KR101513011B1 - Rock bolt construction identification device - Google Patents

Rock bolt construction identification device Download PDF

Info

Publication number
KR101513011B1
KR101513011B1 KR1020140187218A KR20140187218A KR101513011B1 KR 101513011 B1 KR101513011 B1 KR 101513011B1 KR 1020140187218 A KR1020140187218 A KR 1020140187218A KR 20140187218 A KR20140187218 A KR 20140187218A KR 101513011 B1 KR101513011 B1 KR 101513011B1
Authority
KR
South Korea
Prior art keywords
bolt
shock layer
layer
support plate
bolt shaft
Prior art date
Application number
KR1020140187218A
Other languages
Korean (ko)
Inventor
유예슬
Original Assignee
유예슬
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=53053463&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR101513011(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 유예슬 filed Critical 유예슬
Priority to KR1020140187218A priority Critical patent/KR101513011B1/en
Application granted granted Critical
Publication of KR101513011B1 publication Critical patent/KR101513011B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V15/00Tags attached to, or associated with, an object, in order to enable detection of the object

Abstract

The present invention relates to a telescopic measuring stick to check a new type of rock bolts which allows effective inspection on whether the rock bolts have been installed in the intended numbers. The present invention of the measuring stick for rock bolts comprises: a fixed part (21) fastened to the rock bolt (10), and the main measuring stick part (20) composed of the extended part (22) which protrudes toward the inside of a shock-crete finishing layer (4) on the fixed part (21). Once the rock bolt (10) is installed in a method of the main measuring stick part (20) is firmly fixated on the rock bolt (10) and the shock-crete finishing layer (4) covers the inside of the shock-crete base layer (2), the extended part (22b) will protrude from the inside such that one can clearly see the part (22b) even after the shock-crete finishing layer (4) has been formed. By allowing the workmen see that the rock bolts have been installed, it can prevent the rock bolts from being installed in fewer numbers rather than a construction design from occurring.

Description

락볼트 시공확인용 검측봉{Rock bolt construction identification device}Rock bolt construction identification device

본 발명은 락볼트의 시공여부를 효과적으로 확인할 수 있도록 된 새로운 구조의 락볼트 시공확인용 검측봉에 관한 것이다.
BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a detection rod for confirming the construction of a rock bolt with a new structure that can effectively confirm whether a rock bolt is installed or not.

일반적으로, 도 1에 도시한 바와 같이, 터널공사를 할 때는 발파를 통해 터널을 일정한 거리만큼 굴착한 후, 쇼크리트층과 락볼트(10)를 이용하여 굴착된 터널의 내부를 보강하고, 다시 발파를 통해 터널의 길이를 연장하고, 쇼크리트층과 락볼트(10)를 이용하여 연장된 터널의 내부를 다시 보강하는 작업을 반복하여, 최종적으로 양단이 개방된 터널을 시공하는 방법이 주로 이용되고 있다.Generally, as shown in FIG. 1, when tunnels are constructed, the tunnels are excavated by a certain distance through blasting, and then the interior of the excavated tunnel is reinforced by using the shock layer and the rock bolts 10, A method of extending the length of the tunnel through blasting and repeating the operation of reinforcing the inside of the tunnel extended by using the shock layer and the rock bolt 10 and finally constructing a tunnel having both ends open is mainly used .

이때, 상기 락볼트(10)는 도 2에 도시한 바와 같이, 상기 터널의 둘레면을 관통하여 터널 주변의 지반(1)에 고정되는 볼트축(11)과, 상기 볼트축(11)의 단부에 결합되는 지지판(12) 및 너트부재(13)로 구성된다.2, the rock bolt 10 includes a bolt shaft 11 fixed to the ground 1 around the tunnel through a circumferential surface of the tunnel, And a nut member (13).

도 3 내지 도 7은 이와 같이 구성된 락볼트(10)를 이용하여 터널을 시공하는 방법을 도시한 것으로, 발파를 통해 일정한 거리만큼 터널을 굴착한 후, 도 3에 도시한 바와 같이, 터널이 굴착된 지반(1)의 내측면에 기초쇼크리트층(2)을 타설한다.3 to 7 illustrate a method of constructing a tunnel using the rock bolt 10 constructed as described above. After tunneling by a certain distance through blasting, the tunnel is excavated as shown in FIG. 3, The foundation rock layer 2 is laid on the inner surface of the ground 1.

그리고, 도 4에 도시한 바와 같이, 상기 기초쇼크리트층(2)의 내측면으로부터 주변의 지반(1)까지 연장된 고정공(3)을 형성하고, 상기 고정공(3)에 상기 볼트축(11)을 삽입하여 그라우팅한 후, 상기 볼트축(11)의 내측단에 상기 지지판(12)과 너트부재(13)를 결합하여 조이고, 도 5에 도시한 바와 같이, 상기 기초쇼크리트층(2)의 내측면에 상기 볼트축(11)의 단부가 매립될 정도의 두께로 마감쇼크리트층(4)을 타설하여 락볼트(10)의 시공을 완료할 수 있다.4, a fixing hole 3 extending from the inner side surface of the basic shock layer 2 to the surrounding ground 1 is formed, and the fixing hole 3 is formed with the bolt shaft 3, The support plate 12 and the nut member 13 are joined to each other at the inner end of the bolt shaft 11 to be tightened and inserted into the base shock layer 2, it is possible to complete the construction of the locking bolt 10 by inserting the finishing shock layer 4 with a thickness sufficient to embed the end portion of the bolt shaft 11.

그리고, 상기 마감쇼크리트층(4)의 시공이 완료되면, 다시 발파를 통해 일정거리만큼 터널을 굴착하고, 새롭게 굴착된 터널의 지반(1) 내측면을 전술한 방법으로 다시 보강하는 과정을 반복하여 터널이 점차 길어지도록 하며, 터널의 양단이 완전히 개방되면, 도 6 및 도 7에 도시한 바와 같이, 상기 마감쇼크리트층(4)의 내측을 마감처리하여, 터널시공을 완료한다.When the construction of the finishing shock layer 4 is completed, the tunnel is again excavated by a certain distance through blasting, and the inside surface of the ground 1 of the newly excavated tunnel is reinforced again by the above- The tunnel is gradually elongated. When both ends of the tunnel are completely opened, as shown in Figs. 6 and 7, the inside of the finishing shock layer 4 is finished and the tunnel construction is completed.

한편, 이와 같이 터널을 시공하기 위해서는 터널의 내부에 설계시 정해진 만큼의 락볼트(10)가 정확히 설치되어야 한다.In order to construct the tunnel as described above, it is necessary that the rock bolts (10) as many as determined at the time of design are installed in the tunnel.

그런데, 상기 락볼트(10)는 터널의 내부에 매우 많은 수가 설치될 뿐 아니라, 락볼트(10)를 설치하는데 시간이 많이 소요됨으로, 작업시간과 비용을 줄이기 위해 이러한 락볼트(10)를 설계된 것 보다 적은 수만 시공하는 경우가 많이 발생되고 있다.However, since the lock bolt 10 is installed in a very large number in the tunnel and it takes a long time to install the lock bolt 10, The number of cases of construction is less than the number of cases.

특히, 이러한 락볼트(10)를 시공한 후에는 상기 기초쇼크리트층(2)의 내측면에 마감쇼크리트층(4)이 타설되어 락볼트(10)가 가려지게 됨으로, 락볼트(10)의 시공후 락볼트(10)가 정확한 개수만큼 시공하였는지를 확인하는 것이 매우 어려운 문제점이 있었다.Particularly, after the rock bolt 10 is installed, the rock bolt 10 is obscured by placing the finish shock layer 4 on the inner side of the base shock layer 2, There is a problem in that it is very difficult to confirm whether the lock bolts 10 have been installed the correct number of times.

따라서, 이러한 문제점을 해결할 수 있는 새로운 방법이 필요하게 되었다.Therefore, there is a need for a new method to solve such a problem.

또한, 이와 같은 방법으로 터널을 시공할 때는, 터널의 굴착속도에 맞춰 기초쇼크리트층(2)과 락볼트(10) 및 마감쇼크리트층(4)을 시공하고, 터널의 양단이 개방되도록 터널이 완전히 굴착되면, 상기 마감쇼크리트층(4)의 내측면을 마감처리함으로, 마감쇼크리트층(4)을 시공한 후 마감쇼크리트층(4)의 내측면을 마감처리할 때까지 매우 긴 시간 동안 상기 마감쇼크리트층(4)이 노출된 상태를 유지한다.When the tunnel is constructed in this way, the foundation rock layer 2, the rock bolt 10 and the finish shock layer 4 are constructed in accordance with the tunneling speed of the tunnel, It is possible to finish the inside surface of the finish shock layer 4 to a very long time until the inside surface of the finish shock layer 4 is finished after the finish shock layer 4 is applied, The exposed shock layer 4 remains exposed for a period of time.

따라서, 이와 같이 터널을 굴착할 때는, 상기 마감쇼크리트층(4)의 내측면에 소화기나 표시램프과 같은 다양한 장비와, 상기 장비에 연결된 전원선을 지지하기 위한 지지브라켓 등을 고정하여 사용하게 되는데, 이와 같이 장비나 지지브라켓 등을 상기 마감쇼크리트층(4)에 고정하기 위해서는, 별도의 앵커볼트를 상기 마감쇼크리트층(4)에 박고, 상기 앵커볼트에 지지브라켓이나 장비 등을 고정하여야 함으로, 작업이 더욱 번거로워지는 문제점이 있었다.Therefore, when the tunnel is excavated in this manner, various equipment such as a fire extinguisher and a display lamp, and a support bracket for supporting a power line connected to the equipment are fixedly used on the inner side of the finish shock layer 4 In order to fix the equipment, the support bracket, and the like to the finish shock layer 4, a separate anchor bolt is inserted into the finish shock layer 4 and the support bracket or equipment is fixed to the anchor bolt As a result, there has been a problem that work becomes more troublesome.

특히, 상기 터널의 굴착이 완료되어 상기 마감쇼크리트층(4)의 내측면을 마감처리하기 위해서는, 도 2 및 6에 도시한 바와 같이, 상기 마감쇼크리트층(4)의 내측면에 부직포(5)를 적층하고, 란델이라고 불리는 별도의 지지부재(6)를 콘크리트못(6a)을 이용하여 상기 부직포(5)의 내측면에 고정하여 부직포(5)가 이탈되지 않도록 한 후, 상기 부직포(5)의 외측에 방수시트(7) 등을 적층하고, 도 7에 도시한 바와 같이, 방수시트(7)의 내측면에 다시 마감층(8)을 형성하는 작업을 해야 하는데, 이와 같이 상기 부직포(5)를 마감쇼크리트층(4)의 내측면에 적층한 후, 콘크리트못(6a)을 이용하여 상기 부직포(5)의 내측면에 지지부재(6)를 고정하는 것이 매우 번거로운 문제점이 있었다.Particularly, as shown in FIGS. 2 and 6, in order to finish the inner surface of the finishing shock layer 4 after completion of the tunnel excavation, the inner surface of the finishing shock layer 4 is coated with a non- 5 is laminated and a separate supporting member 6 called a ladle is fixed to the inner surface of the nonwoven fabric 5 by using concrete nails 6a to prevent the nonwoven fabric 5 from being detached, 7, it is necessary to work to form a finish layer 8 on the inner surface of the waterproof sheet 7 as shown in Fig. 7. In this way, It is very troublesome to fix the supporting member 6 on the inner surface of the nonwoven fabric 5 by using the concrete nail 6a after the reinforcing layer 5 is laminated on the inner surface of the finished shock layer 4 .

따라서, 이러한 문제점을 해결할 수 있는 새로운 방법이 필요하게 되었다.
Therefore, there is a need for a new method to solve such a problem.

등록실용신안 20-0201071호Registered utility model 20-0201071 등록특허 10-0740200호Patent No. 10-0740200

본 발명은 상기의 문제점을 해결하기 위한 것으로서, 락볼트의 시공여부를 효과적으로 확인할 수 있도록 된 새로운 구조의 락볼트 시공확인용 검측봉을 제공함에 그 목적이 있다.
SUMMARY OF THE INVENTION It is an object of the present invention to provide a detection rod for confirming the construction of a rock bolt with a new structure which can effectively confirm whether a rock bolt is installed or not.

상기한 목적을 달성하기 위한 본 발명은, 터널의 기초쇼크리트층(2)의 내측면에서 주변의 지반(1)까지 연장된 고정공(3)에 그라우팅된 볼트축(11)과, 상기 기초쇼크리트층(2)의 내측에 위치되도록 상기 볼트축(11)에 결합되는 지지판(12)과, 상기 볼트축(11)의 단부에 결합되어 상기 지지판(12)이 상기 기초쇼크리트층(2)의 내측면에 밀착되도록 가압하는 너트부재(13)를 포함하며, 상기 기초쇼크리트층(2)의 내측면에 타설되는 마감쇼크리트층(4)에 의해 보이지 않도록 매립되는 락볼트(10)에 있어서, 상기 락볼트(10)에 고정되는 고정부(21)와, 상기 고정부(21)에서 상기 마감쇼크리트층(4)의 내측으로 돌출되도록 연장된 연장부(22)로 구성된 검측봉본체(20)를 포함하는 것을 특징으로 하는 락볼트 시공확인용 검측봉이 제공된다.In order to accomplish the above object, the present invention provides a tunnel structure comprising a bolt shaft (11) grooved in a fixing hole (3) extending from an inner side of a base shock layer (2) A support plate 12 coupled to the bolt shaft 11 so as to be located inside the shock layer 2 and a support plate 12 coupled to an end of the bolt shaft 11 so that the support plate 12 supports the base shock layer 2 And a lock bolt (10) embedded in the base shock layer (2) so as not to be seen by the deadlock layer (4) placed on the inner surface of the base shock layer (2) , Wherein the fixing bolt (10) has a fixing part (21) fixed to the locking bolt (10) and an extension part (22) extending from the fixing part (21) so as to protrude inward of the finishing shock layer And a main body (20).

본 발명의 다른 특징에 따르면, 상기 고정부(21)는 상기 볼트축(11)이 관통하는 통공(21a)이 형성된 링형태로 구성되어, 상기 볼트축(11)에 상기 지지판(12)을 결합하고, 상기 지지판(12)의 외측에 위치되도록 상기 고정부(21)를 볼트축(11)에 끼운 후, 상기 너트부재(13)를 결합하여, 상기 고정부(21)를 락볼트(10)에 고정할 수 있도록 된 것을 특징으로 하는 락볼트 시공확인용 검측봉이 제공된다.According to another aspect of the present invention, the fixing portion 21 is formed in the shape of a ring having a through hole 21a through which the bolt shaft 11 passes, and the support plate 12 is coupled to the bolt shaft 11 And the nut member 13 is engaged with the bolt shaft 11 so that the fixing part 21 is inserted into the locking bolt 10 after the fixing part 21 is inserted into the bolt shaft 11, And the fixing bolt is fixed to the locking bolt.

본 발명의 또 다른 특징에 따르면, 상기 검측봉본체(20)는 탄성이 있는 합성수지재질로 구성된 것을 특징으로 하는 락볼트 시공확인용 검측봉이 제공된다.According to another aspect of the present invention, there is provided a test bar for confirming the construction of a lock bolt, wherein the test bar body 20 is made of an elastic synthetic resin material.

본 발명의 또 다른 특징에 따르면, 상기 연장부(22)의 둘레면에는 나사산(22c)이 형성되며, 상기 연장부(22)에 나사결합되는 고정부재(40)를 더 포함하는 것을 특징으로 하는 락볼트 시공확인용 검측봉이 제공된다.According to still another aspect of the present invention, there is further provided a fixing member (40) having a screw thread (22c) formed on the circumferential surface of the extended portion (22) and screwed to the extended portion Detection rods for lock bolt construction confirmation are provided.

본 발명의 또 다른 특징에 따르면, 일단이 개방된 관체형태로 구성되어 상기 연장부(22)의 외측에 탈착가능하게 결합되는 보호튜브(30)를 더 포함하는 것을 특징으로 하는 락볼트 시공확인용 검측봉이 제공된다.According to another aspect of the present invention, there is provided a locking bolt for confirming the construction of a locking bolt, which is formed in an open-ended tube shape and is detachably coupled to an outer side of the extending portion (22) A test stick is provided.

본 발명의 또 다른 특징에 따르면, 상기 너트부재(13)에서 상기 지지판(12)에 밀착되는 쪽의 단부에는 반구형태의 돌출부(13a)가 형성된 것을 특징으로 하는 락볼트 시공확인용 검측봉이 제공된다.According to another aspect of the present invention, there is provided a detecting bar for confirming the construction of a locking bolt, wherein a hemispherical protrusion 13a is formed at an end of the nut member 13 which is in contact with the supporting plate 12 .

본 발명에 따른 락볼트 시공확인용 검측봉은 상기 락볼트(10)에 고정되는 고정부(21)와, 상기 고정부(21)에서 상기 마감쇼크리트층(4)의 내측으로 돌출되도록 연장된 연장부(22)로 구성된 검측봉본체(20)가 구비된다.The detection rod for confirming the construction of the lock bolt according to the present invention comprises a fixing part 21 fixed to the lock bolt 10 and an extension part 23 extending from the fixing part 21 to protrude inward of the closed shock layer 4 (22).

따라서, 상기 검측봉본체(20)가 락볼트(10)에 고정되도록 락볼트(10)를 시공한 후, 상기 기초쇼크리트층(2)의 내측면에 마감쇼크리트층(4)을 타설하면, 상기 연장봉(22b)이 마감쇼크리트층(4)의 내측으로 돌출되어, 상기 마감쇼크리트층(4)을 타설한 후에도 상기 연장봉(22b)을 육안으로 확인하여 해당부분에 락볼트(10)가 시공된 것을 확인할 수 있음으로, 상기 락볼트(10)를 설계치보다 적게 시공하는 것을 방지할 수 있는 장점이 있다.Therefore, when the lock bolt 10 is installed so that the detection rod body 20 is fixed to the lock bolt 10, and then the finish shock layer 4 is laid on the inner surface of the base shock layer 2 , The extension rod 22b is projected to the inside of the finish shock layer 4 so that the extension rod 22b is visually confirmed even after the finish shock layer 4 is laid and the lock bolt 10 is installed on the rock bolt 10, it is advantageous to prevent the rock bolt 10 from being constructed less than the designed bolt.

특히, 상기 연장봉(22b)의 단부가 상기 마감쇼크리트층(4)의 내측으로 돌출됨으로, 소화기나 표시램프와 같은 다양한 장비와, 다양한 장비를 구동시키기 위한 전원선을 지지하기 위한 지지브라켓을 상기 마감쇼크리트층(4)의 내측으로 돌출된 연장봉(22b)의 단부에 고정할 수 있다.Particularly, since the ends of the extension rods 22b protrude to the inside of the finishing shock layer 4, various kinds of equipment such as fire extinguishers and display lamps and support brackets for supporting power lines for driving various equipment And can be fixed to the end of the extension rod 22b protruding inward of the finish shock layer 4.

따라서, 상기 장비나 지지브라켓을 걸기 위해 마감쇼크리트층(4)에 별도의 앵커볼트를 박을 필요가 없어서 작업이 더욱 용이해지는 장점이 있다.
Therefore, there is no need to put an anchor bolt in the finish shock layer 4 to hang the equipment or the support bracket, which makes it easier to work.

도 1은 일반적인 터널의 구조을 도시한 단면 참고도,
도 2는 도 1의 A-A선 단면을 도시한 참고도,
도 3 내지 도 7은 터널의 시공방법을 도시한 참고도,
도 8은 본 발명에 따른 락볼트 시공확인용 검측봉의 시공상태를 도시한 측단면도,
도 9는 본 발명에 따른 락볼트 시공확인용 검측봉을 도시한 사시도,
도 10은 본 발명에 따른 락볼트 시공확인용 검측봉을 도시한 측단면도,
11은 본 발명에 따른 락볼트 시공확인용 검측봉의 작용을 락볼트에 고정한 상태를 도시한 측단면도,
도 12는 본 발명에 따른 락볼트 시공확인용 검측봉의 작용을 설명하기 위한 참고도이다.
1 is a cross-sectional view showing a structure of a general tunnel,
FIG. 2 is a reference view showing a cross-sectional view taken along line AA in FIG. 1,
3 to 7 are reference views showing a tunnel construction method,
FIG. 8 is a side sectional view showing a construction state of a detection rod for confirming a lock bolt construction according to the present invention,
FIG. 9 is a perspective view showing a check bar for confirming a lock bolt construction according to the present invention,
10 is a side cross-sectional view showing a check bar for confirmation of lock bolt construction according to the present invention,
11 is a side sectional view showing a state in which the action of the detection rod for confirming the construction of the lock bolt according to the present invention is fixed to the lock bolt,
12 is a reference view for explaining the action of the detection rod for confirming the construction of the lock bolt according to the present invention.

이하, 본 발명을 첨부된 예시도면에 의거하여 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 9 내지 도 12는 본 발명에 따른 락볼트 시공확인용 검측봉을 도시한 것으로, 상기 락볼트(10)는 터널의 기초쇼크리트층(2)의 내측면에서 주변의 지반(1)까지 연장된 고정공(3)에 그라우팅된 볼트축(11)과, 상기 기초쇼크리트층(2)의 내측에 위치되도록 상기 볼트축(11)에 결합되는 지지판(12)과, 상기 볼트축(11)의 단부에 결합되어 상기 지지판(12)이 상기 기초쇼크리트층(2)의 내측면에 밀착되도록 가압하는 너트부재(13)로 구성되어, 상기 기초쇼크리트층(2)의 내측면에 타설되는 마감쇼크리트층(4)에 의해 보이지 않도록 매립되는 것은 종래와 동일하다.9 to 12 show a detection rod for confirming the construction of a rock bolt according to the present invention. The rock bolt 10 extends from the inner side of the base rock layer 2 of the tunnel to the surrounding ground 1 A support plate 12 coupled to the bolt shaft 11 so as to be positioned on the inner side of the base shock layer 2 and a bolt shaft 11 connected to the bolt shaft 11, And a nut member 13 which is coupled to an end of the base shock layer 2 so as to press the support plate 12 against the inner side surface of the base shock layer 2, It is the same as in the prior art that it is buried invisibly by the finish shock layer 4.

그리고, 본 발명에 따른 검측봉은 상기 락볼트(10)에 고정되는 검측봉본체(20)와, 상기 검측봉본체(20)에 결합되는 보호튜브(30) 및 고정부재(40)로 구성된다.The detection rod according to the present invention is composed of a detection rod main body 20 fixed to the lock bolt 10 and a protection tube 30 and a fixing member 40 coupled to the detection rod main body 20.

이를 자세히 설명하면, 상기 검측봉본체(20)는 고정되는 고정부(21)와, 상기 고정부(21)에서 상기 마감쇼크리트층(4)의 내측으로 돌출되도록 연장된 연장부(22)로 구성된다.The detecting rod main body 20 includes a fixing part 21 to be fixed and an extension part 22 extending from the fixing part 21 to protrude inward of the finishing shock layer 4 .

상기 고정부(21)는 상기 볼트축(11)이 관통하는 통공(21a)이 형성된 링형태로 구성되어, 상기 볼트축(11)에 상기 지지판(12)을 결합하고, 상기 지지판(12)의 외측에 위치되도록 상기 고정부(21)를 볼트축(11)에 끼운 후, 상기 너트부재(13)를 결합하여, 상기 고정부(21)를 락볼트(10)에 고정할 수 있도록 구성된다.The fixing part 21 is formed in the shape of a ring having a through hole 21a through which the bolt shaft 11 passes. The fixing part 21 is coupled to the bolt shaft 11, The fixing part 21 is fixed to the locking bolt 10 by engaging the nut member 13 after inserting the fixing part 21 into the bolt shaft 11 so as to be positioned on the outer side of the fixing bolt 10.

상기 연장부(22)는 삼각형으로 구성되며 일측에 상기 고정부(21)가 구비된 지지대(22a)와, 상기 지지대(22a)의 단부에서 상기 마감쇼크리트층(4)의 외측으로 연장된 연장봉(22b)으로 구성되며, 상기 연장봉(22b)의 둘레면에는 나사산(22c)이 형성된다.The extension 22 is formed of a triangle and has a support 22a having the fixing part 21 at one side thereof and an extension 22a extending from the end of the support 22a to the outside of the closing shock layer 4, And a rod 22b, and a thread 22c is formed on the circumferential surface of the rod 22b.

이때, 상기 검측봉본체(20)는 탄성이 있는 합성수지재질로 구성된다.At this time, the detection rod body 20 is made of an elastic synthetic resin material.

그리고, 상기 너트부재(13)에서 상기 지지판(12)에 밀착되는 쪽의 단부는 반구형태의 돌출부(13a)가 형성된다.A hemispherical protrusion 13a is formed at an end of the nut member 13 which is in close contact with the support plate 12.

따라서, 도 10 및 도 11에 도시한 바와 같이, 상기 볼트축(11)에 상기 지지판(12)을 결합하고, 볼트축(11)에 상기 고정부(21)를 끼운 후, 볼트축(11)의 단부에 상기 너트부재(13)를 결합하여 조이면, 상기 돌출부(13a)가 상기 지지판(12)에 밀착되어 지지판(12)이 가압되도록 하며, 상기 고정부(21)는 상기 돌출부(13a)의 둘레부에 걸려 빠지지 않도록 고정된다.10 and 11, the support plate 12 is coupled to the bolt shaft 11, the bolt shaft 11 is fitted with the fixing portion 21, When the nut member 13 is fastened to the end of the protruding portion 13a, the protruding portion 13a is brought into close contact with the support plate 12 to press the support plate 12, It is caught by the periphery and fixed so as not to come off.

상기 보호튜브(30)는 일단은 개방되고 타단은 밀폐된 플랙시블한 합성수지재질의 관형태로 구성되어, 상기 연장부(22)의 연장봉(22b) 외측에 탈착가능하게 끼움결합된다.The protection tube 30 has a tube shape of a flexible synthetic resin material, one end of which is opened and the other end thereof is hermetically sealed, and is detachably fitted to the outside of the extension rod 22b of the extension part 22. [

상기 고정부재(40)는 전술한 선행기술에서 부직포(5)를 고정하기 위한 란델과 동일한 형태로 구성되어 상기 연장봉(22b)에 나사결합되도록 구성된다.The fixing member 40 is configured in the same manner as the lancet for fixing the nonwoven fabric 5 in the above-described prior art, and is configured to be screwed to the extending rod 22b.

즉, 상기 고정부재(40)는 중앙부에 관통공(41)이 형성된 원판형태로 구성되며, 상기 관통공(41)의 내주면에는 나사산(42)이 형성되어, 상기 고정부재(40)의 관통공(41)을 상기 연장봉(22b)의 단부에 결합한 후 상기 고정부재(40)를 회전시키면, 나사산(22c,42)의 작용에 의해 상기 고정부재(40)가 연장봉(22b)의 기단부쪽으로 전진된다.The fastening member 40 is formed in the shape of a disk having a through hole 41 formed at a central portion thereof and a thread 42 is formed on the inner circumferential surface of the through hole 41, The fixing member 40 is moved toward the proximal end of the extension rod 22b by the action of the threads 22c and 42 when the fixing member 40 is rotated after the connection member 41 is coupled to the end of the extension rod 22b, It is advanced.

이와 같이 구성된 락볼트 시공확인용 검측봉은 상기 락볼트(10)에 고정되는 고정부(21)와, 상기 고정부(21)에서 상기 마감쇼크리트층(4)의 내측으로 돌출되도록 연장된 연장부(22)로 구성된 검측봉본체(20)가 구비된다.The detection rod for confirming the construction of the rock bolt thus constructed is provided with a fixing part 21 fixed to the lock bolt 10 and an extension part 23 extending from the fixing part 21 to protrude inward of the closed shock layer 4 And a detection rod body 20 composed of a detection rod body 22.

따라서, 상기 검측봉본체(20)가 락볼트(10)에 고정되도록 락볼트(10)를 시공한 후, 상기 기초쇼크리트층(2)의 내측면에 마감쇼크리트층(4)을 타설하면, 도 8에 도시한 바와 같이, 상기 연장봉(22b)이 마감쇼크리트층(4)의 내측으로 돌출되어, 상기 마감쇼크리트층(4)을 타설한 후에도 상기 연장봉(22b)을 육안으로 확인하여 해당부분에 락볼트(10)가 시공된 것을 확인할 수 있음으로, 상기 락볼트(10)를 설계치보다 적게 시공하는 것을 방지할 수 있는 장점이 있다.Therefore, when the lock bolt 10 is installed so that the detection rod body 20 is fixed to the lock bolt 10, and then the finish shock layer 4 is laid on the inner surface of the base shock layer 2 , The extension rod 22b is projected to the inside of the deadlock layer 4 so that the extension rod 22b can be visually inspected even after the deadlock layer 4 is laid, It is possible to confirm that the lock bolts 10 have been applied to the corresponding portions, so that it is possible to prevent the lock bolts 10 from being constructed less than the designed bolts.

특히, 상기 연장봉(22b)의 단부가 상기 마감쇼크리트층(4)의 내측으로 돌출됨으로, 소화기나 표시램프와 같은 다양한 장비와, 다양한 장비를 구동시키기 위한 전원선을 지지하기 위한 지지브라켓을 상기 마감쇼크리트층(4)의 내측으로 돌출된 연장봉(22b)의 단부에 고정할 수 있다.Particularly, since the ends of the extension rods 22b protrude to the inside of the finishing shock layer 4, various kinds of equipment such as fire extinguishers and display lamps and support brackets for supporting power lines for driving various equipment And can be fixed to the end of the extension rod 22b protruding inward of the finish shock layer 4.

따라서, 상기 장비나 지지브라켓을 걸기 위해 마감쇼크리트층(4)에 별도의 앵커볼트를 박을 필요가 없어서 작업이 더욱 용이해지는 장점이 있다.Therefore, there is no need to put an anchor bolt in the finish shock layer 4 to hang the equipment or the support bracket, which makes it easier to work.

그리고, 상기 고정부(21)는 상기 볼트축(11)이 관통하는 통공(21a)이 형성된 링형태로 구성되어, 상기 볼트축(11)에 상기 지지판(12)을 결합하고, 상기 지지판(12)의 외측에 위치되도록 상기 고정부(21)를 볼트축(11)에 끼운 후, 상기 너트부재(13)를 결합하여, 상기 고정부(21)를 락볼트(10)에 고정할 수 있음으로, 상기 검측봉본체(20)를 상기 락볼트(10)에 고정하는 것이 매우 용이한 장점이 있다.The fixing part 21 is formed in the shape of a ring having a through hole 21a through which the bolt shaft 11 passes. The fixing part 12 is engaged with the bolt shaft 11, The fixing part 21 can be fixed to the locking bolt 10 by engaging the nut member 13 after the fixing part 21 is inserted into the bolt shaft 11 so as to be positioned outside the fixing bolt 10 , It is very easy to fix the detection rod body 20 to the lock bolt 10.

또한, 상기 검측봉본체(20)는 탄성이 있는 합성수지재질로 구성됨으로, 상기 락볼트(10)에 검측봉본체(20)를 고정한 후, 상기 기초쇼크리트층(2)의 내측면에 마감쇼크리트층(4)을 타설할 때, 상기 검측봉본체(20)가 손상되는 것을 방지할 수 있는 장점이 있다.The detection rod main body 20 is made of an elastic synthetic resin material so that the detection rod main body 20 is fixed to the lock bolt 10 and then the inner surface of the basic shock layer 2 is subjected to a finish shock There is an advantage that the inspection rod main body 20 can be prevented from being damaged when the litter layer 4 is laid.

즉, 상기 마감쇼크리트층(4)을 타설할 때는 분사장치를 이용하여 상기 기초쇼크리트층(2)의 내측면에 콘크리트를 분사하여 부착시켜 시공되는데, 이와 같이, 분사된 콘크리트가 상기 검측봉본체(20)에 충돌하게 된다.That is, when the deadlock layer 4 is laid, the concrete is sprayed onto the inner surface of the base shock layer 2 by using an injection device, And collide with the main body 20.

이때, 상기 검측봉본체(20)는 탄성이 있는 합성수지재질로 구성됨으로, 마감쇼크리트층(4)를 타설하기 위해 분사된 콘크리트가 충돌할 경우, 탄성적으로 변형되면서 충격을 흡수하여 손상되지 않게 되는 장점이 있다.In this case, when the impacted concrete is collided to pour the finishing shock layer 4, the inspection rod body 20 is elastically deformed to absorb the impact and not be damaged .

그리고, 상기 연장부(22)의 둘레면에는 나사산(22c)이 형성되며, 상기 연장부(22)에 나사결합되는 고정부재(40)가 구비된다.A threaded portion 22c is formed on the circumferential surface of the extended portion 22 and a fixing member 40 screwed to the extended portion 22 is provided.

이때, 상기 고정부재(40)는 종래에 부직포(5)를 고정할 때 사용되는 란델과 동일한 형태로 구성되어 상기 연장부(22)에 나사결합되도록 구성됨으로, 상기 마감쇼크리트층(4)의 내측면을 마감할 때, 도 12에 도시한 바와 같이, 상기 마감쇼크리트층(4)의 내측으로 돌출된 연장부(22)에 상기 부직포(5)를 끼운 후, 상기 연장부(22)에 상기 고정부재(40)를 나사결합함으로서, 별도의 콘크리트못(6a)을 이용하지 않고도 상기 부직포(5)를 마감쇼크리트층(4)의 내측면에 견고하게 고정할 수 있는 장점이 있다.The fixing member 40 is configured to be screwed to the extended portion 22 in the same manner as the conventional lancet used for fixing the nonwoven fabric 5, 12, the nonwoven fabric 5 is sandwiched between the extended portions 22 protruding inwardly of the finishing shock layer 4, and then the nonwoven fabric 5 is inserted into the extended portions 22 The nonwoven fabric 5 can be firmly fixed to the inner surface of the finished shockproof layer 4 by screwing the fixing member 40 without using a separate concrete nail 6a.

또한, 상기 연장부(22)에는 상기 일단에 개구부가 형성된 관체형태로 구성된 보호튜브(30)가 결합됨으로, 상기 마감쇼크리트층(4)을 타설할 때 콘크리트가 상기 연장부(22)의 나사산(22c)에 부착되는 것을 방지하고, 상기 마감쇼크리트층(4)의 내측면에 부직포(5)를 고정한 후, 상기 연장부(22)에 고정부재(40)를 나사결합할 때, 상기 연장부(22)에 부착된 콘크리트에 의해 고정부재(40)가 원활히 나사결합되지 못하게 되는 것을 방지할 수 있는 장점이 있다.A protective tube 30 having a tubular shape and having an opening at one end thereof is coupled to the extension portion 22 so that when the deadlock layer 4 is laid, When the fixing member 40 is screwed to the extending portion 22 after the nonwoven fabric 5 is fixed to the inner surface of the finishing shock layer 4, There is an advantage that it is possible to prevent the fixing member 40 from being screwed smoothly by the concrete attached to the part 22.

즉, 상기 연장부(22)에 상기 보호튜브(30)가 결합된 상태로 상기 마감쇼크리트층(4)을 시공하고, 마감쇼크리트층(4)의 시공이 완료되면 상기 보호튜브(30)를 분리한 후, 도 12에 도시한 바와 같이, 상기 연장부(22)에 상기 고정부재(40)를 결합하여, 상기 고정부재(40)를 연장부(22)의 나사산(22c)에 원활히 결합할 수 있다.That is, the closed shock layer 4 is installed in a state where the protection tube 30 is coupled to the extension part 22, and when the completion of the completion shock layer 4 is completed, The fixing member 40 is engaged with the extending portion 22 to smoothly engage the fixing member 40 with the thread 22c of the extending portion 22 as shown in FIG. can do.

그리고, 상기 너트부재(13)에서 상기 지지판(12)에 밀착되는 쪽의 단부에는 반구형태의 돌출부(13a)가 형성됨으로, 상기 락볼트(10)에 상기 고정부(21)를 결합하기 위해, 상기 볼트축(11)에 고정부(21)를 끼우고 상기 너트부재(13)를 볼트축(11)에 끼워 조이면, 상기 고정부(21)가 상기 지지판(12)과 너트부재(13)의 사이에 끼어 가압되지 않고, 상기 돌출부(13a)의 둘레면에 걸려 빠지지 않도록 고정된다.A hemispherical protrusion 13a is formed at an end of the nut member 13 which is in close contact with the support plate 12 so that the locking bolt 10 is fixed to the fixing bolt 10, When the fixing member 21 is fitted to the bolt shaft 11 and the nut member 13 is fitted to the bolt shaft 11 and the fixing member 21 is fitted to the nut member 13 So that it is not caught by the peripheral surface of the protruding portion 13a and is fixed so as not to come off.

즉, 일반적인 너트부재(13)는 상기 지지판(12)에 밀착되는 쪽의 단부가 평면을 이루도록 구성되어, 상기 고정부(21)가 상기 지지판(12)과 너트부재(13)의 사이에 끼워져, 상기 너트부재(13)를 조이면 고정부(21)가 가압되도록 구성되는데, 상기 고정부(21)는 탄성이 있는 합성수지재로 구성됨으로, 상기 고정부(21)가 상기 지지판(12)과 너트부재(13)의 사이에 끼워져 가압되면, 간단히 손상되어 끊어지게 된다.That is, a general nut member 13 is configured such that an end portion of the nut member 13 which is in close contact with the support plate 12 is flat, and the fixing portion 21 is sandwiched between the support plate 12 and the nut member 13, When the nut member 13 is tightened, the fixing portion 21 is pressed. The fixing portion 21 is made of a synthetic resin material having elasticity, and the fixing portion 21 is fixed to the supporting plate 12 and the nut member (13), it is simply damaged and broken.

이에 반해, 본원발명에 따른 너트부재(13)는 상기 너트부재(13)에서 상기 지지판(12)에 밀착되는 쪽의 단부에 반구형태의 둘출부(13a)가 형성됨으로, 상기 고정부(21)가 상기 지지판(12)과 너트부재(13)의 사이에 끼어 가압되지 않고, 도 11에 도시한 바와 같이, 상기 둘출부(13a)의 둘레면에 걸려 빠지지 않도록 고정됨으로, 상기 지지판(12)이 기초쇼크리트층(2)을 가압하도록 너트부재(13)를 강하게 조이더라도, 상기 고정부(21)가 손상되지 않는 장점이 있다.In contrast, the nut member 13 according to the present invention has a hemispherical spigot 13a formed at the end of the nut member 13 which is in close contact with the support plate 12, The support plate 12 and the nut member 13 are not pressed against each other and are not caught by the circumferential surface of the circumferential portion 13a as shown in FIG. There is an advantage that the fixing portion 21 is not damaged even if the nut member 13 is strongly tightened to press the basic shock layer 2.

본 실시예의 경우, 상기 고정부재(40)는 상기 란델과 동일한 형태로 구성된 것을 예시하였으나, 상기 고정부재(40)의 형태를 다양하게 변경될 수 있다.In this embodiment, the fixing member 40 is formed in the same shape as the land, but the shape of the fixing member 40 may be variously changed.

특히, 상기 고정부재(40)를 일반적인 너트형태로 구성하여, 상기 마감쇼크리트층(4)의 외측으로 돌출된 연장부(22)에 별도의 브라켓이나 기구를 고정한 후, 상기 고정부재(40)를 연장부(22)에 결합하여 조임으로서, 상기 브라켓이나 기구가 견고하게 고정되도록 하는 것도 가능하다.
Particularly, the fixing member 40 is formed in a general nut shape, and a separate bracket or mechanism is fixed to the extended portion 22 protruding outward of the finishing shock layer 4, It is possible to fix the bracket or the mechanism firmly by tightening it by fastening it to the extension 22.

10. 락볼트 20. 검측봉본체
21. 고정부 22. 연장부
30. 보호튜브 40. 고정부재
10. Lock bolt 20. Inspection rod body
21. Fixed Government 22. Extension
30. Protection tube 40. Fixing member

Claims (6)

삭제delete 터널의 기초쇼크리트층(2)의 내측면에서 주변의 지반(1)까지 연장된 고정공(3)에 그라우팅된 볼트축(11)과,
상기 기초쇼크리트층(2)의 내측에 위치되도록 상기 볼트축(11)에 결합되는 지지판(12)과,
상기 볼트축(11)의 단부에 결합되어 상기 지지판(12)이 상기 기초쇼크리트층(2)의 내측면에 밀착되도록 가압하는 너트부재(13)를 포함하며,
상기 기초쇼크리트층(2)의 내측면에 타설되는 마감쇼크리트층(4)에 의해 보이지 않도록 매립되는 락볼트(10)에 있어서,
상기 락볼트(10)에 고정되는 고정부(21)와,
상기 고정부(21)에서 상기 마감쇼크리트층(4)의 내측으로 돌출되도록 연장된 연장부(22)로 구성된 검측봉본체(20)를 포함하고,
상기 고정부(21)는 상기 볼트축(11)이 관통하는 통공(21a)이 형성된 링형태로 구성되어,
상기 볼트축(11)에 상기 지지판(12)을 결합하고,
상기 지지판(12)의 외측에 위치되도록 상기 고정부(21)를 볼트축(11)에 끼운 후,
상기 너트부재(13)를 결합하여,
상기 고정부(21)를 락볼트(10)에 고정할 수 있도록 된 것을 특징으로 하는 락볼트 시공확인용 검측봉.
A bolt shaft 11 grooved in the fixing hole 3 extending from the inner side of the base shock layer 2 to the surrounding ground 1,
A support plate (12) coupled to the bolt shaft (11) so as to be positioned inside the base shock layer (2)
And a nut member (13) coupled to an end of the bolt shaft (11) and pressing the support plate (12) so as to be in close contact with an inner surface of the base shock layer (2)
In a rock bolt (10) which is embedded so as not to be seen by a deadlock layer (4) laid on the inner side surface of the basic shock layer (2)
A fixing part 21 fixed to the lock bolt 10,
And an extension part (22) extending from the fixing part (21) so as to protrude inward of the finishing shock layer (4)
The fixing portion 21 is formed in a ring shape having a through hole 21a through which the bolt shaft 11 passes,
The support plate 12 is coupled to the bolt shaft 11,
The fixing portion 21 is inserted into the bolt shaft 11 so as to be positioned outside the support plate 12,
The nut member 13 is engaged,
And the fixing part (21) can be fixed to the locking bolt (10).
터널의 기초쇼크리트층(2)의 내측면에서 주변의 지반(1)까지 연장된 고정공(3)에 그라우팅된 볼트축(11)과,
상기 기초쇼크리트층(2)의 내측에 위치되도록 상기 볼트축(11)에 결합되는 지지판(12)과,
상기 볼트축(11)의 단부에 결합되어 상기 지지판(12)이 상기 기초쇼크리트층(2)의 내측면에 밀착되도록 가압하는 너트부재(13)를 포함하며,
상기 기초쇼크리트층(2)의 내측면에 타설되는 마감쇼크리트층(4)에 의해 보이지 않도록 매립되는 락볼트(10)에 있어서,
상기 락볼트(10)에 고정되는 고정부(21)와,
상기 고정부(21)에서 상기 마감쇼크리트층(4)의 내측으로 돌출되도록 연장된 연장부(22)로 구성된 검측봉본체(20)를 포함하고,
상기 검측봉본체(20)는 탄성이 있는 합성수지재질로 구성된 것을 특징으로 하는 락볼트 시공확인용 검측봉.
A bolt shaft 11 grooved in the fixing hole 3 extending from the inner side of the base shock layer 2 to the surrounding ground 1,
A support plate (12) coupled to the bolt shaft (11) so as to be positioned inside the base shock layer (2)
And a nut member (13) coupled to an end of the bolt shaft (11) and pressing the support plate (12) so as to be in close contact with an inner surface of the base shock layer (2)
In a rock bolt (10) which is embedded so as not to be seen by a deadlock layer (4) laid on the inner side surface of the basic shock layer (2)
A fixing part 21 fixed to the lock bolt 10,
And an extension part (22) extending from the fixing part (21) so as to protrude inward of the finishing shock layer (4)
Wherein the detection rod body (20) is made of an elastic synthetic resin material.
터널의 기초쇼크리트층(2)의 내측면에서 주변의 지반(1)까지 연장된 고정공(3)에 그라우팅된 볼트축(11)과,
상기 기초쇼크리트층(2)의 내측에 위치되도록 상기 볼트축(11)에 결합되는 지지판(12)과,
상기 볼트축(11)의 단부에 결합되어 상기 지지판(12)이 상기 기초쇼크리트층(2)의 내측면에 밀착되도록 가압하는 너트부재(13)를 포함하며,
상기 기초쇼크리트층(2)의 내측면에 타설되는 마감쇼크리트층(4)에 의해 보이지 않도록 매립되는 락볼트(10)에 있어서,
상기 락볼트(10)에 고정되는 고정부(21)와,
상기 고정부(21)에서 상기 마감쇼크리트층(4)의 내측으로 돌출되도록 연장된 연장부(22)로 구성된 검측봉본체(20)를 포함하고,
상기 연장부(22)의 둘레면에는 나사산(22c)이 형성되며,
상기 연장부(22)에 나사결합되는 고정부재(40)를 더 포함하는 것을 특징으로 하는 락볼트 시공확인용 검측봉.
A bolt shaft 11 grooved in the fixing hole 3 extending from the inner side of the base shock layer 2 to the surrounding ground 1,
A support plate (12) coupled to the bolt shaft (11) so as to be positioned inside the base shock layer (2)
And a nut member (13) coupled to an end of the bolt shaft (11) and pressing the support plate (12) so as to be in close contact with an inner surface of the base shock layer (2)
In a rock bolt (10) which is embedded so as not to be seen by a deadlock layer (4) laid on the inner side surface of the basic shock layer (2)
A fixing part 21 fixed to the lock bolt 10,
And an extension part (22) extending from the fixing part (21) so as to protrude inward of the finishing shock layer (4)
A thread 22c is formed on the circumferential surface of the extended portion 22,
Further comprising a fixing member (40) screwed to the extended portion (22).
제 4항에 있어서,
일단이 개방된 관체형태로 구성되어 상기 연장부(22)의 외측에 탈착가능하게 결합되는 보호튜브(30)를 더 포함하는 것을 특징으로 하는 락볼트 시공확인용 검측봉.
5. The method of claim 4,
Further comprising a protection tube (30) formed in an open tube shape and detachably coupled to an outer side of the extension part (22).
터널의 기초쇼크리트층(2)의 내측면에서 주변의 지반(1)까지 연장된 고정공(3)에 그라우팅된 볼트축(11)과,
상기 기초쇼크리트층(2)의 내측에 위치되도록 상기 볼트축(11)에 결합되는 지지판(12)과,
상기 볼트축(11)의 단부에 결합되어 상기 지지판(12)이 상기 기초쇼크리트층(2)의 내측면에 밀착되도록 가압하는 너트부재(13)를 포함하며,
상기 기초쇼크리트층(2)의 내측면에 타설되는 마감쇼크리트층(4)에 의해 보이지 않도록 매립되는 락볼트(10)에 있어서,
상기 락볼트(10)에 고정되는 고정부(21)와,
상기 고정부(21)에서 상기 마감쇼크리트층(4)의 내측으로 돌출되도록 연장된 연장부(22)로 구성된 검측봉본체(20)를 포함하고,
상기 너트부재(13)에서 상기 지지판(12)에 밀착되는 쪽의 단부에는 반구형태의 돌출부(13a)가 형성된 것을 특징으로 하는 락볼트 시공확인용 검측봉.
A bolt shaft 11 grooved in the fixing hole 3 extending from the inner side of the base shock layer 2 to the surrounding ground 1,
A support plate (12) coupled to the bolt shaft (11) so as to be positioned inside the base shock layer (2)
And a nut member (13) coupled to an end of the bolt shaft (11) and pressing the support plate (12) so as to be in close contact with an inner surface of the base shock layer (2)
In a rock bolt (10) which is embedded so as not to be seen by a deadlock layer (4) laid on the inner side surface of the basic shock layer (2)
A fixing part 21 fixed to the lock bolt 10,
And an extension part (22) extending from the fixing part (21) so as to protrude inward of the finishing shock layer (4)
Wherein a protrusion (13a) in the form of a hemispherical shape is formed at an end of the nut member (13) which is in close contact with the support plate (12).
KR1020140187218A 2014-12-23 2014-12-23 Rock bolt construction identification device KR101513011B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140187218A KR101513011B1 (en) 2014-12-23 2014-12-23 Rock bolt construction identification device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140187218A KR101513011B1 (en) 2014-12-23 2014-12-23 Rock bolt construction identification device

Publications (1)

Publication Number Publication Date
KR101513011B1 true KR101513011B1 (en) 2015-04-22

Family

ID=53053463

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140187218A KR101513011B1 (en) 2014-12-23 2014-12-23 Rock bolt construction identification device

Country Status (1)

Country Link
KR (1) KR101513011B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101646975B1 (en) 2016-03-31 2016-08-09 유정렬 Rod for indicating rock bolt constructed in tunnel
KR102088954B1 (en) 2019-04-16 2020-03-13 주식회사 파워머티리얼 Guide cap for measuring a shotcrete construction thickness
KR20210037912A (en) * 2019-09-30 2021-04-07 신현택 Fixing nut for rock bolt position check up

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100930829B1 (en) * 2009-05-04 2009-12-10 브사렐건설 주식회사 Pannel have rockbolt coupler
KR20120103106A (en) * 2011-03-10 2012-09-19 (주) 신우하이텍 Cross spiral rock bolt

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100930829B1 (en) * 2009-05-04 2009-12-10 브사렐건설 주식회사 Pannel have rockbolt coupler
KR20120103106A (en) * 2011-03-10 2012-09-19 (주) 신우하이텍 Cross spiral rock bolt

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101646975B1 (en) 2016-03-31 2016-08-09 유정렬 Rod for indicating rock bolt constructed in tunnel
KR102088954B1 (en) 2019-04-16 2020-03-13 주식회사 파워머티리얼 Guide cap for measuring a shotcrete construction thickness
KR20210037912A (en) * 2019-09-30 2021-04-07 신현택 Fixing nut for rock bolt position check up
KR102242116B1 (en) * 2019-09-30 2021-04-19 신현택 Fixing nut for rock bolt position check up

Similar Documents

Publication Publication Date Title
KR101505548B1 (en) rock bolt construction identification device
KR101513011B1 (en) Rock bolt construction identification device
ES2798073T3 (en) Friction bolt
US9835030B2 (en) Rock bolt
KR101371333B1 (en) The end head of anchor construction method in soft ground of gavingused the foundation fixing anchor
KR20090123779A (en) Guid apparatus for soil nail of reinforcing a slope
KR20030051002A (en) Ground anchor
WO2014085867A1 (en) Tapping device
KR20160011113A (en) Subsidence observing bar equipment of pipe under the ground and construction method therefor
KR101903699B1 (en) Anchor assembly
KR100586078B1 (en) Internal fixture of tension wire removal type ground anchorage
KR101595306B1 (en) Mechanical fixing earth anchor by rotation and method for constructing this same
BR112017023180B1 (en) SET OF COMPONENTS FOR ENCAPSULATION PROCESSES OF ROPE IN AN ACTIVE ANCHORAGE PLATE IN PRESTRESSED CONCRETE
JP2005248496A (en) Method for uplift preventive manhole in liquefaction
US9725866B1 (en) Tieback assembly with removable tendon threaded element
KR100517735B1 (en) Insert in the ground and construction method and test method of thereof
JP6408928B2 (en) How to install expansion joints for concrete structures
KR101974397B1 (en) Structure of reinforcing anchor for corrugated pipe type
KR101603507B1 (en) Compression type anchor with central tube
KR20230064313A (en) Inspection rod for indicating rock bolt
KR20170065298A (en) Fixing device for earth anchor
KR101759052B1 (en) Sleeve protecting assembly for structure
KR101016808B1 (en) A anchor attaching device
KR101760721B1 (en) The fuser unit is increased to improve adhesion and grouting Ground reinforcement
KR101072688B1 (en) Anchor head structure for removal tension wire

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J202 Request for trial for correction [limitation]
J121 Written withdrawal of request for trial
FPAY Annual fee payment

Payment date: 20190306

Year of fee payment: 5