KR102088954B1 - Guide cap for measuring a shotcrete construction thickness - Google Patents

Guide cap for measuring a shotcrete construction thickness Download PDF

Info

Publication number
KR102088954B1
KR102088954B1 KR1020190044215A KR20190044215A KR102088954B1 KR 102088954 B1 KR102088954 B1 KR 102088954B1 KR 1020190044215 A KR1020190044215 A KR 1020190044215A KR 20190044215 A KR20190044215 A KR 20190044215A KR 102088954 B1 KR102088954 B1 KR 102088954B1
Authority
KR
South Korea
Prior art keywords
thickness
measuring
fixing member
guide cap
shotcrete
Prior art date
Application number
KR1020190044215A
Other languages
Korean (ko)
Inventor
조은경
Original Assignee
주식회사 파워머티리얼
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 파워머티리얼 filed Critical 주식회사 파워머티리얼
Priority to KR1020190044215A priority Critical patent/KR102088954B1/en
Application granted granted Critical
Publication of KR102088954B1 publication Critical patent/KR102088954B1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B5/00Measuring arrangements characterised by the use of mechanical techniques
    • G01B5/0002Arrangements for supporting, fixing or guiding the measuring instrument or the object to be measured
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0093Accessories
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B3/00Measuring instruments characterised by the use of mechanical techniques
    • G01B3/02Rulers with scales or marks for direct reading
    • G01B3/04Rulers with scales or marks for direct reading rigid
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B5/00Measuring arrangements characterised by the use of mechanical techniques
    • G01B5/18Measuring arrangements characterised by the use of mechanical techniques for measuring depth
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

One embodiment of the present invention relates to a guide cap for measuring the thickness of shotcrete construction. According to one embodiment of the present invention, provided is the guide cap for measuring the thickness of the shotcrete construction, which is coupled to a fixing member which is for making a steel bar inserted into a fixing hole formed in the foundation and a pressing member fastened through a through-hole adhere to the foundation. The guide cap of the present invention includes: a tight fastening unit which is tightly fastened on the fixing member; and a measurement bar which is formed to vertically protrude from one side of the tight fastening unit to measure the thickness of the shotcrete construction. The tight fastening unit includes: a fixing member insertion hole into which the fixing member is inserted; and a fastening piece which is located on a pressing member side with respect to the fixing member insertion hole, and for binding a head unit of the fixing member.

Description

숏크리트 시공 두께 측정용 가이드 캡{GUIDE CAP FOR MEASURING A SHOTCRETE CONSTRUCTION THICKNESS}Guide cap for measuring the thickness of shotcrete construction {GUIDE CAP FOR MEASURING A SHOTCRETE CONSTRUCTION THICKNESS}

본 발명은 숏크리트 시공 두께 측정용 가이드 캡에 관한 것으로서, 터널 및 지하공간 건설공사, 사면안정(법면보호), 구조물의 보수보강 공사에서의 공법에 적용되는 숏크리트에 있어서 설계된 숏크리트의 시공 두께 대비 시공된 숏크리트의 두께를 일치시키기 위하여 숏크리트 시공 두께를 측정하기 위한 가이드 캡에 관한 것이다.The present invention relates to a guide cap for measuring the thickness of shotcrete construction, constructed in comparison to the construction thickness of shotcrete designed in shotcrete applied to construction methods in tunnel and underground construction, slope stabilization (protection of faces), and repair and reinforcement of structures. It relates to a guide cap for measuring the thickness of shotcrete construction in order to match the thickness of shotcrete.

최근 들어, 사회기반 시설의 확충의 필요성 및 국토 이용의 효율성을 위하여 지상환경을 보존하고 국토의 효율적인 활용을 위하여 지하철, 도로, 국철 및 고속철도 공사 등에서 터널 및 지하공간의 건설공사가 증가하고 공사의 규모가 대형화되는 추세에 있다.In recent years, the construction of tunnels and underground spaces has increased and the scale of construction has increased in the subway, road, national railroad and high-speed rail construction, etc. Is in a trend of becoming large.

이와 같이, 대형화 되는 지하공사의 일환으로 터널시공, 댐공사 또는 지하구조물 공사에 주로 사용되는 공법을 나틈공법(NATM ; New Austrian Tunneling Method)이라 하는데, 이는 단순히 굴착, 지보공의 수단, 지보공의 설치 순서 등에 따른 공법을 의미하는 것이 아니다. 나틈공법은 현실에 맞게 판단하는 지반거동의 제 원칙에 따라 시공하는 것으로, 터널을 형성하는 주된 객체가 주변지반이고 지보공은 지반 본래의 강도를 유지하고 보강하는 수단으로 생각하는 개념이며, 강재지보, 락볼트와 숏크리트를 지보재로 사용하고 암반 굴착 직후 원지반의 지지능력을 최대로 활용하여 지반을 안정화시킴으로써 터널의 안정성을 유지시키는 것으로 굴착면을 안정화 하는 굴착면 안정화 공법이다.As such, as a part of large-scale underground construction, a construction method mainly used for tunnel construction, dam construction, or underground structure construction is referred to as a New Austrian Tunneling Method (NATM), which is simply excavation, means of supporting construction, and installation order of supporting construction. It does not mean the construction method according to the back. The division method is constructed according to the principles of ground behavior judged according to reality.The main object that forms a tunnel is the surrounding ground, and the supporting hole is a concept that maintains and reinforces the original strength of the ground. This is a stabilization method of excavation surface that stabilizes the excavation surface by using rock bolts and shotcrete as support materials, and stabilizing the ground by stabilizing the ground by maximizing the support capacity of the original ground immediately after rock excavation.

상기와 같은 굴착면 안정화 공법의 지보재로 사용되는 숏크리트(Shotcrete)는 암반 또는 지반을 보강하여 붕괴를 방지하기 위한 것으로서, 별도의 거푸집이 필요 없이 숏크리트 장비를 사용하여 굴착된 원지반에 공기압 및 펌프의 압력으로 분사 고착시키는 콘크리트이며, 지반의 이완을 방지하여 원지반의 강도를 유지하고 콘크리트 아치로서 하중을 분담시켜 굴착면을 평활하게 하여 응력집중을 방지하는 중요한 역할을 수행한다.Shotcrete used as a support material for the above-described excavation surface stabilization method is to prevent collapse by reinforcing the rock or the ground, and requires air pressure and pump pressure on the excavated ground using shotcrete equipment without the need for a separate formwork. It is a concrete that is spray-bonded and maintains the strength of the base by preventing relaxation of the ground, and plays an important role in preventing stress concentration by smoothing the excavation surface by sharing the load as a concrete arch.

이러한 숏크리트는 원지반의 지반거동 및 지반의 특성을 고려하여 두 가지 형태가 설계되는데, 이는 연약지반에 적용되어지는 섬유보강 숏크리트와 경암 지반에 적용되어지는 무보강 숏크리트이며, 이러한 지반의 지반거동을 고려하여 숏크리트의 지보 능력을 확보하기 위하여 두께가 상이하게 설계되어진다.Two types of shotcrete are designed in consideration of the ground behavior and the characteristics of the ground, which are fiber-reinforced shotcrete applied to soft ground and unreinforced shotcrete applied to hard rock ground, taking into account the ground behavior of these ground Therefore, the thickness is designed differently to secure the support ability of shotcrete.

그러나, 지반의 특성에 따라 설계되는 숏크리트 형태 적용은 설계서에 의해 적절히 적용되고 있으나, 숏크리트 시공에 있어 설계서에 적합하게 시공하기는 어려운 실정이며, 그로 인하여 숏크리트 시공시 설계보다 얇게 시공됨에 따라 지보 성능이 저하되거나, 설계보다 두껍게 시공되어 경제성을 악화시키는 문제점이 발생하게 된다.However, although the application of the shotcrete form designed according to the characteristics of the ground is appropriately applied by the design document, it is difficult to properly construct the design in the construction of the shotcrete, and as a result, the support performance is thinner than the design during the construction of the shotcrete. A problem that deteriorates or deteriorates the economic efficiency due to the construction is thicker than the design.

이와 같이 숏크리트 시공에 있어 발생되는 시공의 단점을 보완하기 위하여 본 발명의 숏크리트 시공 두께 측정용 가이드 캡을 개발하게 되었다.In order to compensate for the shortcomings of the construction that occurs in the construction of shotcrete, the guide cap for measuring the thickness of shotcrete construction of the present invention was developed.

한국등록특허 제10-1513011호(2015.04.13)Korean Registered Patent No. 10-1513011 (2015.04.13)

본 발명의 일 실시예에 따르면, 간단한 방식으로 고정할 수 있는 숏크리트 시공 두께 측정용 가이드 캡을 제공하고자 한다.According to an embodiment of the present invention, it is intended to provide a guide cap for measuring shotcrete construction thickness that can be fixed in a simple manner.

또한, 숏크리트의 지보능력을 형성하는데 최대한 적합하도록 시공할 수 있도록 보조하는 숏크리트 시공 두께 측정용 가이드 캡을 제공하고자 한다.In addition, the purpose of the present invention is to provide a guide cap for measuring the thickness of the shotcrete construction, which assists in the construction of the shotcrete so as to be suitable for forming as much as possible.

본 발명의 일 실시예에 따르면, 원지반에 형성된 고정공에 삽입되는 봉강과 관통홀을 통해 체결되는 가압부재를 원지반과 밀착시키기 위한 고정부재에 결합되는 숏크리트 시공 두께 측정용 가이드 캡에 있어서, 상기 고정부재 상에 밀착체결되는 밀착체결부; 및 상기 밀착체결부의 일측에 수직 돌출 형성되어 숏크리트 시공 두께를 측정가능한 측정용 바;를 포함하고, 상기 밀착체결부는, 상기 고정부재가 삽입되는 고정부재 삽입구; 상기 고정부재 삽입구에 대해서 상기 가압부재 측에 위치하며 상기 고정부재의 헤드부를 결속하기 위한 체결편;을 포함하는, 숏크리트 시공 두께 측정용 가이드 캡을 제공한다.According to an embodiment of the present invention, in the guide cap for measuring the thickness of shotcrete construction, which is coupled to a fixing member for adhering a pressing member fastened through a through-hole and a steel bar inserted into a fixing hole formed in the base plate, the fixing An adhesive fastening part that is tightly fastened on the member; And a measuring bar formed vertically protruding on one side of the contact fastening part and capable of measuring the thickness of shotcrete construction, wherein the contact fastening part includes a fastening member insertion port into which the fastening member is inserted; It provides a guide cap for measuring the thickness of the shotcrete construction, including; a fastening piece for binding the head portion of the fixing member located on the side of the pressing member with respect to the fixing member insertion hole.

상기 고정부재 삽입구의 내측면에는 복수의 돌기가 형성될 수 있다.A plurality of protrusions may be formed on the inner surface of the fixing member insertion hole.

상기 고정부재 삽입구는 원통 형상일 수 있다.The fixing member insertion hole may have a cylindrical shape.

상기 체결편의 개방단부는 상기 체결편의 내측으로 연장된 형상일 수 있다.The open end of the fastening piece may have a shape extending inwardly of the fastening piece.

상기 체결편의 내측면은 곡면일 수 있다.The inner surface of the fastening piece may be a curved surface.

상기 곡면은 구면의 일부일 수 있다.The curved surface may be part of a spherical surface.

상기 체결편의 상기 개방단부는 내측을 향해 수평방향으로 연장된 형상일 수 있다.The open end of the fastening piece may have a shape extending in a horizontal direction toward the inside.

상기 체결편은 일정한 두께로 형성될 수 있다.The fastening piece may be formed with a constant thickness.

상기 밀착체결부에 있어서 상기 고정부재가 삽입되는 측의 반대편에는 상기 봉강이 관통가능한 봉강관통구가 형성될 수 있다.On the opposite side of the side in which the fixing member is inserted in the contact fastening portion, a bar through-hole through which the bar can penetrate may be formed.

상기 봉강관통구의 내측면에는 복수의 돌기가 형성될 수 있다.A plurality of protrusions may be formed on the inner surface of the bar through-hole.

상기 측정용 바에는 숏크리트 시공 두께를 측정할 수 있는 눈금이 표시될 수 있다.A scale capable of measuring the thickness of shotcrete construction may be displayed on the measurement bar.

본 발명의 실시예들에 따르면, 간단한 방식으로 고정할 수 있는 숏크리트 시공 두께 측정용 가이드 캡이 제공된다. According to embodiments of the present invention, there is provided a guide cap for measuring shotcrete construction thickness that can be fixed in a simple manner.

또한, 숏크리트의 지보능력을 형성하는데 최대한 적합하도록 시공할 수 있도록 보조하는 숏크리트 시공 두께 측정용 가이드 캡이 제공된다.In addition, a guide cap for measuring the thickness of shotcrete is provided to assist in constructing the shotcrete so as to be suitable for forming as much as possible.

도 1은 본 발명의 일 실시예에 따른 숏크리트 시공 두께 측정용 가이드 캡을 나타내는 사시도
도 2는 본 발명의 일 실시예에 따른 숏크리트 시공 두께 측정용 가이드 캡이 설치된 상태를 나타내는 정면도
도 3은 도 2의 단면도
도 4는 본 발명의 일 실시예에 따른 숏크리트 시공 두께 측정용 가이드 캡의 단면도
도 5는 본 발명의 다른 실시예에 따른 숏크리트 시공 두께 측정용 가이드 캡이 설치된 상태를 나타내는 단면도
1 is a perspective view showing a guide cap for shotcrete construction thickness measurement according to an embodiment of the present invention
Figure 2 is a front view showing a state in which a guide cap for measuring the thickness of shotcrete construction according to an embodiment of the present invention is installed
Figure 3 is a cross-sectional view of Figure 2
Figure 4 is a cross-sectional view of a guide cap for shotcrete construction thickness measurement according to an embodiment of the present invention
5 is a cross-sectional view showing a state in which a guide cap for measuring the thickness of shotcrete construction according to another embodiment of the present invention is installed

이하, 도면을 참조하여 본 발명의 구체적인 실시형태를 설명하기로 한다. 이하의 상세한 설명은 본 명세서에서 기술된 방법, 장치 및/또는 시스템에 대한 포괄적인 이해를 돕기 위해 제공된다. 그러나 이는 예시에 불과하며 본 발명은 이에 제한되지 않는다.Hereinafter, specific embodiments of the present invention will be described with reference to the drawings. The following detailed description is provided to assist in a comprehensive understanding of the methods, devices, and / or systems described herein. However, this is only an example and the present invention is not limited thereto.

본 발명의 실시예들을 설명함에 있어서, 본 발명과 관련된 공지기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략하기로 한다. 그리고, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다. 상세한 설명에서 사용되는 용어는 단지 본 발명의 실시예들을 기술하기 위한 것이며, 결코 제한적이어서는 안 된다. 명확하게 달리 사용되지 않는 한, 단수 형태의 표현은 복수 형태의 의미를 포함한다. 본 설명에서, "포함" 또는 "구비"와 같은 표현은 어떤 특성들, 숫자들, 단계들, 동작들, 요소들, 이들의 일부 또는 조합을 가리키기 위한 것이며, 기술된 것 이외에 하나 또는 그 이상의 다른 특성, 숫자, 단계, 동작, 요소, 이들의 일부 또는 조합의 존재 또는 가능성을 배제하도록 해석되어서는 안 된다.In describing the embodiments of the present invention, when it is determined that a detailed description of known technology related to the present invention may unnecessarily obscure the subject matter of the present invention, the detailed description will be omitted. In addition, terms to be described later are terms defined in consideration of functions in the present invention, which may vary according to a user's or operator's intention or practice. Therefore, the definition should be made based on the contents throughout this specification. The terminology used in the detailed description is only for describing embodiments of the present invention and should not be limiting. Unless expressly used otherwise, a singular form includes a plural form. In this description, expressions such as “comprising” or “equipment” are intended to indicate certain characteristics, numbers, steps, actions, elements, parts or combinations thereof, and one or more other than described. It should not be interpreted to exclude the presence or possibility of other characteristics, numbers, steps, actions, elements, or parts or combinations thereof.

도 1은 본 발명의 일 실시예에 따른 숏크리트 시공 두께 측정용 가이드 캡(100)을 나타내는 사시도이고, 도 2는 본 발명의 일 실시예에 따른 숏크리트 시공 두께 측정용 가이드 캡(100)이 설치된 상태를 나타내는 정면도이며, 도 3은 도 2의 단면도이다.1 is a perspective view showing a guide cap 100 for measuring shotcrete construction thickness according to an embodiment of the present invention, and FIG. 2 is a state in which a guide cap 100 for measuring shotcrete construction thickness according to an embodiment of the present invention is installed 3 is a cross-sectional view of FIG. 2.

도 1 내지 도 3을 참조하면, 본 발명의 일 실시예에 따른 숏크리트 시공 두께 측정용 가이드 캡(100)은 밀착체결부(200) 및 밀착체결부의 일측에 수직 돌출 형성되는 측정용 바(300)를 포함할 수 있다. 숏크리트 시공 두께 측정용 가이드 캡(100)의 밀착체결부(200)는 후술할 고정부재 상에 밀착체결되는 부분일 수 있다. 1 to 3, the guide cap 100 for measuring the thickness of shotcrete construction according to an embodiment of the present invention is a contact bar 200 and a measurement bar 300 that is vertically projected on one side of the contact fastener It may include. The contact fastening part 200 of the guide cap 100 for measuring the thickness of shotcrete construction may be a part that is fastened on a fixing member to be described later.

숏크리트 시공을 위하여, 원지반(G)에 형성되는 고정공(H)에 봉강(500)이 삽입되고, 가압부재(600)에는 봉강(500)이 관통할 수 있는 관통홀(650)이 형성되어 이를 통해 봉강(500)과 가압부재(600)가 체결될 수 있다. 가압부재(600)는 탄성을 가지는 소재로 형성되고 곡면 형상을 가짐으로써, 수직으로 누르는 힘에 의해서 원지반(G) 측에 밀착될 수 있다. 가압부재(600)에 수직으로 누르는 힘을 가하기 위하여 봉강(500)의 나사선에 따라서 봉강(500)의 길이방향으로 이동가능한 고정부재(700)가 봉강(500)에 결합되어, 고정부재(700)를 통해 가압부재(600)를 원지반(G)측으로 밀착시킬 수 있다. 고정부재(700)는 내측에 나사선을 가지는 결합홀(미도시됨)을 가질 수 있다. 고정부재(700)의 결합홀이 봉강(500)을 관통하면서 고정부재(700)과 봉강(500) 간이 나사결합될 수 있다. For the construction of shotcrete, a steel bar 500 is inserted into a fixing hole H formed in the base plate G, and a through hole 650 through which the steel bar 500 can penetrate is formed in the pressing member 600. Through the bar 500 and the pressing member 600 can be fastened. The pressing member 600 is formed of a material having elasticity and has a curved surface shape, and thus can be in close contact with the base plate G side by a vertical pressing force. In order to apply a pressing force perpendicular to the pressing member 600, a fixing member 700 movable in the longitudinal direction of the steel bar 500 along a screw line of the steel bar 500 is coupled to the steel bar 500, and the fixing member 700 Through the pressing member 600 may be in close contact with the base (G) side. The fixing member 700 may have a coupling hole (not shown) having a screw thread therein. While the coupling hole of the fixing member 700 penetrates the steel bar 500, the fixing member 700 and the steel bar 500 may be screwed.

고정부재(700)는 바디(710)와 헤드부(720)로 형성될 수 있다. 고정부재(700)의 바디(710)는 스패너 등의 공구로 잡을 수 있도록 다각형상(예를 들어, 6각형)의 외면을 가질 수 있다. 고정부재(700)의 헤드부(720)는 바디(710)보다 외측으로 돌출 형성될 수 있다.The fixing member 700 may be formed of a body 710 and a head portion 720. The body 710 of the fixing member 700 may have a polygonal (eg, hexagonal) outer surface to be held by a tool such as a spanner. The head portion 720 of the fixing member 700 may be formed to protrude outside the body 710.

숏크리트 시공 두께 측정용 가이드 캡(100)의 밀착체결부(200)는 고정부재(700) 상에 체결되기 위하여, 고정부재(700)가 삽입되는 공간을 제공하는 고정부재 삽입구(210)를 포함할 수 있다. 또한, 고정부재 삽입구(210)에 대해서 가압부재(600) 측에 위치하며 고정부재(700)의 헤드부(750)를 결속하기 위한 체결편(220)이 밀착체결부(200)의 하측에 위치할 수 있다. 체결편(220)은 고정부재(700)의 헤드부(750)와 억지끼움되기 위한 구성일 수 있다.In order to be fastened on the fixing member 700, the fastening member 200 of the guide cap 100 for measuring the thickness of shotcrete construction thickness may include a fixing member insertion hole 210 that provides a space into which the fixing member 700 is inserted. Can. In addition, the fastening member 220 for fastening the head portion 750 of the fastening member 700 is located on the side of the pressing member 600 with respect to the fixing member insertion port 210, the lower side of the fastening member 200 can do. The fastening piece 220 may be configured to be fitted with the head portion 750 of the fixing member 700.

고정부재 삽입구(210)에는 고정부재(700)가 삽입되어 수용될 수 있는 공간을 제공하며 해당 공간은 원통 형상일 수 있다. 특히, 고정부재 삽입구(210)는 고정부재(700)의 바디(710)를 수용하는 공간을 제공하며, 고정부재(700) 상에 밀착체결부(200)가 안정되게 유지될 수 있도록 할 수 있다. The fixing member insertion port 210 provides a space in which the fixing member 700 is inserted and accommodated, and the space may be cylindrical. In particular, the fixing member insertion port 210 provides a space for accommodating the body 710 of the fixing member 700, and enables the fastening part 200 to be stably maintained on the fixing member 700. .

체결편(220)은 고정부재(700)의 헤드부(720)와 억지끼움되도록 하기 위하여 최하부인 개방단부(225)가 체결편(220)의 내측으로 연장되어 고정부재(700)의 헤드부(720)를 감싸는 형상이 되도록 할 수 있다. 이러한 체결편(220)을 통해서 숏크리트 시공 두께 측정용 가이드 캡(100)의 밀착체결부(200)가 고정부재(700) 상에 체결된 상태를 유지하면서 밀착체결부(200)가 고정부재(700)로부터 이탈되거나 밀착체결부(200)와 고정부재(700) 간의 체결 상태가 변경되는 것을 방지할 수 있다.In the fastening piece 220, the lower end of the open end 225 extends inwardly of the fastening piece 220 so that the head part 720 of the fastening member 700 is fitted with the head part 720 of the fastening member 700 ( 720). Through the fastening piece 220, while the close fastening part 200 of the guide cap 100 for measuring the thickness of shotcrete construction is maintained on the fastening member 700, the close fastening part 200 is fastened to the fastening member 700 It can be prevented from being separated from the or the fastening state between the fastening member 200 and the fixing member 700 is changed.

또한, 밀착체결부(200)의 상부, 즉 고정부재(700)가 삽입되는 측의 반대편에는 봉강(500)이 관통되는 봉강관통구(230)가 형성될 수 있다.In addition, a bar through-hole 230 through which the steel bar 500 penetrates may be formed on an upper portion of the close contact part 200, that is, on the opposite side of the side where the fixing member 700 is inserted.

그리고, 밀착체결부(200)의 일측에는 숏크리트 시공 두께를 측정하기 위한 측정용 바(300)가 형성될 수 있다. 측정용 바(300)는 원지반(G)의 지면에 대해서 수직인 방향으로 형성될 수 있으며, 그 외부에는 숏크리트 시공 두께를 측정할 수 있도록 눈금(350)이 형성될 수 있다.In addition, a measuring bar 300 for measuring the thickness of the shotcrete construction may be formed on one side of the contact fastening portion 200. The measurement bar 300 may be formed in a direction perpendicular to the ground of the base plate G, and a scale 350 may be formed outside to measure the thickness of the shotcrete construction.

도 4는 본 발명의 일 실시예에 따른 숏크리트 시공 두께 측정용 가이드 캡(100)의 단면도이다.4 is a cross-sectional view of a guide cap 100 for measuring shotcrete construction thickness according to an embodiment of the present invention.

도 4를 참조하면, 숏크리트 시공 두께 측정용 가이드 캡(100)의 체결편(220)의 내측면은 곡면 형상일 수 있다. 특히, 체결편(220)의 내측면을 이루는 곡면은 구면의 일부에 해당하는 형상일 수 있다. 그리고, 체결편(220)의 두께는 모든 부위에 대해서 일정한 두께로 형성될 수 있다.Referring to FIG. 4, the inner surface of the fastening piece 220 of the guide cap 100 for measuring shotcrete construction thickness may have a curved shape. In particular, the curved surface forming the inner surface of the fastening piece 220 may have a shape corresponding to a part of the spherical surface. In addition, the thickness of the fastening piece 220 may be formed with a constant thickness for all parts.

그리고, 고정부재 삽입구(210)의 내측면에는 복수의 돌기(215)가 형성될 수 있다. 복수의 돌기(215)는 고정부재 삽입구(210)로 들어온 고정부재(700), 특히 바디(710)에 대하여 밀착체결부(200)가 보다 견고하게 고정될 수 있도록 하기 위하여 고정부재 삽입구(210)와 고정부재(700)의 바디(710) 간이 견고하게 끼워지도록 할 수 있다.In addition, a plurality of protrusions 215 may be formed on the inner surface of the fixing member insertion hole 210. The plurality of protrusions 215 are provided with a fixing member insertion hole 210 in order to allow the contact fastening part 200 to be more firmly fixed to the fixing member 700, particularly the body 710, which has entered the fixing member insertion hole 210. Between the body 710 of the and the fixing member 700 can be firmly fitted.

또한, 봉강관통구(230)의 내측면에는 복수의 돌기(235)가 형성될 수 있다. 봉강관통구(230)의 내측면에 형성된 복수의 돌기(235)도 고정부재 삽입구(210)의 내측면에 형성된 복수의 돌기(215)와 유사한 기능을 할 수 있다. 즉, 복수의 돌기(235)는 봉강관통구(230) 내에 위치하는 봉강(500)에 대하여 밀착체결부(200)가 보다 견고하게 고정될 수 있도록 하기 위하여 봉강관통구(230)와 봉강(500) 간이 견고하게 끼워지도록 할 수 있다.In addition, a plurality of protrusions 235 may be formed on the inner surface of the bar steel through-hole 230. The plurality of protrusions 235 formed on the inner surface of the bar through-hole 230 may function similarly to the plurality of protrusions 215 formed on the inner surface of the fixing member insertion hole 210. That is, the plurality of protrusions 235 is in order to ensure that the fastening portion 200 is more firmly fixed to the steel bar 500 located in the steel bar through hole 230, and the steel bar through hole 230 and the steel bar 500 ) The liver can be firmly fitted.

도 5는 본 발명의 다른 실시예에 따른 숏크리트 시공 두께 측정용 가이드 캡(100')이 설치된 상태를 나타내는 단면도이다.5 is a cross-sectional view showing a state in which a guide cap 100 'for measuring shotcrete construction thickness according to another embodiment of the present invention is installed.

도 5를 참조하면, 본 실시예에 따른 숏크리트 시공 두께 측정용 가이드 캡(100')에서는 체결편(220')의 형상이 앞선 실시예와 다를 수 있다. 체결편(220')이 일정한 두께로 형성되는 것은 유사하지만 체결편(220')의 개방단부(225')가 체결편(220')의 내측을 향해 수평방향으로 연장된 형상일 수 있다. 이러한 형상으로도 체결편(220')이 고정부재(700)의 헤드부(720)를 감싸면서 고정부재(700)에서 밀착체결부(200')가 이탈되지 않도록 할 수 있다. Referring to FIG. 5, in the guide cap 100 'for measuring shotcrete construction thickness according to the present embodiment, the shape of the fastening piece 220' may be different from the previous embodiment. It is similar that the fastening piece 220 'is formed with a constant thickness, but the open end 225' of the fastening piece 220 'may have a shape extending in a horizontal direction toward the inside of the fastening piece 220'. Even in such a shape, the fastening piece 220 ′ may wrap the head portion 720 of the fixing member 700 and prevent the adhesive fastening portion 200 ′ from being detached from the fixing member 700.

이상에서 본 발명의 대표적인 실시예들을 상세하게 설명하였으나, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자는 상술한 실시예에 대하여 본 발명의 범주에서 벗어나지 않는 한도 내에서 다양한 변형이 가능함을 이해할 것이다. 그러므로 본 발명의 권리범위는 설명된 실시예에 국한되어 정해져서는 안 되며, 후술하는 특허청구범위뿐만 아니라 이 특허청구범위와 균등한 것들에 의해 정해져야 한다.Although the exemplary embodiments of the present invention have been described in detail above, those skilled in the art to which the present invention pertains will understand that various modifications are possible within the limits without departing from the scope of the present invention. . Therefore, the scope of rights of the present invention should not be limited to the described embodiments, and should be determined not only by the claims to be described later, but also by the claims and equivalents.

100: 숏크리트 시공 두께 측정용 가이드 캡
200: 밀착체결부
210: 고정부재 삽입구
215: 돌기
220: 체결편
225: 개방단부
230: 봉강관통구
235: 돌기
300: 측정용 바
350: 눈금
500: 봉강
600: 가압부재
650: 관통홀
700: 고정부재
710: 바디
720: 헤드부
100: shotcrete construction thickness measurement guide cap
200: close contact
210: fixing member insertion hole
215: projection
220: fastener
225: open end
230: Bonggang through
235: projection
300: measuring bar
350: graduation
500: Bonggang
600: pressing member
650: through hole
700: fixing member
710: body
720: head

Claims (11)

원지반에 형성된 고정공에 삽입되는 봉강과 관통홀을 통해 체결되는 가압부재를 원지반과 밀착시키기 위한 고정부재에 결합되는 숏크리트 시공 두께 측정용 가이드 캡에 있어서,
상기 고정부재 상에 밀착체결되는 밀착체결부; 및
상기 밀착체결부의 일측에 수직 돌출 형성되어 숏크리트 시공 두께를 측정가능한 측정용 바;를 포함하고,
상기 밀착체결부는,
상기 고정부재가 삽입되는 고정부재 삽입구;
상기 고정부재 삽입구에 대해서 상기 가압부재 측에 위치하며 상기 고정부재의 헤드부를 결속하기 위한 체결편;을 포함하는, 숏크리트 시공 두께 측정용 가이드 캡.
In the guide cap for measuring the thickness of shotcrete construction, which is coupled to a fixing member for adhering a pressing member that is fastened through a through hole and a steel bar inserted into a fixing hole formed in a base plate,
An adhesive fastening part that is tightly fastened on the fixing member; And
Includes; a measurement bar that is formed vertically protruding on one side of the contact fastening portion can measure the thickness of shotcrete construction;
The close contact portion,
A fixing member insertion hole into which the fixing member is inserted;
Containing; a fastening piece for binding the head portion of the fixing member and located on the side of the pressing member with respect to the fixing member insertion hole; including, a guide cap for measuring the thickness of shotcrete construction.
청구항 1에 있어서,
상기 고정부재 삽입구의 내측면에는 복수의 돌기가 형성되는, 숏크리트 시공 두께 측정용 가이드 캡.
The method according to claim 1,
A guide cap for measuring the thickness of shotcrete construction, in which a plurality of protrusions are formed on the inner surface of the fixing member insertion hole.
청구항 1에 있어서,
상기 고정부재 삽입구는 원통 형상인, 숏크리트 시공 두께 측정용 가이드 캡.
The method according to claim 1,
The fixing member insertion hole is a cylindrical shape, a guide cap for measuring the thickness of shotcrete construction.
청구항 1에 있어서,
상기 체결편의 개방단부는 상기 체결편의 내측으로 연장된 형상인, 숏크리트 시공 두께 측정용 가이드 캡.
The method according to claim 1,
The open end of the fastening piece has a shape extending to the inside of the fastening piece, a guide cap for measuring the thickness of shotcrete construction.
청구항 4에 있어서,
상기 체결편의 내측면은 곡면인, 숏크리트 시공 두께 측정용 가이드 캡.
The method according to claim 4,
The inner surface of the fastening piece is a curved surface, a guide cap for measuring the thickness of shotcrete construction.
청구항 5에 있어서,
상기 곡면은 구면의 일부인, 숏크리트 시공 두께 측정용 가이드 캡.
The method according to claim 5,
The curved surface is a part of a spherical surface, a guide cap for measuring shotcrete construction thickness.
청구항 4에 있어서,
상기 체결편의 상기 개방단부는 내측을 향해 수평방향으로 연장된 형상인, 숏크리트 시공 두께 측정용 가이드 캡.
The method according to claim 4,
The open end of the fastening piece is a shape that extends in the horizontal direction toward the inside, a guide cap for measuring the thickness of shotcrete construction.
청구항 1에 있어서,
상기 체결편은 일정한 두께로 형성되는, 숏크리트 시공 두께 측정용 가이드 캡.
The method according to claim 1,
The fastening piece is formed of a constant thickness, a guide cap for measuring the thickness of shotcrete construction.
청구항 1에 있어서,
상기 밀착체결부에 있어서 상기 고정부재가 삽입되는 측의 반대편에는 상기 봉강이 관통가능한 봉강관통구가 형성되는, 숏크리트 시공 두께 측정용 가이드 캡.
The method according to claim 1,
A guide cap for measuring the thickness of shotcrete construction, on the opposite side of the side where the fixing member is inserted in the close-up fastening portion, through which a bar through which the bar can penetrate is formed.
청구항 9에 있어서,
상기 봉강관통구의 내측면에는 복수의 돌기가 형성되는, 숏크리트 시공 두께 측정용 가이드 캡.
The method according to claim 9,
A guide cap for measuring the thickness of shotcrete construction, in which a plurality of protrusions are formed on the inner surface of the through-hole.
청구항 1에 있어서,
상기 측정용 바에는 숏크리트 시공 두께를 측정할 수 있는 눈금이 표시되는, 숏크리트 시공 두께 측정용 가이드 캡.
The method according to claim 1,
A guide for measuring the thickness of shotcrete is displayed on the bar for measurement, the guide cap for measuring the thickness of shotcrete.
KR1020190044215A 2019-04-16 2019-04-16 Guide cap for measuring a shotcrete construction thickness KR102088954B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190044215A KR102088954B1 (en) 2019-04-16 2019-04-16 Guide cap for measuring a shotcrete construction thickness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190044215A KR102088954B1 (en) 2019-04-16 2019-04-16 Guide cap for measuring a shotcrete construction thickness

Publications (1)

Publication Number Publication Date
KR102088954B1 true KR102088954B1 (en) 2020-03-13

Family

ID=69938449

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190044215A KR102088954B1 (en) 2019-04-16 2019-04-16 Guide cap for measuring a shotcrete construction thickness

Country Status (1)

Country Link
KR (1) KR102088954B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663786A (en) * 2020-07-03 2020-09-15 福建成森建设集团有限公司 Construction auxiliary tool for controlling thickness of concrete and using method thereof
KR102214141B1 (en) * 2020-08-27 2021-02-08 신현택 Hollow rockbolt
KR102253066B1 (en) * 2021-01-26 2021-05-14 신현택 fixing method of hollow rockrock for tunnel construction
KR102432838B1 (en) 2022-05-17 2022-08-19 (주)건설자재산업 Identification device for rock bolt

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101505548B1 (en) * 2015-02-03 2015-03-25 유정렬 rock bolt construction identification device
KR101513011B1 (en) 2014-12-23 2015-04-22 유예슬 Rock bolt construction identification device
KR20180016011A (en) * 2016-08-05 2018-02-14 정혁수 Rock bolt with inspection rod

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101513011B1 (en) 2014-12-23 2015-04-22 유예슬 Rock bolt construction identification device
KR101505548B1 (en) * 2015-02-03 2015-03-25 유정렬 rock bolt construction identification device
KR20180016011A (en) * 2016-08-05 2018-02-14 정혁수 Rock bolt with inspection rod

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663786A (en) * 2020-07-03 2020-09-15 福建成森建设集团有限公司 Construction auxiliary tool for controlling thickness of concrete and using method thereof
KR102214141B1 (en) * 2020-08-27 2021-02-08 신현택 Hollow rockbolt
KR102253066B1 (en) * 2021-01-26 2021-05-14 신현택 fixing method of hollow rockrock for tunnel construction
KR102432838B1 (en) 2022-05-17 2022-08-19 (주)건설자재산업 Identification device for rock bolt

Similar Documents

Publication Publication Date Title
KR102088954B1 (en) Guide cap for measuring a shotcrete construction thickness
KR100675985B1 (en) A bracing for reinforcing support
JP6746264B1 (en) Slope stabilization retaining wall and its construction method
KR101402267B1 (en) Close juxtaposition tunnel pillar reinforcement structure and its construction methods
KR101453303B1 (en) Retension for anchorage
JP2016011511A (en) Post-construction anchor and construction method thereof
KR20070020312A (en) The ground reinforcement apparatus and ground reinforcement method grouting type using steel pipe
CN210151728U (en) Tubular pile for foundation reinforcement
KR20140055673A (en) Shoring apparatus
CN202273691U (en) Resistance increasing pressure-resistant type roadway support
KR101665516B1 (en) Construction method of duel tunnel using composite capable of bidirectional tensioning, pressure casting and tiebolting, and its duel tunnel
KR20150101687A (en) A support of earth retaining wall and method for earth retaining wall using th same
KR101731535B1 (en) Pre-loading apparatus for pile and pre-loading method using the same
KR101407965B1 (en) Reinforced Upper Tunnel Using Pre-support Structure and its Construction Method
KR101202845B1 (en) Hybrid ground reinforcing method by earth anchor and soil nail
KR101473704B1 (en) Soilnail with spring
KR100696309B1 (en) Anchor-nail Device for Slope-reinforcement-construction
JP5377563B2 (en) Manhole reinforcement method
KR100997673B1 (en) Structure of pemanent anchor
JP6579902B2 (en) Tunnel reinforcement structure
KR101363483B1 (en) High performance composite anchor
US10378211B1 (en) Spacer device and method
KR102014471B1 (en) Tunnel construction method and tunnel supporting structure
KR100784491B1 (en) A fixing tools for rock bolt
KR102178057B1 (en) Rock bolt end-cap apparatus for resin construction of tunnel

Legal Events

Date Code Title Description
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant