KR100517735B1 - Insert in the ground and construction method and test method of thereof - Google Patents

Insert in the ground and construction method and test method of thereof Download PDF

Info

Publication number
KR100517735B1
KR100517735B1 KR1020050028222A KR20050028222A KR100517735B1 KR 100517735 B1 KR100517735 B1 KR 100517735B1 KR 1020050028222 A KR1020050028222 A KR 1020050028222A KR 20050028222 A KR20050028222 A KR 20050028222A KR 100517735 B1 KR100517735 B1 KR 100517735B1
Authority
KR
South Korea
Prior art keywords
ground
depth
guide rod
inspection line
insert
Prior art date
Application number
KR1020050028222A
Other languages
Korean (ko)
Inventor
장성두
Original Assignee
장성두
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 장성두 filed Critical 장성두
Priority to KR1020050028222A priority Critical patent/KR100517735B1/en
Application granted granted Critical
Publication of KR100517735B1 publication Critical patent/KR100517735B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B5/00Measuring arrangements characterised by the use of mechanical techniques
    • G01B5/02Measuring arrangements characterised by the use of mechanical techniques for measuring length, width or thickness
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 지반삽입체 및 이를 이용한 지반삽입체의 시공방법 및 심도검사방법에 관한 것으로서, 심도 검사선이 내장된 가이드봉이 마련되어, 지반삽입체의 시공후 검사자는 캡을 열고 가이드봉으로부터 심도 검사선을 인출하여 심도 검사선의 길이를 체크함으로써, 간단하고 빠르며 정확하게 지반삽입체의 심도를 검사할 수 있으며, 특히, 심도 검사선의 외면에 윤활제를 도포하여, 지반삽입체의 시공이 완료된 후 상당한 시간이 흐른 후라 하더라도 언제든지 지반삽입체의 심도를 검사할 수 있을 뿐 아니라, 심도 검사선의 길이 체크시 심도 검사선의 길이를 측정하는 별도의 길이측정수단이 불필요하므로, 검사자는 한눈에 심도 검사선의 길이를 체크할 수 있는 지반삽입체의 시공방법 및 심도검사방법에 관한 것이다.The present invention relates to a ground insert and a construction method and depth inspection method of the ground insert using the same, provided with a guide rod with a built-in depth inspection line, the inspector after the construction of the ground insert open the cap and the depth inspection line from the guide rod By checking the length of the depth inspection line by withdrawing, the depth of the ground insert can be inspected simply, quickly and accurately. In particular, by applying a lubricant to the outer surface of the depth inspection line, a considerable time has passed after the construction of the ground insert is completed. In addition, the depth of the ground insert can be inspected at any time, and a separate length measuring means for measuring the length of the depth inspection line is unnecessary when checking the length of the depth inspection line, so the inspector can check the length of the depth inspection line at a glance. The present invention relates to a construction method and depth inspection method of a ground insert.

Description

지반삽입체 및 이를 이용한 지반삽입체의 시공방법 및 심도검사방법{insert in the ground and construction method and test method of thereof}Ground insert and method of construction and depth inspection using the ground insert {insert in the ground and construction method and test method of

본 발명은 지반삽입체 및 이를 이용한 지반삽입체의 시공방법 및 심도검사방법에 관한 것이다.The present invention relates to a ground insert and a construction method and depth inspection method of the ground insert using the same.

지반 또는 암반 등의 천공 후 삽입설치되는 어스앵커, 락앵커, 락볼트 또는 쏘일네일링 등의 막대 형태의 지반삽입부를 가진 지반삽입체 중 어스앵커는 일반적으로 가설 앵커와 영구 앵커 두 가지가 있다. 가설 앵커는 지중에 매설한 후 사용하는 기간이 대략 12개월에서 24개월 이내의 것을 가리키고, 영구 앵커는 24개월 이상 또는 영구히 지중에 매설해 두는 앵커를 말한다. 영구 앵커는 지중에 매설된 후 영구적으로 정착하중을 받아야 하므로 처리방식, 하중전달방법 등에 철저한 대비가 따라야 한다. 어스앵커는 정착부와 자유부 및 앵커두부로 구분된다. 정착부는 필요한 하중을 지중에 전달하고, 자유부는 주어진 하중을 정착부에 전달하며, 앵커두부는 주어진 하중을 고정시켜 자유부와 정착부에 걸린 하중을 유지하게 된다. 어스앵커의 자유부와 정착부에 사용하는 인장재는 통상 PC 스트랜드(강연선)나 강봉을 사용한다. 인장재를 고정시키는 구조는, 강연선일 경우에는 주로 웨지콘을 이용하는 쐐기방식을, 강봉일 경우에는 주로 너트방식을 사용한다.Among the ground inserts having rod-shaped ground inserts, such as earth anchors, rock anchors, rock bolts, or soil nailing, which are inserted after drilling of ground or rock, there are generally two types of anchors: temporary anchors and permanent anchors. Hypothetical anchor refers to a period of about 12 to 24 months of use after being buried in the ground, and permanent anchor refers to an anchor that is buried in the ground for more than 24 months or permanently. Permanent anchors must be permanently settled after being buried in the ground, so thorough preparation must be followed for treatment methods and load transfer methods. The earth anchor is divided into a fixing part, a free part and an anchor head. The fixing unit transmits the necessary load to the ground, the free unit transmits the given load to the fixing unit, and the anchor head fixes the given load to maintain the load on the free unit and the fixing unit. As the tension member used for the free portion and the fixing portion of the earth anchor, PC strand (steel strand) or steel rod is usually used. The structure for fixing the tension member uses a wedge method mainly using wedge cone in the case of a stranded wire, and a nut method mainly in the case of a steel bar.

종래 어스앵커의 일 예가 도 7에 제시되어 있다. 도 7은 한국 실용신안 등록번호 제20-0255711호의 "어스앵커"에 관한 것이다. 상기 공보에 따른 어스앵커(10)는 매설공(2)으로 그라우트(4)를 주입하기 위한 제 1주입호스(12)가 구비되고, 지중의 매설공(2)에 삽입되고 지상에서 고정수단(3)에 의해 고정되는 다수의 강연선(11)이 설치되되, 일부분은 매설공(2)에 매설되어 정착장부(Fx)가 형성되고, 타측 일부분은 토류벽(5)을 토압으로부터 지지하는 자유장부(Fr)로 형성되는 강연선(11) 및 상기 제 1주입호스(12)를 감싸도록 설치되어 그라우트(4)로부터 보호하기 위한 보호관(20) 및 보호관(20)과 맞닿는 정착장부(Fx)의 소정 부분의 강연선(11)을 밀폐처리 시키는 밀폐수단(30)을 포함한다. 상기와 같이 구성된 어스앵커를 시공함에 있어서는 먼저, 천공장비를 이용하여 토류벽(5)에 소정의 경사각으로 매설공(2)을 천공한다. 이때, 가상붕괴선(S)과 매설공(2)의 만나는 지점을 중심으로 자유장부(Fr)와 정착장부(Fx)를 설정하고, 자유장부(Fr)와 정착장부(Fx)에 대응하는 앵커(10)를 매설공(2)으로 가설한다. 그리고 제 1주입호스(12)를 통하여 매설공(2)에 그라우트(4)를 주입하여 정착장부(Fx)를 형성한다. 또한, 그라우트(4)를 계속 채워서 매설공(2)의 외부로 그라우트(4)가 배출되면 자유장부(Fr)도 형성 완료된다. 마지막으로, 매설공(2)의 그라우트(4)를 소정 시간 동안 양생하여, 그라우트(4)의 양생이 완료되면, 인장장비로 강연선(11)을 긴장시켜 토류벽(5)의 외측에 있는 고정수단(3)으로 강연선(11)을 고정시킨다.An example of a conventional earth anchor is shown in FIG. Figure 7 relates to the "earth anchor" of Korean Utility Model Registration No. 20-0255711. Earth anchor 10 according to the publication is provided with a first injection hose 12 for injecting grout (4) into the buried hole (2), is inserted into the buried hole (2) in the ground and fixed means (on the ground) A plurality of strands (11) is fixed by 3) is installed, a part is embedded in the buried hole (2) to form a fixing chapter (Fx), the other side of the free portion for supporting the earth wall (5) from earth pressure ( A predetermined portion of the fixing tube part Fx, which is installed to surround the strand 11 and the first injection hose 12 formed of Fr, and is in contact with the protective tube 20 and the protective tube 20 for protecting from the grout 4. It includes a sealing means 30 for sealing the strand 11 of the. In constructing the earth anchor constructed as described above, first, the buried hole 2 is drilled in the earth wall 5 at a predetermined inclination angle by using the drilling equipment. At this time, the free ledger (Fr) and the fixing ledger (Fx) is set around the point where the virtual collapse line (S) and the buried hole (2) meet, and the anchor corresponding to the free ledger (Fr) and the fixing ledger (Fx) (10) is installed as a buried hole (2). In addition, the grout 4 is injected into the buried hole 2 through the first injection hose 12 to form the fixing part Fx. In addition, when the grout 4 is continuously filled and the grout 4 is discharged to the outside of the buried hole 2, the free chapter Fr is also formed. Finally, by curing the grout (4) of the buried hole (2) for a predetermined time, when curing of the grout (4) is completed, tension the strand (11) with a tensioning device to secure the outside of the earth wall (5) The strand wire 11 is fixed with (3).

종래 어스앵커의 다른 예가 도 8에 제시되어 있다. 도 8은 한국 특허 등록번호 제10-0457406호의 "그라운드앵커"에 관한 것이다. 여기에서, 어스앵커와 그라운드앵커는 동일한 용어이며, 어스앵커 및 그라운드앵커를 혼용하여 쓴다. 상기 공보에 따른 그라운드앵커는 각각 나선형의 돌출리브(11,21)를 가지는 정착철근(10) 및 자유철근(20)과, 상기 정착철근(10)과 자유철근(20)을 나사식으로 결합 또는 분리할 수 있도록 연결하여 주는 연결구(30)와, 상기 정착철근(10)의 선단부에 결착되는 정착구(40)와, 상기 정착철근(10)과 자유철근(20)을 따라 길게 설치되는 그라우트 호스(50)로 구성된 것에 있어서, 상기 자유철근(20)의 외면에 소정의 간격을 유지하면서 감싸지는 격리관(61)을 가지며, 그 격리관을 상기 연결구(30)에 밀실하게 연결시켜 주는 연결튜브(62)로 구성된다.Another example of a conventional earth anchor is shown in FIG. 8. 8 relates to a "ground anchor" of Korean Patent Registration No. 10-0457406. Here, the ground anchor and the ground anchor are the same term, and the ground anchor and the ground anchor are used interchangeably. The ground anchors according to the publication are screwed to the fixing reinforcing bar 10 and the free reinforcing bar (20) having spiral protruding ribs (11, 21), respectively, or the fixing reinforcing bar (10) and the free reinforcing bar (20) The connector 30 to be detachably connected, the fixing unit 40 is fastened to the distal end of the fixing reinforcing bar 10, the grout hose is installed along the fixing reinforcing bar 10 and the free reinforcing bar (20) 50, the connecting tube having an isolation tube 61 wrapped on the outer surface of the free rebar 20 while maintaining a predetermined interval, and tightly connecting the isolation tube to the connector 30 ( 62).

상기와 같은 어스앵커의 시공시 시공자는 설계된 어스앵커의 깊이만큼 시공하지 않고 원가절감 등의 이유로 더 짧게 시공하는 경우가 허다하여, 어스앵커의 시공이 완료된 후에 어스앵커의 심도를 검사할 필요성이 있다.When constructing the above-mentioned earth anchors, the contractor often does not install as much as the designed depth of the earth anchor and shortens the construction for the cost reduction, so it is necessary to inspect the depth of the earth anchor after the completion of the earth anchor construction. .

이렇게 어스앵커의 심도검사를 위하여 종래에는 초음파를 이용하여 어스앵커의 심도를 측정하였으나, 초음파를 이용하여 심도를 측정하는 경우 정확성이 떨어져 부정확하게 측정되는 단점이 있으며, 이외에도 여러가지 방법이 있으나 부정확하고 복잡하여 잘 사용되지 않고 있으며, 빠르고 간편하면서도 정확하게 어스앵커의 심도를 측정할 수 있는 심도검사장치 및 방법이 요구되고 있는 실정이다.In order to inspect the depth of the earth anchor, conventionally, the depth of the earth anchor is measured using ultrasonic waves. However, when the depth is measured using the ultrasonic waves, the depth of accuracy is inaccurately measured. In addition, there are various methods but inaccurate and complicated. It is not used well, and a situation that requires a depth inspection device and method that can measure the depth of the earth anchor fast, simple and accurate.

상기와 같은 어스앵커 이외에도 지반 또는 암반 등의 천공 후 삽입설치되는 락앵커, 락볼트 또는 쏘일네일링 등 막대 형태의 지반삽입부를 가진 지반삽입체의 시공후 지반삽입체의 심도를 검사하는 심도검사장치 및 방법도 요구되고 있다.In addition to the earth anchor as described above, the depth inspection device for inspecting the depth of the ground insert after the construction of the ground insert having a rod-shaped ground insert, such as a rock anchor, rock bolt or soil nailing is installed after drilling of the ground or rock And methods are also required.

본 발명은 전술한 문제를 해결하기 위하여 안출된 것으로, 간단하고 빠르며 정확하게 지반삽입체의 심도를 검사할 수 있으며, 지반삽입체의 시공이 완료된 후 상당한 시간이 흐른 후라 하더라도 언제든지 지반삽입체의 심도를 검사할 수 있을 뿐 아니라, 심도 검사선의 길이 체크시 심도 검사선의 길이를 측정하는 별도의 길이측정수단이 불필요하므로, 검사자는 한눈에 심도 검사선의 길이를 체크할 수 있는 지반삽입체 및 이를 이용한 지반삽입체의 시공방법 및 심도검사방법을 제공하는 데 그 목적이 있다.The present invention has been made in order to solve the above-described problems, it is possible to examine the depth of the ground insert, simple, fast and accurate, and even if a considerable time has passed after the construction of the ground insert is completed the depth of the ground insert In addition to inspecting the length of the depth inspection line, a separate length measuring means for measuring the length of the depth inspection line is unnecessary, so the inspector can check the length of the depth inspection line at a glance and the ground insertion using the same. The purpose is to provide a method of construction and depth inspection of the sieve.

전술한 목적을 달성하기 위한 본 발명의 지반삽입체는, 지반 또는 암반 등의 천공 후 삽입설치되는 어스앵커, 락앵커, 락볼트 또는 쏘일네일링 등의 막대 형태의 지반삽입부를 가진 지반삽입체에 있어서: 상기 지반삽입부에 고정되어 상기 지반삽입부와 나란히 마련되며, 상단이 지상으로 노출되어 개방되는 가이드봉; 상기 가이드봉 내에 상기 가이드봉의 길이방향을 따라 마련되는 심도 검사선;을 포함하여 이루어진다.The ground insert according to the present invention for achieving the above object is in the ground insert having a rod-shaped ground insert, such as earth anchor, rock anchor, rock bolt or soil nailing, which is installed after drilling of ground or rock. The guide rod is fixed to the ground insertion unit and is provided in parallel with the ground insertion unit, the guide rod having an upper end exposed to the ground. And a depth inspection line provided along the longitudinal direction of the guide rod in the guide rod.

상기에서, 지반삽입부란 지반에 천공된 천공부에 삽입되는 부분으로서, 쏘일네일링에 있어서는 네일을 말하며, 어스앵커에 있어서는 정착부 및 자유부를 말하는 것이다.In the above description, the ground insertion portion is a portion inserted into the perforated portion drilled in the ground, and refers to a nail in the soil nailing, and refers to a fixing portion and a free portion in the earth anchor.

상기에 있어서, 상기 심도 검사선의 일단에 고정되어 상기 가이드봉의 개방된 상면을 폐쇄시키는 캡이 부가되는 것이 바람직하다.In the above, it is preferable that a cap is fixed to one end of the depth inspection line to close the open upper surface of the guide rod.

상기에 있어서, 상기 가이드봉은 상기 지반삽입부 내부에 마련될 수 있다.In the above, the guide rod may be provided in the ground insertion portion.

상기에 있어서, 상기 심도 검사선에 소정의 단위로 눈금이 표시되는 것이 바람직하다.In the above, the scale is preferably displayed in a predetermined unit on the depth inspection line.

또, 이와 같은 목적을 달성하기 위한 본 발명의 지반삽입체의 심도검사방법은, 상기 지반삽입체의 시공후 상기 가이드봉으로부터 인출된 상기 심도 검사선의 길이를 체크하여 지반삽입체의 심도를 검사한다.In addition, the depth inspection method of the ground insert of the present invention for achieving the above object, by checking the length of the depth inspection line drawn from the guide rod after the construction of the ground insert to inspect the depth of the ground insert .

또, 이와 같은 목적을 달성하기 위한 본 발명의 지반삽입체의 시공방법은, 지반 또는 암반 등의 천공 후 삽입설치되는 어스앵커, 락앵커, 락볼트 또는 쏘일네일링 등의 막대 형태의 지반삽입부를 가진 지반삽입체의 시공방법에 있어서: 지반에 소정의 깊이와 직경으로 천공부를 형성하기 위하여 천공하는 단계; 상기 천공부에 지반삽입체의 지반삽입부 및 내부에 길이방향을 따라 심도 검사선이 마련된 가이드봉을 삽입하는 단계; 상기 천공부에 그라우트를 주입하여 상기 지반삽입체를 지반에 고정시키는 단계;를 포함하여 이루어진다.In addition, the construction method of the ground insert according to the present invention for achieving the above object, the ground insert portion of the rod shape, such as earth anchor, rock anchor, rock bolt or soil nailing to be installed after the drilling of the ground or rock A method of constructing an excavated ground insert, the method comprising: drilling a ground to form a perforation with a predetermined depth and diameter; Inserting a guide rod having a depth inspection line along a length direction in a ground insertion portion of the ground insert and the inside of the perforation portion; Injecting grout into the perforation to fix the ground insert to ground.

이하, 본 발명의 일 실시예에 의하여 본 발명의 구성과 작용을 상세히 설명하여, 지반 또는 암반 등의 천공 후 삽입설치되는 어스앵커, 락앵커, 락볼트 또는 쏘일네일링 등의 막대 형태의 지반삽입부를 가진 지반삽입체 중에서 어스앵커를 일예로 들어 설명하기로 한다.Hereinafter, by explaining the configuration and operation of the present invention according to an embodiment of the present invention in detail, the rod-type ground insertion such as earth anchor, rock anchor, rock bolt or soil nailing that is installed after the drilling of the ground or rock An earth anchor will be described as an example among the ground inserts having wealth.

도 1은 본 발명에 따른 지반삽입체 중 어스앵커의 일실시예로서, 어스앵커의 그라우트 주입 전을 개략적으로 도시한 종단면도이고, 도 2는 도 1에 의한 일 실시예에 따른 어스앵커의 시공후를 개략적으로 도시한 종단면도이며, 도 3은 도 1의 가이드봉을 확대하여 도시한 단면도이고, 도 4의 a,b는 가이드봉의 다른 실시예를 각각 도시한 단면도 및 평면도이며, 도 5는 가이드봉의 또 다른 실시예를 도시한 단면도이다.1 is a longitudinal cross-sectional view schematically showing an earth anchor in the ground insert according to the present invention, before grout injection of the earth anchor, and FIG. 2 is a construction of the earth anchor according to the embodiment shown in FIG. 1. 3 is a cross-sectional view illustrating an enlarged guide rod of FIG. 1, and FIGS. 4A and 4B are cross-sectional views and a plan view of another embodiment of the guide rod, respectively. It is sectional drawing which shows another Example of a guide rod.

도 1에 도시한 바와 같이, 본 실시예에 따른 앵커체(100)의 정착부(Fx) 및 자유부(Fr)를 구성하는 인장재(110)는 언본디드 강연선(unbonded PC strand)을 사용하였으며, 다수개의 인장재(110)가 마련된다.As shown in FIG. 1, the tension member 110 constituting the fixing part Fx and the free part Fr of the anchor body 100 according to the present embodiment used an unbonded PC strand. A plurality of tension members 110 are provided.

다수개의 인장재(110)의 중앙에는 상면이 개방된 가이드봉(130)이 마련되며, 이러한 다수개의 인장재(110)와 가이드봉(130)의 배치는 일실시예에 불과하므로, 실시예에 따라 다양하게 변경하여 실시할 수 있을 것이다.In the center of the plurality of tension member 110 is provided with a guide rod 130, the upper surface is open, the arrangement of the plurality of tension member 110 and the guide rod 130 is only one embodiment, it varies depending on the embodiment May be changed.

가이드봉(130)은 인장재(110)와 나란히 마련되며, 상단이 지상으로 노출된다.Guide rod 130 is provided in parallel with the tension member 110, the top is exposed to the ground.

즉, 가이드봉(130)의 일단은 인장재(110)의 정착부(Fx)에 마련되고, 타단은 지상으로 노출되는 인장재(110)와 함께 지상으로 노출된다.That is, one end of the guide rod 130 is provided in the fixing unit (Fx) of the tension member 110, the other end is exposed to the ground with the tension member 110 is exposed to the ground.

가이드봉(130) 내에는, 도 3에 도시한 바와 같이, 가이드봉(130)의 길이방향을 따라 심도 검사선(131)이 마련되어 있다.In the guide rod 130, as shown in FIG. 3, the depth inspection line 131 is provided along the longitudinal direction of the guide rod 130. As shown in FIG.

심도 검사선(131)의 일단에 가이드봉(130)의 개방된 상면을 폐쇄시킬 수 있는 캡(133)이 고정되는 것이 바람직하며, 캡(133)의 외측면에는 나사산(134)이 형성되어 있다.A cap 133 may be fixed to one end of the depth inspection line 131 to close the open upper surface of the guide rod 130, and a thread 134 is formed on the outer surface of the cap 133. .

캡(133)의 외측면에 형성된 나사산(134)은 가이드봉(130)의 내주면에 형성된 나사산과 나사결합되어 가이드봉(130)의 개방된 상면을 폐쇄시킨다.The thread 134 formed on the outer surface of the cap 133 is screwed with the thread formed on the inner circumferential surface of the guide rod 130 to close the open upper surface of the guide rod 130.

가이드봉(130)으로부터 캡(133)을 열고 닫기 편하도록 캡(133)의 상부에는 가이드봉(130)의 상면으로부터 돌출된 돌출부(135)가 형성되어 있어, 돌출부(135)를 잡고 캡(133)을 돌려 열 수 있다.A protrusion 135 protruding from the upper surface of the guide rod 130 is formed at the upper portion of the cap 133 so as to open and close the cap 133 from the guide rod 130, and hold the protrusion 135 to hold the cap 133. To open it.

캡의 다른 실시예로서, 도 4의 a,b에 도시한 바와 같이, 캡(133a)의 외측면에 나사산(135a)이 형성되어 가이드봉(130)의 내주면에 형성된 나사산과 나사결합하여, 가이드봉(130)의 상면을 폐쇄시킨다.As another embodiment of the cap, as shown in a, b of Figure 4, the thread (135a) is formed on the outer surface of the cap (133a) is screwed with the thread formed on the inner peripheral surface of the guide rod 130, the guide The upper surface of the rod 130 is closed.

이 실시예에서, 캡(133a)의 상면은 가이드봉(130)의 개방된 상면과 일직선을 이루도록 배치되며, 캡(133a)의 상면에는 드라이버 등으로 돌려 캡(133a)을 열 수 있도록 '-자형' 또는 '+자형'의 홈(136)이 형성되어 있다.In this embodiment, the top surface of the cap 133a is disposed to be in line with the open top surface of the guide rod 130, and the top surface of the cap 133a is rotated by a driver or the like so as to open the cap 133a. A groove 136 of 'or' + 'shape is formed.

캡의 또 다른 실시예로서, 도 5에 도시한 바와 같이, 캡(133b)의 상면에 고리부(137)가 마련되어 있고, 캡(133b)의 상면은 가이드봉(130)의 개방된 상면과 일직선을 이루도록 배치된다.As another embodiment of the cap, as shown in FIG. 5, a ring portion 137 is provided on the top surface of the cap 133b, and the top surface of the cap 133b is aligned with the open top surface of the guide rod 130. It is arranged to achieve.

캡(133b)의 외측면이 가이드봉(130)의 내주면에 밀착되어 캡(133b)이 가이드봉(130)의 개방된 상면을 폐쇄시키며, 캡(133b)의 상면에 마련된 고리부(137)를 잡고 캡(133b)을 당겨 열 수 있다.The outer surface of the cap 133b is in close contact with the inner circumferential surface of the guide rod 130, so that the cap 133b closes the open upper surface of the guide rod 130, and the ring portion 137 provided on the upper surface of the cap 133b. The cap 133b can be pulled open.

상기에서와 같이 캡의 구조는 다양하게 변경하여 실시할 수 있으며, 상기에서 제시한 캡의 구조 이외에도 실시예에 따라 다양하게 변경하여 실시할 수 있을 것이다.As described above, the structure of the cap may be variously changed, and in addition to the structure of the cap described above, it may be variously changed according to an embodiment.

가이드봉(130)의 하면은 폐쇄되는 것이 바람직하며, 가이드봉(130)의 내부에 마련된 심도 검사선(131)의 외면에는 그리스(grease) 등의 윤활제(139)가 도포될 수 있다.The lower surface of the guide rod 130 is preferably closed, and a lubricant 139 such as grease may be applied to the outer surface of the depth inspection line 131 provided in the guide rod 130.

심도 검사선(131)의 외면에 윤활제(139)가 도포됨으로써, 어스앵커의 시공후 캡(133)을 열어 심도 검사선(131)의 길이 체크시 윤활제(139)에 의해 심도 검사선(131)이 가이드봉(130)의 내부로부터 외부로 부드럽게 인출될 수 있으며, 어스앵커의 시공이 완료된 후 상당한 시간이 흐른 후라 하더라도 심도 검사선(131)의 외면에 도포된 윤활제(139)가 심도 검사선(131)을 보호하여 언제든지 어스앵커의 심도를 검사할 수 있다.Since the lubricant 139 is applied to the outer surface of the depth inspection line 131, the depth inspection line 131 is opened by the lubricant 139 when the length of the depth inspection line 131 is checked by opening the cap 133 after the earth anchor is constructed. The guide rod 130 may be smoothly drawn out from the inside, and even after a considerable time has passed since the construction of the earth anchor is completed, the lubricant 139 applied to the outer surface of the depth inspection line 131 may be a depth inspection line ( 131) can be used to inspect the depth of the earth anchor at any time.

나아가, 상기 심도 검사선(131)에는 소정의 단위, 가령 1m 단위로 눈금이 표시되어 있는 것이 바람직하며, 심도 검사선(131)에 눈금이 표시되면, 심도 검사선(131)의 길이 체크시 심도 검사선(131)의 길이를 측정하는 별도의 길이측정수단이 불필요하므로, 검사자는 한눈에 심도 검사선(131)의 길이를 체크할 수 있다.Further, it is preferable that a scale is displayed on the depth inspection line 131 in a predetermined unit, for example, 1 m unit. When the scale is displayed on the depth inspection line 131, the depth of the depth inspection line 131 is checked. Since a separate length measuring means for measuring the length of the inspection line 131 is unnecessary, the inspector can check the length of the depth inspection line 131 at a glance.

한편, 다수개의 인장재(110) 및 가이드봉(130)은, 도 1에 도시한 바와 같이, 어스앵커의 자유부(Fr)에 마련되는 인장재보호관(140)에 삽설되어 있다. 본 실시예의 인장재보호관(140)으로서는 PE파이프를 도시하였으나, 경우에 따라서는 주름관을 사용할 수 있다.Meanwhile, the plurality of tension members 110 and the guide rods 130 are inserted in the tension member protection tube 140 provided in the free portion Fr of the earth anchor as shown in FIG. 1. Although the PE pipe is illustrated as the tensile material protection tube 140 of the present embodiment, a corrugated tube may be used in some cases.

인장재보호관(140)의 하부에는 정착체(150)가 마련되어 있다.A fixing body 150 is provided below the tensile protection tube 140.

정착체(150)는 관형태로 형성되며, 자유부(Fr)로부터 연장되는 인장재(110)들과 가이드봉(130)이 함께 삽설되며, 외주면에는 그라우트와 정착되기 위하여 요철부(151)가 형성되어 있다.The fixing member 150 is formed in a tubular shape, and the tension members 110 and the guide rods 130 extending from the free portion Fr are inserted together, and the uneven portion 151 is formed on the outer circumferential surface to fix the grout. It is.

정착체(150)의 하부에는 정착헤드(160)가 마련된다.The fixing head 160 is provided below the fixing body 150.

인장재(110)는 앵커체(100)의 하부에서 정착헤드(160)에 의해 고정된다.The tension member 110 is fixed by the fixing head 160 under the anchor body 100.

정착헤드(160)와 정착체(150)는 나사결합되어 있으며, 정착헤드(160)와 정착체(150)는 일체로 형성될 수도 있지만, 제작상 편의를 위하여 정착헤드(160)와 정착체(150)를 구분하여 제작한 후 나사결합하였다.The fixing head 160 and the fixing body 150 are screwed together, but the fixing head 160 and the fixing body 150 may be integrally formed, but for the convenience of manufacturing, the fixing head 160 and the fixing body ( 150) were separated and manufactured by screwing.

정착헤드(160)에는 웨지콘(170)이 결합되어 있으며, 인장재(110)는 정착헤드(160)의 웨지콘(170)에 의하여 고정된다. 이와 같이 웨지콘(170)을 이용한 강연선의 고정 구조는 종래의 기술에 널리 사용되고 있으며 또한 다양한 방식들이 널리 알려져 있다.The wedgecon 170 is coupled to the fixing head 160, and the tension member 110 is fixed by the wedge cone 170 of the fixing head 160. As such, the fixing structure of the stranded wire using the wedge cone 170 is widely used in the related art, and various methods are widely known.

정착헤드(160)의 하부에는 보호캡(180)이 마련되어 내부의 인장재(110)를 보호하고 있다.A protection cap 180 is provided below the fixing head 160 to protect the tension member 110 therein.

상기에서, 가이드봉(130)은 인장재보호관(140) 또는 정착제(150)에 고정되어 마련되는 것이 바람직하다.In the above, the guide rod 130 is preferably provided is fixed to the tension protection tube 140 or the fixing agent 150.

한편, 상기의 실시예에서는 가이드봉(130)이 인장재(110)들과 함께 인장재보호관(140)에 삽설된 것으로 설명하였으나, 가이드봉(130)은 인장재보호관(140)의 외측에 마련될 수도 있음은 물론이다. 이렇게 가이드봉(130)이 인장재보호관(140)의 외측에 마련될 때에는 가이드봉(130)의 하면이 폐쇄되어, 그라우트의 유입을 차단해야 할 것이며, 가이드봉(130)을 인장재보호관(130) 또는 정착제(150)의 외측에 고정시켜야 할 것이다.Meanwhile, in the above embodiment, the guide rod 130 has been described as being inserted into the tension protection tube 140 together with the tension members 110, but the guide rod 130 may be provided outside the tension protection tube 140. Of course. When the guide rod 130 is provided on the outer side of the tension protection tube 140, the lower surface of the guide rod 130 is to be closed, and the inflow of grout should be blocked, and the guide rod 130 may be the tension protection tube 130 or It should be fixed to the outside of the fixing agent 150.

상기와 같이 구성된 본 발명의 일실시예에 따른 어스앵커의 시공방법을 살펴보기로 하며, 도 1 및 도 2를 참조하여 설명한다.The construction method of the earth anchor according to an embodiment of the present invention configured as described above will be described, with reference to FIGS. 1 and 2.

어스앵커를 시공할 지반(400)에 소정의 깊이와 직경으로 천공기를 이용하여 천공한다. (제 1단계)The ground anchors are drilled into the ground 400 to be constructed using a perforator at a predetermined depth and diameter. (Step 1)

지반(400)에 천공된 천공부(300)에 인장재(110)와 가이드봉(130) 등으로 구성된 앵커체(100)와, 상기 앵커체(100)와 별도로 구비된 그라우트 주입호스(200)를 함께 삽입한다. (제 2단계)An anchor body (100) consisting of a tension member (110), a guide rod (130), and the like, and a grout injection hose (200) provided separately from the anchor body (100) in the perforations (300) bored in the ground (400). Insert it together. (Step 2)

천공부(300)에 삽입된 그라우트 주입호스(200)를 이용하여 천공부(300)에 그라우트를 주입한다. (제 3단계)The grout is injected into the punching part 300 using the grout injection hose 200 inserted into the punching part 300. (Step 3)

이때, 그라우트는 시멘트 페이스트(cement paste) 또는 몰탈(mortor) 등으로 할 수 있다. 설정된 양으로 그라우트의 주입이 완료되면, 그라우트 주입호스(200)를 절단한다.At this time, the grout may be cement paste or mortar. When the grout injection is completed in the set amount, the grout injection hose 200 is cut.

주입된 그라우트의 양생이 완료되면, 인장장비로 인장재(110)를 긴장시켜 고정수단인 웨지콘(121) 등으로 인장재(110)의 앵커두부(120)를 정착시켜 시공을 완료한다. (제 4단계)When the curing of the injected grout is completed, the tension member 110 is tensioned with the tensioning equipment to fix the anchor head 120 of the tension member 110 with the wedge cone 121 as a fixing means to complete the construction. (Step 4)

이때, 인장재(110)를 정착시키는 웨지콘(121)이 고정된 브라켓(123)에 가이드봉(130)의 일단을 고정시켜, 가이드봉(130)의 상면이 브라켓(123)의 외부로 노출되도록 하는 것이 차후에 검사자가 하기에서 설명하는 어스앵커의 심도를 간편하게 검사할 수 있다는 측면에서 바람직하다.At this time, one end of the guide rod 130 is fixed to the bracket 123 to which the wedge cone 121 fixing the tension member 110 is fixed so that the top surface of the guide rod 130 is exposed to the outside of the bracket 123. It is preferable that the inspector can easily inspect the depth of the earth anchor described later.

인장재(110)를 긴장시켜 정착시키는 방법은 본 실시예에서와 같이 강연선을 사용한 경우 웨지콘(121)을 이용하여 고정시키는 방법이 사용될 수 있으며, 인장재로서 강봉을 사용할 경우 너트 등으로 조여 고정시킬 수 있으며, 인장재를 긴장시켜 정착시키는 방법은 종래에 널리 알려져 있고, 다양한 방법들이 사용되고 있다.As a method of tensioning and fixing the tension member 110, a method of fixing using the wedge cone 121 may be used when the strand is used as in the present embodiment, and when the steel rod is used as the tension member, it may be fixed by tightening with a nut or the like. In addition, a method of tensioning and fixing a tension member is widely known in the art, and various methods are used.

상기와 같이 시공된 어스앵커의 심도검사방법을 도 1 내지 도 3을 참조하여 설명하기로 한다.The depth inspection method of the earth anchor constructed as described above will be described with reference to FIGS. 1 to 3.

검사자가 브라켓(123)에 고정되어 있는 가이드봉(130)의 캡(133)을 열고, 가이드봉(130)으로부터 심도 검사선(131)을 인출하여 심도 검사선(131)의 길이를 체크하여 어스앵커의 심도를 검사한다. 이때 어스앵커의 심도는 인출된 심도 검사선(131)의 전체 길이로 추정되는 것이다. 또한 인출된 심도 검사선(131)의 전체 길이는 가이드봉(130)의 전체 길이와 대체로 일치할 것이다. 즉 어스앵커의 심도, 심도 검사선(131)의 전체 길이, 가이드봉(130)의 전체 길이는 서로 일치하며, 시공자로서는 실제로 검사되는 어스앵커의 심도를 조금이라도 깊게 검사되도록 하기 위하여 가이드봉(130) 및 심도 검사선(131)을 조금이라도 더 길게 어스앵커에 장착하려 할 것이며, 이러한 시공자의 노력은 자연스럽게 보다 더 정확한 어스앵커의 심도 측정이 가능하게 될 것이다.The inspector opens the cap 133 of the guide rod 130 fixed to the bracket 123, draws out the depth inspection line 131 from the guide rod 130, checks the length of the depth inspection line 131, and checks the earth. Examine the depth of the anchor. In this case, the depth of the earth anchor is estimated as the total length of the extracted depth inspection line 131. In addition, the entire length of the drawn depth inspection line 131 will generally coincide with the entire length of the guide rod 130. In other words, the depth of the ground anchor, the total length of the depth inspection line 131, the total length of the guide rod 130 is matched with each other, the guide rod 130 to allow the installer to inspect the depth of the earth anchor to be inspected even a little deeper ) And the depth inspection line 131 will be mounted to the earth anchor at least a little longer, and the effort of the contractor will naturally enable more accurate depth measurement of the earth anchor.

이때, 심도 검사선(131)에 눈금이 표시되어 있어, 별도의 길이측정수단 없이도 검사자는 한눈에 심도 검사선(131)의 길이를 체크할 수 있다.At this time, the scale is displayed on the depth inspection line 131, the inspector can check the length of the depth inspection line 131 at a glance without a separate length measuring means.

또한, 심도 검사선(131)의 외면에 윤활제(139)가 도포되어 있어 심도 검사선(131)이 가이드봉(130)의 내부로부터 외부로 부드럽게 인출되므로, 시공이 완료된 후 상당한 시간이 흐른 후라 하더라도 심도 검사선(131) 외면에 도포된 윤활제(139)가 심도 검사선(131)을 보호하여 언제든지 어스앵커의 심도를 검사할 수 있다.In addition, since the lubricant 139 is coated on the outer surface of the depth inspection line 131 and the depth inspection line 131 is smoothly drawn out from the inside of the guide rod 130, even after a considerable time has passed after the construction is completed. The lubricant 139 applied to the outer surface of the depth inspection line 131 protects the depth inspection line 131 so that the depth of the earth anchor can be inspected at any time.

어스앵커는 외력에 의해 토건구조물이 붕괴되거나 전도되는 것을 방지하기 위하여 보통 다수개가 한꺼번에 시공되므로, 검사자는 시공된 다수개의 어스앵커 중 최소한 2 내지 3%의 어스앵커의 심도만 검사하더라도, 확률상으로 따져볼 때 시공된 어스앵커 전체의 심도를 파악할 수 있으며, 또한 시공자는 이를 대비하여 어스앵커의 설계된 정확한 깊이 대로 시공을 하게 될 것이다.Earth anchors are usually constructed at one time in order to prevent collapse or overturning of construction structures by external forces, so the inspector is likely to examine the depth of at least two to three percent of the earth anchors, After all, you can see the depth of the entire earth anchor constructed, and the builder will be prepared to the exact depth of the earth anchor designed for this purpose.

도 6은 본 발명에 따른 지반삽입체 중 어스앵커의 다른 실시예로서, 어스앵커의 시공후를 개략적으로 도시한 종단면도이다.6 is a longitudinal cross-sectional view schematically showing the construction of the earth anchor as another embodiment of the earth anchor in the ground insert according to the present invention.

도 6에 도시한 바와 같이, 다른 실시예에 의한 어스앵커의 인장재인 강연선(110')은 다수개로 구성되어, 자유부(Fr)에서 일직선으로 형성되고, 정착부(Fx)에서 소정 간격으로 절곡된 형상을 가진다.As shown in FIG. 6, a plurality of strands 110 ′, which are tension members of the earth anchor, according to another embodiment, are formed in a plurality, and are formed in a straight line in the free portion Fr, and are bent at a predetermined interval in the fixing portion Fx. Has a shape.

다수개의 강연선(110')의 중앙에는 상면이 개방된 가이드봉(130')이 마련되며, 가이드봉(130')의 일단은 강연선(110')의 정착부(Fx)에 마련되고, 타단은 지상으로 노출된 강연선(110')와 함께 지상으로 노출된다.A guide rod 130 'having an upper surface is provided at the center of the plurality of strands 110', one end of the guide rod 130 'is provided at the fixing unit Fx of the strand 110', and the other end is It is exposed to the ground with the strand 110 'exposed to the ground.

가이드봉(130')의 구조는 상기에서 설명한 구조와 동일하므로 상기의 상세한 설명을 참조하기로 하고, 여기에서는 가이드봉(130')의 상세한 설명을 생략하기로 한다.Since the structure of the guide rod 130 'is the same as that described above, the detailed description thereof will be referred to, and the detailed description of the guide rod 130' will be omitted herein.

절곡부에는 공간을 확보하기 위한 간격재(170')와, 다수의 강연선(110')을 고정하기 위한 고정밴드(160')가 결합되어 있다.The bent portion has a spacer 170 ′ for securing a space and a fixing band 160 ′ for fixing a plurality of strands 110 ′.

폴리에틸렌(PE)이나 폴리염화비닐(PVC)과 같은 합성수지의 재질로 형성되는 인장재보호관(140')에 다수개의 인장재(110')와 그라우트 주입호스(200')와 가이드봉(130')이 삽설되며, 가이드봉(130')는 인장재보호관(140')에 고정된다.A plurality of tension members 110 ', grout injection hoses 200', and guide rods 130 'are inserted in the tension protection tube 140' formed of a synthetic resin material such as polyethylene (PE) or polyvinyl chloride (PVC). The guide rod 130 'is fixed to the tension protection tube 140'.

인장재보호관(140')과, 인장재보호관(140')과 맞닿는 강연선(110')들의 정착부는 밀폐튜브(150')에 의하여 밀폐된다.The tensioner protection tube 140 'and the fixing portion of the strands 110' contacting the tensioner protection tube 140 'are sealed by the sealing tube 150'.

밀폐튜브(150')은 자유부(Fr)와 정착부(Fx)의 경계를 구분 지으며, 또한 정착부(Fx)에 채워지는 그라우트가 인장재보호관(140')의 내부로 유입되는 것도 방지한다.The sealing tube 150 'distinguishes the boundary between the free part Fr and the fixing part Fx, and also prevents the grout filled in the fixing part Fx from flowing into the tension protecting member 140'.

이와 같이 밀폐튜브(150')를 이용한 인장재보호관(140')을 밀폐시키는 밀폐 구조는 이에 한정하는 것은 아니며, 상기와 같은 밀폐튜브(150') 이외의 방법이 종래 널리 사용되고 있으므로, 실시예에 따라 다양하게 적용하여 실시할 수 있음은 물론이다.As described above, the sealing structure for sealing the tensile material protection tube 140 'using the sealing tube 150' is not limited thereto, and since the method other than the sealing tube 150 'is widely used, according to an embodiment, Of course, it can be implemented in a variety of applications.

상기와 같이 구성된 어스앵커의 시공방법 및 심도검사방법은 상기에서 설명한 방법으로 시공 및 검사할 수 있다.The construction method and depth inspection method of the earth anchors configured as described above can be constructed and inspected by the method described above.

본 발명의 실시예에서는 지반삽입체 중 어스앵커를 일예로 들어 설명하였지만, 락앵커, 락볼트 또는 쏘일네일링 등의 막대 형태의 지반삽입부를 가진 지반삽입체에 상기의 구조와 시공방법 및 검사방법을 적용할 수 있음은 물론이다.In the embodiment of the present invention has been described as an example of the earth anchor of the ground insert, the above structure, construction method and inspection method in the ground insert having a rod-shaped ground insert, such as rock anchor, rock bolt or soil nailing Of course it can be applied.

상술한 바와 같이, 본 발명의 바람직한 실시예를 참조하여 설명하였지만, 해당기술분야의 숙련된 당업자는 하기의 특허청구범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 또는 변형하여 실시할 수 있다.As described above, although described with reference to a preferred embodiment of the present invention, those skilled in the art various modifications of the present invention without departing from the spirit and scope of the invention described in the claims below. Or it may be modified.

이상에서 설명한 바와 같은 본 발명의 지반삽입체 및 이를 이용한 지반삽입체의 시공방법 및 심도검사방법에 따르면, 다음과 같은 효과가 있다.According to the ground insert of the present invention and the construction method and depth inspection method of the ground insert using the same as described above, there are the following effects.

심도 검사선이 내장된 가이드봉이 마련되어, 지반삽입체의 시공후 검사자는 캡을 열고 가이드봉으로부터 심도 검사선을 인출하여 심도 검사선의 길이를 체크함으로써, 간단하고 빠르며 정확하게 지반삽입체의 심도를 검사할 수 있다.A guide rod with a built-in depth inspection line is provided, and after the construction of the ground insert, the inspector opens the cap, draws out the depth inspection line from the guide rod, and checks the length of the depth inspection line so that the depth of the ground insert can be inspected simply, quickly and accurately. Can be.

특히, 가이드봉의 하면이 폐쇄되면, 심도 검사선의 외면에 윤활제를 도포하여, 심도 검사시 심도 검사선이 가이드봉의 내부로부터 외부로 부드럽게 인출될 수 있으며, 지반삽입체의 시공이 완료된 후 상당한 시간이 흐른 후라 하더라도 심도 검사선의 외면에 도포된 윤활제가 심도 검사선을 보호하여 언제든지 지반삽입체의 심도를 검사할 수 있다.In particular, when the lower surface of the guide rod is closed, a lubricant is applied to the outer surface of the depth inspection line, the depth inspection line can be drawn out smoothly from the inside of the guide rod to the outside during the depth inspection, a considerable time has passed after the construction of the ground insert is completed Even if it is, the lubricant applied to the outer surface of the depth inspection line protects the depth inspection line so that the depth of the ground insert can be inspected at any time.

나아가, 심도 검사선에 소정의 단위로 눈금이 표시되면, 심도 검사선의 길이 체크시 심도 검사선의 길이를 측정하는 별도의 길이측정수단이 불필요하므로, 검사자는 한눈에 심도 검사선의 길이를 체크할 수 있다.Furthermore, when the scale is displayed on the depth inspection line in a predetermined unit, an extra length measuring means for measuring the length of the depth inspection line is unnecessary when checking the length of the depth inspection line, so that the inspector can check the length of the depth inspection line at a glance. .

도 1은 본 발명에 따른 지반삽입체 중 어스앵커의 일실시예로서, 어스앵커의 그라우트 주입 전을 개략적으로 도시한 종단면도.1 is a longitudinal sectional view schematically showing an earth anchor in an ground insert according to the present invention, before grout injection of the earth anchor;

도 2는 도 1에 의한 일 실시예에 따른 어스앵커의 시공 후를 개략적으로 도시한 종단면도.Figure 2 is a longitudinal sectional view schematically showing the construction after the earth anchor according to an embodiment according to Figure 1;

도 3은 도 1의 가이드봉을 확대하여 도시한 단면도.3 is an enlarged cross-sectional view of the guide rod of FIG.

도 4의 a,b는 가이드봉의 다른 실시예를 각각 도시한 단면도 및 평면도.Figure 4 a, b is a cross-sectional view and a plan view showing another embodiment of the guide rod, respectively.

도 5는 가이드봉의 또 다른 실시예를 도시한 단면도.5 is a sectional view showing another embodiment of the guide rod.

도 6은 본 발명에 따른 지반삽입체 중 어스앵커의 다른 실시예로서, 어스앵커의 시공후를 개략적으로 도시한 종단면도.6 is a longitudinal sectional view schematically showing the construction of the earth anchor as another embodiment of the earth anchor in the ground insert according to the present invention.

도 7은 종래 일예의 어스앵커의 시공후를 개략적으로 도시한 종단면도.Figure 7 is a longitudinal sectional view schematically showing the construction after the conventional example of the earth anchor.

도 8은 종래 다른 예의 어스앵커의 시공후를 개략적으로 도시한 종단면도.Figure 8 is a longitudinal sectional view schematically showing the construction after the conventional conventional ground anchors.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

100 : 앵커체 110 : 인장재100 anchor member 110 tension member

120 : 앵커두부 121 : 웨지콘120: anchor head 121: wedge cone

123 : 브라켓 130 : 가이드봉123: bracket 130: guide rod

131 : 심도 검사선 133 : 캡131: depth inspection line 133: cap

134 : 나사산 135 : 돌출부134: thread 135: protrusion

139 : 윤활제 140 : 인장재보호관139: Lubricant 140: tensile protective tube

150 : 정착제 151 : 요철부150: fixing agent 151: uneven portion

160 : 정착헤드 170 : 웨지콘160: fixing head 170: wedge cone

180 : 보호캡 200 : 그라우트 주입호스180: protective cap 200: grout injection hose

300 : 천공부 400 : 지반300: drilling part 400: ground

Claims (6)

지반 또는 암반 등의 천공 후 삽입설치되는 어스앵커, 락앵커, 락볼트 또는 쏘일네일링 등의 막대 형태의 지반삽입부를 가진 지반삽입체에 있어서:In a ground insert having a rod-shaped ground insert, such as an earth anchor, a rock anchor, a rock bolt, or a nail nailing, which is inserted after drilling a ground or a rock: 상기 지반삽입부에 고정되어 상기 지반삽입부와 나란히 마련되며, 상단이 지상으로 노출되어 개방되는 가이드봉;A guide rod fixed to the ground insertion unit and provided in parallel with the ground insertion unit, the guide rod having an upper end exposed to the ground; 상기 가이드봉 내에 상기 가이드봉의 길이방향을 따라 마련되는 심도 검사선;을 포함하여 이루어지는 것을 특징으로 하는 지반삽입체.And a depth inspection line provided along the longitudinal direction of the guide rod in the guide rod. 제 1항에 있어서,The method of claim 1, 상기 심도 검사선의 일단에 고정되어 상기 가이드봉의 개방된 상면을 폐쇄시키는 캡이 부가되는 것을 특징으로 하는 지반삽입체.And a cap fixed to one end of the depth inspection line to close the open top surface of the guide rod. 제 1항에 있어서,The method of claim 1, 상기 가이드봉은 상기 지반삽입부 내부에 마련되는 것을 특징으로 하는 지반삽입체.The guide rod is a ground insert, characterized in that provided in the ground insert. 제 1항에 있어서,The method of claim 1, 상기 심도 검사선에 소정의 단위로 눈금이 표시된 것을 특징으로 하는 지반삽입체.The ground insert is characterized in that the scale is displayed on the depth inspection line in a predetermined unit. 제 1항 내지 제 4항 중 어느 한 항의 지반삽입체의 시공후 상기 가이드봉으로부터 인출된 상기 심도 검사선의 길이를 체크하여 지반삽입체의 심도를 검사하는 것을 특징으로 하는 지반삽입체의 심도검사방법.After the construction of the ground insert according to any one of claims 1 to 4, the depth of the ground insert is inspected by checking the length of the depth inspection line drawn from the guide rod to inspect the depth of the ground insert . 지반 또는 암반 등의 천공 후 삽입설치되는 어스앵커, 락앵커, 락볼트 또는 쏘일네일링 등의 막대 형태의 지반삽입부를 가진 지반삽입체의 시공방법에 있어서:In the construction method of a ground insert having a rod-shaped ground insert, such as an earth anchor, a rock anchor, a rock bolt, or a nail nailing, which is inserted after drilling a ground or a rock: 지반에 소정의 깊이와 직경으로 천공부를 형성하기 위하여 천공하는 단계;Perforating to form perforations at a predetermined depth and diameter in the ground; 상기 천공부에 지반삽입체의 지반삽입부 및 내부에 길이방향을 따라 심도 검사선이 마련된 가이드봉을 삽입하는 단계;Inserting a guide rod having a depth inspection line along a length direction in a ground insertion portion of the ground insert and the inside of the perforation portion; 상기 천공부에 그라우트를 주입하여 상기 지반삽입체를 지반에 고정시키는 단계;를 포함하여 이루어지는 지반삽입체의 시공방법.And injecting grout into the perforation to fix the ground insert to the ground.
KR1020050028222A 2005-04-04 2005-04-04 Insert in the ground and construction method and test method of thereof KR100517735B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050028222A KR100517735B1 (en) 2005-04-04 2005-04-04 Insert in the ground and construction method and test method of thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050028222A KR100517735B1 (en) 2005-04-04 2005-04-04 Insert in the ground and construction method and test method of thereof

Publications (1)

Publication Number Publication Date
KR100517735B1 true KR100517735B1 (en) 2005-09-28

Family

ID=37305031

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050028222A KR100517735B1 (en) 2005-04-04 2005-04-04 Insert in the ground and construction method and test method of thereof

Country Status (1)

Country Link
KR (1) KR100517735B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100763032B1 (en) 2005-12-09 2007-10-09 양영훈 A prestressing soil nailing structure
KR101015878B1 (en) * 2007-04-10 2011-02-23 주식회사 선택코리아 Depth measuring apparatus for Reinforcing pile
KR101400750B1 (en) * 2012-10-30 2014-05-29 장성두 Agitating device for ground improvement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100763032B1 (en) 2005-12-09 2007-10-09 양영훈 A prestressing soil nailing structure
KR101015878B1 (en) * 2007-04-10 2011-02-23 주식회사 선택코리아 Depth measuring apparatus for Reinforcing pile
KR101400750B1 (en) * 2012-10-30 2014-05-29 장성두 Agitating device for ground improvement

Similar Documents

Publication Publication Date Title
US5775849A (en) Coupler for ducts used in post-tension rock anchorage systems
EP2427633B1 (en) Method, system, use of the system and reinforcement member for rock reinforcement
US4773794A (en) Injection anchors for placement in pre-drilled holes
KR20090101045A (en) Pre-tension soil nail and method of soil nail construction using the same
KR100955469B1 (en) Guid Apparatus for Soil Nail of reinforcing a slope
KR100517735B1 (en) Insert in the ground and construction method and test method of thereof
KR100457406B1 (en) Ground Anchor
KR100908085B1 (en) Ground adhering soil nailing structure and ground reinforcement method using the same
KR101903699B1 (en) Anchor assembly
KR101285031B1 (en) Steel strand removing type ground anchor
KR20060112798A (en) Insert in the ground and test method of thereof
KR101241351B1 (en) The nail with high anchorage and the nailing construction method thereof
JP2009002023A (en) Prop for protective structure against avalanche and falling rock
KR101243281B1 (en) Steel strand cable bolts and rock bolts for settlement body construction equipment
KR100930541B1 (en) Slope reinforcement device and method
KR20140049729A (en) Steel strand removing type ground anchor
JP2688340B2 (en) U-turn type ground anchor structure and PC steel stranded wire used for the anchor structure
JP5939483B2 (en) Installing a filler detection sensor in the filler injection gap
KR100869369B1 (en) The ground reinforcement apparatus and method grouting type using bundle steel pipe
JPS5817792Y2 (en) End closure structure of earth anchor sheath
JP4572285B2 (en) Ready-made piles with embedded optical fibers
JP3513905B2 (en) Permanent anchor method
KR101277730B1 (en) Anchor settle for integral body construction equipment and construction methods
KR200384163Y1 (en) Apparatus for tensioning ground reinforcing material
KR101346635B1 (en) Device and method for reinforcing the ground using pc twisted steel wire

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120709

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20121211

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20190813

Year of fee payment: 15