KR102121029B1 - Construction method of railroad way concrete - Google Patents
Construction method of railroad way concrete Download PDFInfo
- Publication number
- KR102121029B1 KR102121029B1 KR1020200014389A KR20200014389A KR102121029B1 KR 102121029 B1 KR102121029 B1 KR 102121029B1 KR 1020200014389 A KR1020200014389 A KR 1020200014389A KR 20200014389 A KR20200014389 A KR 20200014389A KR 102121029 B1 KR102121029 B1 KR 102121029B1
- Authority
- KR
- South Korea
- Prior art keywords
- mold
- deacon
- nut
- concrete
- fixing
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
- E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/005—Making of concrete parts of the track in situ
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B3/00—Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
- E01B3/48—Distance keepers or tie-rods for sleepers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2201/00—Fastening or restraining methods
- E01B2201/04—Fastening or restraining methods by bolting, nailing or the like
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2205/00—Electrical insulation of railway track parts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
본 발명은 레일을 받치는 콘크리트 침목을 지지하는 도상 콘크리트의 시공에 있어서, 콘크리트 침목이 설치되는 설치공간을 확보하기 위하여 설치되는 형틀의 상하좌우 위치조절이 용이함은 물론 고정된 상태에서 몰타르 타설 후 탈형이 이루어지도록 하는 도상 콘크리트 시공 방법에 관한 것이다. In the present invention, in the construction of island concrete supporting railroad concrete sleepers, it is easy to adjust the vertical and horizontal position of the mold installed to secure the installation space where the concrete sleepers are installed, as well as demoulding after pouring mortar in a fixed state. It relates to a concrete construction method to be made.
콘크리트 침목(枕木: sleeper. rail timber)은 레일을 소정위치에 고정시키도록 지지함과 동시에 차륜의 하중을 도상에 넓게 분포시키기 위해 레일 밑에 깔아 놓기 위한 것으로, 상기 침목을 지지하는 도상 콘크리트는 유지관리의 편리성과 환경오염원의 차단을 위해 자갈 도상 대체용으로 사용되고 있다.Concrete sleeper (rail timber) is to lay the rails under the rails to support the rails to be fixed in a predetermined position and to distribute the load of the wheels widely on the road, while maintaining the concrete on the rails. It is used as a substitute for gravel islands for convenience and protection of environmental pollutants.
도상 콘크리트는 주행 중인 열차의 차륜과 레일간의 마찰에 의하여 발생되는 철도궤도의 진동과 소음을 콘크리트 침목을 통해 전달받아 지반에 전가하기 때문에 강도를 유지하고 콘크리트의 건조 수축에 의한 균열을 방지하기 위해 횡철근과 종철근이 상호 교차하는 형태로 도상 콘크리트 내에 배근된다.On the road, the concrete on the road receives the vibrations and noises of the railway tracks generated by friction between the wheels and the rails of the train in transit through the concrete sleepers and transfers them to the ground, thus maintaining strength and preventing cracks due to drying shrinkage of the concrete. The reinforcing bar and the longitudinal reinforcing bar are reinforced in iconic concrete in the form of crossing each other.
그러나, 철근의 배근으로 인하여 레일 궤도 상에 흐르는 전류 또는 자기장이 콘크리트 침목을 통하여 도상 콘크리트에 매입된 철근을 통하여 흐르면서 철도의 신호체계에 간섭을 일으켜 열차의 운행을 방해할 우려가 있을 뿐만 아니라, 철근을 전극으로 한 전기분해 작용에 의하여 전식현상이 발생하기 때문에 도상 콘크리트를 구축할 때, 종철근과 횡철근이 항상 일정한 전기 절연저항으로 유지되도록 절연시공을 하거나 상기 종철근과 횡철근이 교차하는 부위에 절연재를 설치하여 절연이 이루어지도록 하고 있다.However, due to the reinforcement of the reinforcing bar, current or magnetic fields flowing on the rail tracks may flow through the reinforcing bar embedded in the concrete through the sleepers, causing interference in the railway signal system, which may interfere with the operation of the train. When electroconductive action is generated by the electrolysis action with the electrode, when constructing iconic concrete, insulation construction is performed so that the longitudinal reinforcing bar and transverse rebar are always maintained at a constant electrical insulation resistance, or where the longitudinal reinforcing bar and transverse reinforcing bar intersect. Insulating materials are installed on the panels to ensure insulation.
이러한, 도상 콘크리트는 몰타르를 타설하기 전에 콘크리트 침목이 설치되는 설치공간을 확보하기 위하여 단면이 자 형태를 갖는 한 쌍의 형틀을 레일의 길이 방향으로 설치한 후 상기 형틀의 외측으로 몰타르 타설을 한 다음 형틀을 제거함으로써 설치공간을 확보하고 있으나, 형틀은 정확한 위치와 높이를 갖고 설치된 상태에서 몰타르 타설이 이루어져야만 콘크리트 침목을 정확한 위치와 높이로 설치할 수 있으나, 형틀의 좌우 이동 거리와 상하 이동 거리를 미세하게 고정하지 못함으로써, 콘크리트 침목의 설치 위치에 오차가 발생할 우려가 있게 된다.Such, island concrete has a cross-section to secure an installation space where concrete sleepers are installed before pouring mortar. After installing a pair of molds having a ruler shape in the lengthwise direction of the rail, mortar is poured out of the molds, and then the molds are removed to secure the installation space. Although it is possible to install the concrete sleepers at the correct position and height only by pouring, it is not possible to minutely fix the left and right travel distances and the up and down movement distances of the mold, and thus there is a risk of errors in the installation positions of the concrete sleepers.
즉, 도상 콘크리트를 제작할 때 철근의 배근과 함께 콘크리트 침목을 설치하기 위한 설치공간을 형성하는 형틀을 매설하여야 하며, 상기 형틀의 매설 과정에서 형틀의 좌우 위치 이동과 상하 높낮이를 간단히 조절하여야만 형틀의 제거 후 콘크리트 침목을 정확한 위치에 설치할 수 있기 때문에 형틀의 설치와 미세 위치 조절이 쉽지 않은 것이었다.In other words, when manufacturing the island concrete, the mold that forms the installation space for installing the concrete sleepers together with the reinforcement of the reinforcing bar must be buried, and in the process of laying the mold, the movement of the left and right positions of the mold and vertical height must be adjusted to remove the mold. Since it was possible to install the concrete sleeper at the correct location, it was not easy to install the mold and finely adjust the position.
본 발명은 도상 콘크리트의 시공시 콘크리트 침목이 설치되는 설치공간을 확보하기 위하여 형틀을 매설하여 몰타르 타설이 이루어질 때 상기 형틀의 좌우 위치와 상하 높낮이 조절이 미세하게 이루어지지 못하는 문제를 해결하기 위한 것으로, 상기 형틀의 저면과 좌우측이 디콘너트에 받쳐지게 하는 한편 형틀의 바닥에서 고정볼트를 디콘너트에 끼워서 형틀을 고정시킴으로써 형틀의 정확한 위치 고정과 함께 몰타르 타설 시 형틀의 움직임을 방지하도록 하는 것이다.The present invention is to solve the problem that the left and right positions and vertical height adjustment of the mold is not finely adjusted when the mortar is made by laying the mold to secure the installation space where the concrete sleepers are installed during construction of the island concrete. While the bottom and left and right sides of the mold are supported by the deconcrete, the fixing bolt is fixed on the bottom of the mold by inserting the fixing bolt into the decontainer to prevent the movement of the mold during the pouring of the mortar with the correct positioning of the mold.
본 발명은 도상 콘크리트가 설치되는 단면이 형태를 갖는 작업공간을 몰타르를 타설하여 형성하는 작업공간 형성과정과, 상기 작업공간에 철근을 이용하여 격자 형태로 배근을 하되 철근의 맞닿는 부위는 절연 상태로 고정시키는 철근 배근과정과, 상기 작업공간의 양쪽으로 레일이 지나는 궤적을 따라 바닥에 앵커볼트를 고정시킨 후 앵커볼트의 상단에 디콘 너트를 끼우는 수직 디콘 너트 설치과정과, 상기 철근에 수평 상태로 지지볼트를 고정시킨 후 지지볼트의 선단에 디콘 너트를 끼우는 수평 디콘 너트 설치과정과, 상기 수직과 수평으로 설치된 디콘 너트에 받쳐지게 형틀을 설치하되 디콘 너트로 형틀의 높낮이와 좌우위치를 조절하는 형틀 설치과정과, 상기 형틀의 바닥을 관통하여 형틀의 저면을 받치는 디콘 너트에 고정되면서 형틀의 상하 이동을 방지하는 상하 이동 방지과정과, 상기 형틀의 외측으로 작업공간에 몰타르를 타설하는 타설과정과, 타설된 몰타르가 굳은 후 형틀을 빼내는 탈형과정을 수행함으로써 형틀이 제거된 설치공간을 이용하여 콘크리트 침목을 설치한 후 레일의 설치가 이루어지게 된다.The present invention has a cross-section is installed on the island concrete A work space forming process for forming a working space having a form by pouring mortar, and a reinforcing bar reinforcement process for reinforcing the grid in a lattice form using reinforcing bars in the work space, but fixing the abutting part in an insulated state, After fixing the anchor bolts on the floor along the trajectory of the rails on both sides of the installation process, install the vertical decon nut to install the decon nut on the top of the anchor bolt, and fix the support bolt horizontally to the reinforcing bar, and then fix it to the tip of the support bolt. A horizontal deacon nut installation process of fitting a deacon nut, and a mold frame installation process to install the mold frame to be supported by the vertical and horizontal deacon nuts, and to adjust the height and the left and right positions of the mold frame with the deacon nut, penetrate through the bottom of the mold frame. The vertical movement prevention process that prevents vertical movement of the mold while being fixed to the deacon nut supporting the bottom of the mold, the pouring process of pouring mortar into the working space outside the mold, and the demoulding process of removing the mold after the poured mortar hardens By performing the installation, the rails are made after installing the concrete sleepers using the installation space from which the mold was removed.
본 발명에서, 디콘 너트는 볼트에 끼워져 고정되면서 간격조절을 하되 양쪽에서 볼트를 끼워 고정시킬 수 있는 것으로, 형틀의 저면을 받치는 한편 좌우측을 받치면서 형틀의 상하 높낮이와 좌우 거리를 조절하여 고정시키는 한편 형틀의 내부에서 고정볼트를 디콘 너트에 끼워 고정시킴으로써, 형틀이 고정된 상태로 움직이지 않도록 하며, 상기 디콘 너트는 형틀을 분리 제거한 후 빼내어 재사용할 수 있으며, 디콘 너트를 빼낸 자리는 몰타르를 이용하여 메꾸도록 한다.In the present invention, the deacon nut is inserted into and fixed to the bolt to adjust the gap, but can be fixed by inserting the bolts from both sides, while supporting the bottom of the mold while supporting the left and right sides while adjusting and fixing the vertical, horizontal, and left and right distances of the mold. By inserting and fixing a fixing bolt into the deacon nut inside the mold, the mold is not moved in a fixed state, and the deacon nut can be reused by removing and removing the mold and removing the deacon nut using a mortar. Fill it up.
본 발명에서 디콘 너트에 지지되어 설치된 형틀은 연결 브라켓을 이용하여 길이 방향으로 길게 연결하여 사용할 수 있으며, 형틀은 레일이 설치되는 방향을 따라 설치된다.In the present invention, the mold supported and installed on the deacon nut can be used by being connected in a lengthwise direction using a connection bracket, and the mold is installed along the direction in which the rail is installed.
본 발명은 작업공간에 철근 배근과 디콘 너트의 설치 후 형틀을 디콘 너트로 받쳐지게 설치한 상태에서 몰타르 타설 후 형틀을 제거하는 과정은 필수적인 작업 과정이다.In the present invention, the process of removing the mold after pouring the mortar in the state where the mold is installed to be supported by the decon nut after the installation of the rebar and the decon nut in the working space is an essential work process.
본 발명은 콘크리트 침목을 받치는 도상 콘크리트의 설치과정에서 사용되는 형틀을 간편하게 설치할 수 있도록 하는 것으로, 간격 조절이 용이한 디콘 너트를 이용하여 형틀의 저면과 측면을 받침으로써 형틀의 높낮이와 좌우 거리를 미세하게 조절할 수 있으며, 상기 형틀은 바닥에서 고정볼트를 디콘 너트에 고정시킴으로서 몰타르 타설시 형틀이 상부로 밀리지 않도록 하여, 정확한 위치에 설치공간을 확보할 수 있어, 콘크리트 침목을 정확한 위치에 설치할 수 있는 것이다.The present invention is to make it easy to install the mold used in the installation process of concrete on the road to support the concrete sleepers, by using the decon nut easy to adjust the gap to support the bottom and side of the mold to finely adjust the height and the left and right distances of the mold. The mold can be fixed to the deacon nut by fixing the fixing bolt on the floor, so that the mold is not pushed upward when pouring mortar, so that the installation space can be secured at the correct location, so that the concrete sleepers can be installed at the correct location. .
본 발명은 간편한 방법으로 형틀의 위치를 조절할 수 있음은 물론 콘트리트 타설 시 움직임 없이 타설이 이루어질 수 있도록 하는 한편 타설 후 형틀을 용이하게 제거할 수 있는 것으로, 도상 콘크리트를 간단히 시공할 수 있는 것이다.The present invention is to be able to easily adjust the position of the mold in a simple way, as well as to allow pouring without movement during pouring of concrete, and to easily remove the mold after pouring, and can easily construct coated concrete.
도 1은 디콘 너트의 사시도
도 2는 디콘 너트의 평면도
도 3은 디콘 너트의 단면도
도 4는 도상 콘크리트가 형성되는 작업 공간을 보인 단면도
도 5는 본 발명의 형틀을 디콘 너트에 받쳐지게 설치하는 상태도
도 6은 본 발명의 형틀을 디콘 너트에 고정시키는 상태도
도 7은 본 발명의 형틀 설치상태 단면도
도 8은 본 발명의 도상 콘크리트 형성을 위한 몰타르 투입 상태도
도 9는 본 발명의 도상 콘크리트 형성 상태도
도 10은 본 발명의 도상 콘크리트 요부 형성 상태도
도 11은 본 발명의 형틀 탈형 상태 단면도
도 12는 본 발명의 디콘 너트에 고정볼트로 형틀을 고정시킨 상태를 보인 요부 단면도
도 13은 본 발명의 철근 고정 상태도
도 14는 본 발명의 형틀 요부 사시도1 is a perspective view of a deacon nut
2 is a plan view of a deacon nut
3 is a cross-sectional view of a deacon nut
Figure 4 is a cross-sectional view showing a working space is formed of island concrete
5 is a state diagram for installing the mold of the present invention to be supported on the deacon nut
Figure 6 is a state diagram for fixing the mold of the present invention to the deacon nut
Figure 7 is a cross-sectional view of the mold installation state of the present invention
8 is a state diagram of mortar input for the formation of island concrete of the present invention
Figure 9 is a state concrete formation state diagram of the present invention
Fig. 10 is a state diagram of a concrete concave portion of the present invention.
11 is a cross-sectional view of the mold demolding state of the present invention
Figure 12 is a cross-sectional view showing the main portion of the mold frame fixed to the deacon nut of the present invention
13 is a fixed state bar of the present invention
14 is a perspective view of the main part of the mold of the present invention
본 발명은 콘크리트 침목을 받치는 도상 콘크리트를 시공하되 레일이 설치되는 방향을 따라 콘크리트 침목이 끼워지는 설치공간을 형성함에 있어서, 설치공간을 형성하는 형틀이 도상 콘크리트를 시공하는 작업공간에 형성할 때 형틀의 저면과 좌우측에서 디콘 너트를 설치함으로써 디콘 너트를 이용하여 형틀의 높낮이와 좌우 거리를 간편하게 조절한 상태에서 몰타르 타설이 이루어지도록 하는 한편 상기 형틀은 몰타르 타설 과정에서 들리지 않도록 형틀의 바닥에서 고정볼트를 디콘 너트에 고정시키는 것이다.In the present invention, when constructing an iconic concrete supporting a concrete sleeper, but forming an installation space in which a concrete sleeper is fitted along a direction in which a rail is installed, the formwork forming the installation space is formed when forming a working space for constructing the concrete. By installing the deacon nuts on the bottom and left and right sides of the mold, the mortar pour is made while the height and the left and right distances of the mold are easily adjusted using the deacon nuts, while the molds are fixed bolts at the bottom of the mold so as not to be heard in the process of pouring the mortar. It is fixed to the deacon nut.
본 발명에서의 작업공간에는 철근을 종횡으로 배치하여 고정시키되 서로 겹치는 부위는 절연판을 대고 절연이 이루어진 상태에서 절연이 이루어지는 밴드타이를 이용하여 고정이 이루어지게 함으로써 철근을 통한 절연이 이루어지도록 한다.In the working space in the present invention, the reinforcing bars are arranged vertically and horizontally, and the overlapping portions are fixed by using an insulating band tie in an insulating state with an insulating plate placed therebetween, so that insulation through the reinforcing bars is achieved.
본 발명을 첨부된 실시예 도면에 의거 상세히 설명한다.The present invention will be described in detail based on the accompanying drawings.
본 발명은 레일이 설치되는 방향을 따라 도상 콘크리트(20)를 설치하기 위하여 단면이 자 형태를 갖는 작업공간(10)을 몰타르 타설하여 제작하는 작업공간 형성과정을 수행하는 것으로, 레일이 놓이는 방향을 따라 일정 폭의 작업공간(10)이 형성되게 콘크리트로 제작하는 것이다.The present invention has a cross-section to install the iconic concrete (20) along the direction in which the rail is installed. By performing a process of forming a work space by pouring the
작업공간 형성과정은 본 발명만의 특징이 아니고, 통상적으로 콘크리트 침목을 설치하기 위한 방식 중의 하나로써, 몰타르를 타설하되 단면이 자 형태를 갖도록 형성하는 것이며, 이러한 도상 콘크리트(20)를 몰타르로 형성할 때 작업공간(10)으로 매설된 철근(1)이 돌출되게 형성함으로써, 작업공간(10)에서 철근(1)(2)의 배근이 견고히 이루어질 수 있도록 한다.The process of forming a working space is not a characteristic of the present invention, and is typically one of the methods for installing concrete sleepers, where mortar is poured but the cross section is It is formed to have a ruler shape, and when the
즉, 본 발명은 작업공간 형성과정을 수행할 때 철근(1)이 매설된 상태로 형성한 후에는 콘크리트에 일부가 매설된 철근(1)과 또 다른 철근(2)을 이용하여 격자 형태로 배근될 수 있도록 하되 두 개의 철근(1)(2)이 서로 겹칠 때 절연이 이루어질 수 있도록 철근 배근과정을 수행한다.That is, in the present invention, when the reinforcing bar (1) is formed in a buried state when performing the process of forming a working space, the reinforcement (1) and another reinforcing bar (2) partially buried in concrete are used to form a grid in the form of a grid. The reinforcement process is performed so that the insulation can be achieved when the two reinforcing bars (1) and (2) overlap each other.
작업공간(10)을 콘크리트로 형성할 때 매설된 철근(1)을 이용하여 격자 형태로 철근(2)을 배근하여 도상 콘크리트(20)가 진동과 하중을 견딜 수 있도록 하되 상기 철근(1)(2)은 서로 겹치게 배열할 때 철근(1)(2) 사이에 절연판(3)을 위치시킴으로써 철근(1)(2) 사이의 절연이 이루어지게 하고, 절연판(3)을 사이에 두고 서로 겹치게 되는 철근(1)(2)은 절연재질인 밴드 타이(5)를 이용하여 고정시키도록 한다.When the
즉, 철근(1)(2)을 서로 겹치게 고정시킬 때 철근(1)(2) 사이에 절연판(3)을 위치시키는 한편 절연재질인 밴드 타이(5)를 이용하여 철근(1)(2)의 고정이 이루어지게 함으로써, 철근(1)(2)을 통한 절연이 확실히 이루어질 수 있도록 한다.That is, when fixing the reinforcing bar (1) (2) overlapping each other, while placing the insulating plate (3) between the reinforcing bar (1) (2) while using the insulating material band tie (5) reinforcing bar (1) (2) By making the fixing of, it is possible to ensure the insulation through the reinforcing bar (1) (2).
콘크리트로 작업공간(10)을 형성한 후 철근(1)(2)을 절연상태로 배근한 후에는 작업공간(10)의 좌우측으로 레일이 지나는 위치에 앵커볼트(31)를 바닥에 고정시킨 후 앵커볼트(31)의 선단에 디콘 너트(30)를 끼워주는 수직 디콘 너트 설치과정을 수행하고, 작업공간(10)에 배근된 철근(1)(2)에 지지볼트(41)를 수평방향으로 용접 고정시키되 상기 지지볼트(41)의 선단에는 디콘 너트(40)를 끼워주는 수평 디콘 너트 설치과정을 수행한다.After forming the
여기서, 수직과 수평 디콘 너트 설치과정은 바닥 콘크리트에 고정되는 앵커볼트(31)와 철근(1)(2)에 용접 고정되는 지지볼트(41)에 수직 방향과 수평 방향으로 각각 디콘 너트(30)(40)를 끼워주는 것으로, 상기 디콘 너트(30)(40)는 콘크리트 침목이 설치되는 설치공간(50)을 형성하기 위한 형틀(60)의 저면과 측면을 받쳐주게 된다.Here, the installation process of the vertical and horizontal deacon nuts is vertically and horizontally respectively to the
즉, 수직과 수평 디콘 너트 설치과정이 이루어진 후에는 디콘 너트(30)(40)에 받쳐지는 단면이 자 형태를 갖는 형틀(60)을 설치하되 상기 형틀(60)은 높낮이는 디콘 너트(30)를 이용하여 조절하는 한편 좌우위치는 디콘 너트(40)를 이용하여 조절하게 되는 것으로, 형틀(60)을 정확하게 고정하기 위하여 디콘 너트(30)(40)를 풀거나 조여서 형틀(60)의 상하 높낮이와 좌우 위치를 맞추게 된다.That is, after the vertical and horizontal deacon nut installation process is made, the cross section supported by the
본 발명의 형틀(60)은 간편하게 디콘 너트(30)(40)를 조이고 풀음에 따라 정확한 위치를 잡아서 고정시킬 수 있는 것으로, 형틀(60)의 고정에 따른 간편함이 특징이다.The
본 발명에서, 형틀(60)을 설치하는 형틀 설치과정이 이루어진 후에는 형틀(60)의 바닥에 형성된 구멍(61)을 통하여 고정볼트(70)를 끼운 후 상기 고정볼트(70)는 디콘 너트(30)에 끼워지게 함으로써 형틀(30)의 움직임을 방지하는 상하 이동 방지과정을 수행하게 되는 것으로, 고정볼트(70)는 형틀(60)의 바닥에 형성된 구멍(61)을 관통하여 디콘 너트(30)에 끼워져 고정되기 때문에 형틀(60)이 좌우로 이동하지도 않고, 형틀(60)의 저면으로 몰타르가 채워지더라도 형틀(60)이 상부로 들리지 않게 된다.In the present invention, after the mold frame installation process for installing the
본 발명은 고정볼트(70)를 디콘 너트(30)에 끼워 고정시킴으로써 형틀(60)의 움직임을 방지하는 것이다.The present invention is to prevent the movement of the
여기서, 형틀(60)은 그 길이가 한정되기 때문에 필요한 길이를 맞추기 위해서는 형틀(60)의 선단 내측에 설치되는 연결 브라켓(62)을 이용하여 볼트로 서로 고정되게 함으로써 원하는 길이를 맞출 수 있으며, 형틀(60)의 해체시에는 볼트를 풀면 간단히 분리 가능하다.Here, since the length of the
이와 같이 형틀(60)의 움직임을 방지하는 상하 이동 방지과정을 수행한 후에는 형틀(60)의 외측에서 작업공간(10)을 몰타르로 채우는 타설과정을 수행하도록 하며, 상기 타설과정에서 몰타르가 작업공간(10)에 채워지면서 형틀(60)의 저면을 채우더라도 형틀(60)은 고정볼트(70)에 의해 디콘 너트(30)에 고정되어 있기 때문에 몰타르가 형틀(60)을 들어 올리는 힘을 가하더라도 형틀(60)은 들리지 않고 고정된 상태를 유지한 채로 몰타르를 굳히게 된다.After performing the up-and-down movement preventing process to prevent the movement of the
형틀(60)이 고정된 상태에서 작업공간(10)에 몰타르를 채워 고정시키면 도상 콘크리트(20)가 형성되는 것으로, 도상 콘크리트(20)가 형성된 후에는 고정볼트(70)를 풀은 후 형틀(60)을 제거하는 탈형과정을 수행하게 되며, 형틀(60)이 연결 브라켓(62)을 이용하여 여러 개가 연속적으로 연결되어 있을 경우는 고정볼트(70)와 함께 연결 브라켓(62)을 고정시키는 볼트를 풀은 후 형틀(60)의 탈형이 이루어지도록 한다.When the
도상 콘크리트(20)가 형성된 상태에서 형틀(60)을 분리하면 형틀(60)이 위치한 장소에 설치공간(50)이 형성되고, 상기 설치공간(50)의 내측으로 디콘 너트(30)(40)의 선단이 각각 노출된 상태로 보이게 되며, 이 상태에서 복스 등을 이용하여 디콘 너트(30)(40)를 풀어서 제거한 후에 재사용할 수 있도록 한다.When the
디콘 너트(30)(40)는 설치공간(50)의 바닥과 측면에서 너트부위가 노출되어 있기 때문에 복스 등을 이용하여 쉽게 분리할 수 있으며, 디콘 너트(30)(40)가 분리 제거된 후에는 디콘 너트(30)(40)가 끼워졌던 자리를 몰타르를 이용하여 메꾸어 주면 단면이 자 형태를 갖는 설치공간(50)이 확보된다.The
본 발명에서 도상 콘크리트(60)에 설치된 설치공간(50)은 콘크리트 침목이 끼워져 설치되는 한편 상기 콘크리트 침목의 상부에는 레일이 설치된다.In the present invention, the
본 발명에서, 디콘 너트(30)(40)와 형틀(60)은 반복적인 재사용이 가능하다.In the present invention, the
이와 같이 본 발명은 도상 콘크리트(20)를 시공하는 과정에서 콘크리트 침목을 설치하기 위한 설치공간(50)을 간편하게 형성할 수 있도록 하는 것으로, 콘크리트 침목과 단면이 동일한 형틀(60)을 디콘 너트(30)(40)를 이용하여 저면과 측면을 받치도록 하되 높낮이와 수평 거리를 맞추어 설치될 수 있도록 하는 한편 저면의 디콘 너트(30)에 고정볼트(70)로 형틀(60)을 고정시킴으로써 몰타르 타설 과정에서도 형틀(60)의 움직임을 방지하여, 설치공간(50)을 정확한 위치에 간편하게 형성할 수 있는 것이다.As described above, the present invention is to facilitate the formation of an
10 : 작업공간 20 : 도상 콘크리트
30,40 : 디콘 너트 50 : 설치공간
60 : 형틀 70 : 고정볼트10: Work space 20: Concrete on the island
30,40: Deacon nut 50: Installation space
60: form 70: fixed bolt
Claims (5)
상기 작업공간(10)에 철근(1)(2)을 격자 형태로 배근을 하되 철근(1)(2)의 맞닿는 부위는 절연 상태로 고정시키는 철근 배근과정과,
상기 작업공간(10)의 양쪽으로 레일이 지나는 궤적을 따라 바닥에 앵커볼트(31)를 고정시킨 후 앵커볼트(31)의 상단에 디콘 너트(30)를 끼우는 수직 디콘 너트 설치과정과,
상기 철근(1)(2)에 수평 상태로 지지볼트(41)를 고정시킨 후 지지볼트(41)의 선단에 디콘 너트(40)를 끼우는 수평 디콘 너트 설치과정과,
상기 수직과 수평으로 설치된 디콘 너트(30)(40)에 저면과 양측면이 받쳐지게 단면이 자 형태의 형틀(60)을 설치하되 상기 디콘 너트(30)(40)는 앵커볼트(31)와 지지볼트(41)에 끼워진 채로 회전되면서 돌출 높이를 조절하여 형틀(60)의 상하 높낮이와 좌우 위치를 조절하는 형틀 설치과정과,
상기 형틀(60)의 바닥에 형성된 구멍(61)을 관통하여 고정볼트(70)를 끼우되 상기 고정볼트(70)는 형틀(60)의 저면을 받치는 디콘 너트(30)에 끼워져 고정되면서 형틀(60)의 상하 이동을 방지하는 상하 이동 방지과정과,
상기 형틀(60)의 외측에서 작업공간(10)에 몰타르를 타설하는 타설과정과,
타설된 몰타르가 굳은 후 형틀(60)을 빼내어 콘크리트 침목이 설치되는 설치공간(10)을 형성하는 탈형과정을 수행하여 이루어지는 것을 특징으로 하는 도상 콘크리트 시공 방법.The cross section where the concrete 20 is installed A process of forming a working space in which the working space 10 having a form is formed by pouring mortar;
Reinforcing bar reinforcement process for reinforcing the reinforcing bar (1) (2) in the work space 10 in a grid, but fixing the abutting part of the reinforcing bar (1) (2) in an insulated state,
After the anchor bolts 31 are fixed to the floor along the trajectory of the rails on both sides of the working space 10, a vertical deacon nut installation process of inserting the deacon nuts 30 on the top of the anchor bolts 31,
After fixing the support bolt 41 in the horizontal state to the reinforcing bar (1) (2), the horizontal deacon nut installation process of fitting the deacon nut (40) to the front end of the support bolt (41),
The cross section so that the bottom and both sides are supported on the vertical and horizontally installed deacon nuts 30 and 40. A ruler-shaped mold frame 60 is installed, but the deacon nuts 30 and 40 are rotated while being fitted to the anchor bolt 31 and the support bolt 41 to adjust the protruding height to adjust the height of the mold frame 60. The process of installing the mold to adjust the position,
The fixing bolt 70 is fitted through the hole 61 formed at the bottom of the mold 60, but the fixing bolt 70 is inserted into and fixed to the deacon nut 30 supporting the bottom surface of the mold 60 while being fixed. 60) the vertical movement prevention process to prevent vertical movement,
A pouring process of pouring mortar into the working space 10 from the outside of the mold 60;
After the cast-in-place mortar is hardened, the concrete frame construction method is carried out by performing a demolding process to form an installation space 10 in which concrete sleepers are installed by removing the mold 60.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020200014389A KR102121029B1 (en) | 2020-02-06 | 2020-02-06 | Construction method of railroad way concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020200014389A KR102121029B1 (en) | 2020-02-06 | 2020-02-06 | Construction method of railroad way concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
KR102121029B1 true KR102121029B1 (en) | 2020-06-10 |
Family
ID=71087204
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020200014389A KR102121029B1 (en) | 2020-02-06 | 2020-02-06 | Construction method of railroad way concrete |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102121029B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102464469B1 (en) | 2021-12-27 | 2022-11-18 | 한국철도공사 | Railway concrete track mortar fill up machine |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5297504A (en) * | 1976-02-09 | 1977-08-16 | Mitsui Toatsu Chem Inc | Process for laying rail |
JP2001172901A (en) * | 1999-12-15 | 2001-06-26 | West Japan Railway Co | Anti-vibration device for sleeper |
KR100838227B1 (en) | 2007-04-16 | 2008-06-16 | 한국철도기술연구원 | Structure of high-strength and rapidly-hardening prepacked concrete track for carrying out mechanization and working method thereof |
KR100939921B1 (en) | 2009-07-22 | 2010-02-03 | 한국철도시설공단 | A concrete tie and its laying method thereof |
KR200450314Y1 (en) | 2010-02-10 | 2010-09-20 | 한국철도시설공단 | Rebar Insulation Material for Concrete |
KR20110089991A (en) | 2010-02-02 | 2011-08-10 | (주)신성엔지니어링 | Vibration-proof track for railroads and this construction technique |
-
2020
- 2020-02-06 KR KR1020200014389A patent/KR102121029B1/en active IP Right Grant
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5297504A (en) * | 1976-02-09 | 1977-08-16 | Mitsui Toatsu Chem Inc | Process for laying rail |
JP2001172901A (en) * | 1999-12-15 | 2001-06-26 | West Japan Railway Co | Anti-vibration device for sleeper |
KR100838227B1 (en) | 2007-04-16 | 2008-06-16 | 한국철도기술연구원 | Structure of high-strength and rapidly-hardening prepacked concrete track for carrying out mechanization and working method thereof |
KR100939921B1 (en) | 2009-07-22 | 2010-02-03 | 한국철도시설공단 | A concrete tie and its laying method thereof |
KR20110089991A (en) | 2010-02-02 | 2011-08-10 | (주)신성엔지니어링 | Vibration-proof track for railroads and this construction technique |
KR200450314Y1 (en) | 2010-02-10 | 2010-09-20 | 한국철도시설공단 | Rebar Insulation Material for Concrete |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102464469B1 (en) | 2021-12-27 | 2022-11-18 | 한국철도공사 | Railway concrete track mortar fill up machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5653388A (en) | Method and apparatus for constructing a permanent railroad track | |
KR101052906B1 (en) | Precast slab track system and method constructing the same | |
EP1700954A2 (en) | Prefabricated modular member, permanent railway for tramways and subways including said member, and process for laying the same | |
KR101780224B1 (en) | Concrete long sleeper block of fast-hardening track for improving rail track considering train operation construction method | |
KR101076029B1 (en) | Replacing Method of Old Train Track using Twin-Block Type Train Track | |
KR20160001011U (en) | Precast Concrete Panel for Concrete Ballast of the Railway | |
CN107268348B (en) | Subway column check pit construction method | |
KR102121029B1 (en) | Construction method of railroad way concrete | |
KR100454405B1 (en) | Method for changing steel bridge of supporting rail into concreat bridge | |
JP4540632B2 (en) | Erection girder | |
JP4934779B2 (en) | Boarding / exit structure and boarding / exiting method | |
KR100881598B1 (en) | Method for construction of track for linear induction motor panel in linear induction motor | |
JP4477467B2 (en) | Bridge structure and its replacement method | |
JP4136959B2 (en) | "How to build underground structures and installation girder" | |
JP2014095229A (en) | Height adjustment method for rail | |
KR101756965B1 (en) | Height adjusting type maintanable rail track construction method and maintanance method using the same | |
CN111926649A (en) | Reinforced integrally-built crossing plate for railway special line and line rail fixing device | |
JP6823389B2 (en) | Railroad support structure | |
KR20140094863A (en) | imporving method for old gravel track | |
CN212505689U (en) | Reinforced integrally-built crossing plate for railway special line and line rail fixing device | |
KR101986787B1 (en) | Construction method of precast slab track system | |
JPH06264401A (en) | Simplified track panel protection device | |
KR102401085B1 (en) | Labor saving ballast track structure having sleeper fixing and supporting apparatus for securing longitudinal and transverse axial, and construction method for the same | |
CN112982044B (en) | Construction process for quickly forming integral road bed of road junction | |
KR100729844B1 (en) | Repair work of railroad bridge and that structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |