KR102118785B1 - Dike construction method using a tube structure consisting of a geotextile tube and a plurality of geotextile tubes - Google Patents

Dike construction method using a tube structure consisting of a geotextile tube and a plurality of geotextile tubes Download PDF

Info

Publication number
KR102118785B1
KR102118785B1 KR1020180031008A KR20180031008A KR102118785B1 KR 102118785 B1 KR102118785 B1 KR 102118785B1 KR 1020180031008 A KR1020180031008 A KR 1020180031008A KR 20180031008 A KR20180031008 A KR 20180031008A KR 102118785 B1 KR102118785 B1 KR 102118785B1
Authority
KR
South Korea
Prior art keywords
tube
geotextile
mortar
geotextile tube
filling
Prior art date
Application number
KR1020180031008A
Other languages
Korean (ko)
Other versions
KR20190109080A (en
Inventor
김정한
Original Assignee
에스오씨기술지주 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 에스오씨기술지주 주식회사 filed Critical 에스오씨기술지주 주식회사
Priority to KR1020180031008A priority Critical patent/KR102118785B1/en
Publication of KR20190109080A publication Critical patent/KR20190109080A/en
Application granted granted Critical
Publication of KR102118785B1 publication Critical patent/KR102118785B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Revetment (AREA)

Abstract

본 발명은 지오텍스타일 튜브을 이용하여 건설공사용 임시제방 및 영구제방에 대한 시공방법에 관한 것으로, 보다 상세하게는 지오텍스타일 튜브을 겹침 조적하여 형성하여서, 다양한 내부충진재의 범용적 사용가능하고. 이로 인해 신속하고 경제적인 시공이 이루어지게 하는 것을 목적으로 한 것이다.
지오텍스타일 튜브를 맞물림 조적에 의하여 설치하는 튜브조적과정과, 상기 튜브조적과정을 통하여 조적된 지오텍스타일 튜브에 구조체몰탈을 주입하는 몰탈주입과정, 몰탈주입과정을 통하여 지오텍스타일 튜브에 채워진 구조체몰탈을 탈수하는 몰탈탈수과정, 몰탈탈수과정을 통하여 수분제거된 채움재에 경화제를 주입하여 채움재를 경화시키는 튜브경화과정 및 상기 지오텍스타일 튜브의 후방을 메움작업하는 메움과정으로 이루어지고, 상기 지오텍스타일 튜브로 이루어진 튜브구조체로 구성하되 상기 튜브구조체는 측방향으로 겹침조적되며 내부에 경화된 채움재가 충진된 지오텍스타일 튜브로 구성하여 겹이음에 따른 겹이음접합부가 형성되어 지면과 접하는 부분에 채움제가 채워졌을 때 곡면형상을 갖지 않게 되므로 지면과의 접지되는 부분에서의 틈새 발생이 없게 되고, 겹이음접합부를 통해 지오텍스타일 튜브를 구축하게 되어 지오텍스타일 튜브 간의 틈새 발생이 최소화되어 조류의 영향이 최소화되며, 구조체를 이루는 지오텍스타일를 겹이음접합하여 구조체를 구축하게 되어 구조체간의 연결을 쉽게 이루게 되는 것이다.
The present invention relates to a construction method for a temporary embankment and a permanent embankment for construction construction using a geotextile tube, and more specifically, a geotextile tube is formed by overlapping masonry, so that it can be used universally for various internal fillers. The purpose of this is to enable rapid and economical construction.
The tube masonry process of installing the geotextile tube by the meshing masonry, the mortar injection process of injecting the structure mortar into the geotextile tube fabricated through the tube masonry process, and the structure mortar filled in the geotextile tube through the mortar injection process are dehydrated. A tube consisting of the geotextile tube, which consists of a tube curing process for curing the filling material by injecting a curing agent into the filler material removed through the mortar dehydration process and a mortar dehydration process, and filling the back of the geotextile tube. Consisting of a structure, the tube structure is composed of a geotextile tube filled with a hardened filling material and overlapped in the lateral direction to form a layered joint according to the layering, thus forming a curved surface when the filling agent is filled in the area in contact with the ground. Since it does not have, there will be no crevice in the grounded part with the ground, and the geotextile tube will be constructed through the layered joint to minimize the occurrence of a gap between the geotextile tubes, thus minimizing the effect of algae, and forming the geotextile By constructing structures by layering and joining styles, it is easy to make connections between structures.

Description

지오텍스타일 튜브 및 복수의 지오텍스타일 튜브로 이루어진 튜브구조제에 의한 제방시공방법{Dike construction method using a tube structure consisting of a geotextile tube and a plurality of geotextile tubes}The construction method using a tube structure consisting of a geotextile tube and a plurality of geotextile tubes and a plurality of geotextile tubes and a plurality of geotextile tubes}

본 발명은 지오텍스타일 튜브 및 이를 이용하여 건설공사용 임시제방 또는 영구제방에 대한 시공방법에 관한 것으로, 보다 상세하게는 지오텍스타일 튜브를 겹침 조적으로 형성하여서, 절개지구조체와 제방구조체 및 해안침식방지구조체 등과 같은 영구구조체 또는 임시구조체의 축조에 이용되고, 이로 인하여 다양한 내부 충진재의 범용적 사용이 가능하여 신속하고, 경제적인 시공이 이루어지게 하는 것을 목적으로 한 것이다.The present invention relates to a geotextile tube and a construction method for a temporary embankment or a permanent embankment for construction construction using the same, and more specifically, by forming a geotextile tube in an overlapping structure, an incision structure, embankment structure, coastal erosion prevention structure, etc. It is used for the construction of the same permanent structure or temporary structure, and for this purpose, it is possible to universally use a variety of internal fillers, and is intended to achieve rapid and economical construction.

일반적으로, 구조체는 절개지와 제방 및 해안가에서 임시 또는 영구적으로 축조하여 토사 및 모래의 유실을 억제하여 절개지와 제방 및 해안가가 유지되게 하기 위해 하는 것이다.In general, the structure is to temporarily or permanently build on the incision and embankment and the coast to suppress the loss of soil and sand to maintain the incision and embankment and the coast.

이상과 같은 구조체는 콘크리트옹벽을 타설하여 절개지와 제방 및 해안가의 토사 및 모래의 유실을 방지되게 하고 있다.The structure as described above is to prevent the loss of soil and sand in the incision and embankment and the coast by pouring concrete retaining walls.

이와같은 구조체의 시공 중 절개지의 시공은 절개지의 하부를 굴착하고 콘크리트옹벽을 타설한 후 콘크리트옹벽의 배면에 토사를 채워 시공하는 것이다.The construction of the incision site during the construction of such a structure is to excavate the lower portion of the incision site, pour the concrete retaining wall, and then fill the back of the concrete retaining wall with soil to construct it.

그리고, 제방의 시공은 제방 주변에 강물 또는 바닷물의 유입을 차단하는 차수벽을 형성하고, 콘크리트옹벽을 타설한 후 콘크리트옹벽의 배면에 토사를 채워 재방의 구조체를 형성하고 구조체 전방 측에 기 시공된 차수벽을 제거하는 작업을 통하여 시공하는 것이다.Then, the construction of the embankment forms a water barrier to block the inflow of river water or seawater around the embankment, and after pouring the concrete retaining wall, fills the soil with the back of the concrete retaining wall to form the structure of the re-wall, and the previously constructed water barrier wall It is to be constructed through the operation of removing it.

또한, 해안가의 시공은 해안에 바닷물의 유입을 방지하는 차수벽을 형성하고 시공위치 하상을 굴착한 콘크리트옹벽을 타설한 후 콘크리트옹벽의 배면에 모래를 채우고 구조체 전방에 기 시공된 차주벽을 제거하는 작업을 통하여 시공하는 것이다.In addition, the construction of the coastal area forms a water barrier to prevent the inflow of sea water to the coast, and the concrete retaining wall excavated from the bottom of the construction site is filled, then the sand is filled on the back of the concrete retaining wall and the pre-constructed wall is removed. It is to construct through.

그러나 상기한 바와 같은 종래 절개지와 제방 및 해안가의 구조체는 콘크리트구조체 시공을 위한 거푸집의 설치와 차수를 위한 차수벽을 설치하여야 하는 등 그 시공과정이 복잡하고 콘트리트의 양생과 같은 시공에 많은 시간과 경비가 소요되는 문제점이 있었다.However, the structure of the conventional incision and embankment and coastal structure as described above is complicated, such as the installation of a formwork for the construction of a concrete structure and the installation of a water barrier for the order. There was a problem to be taken.

등록특허 10-0902327Patent Registration 10-0902327

이에, 본 발명은 절개지와 제방 및 해안가의 구조체는 콘크리트구조체 시공을 위한 거푸집의 설치와 차수를 위한 차수벽을 설치하여야 하는 등 그 시공과정이 복잡하고 콘트리트의 양생과 같은 시공에 많은 시간과 경비가 소요되는 문제점을 해결할 수 있도록 한 것이다.Accordingly, in the present invention, the construction process of the incision site, the embankment, and the coastal area is complicated, such as the installation of a formwork for the construction of a concrete structure and the installation of a water barrier for the order, and the construction process, such as curing concrete, takes a lot of time and money. This is to help solve the problem.

즉, 본 발명은 복수의 지오텍스타일 튜브로 이루어진 튜브구조체로 제방을 구축하는 제방시공방법을 제공하는 것을 특징으로 하는 것이다.
본 발명은 제방시공방법에 있어서 튜브구조체는 텍스타일 튜브를 맞물림 조적에 의하여 설치하는 튜브조적과정과, 상기 튜브조적과정을 통하여 조적된 지오텍스타일 튜브에 구조체몰탈을 주입하는 몰탈주입과정, 몰탈주입과정을 통하여 지오텍스타일 튜브에 채워진 구조체몰탈을 탈수하는 몰탈탈수과정, 몰탈탈수과정을 통하여 수분제거된 채움재에 경화제를 주입하여 채움재를 경화시키는 튜브경화과정 및 상기 지오텍스타일 튜브의 후방을 메움작업하는 메움과정으로 이루어진 것을 특징으로 하는 것이다.
That is, the present invention is characterized by providing a dike construction method of constructing a dike with a tube structure made of a plurality of geotextile tubes.
In the present invention, in the embankment construction method, the tube structure includes a tube construction process in which a textile tube is installed by an interlocking masonry, and a mortar injection process and a mortar injection process for injecting structure mortar into the geotextile tube constructed through the tube masonry process. Through the mortar dehydration process of dewatering the structure mortar filled in the geotextile tube through the tube curing process of curing the filling material by injecting a curing agent into the water-depleted filling material through the mortar dehydration process and the filling process of filling the back of the geotextile tube It is characterized by being made.

본 발명은 튜브구조체를 측방향으로 조적되는 복수의 지오텍스타일 튜브가 겹침조적되고 내부에 경화된 채움재가 충진되게 구성한 것을 특징으로 것이다.The present invention is characterized in that a plurality of geotextile tubes stacked in the lateral direction of the tube structure are configured to overlap and filled with a cured filling material therein.

본 발명은 지오텍스타일 튜브는 일측에 측방향으로 연속조적되는 지오텍스타일 튜브에 의하여 깔림 겹침되는 깔림겹치부를 형성하고 다른 일측에 기 조적된 지오텍스타일 튜브의 깔림겹침부의 상부에 덮힘 겹침되는 덮힘겹침부를 형성하며, 지오텍스타일 튜브는 원주방향과 길이방향의 겹이음접합부로 접합형성하고 상부에 등간격으로 충진투입구를 형성한 것을 특징으로 하는 것이다.In the present invention, the geotextile tube forms a covering overlapping part overlapped by a geotextile tube continuously laterally arranged on one side, and a covering overlapping part overlapping and overlapping the covering overlapping part of the geotextile tube constructed on the other side. Formed, the geotextile tube is characterized in that it forms a junction with a layered joint in the circumferential direction and the longitudinal direction and forms a filling inlet at equal intervals on the top.

본 발명은 구조체몰탈은 준설토와 하수슬러지 중 어느 하나로 조성한 것을 특징으로 하는 것이다.The present invention is characterized in that the structure mortar is composed of either dredged soil or sewage sludge.

본 발명은 구조체몰탈에 고화재와 시멘트모르탈 중 어느 하나 이상의 경화제를 추가로 조성한 것을 특징으로 하는 것이다.The present invention is characterized in that the structure mortar is further composed of any one or more curing agents of a solidifying material and a cement mortar.

본 발명은 지오텍스타일 튜브의 깔림겹침부는 지오텍스타일 튜브의 하단부를 상단부보다 짧게 경사 절단하고 지오텍스타일 튜브의 상단부를 하단부에 재봉형성하며,In the present invention, the overlapping portion of the geotextile tube is inclinedly cut shorter than the upper portion of the geotextile tube, and the upper portion of the geotextile tube is sewn to the lower portion,

지오텍스타일 튜브의 덮힘겹침부는 지오텍스타일 튜브의 상단부를 하단부보다 짧게 경사 절단하고 지오텍스타일 튜브의 상단부를 하단부에 재봉형성한 것을 특징으로 하는 것이다.The overlapping portion of the geotextile tube is characterized in that the upper end of the geotextile tube is inclined cut shorter than the lower end, and the upper end of the geotextile tube is sewn to the lower end.

본 발명의 지오텍스타일 튜브는 겹이음에 따른 겹이음접합부가 형성되어 지면과 접하는 부분에 채움제가 채워졌을 때 곡면형상을 갖지 않게 되므로 지면과의 접지되는 부분에서의 틈새 발생이 없게 되는 것이다.In the geotextile tube of the present invention, since a layered joint according to the layering is formed so that the filler does not have a curved shape when the filling agent is filled in the portion in contact with the ground, there is no occurrence of a gap in the grounded portion with the ground.

또한, 지오텍스타일 튜브의 구조체몰탈에 경화제를 추가로 투입하여 조성함으로써 임시 또는 영구제방으로서의 시공이 가능한 것이다.In addition, it is possible to construct a temporary or permanent embankment by additionally adding a curing agent to the structure mortar of the geotextile tube.

또한, 겹이음접합부를 통해 지오텍스타일 튜브를 구축하게 되어 지오텍스타일 튜브간의 틈새 발생이 최소화되어 조류의 영향이 최소화되는 것이다.In addition, since the geotextile tube is constructed through the layered joint, the occurrence of a gap between the geotextile tubes is minimized to minimize the influence of the algae.

또한, 구조체를 이루는 지오텍스타일을 겹이음접합하여 구조체를 구축하게 되어 구조체간의 연결을 쉽게 이루게 되는 것이다.In addition, it is possible to easily connect the structures by constructing the structure by layering and joining the geotextile forming the structure.

도 1은 본 발명의 실시에 따른 공정순서도
도 2는 본 발명의 실시에 따른 공정예시도
도 3은 본 몰탈발명의 실시에 따른 지오텍스타일 튜브 구성도
도 4는 본 발명의 실시에 따른 지오텍스타일 튜브의 구축상태 예시도
1 is a process flow chart according to the practice of the present invention
2 is a process example according to the practice of the present invention
Figure 3 is a geotextile tube configuration according to the implementation of the present invention mortar
Figure 4 is an exemplary view of the construction state of the geotextile tube according to the practice of the present invention

이하, 첨부된 도면을 참조하여 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings will be described.

즉, 본 발명은 복수의 지오텍스타일 튜브로 이루어진 튜브구조체로 제방을 구축하는 제방시공방법이 이루어지는 것이다.
상기 제방시공방법의 튜브구조체는 지오텍스타일 튜브(10)를 맞물림 조적에 의하여 설치하는 튜브조적과정(110)과, 상기 튜브조적과정(110)을 통하여 조적된 지오텍스타일 튜브(10)에 구조체몰탈을 주입하는 몰탈주입과정(120), 몰탈주입과정(120)을 통하여 지오텍스타일튜브(10)에 채워진 구조체몰탈을 탈수하는 몰탈탈수과정(130), 몰탈탈수과정(130)을 통하여 수분제거된 채움재에 경화제를 주입하여 채움재를 경화시키는 튜브경화과정(140), 및 상기 지오텍스타일 튜브(10)의 후방을 메움작업하는 메움과정(150)으로 이루어지는 것이다.
That is, the present invention is made of a dike construction method for constructing a dike with a tube structure made of a plurality of geotextile tubes.
The tube structure of the embankment construction method is a tube mortar process 110 for installing the geotextile tube 10 by meshing masonry, and a structure mortar on the geotextile tube 10 assembled through the tube grafting process 110. In the mortar injecting process 120, the mortar dehydration process 130 for dewatering the structure mortar filled in the geotextile tube 10 through the mortar injecting process 120, and the moisture-removed filler material through the mortar dehydration process 130 It consists of a tube curing process 140 for curing the filling material by injecting a curing agent, and a filling process 150 for filling the back of the geotextile tube 10.

한편, 본 발명은 튜브구조체는 측방향으로 조적되는 복수의 지오텍스타일 튜브(10)를 겹침조적하며 내부에 경화된 채움재가 충진하여 구성한 것이다.On the other hand, in the present invention, the tube structure is constructed by overlapping and overlapping a plurality of geotextile tubes 10 which are laterally assembled and filling a cured filling material therein.

본 발명은 지오텍스타일 튜브(10)는 일측에 측방향으로 연속조적되는 지오텍스타일튜브(10)에 의하여 깔림 겹침되는 깔림겹침부(11)를 형성하고 다른 일측에 기 조적된 지오텍스타일 튜브(10)의 깔림겹침부(11)의 상부에 덮힘 겹침되는 덮힘겹침부(12)를 형성하며, 지오텍스타일 튜브(10)는 원주방향과 길이방향의 겹이음접합부(13)로 접합형성하고 상부에 등간격으로 충진투입구(14)를 형성한 것이다.In the present invention, the geotextile tube 10 forms a covering overlapping portion 11 overlapped by a geotextile tube 10 continuously laterally arranged on one side and a geotextile tube 10 constructed on the other side. Forming a covering overlapping portion 12 overlapping the covering on the upper portion of the covering overlapping portion 11, the geotextile tube 10 is formed in the circumferential and longitudinal direction of the overlapping joint portion 13 is bonded and equally spaced on the top It is to form the filling inlet (14).

또한, 상기 메움작업이 이루어지는 지오텍스타일 튜브(10)의 덮힘겹침부(12)가 형성된 하부에는 덮힘겹침부(12)의 처짐을 방지하는 삼각형상을 이루는 지지튜브(20)가 구비되는 것이다.In addition, a support tube 20 having a triangular shape to prevent sagging of the covering overlapping portion 12 is provided at a lower portion where the covering overlapping portion 12 of the geotextile tube 10 in which the filling operation is performed is formed.

또한, 상기 구조체몰탈은 준설토와 모래 및 하수슬러지 중 어느 하나로 조성하여 지오텍스타일 튜브(10)를 구축하는 것이다.In addition, the structure mortar is to construct the geotextile tube 10 by constructing one of dredged soil and sand and sewage sludge.

상기 구조체몰탈에 고화재와 시멘트모르탈 중 어느 하나 이상의 경화제를 추가로 조성한 것이다.The structure mortar is a composition of any one or more curing agents of a solidifying material and a cement mortar.

한편, 지오텍스타일 튜브(10)의 깔림겹침부(11)는 지오텍스타일 튜브(10)의 하단부를 상단부보다 짧게 경사 절단하고 지오텍스타일 튜브(10)의 상단부를 하단부에 재봉형성하여 형성하는 것이다.On the other hand, the overlapping portion 11 of the geotextile tube 10 is formed by cutting the lower end of the geotextile tube 10 shorter than the upper end and sewing the upper end of the geotextile tube 10 to the lower end.

상기 지오텍스타일 튜브(10)의 덮힘겹침부(12)는 지오텍스타일 튜브(10)의 상단부를 하단부보다 짧게 경사 절단하고 지오텍스타일 튜브(10)의 상단부를 하단부에 재봉형성하는 것이다.The overlapping portion 12 of the geotextile tube 10 is to cut the upper end of the geotextile tube 10 shorter than the lower end and to sew the upper end of the geotextile tube 10 to the lower end.

이하, 본 발명의 지오텍스타일 튜브(10)를 이용한 구조체 및 구조체 시공방법에 관해 설명한다.Hereinafter, a structure and a method of constructing the structure using the geotextile tube 10 of the present invention will be described.

본 발명은 지오텍스타일 튜브(10)를 맞물림 조적에 의하여 설치하는 튜브조적과정(110)과, 상기 튜브조적과정(110)을 통하여 조적된 지오텍스타일 튜브(10)에 구조체몰탈을 주입하는 몰탈주입과정(120), 몰탈주입과정(120)을 통하여 지오텍스타일튜브(10)에 채워진 구조체몰탈을 탈수하는 몰탈탈수과정(130), 몰탈탈수과정(130)을 통하여 수분제거된 채움재에 경화제를 주입하여 채움재를 경화시키는 튜브경화과정(140), 및 상기 지오텍스타일 튜브(10)의 후방을 메움작업하는 메움과정(150)으로 이루어져 지오텍스타일 튜브(10)의 시공성 향상을 갖게 되는 것이다.The present invention is a mortar injection process for injecting a structure mortar into the tube fabrication process (110) for installing the geotextile tube (10) by meshing masonry, and the geotextile tube (10) fabricated through the tube preparation process (110). (120), a mortar dehydration process (130) to dehydrate the structure mortar filled in the geotextile tube (10) through a mortar injection process (120), and a mortar dehydration process (130). It consists of a tube curing process 140 for curing, and a filling process 150 for filling the back of the geotextile tube 10 to improve the constructability of the geotextile tube 10.

한편, 지오텍스타일 튜브(10)로 이루어진 튜브구조체로 구성하되 상기 튜브구조체는 측방향으로 겹침조적되며 내부에 경화된 채움재가 충진된 지오텍스타일튜브(10)로 구성하여 실시하게 되면 인접하여 겹침조적되는 구조체 간의 긴밀한 밀착이 이루어질 수 있는 구조를 갖게 되는 것이다.On the other hand, it is composed of a tube structure made of a geotextile tube 10, the tube structure is overlapped in the lateral direction and consists of a geotextile tube 10 filled with a cured filling material inside to perform overlapping adjacent structures. It will have a structure that can be in close contact between the structures.

또한, 지오텍스타일 튜브(10)는 일측에 측방향으로 연속조적되는 지오텍스타일튜브(10)에 의하여 깔림 겹침되는 깔림겹침부(11)를 형성하고 다른 일측에 기 조적된 지오텍스타일 튜브(10)의 깔림겹침부(11)의 상부에 덮힘 겹침되는 덮힘겹침부(12)를 형성하며, 지오텍스타일 튜브(10)는 원주방향과 길이방향의 겹이음접합부(13)로 접합형성하고 상부에 등간격으로 충진투입구(14)를 형성하여 실시하게 되면 지오텍스타일튜브(10)의 일측에 형성된 깔림겹침부(11)의 상측으로 다른 지오텍스타일 튜브(10)의 일측 덮힘겹침부(12)가 덮이도록 구조체가 구축되어 구조체 간의 긴밀한 밀착에 따른 틈새 발생이 없게 되는 것이다.In addition, the geotextile tube 10 forms a covering overlapping portion 11 overlapped by a geotextile tube 10 continuously laterally fabricated on one side, and the geotextile tube 10 constructed on the other side. The covering overlapping portion 12 is formed on the upper portion of the covering overlapping portion 11 and overlapped, and the geotextile tube 10 is formed in a circumferential direction and a longitudinally overlapping joint portion 13 at equal intervals. When the filling inlet 14 is formed and carried out, the structure is formed so that the covering overlapping portion 12 of the other geotextile tube 10 is covered with the upper side of the covering overlapping portion 11 formed on one side of the geotextile tube 10. It is constructed so that there is no occurrence of a gap due to the close contact between the structures.

또한, 상기 메움작업이 이루어지는 지오텍스타일 튜브(10)의 덮힘겹침부(12)가 형성된 하부에는 덮힘겹침부(12)의 처짐을 방지하는 삼각형상을 이루는 지지튜브(20)로 구비하여 구조체를 구축한 시작부분에서 덮힘겹침부(12)에 의해 발생하는 빈 공간을 메울 수 있게 되는 것이다.In addition, at the bottom where the overlapping portion 12 of the geotextile tube 10 in which the filling operation is performed is provided with a support tube 20 having a triangular shape to prevent sagging of the overlapping portion 12, the structure is constructed. It is possible to fill in the empty space generated by the overlapping portion 12 at one beginning.

또한, 상기 구조체몰탈은 준설토와 모래 및 하수슬러지 중 어느 하나로 조성하여 지오텍스타일 튜브(10)의 구조물 구축시 구조체몰탈에 고화재와 시멘트모르탈 중 어느 하나 이상의 경화제를 추가로 투입 조성할 수 있는 것이다.In addition, the structure mortar may be composed of any one of dredged soil, sand, and sewage sludge, and when constructing the structure of the geotextile tube 10, one or more curing agents of solidifying material and cement mortar may be additionally added to the structure mortar. .

한편, 지오텍스타일 튜브(10)의 깔림겹침부(11)는 지오텍스타일 튜브(10)의 하단부를 상단부보다 짧게 경사 절단하고 지오텍스타일 튜브(10)의 상단부를 하단부에 재봉형성하여 하측이 바닥에 깔리게 되는 깔림겹침부를 형성할 수 있게 되는 것이다.On the other hand, the overlapping portion 11 of the geotextile tube 10 is inclined to cut the lower end of the geotextile tube 10 shorter than the upper end, and the upper end of the geotextile tube 10 is sewn to the lower end to be laid on the bottom. It is possible to form the overlapping portion.

상기 지오텍스타일 튜브(10)의 덮힘겹침부(12)는 지오텍스타일 튜브(10)의 상단부를 하단부보다 짧게 경사 절단하고 지오텍스타일 튜브(10)의 상단부를 하단부에 재봉형성하여 다른 지오텍스타일 튜브(10)에 형성된 깔림겹침부(11)의 상측으로 덮힘되는 덮힘겹침부(12)를 형성할 수 있게 되는 것이다.The covering overlapping portion 12 of the geotextile tube 10 is inclined cut shorter than the lower end of the geotextile tube 10 and sewn to the lower end of the geotextile tube 10 to form a different geotextile tube 10 It is to be able to form a covering overlapping portion 12 covered with the upper side of the covering overlapping portion 11 formed in ).

10 : 지오텍스타일 튜브
11 : 깔림겹침부
12 : 덮힘겹침부
13 : 겹이음접합부
14 : 충진투입구
110 : 튜브조적과정
120 : 몰탈주입과정
130 : 몰탈탈수과정
140 : 튜브경화과정
150 : 메움과정
10: Geotextile tube
11: Overlay part
12: overlapping cover
13: layered joint
14: filling entrance
110: tube preparation process
120: mortar injection process
130: mortar dehydration process
140: tube curing process
150: filling process

Claims (3)

복수의 지오텍스타일 튜브로 이루어진 튜브구조체로 제방을 구축하는 제방시공방법이 이루어지되;
상기 튜브구조체는 지오텍스타일 튜브(10)를 맞물림 조적에 의하여 설치하는 튜브조적과정(110)과, 상기 튜브조적과정(110)을 통하여 조적된 지오텍스타일 튜브(10)에 구조체몰탈을 주입하는 몰탈주입과정(120), 몰탈주입과정(120)을 통하여 지오텍스타일 튜브(10)에 채워진 구조체몰탈을 탈수하는 몰탈탈수과정(130), 몰탈탈수과정(130)을 통하여 수분제거된 채움재에 경화제를 주입하여 채움재를 경화시키는 튜브경화과정(140) 및 상기 지오텍스타일 튜브(10)의 후방을 메움작업하는 메움과정(150)으로 이루어지고;
상기 튜브구조체는 측방향으로 조적되는 복수의 지오텍스타일 튜브(10)가 겹침조적되며 내부에 경화된 채움재가 충진되어 구성하되,
지오텍스타일 튜브(10)는 일측에 측방향으로 연속조적되는 지오텍스타일튜브(10)에 의하여 깔림 겹침되는 깔림겹침부(11)를 형성하고 다른 일측에 기 조적된 지오텍스타일 튜브(10)의 깔림겹침부(11)의 상부에 덮힘 겹침되는 덮힘겹침부(12)를 형성하며, 지오텍스타일 튜브(10)는 원주방향과 길이방향의 겹이음접합부(13)로 접합형성하고 상부에 등간격으로 충진투입구(14)를 형성하며;
상기 메움작업이 이루어지는 지오텍스타일 튜브(10)의 덮힘겹침부(12)가 형성된 하부에는 덮힘겹침부(12)의 처짐을 방지하는 삼각형상을 이루는 지지튜브(20)가 구비되며;
지오텍스타일 튜브(10)의 깔림겹침부(11)는 지오텍스타일 튜브(10)의 하단부를 상단부보다 짧게 경사 절단하고 지오텍스타일 튜브(10)의 상단부를 하단부에 재봉형성하여 형성하고;
지오텍스타일 튜브(10)의 덮힘겹침부(12)는 지오텍스타일 튜브(10)의 상단부를 하단부보다 짧게 경사 절단하고 지오텍스타일 튜브(10)의 상단부를 하단부에 재봉형성한 것으로 이루어짐을 특징으로 하는 복수의 지오텍스타일 튜브로 이루어진 튜브구조제에 의한 제방시공방법.
The embankment construction method of constructing a dike with a tube structure made of a plurality of geotextile tubes is made;
The tube structure is a tube construction process 110 for installing the geotextile tube 10 by an interlocking masonry, and mortar injection to inject structure mortar into the geotextile tube 10 assembled through the tube masonry process 110. By injecting a curing agent into the water-repellent filler material through the mortar dehydration process 130 and the mortar dehydration process 130 to dehydrate the structure mortar filled in the geotextile tube 10 through the process 120 and the mortar injection process 120 It consists of a tube curing process 140 for curing the filling material and a filling process 150 for filling the back of the geotextile tube 10;
The tube structure is composed of a plurality of geotextile tubes 10 stacked in a lateral direction, overlapped and filled with a cured filling material therein,
The geotextile tube 10 forms a covering overlapping part 11 overlapped by a geotextile tube 10 continuously laterally arranged on one side, and the overlapping overlapping of the geotextile tube 10 constructed on the other side. A covering overlapping portion 12 is formed on the upper portion of the portion 11 and overlapped, and the geotextile tube 10 is formed to be joined by a layered joint portion 13 in a circumferential direction and a longitudinal direction, and is filled at regular intervals at the top. (14);
A support tube 20 having a triangular shape to prevent sagging of the covering overlapping portion 12 is provided at a lower portion where the covering overlapping portion 12 of the geotextile tube 10 in which the filling operation is performed is formed;
The overlapping portion 11 of the geotextile tube 10 is formed by slanting the lower end of the geotextile tube 10 shorter than the upper end and sewing the upper end of the geotextile tube 10 to the lower end;
The covering overlapping portion 12 of the geotextile tube 10 is made up of a plurality of features characterized in that the upper end of the geotextile tube 10 is inclined cut shorter than the lower end, and the upper end of the geotextile tube 10 is sewn to the lower end. Embankment construction method by a tube structure made of a geotextile tube.
제 1 항에 있어서;
상기 구조체몰탈은 준설토와 모래 및 하수슬러지 중 어느 하나로 조성하여 지오텍스타일 튜브(10)를 구축하여 이루어짐을 특징으로 하는 복수의 지오텍스타일 튜브로 이루어진 튜브구조제에 의한 제방시공방법.
According to claim 1;
The structure mortar is made of any one of dredged soil and sand and sewage sludge, a construction method of embankment by a tube structure consisting of a plurality of geotextile tubes, characterized in that the geotextile tube 10 is constructed.
제 1항에 있어서,
상기 구조체몰탈에 고화재와 시멘트모르탈 중 어느 하나 이상의 경화제를 추가로 조성하여 이루어짐을 특징으로 하는 복수의 지오텍스타일 튜브로 이루어진 튜브구조제에 의한 제방시공방법.
According to claim 1,
A method of embankment by a tube structure consisting of a plurality of geotextile tubes, characterized in that the structure mortar is formed by additionally forming at least one curing agent among a solidifying material and a cement mortar.
KR1020180031008A 2018-03-16 2018-03-16 Dike construction method using a tube structure consisting of a geotextile tube and a plurality of geotextile tubes KR102118785B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180031008A KR102118785B1 (en) 2018-03-16 2018-03-16 Dike construction method using a tube structure consisting of a geotextile tube and a plurality of geotextile tubes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180031008A KR102118785B1 (en) 2018-03-16 2018-03-16 Dike construction method using a tube structure consisting of a geotextile tube and a plurality of geotextile tubes

Publications (2)

Publication Number Publication Date
KR20190109080A KR20190109080A (en) 2019-09-25
KR102118785B1 true KR102118785B1 (en) 2020-06-04

Family

ID=68068406

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180031008A KR102118785B1 (en) 2018-03-16 2018-03-16 Dike construction method using a tube structure consisting of a geotextile tube and a plurality of geotextile tubes

Country Status (1)

Country Link
KR (1) KR102118785B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005139667A (en) * 2003-11-05 2005-06-02 Ashimori Ind Co Ltd Bag body for forming civil engineering structure, and civil engineering structure using it
JP3742240B2 (en) * 1999-02-08 2006-02-01 独立行政法人土木研究所 Connectable bag dehydration bag
JP2008080186A (en) * 2006-09-26 2008-04-10 Ashimori Ind Co Ltd Dewatering bag body
JP2012117366A (en) * 2012-02-09 2012-06-21 Nippon Kensetsu Gijutsu Kk Construction material and banking construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100902327B1 (en) 2009-01-13 2009-06-12 재현토건(주) Bank construction and reclamation method using the geotextile tube

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3742240B2 (en) * 1999-02-08 2006-02-01 独立行政法人土木研究所 Connectable bag dehydration bag
JP2005139667A (en) * 2003-11-05 2005-06-02 Ashimori Ind Co Ltd Bag body for forming civil engineering structure, and civil engineering structure using it
JP2008080186A (en) * 2006-09-26 2008-04-10 Ashimori Ind Co Ltd Dewatering bag body
JP2012117366A (en) * 2012-02-09 2012-06-21 Nippon Kensetsu Gijutsu Kk Construction material and banking construction method

Also Published As

Publication number Publication date
KR20190109080A (en) 2019-09-25

Similar Documents

Publication Publication Date Title
KR102022341B1 (en) Construruction method for underwater concrete block structure
CN102433876B (en) Multi-compartment casing composite pile and construction method thereof
KR101664368B1 (en) A cast-in place pile arrangement method for head of concrete pile exposed to outside using geo tube
KR20210119861A (en) Slurry wall, construction method for the same and wire mesh assembly
CN204080789U (en) The preparing structure of underground continuous wall width breach
KR101301915B1 (en) Method for reinforcing slope using gabion
KR101159755B1 (en) Finishing block and Retaining wall using the same
JP6186267B2 (en) How to build an underground tunnel
CN103233444A (en) Underwater riprap foundation bed and side slope erosion resisting structure and construction method thereof
KR102173079B1 (en) Composite phc pile for soil retaining wall
CN105756100A (en) Basement post-pouring belt system and making method thereof
JP2004108142A (en) Method for construction of a control type revetment
KR101924383B1 (en) A Environment-Friendly construction method of drainage channel on softground by Grouting and Mixing of Solidifying Agent
KR102118785B1 (en) Dike construction method using a tube structure consisting of a geotextile tube and a plurality of geotextile tubes
CN104153347A (en) Repair structure of underground diaphragm wall panel notch and construction method of repair structure
JP5407642B2 (en) Composite dike and its construction method
JP5099709B2 (en) Construction method of managed revetment
CN108316237B (en) Revetment retaining wall
KR101045932B1 (en) Composite steel sheet pile and this construction technique
JP5681988B2 (en) Breakwater reinforcement method and reinforced breakwater
JP2018044337A (en) Structure and method for reinforcing embankment
KR20090084571A (en) Method for execution a wall engineering works construction concrete block structure
JP6633894B2 (en) Construction method of revetment
KR101733560B1 (en) Wall block for assemblage
JPS5936058B2 (en) How to construct a structure using underground continuous walls

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right