KR101742267B1 - Selection process unit alternative device of building and construction - Google Patents
Selection process unit alternative device of building and construction Download PDFInfo
- Publication number
- KR101742267B1 KR101742267B1 KR1020150176535A KR20150176535A KR101742267B1 KR 101742267 B1 KR101742267 B1 KR 101742267B1 KR 1020150176535 A KR1020150176535 A KR 1020150176535A KR 20150176535 A KR20150176535 A KR 20150176535A KR 101742267 B1 KR101742267 B1 KR 101742267B1
- Authority
- KR
- South Korea
- Prior art keywords
- construction
- alternative
- activity
- information
- basic
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
Abstract
Description
The present invention relates to an alternative process selecting apparatus for building and construction which can select an alternative process based on the entire process period and cost, while confirming an alternative process that can be changed per unit process for a construction and construction project under construction will be.
In general, construction and construction projects are made up of a number of processes, and as the construction progresses, a lot of manpower and materials are input by the basic processes planned in the initial designing process.
Generally, in the case of a project of construction and construction, it is difficult to change basic processes because a combination of various unit processes and a unit process are formed by combination of those having no relationship with each other.
However, as the construction and construction projects progress substantially, the basic processes can be changed, and if they are changed, there is a problem that the influence on the entire process can not be confirmed by the change of the alternative process.
The inventors have therefore proposed a technique for selecting a number of alternative processes that can be used as an alternative to the basic process and analyzing the overall air and cost impact.
Therefore, the object of the present invention is to select an alternative process for construction and construction that can select an optimal alternative process based on the entire process period and cost, Device.
The apparatus for selecting an alternative process for construction and construction according to the present invention is characterized in that the information on the operation period and the normal operation cost for the basic process of the unit process selected for the first time in the construction and construction project is registered as basic information and stored A process registration module (10); A basic
The information on the operation period of the basic
[Equation 1]
I = Activity indicator, k = Alternatives for each activity, mi = Number of alternatives for the corresponding Activity i, and Costik (i) = Direct cost of selected Activity i, IDC = Indirect Cost, Total_Dur = Project Total Construction Period.
&Quot; (2) "
Here, Xik is a binary number that determines one of the alternatives of Activity i.
&Quot; (3) "
Here, ESj is the earliest start time of the trailing activity (ES below ES), Esi is the ES of the preceding activity i, Dik is the construction period of each preceding activity, Lag ij is the delay between the preceding Activity i and the trailing Activity j It is time.
According to the alternate process selecting apparatus for building and construction of the present invention, when a plurality of alternative processes that can be substituted for each unit process belonging to a project are registered, the process can be combined with neighboring processes when process change is required, And an optimum alternative process can be selected.
1 is a block diagram of an alternative process selection system for construction and construction according to the present invention;
FIG. 2 is an exemplary screen for classifying basic information according to a unit process classified by the basic process classification module according to the present invention. FIG.
3A is an exemplary screen of an 'alternative process input window' presented in the alternative process registration module of the present invention.
FIG. 3B is an exemplary screen of the 'alternative information input window' proposed by the alternative process registration module of the present invention.
FIG. 3C is an example screen for sorting alternative processes registered through the alternative process registration module of the present invention. FIG.
4 is an exemplary screen of a 'daily overhead cost input window' proposed by the daily overhead expense registration module of the present invention.
5 is an exemplary diagram showing an alternative process selected by the alternative process selection module of the present invention.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an alternative process selecting apparatus for construction and construction according to the present invention will be described in detail with reference to the accompanying drawings.
As shown in FIG. 1, the alternative process selection apparatus for construction and construction of the present invention includes a basic
The basic
The basic
The alternative
The alternative
[Equation 1]
I = Activity indicator, k = Alternatives for each activity, mi = Number of alternatives for the corresponding Activity i, and Costik (i) = Direct cost of selected Activity i, IDC = Indirect Cost, Total_Dur = Project Total Construction Period. By using the equation (1), the sum of the direct costs and the overhead costs is minimized when the alternative process is selected.
&Quot; (2) "
Here, Xik is a binary number that determines one of the alternatives of Activity i. One of the alternatives can be determined using Equation (2).
&Quot; (3) "
Here, i is the preceding activity and j is the trailing activity when the trailing relationship of Activity i and j has Fnish to Start. Where Esj is the earliest start time of the trailing Activity (ES below ES), Esi is the ES of the preceding Activity i, Dik is the construction period of each preceding Activity, Lag ij is the delay between the preceding Activity i and the Trailing Activity j It is time. Therefore, if the trailing relationship between the activities is Finish to Start, the trailing activity ES is always larger than the sum of the ES, construction period and delay time of the selected leading activity among the alternatives. Using Equation (3), it is possible to confirm whether the selected alternative process is in violation of the line-following relationship.
The optimum
Hereinafter, an operation process of the alternative process confirmation apparatus for building and construction will be described.
First, when information on the first selected work period, normal cost, and continuity is registered as basic information for each unit process in the construction and construction project, it is classified into items. These basic information should be provided in an Excel file. At this time, the unit process of the project is classified into 'Activity ID item', the estimated operation period of each unit process is classified as 'Original Duration item', and the remaining period is classified into 'Remaining Duration item' , The job start date is classified as 'Start', the job end date is classified as 'job end date', and the normal cost is classified as 'Budgeted Total Cost' do. And, the free time that each activity can have without delaying the project delivery date is classified into 'Total float' item.
After these basic processes are registered, information on the working period and cost of the alternative process that can be used as an alternative to the unit process of the registered construction and construction project is input. For example, the ID of the unit process matching the alternative process is registered through the "Activity ID input menu" of the "Alternative process input window (Activity alternative input window)", and the number of alternative processes of the alternative process is inputted through the " And receives the operation period and the required cost for each alternative process through the 'alternative information input window'.
Based on the construction period and the required cost of the basic and alternative processes registered for each unit process, the following equations (1), (2) and (3) can be applied to the optimum unit process, construction period and cost And calculates the information about it. An alternative process to shorten the air can be selected by this formula to easily check the changed construction period, cost, and the like.
That is, one of the alternatives is determined by using Equation (2) so that the sum of the direct ratio and the overhead ratio is minimized when the alternative process is selected by Equation (1), and the alternative process selected by using Equation Check if it violates the trailing relationship. When the shortening period of the process is confirmed, the cost can be calculated for the shortened air, so that information on the final cost can be confirmed.
[Equation 1]
I = Activity indicator, k = Alternatives for each activity, mi = Number of alternatives for the corresponding Activity i, and Costik (i) = Direct cost of selected Activity i, IDC = Indirect Cost, Total_Dur = Project Total Construction Period.
&Quot; (2) "
Here, Xik is a binary number that determines one of the alternatives of Activity i.
&Quot; (3) "
Here, i is the preceding activity and j is the trailing activity when the trailing relationship of Activity i and j has Fnish to Start. Where Esj is the Early Start Time (ES) of the trailing Activity, Esi is the ES of the preceding Activity i, Dik is the construction period of each preceding Activity, Lag ij is the delay between the preceding Activity i and the trailing Activity j It is time. Therefore, if the trailing relationship between the activities is Finish to Start, the trailing activity ES is always larger than the sum of the ES, construction period and delay time of the selected leading activity among the alternatives.
In this way, the total construction cost of the newly selected project, the total construction period, and the construction period of the selected unit process and the construction cost are displayed so that the user can confirm it.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims. It will be easy to understand. If the practice of such improvement, alteration, substitution or addition is within the scope of the following claims, the technical idea is also deemed to belong to the present invention.
10: Basic process registration module
20: Basic process classification module
30: Alternative Process Registration Module
40: Alternative Process Selection Module
50: Optimum process display module
Claims (5)
A basic process classification module 20 for classifying information on a basic process in a project of construction and construction registered through the basic process registration module 10;
An alternative process registration module 30 for registering and storing information on an alternative process that can be used as an alternative to a unit process of a registered building and construction project;
Based on the construction period and the required cost of the basic process and the alternative process registered for each unit process, the sum of the direct costs and the overhead costs is minimized when the alternative process is selected by using the following equation (1) An alternative process selection module (40) for determining one of the alternatives and verifying whether the alternative process selected by using Equation (3) is in violation of the pre-process relationship;
An optimal process display module 50 for displaying the construction period of the unit process, the construction cost, the total construction cost of the entire project, and the total construction period identified by the alternative process selection module 40 so that the user can confirm the construction period,
The information on the operation period of the basic process registration module 10 includes information on the estimated operation period, the remaining operation period, the operation start date, the operation end date, the total float, and the successors,
The basic process classification module 20 classifies each unit process as an 'Activity ID item', classifies the information on the estimated operation period registered for each unit process as an 'Original Duration item' Information on the job start date is classified into 'Early Start', and information on the job end date is classified into 'Last Finish' item ', And the information about normal expenditure is classified into' Budgeted Total Cost 'and classified, and the free time of each activity is matched to' Total float 'without delaying the project delivery date However,
In the alternative process registration module 30, the alternative process registration module 30 has an "Activity ID input menu" in which an ID of a registered unit process matching an alternative process is inputted and an " alternative ID " An alternative process input window for inputting the alternative process information of the unit process and an alternative information input window for inputting the operation period and the required cost of the inputted alternative process,
And selecting an alternate process selection criterion based on a construction period or a required cost.
[Equation 1]
I = Activity indicator, k = Alternatives for each activity, mi = Number of alternatives for the corresponding Activity i, and Costik (i) = Direct cost of selected Activity i, IDC = Indirect Cost, Total_Dur = Project Total Construction Period.
&Quot; (2) "
Here, Xik is a binary number that determines one of the alternatives of Activity i.
&Quot; (3) "
Here, ESj is the earliest start time of the trailing activity (ES below ES), Esi is the ES of the preceding activity i, Dik is the construction period of each preceding activity, Lag ij is the delay between the preceding Activity i and the trailing Activity j It is time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150176535A KR101742267B1 (en) | 2015-12-11 | 2015-12-11 | Selection process unit alternative device of building and construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150176535A KR101742267B1 (en) | 2015-12-11 | 2015-12-11 | Selection process unit alternative device of building and construction |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101742267B1 true KR101742267B1 (en) | 2017-05-31 |
Family
ID=59052305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020150176535A KR101742267B1 (en) | 2015-12-11 | 2015-12-11 | Selection process unit alternative device of building and construction |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101742267B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102026268B1 (en) * | 2018-12-28 | 2019-09-30 | 한국건설기술연구원 | Apparatus and method for providing an optimum construction equipment combination service |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013097560A (en) * | 2011-10-31 | 2013-05-20 | Mitsubishi Heavy Ind Ltd | System for optimizing process of construction work and method for optimizing process of construction work |
-
2015
- 2015-12-11 KR KR1020150176535A patent/KR101742267B1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013097560A (en) * | 2011-10-31 | 2013-05-20 | Mitsubishi Heavy Ind Ltd | System for optimizing process of construction work and method for optimizing process of construction work |
Non-Patent Citations (1)
Title |
---|
Jaeho son 외 2인, "A Mixed (Continuous+Discrete) Time-Cost Trade-Off Model Considering Four Different Relationships with Lag Time", KSCE Journal of Civil Engineering, Vol. 17, No. 2, 2013.03., pp281-291 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102026268B1 (en) * | 2018-12-28 | 2019-09-30 | 한국건설기술연구원 | Apparatus and method for providing an optimum construction equipment combination service |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106296142B (en) | Method and system for selecting multiple payment channels | |
JP6682223B2 (en) | Plan management system and plan management method | |
US20160342927A1 (en) | Systems and methods for providing an information technology interface | |
CN111199370A (en) | Order information processing method and device, storage medium and electronic equipment | |
US20140207512A1 (en) | Timeline-Based Visual Dashboard For Construction | |
KR101674101B1 (en) | Project management system based information and communication technology | |
JP2015162077A (en) | Data management program, data management system, and data management server | |
US20220004987A1 (en) | Electronic apparatus and operation method thereof | |
JP2016048488A (en) | Work management device and program | |
CN114090259A (en) | Resource allocation method, device, electronic equipment and storage medium | |
KR101742267B1 (en) | Selection process unit alternative device of building and construction | |
KR20180097181A (en) | A method for automatically expressing a construction schedule according to its category and system for the same | |
CN111435474A (en) | Method, system and computer readable medium for optimizing parts extraction lists and routes | |
JPWO2017203598A1 (en) | Work support system, allocation system, and allocation method | |
US10289101B2 (en) | Method and system for controlling body-shop processing | |
CN117196530A (en) | Digital intelligent scheduling method and system for software project set and human resource pool | |
US20140129466A1 (en) | Method and system for selecting labour resources | |
JP6358937B2 (en) | Estimating system and program for air conditioning equipment construction | |
JP7085957B2 (en) | Work schedule creation device | |
KR101742241B1 (en) | Construction duration reduction confirmation device of building and construction | |
US20220215314A1 (en) | Systems and Methods for Improved Management of the Supply Chain in a Construction Project | |
JP2020035280A (en) | Inspection work support device, inspection work support system, and inspection work support method | |
US20210180971A1 (en) | Information processing apparatus, information processing method and non-transitory memory medium | |
JP7183676B2 (en) | INPUT WORK EVALUATION DEVICE, INPUT WORK EVALUATION METHOD AND PROGRAM | |
CN107615314A (en) | Production plan generates servicing unit and production plan generating means |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |