheral surface of the supporter when the separate guide descends It is achieved by a structural slab construction apparatus comprising a stiffening member for gradual descending of the beam and a stopper fixed to a predetermined height on the supporter to stop the descending of the beam and the slab panel.
이때, 상기 코너 브라켓은 대략 사각 단면 형태로서 일측면 하부가 트여진 소피트 랭스와 형합하여 슬라이딩 가능하게 삽입되도록 하는 단면 형태로서, 일측 하부로는 한쌍의 핀 삽입부가 형성되고, 상기 소피프 랭스와 형합하여 삽입되는 일측 수직외벽부는 걸림턱이 형성된 자유단부로 이루어져서 상기 핀 삽입부와 걸림턱 사이에는 트임부로 존재하게 된다.At this time, the corner bracket is a cross-sectional shape in which a lower part of one side is slidably inserted into an open small pit length in a substantially rectangular cross-sectional shape, and a pair of pin inserts is formed in the lower part of one side, and the small pipe length and One side of the vertical outer wall portion that is inserted into the mold is formed of a free end portion having a locking jaw formed therein, and thus exists as an opening between the pin insertion portion and the locking jaw.
그리고 상기 빔 고정용 브라켓은 상기 코너 브라켓의 핀 삽입부와 힌지핀의 공통 삽입을 위한 핀홀이 구비된 체결부와 상기 체결부의 수평방향 일외측으로 연장되고 외측 단부에 빔에 체결되는 핀에 걸리도록 형성된 걸림절곡편을 포함하는 몸체부 및 상기 몸체부와 반대편의 체결부로부터 상향으로 연장되고 그 단부에 상기 코너 브라켓의 걸림턱에 걸어물리도록 형성된 후크를 포함하여 이루어진다.And the beam fixing bracket is a fastening part provided with a pin hole for common insertion of a pin insertion part of the corner bracket and a hinge pin, and the fastening part extends outward in the horizontal direction and is caught by the pin fastened to the beam at the outer end. A body portion including a formed engaging bent piece, and a hook extending upwardly from a fastening portion opposite to the body portion and formed at an end thereof to be hooked to a locking jaw of the corner bracket.
상기 빔 고정용 브라켓은 체결부의 핀홀을 상기 코너 브라켓의 핀 삽입부에 일치시킨 상태에서 힌지핀을 공통삽입함에 의해 상기 후크가 코너 브라켓의 걸림턱에 맞물리게 되어 소피트 랭스 및 코너 브라켓에 고정된다.The beam fixing bracket is fixed to the small fit length and the corner bracket by jointly inserting a hinge pin in a state in which the pinhole of the fastening part is aligned with the pin insertion part of the corner bracket, so that the hook engages with the locking jaw of the corner bracket.
한편, 상기 프롭 헤드는 상기 서포터의 상단에 끼움 결합되는 지주와, 상기 지주의 상단에 지주를 감싸는 형태로 고정되며 빔과 동일한 단면 형태로서 양측 단부가 하향 경사진 전체적으로 역삼각형 형태의 본체로 이루어진다. On the other hand, the prop head is composed of a post fitted to the upper end of the supporter, and a main body of an inverted triangle shape, which is fixed in a form surrounding the post at the upper end of the post and has the same cross-sectional shape as the beam, and both ends are inclined downward.
상기 빔은 상기 서포터 상단에 지지되는 프롭 헤드와 결합되고 양측 단부가 상기 소피트 랭스에 지지되어 슬라브 패널을 지지하는 것으로서, 상기 프롭 헤드와 동일한 단면을 구비하며, 프롭 헤드와 결합되는 측단부는 상향 경사면을 이룬다. 상기 빔은 전,후면상에 슬라브 패널의 안착을 위한 안착 리브가 길이방향을 따라 돌출형성되고, 그 아래쪽으로는 폭방향으로 후퇴절곡된 요입부로서의 고정편 안착부가 구비된다.The beam is coupled to the prop head supported on the upper end of the supporter, and both ends are supported by the small pit length to support the slab panel, and have the same cross-section as the prop head, and the side end coupled to the prop head is upward It forms a slope. In the beam, a seating rib for seating a slab panel is formed protruding along a longitudinal direction on the front and rear surfaces of the beam, and a fixed piece seating portion as a concave inlet portion retracted and bent in the width direction is provided below the beam.
한편, 상기 프롭 헤드 아래쪽의 서포터에는 서로 대칭되게 형성되어 서포터의 외주면에 장착되는 분리형 가이드가 설치되는바, 상기 분리형 가이드는 외측으로 상향 연장된 윙부의 상단에 상기 고정편의 핀공에 공통으로 삽입되는 고정핀의 삽입을 위한 핀홀이 구비되고, 윙부 아래쪽으로는 완강부재 안착부가 일체로 형성된다.On the other hand, the supporter under the prop head is provided with a detachable guide formed symmetrically to each other and mounted on the outer circumferential surface of the supporter.The detachable guide is a fixed that is commonly inserted into the pin hole of the fixing piece at the upper end of the wing part extending upwardly to the outside. A pinhole for inserting a pin is provided, and a stiffening member seating portion is integrally formed below the wing portion.
상기 완강부재는 스프링의 탄성력에 의해 서포터의 외주면과 마찰접촉을 이루는 마찰부재 헤드와 마찰부재 헤드로부터 연장되어 스프링이 개재된 상태로 상기 완강 부재 안착부에 고정되는 고정로드를 포함한다. The stiffening member includes a friction member head in frictional contact with an outer circumferential surface of the supporter by the elastic force of the spring, and a fixing rod extending from the friction member head and fixed to the stiffening member seating portion with a spring interposed therebetween.
그리고 상기 서포터의 수직 구간 중 소정 높이이 외주면에는 슬라브 패널의 해체시에 빔과 함께 하강하는 분리형 가이드가 소정의 구간만큼만 하강한 상태에서 멈출 수 있도록 하는 스토퍼가 형성되어 있다.In addition, a stopper is formed on an outer circumferential surface having a predetermined height among the vertical sections of the supporter so that the detachable guide that descends together with the beam when the slab panel is dismantled can be stopped in a state that descends only by a predetermined section.
이와 같은 구조로 이루어진 본 발명의 슬라브 시공 장치를 이용한 건축물의 슬라브 시공 방법은, 벽체 패널의 상단에 소피트 랭스를 설치하고 이에 코너 브라켓을 장착하는 단계, 서포터의 상단에 프롭 헤드를 결합해서 바닥으로부터 수직으로 세우는 단계, 상기 프롭 헤드와 빔을 고정편과 분리형 가이드를 이용해서 고정시키는 한편 빔 고정용 브라켓을 이용하여 빔의 단부가 코너 브라켓에 고정되도록 하여 빔이 수평 상태를 유지하며 양 벽체 사이에 지지되도록 하는 단계, 빔 사이의 공간에 슬라브 패널을 격자상으로 안착시키는 단계, 상기 빔과 슬라브 패널로 이루어진 거푸집에 콘크리트를 타설하는 단계, 콘트리트가 어느 정도 양생이 이루어진 때에 소피트 랭스와 빔 사이의 결합 및 플롭 헤드와 빔 사이의 결합을 분리시키는 단계, 분리형 가이드에 의해 가이드 되고 완강 부재에 의한 마찰력의 작용으로 빔과 슬라브 패널이 서포트의 외주면을 따라 서서히 하강하도록 하는 단계, 서포터를 타고 하강하여 스토퍼에 걸려서 멈춘 패널과 빔을 분리해 내는 단계 및 슬라브 콘트리트가 완전히 양생된 후에 프롭 헤드가 결합된 서포터를 제거해 내는 단계로 이루어진다.In the slab construction method of a building using the slab construction device of the present invention having such a structure, the step of installing a small pit length on the top of the wall panel and mounting a corner bracket thereto, combining the prop head on the top of the supporter from the floor Standing vertically, the prop head and the beam are fixed using a fixing piece and a separate guide, while the end of the beam is fixed to the corner bracket using a beam fixing bracket, so that the beam remains horizontal and between the two walls. The step of supporting, placing the slab panel in a grid shape in the space between the beams, pouring concrete into the formwork made of the beam and the slab panel, and between the sofit length and the beam when the concrete is cured to some extent. The step of separating the coupling and the coupling between the flop head and the beam, guided by a detachable guide and causing the beam and the slab panel to gradually descend along the outer circumferential surface of the support by the action of frictional force by the stiff member. It consists of a step of separating the beam from the panel that has been stuck in the wall and removing the supporter with the prop head after the slab concrete is completely cured.
본 발명의 다른 슬라브 시공 방법에서는 먼저 빔과 프롭 헤드를 서로 연결시킨 다음에 일자로 연결된 빔과 프롭 헤드를 양 벽체 상단의 소피트 랭스에 지지되도록 한 다음 지면으로부터 서포터의 상단이 기 설치된 프롭 헤드에 결합되되록 할 수도 있다, 이후의 과정은 앞서의 방법과 동일하다. In another slab construction method of the present invention, first, the beam and the prop head are connected to each other, and then the straight-connected beam and the prop head are supported by the small fit length at the top of both walls, and then the upper end of the supporter is attached to the previously installed prop head from the ground. It can also be combined, the subsequent process is the same as the previous method.
본 발명은 종래의 슬라브 시공시에 거푸집 해체 후 콘크리트의 완전한 양생이 이루어지기까지 별도의 필러 서포트를 설치할 필요가 없이 프롭 헤드가 구비된 본 발명의 서포트가 빔과 슬라브 패널의 하강을 안내하는 역할과 함께 필러 서포트의 역할을 하는 존치형 서포트를 구성함에 따라 슬라브 시공을 위한 거푸집 구성부재의 간략화되어 거푸집 설치 및 해체 작업이 신속하고도 용이하게 이루어질 수 있는 장점이 있다.In the present invention, the support of the present invention provided with a prop head guides the descending of the beam and the slab panel without the need to install a separate filler support until the concrete is completely cured after dismantling the formwork during the conventional slab construction. As a stand-alone support, which acts as a filler support together, is formed, the formwork constituent members for slab construction are simplified, so that the formwork installation and disassembly work can be quickly and easily performed.
즉, 본 발명의 장치에서 상기 존치형 서포트는 슬라브 형성을 위한 콘크리트의 타설 시 발생하는 하중과 콘크리트의 양생이 이루어지기까지 콘트리트의 자중에 의한 처짐을 방지하는 역할을 함에 따라 기존의 슬라브 시공장치에서와는 달리 별도의 필러 서포트를 필요로 하지 않게 된다.That is, in the apparatus of the present invention, the standing support serves to prevent sagging due to the weight of the concrete until the load generated when the concrete is poured for slab formation and the concrete is cured, so that it is different from the existing slab construction apparatus. Otherwise, it does not require a separate filler support.
또한 본 발명에서는 빔과 소피트 랭스 사이의 결합 및 분리를 비롯한 프롭 헤드와 빔 사이이 결합 및 분리가 핀의 삽입과 분리에 의해서 일거에 이루어지게 됨에 따라 슬라브 시공을 위한 거푸집의 설치와 해체 작업에 고도의 숙련도를 필요로 함이 없이도 신속하게 시공 작업을 수행할 수 있다.In addition, in the present invention, as the coupling and separation between the prop head and the beam, including the coupling and separation between the beam and the small pit length, are performed at once by the insertion and separation of the pin, it is highly suitable for the installation and dismantling work of the formwork for slab construction. It is possible to perform construction work quickly without requiring any skill level.
이에 더하여, 본 발명에서는 거푸집의 해체과정에서 자중에 의해 낙하하는 중량물로서의 빔과 패널 조립체가 분리형 가이드에 안내되어 서포터의 외주면을 타고 하강함에 있어 완강부재의 마찰력으로 전체적으로 수평상태를 유지한 가운데 하강 속도의 조절이 이루어진 가운데 서서히 내려오게 되어 거푸집 해체 과정에서의 패널 손상 및 안전사고의 위험이 배제되는 한편 소음이나 분진의 발생 요인도 원천적으로 차단되는 이점이 있다. In addition, in the present invention, the beam and panel assembly as a heavy object falling by its own weight in the process of dismantling the formwork is guided by a separate guide to descend along the outer peripheral surface of the supporter, while maintaining the overall horizontal state by the frictional force of the stiff member. As it gradually descends during the adjustment of the formwork, the risk of panel damage and safety accidents in the process of dismantling the formwork is excluded, while the cause of noise or dust is fundamentally blocked.
도1은 본 발명의 일실시예 장치에 대한 분해 사시도
도2는 도1의 장치가 결합된 상태의 사시도,
도3은 본 발명의 일실시예에 따른 소피트 랭스와 빔 결합부의 분해 사시도.
도4는 본 발명의 일실시예에 따른 소피트 랭스와 빔의 결합 상태 단면도.
도5는 본 발명의 일실시예에 따른 빔과 서포터 결합부의 분해 사시도.
도6은 도5의 결합 상태 단면도.
도7은 도5의 장치에서 프롭 헤드와 빔이 분리된 상태의 단면도.
도8는 본 발명의 분리형 가이드의 다른 실시예에 대한 분해 사시도.
도9는 도8의 분리형 가이드가 사용된 장치의 프롭 헤드와 빔의 결합 상태의 단면도.
도10은 본 발명의 장치를 이용한 슬라브 패널의 설치상태를 보인 사시도.
도11 ~ 15는 본 발명의 방법에 따른 거푸집 해체 과정에 대한 단계별 단면도.1 is an exploded perspective view of an apparatus according to an embodiment of the present invention
Figure 2 is a perspective view of the device of Figure 1 in a combined state;
Figure 3 is an exploded perspective view of a small fit length and beam coupling unit according to an embodiment of the present invention.
Figure 4 is a cross-sectional view of a combination of a small pit length and a beam according to an embodiment of the present invention.
5 is an exploded perspective view of a beam and a supporter coupling portion according to an embodiment of the present invention.
Figure 6 is a cross-sectional view of the combined state of Figure 5;
Fig. 7 is a cross-sectional view of the device of Fig. 5 in which the prop head and the beam are separated.
Figure 8 is an exploded perspective view of another embodiment of the detachable guide of the present invention.
Fig. 9 is a cross-sectional view showing a combination of a prop head and a beam of the device using the detachable guide of Fig. 8;
Figure 10 is a perspective view showing the installation state of the slab panel using the device of the present invention.
11 to 15 are step-by-step cross-sectional views of the process of dismantling a formwork according to the method of the present invention.
본 발명의 상기 목적들과 장치의 구체적인 구성을 비롯한 동 장치를 이용한 구체적인 슬라브 시공 방법은 아래의 도면을 참조한 상세한 설명을 통해서 보다 자세하게 이해될 것이다.The above objects of the present invention and a concrete slab construction method using the device including the specific configuration of the device will be understood in more detail through the detailed description with reference to the drawings below.
먼저, 도 1은 본 발명의 일실시예 장치에 대한 분해 사시도이고 도 2는 도1의 장치가 결합된 상태의 사시도이며, 도 3은 본 발명의 일실시예에 따른 소피트 랭스와 빔 결합부의 분해 사시도이고, 도4는 본 발명의 일실시예에 따른 소피트 랭스와 빔의 결합 상태 단면도이다.First, FIG. 1 is an exploded perspective view of an apparatus according to an exemplary embodiment of the present invention, and FIG. 2 is a perspective view of a state in which the apparatus of FIG. 1 is coupled, and FIG. 3 is a small pit length and a beam coupling unit according to an exemplary embodiment of the present invention. It is an exploded perspective view, and FIG. 4 is a cross-sectional view illustrating a combination of a small pit length and a beam according to an embodiment of the present invention.
본 발명의 슬라브 시공 장치는, 벽 패널(도면 미도시)의 상단에 장착되는 소피트 랭스(1000)와, 소피트 랭스(1000)에 양측 단부가 결합되어 지지되는 빔(2000)과, 빔(2000)들을 연결하여 서로 일직선상으로 결합하는 프롭 헤드(3000)와, 프롭 헤드(3000)와 함께 빔(2000)들간의 연결이 보다 확실하게 이루어지도록 하는 한편 거푸집의 해체시에 프롭 헤드(3000)를 제외한 빔과 슬라브 패널이 자중에 의해 서포터를 따라 하강하도록 유도하는 분리형 가이드(4000)와, 분리형 가이드(4000)의 본체에 설치되어 분리형 가이드와 함께 서포터를 따라 하강하는 빔과 슬라브 패널의 완만한 하강이 이루어지도록 하는 완강부재(5000)와, 바닥으로부터 수직으로 세워져서 그 상단부가 상기 프롭 헤드(3000)와 결합되어 프롭 헤드를 지지하는 한편 상기 분리형 가이드(4000)의 장착이 이루어지는 서포트(6000) 및 서포트(6000)의 일정한 높이 외주면에 돌출되게 형성되어 슬라브 패널 조립체를 포함한 분리형 가이드(4000)의 하강을 정지시키는 스토퍼(7000)를 포함하여 구성된다.The slab construction apparatus of the present invention includes a
상기 소피트 랭스(1000)는 빔(2000) 결합부측 일측 하부가 트여진 대략 중공 사각 단면 형태로서 벽 패널 상단에 수평방향으로 길게 고정되며, 그 내부로 대략 동일한 외주 단면 형태를 지닌 코너 브라킷(1300)이 슬라이딩 삽입된다. 상기 코너 브래킷(1300)은 일측 하부로는 한 쌍의 핀 삽입부(1310)가 형성되고, 상기 소피프 랭스와 형합하여 삽입되는 일측 수직외벽부는 걸림턱(1320)이 형성된 자유단부로 이루어져서 상기 핀 삽입부(1310)와 걸림턱(1320) 사이에는 트여진 공간을 이룬다. The
한편, 소피트 랭스(1000)에 결합된 상태에서 코너 브라킷(1300)의 걸림턱(1320)은 소피트 랭스의 외측 수직벽부 자유단부상에 내향 돌출된 단턱부(1150)에 접촉상태로 지지된다.On the other hand, in a state coupled to the
상기 소피트 랭스(1000)와 빔(2000) 사이에는 코너 브래킷(1300)을 매개로 하여 이들 두 부재들을 결합시키기 위한 빔 고정용 브라켓(1500)이 코너 브라켓(1300)에 결합된다. A
상기 빔 고정용 브라켓(1500)은 핀홀(1511)이 형성된 체결부(1510)와 상기 체결부의 수평방향 일외측으로 연장되고 외측 단부에 빔에 체결되는 핀(P2)에 걸리도록 형성된 걸림절곡편(1521)을 포함하는 몸체부(1520) 및 상기 몸체부(1520)와 상기 체결부(1510)로부터 상향으로 연장되고 그 단부에 상기 코너 브라켓(1300)의 걸림턱(1320)에 걸어물리도록 형성된 후크(1512)를 포함하여 이루어진다.The
도4에 도시된 바와 같이, 상기 빔 고정용 브라켓(1500)은 체결부(1510)의 핀홀(1511)을 상기 코너 브라켓(1300)의 핀 삽입부(1310)에 일치시킨 상태에서 힌지핀(P1)을 공통삽입함에 의해 상기 후크(1512)가 코너 브라켓(1500)의 걸림턱(1320)에 맞물리게 되어 소피트 랭스(1000) 및 코너 브라켓(1300)에 고정된다. 미설명 부호 F는 힌지핀(P1)의 이탈을 방지하기 위한 멈춤편이다.As shown in Figure 4, the
한편, 도 5는 본 발명의 일실시예에 따른 빔과 서포터 결합부의 분해 사시도이고, 도 6은 도5의 결합 상태 단면도로서 이에 도시된 바와 같이, 상기 프롭 헤드(3000)는 상기 서포터(6000)의 상단에 끼움 결합되는 지주(3200)와, 상기 지주(3200)의 상단에 지주를 감싸는 형태로 고정되며 빔(2000)과 동일한 단면 형태로서 양측 단부가 하향 경사진 전체적으로 역삼각형 중공 단면 형태의 본체(3100)로 이루어진다. On the other hand, Figure 5 is an exploded perspective view of the beam and the supporter coupling portion according to an embodiment of the present invention, Figure 6 is a cross-sectional view of the coupling state of Figure 5, as shown therein, the
상기 프롭 헤드(3000)의 본체(3100)는 시공될 슬라브의 바닥면에의 고정을 위한 앵커(3111)가 돌출형성된 평면상의 상면(3110)과 상면의 상하 단부로부터 수직으로 절곡되어 슬라브 패널이 결합되는 양 측면(3120) 및 양측면의 하단부로부터 내향 절곡된 단턱부(3130)의 아래로 수직 연장된 고정편 체결면(3140)이 구비되고, 상기 고정편 체결면(3140)에는 고정편의 고정을 위한 핀삽입공(3141)이 형성되어 있다. The
상기 빔(2000)은 상기 서포터(6000) 상단에 지지되는 프롭 헤드(3000)와 결합되고 양측 단부가 상기 소피트 랭스(1000)에 지지되어 슬라브 패널(SP)을 지지하는 것으로서, 상기 프롭 헤드(3000)와 동일한 단면을 구비하며, 프롭 헤드(3000)와의 결합되는 측단부는 상향 경사면을 이루어 프롭 헤드와 빔이 연결된 때에 틈새가 없이 일직선을 이루게 된다. 상기 빔(2000)은 전,후면상에 슬라브 패널의 안착을 위한 안착 리브(2100)가 길이방향을 따라 돌출형성되고, 그 아래쪽으로는 폭방향으로 후퇴절곡된 요입부로서의 고정편 안착부(2200)가 구비된다.The
상기 빔(2000)과 프롭 헤드(3000)의 연결 및 고정은 프롭 헤드(3000)와 빔(2000) 및 분리형 가이드(4000)에 공통 체결되는 한 쌍의 고정편(2300)에 의해 이루어지게 된다. The connection and fixing of the
상기 분리형 가이드(4000)는 프롭 헤드(3000) 아래쪽의 서포터(6000)에 서로 대칭되게 설치되는바, 상기 분리형 가이드(4000)는 외측으로 상향 연장된 윙부(4100)의 상단에 고정편(2300)의 핀공(2310)에 공통으로 삽입되는 고정핀(P3)의 삽입을 위한 핀홀(4110)이 구비되고, 윙부(4100) 아래쪽으로는 완강부재 안착부(4200)가 일체로 형성된다.The
상기 완강부재(5000)는 스프링(5200)의 탄성력에 의해 서포터(6000)의 외주면과 마찰접촉을 이루는 마찰헤드(5110)와 마찰헤드로부터 연장되어 스프링(5200)이 개재된 상태로 상기 완강부재 안착부(4200)에 고정되는 고정로드(5120)를 포함한다. The stiffening
상기 분리형 가이드(4000)의 하부, 즉 상기 완강부재 안착부(4200)의 내측으로는 상기 서포터(6000)에의 장착을 위한 체결부(4300)가 각각 연장 형성되고 체결부의 자유단부상에서 체결부의 결합을 위한 체결부 고정구가 형성되는바, 상기 체결부 고정구는 걸어물림부 또는 별도의 체결용 피스로 이루어질 수 있다. 도5에는 양 쪽이 걸어물림부(4310)로 이루어진 체결부 고정구가 도시되고 있다.A
도8은 분리형 가이드(4000)의 다른 실시예로서, 체결부 고정구 중 한 쪽은 걸어물림부(4310)로, 다른 쪽은 체결용 피스(4320)으로 이루어지며, 윙부(4100)의 위쪽으로 "ㄴ"자 단면의 지지브라켓(4400)이 부가되어 있는 점을 제외하고는 상기 도5의 분리형 가이드와 동일한 구조로 이루어져 있다. 이와 같은 실시예의 분리형 가이드에서는 핀홀(4110)에 핀(P3)이 관통삽입되거나, 도9에서와 같이 핀(P3)이 고정편(2300)과 빔의 핀홀에 삽입된 상태에서 상기 지지브라켓(4400)이 핀(P3)의 저면을 접촉지지하는 형태를 취할 수도 있다.8 is another embodiment of the
한편 도6에 도시된 바와 같이 고정편(2300)을 프롭 헤드(3000)의 고정편 체결면(3140)과 빔(2000)의 고정편 안착부(2200)면에 위치시킴과 아울러 분리형 가이드(4000)의 양 윙부(4100)에 형성된 핀홀(4110)이 대응되는 고정편의 핀홀(2310)에 일치되도록 한 상태에서 고정편(2300)과 프롭 헤드(3000)를 가로지르는 중앙 핀(P3)을 삽입하는 한편 고정편(2300)과 빔(2000) 및 분리형 가이드(4000)의 핀홀(4110)을 관통하는 양측 핀(P3)을 삽입함에 의해서 빔과 프롭 헤드 및 빔 간의 결합이 이루어지게 됨과 아울러 이렇게 결합된 조립체는 서포터(6000)에 의해서 지지가 이루어지게 된다. Meanwhile, as shown in FIG. 6, the
한편, 상기와 같이 고정편(2300)과 핀(P3)을 이용한 프롭 헤드(3000)와 빔(2000) 및 분리형 가이드(4000)의 결합을 통해서 이들 부재 상호간의 고정적인 고정상태가 유지됨과 아울러 서포터(6000)에 의한 지지가 이루어지게 되나, 슬라브 형성을 위해 타설된 콘크리트와 빔의 자중으로부터 가해지는 하중에 의해서 빔을 포함한 슬라브 패널 조립체가 낙하할 위험에 대비하여 도5 및 도6에서와 같이 프롭 헤드(3000)의 지주(3200) 외주면에 걸림턱(3210)을 형성하여 이에 대경부(8100)와 소경부(8200)를 갖는 멈춤키(8000)의 소경부(8200)가 상기 걸림턱(3210)에 괘지되도록 하여 멈춤키(8000)를 통한 보다 확실한 슬라브 패널 조립체의 지지가 이루어지도록 할 수도 있다.On the other hand, through the combination of the
도6에서와 같이, 빔(2000)과 프롭 헤드(3000) 및 분리형 가이드(4000)가 일체로 결합되고 빔들 사이에 슬라브 패널(도면 미도시)의 조립이 완료된 상태에서 완강부재(5000)의 마찰헤드(5110)는 스프링(5200)의 탄성력에 의해서 서포터(6000)의 외주면에 탄성접촉을 이룬 상태로 된다, 이때 상기 마찰헤드(5110)는 금속재질로 이루어진 서포터(6000)와의 관계에서 마찰력을 부여하기에 적절한 재료서 고무나 합성수지 등으로 이루어질 수 있으며, 스프링이 탄성력 조정을 통해서 서포터에 가해지는 마찰력의 조절이 가능하게 된다.6, the friction of the stiffening
한편 상기 서포터(6000)의 수직 구간 중 소정 높이의 외주면에는 슬라브 패널의 해체시에 빔과 함께 하강하는 분리형 가이드(4000)가 소정의 구간만큼, 즉, 작업자가 별도의 사다리를 이용함이 없이 슬라브 패널 등을 끌어 내릴 수 있는 정도의 높이로 하강한 상태에서 멈출 수 있도록 하는 스토퍼(7000)가 형성되는 바, 이때 스토퍼는 이에 접촉하는 분리형 가이드를 비롯한 중량물을 확실하게 떠받칠 수 있도록 서포터의 전체 외주면으로부터 외측으로 확장된 지지면을 갖도록 형성하는 것이 바람직하다. 도면중 미설명 부호 P4는 스토퍼를 서포터(6000)상에 고정시키기 위한 핀이다.Meanwhile, on the outer peripheral surface of a predetermined height among the vertical sections of the
이상과 같은 구조로 이루어진 본 발명의 슬라브 시공장치를 이용한 슬라브 시공 방법은 아래와 같다.The slab construction method using the slab construction apparatus of the present invention made of the above structure is as follows.
먼저, 기 설치된 벽체 패널의 상단에 소피트 랭스(1000)를 설치하고 이에 다수의 코너 브라켓(1300)을 슬라이딩 삽입하여 빔 결합부 상에 위치시킨다. First, a
다음, 서포터(6000)의 상단에 프롭 헤드(3000)를 결합하여 상기 양측벽의 코너 브라켓 과 일직선 상의 위치의 바닥으로부터 수직으로 세운 상태에서 상기 프롭 헤드와 빔(2000)을 고정편(2300)과 분리형 가이드(4000)를 이용해서 고정시키는 한편 빔 고정용 브라켓(1500)을 이용하여 빔의 단부가 코너 브라켓(1300)에 고정되도록 하여 빔(2000)이 수평 상태를 유지하며 양 벽체 사이에 지지되도록 한다. 이때 프롭 헤드(3000)와 빔(2000) 사이의 결합은 프롭 헤드(3000)와 빔(2000)이 일직선을 이루도록 함과 아울러 분리형 가이드(4000)의 양 윙부(4100)에 구비된 핀홀(4110)이 대응되는 고정편(2300)의 핀홀과 빔의 핀홀에 일치되도록 한 상태에서 고정편(2300)을 맞대고 세 핀홀(2310)을 통해서 핀(P3)을 관통삽입함에 의해서 달성된다,Next, the
그리고, 코너 브라켓(1300)과 빔(2000) 사이의 결합은 도4에서와 같이 빔 고정용 브라켓(1500)의 체결부(1510)에 형성된 핀홀(1511)과 코너 브라켓(1300)의 핀 삽입부(1310)을 일치시킨 상태에서 핀(P1)을 공통삽입하여 소피트 랭스(1000)에 고정된 빔 고정용 브라켓(1500)상에 빔(200)의 단부가 얹혀져서 지지되도록 함으로써 이루어지게 된다. In addition, the coupling between the
이어서 도10에 도시된 바와 같이, 양 벽체의 상단에 걸쳐지고 서포터에 의해서 지지되는 빔들의 사이의 공간에 슬라브 패널을 안착시켜서 빔과 슬라브 패널 및 소피트 랭스의 표면이 빈 공간이나 틈새가 없는 평탄면을 형성함으로써 거푸집의 설치가 완료된다. Subsequently, as shown in Fig. 10, the slab panel is seated in the space between the beams spanning the top of both walls and supported by the supporter, so that the surface of the beam, the slab panel, and the small pit length is flat without space or gap. By forming the surface, the installation of the formwork is completed.
설치가 완료된 상기 슬라브 형성용 평탄면 위에 배근을 하고 그 위에 콘크리트를 타설한 후 콘트리트가 어느 정도 양생이 이루어진 때에 거푸집의 해체 작업을 행하게 되는 바, 이러한 해체 공정을 도11 내지 도15에 의거하여 설명한다.After the installation is completed, the slab is laid on the flat surface for forming the slab, and after concrete is poured thereon, the formwork is dismantled when the concrete is cured to some extent.The dismantling process is explained based on Figs. do.
먼저, 코너 브라켓(1300)과 빔 고정용 브라켓(1500)을 결합하고 있는 핀(P1)을 빼내어 빔 고정용 브라켓(1500)을 제거해 냄으로써 빔(2000)과 소피트 랭스(1000)의 분리가 이루어지도록 한다.First, by removing the pin (P1) connecting the corner bracket (1300) and the beam fixing bracket (1500) and removing the beam fixing bracket (1500), the beam (2000) and the small pit length (1000) are separated. To lose.
이어서, 단부가 양갈래로 벌어진 해체용 공구(T)의 일측 단부를 프롭 헤드(3000)의 단턱부(3130)에 접촉시킨 상태에서 다른 한 쪽의 걸림돌기를 슬라브 패널(SL) 측면에 형성된 구멍에 삽입한 상태로 손잡이를 잡고 회전시켜서 콘크리트와 접착 상태에 있는 슬라브 패널의 접촉면을 분리시킨다.Then, in a state in which one end of the disassembly tool (T), which has two ends in contact with the stepped portion (3130) of the prop head (3000), inserts the other locking protrusion into the hole formed on the side of the slab panel (SL) Hold the handle in one state and rotate it to separate the contact surface of the slab panel in the adhesive state with the concrete.
다음, 프롭 헤드(3000)로부터 빔(2000)을 분리시키게 되는데, 이러한 두 부재 사이의 분리는 고정편(2300)의 중앙 핀홀(2300)에 삽입되어 있는 핀(P3)을 제거함으로써 달성된다.Next, the
이와 같이 빔의 측단부가 소피트 랭스로부터 분리되고 중간 빔이 프롭 헤드로부터 분리되는 순간에 슬라브 패널 조립체는 자중에 의해 서포터를 타고 하강을 개시하게 된다. 만일 멈춤키(8000)가 장착된 상태인 경우에는 멈춤키에 타격을 가하여 프롭 헤드(3000)의 지주(3200)가 멈춤키의 소경부(3100)로부터 대경부(8200)로 이동하도록 함으로써 슬라브 패널 조립체의 하강이 개시된다.As such, the slab panel assembly starts to descend on the supporter by its own weight when the side end of the beam is separated from the small pit length and the intermediate beam is separated from the prop head. If the stop key (8000) is installed, the slab panel is made to move the support (3200) of the prop head (3000) from the small diameter (3100) of the stop key to the large diameter (8200) by hitting the stopping key. Lowering of the assembly begins.
이와 같은 슬라브 패널 조립체의 하강은 도7 및 도12에 도시된 바와 같이 고정편(2300)과 분리형 가이드(4000)에 의해 빔(200)이 견고하게 지지된 상태에서 서포터(6000)의 외주면에 탄성접촉하는 완강 부재(5000)로부터 가해지는 마찰력에 의해서 급격한 드롭을 피한 채 서서히 하강하게 되고, 이같은 하강은 넓은 평판상의 슬라브 패널 조립체가 어느 한쪽으로 기울거나 조립 상태의 흐뜨러짐이 없이 수평상태를 이룬 가운데 안정적으로 진행된다. The lowering of the slab panel assembly is elastic to the outer circumferential surface of the
상기 슬라브 패널 조립체의 하강은 분리형 가이드(4000)의 저면이 서포터(6000)상의 스토퍼(7000)에 접촉함에 따라 멈춰지게 된다. 이때 작업자는 별도의 사다리를 이용함이 없이 슬라브 패널(SP) 사이의 결합핀을 제거하여 슬라브 패널을 분리하여 바닥으로 내려 놓게 된다(도13).The lowering of the slab panel assembly is stopped as the bottom surface of the
이어서 도14에서와 같이 고정편(2300)과 분리형 가이드(4000)를 결합하고 있는 핀(P3)들을 제거하여 빔(2000)을 분리해 냄으로써 스토퍼(7000)에는 분리형 가이드(4000)만이 남게 된다.Subsequently, as shown in FIG. 14, the
상기 분리형 가이드(4000)는 양쪽 모두가 걸어물림부(4310)의 체결부 고정구인 경우 어느 한쪽을 상대적으로 밀어 올리거나 밀어 내림으로써, 한쪽이 체결용 피스(4320)의 체결부 고정구인 경우에는 체결용 피스를 제거한 후 상대적인 수직위치 변화를 가하는 단순한 작업을 통해서 손쉽게 서포터(6000)로부터 분리가 이루어지게 된다. When both sides of the
이와 같이 슬라브 패널 조립체를 이루는 모든 구성 부재들이 서포터로부터 해체 및 분리된 후 프롭 헤드를 포함한 서포트는 도15도에서와 같이 슬라브 콘크리트가 완전히 양생되기까지 하중을 지탱하는 존치형 서포트로 남게 되고 콘트리트의 완전한 양생이 이루어진 후에 해체가 이루어지게 된다. As such, after all the constituent members of the slab panel assembly are disassembled and separated from the supporter, the support including the prop head remains as a stand-alone support that supports the load until the slab concrete is completely cured as shown in FIG. Dismantling takes place after curing.
본 발명의 다른 슬라브 시공 방법에서는 먼저 고정편(2300)을 이용하여 빔(2000)과 프롭 헤드(3000)를 서로 연결시켜 양 측벽 사이의 길이와 일치하는 길이의 빔과 프롭 헤드 조립체를 형성하는 단계와, 벽체 상단의 소피트 랭스(1000)에 코너 브라켓(1300)과 빔 지지용 브라켓(1500)을 조립하는 단계와, 상기 빔과 프롭 헤드 조립체의 양 단이 빔 지지용 브라켓에 지지되도록 하는 단계와, 외주면에 분리형 가이드(4000)가 결합된 서포터의 상단을 빔과 프롭 헤드 조립체의 프롭 헤드 지주와 결합시킴과 아울러 분리형 가이드의 윙부에 의해 빔의 지지가 이루어지도록 하는 단계로 이루어진 슬라브 시공용 거푸집 설치단계로 이루어지며, 이후의 콘트리트 타설에 이은 거푸집 해체 단계는 앞서의 방법과 동일한 과정으로 이루어진다.In another slab construction method of the present invention, first, the
상기 방법에서는 도8에 도시된 바의 지지브라켓(4400)이 구비된 분리형 가이드(4000)을 사용하는 것이 바람직하다. 본 방법에서는 빔(2000)과 프롭 헤드(3000)를 미리 조립함에 있어서 분리형 가이드(4000)가 배제된 채 고정편(2300)의 각 핀홀(2310)을 통해 핀(P3)들이 모두 관통삽입됨에 따라 이후에 서포터(6000)와 함께 빔과 프롭 헤드 조립체에 결합되는 분리형 가이드(4000)의 지지브라켓(4400)은 도9에 도시된 바와 같이 고정편(2300)의 양 외측에 기 삽입된 핀(P3)의 저면을 지지하게 된다. In the above method, it is preferable to use a
1000 : 소피트 랭스
1300 : 코너 브라켓 1500 : 빔 고정용 브라켓
2000 : 빔 2200 : 고정편 안착부
2300 : 고정편 2310 : 핀홀
3000 : 프롭 헤드 3100 : 본체
3200 : 슬라브패널 삽입홈 3300 : 고정편 삽입홈
3130 : 단턱부 3140 : 고정편 체결면
4000 : 분리형 가이드 4100 : 윙부
4110 : 핀홀 4200 : 완강부재 안착부
4300 : 체결부 5000 : 완강부재 5110 : 마찰 헤드 5120 : 고정 로드
5200 : 스프링 6000 : 서포터 7000 : 스토퍼 SP : 슬라브 패널
P1 ∼ P4 : 핀1000: Sofite Reims
1300: corner bracket 1500: beam fixing bracket
2000: beam 2200: fixing piece seating part
2300: fixed piece 2310: pinhole
3000: prop head 3100: main body
3200: slab panel insertion groove 3300: fixing piece insertion groove
3130: stepped part 3140: fastening surface of the fixed piece
4000: detachable guide 4100: wing part
4110: pinhole 4200: stiffening member seating part
4300: fastening part 5000: stiff member 5110: friction head 5120: fixed rod
5200: spring 6000: supporter 7000: stopper SP: slab panel
P1 ∼ P4: Pin
Claims (14)
상기 코너 브라켓(1300)에 결합되는 빔 고정용 브라켓(1500)에 양측 단부가 지지되는 빔(2000)과,
상기 빔(2000)과 동일한 상면을 유지하며 직선상으로 연결되는 프롭 헤드(3000)와,
서포터의 외주면에 결합되어 상기 프롭 헤드(3000)와 빔(2000)의 연결이 이루어지도록 하는 한편 거푸집의 해체시에 프롭 헤드(3000)를 제외한 빔(2000)과 슬라브 패널이 자중에 의해 서포터를 따라 하강하도록 유도하는 분리형 가이드(4000)와,
상기 분리형 가이드(4000)에 구비되어 분리형 가이드와 함께 서포터를 따라 하강하는 빔과 슬라브 패널의 완만한 하강이 이루어지도록 하는 완강부재(5000)와,
상단부가 상기 프롭 헤드(3000)와 결합되어 프롭 헤드를 지지하는 한편 상기 분리형 가이드(4000)의 장착이 이루어지는 서포터(6000), 및
상기 서포터(6000)의 외주면에 돌출되게 형성되어 분리형 가이드(4000)의 하강을 정지시키는 스토퍼(7000)를 포함하여 구성됨을 특징으로 하는 건축물의 슬라브 시공 장치.A small fit length 1000 mounted on the top of the wall panel to which the corner bracket 1300 is coupled,
A beam 2000 supported at both ends of a beam fixing bracket 1500 coupled to the corner bracket 1300,
A prop head 3000 that maintains the same upper surface as the beam 2000 and is connected in a straight line,
It is coupled to the outer circumferential surface of the supporter so that the connection between the prop head 3000 and the beam 2000 is made, while the beam 2000 except for the prop head 3000 and the slab panel are formed along the supporter by their own weight when the formwork is dismantled. A detachable guide 4000 that induces to descend,
A stiffening member 5000 provided in the separable guide 4000 so that the beam descending along the supporter together with the separable guide and the slab panel are gently lowered,
The supporter 6000 on which the upper end portion is coupled to the prop head 3000 to support the prop head while the detachable guide 4000 is mounted, and
A slab construction apparatus for a building, characterized in that it comprises a stopper (7000) formed to protrude from the outer peripheral surface of the supporter (6000) to stop the descending of the detachable guide (4000).
상기 빔 고정용 브라켓(1500)은 상기 코너 브라켓(1300)의 핀 삽입부(1310)와 핀(P1)이 공통삽입되는 핀홀(1511)이 구비된 체결부(1510)와 상기 체결부로부터 연장되고 외측 단부에 빔(2000)에 체결되는 핀(P2)에 걸리도록 형성된 걸림절곡편(1521)을 포함하는 몸체부(1520) 및 상기 몸체부(1520)와 상기 체결부(1510)로부터 상향으로 연장되고 그 단부에 상기 코너 브라켓(1300)의 걸림턱(1320)에 걸어물리도록 형성된 후크(1512)를 포함하여 이루어진 것을 특징으로 하는 건축물의 슬라브 시공 장치.The method of claim 1, wherein the corner bracket (1300) is provided with a pair of pin insertion portions (1310), and a locking protrusion (1320) is formed at the free end of one vertical outer wall,
The beam fixing bracket 1500 extends from the fastening part 1510 and the fastening part provided with a pin hole 1511 through which a pin insertion part 1310 and a pin P1 of the corner bracket 1300 are commonly inserted, and The body portion 1520 including the engaging bent piece 1521 formed to be caught by the pin P2 fastened to the beam 2000 at the outer end, and extending upward from the body portion 1520 and the fastening portion 1510 And a hook (1512) formed at the end thereof to be hooked to the locking projection (1320) of the corner bracket (1300).
서포터의 상단에 프롭 헤드를 결합하여 바닥으로부터 수직으로 세우는 단계, 상기 프롭 헤드와 빔을 고정편과 분리형 가이드를 이용해서 고정시키는 한편 빔 고정용 브라켓을 이용하여 빔의 단부가 코너 브라켓에 고정되도록 하여 빔이 수평 상태를 유지하며 양 벽체 사이에 지지되도록 하는 단계;
빔 사이의 공간에 슬라브 패널을 격자상으로 안착시키는 단계;
상기 빔과 슬라브 패널로 이루어진 거푸집에 콘크리트를 타설하는 단계;
콘트리트가 어느 정도 양생이 이루어진 때에 소피트 랭스와 빔 사이의 결합 및 프롭 헤드와 빔 사이의 결합을 분리시키는 단계;
상기 분리형 가이드에 의해 가이드되고 분리형 가이드에 장착된 완강 부재에 의한 서포터 외주면과의 마찰력으로 빔과 슬라브 패널이 서포트의 외주면을 따라 서서히 하강하도록 하는 단계;
상기 서포터를 타고 하강하여 스토퍼 상에 멈춘 슬라브 패널과 빔 및 분리형 가이드를 차례로 분리해 내는 단계; 및
슬라브 콘트리트가 완전히 양생된 후에 프롭 헤드가 결합된 존치형 서포터를 제거해 내는 단계,
로 이루어짐을 특징으로 하는 건축물의 슬라브 시공 방법.Installing a small fit length on the top of the wall panel and attaching a corner bracket and a beam fixing bracket thereto,
The step of attaching the prop head to the top of the supporter and standing it vertically from the floor, while fixing the prop head and the beam using a fixing piece and a separate guide, while fixing the end of the beam to the corner bracket using a beam fixing bracket. Maintaining the beam in a horizontal state and being supported between both walls;
Seating the slab panel in a grid shape in the space between the beams;
Pouring concrete into a form made of the beam and slab panel;
Separating the coupling between the small pit length and the beam and the coupling between the prop head and the beam when the concrete is cured to some extent;
Allowing the beam and the slab panel to gradually descend along the outer circumferential surface of the support by frictional force with the outer circumferential surface of the supporter by the stiff member guided by the detachable guide and mounted on the detachable guide;
Descending on the supporter to sequentially separate the slab panel, the beam, and the separable guide stopped on the stopper; And
After the slab concrete is completely cured, removing the retained supporter with the prop head attached,
Slab construction method of a building, characterized in that consisting of.
벽체 상단의 소피트 랭스에 코너 브라켓과 빔 지지용 브라켓을 조립하는 단계;
상기 빔과 프롭 헤드 조립체의 양 단부가 빔 지지용 브라켓에 지지되도록 하는 단계;
외주면에 분리형 가이드가 결합된 서포터의 상단을 빔과 프롭 헤드 조립체의 프롭 헤드 지주와 결합시킴과 아울러 분리형 가이드의 윙부에 의해 빔의 지지가 이루어지도록 하는 단계;
빔 사이의 공간에 슬라브 패널을 격자상으로 안착시키는 단계;
상기 빔과 슬라브 패널로 이루어진 거푸집에 콘크리트를 타설하는 단계;
콘트리트가 어느 정도 양생이 이루어진 때에 소피트 랭스와 빔 사이의 결합 및 프롭 헤드와 빔 사이의 결합을 분리시키는 단계;
상기 분리형 가이드에 의해 가이드되고 분리형 가이드에 장착된 완강 부재에 의한 서포터 외주면과의 마찰력으로 빔과 슬라브 패널이 서포트의 외주면을 따라 서서히 하강하도록 하는 단계;
상기 서포터를 타고 하강하여 스토퍼 상에 멈춘 슬라브 패널과 빔 및 분리형 가이드를 차례로 분리해 내는 단계; 및
슬라브 콘트리트가 완전히 양생된 후에 프롭 헤드가 결합된 존치형 서포터를 제거해 내는 단계,
로 이루어짐을 특징으로 하는 건축물의 슬라브 시공 방법.
Forming a beam and a prop head assembly having a length matching the length between both sidewalls by connecting the beam and the prop head using a fixing piece;
Assembling the corner bracket and the beam support bracket to the small pit length on the top of the wall;
Allowing both ends of the beam and prop head assembly to be supported by a beam support bracket;
Coupling the upper end of the supporter to which the detachable guide is coupled to the outer circumferential surface with the prop head support of the beam and the prop head assembly, and allowing the beam to be supported by the wing portion of the detachable guide;
Seating the slab panel in a grid shape in the space between the beams;
Pouring concrete into a form made of the beam and slab panel;
Separating the coupling between the small pit length and the beam and the coupling between the prop head and the beam when the concrete is cured to some extent;
Allowing the beam and the slab panel to gradually descend along the outer circumferential surface of the support by frictional force with the outer circumferential surface of the supporter by the stiff member guided by the detachable guide and mounted on the detachable guide;
Descending on the supporter to sequentially separate the slab panel, the beam, and the separable guide stopped on the stopper; And
After the slab concrete is completely cured, removing the retained supporter with the prop head attached,
Slab construction method of a building, characterized in that consisting of.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/KR2019/002774 WO2019190078A1 (en) | 2018-03-28 | 2019-03-11 | Apparatus and method for constructing slab of building |
CN201980022769.4A CN112041519B (en) | 2018-03-28 | 2019-03-11 | Apparatus and method for constructing floor slab of building |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020180035745 | 2018-03-28 | ||
KR20180035745 | 2018-03-28 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20190114731A KR20190114731A (en) | 2019-10-10 |
KR102150274B1 true KR102150274B1 (en) | 2020-10-27 |
Family
ID=68206335
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020190001501A KR102150274B1 (en) | 2018-03-28 | 2019-01-07 | Apparaurs for constructing slab of building and method for the same |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR102150274B1 (en) |
CN (1) | CN112041519B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20220113177A (en) | 2021-02-05 | 2022-08-12 | 박재수 | A Device for taking apart Sofit Length |
KR20240069314A (en) | 2022-11-11 | 2024-05-20 | 박재수 | Simplified Beam Assembly for dropping Slab pannel and Method Using Thereof |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2020265450A1 (en) * | 2019-04-29 | 2021-11-25 | Shinwide Pty Ltd | Prop head for formwork shoring and method of using same |
KR102247612B1 (en) * | 2019-11-22 | 2021-05-03 | 김준년 | Apparatus for dropping Deck Support Frame |
KR102247611B1 (en) * | 2019-11-22 | 2021-05-03 | 김준년 | Supporting Device for Deck Support Frame and Method for dropping the Deck Support Frame using the same |
KR102344853B1 (en) * | 2020-09-24 | 2021-12-30 | 주식회사 에이씨피 | Guide for supporting slab pannel beam of building construction |
KR102446381B1 (en) | 2020-09-28 | 2022-09-23 | 박재수 | soffit Assembly and Method for disassembling thereof |
KR102614750B1 (en) * | 2021-09-14 | 2023-12-20 | 백희정 | Guide for supporting slab pannel beam of building construction |
KR20220083982A (en) | 2022-06-02 | 2022-06-21 | 박재수 | Lift for disassembling Slave Panel Assembly |
CN115030491B (en) * | 2022-06-07 | 2023-08-15 | 晟通科技集团有限公司 | Roof fixing device and method for adjusting supporting position of roof bar |
KR102534830B1 (en) * | 2022-06-24 | 2023-05-26 | 김재성 | PIT floor multi support system and PIT floor construction method using the same |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101007538B1 (en) | 2008-04-07 | 2011-01-14 | 삼목정공주식회사 | Connecting Device For Slab Wall Form |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100665340B1 (en) * | 2005-03-21 | 2007-01-09 | (주)거혁건설 | The construction structure of slab deck being dismantled easily |
KR100985865B1 (en) * | 2008-06-17 | 2010-10-08 | 박종역 | Supporter where has drop-head function where the dissolution construction is improved and slab construction methods which use this |
CN203308084U (en) * | 2013-06-08 | 2013-11-27 | 广东台澳特种铝材有限公司 | Aluminum template system for building |
KR101800117B1 (en) * | 2016-04-20 | 2017-11-21 | 삼목에스폼 주식회사 | Drop-head assembly for slab for slab form |
KR101871280B1 (en) * | 2016-09-09 | 2018-08-03 | 백희정 | Restoration type support with the axis with a drop bangbeop and drop device |
-
2019
- 2019-01-07 KR KR1020190001501A patent/KR102150274B1/en active IP Right Grant
- 2019-03-11 CN CN201980022769.4A patent/CN112041519B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101007538B1 (en) | 2008-04-07 | 2011-01-14 | 삼목정공주식회사 | Connecting Device For Slab Wall Form |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20220113177A (en) | 2021-02-05 | 2022-08-12 | 박재수 | A Device for taking apart Sofit Length |
KR20240069314A (en) | 2022-11-11 | 2024-05-20 | 박재수 | Simplified Beam Assembly for dropping Slab pannel and Method Using Thereof |
Also Published As
Publication number | Publication date |
---|---|
KR20190114731A (en) | 2019-10-10 |
CN112041519A (en) | 2020-12-04 |
CN112041519B (en) | 2022-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102150274B1 (en) | Apparaurs for constructing slab of building and method for the same | |
KR101871280B1 (en) | Restoration type support with the axis with a drop bangbeop and drop device | |
US20060163001A1 (en) | Wall hanging scaffold | |
KR100731315B1 (en) | Gang form climbing guide and system using the same | |
WO2019190078A1 (en) | Apparatus and method for constructing slab of building | |
KR20200142351A (en) | Finishing panel fixing bracket and outer wall finishing apparatus having the same | |
KR200425807Y1 (en) | Lift type gangform | |
KR101076562B1 (en) | Supporting structure of slab form | |
KR20070000811U (en) | Gang form climbing guide | |
KR102344853B1 (en) | Guide for supporting slab pannel beam of building construction | |
KR102558279B1 (en) | Safety work structure for construction of post-type footbridge and deck roads | |
KR20080069784A (en) | Drop head for construction and constructing method for slab form using the same | |
JP4516585B2 (en) | Internal staircase for building and its construction method | |
KR102234335B1 (en) | Guide and fixing device for Gang-form Guide-rail Climbing System | |
KR102446381B1 (en) | soffit Assembly and Method for disassembling thereof | |
KR102311766B1 (en) | Method of dropping Slab pannel for Slab Construction | |
KR20220113177A (en) | A Device for taking apart Sofit Length | |
KR101673907B1 (en) | Roof building construction methods and construction materials used him | |
KR102614750B1 (en) | Guide for supporting slab pannel beam of building construction | |
KR20240008519A (en) | Assembly for slab pannel of building construction | |
KR20230152504A (en) | Dropping guide for supporting slab pannel beam of building construction | |
KR102259942B1 (en) | Apparatus for supporting slab beam of form | |
KR100570261B1 (en) | Temporary bracket for construction of steel bridge and the installation method using the same | |
KR20240077575A (en) | Tool for dissembleing alumiun slab form | |
KR101861327B1 (en) | Restoration type support with the axis with a drop bangbeop and drop device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |