KR101762849B1 - Drillship - Google Patents

Drillship Download PDF

Info

Publication number
KR101762849B1
KR101762849B1 KR1020160024558A KR20160024558A KR101762849B1 KR 101762849 B1 KR101762849 B1 KR 101762849B1 KR 1020160024558 A KR1020160024558 A KR 1020160024558A KR 20160024558 A KR20160024558 A KR 20160024558A KR 101762849 B1 KR101762849 B1 KR 101762849B1
Authority
KR
South Korea
Prior art keywords
drill
derrick
door frame
interior
hull
Prior art date
Application number
KR1020160024558A
Other languages
Korean (ko)
Inventor
김성준
강상민
김병만
조승호
최봉균
Original Assignee
삼성중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성중공업 주식회사 filed Critical 삼성중공업 주식회사
Priority to KR1020160024558A priority Critical patent/KR101762849B1/en
Application granted granted Critical
Publication of KR101762849B1 publication Critical patent/KR101762849B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • B63B27/02
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/10Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/02Supports for the drilling machine, e.g. derricks or masts specially adapted for underwater drilling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B2003/147Moon-pools, e.g. for offshore drilling vessels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mining & Mineral Resources (AREA)
  • Ocean & Marine Engineering (AREA)
  • Civil Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

A drill ship is disclosed. The drill ship according to one aspect of the present invention includes a hull having a door pool formed therein, a drill rig placed on a drill floor of the hull and a lower portion inserted into the interior of the door pool to be supported inside the door pool, do.

Description

DRILLSHIP {DRILLSHIP}

The present invention relates to a drill ship.

The drill rig requires a Derrick structure for drilling. Derrick usually has the same shape as a high tower. Because these deriks are quite high, drill rigs can be a major obstacle to passing through places with air draft limitations.

For example, in order to pass through the Panama Canal or the Suez Canal, it is necessary to meet the Air Draft required by the Flight Administration, as it may pass under certain bridges during canal passage.

Therefore, if the height of the derrick included in the drill ship does not satisfy this requirement, the drill ship may not pass through the Panama Fort or the Suez Canal.

Korean Patent Laid-Open Publication No. 10-2011-0013045 (2011.02.09, Derrick and drilling line including it)

The embodiment of the present invention is intended to provide a drill ship capable of adjusting the height of a drill derrick as required.

According to one aspect of the present invention there is provided a hull comprising a door hull, a drill that is installed on the drill floor of the hull and the lower portion is inserted into the interior of the door frame and can be supported inside the door frame, Is provided.

Here, a stepped portion protruding from the upper portion is formed in the interior of the door frame, and the sectional area of the doorway deriving portion is smaller than the upper opening area of the door frame and larger than the step opening area of the door frame.

The drill ship can be supported on the drill floor by the rotation of the drill derrick with the drill derrick raised and each corner of the drill derrick deviates from the opening of the portal.

The drill ship can be supported on the drill floor by turning the upper surface of the drum while the drill derrick is lifted so that each corner of the drill derrick deviates from the opening of the drum.

The drill ship can be supported on the drill floor by the support bar protruding from the opening face of the door frame with the drill derrick raised.

The elevating portion may include a crane installed in the hull.

Further, the elevating portion may include a jack-up device installed on the hull.

According to the embodiment of the present invention, since the lower part of the drilling deck installed on the drill floor can be inserted into the interior of the door, it is possible to realize a drill ship which can adjust the height of the drilling derrick if necessary.

BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a side view schematically showing a state in which a height of a drilling derrick is adjusted in a drill ship according to an embodiment of the present invention; FIG.
2 is a plan view schematically showing an example of a drill derrick and a drum hole in a drill ship according to an embodiment of the present invention;
3 is a plan view schematically showing another example of a drilling derrick and a drum in a drill ship according to an embodiment of the present invention;
4 is a plan view schematically showing another example of a drilling derrick and a drum in a drill ship according to an embodiment of the present invention;
5 is a side view schematically showing a state in which a height of a drilling derrick is adjusted in a drill ship according to another embodiment of the present invention.

The terminology used in this application is used only to describe a specific embodiment and is not intended to limit the invention. The singular expressions include plural expressions unless the context clearly dictates otherwise.

In the present application, when a component is referred to as "comprising ", it means that it can include other components as well, without excluding other components unless specifically stated otherwise. Also, throughout the specification, the term "on" means to be located above or below the object portion, and does not necessarily mean that the object is located on the upper side with respect to the gravitational direction.

In addition, the term " coupled " is used not only in the case of direct physical contact between the respective constituent elements in the contact relation between the constituent elements, but also means that other constituent elements are interposed between the constituent elements, Use them as a concept to cover each contact.

Also, the terms first, second, etc. may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from another.

The sizes and thicknesses of the respective components shown in the drawings are arbitrarily shown for convenience of explanation, and thus the present invention is not necessarily limited to those shown in the drawings.

DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT Hereinafter, an embodiment of a drill ship according to the present invention will be described in detail with reference to the accompanying drawings. Referring to the accompanying drawings, the same or corresponding components are denoted by the same reference numerals, Is omitted.

Generally, a drill floor, a drill floor, a setback area, a guide rail, and the like may be formed on the drill ship. A propeller for propulsion of the ship and an azimuth thruster for dynamic positioning (DP) can be installed at the bottom of the drill ship hull.

In this case, the door frame may be formed so as to pass through the hull of the drill rig. The drill floor may be coupled to the hull of the drill rig and disposed above the door frame, and a derrick structure for drilling may be disposed above the drill floor.

A setback area can be connected to the drill floor by being connected to the hull of the drill ship. The upper surface of the drill floor and the upper surface of the setback area may be disposed on the same horizontal plane. On the other hand, if the derrick structure is installed directly on the deck rather than on the drill floor, the setback area may be replaced by a deck as well as the drill floor.

These two-hundred areas can be placed on the fore and aft sides, respectively, on the basis of the drill floor, thereby providing a riser space for a riser or drill pipe used in drilling operations.

The guide rails may be formed on the top surface of the drill floor and the two-hundred areas and may extend horizontally in a straight line from the drill floor to the two-hundred areas to guide horizontal movement of the sub-module.

1 is a side view schematically showing a state in which a height of a drilling derrick is adjusted in a drill ship according to an embodiment of the present invention. 2 is a plan view schematically showing an example of a drill derrick and a drum hole in a drill ship according to an embodiment of the present invention. 3 is a plan view schematically showing another example of a drill derrick and a door drum in a drill ship according to an embodiment of the present invention. FIG. 4 is a plan view schematically showing another example of a drill derrick and a door drum in a drill ship according to an embodiment of the present invention.

1 to 4, a drill ship 1000 according to an embodiment of the present invention includes a hull 100, a drilling derrick 200, and a lift portion 300.

The hull 100 is a portion where the door 110 is formed, and can constitute the main body of the drill ship 1000 according to the present embodiment. In this case, the door frame 110 may be formed to pass through the hull 100. The hull 100 may be formed with a drill floor 10 or the like and the drill floor 10 may be coupled to the hull 100 and disposed on the upper side of the door 110, The drilling derrick 200 can be disposed on the upper side.

The drilling derrick 200 is a part installed on the drill floor 10 of the hull 100 and the lower part of which can be inserted into the interior of the interior space 110 to be supported inside the interior space of the interior space 110, ) Can be equipped with various facilities necessary for drilling work.

The elevating part 300 is a part for raising and lowering the drilling deck 200, and the drilling derrick 200 can be moved up and down as a unit to a required position.

Generally, the drilling derrick 200 needs to be installed at a predetermined height or higher for drilling, but it needs to be lowered in height as it passes under a specific bridge during passage of a canal.

Therefore, in the drill ship 1000 according to the present embodiment, the lower portion of the drill derrick 200 can be supported while being inserted into the inside of the drum 110, if necessary, and the height of the drill rig 200 can be adjusted Do.

In the drill ship 1000 according to the embodiment of the present invention, a step 111 protruding from the upper part is formed in the interior of the door frame 110, the sectional area of the door derrick 200 is smaller than the upper opening area of the door frame 110, May be larger than the open area of the step 111 of the base 110.

Therefore, even if the lower portion of the drill derrick 200 is inserted into the interior of the door frame 110, it can be supported naturally without being lowered further by being caught by the step 111.

In the drill ship 1000, the drill derrick 200 is rotated in a state in which the drill derrick 200 is lifted, so that each corner of the drill derrick 200 deviates from the open face of the drum 110, Can be supported on the drill floor (10).

That is, as shown in FIG. 2, the lower portion of the drill derrick 200 may be inserted into the interior of the interior of the interior of the interior of the interior of the interior of the interior of the interior of the interior of the hall. When the drilling derrick 200 is lifted and the drilling derrick 200 is rotated such that each corner is offset from the open face of the drum 110, the drilling derrick 200 is installed on the drill floor 10, Can be maximized.

In the drill ship 1000, the upper surface of the drum 110 is rotated in a state where the drill derrick 200 is lifted, so that each edge of the drill derrick 200 deviates from the open surface of the drum 110, 200 can be supported on the drill floor 10.

3, the lower portion of the drilling derrick 200 is inserted into the interior of the interior of the interior of the interior of the interior of the interior of the interior of the interior of the interior of the interior of the interior of the interior of the hall. When the drill derrick 200 is lifted and the upper surface of the drum 110 is rotated so that each corner is offset from the open side of the drum 110, the drill derrick 200 is installed on the drill floor 10, The height can be maximized.

The drill ship 1000 can be supported on the drill floor 10 by the support 113 protruding from the open face of the door 110 in a state where the drill derrick 200 is lifted .

That is, as shown in FIG. 4, the lower portion of the drill derrick 200 is inserted into the interior of the interior of the interior of the interior of the interior of the interior of the interior of the interior of the interior of the interior of the hall. When the support 113 is protruded from the open face of the door frame 110 after lifting the drill derrick 200, the drill derrick 200 is mounted on the support floor 113 by being mounted on the support base 113 Its height can be maximized.

In the drill ship 1000 according to the present embodiment, the lifting unit 300 may include a crane 310 installed on the hull 100. That is, the height of the drilling derrick 200 can be raised and lowered integrally through the crane 310.

The installation position and the number of the cranes 310 are not limited to those shown in the drawings, and one or more cranes 310 may be arranged around the drilling derrick 200 in various ways.

5 is a side view schematically showing a state in which the height of a drilling derrick is adjusted in a drill ship according to another embodiment of the present invention.

5, in the drill ship 2000 according to another embodiment of the present invention, the lifting unit 300 may include a jack-up device 320 installed on the hull 100. That is, the height of the drilling derrick 200 can be raised and lowered integrally through the jack-up device 320.

In this case, the jack-up device 320 refers to a device that adjusts the height by means of the engagement structure of the rack and the pinion gear.

When the upper surface of the door frame 110 is rotated after lifting the drilling derrick 200 through the jack-up device 320 as described above, the height adjustment of the drilling deck 200 is automatically performed without an artificial operation by the operator ≪ / RTI >

Meanwhile, the drill ship 2000 according to another embodiment of the present invention is the same as or similar to the main configuration of the drill ship 1000 according to the embodiment of the present invention except for the above-mentioned features, A detailed description thereof will be omitted.

It will be apparent to those skilled in the art that various modifications and additions to, or additions to, the components may be made without departing from the scope of the present invention as set forth in the appended claims. The present invention can be variously modified and changed by those skilled in the art, and it is also within the scope of the present invention.

10: Drill floor 100: Hull
110: a frame 111: a step
113: support 200: drilling derrick
300: elevating part 310: crane
320: Jack-up device 1000, 2000: Drill ship

Claims (7)

hull;
A portal provided above and below the hull;
A drill floor coupled to the hull and disposed above the door frame;
A drilling deck having a lower portion inserted into the interior of the door frame to be supported in the interior of the door frame and integrally raised and lowered on the drill floor during drilling; And
And an elevating part for elevating and lowering the drilling derrick integrally,
A stepped portion protruding from the upper portion is formed in the interior of the door frame,
The sectional area of the drill derrick is smaller than the upper opening area of the door frame and larger than the step opening area of the door frame so that even if the lower portion of the door hole is inserted into the door frame, In addition,
Wherein the drill derrick is supported on the drill floor by each corner of the drill derrick being offset from an open face of the drum pool in a state in which the drill derrick is integrally lifted using the elevating part.
delete The method according to claim 1,
And the drilling derrick is rotated in a state in which the drilling derrick is lifted.
The method according to claim 1,
The upper surface of the drum being rotated while the drill derrick is lifted.
hull;
A portal provided above and below the hull;
A drill floor coupled to the hull and disposed above the door frame;
A drilling deck having a lower portion inserted into the interior of the door frame to be supported in the interior of the door frame and integrally raised and lowered on the drill floor during drilling; And
And an elevating part for elevating and lowering the drilling derrick integrally,
A stepped portion protruding from the upper portion is formed in the interior of the door frame,
The sectional area of the drill derrick is smaller than the upper opening area of the door frame and larger than the step opening area of the door frame so that even if the lower portion of the door hole is inserted into the door frame, In addition,
Wherein the drill derrick is supported on the drill floor by projecting a support base from the open face of the door frame while the lower portion of the drill derrick is seated on the support base in a state in which the drill derrick is integrally lifted using the lift portion, Easy.
6. The method according to any one of claims 1 to 5,
Wherein the elevating portion includes a crane installed in the hull.
6. The method according to any one of claims 1 to 5,
Wherein the elevating portion includes a jack-up device installed on the hull.
KR1020160024558A 2016-02-29 2016-02-29 Drillship KR101762849B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160024558A KR101762849B1 (en) 2016-02-29 2016-02-29 Drillship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160024558A KR101762849B1 (en) 2016-02-29 2016-02-29 Drillship

Publications (1)

Publication Number Publication Date
KR101762849B1 true KR101762849B1 (en) 2017-07-28

Family

ID=59422198

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160024558A KR101762849B1 (en) 2016-02-29 2016-02-29 Drillship

Country Status (1)

Country Link
KR (1) KR101762849B1 (en)

Similar Documents

Publication Publication Date Title
US9988848B2 (en) Method and apparatus for drilling multiple subsea wells from an offshore platform at a single site
US9458680B2 (en) Drilling rig
KR101762849B1 (en) Drillship
CN101857075B (en) Lifting system of slipway
KR100895475B1 (en) Slip way lift system
KR101762841B1 (en) Derrick structure
KR20160112502A (en) Semi-submersible marine structure
KR20120014632A (en) Device for guiding blow out preventer
KR101762838B1 (en) Derrick structure
EP3755618B1 (en) Vessel and method for performing subsea wellbore related activities, e.g. workover activities, well maintenance, installing an object on a subsea well bore
KR101824210B1 (en) Derrick structure and drillship including the same
KR20110052879A (en) Drillship
KR20150021608A (en) Heli-deck for ship
US9759021B2 (en) Riser handling on a drilling rig and a flip and service machine for riser handling on a drilling rig
US20140116676A1 (en) Support frame
KR101797616B1 (en) Drillship With Lower Deck For Storing Blowout Preventer Test Equipment
KR101801951B1 (en) Drillships
KR20110013045A (en) Derrick and drillship including the same
KR102107309B1 (en) Riser Handling System and Oil Prospection offshore rig Including The Same
RU2009127587A (en) MOBILE SHIPPING SYSTEM
KR102606579B1 (en) Offshore structure
US11203906B2 (en) Vessel and method to perform subsea wellbore related operations
KR20170098038A (en) Floating structure without moonpool
KR102242211B1 (en) Riser Handling System and Oil Prospection offshore rig Including The Same
JPWO2021191152A5 (en)

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant