KR102093070B1 - A seismic portal structures attached in-plane square framed type strengthened by level-gap plates and sleeve-cap anchors - Google Patents

A seismic portal structures attached in-plane square framed type strengthened by level-gap plates and sleeve-cap anchors Download PDF

Info

Publication number
KR102093070B1
KR102093070B1 KR1020190095210A KR20190095210A KR102093070B1 KR 102093070 B1 KR102093070 B1 KR 102093070B1 KR 1020190095210 A KR1020190095210 A KR 1020190095210A KR 20190095210 A KR20190095210 A KR 20190095210A KR 102093070 B1 KR102093070 B1 KR 102093070B1
Authority
KR
South Korea
Prior art keywords
anchor
vertical
vertical column
newly
reinforced
Prior art date
Application number
KR1020190095210A
Other languages
Korean (ko)
Inventor
한홍수
김영호
김요숙
Original Assignee
주식회사 에스엠피건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 에스엠피건설 filed Critical 주식회사 에스엠피건설
Priority to KR1020190095210A priority Critical patent/KR102093070B1/en
Application granted granted Critical
Publication of KR102093070B1 publication Critical patent/KR102093070B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/027Preventive constructional measures against earthquake damage in existing buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/024Structures with steel columns and beams

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

A seismic reinforcement method of an inner square door-type frame for integrating through shear connection using a level gap plate and a sleeve anchor cap can share load by allowing a new vertical column member of a square door-type frame used for new reinforcement to serve as a base plate in a seismic resistance behavior by vertically constructing the new column member even when the new column member is not in close contact with a conventional vertical column and has difficulty in installation thereof or a great distance (S) and a vertical spacing error (Δh) occurs therebetween, can suppress the occurrence of local ground pressure cracking around bored anchor holes upon boring for installation of anchors, allows the anchors inserted into the bored holes to serve as a rigid reinforcing body, allows the new column of the square door-type frame to have a box-shaped cross section filled with concrete for the purpose of increasing rigidity and strength, prevents the leakage of concrete poured into anchor insertion holes for anchor installation formed in the outer surface thereof, and allows the anchors to be coupled to the new column at anchor points.

Description

갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법{A seismic portal structures attached in-plane square framed type strengthened by level-gap plates and sleeve-cap anchors}A seismic portal structures attached in-plane square framed type strengthened by level-gap plates and sleeve-cap anchors}

본 발명은 기존 건축구조체에서 서로 이격된 기존 2개 수직기둥과 이를 연결하는 수평바닥보로 형성되는 건축구조체의 내측에 끼워 부착 설치되는 사각 문형 프레임 내진보강방법에 관한 것으로, 특히 신설 보강에 사용되는 사각 문형 프레임의 수직한 신설기둥부재가 기존 수직기둥에 잘 밀착되지 않아 설치 곤란하거나 이들 사이에 큰 이격거리(S)와 수직이격오차(△h)가 발생하더라도 신설기둥부재를 수직되게 시공하여 내진 저항거동시 베이스판 역할로 하중을 분담할 수 있고, 앵커체 설치를 위한 천공시 천공 앵커홀 주변의 국부 지압균열 발생을 억제함과 더불어 천공홀에 삽입된 앵커체가 보강강체 기능을 갖도록 하고, 사각문형 프레임의 신설기둥은 강성과 강도를 증대할 목적으로 콘크리트 충전되는 박스단면을 갖되 외측면에 형성된 앵커체 설치용 앵커삽입홀로 타설콘크리트의 누액을 방지하고 앵커체를 신설기둥에 고정점 결합이 되도록 한 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법에 관한 것이다.The present invention relates to a seismic reinforcement method for a square door frame that is installed and attached to the inside of a building structure formed of two existing vertical columns spaced apart from each other in an existing building structure and a horizontal floor beam connecting them, and is particularly used for new reinforcement. Even if a new vertical column member of a square door frame is difficult to install because it does not adhere well to an existing vertical column or a large separation distance (S) and vertical separation error (△ h) occur between them, the new column member is constructed vertically and seismic When the resistance is acting, the load can be shared by the role of the base plate, and when drilling for installation of the anchor body, the occurrence of local acupressure cracks around the perforated anchor hole is suppressed, and the anchor body inserted in the perforated hole has a reinforcement rigid function, The new pillar of the door frame has a box section filled with concrete for the purpose of increasing stiffness and strength, but has an anchor body formed on the outer surface. It relates to an inner square door in-frame seismic reinforcement method that integrates shear synthesis with a gap-level plate and a sleeve anchor cap to prevent leakage of pour concrete with an anchor hole for installation and to anchor the anchor body to a new pillar.

일반적으로 기존 건축물을 보강하도록 하기 위해서는 철근 콘크리트구조물(RC)에 철골 프레임을 설치하고 모르타르를 타설하여 철근 콘크리트 구조물과 철골 프레임을 일체화시킨다. 이같이 철골 프레임의 설치로 건축물의 내진성능을 향상시키고자 하는 기술들이 많이 제시되고 있지만, 지금까지 제시된 기술들은 아직까지는 시공이 복잡하고 만족할 만한 내진성능을 얻지 못하는 문제점이 있었다.In general, in order to reinforce an existing building, a steel frame is installed on a reinforced concrete structure (RC) and a mortar is poured to integrate the reinforced concrete structure and the steel frame. As described above, many techniques have been proposed to improve the seismic performance of a building through the installation of a steel frame. However, the techniques presented so far have a problem in that the construction is complicated and the satisfactory seismic performance cannot be obtained.

더욱이 기존 콘크리트 구조체에서 기둥측 개구부에 철골 프레임을 설치하기 위해 기설치된 시설물을 철거하게 되면, 기둥부에 수직이격오차가 크게 발생하게 된다. 종래에는 단순히 수직이격오차 부분의 틈새를 메우지 않고 앵커체를 설치하기 때문에 철골 프렘임의 설치시 일체성이 떨어져 내진성능을 높이는데 한계가 있다.Moreover, if the existing facilities are removed in order to install the steel frame in the column-side opening in the existing concrete structure, vertical separation error is largely generated in the column. Conventionally, since the anchor body is installed without simply filling the gap of the vertical separation error portion, there is a limitation in increasing the seismic performance due to the lack of integrity when installing the steel frame.

본 발명의 배경이 되는 기술로는 국내 등록특허 등록번호 제1150392호로서 "내진 보강용 철골 구조물의 접합구조 및 접합공법"(특허문헌 1)이 제안되어 있다. 상기 배경기술에서는 '내진 보강용 철골 구조물의 접합구조에 관한 것으로, 기둥 또는 보로 이루어지는 기존 구조체; 상기 기존 구조체의 벽면에 뚫린 복수의 구멍에 에폭시 수지에 의하여 각각 설치되는 철근; 상기 기존 구조체의 벽면에 도포되어 타설되는 모르타르와 벽면의 접착력을 강화시키는 콘크리트 접착제; 상기 기존 구조체의 벽면과 일정 간격을 두고 상기 철근이 관통하도록 용접에 의하여 설치되며 다수의 보강용 스터드 볼트를 구비하고 있는 H형강; 상기 기존 구조체의 벽면과 H형강 사이를 포함하여 H형강의 외부둘레를 감싸는 형태로 구비되는 메쉬 또는 철판; 상기 메쉬 또는 철판에 의하여 타설되는 모르타르;를 포함하는 것을 특징으로 하여 기존 콘크리트 구조물과 내진 보강용 철골 구조물 사이의 결속력을 강화시킴으로써 내진 보강의 효율성을 향상시킬 수 있도록 한 것이다.As a background technology of the present invention, as a domestic registration patent registration number 1150392, "joint structure and joining method of seismic reinforcing steel structure" (Patent Document 1) has been proposed. In the background art, the present invention relates to a joint structure of a steel structure for seismic reinforcement, and includes an existing structure composed of a pillar or a beam; Reinforcing bars respectively installed by epoxy resin in a plurality of holes drilled in the wall of the existing structure; A concrete adhesive applied to the wall surface of the existing structure to strengthen the adhesion between the mortar and the wall surface; An H-shaped steel installed by welding so that the reinforcing bar penetrates the wall surface of the existing structure and has a plurality of reinforcing stud bolts; A mesh or iron plate provided in a form surrounding the outer circumference of the H-beam, including between the wall surface of the existing structure and the H-beam; It characterized in that it comprises a; mortar poured by the mesh or iron plate to enhance the efficiency of seismic reinforcement by strengthening the binding force between the existing concrete structure and the steel structure for seismic reinforcement.

그러나 상기 배경기술은 다수의 스터드 볼트를 설치하여야 하였으며, 기존 구조체와 간접 결합방식으로 지진시 기존 구조체와 분리될 수 있어 내진보강 효과를 높이기 어렵고 기초부 보강이 어려운 등의 단점이 있다. 또한, 상기 배경기술에서는 기존 콘크리트 구조체의 개구부측 기둥부에 수직이격오차가 크게 발생하는 경우에 철골 프레임을 일체되게 설치할 수 기술적 대안이 제시되어 있지 않다.However, the above-mentioned background technology requires a number of stud bolts to be installed, and can be separated from the existing structure during an earthquake by an indirect coupling method with the existing structure, and thus has a disadvantage of enhancing the seismic reinforcement effect and difficult to reinforce the foundation. In addition, in the background art, no technical alternative is proposed to integrally install the steel frame when a vertical separation error is largely generated in the column side of the existing concrete structure.

국내 등록특허 등록번호 제1150392호Domestic registered patent registration number 1150392

본 발명은 신설 보강에 사용되는 사각 문형 프레임의 수직한 신설기둥부재가 기존 수직기둥에 잘 밀착되지 않아 설치 곤란하거나 이들 사이에 큰 이격거리(S)와 수직이격오차(△h)가 발생하더라도 신설기둥부재를 수직되게 시공하여 내진 저항거동시 베이스판 역할로 하중을 분담할 수 있고, 앵커체 설치를 위한 천공시 천공 앵커홀 주변의 국부 지압균열 발생을 억제함과 더불어 천공홀에 삽입된 앵커체가 보강강체 기능을 갖도록 하고, 사각문형 프레임의 신설기둥은 강성과 강도를 증대할 목적으로 콘크리트로 충전되는 박스단면을 갖되 외측면에 형성된 앵커체 설치용 앵커삽입홀로 타설콘크리트의 누액을 방지하고 앵커체를 신설기둥에 고정점 결합이 되도록 한 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법을 제공함에 그 목적이 있다.The present invention is established even if the vertical new column member of the square door frame used for the new reinforcement does not adhere well to the existing vertical column or is difficult to install or a large separation distance (S) and vertical separation error (Δh) occur between them. The pillar member can be installed vertically to distribute the load as a base plate during seismic resistance, and to suppress the occurrence of local acupressure cracks around the perforated anchor hole during drilling to install the anchor body, the anchor body inserted into the perforated hole The new pillar of the square door frame has a box section filled with concrete for the purpose of increasing stiffness and strength, but with an anchor insertion hole for the installation of the anchor body formed on the outer surface to prevent leakage of pouring concrete and prevent the anchor body Inner square door-shaped in-frame integrated with shear synthesis with a gap-level plate and sleeve anchor cap that are fixed to the new pillar The purpose is to provide a seismic reinforcement method.

본 발명의 적절한 실시 형태에 따르면, (a) 기존 건축구조체의 개구부에 접하여 있는 양쪽 기둥의 각 내면측 상,하 개소에 갭 레벨 플레이트를 보강접착제로 정착시켜 신설보강 수직기둥부재와 갭 레벨 플레이트간에 수직이격오차가 없는 나란한 수직기준면 형성시켜 놓는 단계와; (b) 신설보강 수직기둥부재를 수직기둥 내측 상,하 개소에 설치된 갭 레벨 플레이트에 접하도록 가설치하고, 대향하는 신설보강 수직기둥부재의 사이 상단과 하단에 각기 신설보강 바닥보부재를 위치시켜서 상호 연결하고, 신설보강 수직기둥부재의 앵커 삽입홀과 동일축상으로 수직기둥에 소정 간격마다 복수열의 앵커홀을 형성한 후, 주입제를 앵커홀에 주입하고 앵커 삽입홀을 통해 앵커체를 앵커홀에 삽입 설치하는 단계와; (c) 누설방지용 앵커체 강결머리핀를 신설보강 수직기둥부재에 삽입시킨 후 동일 선상에 위치한 앵커체에 나사체결 조임하여 신설보강 수직기둥부재를 기둥에 고정 설치하는 단계와; (d) 상기 기둥과 신설보강 수직기둥부재간의 배면 사이로 들떠있는 틈새를 메우기 위해 배면충전재를 충전하여 놓은 후, 상기 신설보강 수직기둥부재의 수직구간 내부로 타설콘크리트를 주입하는 단계;를 포함하여 시공되는 것을 특징으로 한다.According to a preferred embodiment of the present invention, (a) between the new reinforcement vertical column member and the gap level plate by fixing the gap level plate with a reinforcing adhesive in the upper and lower portions of each inner surface side of the two pillars in contact with the opening of the existing building structure. Forming a parallel vertical reference plane having no vertical separation error; (b) Temporarily install the new reinforced vertical column members to contact the gap level plates installed at the upper and lower locations inside the vertical columns, and place the new reinforced floor beam members at the top and bottom between the opposite new reinforced vertical column members. After mutually connecting and forming a plurality of rows of anchor holes at predetermined intervals in the vertical column on the same axis as the anchor insertion hole of the newly reinforced vertical column member, the injection agent is injected into the anchor hole and the anchor body is anchored through the anchor insertion hole. Inserting in and installing; (c) inserting a rigid hairpin for a leak-preventing anchor body into a new reinforced vertical column member and screwing and tightening the anchor body located on the same line to fix and install the new reinforced vertical column member on a pillar; (d) filling and filling the rear filling material to fill the gap between the pillars and the rear surface of the newly reinforced vertical column member, and then pouring a pour concrete into the vertical section of the newly reinforced vertical column member; It is characterized by being.

또한, 상기 (b) 단계에서, 레벨 플레이트측에는 슬리브 앵커캡을 갭레벨 플레이트측 앵커홀에 우선적으로 삽입 설치한 후 앵커체를 슬리브 앵커캡을 통해 앵커홀에 삽입 설치하는 것을 특징으로 한다.In addition, in the step (b), it is characterized in that the sleeve anchor cap is preferentially inserted into the gap level plate side anchor hole and then the anchor body is inserted into the anchor hole through the sleeve anchor cap on the level plate side.

또한, 상기 (b) 단계에서, 신설보강 수직기둥부재는 수직구간에 형성된 사각중공부와 길이방향으로 일정 간격마다 복열을 이루는 앵커 삽입홀 및 상부 일측면에 형성된 타설콘크리트 주입구를 갖는 수직기둥부와, 일정 길이의 H형 강재로 제작되어 수직기둥부의 상단에 수평 접합되어 있는 신설보강 바닥보부재 상부접합용 브라켓 및 수직기둥부의 하단에 수평 접합되어 있는 신설보강 바닥보부재 하부접합용 브라켓;을 포함하여 구성된 것을 특징으로 한다.In addition, in step (b), the newly reinforced vertical pillar member is formed with a rectangular hollow portion formed in a vertical section and an anchor insertion hole forming a double row at regular intervals in the longitudinal direction, and a vertical pillar portion having a pour concrete injection hole formed on an upper side. , Bracket for the upper joint of the newly reinforced floor reinforcement member made of H-type steel of a certain length and horizontally joined to the top of the vertical pillar, and the bracket for the lower joint of newly reinforced floor reinforcement member horizontally joined to the bottom of the vertical pillar It is characterized by consisting of.

또한, 상기 (b) 단계에서, 슬리브 앵커캡은 원통형으로 후단에 납작머리 걸림턱이 형성되어 있는 것을 특징으로 한다.In addition, in the step (b), the sleeve anchor cap is cylindrical and is characterized in that a flat head locking jaw is formed at the rear end.

또한, 상기 (b) 단계에서, 갭 레벨 플레이트가 설치되지 않은 구간에 존재하는 앵커홀에 추가적으로 슬리브 앵커캡이 더 설치된 것을 특징으로 한다.In addition, in step (b), it is characterized in that the sleeve anchor cap is further installed in the anchor hole existing in the section where the gap level plate is not installed.

또한, 상기 (c) 단계에서, 누설방지용 앵커체 강결머리핀은 내주면에 나사구멍이 형성되어 있는 앵커체결 암나사원통부와, 앵커체결 암나사원통부의 일단에 형성된 누설막음머리판, 누설막음머리판의 중앙에 형성된 6각의 체결조임용 공구결합홈이 구비되어 있는 것을 특징으로 한다.In addition, in the step (c), the anchor body rigid hairpin for preventing leakage is formed in the center of the anchor fastening female screw cylindrical portion having a screw hole formed on the inner circumferential surface, and a leak blocking head plate and a leak blocking head plate formed at one end of the anchor fastening female screw cylindrical portion. It is characterized in that a tool coupling groove for fastening of a hexagon is provided.

또한, 상기 (b) 단계에서, 신설보강 바닥보부재는 H형 강재로 제작되어지고, 개구부에 접하여 있는 보에 형성시킨 앵커홀에 신설보강 바닥보부재를 통해 앵커체를 삽입 설치한 후 너트로 체결하여 신설보강 바닥보부재가 설치되고, 상기 신설보강 바닥보부재와 신설보강 수직기둥부재간의 연결 부분마다 기존 건축구조체와의 사이에 앵커체에 고정되도록 추가적으로 갭 레벨 플레이트를 설치하고, 상기 신설보강 바닥보부재와 신설보강 수직기둥부재간의 연결은 각기 스플라이스 강판의 볼트 접합을 통해 이루어지는 것을 특징으로 한다.In addition, in step (b), the newly reinforced floor beam member is made of H-type steel, and after inserting and installing the anchor body through the newly reinforced floor beam member into the anchor hole formed in the beam facing the opening, the nut is used. A new level reinforcement floor reinforcement member is installed, and additionally, a gap level plate is additionally installed to be fixed to the anchor body between the existing structural structures for each connection portion between the new reinforcement floor reinforcement member and the new reinforcement vertical column member. The connection between the floor beam member and the newly reinforced vertical column member is characterized in that it is made through bolt bonding of each splice steel sheet.

또한, 상기 (b) 단계의 신설보강 바닥보부재는 신설보강 수직기둥부재에 연결 조립된 상태에서 설치되는 것을 특징으로 한다.In addition, the newly reinforced floor reinforcement member of step (b) is characterized in that it is installed in a state assembled and connected to the newly reinforced vertical pillar member.

본 발명의 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법에 따르면, 기존 건축구조체에 양쪽 수직기둥의 경사가 있거나 큰 수직이격오차(△h)를 극복하고자 신설보강 수직기둥부재를 설치하기 위해 수직기둥의 내측 상하 2개소에 갭레벨 플레이트를 설치한 후, 슬리브 앵커캡을 사용하여 결합함으로써 신설보강 수직기둥부재를 수직 오차 없는 설치시공과 함께 일체화 합성 구조체 형성이 가능하다.According to the gap level plate of the present invention and the inner square door in-frame seismic reinforcement method integrated with shear composite with a sleeve anchor cap, a new reinforcement is made to overcome a large vertical separation error (Δh) or an inclination of both vertical pillars in an existing building structure. In order to install the vertical column member, after installing the gap level plate at two places inside and below the vertical column, it is possible to form an integrated composite structure with the installation of the new reinforced vertical column member without vertical error by combining it using a sleeve anchor cap. Do.

또한, 갭레벨 플레이트측에 천공된 앵커홀에 슬리브 앵커캡을 설치하여 지진과 같은 큰 외부 힘이 작용하더라도 앵커홀 주변의 국부 지압 균열이 방지되고 천공홀이 강성 보강된 효과를 볼 수 있다. 따라서 기존 건축구조체와 신설보강 수직기둥부재간의 일체성 확보에 유리하게 된다.In addition, by installing a sleeve anchor cap on the anchor hole drilled on the side of the gap level plate, even if a large external force such as an earthquake acts, local acupressure cracking around the anchor hole can be prevented and the puncture hole can be reinforced rigidly. Therefore, it is advantageous to secure the integrity between the existing building structure and the newly reinforced vertical column member.

또한, 기존 건축구조체에 매립 시공된 앵커체의 끝단부에 누설방지용 앵커체 강결머리핀을 나사조임으로 체결하되 신설보강 수직기둥부재에 뚫려진 앵커 삽입홀로 인한 타설콘크리트의 누액을 방지하고자 누설방지용 앵커체 강결머리핀의 누설 막음판을 사용하여 용접결합함으로써 앵커 삽입홀의 밀폐가 이루어지고 이와 동시에 앵커체가 신설보강 수직기둥부재 측에 연속되게 고정점 결합이 이루어진다. 이로써 기존 건축구조체와 콘크리트가 충전된 신설보강 수직기둥부재가 일체화되어져 기존 건축구조체의 효과적인 내진 보강이 실현된다.In addition, an anchor body for leak prevention is used to prevent leakage of pour concrete due to the anchor insertion hole drilled in the newly reinforced vertical pillar member, while fastening the anchor body rigid hairpin for leak prevention to the end of the anchor body embedded in the existing building structure. The anchor insertion hole is sealed by welding by using a leak-proof plate of the rigid hairpin, and at the same time, the anchor body is continuously fixed to the newly reinforced vertical column member side. As a result, the new reinforced vertical column member filled with concrete and the existing building structure are integrated to realize effective seismic reinforcement of the existing building structure.

본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시 예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니 된다.
도 1a는 본 발명에 적용되는 갭 레벨 플레이트가 기둥부 내면 상,하 개소에 설치된 상태도.
도 1b는 본 발명에 적용되는 갭 레벨 플레이트의 설치상태를 입체적으로 나타낸 사시도.
도 2는 본 발명에 적용되는 갭 레벨 플레이트가 보강접착제를 통해 기둥부 내면 정착된 상태도.
도 3은 본 발명에 따라 신설보강 수직기둥부재를 통한 앵커홀의 천공 상태도.
도 4는 본 발명에 따라 갭 레벨 플레이트에 슬리브 앵커캡과 앵커체가 시공된 상태도.
도 5는 본 발명에 따라 갭 레벨 플레이트측 앵커체에 누설방지용 앵커체 강결머리핀이 체결된 상태도.
도 6은 도 5의 일부 확대도.
도 7은 본 발명에 적용되는 갭 레벨 플레이트, 슬리브 앵커캡 및 누설방지용 앵커체 강결머리핀의 분해사시도.
도 8은 본 발명에 따라 신설보강 수직기둥부재에 신설보강 바닥보부재가 연결된 상태도.
도 9는 본 발명에 따라 신설보강 수직기둥부재와 신설보강 바닥보부재로 이루어진 내부 인프레임의 설치상태도.
도 10은 본 발명에 따라 기존 구조체의 개구부에 갭 레벨 플레이트가 배치된 배치상태도.
도 11은 본 발명에 따라 신설보강 수직기둥부재와 신설보강 바닥보부재로 이루어진 내부 인프레임의 수평 및 수직적 배치상태도.
The following drawings attached in the present specification are intended to illustrate preferred embodiments of the present invention, and serve to further understand the technical idea of the present invention together with the detailed description of the present invention, so the present invention is only described in the accompanying drawings. It is not limited and should not be interpreted.
1A is a state diagram in which gap level plates applied to the present invention are installed at upper and lower portions of an inner surface of a pillar.
Figure 1b is a perspective view showing a three-dimensional installation state of the gap level plate applied to the present invention.
Figure 2 is a state in which the gap level plate applied to the present invention is settled on the inner surface of the pillar through the reinforcing adhesive.
Figure 3 is a perforated state diagram of the anchor hole through a newly reinforced vertical column member in accordance with the present invention.
Figure 4 is a state in which the sleeve anchor cap and the anchor body is installed on the gap level plate according to the present invention.
5 is a state diagram in which the anchor body rigid hairpin for preventing leakage is fastened to the gap level plate side anchor body according to the present invention.
6 is a partially enlarged view of FIG. 5.
7 is an exploded perspective view of a gap level plate, a sleeve anchor cap, and an anchor body rigid hairpin for preventing leakage applied to the present invention.
8 is a state diagram of a newly reinforced floor reinforcement member connected to a newly reinforced vertical column member according to the present invention.
9 is an installation state diagram of an inner in-frame consisting of a newly reinforced vertical pillar member and a newly reinforced floor reinforcement member according to the present invention.
10 is an arrangement state in which a gap level plate is disposed in an opening of an existing structure according to the present invention.
11 is a horizontal and vertical arrangement state diagram of an inner in-frame composed of a newly reinforced vertical pillar member and a newly reinforced floor reinforcement member according to the present invention.

아래에서 본 발명은 첨부된 도면에 제시된 실시 예를 참조하여 상세하게 설명이 되지만 제시된 실시 예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다.The present invention will be described in detail below with reference to the embodiments presented in the accompanying drawings, but the presented embodiments are illustrative for a clear understanding of the present invention and the invention is not limited thereto.

본 발명에 따른 기존 건축구조체(10)의 내진 구조는 도 1 및 도 2와 같이 개구부(101)에 접하여 있는 좌,우측 수직기둥(12,12)의 내면측에 신설보강 수직기둥부재(30와 30)가 설치되고, 신설보강 수직기둥부재(30와 30)의 사이로 상단과 하단에 신설보강 바닥보부재(40)를 연결 설치하여서 이루어진 것이다. 이때 신설보강 수직기둥부재(30)는 좌,우측 수직기둥(12,12)의 내면측에 도 3과 같이 상,하 개소에 설치된 갭레벨 플레이트(gap level plate)(20)에 의해 수직기준면을 얻게 되어 설치된다. 또한 도 10과 같이 갭레벨 플레이트(20)를 삽통하여 수직기둥(12)측에 형성된 앵커홀(121)에는 슬리브 앵커캡(sleeve anchor cap)(29)이 설치된 후 앵커체(25)가 설치되어져 앵커홀(121) 주변에 국부 지압균열 발생을 억제할 수 있고, 앵커홀(121)은 앵커체(25)와 일체가 되어 보강강체로서의 기능을 수행할 수 있다.The seismic structure of the existing building structure 10 according to the present invention is a new reinforced vertical column member 30 and 30 on the inner surface side of the left and right vertical columns 12 and 12 that are in contact with the opening 101 as shown in FIGS. 1 and 2. 30) is installed, and is made by connecting and installing a new reinforced floor reinforcement member 40 at the top and bottom between the newly reinforced vertical column members 30 and 30. At this time, the newly reinforced vertical column member 30 is a vertical reference surface by the gap level plate (gap level plate) 20 installed in the upper and lower locations as shown in Figure 3 on the inner surface side of the left and right vertical columns (12,12). Obtained and installed. In addition, as shown in FIG. 10, the anchor hole 25 is installed after the sleeve anchor cap 29 is installed in the anchor hole 121 formed on the side of the vertical column 12 by inserting the gap level plate 20. The occurrence of local acupressure cracks can be suppressed around the anchor hole 121, and the anchor hole 121 can be integrated with the anchor body 25 to function as a reinforcement body.

또한 앵커체(25)에 누설방지용 앵커체 강결머리핀(28)를 체결하여 신설보강 수직기둥부재(30) 까지 연속되게 형성 고정시킴으로써 효과적인 전단저항 뿐만 아니라 누설방지용 앵커체 강결머리핀(28)이 삽입되는 신설보강 수직기둥부재(30)측 홀이 폐쇄되어 타설콘크리트의 충전시 누액을 방지할 수 있다.In addition, the anchor body 25 is fastened to the new anchoring vertical column member 30 by fastening the anchor body rigid hairpin 28 to prevent leakage, and not only the effective shear resistance but also the anchor body rigid hairpin 28 to prevent leakage is inserted. The hole on the side of the newly reinforced vertical column member 30 is closed to prevent leakage during filling of the pouring concrete.

이러한 특징적 구조를 갖는 기존 2개 수직기둥과 수평바닥보로 구성된 사각틀 구조체에 대응되며 안쪽 내측으로 끼워 부착 설치되는 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법을 순차적으로 설명한다.Corresponds to the existing square structure composed of two vertical columns and horizontal floor beams with this characteristic structure, and the inner-level door-type in-frame seismic reinforcement method, which is integrated with shear by a gap level plate and a sleeve anchor cap, fitted and installed inward, sequentially As described.

갭 레벨 플레이트 설치Gap level plate installation

먼저, 도 1 및 도 2에서와 같이 기존 구조체(10)의 개구부(101)에 접하여 있는 양쪽 수직기둥(12)의 각 내면측 상,하 개소에 갭 레벨 플레이트(gap level plate)(20)를 보강접착제(22)로 부착시켜 갭 레벨 플레이트(20)와 후설치된 신설보강 수직기둥부재(30)간에 수직이격오차(△h)가 없는 수직기준면(X)을 형성시켜 놓는다.First, as shown in FIGS. 1 and 2, a gap level plate 20 is provided at upper and lower locations on each inner side of both vertical columns 12 that are in contact with the opening 101 of the existing structure 10. It is attached with a reinforcing adhesive 22 to form a vertical reference plane X without a vertical separation error (Δh) between the gap level plate 20 and the newly installed reinforced vertical column member 30.

따라서 도 1a와 같이 수직기둥(12) 내면에 최대 수직이격오차(△h)가 발생하더라도 갭 레벨 플레이트(20)는 신설보강 수직기둥부재(30)와 갭 레벨 플레이트(20)간에는 나란하게 되기 때문에 수직이격오차(△h)가 없는 수직기준면(X)을 가질 수 있다. 여기서 최대 수직이격오차(△h)는 50mm 이상으로 크게 발생할 수 있다.Therefore, even if a maximum vertical separation error (Δh) occurs on the inner surface of the vertical column 12 as shown in FIG. 1A, the gap level plate 20 is aligned between the newly reinforced vertical column member 30 and the gap level plate 20. It may have a vertical reference plane (X) without a vertical separation error (Δh). Here, the maximum vertical separation error (Δh) may be large, more than 50mm.

이같이 갭 레벨 플레이트(20)는 신설보강 수직기둥부재(30)의 설치시 수직이격오차(△h)를 맞추기 위해 설치된다. 또한 갭 레벨 플레이트(20)는 도 3에서 신설보강 수직기둥부재(30)를 통해 수직기둥(12)에 일정 깊이로 천공될 앵커홀(121)이 신설보강 수직기둥부재(30)의 수직면과 직각이 되도록 하는 역할을 한다. 보강접착제(22)는 에폭시 몰탈이 사용될 수 있다. 여기서 보강접착제(22)는 갭 레벨 플레이트(20)를 수직기둥(12)측에 정착시키는 역할과 함께 갭 레벨 플레이트(20)측에 형성될 앵커홀(121) 주변의 콘크리트 보강기능도 수행한다. 기둥측 갭 레벨 플레이트(20)는 강판으로 제작될 수 있다. 기둥측 갭 레벨 플레이트(20)는 후술할 앵커체(25)의 삽입을 위한 복수개의 갭 레벨 플레이트 홀(201)을 갖는다. 갭 레벨 플레이트 홀(201)은 원형도 가능하나 앵커홀의 설치 오차를 수용하기 위해 도시된 슬롯 형태가 바람직하다.As such, the gap level plate 20 is installed to meet the vertical separation error (Δh) when the newly reinforced vertical column member 30 is installed. In addition, in the gap level plate 20, the anchor hole 121 to be drilled at a certain depth to the vertical pillar 12 through the newly reinforced vertical pillar member 30 in FIG. 3 is perpendicular to the vertical surface of the newly reinforced vertical pillar member 30. It serves to make this. Epoxy mortar may be used as the reinforcing adhesive 22. Here, the reinforcing adhesive 22 performs a concrete reinforcing function around the anchor hole 121 to be formed on the gap level plate 20 side together with the role of fixing the gap level plate 20 on the vertical column 12 side. The column side gap level plate 20 may be made of a steel plate. The column side gap level plate 20 has a plurality of gap level plate holes 201 for insertion of the anchor body 25 to be described later. The gap level plate hole 201 may be circular, but the illustrated slot shape is preferable to accommodate the installation error of the anchor hole.

앵커체Anchor body 설치 install

그 다음, 도 3에서와 같이 신설보강 수직기둥부재(30)를 수직기둥(12)측 상,하 개소에 설치된 갭 레벨 플레이트(20)에 접하도록 한 후, 수직기둥(12)에 소정 간격마다 복수열의 앵커홀(121)을 형성시킨다. 이때 앵커홀(121)은 신설보강 수직기둥부재(30)의 수직구간에 형성된 앵커 삽입홀(301b)에 천공 드릴을 삽입하여 이루어진다.Then, as shown in FIG. 3, the newly reinforced vertical column member 30 is brought into contact with the gap level plate 20 installed at the upper and lower positions of the vertical column 12, and then, at a predetermined interval to the vertical column 12. A plurality of rows of anchor holes 121 are formed. At this time, the anchor hole 121 is made by inserting a drilling drill into the anchor insertion hole 301b formed in the vertical section of the newly reinforced vertical column member 30.

이후, 도 1b 및 도 4와 같이 앵커홀(121)에 주입제(24)를 주입하고 앵커체(25)를 삽입 설치한다. 앵커체(25)는 전구간으로 외주면에 나사산이 형성되어 있으나 선단부와 후단부에만 나사산이 형성될 수도 있다. 이때, 갭 레벨 플레이트(20)측에는 슬리브 앵커캡(sleeve anchor cap)(29)이 갭 레벨 플레이트(20)측 앵커홀(121)에 우선적으로 삽입 설치된 후 앵커체(25)를 슬리브 앵커캡(29)을 통해 앵커홀(121)에 삽입 설치한다. 도 7과 같이 슬리브 앵커캡(29)은 원통형으로 구성되거나 원통형의 후단에 납작머리 걸림턱(291)이 더 형성되어 있는 것이 될 수 있다. 이같이 슬리브 앵커캡(29)이 앵커홀(121)에 설치되어져 앵커홀(121)의 주변에 지진과 같은 외부 힘이 작용할 때 앵커홀(121) 주변의 국부 지압 균열이 방지되어 앵커홀(121)의 강성이 보강된다.Thereafter, as shown in FIGS. 1B and 4, the injection agent 24 is injected into the anchor hole 121 and the anchor body 25 is inserted and installed. The anchor body 25 is formed with a thread on the outer circumferential surface of the entire stem, but a thread may be formed only on the front end and the rear end. At this time, the sleeve anchor cap (sleeve anchor cap) (29) on the side of the gap level plate 20 is preferentially inserted and installed in the anchor hole 121 on the gap level plate 20, and then the anchor body 25 is inserted into the sleeve anchor cap (29). ) Through the anchor hole 121 is installed. As illustrated in FIG. 7, the sleeve anchor cap 29 may be formed in a cylindrical shape or a flat head engaging jaw 291 may be further formed at a rear end of the cylindrical shape. As such, the sleeve anchor cap 29 is installed in the anchor hole 121 to prevent local acupressure cracking around the anchor hole 121 when an external force such as an earthquake acts around the anchor hole 121 to prevent the anchor hole 121. The stiffness of is reinforced.

여기서, 갭 레벨 플레이트(20)가 설치되지 않은 구간에 존재하는 앵커홀(121)에 추가적으로 슬리브 앵커캡(29)이 더 설치될 수 있다.Here, the sleeve anchor cap 29 may be further installed in the anchor hole 121 existing in the section where the gap level plate 20 is not installed.

이같이 신설보강 수직기둥부재(30)의 수직도 확보를 위한 갭레벨 플레이트(20)와 이격거리(S) 내에서 배면충전재(26)와의 전단키 합성앵커요소인 슬리브 앵커캡(29)을 사용함으로서 정밀시공 설치 및 일체화 거동을 실현할 수 있다. 즉, 배면충전재(26)와의 전단키 합성앵커요소인 슬리브 앵커캡(29)을 사용함으로써 기존 구조체(10)와 내부 사각 문형 인프레임(100) 간의 발생하는 커다란 이격거리(S)에서 합성작용이 효과적으로 작동된다.As described above, by using the sleeve anchor cap 29 which is a composite anchor element of the shear key between the gap filling plate 20 and the back filler 26 within the separation distance S to secure the verticality of the newly reinforced vertical column member 30, Construction installation and integration behavior can be realized. That is, by using the sleeve anchor cap 29, which is a composite anchor element of the shear key with the back filler 26, the synthesis action is effectively performed at a large separation distance S occurring between the existing structure 10 and the inner square door-shaped in-frame 100. It works.

이 단계에서 도 8에서와 같이 대향하는 신설보강 수직기둥부재(30와 30)의 사이 상단과 하단에 각기 신설보강 바닥보부재(40)를 위치시켜서 상호 연결된다.In this step, as shown in FIG. 8, the newly reinforced floor reinforcement members 40 are positioned at upper and lower portions between the newly reinforced vertical pillar members 30 and 30 facing each other, and are interconnected.

즉, 수평바닥보(13)의 각기 내면에 H형 강재로 제작된 신설보강 바닥보부재(40)를 위치시켜 해당 앵커체(25)에 너트(27)로 나사 조임하여 신설보강 바닥보부재(40)를 고정 설치한다. 이때 신설보강 바닥보부재(40)와 신설보강 수직기둥부재(30)간의 연결은 각기 스플라이스 강판(50)과 볼트 접합을 통해 이루어질 수 있다. 이때 신설보강 수직기둥부재(30)와 신설보강 바닥보부재(40)간의 연결 부분마다 도 10과 같이 기존 구조체(10)와의 사이에 추가적으로 갭 레벨 플레이트(20)를 설치하여 시공될 수 있다.That is, by placing the newly reinforced floor reinforcement members 40 made of H-type steel on each inner surface of the horizontal bottom beam 13, screwing them with a nut 27 to the anchor body 25 to screw the newly reinforced bottom reinforcement member ( 40) is fixed. At this time, the connection between the newly reinforced floor reinforcement member 40 and the newly reinforced vertical pillar member 30 may be made through splice steel plate 50 and bolt bonding, respectively. At this time, for each connection portion between the newly reinforced vertical pillar member 30 and the newly reinforced floor reinforcement member 40, as shown in FIG. 10, an additional gap level plate 20 may be installed between the existing structures 10 to be constructed.

여기서 신설보강 바닥보부재(40)는 신설보강 수직기둥부재(30)에 연결 조립된 상태에서 설치 시공될 수도 있다.Here, the newly reinforced floor reinforcement member 40 may be installed and installed in a state where it is connected to the newly reinforced vertical pillar member 30.

신설보강 New reinforcement 수직기둥부재의Vertical columnar 설치 install

그 다음, 도 5에서와 같이 누설방지용 앵커체 강결머리핀(28)을 신설보강 수직기둥부재(30)의 앵커 삽입홀(301b)을 통해 삽입시켜 해당 앵커체(25)에 나사 결합시켜 조임한다. 따라서 신설보강 수직기둥부재(30)가 앵커체(25)와 누설방지용 앵커체 강결머리핀(28)의 나사 체결로 해당 수직기둥(12)측에 일체성 있게 고정 설치된다.Then, as shown in FIG. 5, the anchor body rigid hairpin 28 for preventing leakage is inserted through the anchor insertion hole 301b of the newly reinforced vertical column member 30 and screwed to the corresponding anchor body 25 to be tightened. Therefore, the newly reinforced vertical column member 30 is fixedly installed on the corresponding vertical column 12 side by screwing the anchor body 25 and the leak-free anchor body rigid hairpin 28.

여기서, 도 1a와 같이 신설보강 수직기둥부재(30)는 수직구간에 형성된 사각중공부(301a)와 길이방향으로 일정 간격마다 복열을 이루는 앵커 삽입홀(301b) 및 상부 일측면에 형성된 타설콘크리트 주입구(301c)를 갖는 수직기둥부(301)와, 일정 길이의 H형 강재로 제작되어 수직기둥부(301)의 상단에 수평 접합되어 있는 신설보강 바닥보부재 상부접합용 브라켓(302) 및 수직기둥부(301)의 하단에 수평 접합되어 있는 신설보강 바닥보부재 하부접합용 브라켓(303)으로 구성된다.Here, as shown in Figure 1a, the newly reinforced vertical column member 30 is a rectangular hollow portion 301a formed in a vertical section and an anchor insertion hole 301b forming a double row at regular intervals in the longitudinal direction, and a pour concrete injection hole formed on an upper side. A vertical pillar 301 having a (301c), a new reinforcement floor reinforcement member upper joint bracket 302 and a vertical pillar made of H-type steel of a certain length and horizontally joined to the top of the vertical pillar 301 It is composed of a bracket 303 for lower bonding of a newly reinforced floor reinforcement member that is horizontally joined to the lower end of the unit 301.

이때 도 9와 같이 신설보강 바닥보부재 상부접합용 브라켓(302)과 신설보강 바닥보부재 하부접합용 브라켓(303)은 수평바닥보(13)측에 추가적으로 설치된 앵커체(25)에 너트(27)가 체결되어 기존 구조체(10)에 일체화된다. 물론 앵커체(25)는 신설보강 바닥보부재 상부접합용 브라켓(302)과 신설보강 바닥보부재 하부접합용 브라켓(303)의 각기 플랜지를 통해 수평바닥보(13)에 천공이 이루어진 앵커홀에 각기 삽입되어져 주입제에 의해 고정 설치된다.At this time, as shown in FIG. 9, the bracket 302 for the upper joining of the newly reinforced floor reinforcement member and the bracket 303 for the lower joining of the newly reinforced floor reinforcement member are provided with nuts 27 on the anchor body 25 additionally installed on the horizontal floor 13 side. ) Is fastened and integrated into the existing structure 10. Of course, the anchor body 25 is provided in the anchor hole in the horizontal bottom beam 13 through the flanges of the brackets 302 for the upper joining of the newly reinforced floor reinforcement member and the bracket 303 for the lower joint of the newly reinforced floor reinforcement member. Each is inserted and fixed by injection.

도 6 및 도 7과 같이 누설방지용 앵커체 강결머리핀(28)은 내주면에 나사구멍(281a)이 형성되어 있는 앵커체결 암나사원통부(281)와, 앵커체결 암나사원통부(281)의 일단에 형성된 누설막음머리판(282), 누설막음머리판(282)의 중앙에 형성된 6각의 체결조임용 공구결합홈(283)이 구비되어 있다.6 and 7, the anchor body rigid hairpin 28 for preventing leakage is formed at one end of the anchoring female screw cylindrical portion 281 and the anchoring female screw cylindrical portion 281 having screw holes 281a formed on the inner circumferential surface. The leak stopper head 282 and the hexagonal stopper tool engagement groove 283 formed in the center of the stopper head 282 are provided.

따라서 체결조임용 공구결합홈(283)에 공구를 결합시켜 누설방지용 앵커체 강결머리핀(28)을 앵커체(25)에 나사 체결한 후, 누설막음머리판(282)의 전둘레 용접을 실시함으로써 앵커 삽입홀(301b)이 밀폐되어져 후 공정에서의 타설콘크리트의 주입시 앵커 삽입홀(301b)을 통한 누액을 효과적으로 방지할 수 있다.Therefore, after the tool is coupled to the tool coupling groove 283 for fastening and tightening, the anchor bolt 25 for preventing leakage is screwed onto the anchor body 25, and then the anchor is welded all around the leakproof head plate 282. Since the insertion hole 301b is sealed, it is possible to effectively prevent leakage through the anchor insertion hole 301b during pouring of pour concrete in a subsequent process.

또한 앵커체(25)는 신설보강 수직기둥부재(30)에 조립 용접된 누설방지용 앵커체 강결머리핀(28)을 매개로 고정점을 형성시켜 전단저항을 효과적으로 구현할 수 있다.In addition, the anchor body 25 can form a fixed point through the rigid anchor hairpin 28 for preventing leakage, which is assembled and welded to the newly reinforced vertical column member 30, thereby effectively implementing shear resistance.

배면충전재의Backfill 충전 및  Charging and 타설콘크리트Pour concrete 주입 Injection

그 다음, 도 5에서와 같이 수직기둥(12)과 신설보강 수직기둥부재(30)간의 배면 사이로 들떠있는 틈새를 메우기 위해 배면충전재(26)를 충전하여 놓는다. 배면충전제(26)는 에폭시몰탈이 될 수 있다.Then, as shown in FIG. 5, the back filler 26 is filled and placed to fill a floating gap between the rear faces between the vertical pillar 12 and the newly reinforced vertical pillar member 30. The back filler 26 may be an epoxy mortar.

이후, 신설보강 수직기둥부재(30)의 수직구간 내부로 타설콘크리트(39)가 주입된다. 이때 타설콘크리트(39)의 주입은 신설보강 수직기둥부재(30)의 수직기둥부(301)측에 형성된 타설콘크리트 주입구(301c)를 통해 이루어진다.Then, the pouring concrete 39 is injected into the vertical section of the newly reinforced vertical column member 30. At this time, the pouring of the pouring concrete 39 is made through the pouring concrete injection hole 301c formed on the vertical column 301 side of the newly reinforced vertical column member 30.

이같이 신설보강 수직기둥부재(30)의 수직기둥부(301)측에 타설콘크리트(39)가 주입되더라도 누설방지용 앵커체 강결머리핀(28)에 의해 앵커 삽입홀(301b)이 밀폐되어져 누액을 효과적으로 방지할 수 있다.As described above, even if pour concrete 39 is injected into the vertical column 301 side of the newly reinforced vertical column member 30, the anchor insertion hole 301b is sealed by the anchor body rigid hairpin 28 for preventing leakage to effectively prevent leakage. can do.

이같이 하여 기존 구조체(10)에 내부 사각 문형 인프레임(100)의 설치가 완료된다. 기존 구조체(10)에서 내부 사각 문형 인프레임(100)의 설치는 도 11과 같이 수직적 및 수평적 배치를 통해 연속적으로 시공될 수 있다.In this way, the installation of the inner square door-shaped inframe 100 to the existing structure 10 is completed. In the existing structure 10, the installation of the inner square door-shaped inframe 100 may be continuously constructed through vertical and horizontal arrangement as shown in FIG. 11.

이와 같이 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법에 따르면 다음과 같은 장점을 갖게 된다.As described above, according to the inner square door in-frame seismic reinforcement method, which is integrated with the shear level by the gap level plate and the sleeve anchor cap, it has the following advantages.

첫째, 기존 수직기둥(12)의 수직이격오차(△h), 수평바닥보(13)의 비평탄 등 문제로 인해 공장 제작하여 반입된 강재인 내부사각 문형 인프레임(100)을 기존 건축구조체의 안쪽으로 끼워서 일체로 결합 형성시킴에 있어서, 기존 건축구조체와 신설 내부사각 문형 인프레임(100)과의 이격거리(S) 오차가 50mm 이상으로 크게 빈번히 발생하더라도, 이러한 이격거리(S)에 배면충전재(26)로 에폭시 같은 신구접착제(몰탈계, 아크릴계) 또는 그라우팅제(에폭시, 무수축, 급결제)를 사용하여 기존 건축구조체와 신설 내부사각 문형 인프레임(100) 간의 수직기둥에선 합성 수직전단작용과 수평바닥보에선 합성 수평전단작용이 구현되어지고, 따라서 기존 건축구조체(10)와 신설 내부사각 문형 인프레임(100)이 일체화 합성거동으로 외적환경 지진하중이나 풍하중 등 수평력에 충분한 일체 저항 거동을 구현할 수 있다.First, due to problems such as vertical separation error (△ h) of the existing vertical column (12) and non-flatness of the horizontal floor beam (13), the internal square door in-frame (100), which was manufactured and brought into the factory, is placed inside the existing building structure. In the case of integrally forming the joint by inserting, even if the separation distance (S) error between the existing building structure and the new internal square door in-frame 100 occurs frequently more than 50 mm, the rear filling material (S) 26) Using a new and old adhesive such as epoxy (mortar-based, acrylic-based) or grouting agent (epoxy, non-shrinking, quick-setting agent), the synthetic vertical shearing action and Synthetic horizontal shearing action is implemented on the horizontal floor beam, so the existing building structure (10) and the newly built inner square door in-frame (100) are integrated synthetic behaviors, resulting in external forces such as seismic load or wind load. It may implement a sufficient integrally Resistance.

둘째, 기존 건축구조체(10)와 내부사각 문형 인프레임(100) 간의 발생하는 커다란 이격거리(S)에서 합성작용을 효과적으로 작동되도록 신설보강 수직기둥부재(30)의 수직도 확보를 위한 갭레벨 플레이트(20)와 이격거리(S) 내에서 배면충전재(26)와의 전단키 합성앵커요소인 슬리브 앵커캡(29)을 사용함으로서 정밀시공 설치 및 일체화 거동을 실현할 수 있다.Second, the gap level plate for securing the verticality of the newly reinforced vertical pillar member 30 to effectively operate the composite action at a large separation distance S occurring between the existing building structure 10 and the internal square door-shaped in-frame 100. By using the sleeve anchor cap 29 which is the composite anchor element of the shear key with the back filler 26 within the separation distance S from 20, it is possible to realize the precision construction installation and the integration behavior.

셋째, 기존 구조체(10)에 결합되는 앵커체(25)는 신설보강 수직기둥부재(30)의 내부에 설치됨과 동시에 신설보강 수직기둥부재(30)측에 조립된 누설방지용 앵커체 강결머리핀(28)의 일측 앵커체결 암나사원통부(281)에 체결된다. 이같이 기존 구조체(10)에서 신설보강 수직기둥부재(30)까지 연속되게 전단키 합성앵커와 같은 합성작용을 목적으로 결합된 앵커체(25)가 신설보강 수직기둥부재(30)측에 용접 결합된 누설방지용 앵커체 강결머리핀(28)에 연결되어 고정점을 형성시킴으로써 전단저항을 효과적으로 구현할 수 있다.Third, the anchor body 25 coupled to the existing structure 10 is installed inside the newly reinforced vertical pillar member 30 and at the same time, the anchor body rigid hairpin 28 for preventing leakage assembled on the side of the newly reinforced vertical pillar member 30 ) Is fastened to the anchor screw female threaded portion 281 of one side. As described above, the anchor body 25 coupled for the purpose of synthesizing action such as a shear key composite anchor continuously from the existing structure 10 to the new reinforced vertical pillar member 30 is welded and leaked to the new reinforced vertical pillar member 30 side. Shear resistance can be effectively implemented by forming a fixed point by being connected to the anchoring anchor hairpin 28 for prevention.

지금까지 본 발명은 제시된 실시 예를 참조하여 상세하게 설명이 되었지만 이 분야에서 통상의 지식을 가진 자는 제시된 실시 예를 참조하여 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명은 이와 같은 변형 및 수정 발명에 의하여 제한되지 않으며 다만 아래에 첨부된 청구범위에 의하여 제한된다. The present invention has been described in detail with reference to the presented embodiments, but those skilled in the art can make various modifications and modified inventions without departing from the technical spirit of the present invention with reference to the presented embodiments. will be. The present invention is not limited by such modified and modified inventions, but is limited by the appended claims.

20: 갭 레벨 플레이트
25: 앵커체
26: 배면충전재
29: 슬리브 앵커캡
30: 신설보강 수직기둥부재
40: 신설보강 바닥보부재
20: gap level plate
25: anchor body
26: back filler
29: sleeve anchor cap
30: New reinforcement vertical column member
40: New reinforcement floor reinforcement member

Claims (8)

(a) 기존 구조체(10)의 개구부(101)에 접하여 있는 양쪽 수직기둥(12)의 각 내면측 상,하 개소에 갭 레벨 플레이트(20)를 보강접착제(22)로 정착시켜 신설보강 수직기둥부재(30)와 갭 레벨 플레이트(20)간에 수직이격오차가 없는 나란한 수직기준면(X)을 형성시켜 놓는 단계와;
(b) 신설보강 수직기둥부재(30)를 수직기둥(12) 내측 상,하 개소에 설치된 갭 레벨 플레이트(20)에 접하도록 가설치하고, 대향하는 신설보강 수직기둥부재(30와 30)의 사이 상단과 하단에 각기 신설보강 바닥보부재(40)를 위치시켜서 상호 연결하고, 신설보강 수직기둥부재(30)의 앵커 삽입홀(301b)과 동일축상으로 수직기둥(12)에 소정 간격마다 복수열의 앵커홀(121)을 형성한 후, 주입제(24)를 앵커홀(121)에 주입하고 앵커 삽입홀(301b)을 통해 앵커체(25)를 앵커홀(121)에 삽입 설치하는 단계와;
(c) 누설방지용 앵커체 강결머리핀(28)을 신설보강 수직기둥부재(30)에 삽입시킨 후 동일 선상에 위치한 앵커체(25)에 나사체결 조임하여 신설보강 수직기둥부재(30)를 수직기둥(12)에 고정 설치하는 단계와;
(d) 상기 수직기둥(12)과 신설보강 수직기둥부재(30)간의 배면 사이로 들떠있는 틈새를 메우기 위해 배면충전재(26)를 충전하여 놓은 후, 상기 신설보강 수직기둥부재(30)의 수직구간 내부로 타설콘크리트(39)를 주입하는 단계;를 포함하고,
상기 (b)단계에서, 레벨 플레이트(20)측에는 슬리브 앵커캡(29)을 갭레벨 플레이트(20)측 앵커홀(121)에 우선적으로 삽입 설치한 후 앵커체(25)를 슬리브 앵커캡(29)을 통해 앵커홀(121)에 삽입 설치하는 것을 특징으로 하는 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법.
(a) Gap level plates 20 are fixed with reinforcement adhesive 22 at upper and lower sides of each inner side of both vertical pillars 12 in contact with the opening 101 of the existing structure 10 to establish a new reinforced vertical pillar. Forming a parallel vertical reference plane (X) with no vertical separation error between the member (30) and the gap level plate (20);
(b) The newly reinforced vertical column members 30 are temporarily installed to contact the gap level plates 20 installed at the upper and lower locations of the vertical columns 12, and the opposite of the newly reinforced vertical column members 30 and 30 Each of the newly reinforced floor reinforcement members 40 is positioned at the upper and lower ends to connect to each other, and the plurality of vertical reinforcement pillars 30 are arranged in the same axis as the anchor insertion hole 301b of the newly reinforced vertical pillar member 30 at predetermined intervals After forming the row of the anchor hole 121, the injection agent 24 is injected into the anchor hole 121 and the anchor body 25 is inserted into the anchor hole 121 through the anchor insertion hole 301b. ;
(c) After inserting the leak-proof anchor body rigid hairpin (28) into the new reinforced vertical column member (30), tighten the screw into the anchor body (25) located on the same line to tighten the new reinforced vertical column member (30) into a vertical column (12) fixed installation;
(d) After filling and filling the rear filling material 26 to fill the floating gap between the vertical column 12 and the new reinforced vertical column member 30, the vertical section of the newly reinforced vertical column member 30 Including; pouring the pouring concrete 39 into the interior;
In the step (b), the sleeve anchor cap 29 is preferentially inserted into the gap level plate 20 side anchor hole 121 on the level plate 20 side, and then the anchor body 25 is inserted into the sleeve anchor cap 29 ) An inner square door-type in-frame seismic reinforcement method integrated with shear through a gap level plate and a sleeve anchor cap, characterized in that it is inserted and installed in the anchor hole 121.
삭제delete 제 1항에 있어서,
상기 (b)단계에서,
신설보강 수직기둥부재(30)는 수직구간에 형성된 사각중공부(301a)와 길이방향으로 일정 간격마다 복열을 이루는 앵커 삽입홀(301b) 및 상부 일측면에 형성된 타설콘크리트 주입구(301c)를 갖는 수직기둥부(301)와, 일정 길이의 H형 강재로 제작되어 수직기둥부(301)의 상단에 수평 접합되어 있는 신설보강 바닥보부재 상부접합용 브라켓(302) 및 수직기둥부(301)의 하단에 수평 접합되어 있는 신설보강 바닥보부재 하부접합용 브라켓(303);을 포함하여 구성된 것을 특징으로 하는 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법.
According to claim 1,
In step (b),
The newly reinforced vertical column member 30 is vertical with a rectangular hollow portion 301a formed in a vertical section, an anchor insertion hole 301b forming a double row at regular intervals in the longitudinal direction, and a pour concrete injection hole 301c formed on one side of the upper side. Column 301, a new reinforced floor reinforcement member made of H-type steel of a certain length and horizontally joined to the top of the vertical column 301, the bracket 302 for upper joining and the lower end of the vertical column 301 Newly reinforced floor reinforcement member that is horizontally bonded to the bracket 303 for the lower joining; an inner square door-shaped in-frame seismic reinforcement method integrated with shear synthesis by a gap level plate and a sleeve anchor cap, which comprises a.
제 1항에 있어서,
상기 (b)단계에서,
슬리브 앵커캡(29)은 원통형으로 후단에 납작머리 걸림턱(291)이 형성되어 있는 것을 특징으로 하는 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법.
According to claim 1,
In step (b),
The sleeve anchor cap 29 is cylindrical and has an inner square door in-frame seismic reinforcement method integrated with shear by a gap level plate and a sleeve anchor cap, characterized in that a flat head locking jaw 291 is formed at the rear end.
제 1항에 있어서,
상기 (b)단계에서,
갭 레벨 플레이트(20)가 설치되지 않은 구간에 존재하는 앵커홀(121)에 추가적으로 슬리브 앵커캡(29)이 더 설치된 것을 특징으로 하는 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법.
According to claim 1,
In step (b),
An inner square door inflation integrated with shear synthesis with a gap level plate and a sleeve anchor cap, characterized in that a sleeve anchor cap 29 is further installed in an anchor hole 121 existing in a section where the gap level plate 20 is not installed. Im seismic reinforcement method.
제 1항에 있어서,
상기 (c)단계에서,
누설방지용 앵커체 강결머리핀(28)은 내주면에 나사구멍(281a)이 형성되어 있는 앵커체결 암나사원통부(281)와, 앵커체결 암나사원통부(281)의 일단에 형성된 누설막음머리판(282), 누설막음머리판(282)의 중앙에 형성된 6각의 체결조임용 공구결합홈(283)이 구비되어 있는 것을 특징으로 하는 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법.
According to claim 1,
In step (c),
The anchor body rigid hairpin 28 for leak prevention is an anchoring female screw cylindrical portion 281 having a screw hole 281a formed on its inner circumferential surface, and a leak blocking head plate 282 formed at one end of the anchoring female screw cylindrical portion 281, An inner square door frame in-frame seismic reinforcement method incorporating shear synthesis with a gap level plate and a sleeve anchor cap, characterized in that a hexagonal fastening tool coupling groove 283 formed in the center of the leakproof head plate 282 is provided. .
제 1항에 있어서,
상기 (b)단계에서,
신설보강 바닥보부재(40)는 H형 강재로 제작되어지고, 개구부(101)에 접하여 있는 수평바닥보(13)에 형성시킨 앵커홀에 신설보강 바닥보부재(40)를 통해 앵커체(25)를 삽입 설치한 후 너트(27)로 체결하여 신설보강 바닥보부재(40)가 설치되고,
상기 신설보강 바닥보부재(40)와 신설보강 수직기둥부재(30)간의 연결 부분마다 기존 구조체(10)와의 사이에 앵커체(25)에 고정되도록 추가적으로 갭 레벨 플레이트(20)를 설치하고, 상기 신설보강 바닥보부재(40)와 신설보강 수직기둥부재(30)간의 연결은 각기 스플라이스 강판(50)의 볼트 접합을 통해 이루어지는 것을 특징으로 하는 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법.
According to claim 1,
In step (b),
The newly reinforced floor reinforcement member 40 is made of H-type steel, and the anchor body 25 is formed through the newly reinforced bottom reinforcement member 40 in the anchor hole formed in the horizontal bottom beam 13 in contact with the opening 101. ) Is inserted and then fastened with a nut (27) to install the new reinforced floor beam member (40),
For each connection portion between the newly reinforced floor reinforcement member 40 and the newly reinforced vertical column member 30, an additional gap level plate 20 is installed to be fixed to the anchor body 25 between the existing structure 10, and The connection between the newly reinforced floor reinforcement member 40 and the newly reinforced vertical column member 30 is achieved through bolt bonding of the splice steel plate 50, respectively, and the shear composite is integrated into the gap level plate and sleeve anchor cap. Seismic reinforcement method for square door in-frame.
제 1항에 있어서,
상기 (b)단계의 신설보강 바닥보부재(40)는 신설보강 수직기둥부재(30)에 연결 조립된 상태에서 설치되는 것을 특징으로 하는 갭레벨 플레이트와 슬리브 앵커캡으로 전단합성 일체화시킨 내부사각 문형 인프레임 내진 보강 방법.
According to claim 1,
The step (b) of the newly reinforced floor reinforcement member 40 is a newly reinforced vertical column member 30 connected to the assembly by a gap level plate and a sleeve anchor cap, characterized by being installed in a shear composite integrated inner square door shape In-frame seismic reinforcement method.
KR1020190095210A 2019-08-05 2019-08-05 A seismic portal structures attached in-plane square framed type strengthened by level-gap plates and sleeve-cap anchors KR102093070B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190095210A KR102093070B1 (en) 2019-08-05 2019-08-05 A seismic portal structures attached in-plane square framed type strengthened by level-gap plates and sleeve-cap anchors

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190095210A KR102093070B1 (en) 2019-08-05 2019-08-05 A seismic portal structures attached in-plane square framed type strengthened by level-gap plates and sleeve-cap anchors

Publications (1)

Publication Number Publication Date
KR102093070B1 true KR102093070B1 (en) 2020-03-24

Family

ID=70004509

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190095210A KR102093070B1 (en) 2019-08-05 2019-08-05 A seismic portal structures attached in-plane square framed type strengthened by level-gap plates and sleeve-cap anchors

Country Status (1)

Country Link
KR (1) KR102093070B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086792A (en) * 2021-12-03 2022-02-25 广州容柏生建筑工程设计咨询有限公司 Reinforced structure and method for increasing section through point position connection
CN115306175A (en) * 2022-08-08 2022-11-08 山东新厦建设有限公司 New and old wall anti-cracking structure and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101150392B1 (en) 2011-11-24 2012-06-01 김정수 The joint structure and method of steel structure for earthquake-proof reinforcement
KR20150114139A (en) * 2014-03-31 2015-10-12 청원화학 주식회사 Socket shaped anchor
KR101670633B1 (en) * 2016-05-11 2016-10-28 (주)에스엠구조안전진단 Earthqake Exterior Composite Reinforcing Method
KR20180126412A (en) * 2018-11-07 2018-11-27 시에스엔지니어링(주) reinforcing device and reinforcing method for pillars of structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101150392B1 (en) 2011-11-24 2012-06-01 김정수 The joint structure and method of steel structure for earthquake-proof reinforcement
KR20150114139A (en) * 2014-03-31 2015-10-12 청원화학 주식회사 Socket shaped anchor
KR101670633B1 (en) * 2016-05-11 2016-10-28 (주)에스엠구조안전진단 Earthqake Exterior Composite Reinforcing Method
KR20180126412A (en) * 2018-11-07 2018-11-27 시에스엔지니어링(주) reinforcing device and reinforcing method for pillars of structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086792A (en) * 2021-12-03 2022-02-25 广州容柏生建筑工程设计咨询有限公司 Reinforced structure and method for increasing section through point position connection
CN115306175A (en) * 2022-08-08 2022-11-08 山东新厦建设有限公司 New and old wall anti-cracking structure and construction method thereof
CN115306175B (en) * 2022-08-08 2024-05-14 山东新厦建设有限公司 New and old wall cracking prevention structure and construction method thereof

Similar Documents

Publication Publication Date Title
KR102093071B1 (en) A seismic portal structures attached out-plane square framed type strengthened by level-gap plates and sleeve-cap anchors
KR102143566B1 (en) Seismic retrofit structure using fixing device for reinforcing panel zone and construction method thereof
KR101453407B1 (en) Non-welding type seismic reinforcing method for column using key hole type bolt jointed double C-type steels
KR102012883B1 (en) Aseismatic Reinforcement Steel Frame with Friction Slip Brace and Aseismatic Reinforcement Method using thereof
KR102093070B1 (en) A seismic portal structures attached in-plane square framed type strengthened by level-gap plates and sleeve-cap anchors
JP4693299B2 (en) Column base connection structure
KR101908356B1 (en) Aseismatic Reinforcement Double Steel Frame and Aseismatic Reinforcement Method using thereof
KR102092952B1 (en) A seismic pocket bracket structures of infilled square framed type strengthened by level-gap plates and sleeve-cap anchors
KR102004854B1 (en) Aseismatic Reinforcement Steel Frame with Anchor Plate and Aseismatic Reinforcement Method using thereof
JP2831909B2 (en) Connection structure of steel columns, piles and foundation beams
KR101671894B1 (en) Stud-Anchor Connection Method for Seismic Resistant with Precast Wall Panels in an Old Reinforced Concrete Beam Column Building
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
KR101951095B1 (en) Seismic Strengthening Method For School Building
JP3320708B1 (en) Joint structure of steel column beam and joint method of steel column beam
KR102595835B1 (en) Seismic retrofit system using foundation integrated PC panel
JP2004504521A (en) Joints and structures for joining steel pipe pile heads to concrete foundations
JP2001295496A (en) Structure and method of installing viscous seismic control wall onto existing src constructed beam
KR101814902B1 (en) Seismic Reinforcing Structure of Opening of Building And Reinforcing Method Using Segment Type Reinforcing Structure
JP3843896B2 (en) Structure and construction method of steel pipe column and steel pipe pile
JPH10331436A (en) Earthquake-resisting reinforcing structure for beam-column in existing structure
KR101772938B1 (en) Precast foundation structure buried support of road facility and method for constructing this same
JP2004011203A (en) Precast src-column joining section structure
JP4450706B2 (en) Pile-column connection structure and method
JP2015021229A (en) Seismic strengthening structure and seismic strengthening method for existing building
JP3851563B2 (en) Frame reinforcement structure and its construction method

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant