KR102119658B1 - Blind Type Leader for Air Hammer Excavating Equipment - Google Patents

Blind Type Leader for Air Hammer Excavating Equipment Download PDF

Info

Publication number
KR102119658B1
KR102119658B1 KR1020200039637A KR20200039637A KR102119658B1 KR 102119658 B1 KR102119658 B1 KR 102119658B1 KR 1020200039637 A KR1020200039637 A KR 1020200039637A KR 20200039637 A KR20200039637 A KR 20200039637A KR 102119658 B1 KR102119658 B1 KR 102119658B1
Authority
KR
South Korea
Prior art keywords
leader
leader body
air hammer
excavation
air
Prior art date
Application number
KR1020200039637A
Other languages
Korean (ko)
Inventor
최왕조
Original Assignee
최왕조
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최왕조 filed Critical 최왕조
Priority to KR1020200039637A priority Critical patent/KR102119658B1/en
Application granted granted Critical
Publication of KR102119658B1 publication Critical patent/KR102119658B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • E21B21/065Separating solids from drilling fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/36Percussion drill bits
    • E21B10/38Percussion drill bits characterised by conduits or nozzles for drilling fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/003Drilling with mechanical conveying means
    • E21B7/005Drilling with mechanical conveying means with helical conveying means

Abstract

The present invention relates to a blind-type leader used in an air-hammer excavation apparatus which can safely and effectively discharge excavation soil slime. The blind-type leader comprises: a leader body (100) having a vertically installed pipe structure, wherein one side of a pipe is longitudinally opened in the vertical direction to function as a passage through which excavation soil slime lifted through an internal passage of an air-hammer excavation apparatus is moved into the pipe; a plurality of descent-inducing blinds (200) arranged at preset intervals in the vertical direction of the leader body (100) in the leader body (100), and inclined downwards towards the center of the leader body (100) to induce a descent of excavation soil slime moved into the leader body (100); a guide rail (300) vertically arranged along one side of the leader body (100) functioning as an inlet passage to excavate soil slime by guiding the ascent and descent of the air-hammer excavation apparatus; and a boom coupling unit (400) arranged on the other side of the leader body (100) to allow a boom (20) of construction equipment to be coupled thereto. In an excavation process, the blind-type leader is coupled to the boom of the construction equipment and is vertically installed on the ground to guide vertical ascents and descents of the air-hammer excavation apparatus. In an operation process of the air-hammer excavation apparatus, excavation soil slime lifted along the internal passage of the air-hammer excavation apparatus is moved into the leader body (100) by guiding of the descent-inducing blinds (200) to be lowered and discharged.

Description

에어함마 굴착장치용 블라인드식 리더{Blind Type Leader for Air Hammer Excavating Equipment}Blind Type Leader for Air Hammer Excavating Equipment

본 발명은 에어함마 굴착장치에 사용되는 블라인드식 리더에 관한 것으로서, 굴착 과정에서 건설장비의 붐대(20)에 결합되어 지면에 상하 방향으로 설치되어 에어함마 굴착장치의 상하 방향 승하강을 안내함과 동시에 에어함마 굴착장치의 작동 과정에서 에어함마 굴착장치의 내부 통로를 따라 상승된 순환수, 굴착토 및 암편을 포함하는 슬라임을 외부로 배출하는 것을 특징으로 한다.The present invention relates to a blind type leader used in an air hammer excavation device, which is coupled to the boom 20 of construction equipment during the excavation process and installed in the vertical direction on the ground to guide the up and down direction of the air hammer excavation device. At the same time, during the operation of the air hammer drilling device, it is characterized in that the slime including the elevated circulation water, digging soil and arm pieces along the internal passage of the air hammer drilling device is discharged to the outside.

일반적으로, 교량이나 건축물 혹은 토목 공사에는 기초공사를 위한 지반 굴착이 선행되어야 하는 경우가 대부분이다. 지반 굴착은 굴착장치를 이용하여 이루어지며, 특히 암반과 같이 단단한 지반의 경우에는 굴착이 용이하지 않은 관계로 특수한 굴착장치가 요구된다.In general, in most cases, ground excavation for the basic construction must be preceded in a bridge, building, or civil construction. Soil excavation is performed using an excavation device. In particular, in the case of hard ground such as a rock, a special excavation device is required because excavation is not easy.

종래 가장 일반적인 암반굴착공법으로는 역순환 굴착(RCD, Reverse Circulation Drill) 공법, PRD(Percussion Rotory Drill) 공법 및 이를 개량한 MACH(Mud and Air Circulating Hammer) 공법 등이 있는데, RCD 공법은 선단의 특수한 롤러 비트를 회전시켜 설계심도까지 굴착하는 공법이며, 한편, PRD 공법 및 MACH 공법은 해머 비트를 압축 공기에 의하여 타격하면서 회전시키는 방식으로 지반을 굴착하는 방식이다.The most common rock excavation methods in the prior art include the reverse circulation drilling (RCD) method, the percussion rotation drill (PRD) method, and the improved MACH (Mud and Air Circulating Hammer) method. It is a method of excavating to the design depth by rotating the roller bit. Meanwhile, the PRD method and the MACH method are methods of excavating the ground by rotating the hammer bit while hitting it with compressed air.

도 1 내지 도 3에는 종래의 굴착 공법(MACH 공법, PRD 공법)이 예시되어 있는데, 통상 지반은 표면의 토사층(2)과 그 아래의 암반층(1)으로 구성되며, 지표면으로부터 굴착 작업을 하거나 또는 강이나 바다의 경우에는 수면 위에 지지구조물(3)을 설치한 후에 굴착 작업을 하게 된다. 1 to 3, a conventional excavation method (MACH method, PRD method) is exemplified. Usually, the ground is composed of a sediment layer 2 on the surface and a rock layer 1 below it, and is excavated from the surface or In the case of rivers or the sea, excavation is performed after installing the support structure 3 on the water surface.

굴착 장치는 베이스 머신(4)으로부터 수직으로 리더(5)를 세우고, 리더(5)를 따라 굴착 로드(8)가 로우프(6)등에 의해 상하이동 가능하게 설치되고, 지표면으로부터 소정 깊이까지(통상 심부의 암반층 상부까지)는 굴착공 내부를 보호하기 위한 케이싱 파이프(9)가 설치되고, 드릴링 로드(8)의 하부에는 하나 이상의 비트(11)가 장착된 해머(10)가 위치된다. The excavation device vertically stands the leader 5 from the base machine 4, and along the leader 5, the excavation rod 8 is installed to be movable up and down by a rope 6 or the like, from the ground surface to a predetermined depth (usually A casing pipe 9 for protecting the inside of the excavation hole is installed at the upper part of the rock layer of the deep part, and a hammer 10 equipped with one or more bits 11 is positioned below the drilling rod 8.

MACH 공법에 따르면, 베이스머신(4)에 설치된 회전체(18)에 의하여 드릴링 로드(8)를 회전시키면서, 공기 압축기(12)에서 공급되는 압축공기로 해머(10)를 작동시켜 굴착공 하부의 암반을 굴착한다.According to the MACH method, while rotating the drilling rod 8 by the rotating body 18 installed on the base machine 4, the hammer 10 is operated with compressed air supplied from the air compressor 12, and the bottom of the excavation hole is operated. Excavate the rock.

로드(8)와 굴착공(9) 내에는 공기압축기(12), 공기 공급관(13), 공기 공급로(82) 및 순환수 공급관(14)을 통해 압축 공기와 순환수가 공급되며, 굴착 작업시 발생되는 굴착토(굴착암편을 포함하며, 이하부터는 굴착토로 통칭함)는 로드(8) 내부의 굴착토 배출로(86)를 통해 지상으로 배출된다. Compressed air and circulating water are supplied through the air compressor (12), the air supply pipe (13), the air supply path (82) and the circulating water supply pipe (14) in the rod (8) and the excavation hole (9). The excavated soil (including excavated rock pieces, hereinafter referred to as excavated soil) is discharged to the ground through the excavated soil discharge path 86 inside the rod 8.

로드(8) 내부에는 이외에도 압축 공기가 배출되도록 하는 공기 배출로(84)가 공기 배출관(17)까지 연결된다. 로드(8)의 상부에는 압축공기 및 순환수를 공급 및 배출을 위한 각종 배관을 회전하는 로드(8)에 연결시키기 위한 회전연결부(7)가 설치된다. 회전연결부(7)까지 올라온 굴착토는 배토관(16)을 통해 굴착토 수집부(15) 측으로 이동하여 처리될 수 있다.In addition to the inside of the rod 8, an air discharge path 84 through which compressed air is discharged is connected to the air discharge pipe 17. A rotating connecting portion 7 for connecting compressed air and circulating water to the rotating rod 8 is installed at the upper portion of the rod 8. The excavated soil that has risen up to the rotary connecting portion 7 may be processed by moving toward the excavated soil collecting portion 15 through the discharge pipe 16.

통상적으로, 굴착 중 발생되는 굴착토는 순환수와 함께 지상으로 배출되는데, 이와 같이 순환수에 혼합되어 유동하는 굴착토는 굴착토 제거를 위하여 공기압축기를 사용하므로 다량의 공기방울이 혼합되는 것이 일반적이다. 이로 인하여 지상의 배토관(16) 부위에서 정체 및/또는 막힘 현상이 자주 발생하고 따라서 굴착토의 배출이 원활하게 이루어지지 못하는 결과를 낳게 한다. Typically, the excavated soil generated during excavation is discharged to the ground along with the circulating water. As such, the excavated soil mixed with the circulating water is mixed with a large amount of air bubbles because it uses an air compressor to remove the excavated soil. . Due to this, stagnation and/or clogging frequently occurs in the portion of the earthing pipe 16 on the ground, and thus, the discharge of the excavated soil does not occur smoothly.

또한, PRD 공법의 경우 굴착 작업시 굴착공으로부터 굴착토 슬라임이 뿜어져 나와(도 3 참조) 굴착 작업을 진행하고 있는 작업자들이 흙탕물을 뒤집어쓰게 되는 일이 많다. 굴착토의 정체 및/또는 배토관의 막힘은 굴착토의 배출을 원활하지 않게 하면서 모터 등 각종 기기에 손상을 입히는 등의 문제를 야기시키고, 더 나아가 굴착 속도의 저하 또는 굴착 자체를 불가능하게 하는 문제를 발생시키기도 한다. In addition, in the case of the PRD method, during the excavation work, the slime of the excavated soil is ejected from the excavation hole (see FIG. 3), and workers in the excavation work often overturn the muddy water. The congestion of the excavated soil and/or the clogging of the discharge pipe causes problems such as damaging various devices such as a motor while not smoothly discharging the excavated soil, and furthermore, a problem of slowing the excavation speed or making excavation itself impossible It is also ordered.

그러므로 굴착 작업 중 발생하는 굴착토 슬라임을 흡입하여 배출시키는 배토관 내부에서 굴착토가 정체하는 현상을 없앨 수 있도록 하여 굴착 작업의 속도가 향상될 수 있도록 하는 기술에 대한 요구가 절실한 상황이다.Therefore, there is an urgent need for a technology that allows the speed of excavation work to be improved by eliminating the stagnation of excavated soil inside the discharge pipe that inhales and discharges the excavation slime generated during excavation.

[선행기술문헌][Advanced technical literature]

등록특허 제10-0419973호Registered Patent No. 10-0419973

공개실용 제20-2010-0005138호Public Utility No. 20-2010-0005138

공개특허 제10-2018-0019318호Published Patent No. 10-2018-0019318

상기한 문제점을 해결하기 위하여 창작된 본 발명은 물, 굴착토, 및 암편으로 이루어진 굴착토 슬라임을 안전하고 효과적으로 배출할 수 있는 기능이 구비된 새로운 개념의 리더(Leader)를 제공하는 것을 목적으로 한다.The present invention, created to solve the above problems, aims to provide a new concept leader equipped with a function for safely and effectively discharging excavated slime consisting of water, excavated soil, and arm pieces. .

상기한 목적을 달성하기 위하여 창작된 본 발명은 에어함마 굴착장치에 사용되는 블라인드식 리더에 관한 것으로서, 상하 방향으로 설치되는 관체 구조로서, 관체의 일측은 상하 방향(길이 방향)으로 길게 개방되어 에어함마 굴착장치의 내부 통로를 통하여 상승된 굴착토 슬라임이 관체 내부로 유입되는 통로 역할을 하는 리더몸체(100); 상기 리더몸체(100)의 내측에 상기 리더몸체(100)의 상하 방향(길이 방향)을 따라 미리 설정된 간격으로 배치되며, 상기 리더몸체(100)의 내부로 유입되는 굴착토 슬라임의 하강을 유도하도록 상기 리더몸체(100)의 중심을 향하여 하향 경사를 이루는 다수의 하강유도 블라인드(200); 굴착토 슬라임의 유입 통로 역할을 하는 상기 리더몸체(100)의 일측을 따라 상하 방향(길이 방향)으로 구비되어 에어함마 굴착장치의 승하강을 안내하는 가이드레일(300); 및, 상기 리더몸체(100)의 타측에 구비되어 건설장비의 붐대(20)가 결합되는 붐대결합부(400);를 포함하여 구성되며, 굴착 과정에서 건설장비의 붐대(20)에 결합되어 지면에 상하 방향으로 설치되어 에어함마 굴착장치의 상하 방향 승하강을 안내함과 동시에 에어함마 굴착장치의 작동 과정에서 에어함마 굴착장치의 내부 통로를 따라 상승된 굴착토 슬라임이 상기 하강유도 블라인드(200)의 안내에 따라 상기 리더몸체(100) 내부로 유입되어 하강 배출되는 것을 특징으로 한다. The present invention, created to achieve the above object, relates to a blind type leader used in an air hammer excavation device, and is a tube structure installed in the vertical direction, and one side of the tube is opened long in the vertical direction (longitudinal direction) to open the air A leader body 100 serving as a passage through which the excavated soil slime raised through the inner passage of the hammer drilling device flows into the tube body; Inside the leader body 100 is disposed at predetermined intervals along the vertical direction (longitudinal direction) of the leader body 100, so as to induce the digging of the digging soil slime flowing into the interior of the leader body 100 A plurality of descending induction blinds 200 forming a downward slope toward the center of the leader body 100; A guide rail 300 that is provided in the vertical direction (longitudinal direction) along one side of the leader body 100 serving as an inlet passage of the excavated soil slime to guide up and down of the air hammer drilling device; And, the leader body 100 is provided on the other side of the boom stand 20 of the construction equipment is coupled to the boom stand coupling part 400; is composed, including, in the excavation process is coupled to the boom stand 20 of the construction equipment ground It is installed in the vertical direction to guide the up and down in the vertical direction of the air hammer drilling machine, and at the same time, the digging soil slime elevated along the internal passage of the air hammer drilling machine in the course of the operation of the air hammer drilling machine is the descending induction blind 200 According to the guide, it is characterized in that it flows into the leader body 100 and is discharged downward.

본 발명의 구성에 따른 기술적 효과는 다음과 같다.Technical effects according to the configuration of the present invention are as follows.

첫째, 굴착 과정에서 발생되는 굴착토 슬라임을 안전하고 효과적으로 배출하여 굴착 시공 효율을 극대화시킬 수 있다.First, it is possible to maximize excavation construction efficiency by safely and effectively discharging excavated soil slime generated during the excavation process.

둘째, 굴착 깊이에 따라 리더몸체(100)의 길이를 적절히 변경할 수 있고, 셋팅이 이루어져 굴착 시공이 진행됨에 따라 에어함마 굴착장치가 하강하더라도 별도 조작 없이 굴착토 슬라임가 안정적으로 배출될 수 있다.Second, the length of the leader body 100 can be appropriately changed according to the depth of excavation, and the digging soil slime can be stably discharged without any manipulation even if the air hammer excavation device descends as the construction is performed.

셋째, 건설장비의 붐대(20)에 장착되는 리더에 굴착토 슬라임 배출 기능이 일체화된 새로운 개념의 블라인드식 리더로서, 에어함마 굴착장치의 승하강을 안내하는 별도의 서포터가 불필요하다.Third, as a new type of blind leader with integrated excavation slime discharge function integrated into the leader mounted on the boom stand 20 of construction equipment, a separate supporter that guides the ascent and descend of the air hammer excavation device is unnecessary.

도1 내지 도3은 종래 기술을 예시적으로 도시한다.
도4는 PRD 방식에서 전체 장비의 셋팅 구조를 도시한다.
도5는 PRD 방식에 적용된 본 발명의 단면구조를 도시한다.
도6은 역순환 방식에서 전체 장비의 세팅 구조를 도시한다.
도7은 역순환 방식에 적용된 본 발명의 단면구조를 도시한다.
도8은 본 발명의 리더몸체(100) 가운데 최하단에 결합되는 것의 구조를 예시적으로 도시한다.
도9는 본 발명의 리더몸체(100) 가운데 최하단에 결합되는 것의 다른 구체적 실시예로서, 경사슬로프(150)가 추가된 경우를 도시한다.
도10은 본 발명의 리더몸체(100) 상단부에 구비되는 분사노즐(130)과 풀리(140)를 도시한다.
1 to 3 exemplarily illustrate the prior art.
4 shows the setting structure of the entire equipment in the PRD method.
5 shows a cross-sectional structure of the present invention applied to the PRD method.
Figure 6 shows the setting structure of the entire equipment in a reverse circulation mode.
7 shows a cross-sectional structure of the present invention applied to the reverse circulation method.
8 exemplarily shows the structure of the leader body 100 of the present invention that is coupled to the bottom.
9 is another specific embodiment of the leader body 100 of the present invention coupled to the bottom, showing a case where the slope 150 is added.
10 shows the injection nozzle 130 and the pulley 140 provided at the upper end of the leader body 100 of the present invention.

이하에서는 본 발명의 구체적 실시예를 첨부도면을 참조하여 보다 상세히 설명한다.Hereinafter, a specific embodiment of the present invention will be described in more detail with reference to the accompanying drawings.

본 발명은 에어함마 굴착장치에 사용되는 블라인드식 리더에 관한 것으로서, 리더몸체(100), 하강유도 블라인드(200), 가이드레일(300), 붐대결합부(400) 등을 포함하여 구성된다.The present invention relates to a blind type leader used in an air hammer drilling device, and includes a leader body 100, a descending induction blind 200, a guide rail 300, and a boom-to-joint portion 400.

본 발명인 블라인드식 리더는 다양한 방식의 에어함마 굴착장치에 사용될 수 있는데, 도4 및 도5는 PRD 방식에 적용된 경우를 도시하며, 도6 및 도7은 연순환 방식에 적용된 경우를 도시한다.The blind reader of the present invention can be used in various types of air hammer drilling apparatus, FIGS. 4 and 5 show a case applied to the PRD method, and FIGS. 6 and 7 show a case applied to the soft circulation method.

PRD 방식에 적용되는 에어함마 굴착장치는 도4 및 도5에 도시된 것처럼 싱글오거(13), 스크류로드(15), 더블오거(11), 케이싱(16), 및 DTH함마(19) 등을 포함하여 구성되며, 건설장비의 붐대(20)에 장착되는 리더몸체(100)를 따라 승하강하는 구조로 결합되는데, 에어함마 굴착장치는 이미 상용화되어 있는 제품과 큰 차이가 없는 바 구조 및 기능에 대하여 별도 상세 설명을 생략한다.The air hammer excavation apparatus applied to the PRD method includes a single auger 13, a screw rod 15, a double auger 11, a casing 16, and a DTH hammer 19 as shown in FIGS. It is composed of, and coupled to a structure that moves up and down along the leader body 100 mounted on the boom 20 of the construction equipment, and the air hammer excavation device has a bar structure and functions that do not differ significantly from the products already commercialized. Separate detailed description is omitted.

아울러 본 발명인 블라인드식 리더는 도면에 예시적으로 도시된 것처럼 수직 방향으로만 설치될 수 있는 것이 아니며 건설장비의 붐대에 연결되어 소정의 각도로 경사를 이루도록 기울어진 상태로도 설치되어 사용(경사 천공시에도 사용)될 수 있다.In addition, the blind reader of the present invention may not be installed only in the vertical direction as illustrated in the drawings, and is installed and used in a tilted state to be connected to the boom of the construction equipment to achieve an inclination at a predetermined angle. Poem).

천공(굴착) 과정에서 발생된 굴착토 슬라임은 에어함마 굴착장치의 내부를 따라 상승한 후, 도5에 도시된 것처럼 더블오거(11)의 일측에 구비된 유도통로를 통하여 리더몸체(100) 내부로 전달된다.Digging soil slime generated in the process of drilling (digging) rises along the inside of the air hammer drilling rig, and then, as shown in FIG. 5, passes through the guide passage provided on one side of the double auger 11 into the leader body 100. Is delivered.

이러한 과정에서 더블오거용 분무기(12)를 통하여 더블오거(11)로 이송된 물을 분사하여 굴착토 슬라임이 유도통로를 통하여 리더몸체(100) 내부로 원활하게 전달되도록 할 수 있다.In this process, the water transferred to the double auger 11 is sprayed through the double auger sprayer 12 so that the excavated soil slime can be smoothly transferred into the leader body 100 through the induction passage.

역순환 방식에 적용되는 에어함마 굴착장치는 도6 및 도7에 도시된 것처럼 싱글오거(13), 워터스위벨(17), 역순환용 로드(18) 및 DTH함마(19) 등을 포함하며, 건설장비의 붐대(20)에 장착되는 리더몸체(100)를 따라 승하강하는 구조로 결합되는데, 이러한 에어함마 굴착장치는 이미 상용화되어 있는 제품과 큰 차이가 없는 바 구조 및 기능에 대하여 별도 상세 설명을 생략한다.The air hammer drilling device applied to the reverse circulation method includes a single auger 13, a water swivel 17, a reverse circulation rod 18 and a DTH hammer 19, as shown in FIGS. It is combined in a structure that moves up and down along the leader body 100 mounted on the boom stand 20 of the equipment, and these air hammer digging devices provide a detailed description of the bar structure and functions that do not differ significantly from the products already commercialized. Omitted.

역순환 방식의 경우 천공(굴착) 과정에서 발생된 굴착토 슬라임은 에어함마 굴착자이ㅊ의 내부를 따라 상승한 후, 도7에 도시된 것처럼 워터스위벨(17)의 일측에 구비된 유도통로를 통하여 리더몸체(100) 내부로 전달된다.In the case of the reverse circulation method, the digging soil slime generated in the process of drilling (digging) rises along the inside of the air hammer excavator, and then leads through a guided passage provided on one side of the water swivel 17 as shown in FIG. The body 100 is transmitted inside.

본 발명을 구성하는 리더몸체(100)는 도4 내지 도7에 도시된 것처럼 건설장비의 붐대(20)에 장착되어 상하 방향으로 세워져 에어함마 굴착장치의 상하 이동을 안내하는 역할을 함과 동시에 굴착토 슬라임의 하강 통로 역할을 하게 된다.The leader body 100 constituting the present invention is mounted on the boom 20 of the construction equipment as shown in FIGS. 4 to 7 and is erected in the vertical direction to serve to guide vertical movement of the air hammer drilling device and excavate at the same time. It acts as a descending passage for To Slime.

이러한 리더몸체(100)는 도4 내지 도7에 도시된 것처럼 다단으로 연결되는 구조로서 굴착 깊이에 따라 연결되는 단수를 증감하여 전체 길이(높이)를 조절할 수 있다.The leader body 100 is a structure connected in multiple stages as shown in FIGS. 4 to 7, and the overall length (height) can be adjusted by increasing or decreasing the number of stages connected according to the depth of excavation.

이러한 리더몸체(100)의 구조는 동일하며, 각 리더몸체(100)의 길이를 서로 다른 규격으로 제작하여 필요에 따라 연결되는 단수를 적절히 증감하면 전체 길이를 다양하게 셋팅할 수 있다.The structure of the leader body 100 is the same, and the length of each leader body 100 is manufactured to different standards, and if the number of connected stages is appropriately increased or decreased, the entire length can be variously set.

아울러, 리더몸체(100)의 내측면에는 내마모성 고무코팅 등의 처리가 가능한데, 이를 통하여 리더몸체(100) 내측면을 보호함과 동시에 충격을 흡수하면서 소음을 줄일 수 있다.In addition, the inner surface of the leader body 100 can be treated with abrasion-resistant rubber coating, etc. Through this, it is possible to protect the inner surface of the leader body 100 while absorbing shock and reducing noise.

리더몸체(100)는 상하 방향(길이 방향)으로 설치되는 관체 구조로서, 리더몸체(100)를 구성하는 관체의 일측은 상하 방향으로 길게 개방되어 에어함마 굴착장치의 내부 통로를 통하여 상승된 굴착토 슬라임이 관체 내부로 유입되는 통로 역할을 하게 된다.The leader body 100 is a tube structure installed in the vertical direction (longitudinal direction), and one side of the tube body constituting the leader body 100 is opened long in the vertical direction and excavated soil raised through the internal passage of the air hammer drilling device Slime acts as a passage into the tube body.

하강유도 블라인드(200)는 리더몸체(100)의 내측에 리더몸체(100)의 상하 방향(길이 방향)을 따라 미리 설정된 간격으로 배치되는데, 리더몸체(100)의 내부로 유입되는 굴착토 슬라임의 하강을 유도하도록 리더몸체(100)의 중심을 향하여 하향 경사를 이루며, 에어함마 굴착장치의 더블오거(11)나 워터스위벨(17)의 유도통로를 통하여 전달되는 굴착토 슬라임이 경사면을 따라 하강하면서 자연스럽게 리더몸체(100) 내부 공간으로 유입되도록 한다. The descending induction blinds 200 are arranged at predetermined intervals along the vertical direction (longitudinal direction) of the leader body 100 inside the leader body 100, of the digging soil slime flowing into the leader body 100. The downward slope toward the center of the leader body 100 to induce the descent, while the digging soil slime transmitted through the induction passage of the double auger 11 or the water swivel 17 of the air hammer drilling device descends along the inclined surface. Naturally, it is allowed to flow into the space inside the leader body 100.

이러한 하강유도 블라인드(200)는 리더몸체(100)의 상하 방향(길이 방향)을 따라 연속적으로 배치되어 천공(굴착)이 진행됨에 따라 에어함마 굴착장치가 하강하더라도 굴착토 슬라임이 리더몸체(100) 내부 공간으로 안정감있게 계속 유입되도록 한다.These descending induction blinds 200 are continuously arranged along the vertical direction (longitudinal direction) of the leader body 100 so that even if the air hammer drilling device descends as the drilling (digging) progresses, the digging soil slime is the leader body 100 Keep it flowing in the interior space stably.

이러한 하강유도 블라인드(200)의 표면도 내마모성 고무코팅 등의 처리가 가능하다.The surface of the descending induction blind 200 can also be treated such as wear-resistant rubber coating.

가이드레일(300)은 리더몸체(100)의 일측(굴착토 슬라임의 유입 통로가 되는 일측) 좌우 양측을 따라 상하 방향(길이 방향)으로 구비되어 에어함마 굴착장치의 승하강을 안내하는 역할을 하게 된다.The guide rail 300 is provided in the vertical direction (longitudinal direction) along the left and right sides of one side of the leader body 100 (one side that becomes the inflow passage of the excavation soil slime) to serve to guide the lifting and lowering of the air hammer drilling device. do.

따라서 첨부도면에 별도로 도시하지 않았으나 에어함마 굴착장치에는 가이드레일(300)에 맞물릴 수 있도록 가이드레일(300)의 형상에 대응하는 형태의 가이드홈부가 구비되어야 하는데, 싱글오거(13)나 더블오거(11) 등에 이러한 가이드홈부가 구비될 수 있다.Therefore, although not separately shown in the accompanying drawings, the air hammer drilling device should be provided with a guide groove portion in a shape corresponding to the shape of the guide rail 300 so as to engage the guide rail 300, single auger 13 or double auger (11) Such a guide groove may be provided.

붐대결합부(400)는 도5 또는 도7에 도시된 것처럼 리더몸체(100)의 타측에 구비되어 건설장비의 붐대(20)와 결합된다.The boom stand coupling portion 400 is provided on the other side of the leader body 100 as shown in Figure 5 or 7 is coupled to the boom stand 20 of the construction equipment.

붐대결합부(400)는 리더몸체(100)에서 일정 영역 돌출되어 건설장비의 붐대(20) 단부와 핀결합이 될 수 있는 구조이면 충분하고, 특별한 구조나 형태를 요구하는 것은 아니다.Boom rod coupling portion 400 is a structure capable of protruding a certain area from the leader body 100 to be pinned with the end of the boom rod 20 of the construction equipment is sufficient, and does not require a special structure or shape.

도8에는 이러한 리더몸체(100) 가운데 최하단에 결합되는 것의 구조를 예시적으로 도시하는데, 하부 단면이 막혀 있고, 측면으로 배출구(110)가 구비되는 구조라는 점 이외에는 다른 리더몸체(100)의 구조와 동일하다.FIG. 8 exemplarily shows a structure of the leader body 100 coupled to the bottom of the leader body, except that the lower cross-section is blocked and the outlet 110 is provided to the side. Is the same as

리더몸체(100)의 하부에 구비되는 배출구(110)는 서로 다른 방향으로 다수 구비(예를 들어 좌측면에 1개, 우측면에 1개, 후면에 1개)되어 선택적으로 개방이 가능한 구조가 된다.The outlet 110 provided at the lower portion of the leader body 100 is provided in a number of different directions (for example, one on the left side, one on the right side, and one on the back side) to be selectively opened. .

개방 방식은 별도로 도시하지 않았으나, 덮개를 볼트나 핀으로 고정하여 배출구(110)를 막는 방식을 선택하거나, 덮개를 회동식 도어 형태로 제작하는 방식 등이 선택될 수 있다.Although the opening method is not separately illustrated, a method of blocking the outlet 110 by fixing the cover with a bolt or a pin may be selected, or a method of manufacturing the cover in the form of a pivoting door may be selected.

이러한 배출구(110)는 리더몸체(100) 내부를 통과하여 하강한 굴착토 슬라임이 외부로 배출되는 통로 역할을 하는데, 서로 다른 방향으로 구비된 배출구(110)를 필요에 따라 선택적으로 개방함으로써 배출 방향을 변경할 수 있다.The discharge port 110 serves as a passage through which the digging soil slime descending through the inside of the leader body 100 is discharged to the outside. By selectively opening the discharge port 110 provided in different directions as necessary, the discharge direction Can be changed.

도9는 본 발명의 리더몸체(100) 가운데 최하단에 결합되는 것의 다른 구체적 실시예로서, 경사슬로프(150)가 추가된 경우를 도시하는데, 경사슬로프(150)를 통하여 침전조(21)로 굴착토 슬라임을 안정적으로 배출할 수 있다. 이러한 경사슬로프(150)는 필요에 따라 분리할 수도 있다.9 is another specific embodiment of the leader body 100 of the present invention that is coupled to the bottom, showing a case where the slope slope 150 is added, excavating soil into the sedimentation tank 21 through the slope slope 150 Slime can be discharged stably. The inclined slope 150 may be separated as necessary.

도10은 본 발명의 리더몸체(100) 상단부에 구비되는 분사노즐(130)과 풀리(140)를 도시하는데, 리더몸체(100)의 상단부에 결합되는 탑시브(120)에 하부 내측에 리더용 분무기(14)에서 고압으로 공급된 물을 리더몸체(100) 내부 공간으로 분사하는 분사노즐(130)이 구비되어 굴착토 슬라임이 하강유도 블라인드(200)를 따라 쉽게 하강하여 리더몸체(100) 내부로 유입되고, 리더몸체(100) 내부 공간으로 하강 배출될 수 있다.Figure 10 shows the injection nozzle 130 and the pulley 140 provided at the upper end of the leader body 100 of the present invention, the top sieve 120 coupled to the upper end of the leader body 100 for the lower inner reader A spray nozzle 130 is provided to spray the water supplied from the sprayer 14 at a high pressure into the interior space of the leader body 100 so that the excavated soil slime descends easily along the descending induction blind 200 and inside the leader body 100 It can be introduced into the leader body 100, it can be discharged downward to the interior space.

아울러, 탑시브(120)의 상부 외측에는 건설장비의 윈치(winch) 와이어와 맞물려 회전하는 다수의 풀리(140)가 구비되어 에어함마 굴착장치의 싱글오거(13)나 더블오거(11)를 와이어로 승하강시킬 때 가이드 역할을 하게 된다.In addition, a plurality of pulleys 140 rotating in engagement with a winch wire of a construction equipment are provided on the upper outer side of the top sheave 120 to wire a single auger 13 or a double auger 11 of the air hammer rig. It acts as a guide when ascending and descending.

상기한 바와 같이 본 발명의 구체적 실시예를 첨부도면을 참조하여 설명하였으나 본 발명의 보호범위가 반드시 이러한 실시예에 한정되는 것은 아니며, 본 발명의 기술적 요지를 변경하지 않는 범위 내에서 다양한 설계변경, 공지기술의 부가나 삭제, 단순한 수치한정 등의 경우에도 본 발명의 보호범위에 속함을 분명히 한다.As described above, specific embodiments of the present invention have been described with reference to the accompanying drawings, but the protection scope of the present invention is not necessarily limited to these embodiments, and various design changes within a range that does not change the technical gist of the present invention, Even in the case of addition or deletion of known technology, simple numerical limitation, etc., it is apparent that it falls within the protection scope of the present invention.

11:더블오거
12:더블오거용 분무기
13:싱글오거
14:리더용 분무기
15:스크류로드
16:케이싱
17:워터스위벨
18:역순환용 로드
19:DTH함마
20:붐대
21:침전조
100:리더몸체
110:배출구
120:탑시브
130:분사노즐
140:풀리
150:경사슬로프
200:하강유도 블라인드
300:가이드레일
400:붐대결합부
11: Double Auger
12: Double Auger Sprayer
13: Single auger
14: Leader sprayer
15: screw rod
16: Casing
17: Water swivel
18: Reverse circulation rod
19: DTH hammer
20: Boom stand
21: settling tank
100: leader body
110: outlet
120: Top sheave
130: spray nozzle
140: pulley
150: Slope
200: falling induction blind
300: Guide rail
400: boom rod coupling

Claims (5)

에어함마 굴착장치에 사용되는 블라인드식 리더에 관한 것으로서,
상하 방향으로 설치되는 관체 구조로서, 관체의 일측은 상하 방향(길이 방향)으로 길게 개방되어 에어함마 굴착장치의 내부 통로를 통하여 상승된 굴착토 슬라임이 관체 내부로 유입되는 통로 역할을 하는 리더몸체(100);
상기 리더몸체(100)의 내측에 상기 리더몸체(100)의 상하 방향(길이 방향)을 따라 미리 설정된 간격으로 배치되며, 상기 리더몸체(100)의 내부로 유입되는 굴착토 슬라임의 하강을 유도하도록 상기 리더몸체(100)의 중심을 향하여 하향 경사를 이루는 다수의 하강유도 블라인드(200);
굴착토 슬라임의 유입 통로 역할을 하는 상기 리더몸체(100)의 일측을 따라 상하 방향(길이 방향)으로 구비되어 에어함마 굴착장치의 승하강을 안내하는 가이드레일(300); 및,
상기 리더몸체(100)의 타측에 구비되어 건설장비의 붐대(20)가 결합되는 붐대결합부(400);
를 포함하여 구성되며,
굴착 과정에서 건설장비의 붐대(20)에 결합되어 지면에 상하 방향으로 설치되어 에어함마 굴착장치의 상하 방향 승하강을 안내함과 동시에 에어함마 굴착장치의 작동 과정에서 에어함마 굴착장치의 내부 통로를 따라 상승된 굴착토 슬라임이 상기 하강유도 블라인드(200)의 안내에 따라 상기 리더몸체(100) 내부로 유입되어 하강 배출되는 것을 특징으로 하는 에어함마 굴착장치용 블라인드식 리더.
As a blind type leader used in an air hammer excavation device,
As the tube structure installed in the vertical direction, one side of the tube body is opened long in the vertical direction (longitudinal direction) and the leader body acts as a passage through which the excavated soil slime raised through the internal passage of the air hammer drilling device flows into the tube body ( 100);
The leader body 100 is disposed at predetermined intervals along the vertical direction (longitudinal direction) of the leader body 100 to the inside of the leader body 100, so as to induce the digging of the digging soil slime flowing into the leader body 100. A plurality of descending induction blinds 200 forming a downward slope toward the center of the leader body 100;
A guide rail 300 provided in the vertical direction (longitudinal direction) along one side of the leader body 100 serving as an inlet passage of the excavated soil slime to guide up and down of the air hammer drilling device; And,
A boom stand coupling part 400 provided on the other side of the leader body 100 to which a boom stand 20 of construction equipment is coupled;
It comprises,
In the course of excavation, it is coupled to the boom stand 20 of the construction equipment and installed in the vertical direction on the ground to guide the up and down direction of the air hammer excavation device, and at the same time, the internal passage of the air hammer excavation device during the operation of the air hammer excavation device. A blind reader for an air hammer excavation device, characterized in that the excavated soil slime accordingly flows into the leader body 100 according to the guidance of the descending induction blind 200 and is discharged downward.
제1항에서,
상기 리더몸체(100)의 하부에는,
상기 리더몸체(100) 내부를 통과하여 하강한 굴착토 슬라임이 외부로 배출되는 배출구(110);
가 서로 다른 방향으로 다수 구비되어 필요에 따라 선택적으로 개방함으로써 배출 방향을 변경할 수 있는 것을 특징으로 하는 에어함마 굴착장치용 블라인드식 리더.
In claim 1,
In the lower portion of the leader body 100,
An outlet 110 through which the digging soil slime descending through the inside of the leader body 100 is discharged to the outside;
It is provided in a number of different directions, it is possible to change the discharge direction by selectively opening as required Blind type reader for the air hammer excavator.
제1항에서,
상기 리더몸체(100)의 상단부에는,
고압으로 공급된 물을 상기 리더몸체(100) 내부로 분사하는 분사노즐(130);
이 구비되는 것을 특징으로 하는 에어함마 굴착장치용 블라인드식 리더.
In claim 1,
On the upper end of the leader body 100,
An injection nozzle (130) for spraying water supplied at high pressure into the leader body (100);
Blind type reader for the air hammer drilling device, characterized in that provided.
제1항 내지 제3항 가운데 어느 한 항에서,
상기 리더몸체(100)는 다단으로 연결되는 구조로서 굴착 깊이에 따라 연결되는 단수를 증감하여 전체 길이(높이)를 조절할 수 있는 것을 특징으로 하는 에어함마 굴착장치용 블라인드식 리더.
In any one of claims 1 to 3,
The leader body 100 is a multi-stage structure, a blind reader for an air hammer drilling rig, characterized in that the number of stages connected according to the depth of digging can be adjusted to adjust the overall length (height).
제1항 내지 제3항 가운데 어느 한 항에서,
상기 리더몸체(100)의 상단부에는,
건설장비의 윈치(winch) 와이어와 맞물려 회전하는 다수의 풀리(140);
가 구비되어 에어함마 굴착장치의 오거를 와이어로 승하강시킬 때 가이드 역할을 하는 것을 특징으로 하는 에어함마 굴착장치용 블라인드식 리더.
In any one of claims 1 to 3,
On the upper end of the leader body 100,
A plurality of pulleys 140 that rotate in engagement with a winch wire of the construction equipment;
Is equipped with a blind leader for the air hammer drilling device, characterized in that acts as a guide when lifting and lowering the auger of the air hammer drilling device with a wire.
KR1020200039637A 2020-04-01 2020-04-01 Blind Type Leader for Air Hammer Excavating Equipment KR102119658B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200039637A KR102119658B1 (en) 2020-04-01 2020-04-01 Blind Type Leader for Air Hammer Excavating Equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200039637A KR102119658B1 (en) 2020-04-01 2020-04-01 Blind Type Leader for Air Hammer Excavating Equipment

Publications (1)

Publication Number Publication Date
KR102119658B1 true KR102119658B1 (en) 2020-06-05

Family

ID=71089282

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200039637A KR102119658B1 (en) 2020-04-01 2020-04-01 Blind Type Leader for Air Hammer Excavating Equipment

Country Status (1)

Country Link
KR (1) KR102119658B1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0726874A (en) * 1993-07-09 1995-01-27 Aichi Corp:Kk Automatic lowering control device for suspension well excavator
JPH11200749A (en) * 1998-01-14 1999-07-27 Kinki Ishiko Kk Earth removal device in foundation work machine
KR20050109419A (en) * 2005-11-01 2005-11-21 주식회사 동아지질 A slime removal apparatus and it's removal method
KR20100005138U (en) * 2008-11-10 2010-05-19 김유경 A Slimes Discharge Pipe For Drilling Apparatus
JP2013119765A (en) * 2011-12-09 2013-06-17 Nippon Sharyo Seizo Kaisha Ltd Pile driver
KR20140093397A (en) * 2013-01-18 2014-07-28 (주)삼일이엔씨 Apparatus and method for removing slime stuck on drill rods
KR101906455B1 (en) * 2017-07-27 2018-10-10 한국건설기술연구원 Boring Machine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0726874A (en) * 1993-07-09 1995-01-27 Aichi Corp:Kk Automatic lowering control device for suspension well excavator
JPH11200749A (en) * 1998-01-14 1999-07-27 Kinki Ishiko Kk Earth removal device in foundation work machine
KR20050109419A (en) * 2005-11-01 2005-11-21 주식회사 동아지질 A slime removal apparatus and it's removal method
KR20100005138U (en) * 2008-11-10 2010-05-19 김유경 A Slimes Discharge Pipe For Drilling Apparatus
JP2013119765A (en) * 2011-12-09 2013-06-17 Nippon Sharyo Seizo Kaisha Ltd Pile driver
KR20140093397A (en) * 2013-01-18 2014-07-28 (주)삼일이엔씨 Apparatus and method for removing slime stuck on drill rods
KR101906455B1 (en) * 2017-07-27 2018-10-10 한국건설기술연구원 Boring Machine

Similar Documents

Publication Publication Date Title
US4223747A (en) Drilling using reverse circulation
US3081828A (en) Method and apparatus for producing cuts within a bore hole
CN107407131B (en) Shaft enlargement arrangement for a drilling system
CN110023586B (en) Shaft extension device for a drilling system
KR102119658B1 (en) Blind Type Leader for Air Hammer Excavating Equipment
CN111749292B (en) Construction process for grooving wall-connecting ground in pipeline dense area
CN106801588B (en) semi-closed slurry pressure-maintaining circulation process for drilling construction of confined water stratum
CN117145383A (en) Rectangular slide-resistant pile mechanical hole forming method capable of reaming and synchronously drilling horizontal cantilever
CN111502538A (en) Gas lift pore-forming construction method for building construction drilling
RU2795402C2 (en) Assembly for expansion of a drilling system shaft
JP3839819B2 (en) Reverse circulation drill
RU2435925C1 (en) Procedure for construction of horizontal drain hole in unstable moveable rock and drilling assembly for its implementation
KR102160136B1 (en) Reverse Circulation Air Hammer Excavator and Reverse Circulation Single Hammer Excavating Method
CN212201991U (en) Easily-leaking stratum well completion device
RU133557U1 (en) DRILLING RIG FOR WATER WELL CONSTRUCTION IN RELIEF WATERFLOW HORIZONS WITH HEADS
CN113153142B (en) Hard broken formation gas lift reverse circulation drilling anti-blocking tool in geological drilling
CN114922565B (en) Reverse circulation percussion drill and construction method thereof
RU2640611C2 (en) Hydraulic bore mining of minerals
CN116065950B (en) Intelligent drilling construction process based on oil gas development engineering driller surface layer construction
CN218092906U (en) Drilling equipment for railway overhead fulcrum pile
CN108661556A (en) A kind of units of rotary drilling rig
CN212774216U (en) Water exploration drilling blowout preventer
CN117605403A (en) Drilling machine for partial mud circulation deslagging down-the-hole hammer and use method thereof
CN214997558U (en) Exploratory drilling opening anti-blowout device
RU2256796C1 (en) Method for extraction of mineral resources and device for realization of said method

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant