KR101528846B1 - Reactive forcing device using jack lifting apparatus and foundation reinforcing method therewith - Google Patents

Reactive forcing device using jack lifting apparatus and foundation reinforcing method therewith Download PDF

Info

Publication number
KR101528846B1
KR101528846B1 KR1020140096804A KR20140096804A KR101528846B1 KR 101528846 B1 KR101528846 B1 KR 101528846B1 KR 1020140096804 A KR1020140096804 A KR 1020140096804A KR 20140096804 A KR20140096804 A KR 20140096804A KR 101528846 B1 KR101528846 B1 KR 101528846B1
Authority
KR
South Korea
Prior art keywords
anchor rod
plate
lower anchor
fixing plate
jack
Prior art date
Application number
KR1020140096804A
Other languages
Korean (ko)
Inventor
황규원
Original Assignee
황규원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 황규원 filed Critical 황규원
Priority to KR1020140096804A priority Critical patent/KR101528846B1/en
Application granted granted Critical
Publication of KR101528846B1 publication Critical patent/KR101528846B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/20Placing by pressure or pulling power
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/16Foundations formed of separate piles

Abstract

The present invention relates to a reacting body using a jack lifting device and a foundation reinforcing method using the same capable of press-fitting a charge file into the ground under a foundation and anchoring the charge file on the foundation more rapidly and efficiently using a reacting body and a file mounting device. The reacting body using a jack lifting device includes lower anchor rods mounted on the foundation by being inserted into a borehole; a lower anchor rod mounting plate installed on the top surface of the foundation and including a central hole through which the file set inside the borehole is penetrated and multiple insertion grooves wherein the lower anchor rods are fitted and extended upward on the inner surface of the central hole; upper anchor rods connected to the lower anchor rods, extended upward, and including a reacting plate on the upper part; and a jack lifting means installed on the reaction plate to suspend a press-fitting means on the reacting plate between the upper anchor rods since the wound wire ropes are arranged downward through wire rope holes formed on the reacting plate.

Description

잭 승강수단을 이용한 반력체 및 이를 이용한 기초 보강방법{REACTIVE FORCING DEVICE USING JACK LIFTING APPARATUS AND FOUNDATION REINFORCING METHOD THEREWITH}TECHNICAL FIELD [0001] The present invention relates to a rebound body using a jack lifting means, and a basic reinforcement method using the jack lifting body. [0002]

본 발명은 잭 승강수단을 이용한 반력체 및 이를 이용한 기초 보강방법에 관한 것이다. 더욱 구체적으로 반력체와 파일정착장치를 이용하여 기초 하부 지반에 충전 파일을 보다 신속하고 효율적으로 지반에 압입 및 기초에 정착시킬 수 있는 잭 승강수단을 이용한 반력체 및 이를 이용한 기초 보강방법에 대한 것이다.BACKGROUND OF THE INVENTION Field of the Invention [0001] The present invention relates to a reaction force body using jack lifting means and a basic reinforcement method using the same. More particularly, the present invention relates to a reaction force body using a jack lifting means and a basic reinforcing method using the same, which can pressurize the charging pile into a foundation base more quickly and efficiently, .

도 1a 내지 도 1f는 종래 구조물 기초에 파일을 시공하여 구조물 기초를 보강하는 공종을 개략 도시한 것이다.FIGS. 1A through 1F are schematic views showing a construction for reinforcing a foundation of a structure by installing a file on a foundation of a conventional structure.

먼저, 도 1a 및 도 1b와 같이 기초는 콘크리트로 제작하는 것이 일반적이므로 먼저 상기 기초(10)만을 드릴링 머신(굴착기)을 이용하여 코아링하여 천공홀(20)을 형성시키게 된다.First, as shown in FIGS. 1A and 1B, since the foundation is generally made of concrete, only the foundation 10 is cored by using a drilling machine (excavator) to form the perforation hole 20.

상기 천공홀(20)은 상단이 넓고 그 하단이 좁아지는 형태로 천공되며, 이러한 천공홀(20)의 하부는 구조물이 위치한 지반(30)으로써 지질조건에 따라 토사층, 풍화토층 또는 암반층과 같은 다양한 지반상태로 존재하게 된다.The lower part of the perforation hole 20 is formed as a ground 30 on which a structure is located. The lower part of the perforation hole 20 is divided into various areas such as a soil layer, a weathering- And it exists in the ground state.

이때 기초바닥판 보강을 위하여 강관파일(40)을 기초에 반입하기 어렵기 때문에 통상은 상기 강관파일(40)을 분절(1-1.5m)하여 반입하고, 분절된 강관파일(40)을 지반(30)에 유압잭과 같은 압입수단(50)을 이용하여 압입시키는 방식을 이용하였다.In this case, since it is difficult to bring the steel pipe pile 40 to the foundation for reinforcement of the foundation bottom steel pipe, the steel pipe pile 40 is usually taken as a segment (1-1.5 m), and the segmented steel pipe pile 40 is placed on the ground 30 using a press-fitting means 50 such as a hydraulic jack.

이에 먼저, 도 1c와 같이 강관파일(40)을 압입시킬 수 있을 정도의 용량을 가진 유압잭인 압입수단(50)을 설치할 수 있는 반력체(60)를 천공홀(20)의 주위 기초 저면에 그 하단이 걸려지도록 설치하되 천공홀(20) 상부로 연장되도록 설치된다.First, as shown in Fig. 1C, a reaction force body 60, which can be provided with a press-in means 50, which is a hydraulic jack having a capacity enough to press the steel pipe file 40, is provided on the peripheral bottom surface of the perforation hole 20 And is installed to extend to the upper portion of the perforation hole 20.

상기 반력체(60)는 도 1c와 같이 상부 및 하부앵커봉(61,62)이 다수개로 구분되어 연결너트(63)에 의하여 연결되도록 하고, 하부 앵커봉(62) 하단에 정착플레이트(64)가 장착되도록 하되, 상부 앵커봉(61) 상단은 반력플레이트(65)에 체결너트(66)에 의하여 고정되도록 제작된 것이 이용된다.1C, the reaction force body 60 is divided into a plurality of upper and lower anchor rods 61 and 62 to be connected by a connection nut 63. A fixing plate 64 is attached to the lower end of the lower anchor rod 62, And an upper end of the upper anchor rod 61 is fixed to the reaction plate 65 by a fastening nut 66. [

상기 상부 및 하부 앵커봉(61,62)을 연결너트(63)에 의하여 연결되도록 하는 것은 압입수단(50)인 유압잭을 구성하는 유압실린더가 연장되는 길이를 고려하여 앵커봉(61,62)의 연장길이를 용이하게 조정할 수 있도록 하되, 기초의 제한된 공간에 의한 제약을 피하기 위함이다.The upper and lower anchor rods 61 and 62 are connected to each other by the connecting nut 63 in consideration of the length of the hydraulic cylinder constituting the hydraulic jack, So that the extension length can be easily adjusted, but the restriction due to the limited space of the foundation is avoided.

이에 도 1d와 같이, 강관파일과 같은 강관파일(40)을 천공홀(20)에 삽입하고, 강관파일(40) 상단과 반력체(60)를 구성하는 반력플레이트(65)사이에 유압잭인 압입수단(50)을 설치하고, 상기 유압잭을 작동시켜 유압실린더(51)가 돌출 연장되면서 상기 반력플레이트(65)에 지지되어 그 반력에 의하여 강관파일(40)이 지반(30)에 하방 압입되도록 하여, 최종 지반 하부의 지지층(A)까지 강관파일(40)이 압입되어 소요의 지지력을 확보할 수 있도록 하게 된다.1D, a steel pipe file 40 such as a steel pipe file is inserted into the perforation hole 20, and a press-fitting operation is performed between the upper end of the steel pipe file 40 and the reaction force plate 65 constituting the reaction force body 60, The means 50 is installed and the hydraulic jack is operated so that the hydraulic cylinder 51 is extended and supported by the reaction plate 65 so that the steel pipe pile 40 is downwardly press- , The steel pipe pile (40) is press-fitted to the support layer (A) at the bottom of the final ground so that the required supporting force can be secured.

다음으로는 도 1e와 같이, 반력체(60)를 구성하는 상부 및 하부앵커봉(61,62)과 강관파일(40)을 용접하는 방식으로 서로 일체화시켜 강관파일(40)이 기초에 고정되도록 한다. 말하자면 새로운 파일을 기초에 설치하는 것이라 할 수 있다.Next, as shown in FIG. 1E, the upper and lower anchor rods 61 and 62 and the steel pipe file 40 constituting the reaction force body 60 are integrated with each other by welding so that the steel pipe file 40 is fixed to the foundation do. That is to say, installing a new file on the base.

다음으로는 연결너트(63)를 풀어 상부 및 하부앵커봉(61,62)과 반력플레이트(65)를 해체하고, 별도의 정착플레이트(70)를 천공홀(20) 상단에 설치한 후, 길이가 조정된 하부앵커봉(62)의 상단을 체결너트(80)를 이용하여 정착플레이트(70)에 고정 시키게 된다.Next, the connection nut 63 is loosened to disassemble the upper and lower anchor rods 61 and 62 and the reaction force plate 65, and another fixing plate 70 is installed on the upper end of the perforation hole 20, The lower end of the lower anchor rod 62 is fixed to the fixing plate 70 by using the fastening nut 80.

마지막으로 도 1f와 같이 무수축 모르타르 등과 같은 충진재(90)를 천공홀(20)에 충전시켜 기초의 상면을 마감시켜 기초 보강이 완료될 있도록 하게 된다.Finally, as shown in FIG. 1F, the filling material 90 such as non-shrinkable mortar or the like is filled in the perforation hole 20 to finish the base surface to complete the basic reinforcement.

이때 상기 강관파일(40)의 압입 깊이에 따라 도 2와 같이 압입수단(50)을 2개 이상 상하로 포개어 놓는 경우도 발생하게 되고, 이에 따라 압입수단의 안정적 작동을 위하여 필러강관(92) 및 보강판(91)을 많이 이용하게 된다.As shown in FIG. 2, depending on the indentation depth of the steel pipe 40, two or more of the press fitting means 50 may be stacked vertically. In order to ensure stable operation of the press fitting means, The reinforcing plate 91 is often used.

이에 압입수단(50)을 이용하여 강관파일(40) 압입을 반복하다 보면 반력플레이트(65)의 체결너트(66)를 풀어 하방으로 압입된 강관파일(40) 상단에 반력플레이트(65)를 위치시키기 위하여 재 세팅하는 일이 반복되는 경우가 많이 발생하게 된다.When the press-fitting of the steel pipe pile 40 is repeated by using the press-in means 50, the reaction nut 65 of the reaction force plate 65 is loosened and the reaction force plate 65 is positioned at the upper end of the downwardly- It is often the case that the resetting operation is repeated.

특히 상기 압입수단(50)은 작업자가 좁은 공간인 상부 및 하부 앵커봉(61,62) 사이에 세팅하다보니 무거운 압입수단(50)을 설치하기 위한 작업시간이 지연되고 이에 따라 시공관리가 어려워 비효율적이고 이에 따른 비용도 많이 소요될 수밖에 없다는 문제점이 있었다.Particularly, since the press-in means 50 is set between the upper and lower anchor rods 61 and 62, which are narrow spaces, the work time for installing the heavy press-in means 50 is delayed, And thus the cost is also increased.

나아가, 상기 상부 및 하부 앵커봉(61,62)의 경우 통상 이형철근이나 강봉을 사용하게 되는데 현장에 따라 길이조정이 필요한 경우가 많이 발생한다. 하지만 이형철근이나 강봉 단부에 나사부를 형성시킨 것을 사용(반력플레이트 체결 및 앵커봉들의 연결용)하다 보니 커팅에 의한 길이조정은 가능하다 하더라도 커팅된 상부 및 하부 앵커봉(61,62)의 단부에 나사부를 일일이 가공해야 하므로 아무래도 작업성이 떨어질 수밖에 없었다.Further, in the case of the upper and lower anchor rods 61 and 62, a deformed reinforcing bar or a steel bar is usually used. However, in the case of using the deformed reinforcing bars or the ends of the steel rods having the threaded portions (for connecting the reaction force plates and connecting the anchor rods), it is possible to adjust the length by cutting, Since the threads must be machined one by one, the workability is inevitably reduced.

또한, 천공홀(20)의 주위 기초 저면에 그 하단이 걸려지도록 설치되도록 하부 앵커봉(62) 하단에 하부정착플레이트(64)가 장착하고 기초 저면에 지지되도록 하게 되는데 이 상태에서는 하부 앵커봉(62)의 위치를 확실하게 고정시킬 수 없기 때문에 상부 앵커봉(61)을 설치하고 반력플레이트(65)와 압입수단(50)을 설치할 때 다소 불안정해질 수 있다는 문제점이 있게 된다. 나아가 하부 앵커봉(62)을 고정시키기 위하여 무수축 몰탈과 같은 충진재를 사용하는 경우도 있어 이럴 경우 시공성이 아무래도 떨어질 수밖에 없다는 문제점이 있었다.The lower fixation plate 64 is mounted on the lower end of the lower anchor rod 62 so that the lower end of the lower anchor rod 62 is supported on the base bottom surface of the lower anchor rod 62. In this state, The upper anchor rod 61 may be provided and the reaction force plate 65 and the press-fitting means 50 may be somewhat unstable. Further, in order to fix the lower anchor rod 62, a filler such as a non-shrinkage mortar may be used, and thus the workability is inevitably reduced.

이에 본 발명은 종래 파일 압입을 위한 반력체 및 압입수단의 경우 파일을 하방으로 압입시킬 때 압입후 지속적으로 압입수단(간단하게 잭(JACK))의 위치이동에 많은 비용과 시간이 소요되는 것을 해결하도록 함으로서 시공성 및 작업성이 뛰어난 잭 승강수단을 이용한 반력체 및 이를 이용한 기초 보강방법 제공을 해결하고자 하는 기술적 과제로 한다.Therefore, the present invention solves the problem that, in the case of the reaction force member and the press-in means for press-fitting the file in the prior art, it takes a lot of time and cost to continuously move the press-in means (simply, a jack) after press- The present invention has been made in view of the above problems, and it is an object of the present invention to provide a rebound body using a jack lifting means having excellent workability and workability and a basic reinforcement method using the same.

또한 본 발명은 종래 반력체를 구성하는 상부 및 하부앵커봉의 길이조정을 보다 용이하게 할 수 있으면서도 다양한 길이로 연결시킬 수 있어 현장여건에 원활하게 대응할 수 있는 잭 승강수단을 이용한 반력체 및 이를 이용한 기초 보강방법 제공을 해결하고자 하는 기술적 과제로 한다.In addition, the present invention provides a reaction force body using a jack raising and lowering means which can easily adjust the lengths of the upper and lower anchor rods constituting the conventional reaction force body and can be connected to various lengths, And to provide a reinforcement method.

또한 본 발명은 하부 앵커봉을 간단하게 천공홀 내측에 정착시킬 수 있도록 함으로서 보다 안정적인 시공이 가능한 잭 승강수단을 이용한 반력체 및 이를 이용한 기초 보강방법 제공을 해결하고자 하는 기술적 과제로 한다.Another object of the present invention is to provide a rebound body using a jack lifting means capable of fixing a lower anchor rod simply inside the perforation hole, thereby enabling a more stable construction and a method of providing a basic reinforcement using the same.

상기 기술적 과제를 달성하기 위하여 본 발명은According to an aspect of the present invention,

첫째, 본 발명은 반력체를 구성하는 반력플레이트 상부에 윈치와 같은 잭승강수단을 설치하고, 잭승강수단의 와이어로프가 반력플레이트을 관통하여 상부앵커봉 내측에 서 상기 와이어로프에 매달려 설치된 압입수단(잭(JACK))을 자유롭게 승강 가능하도록 하였다. 말하자면 인력이 아닌 잭승강수단을 이용하여 압입수단(잭(JACK))의 상하이동(승강)이 가능하도록 하였다.First, the present invention is characterized in that a jack lifting means such as a winch is provided on the upper part of the reaction force plate constituting the reaction force body, and the wire rope of the jack lifting means penetrates the reaction force plate and is suspended from the wire rope inside the upper anchor rod Jack (JACK) to be freely movable up and down. That is to say, it is possible to move up and down (lift) the press-in means (jack) by using the jack lifting means rather than the manpower.

둘째, 본 발명은 상부 및 하부앵커봉을 전산볼트를 이용하게 된다. 전산볼트는 외주면에 나사산이 형성된 봉부재인데 적당한 길이로 커팅도 비교적 용이하고 일정한 길이를 가진 것을 커플러등으로 연결시키기가 용이하므로 현장에서 강봉, 이형철근등에 나사산을 별도로 가공하는 등의 작업이 필요 없도록 한 것이다.Second, in the present invention, the upper and lower anchor rods are made of computerized bolts. The bolts are threaded on the outer surface. They are easy to cut with a reasonable length and have a certain length, so it is easy to connect them with a coupler or the like. It is.

셋째, 상기 전산볼트로 제작한 하부앵커봉의 경우 하단에 형성시킨 하부정착플레이트로 기초의 천공홀 주위 기초 저면에 그 하단이 걸려지도록 설치하되 천공홀 상부로 연장되도록 설치하게 되는데 달리 정착상태가 아니므로 이를 위해 본 발명은 상기 하부앵커봉이 내측면에서 끼워져 설치되는 하부앵커정착고정판을 시용하여 하부앵커봉을 안정적으로 정착시킨 상태에서 상부 앵커봉, 압입수단(잭(JACK)) 및 잭승강수단을 설치할 수 있도록 하였다. 즉, 하부앵커봉이 상기 지지용관과 하부앵커봉정착플레이트에 의하여 상,하단이 정착되는 구조로 형성되도록 하되, 상기 세그먼트정착플레이트는 2개의 반원형 세그먼트정착플레이트를 조립하여 파일이 삽입되는 중앙홀과 중앙홀 내면에 삽입홈이 결합 형성되도록 함으로서 기초 상면에 하부앵커봉이 상기 삽입홈에 끼워져 정착되도록 하게 된다.Third, in the case of the lower anchor rod made of the computer bolt, the lower fixing plate formed at the lower end is installed so that the lower end thereof is hooked on the base bottom surface around the perforation hole of the base, but is extended to the upper portion of the perforation hole. To this end, the upper anchor rod, the pressurizing means (jack), and the jack elevating means are installed in a state in which the lower anchor rod is stably fixed by using the lower anchor fixing plate installed in the inner side of the lower anchor rod . That is, the lower anchor rod is formed such that the upper and lower ends are fixed by the supporting tube and the lower anchor rod fixing plate. The segment fixing plate is formed by assembling the two semicircular segment fixing plates, So that the lower anchor rod is inserted into the insertion groove and fixed on the upper surface of the base.

넷째, 본 발명은 지지용관을 이용한 하부앵커봉을 제공한다. 즉, 하부정착플레이트 내측에는 특히 지지용관을 삽입 설치하여 파일에 하중작용 시 상기 하부정착플레이트가 기초 저면 또는 천공홀의 지지홈으로부터 이탈되지 않도록 하는 구속기능을 가질 수 있도록 하게 된다. 즉, 파일 두부에 설치되는 상부정착판, 상기 상부정착판에 상단이 직접 고정 설치되어 기초에 형성된 천공홀을 따라 하방으로 연장되는 하부앵커봉, 상기 하부앵커봉 하단부에 간단하게 조립 설치된 하부정착플레이트, 하부정착플레이트 내측에서 지지하며 천공홀 내부에 삽입 설치된 지지용관;을 제공하되, 상기 지지용관, 파일과 하부앵커봉에 고정플레이트를 용접시켜 보다 안정적인 파일압입 시공이 가능하도록 하게 된다.Fourth, the present invention provides a lower anchor rod using a support tube. That is, the supporting tube is inserted into the lower fixing plate so that the lower fixing plate can be prevented from being separated from the supporting groove of the base bottom or the hole when the load is applied to the pile. That is, an upper fixation plate installed on the top of the pile, a lower anchor rod extending downward along the perforation hole formed on the foundation, the upper fixation plate being directly fixed to the upper fixation plate, and a lower fixation plate And a supporting pipe which is supported inside the lower fixing plate and is inserted into the perforation hole. The stationary plate is welded to the supporting pipe, the pile and the lower anchor rod to enable more stable piercing insertion.

본 발명에 의한 잭 승강수단을 이용한 반력체를 이용하게 되면 반력플레이트와 일체화된 압입수단을 잭승강수단을 이용하여 자유롭게 승강시키면서 압입수단을 작동시켜 파일을 압입시킬 수 있으므로 압입수단의 제어가 용이하고 신속하게 이루어질 수 있기 때문에 안전사고 방지 뿐만 아니라 보다 효율적이고 경제적인 파일 시공에 의한 기초 보강이 가능하게 된다.When the reaction force body using the jack elevating means according to the present invention is used, the press-in means integral with the reaction force plate can be freely lifted and lowered by using the jack lifting means and the press-in means can be operated to press the file, It is possible to prevent the safety accident as well as provide basic reinforcement by more efficient and economical pile construction.

본 발명에 의한 잭 승강수단을 이용한 반력체는 전산볼트로서 상부 및 하부 앵커봉을 이용하기 때문에 현장여건에 따른 자유로운 길이조정 및 연결이 가능하므로 다양한 현장여건에 따른 시공이 가능하게 된다.Since the reaction force body using the jack lifting means according to the present invention uses the upper and lower anchor rods as the computer bolts, it is possible to freely adjust and connect the length according to the site conditions, so that it is possible to carry out construction according to various site conditions.

본 발명에 의한 잭 승강수단을 이용한 반력체는 하부 앵커봉의 초기 정착에 의한 보다 안정적인 본 발명에 의한 잭 승강수단을 이용한 반력체 설치 및 운용이 가능하여 안전사고를 방지할 수 있게 된다.The reaction force body using the jack raising means according to the present invention can install and operate the reaction force body using the jack raising and lowering means according to the present invention more stably by the initial fixing of the lower anchor rod, thereby preventing a safety accident.

본 발명에 의한 잭 승강수단을 이용한 반력체는 지지용관 및 고정플레이트를 이용하여 파일을 압입시키기 때문에 하부 앵커봉 하단의 하부정착플레이트가 기초 저면 또는 천공홀의 지지홈으로부터 이탈되지 않도록 할 수 있어 역시 보다 안전한 파일 압입 시공이 가능하게 된다.Since the reaction force body using the jack lifting means according to the present invention presses the pile using the support tube and the fixing plate, the lower fixation plate at the lower end of the lower anchor cap can be prevented from being detached from the base bottom or the support groove of the perforation hole. It is possible to securely press-fit the file.

도 1a 내지 도 1f는 종래 앵커봉을 이용한 반력체와 유압잭을 이용한 보강체 시공순서도,
도 2는 종래 앵커봉을 이용한 반력체와 유압잭을 이용한 보강체 시공단면도
도 3a, 도 3b 및 도 3c는 본 발명의 잭 승강수단을 이용한 반력체의 구성사시도, 조립사시도 및 횡단면도,
도 4a, 도 4b 및 도 4c는 본 발명의 잭 승강수단을 이용한 반력체를 이용한 기초 보강방법의 순서도이다.
FIGS. 1A to 1F are flowcharts showing a reinforcement body installation procedure using a reaction force body and a hydraulic jack using an anchor rod,
2 is a cross-sectional view of a reinforcement body using a conventional anchor rod and a hydraulic jack
FIGS. 3A, 3B and 3C are a perspective view, a perspective view and a cross-sectional view, respectively, of a reaction force body using the jack lifting means of the present invention;
4A, 4B and 4C are flowcharts of a basic reinforcement method using a reaction force body using the jack lifting means of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings, which will be readily apparent to those skilled in the art. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In order to clearly illustrate the present invention, parts not related to the description are omitted, and similar parts are denoted by like reference characters throughout the specification.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.Throughout the specification, when an element is referred to as "comprising ", it means that it can include other elements as well, without excluding other elements unless specifically stated otherwise.

[ 잭 승강수단을 이용한 반력체(500) ][Reaction force body 500 using jack lift means]

도 3a, 도 3b 및 도 3c는 본 발명의 잭 승강수단을 이용한 반력체의 구성사시도, 조립사시도 및 횡단면도를 도시한 것이다.3A, 3B and 3C are a perspective view, an assembled perspective view and a cross-sectional view of the reaction force body using the jack lifting means of the present invention.

본 발명의 반력체(500)는 하부 및 상부앵커봉(510,520), 지지용관(530), 하부앵커봉정착플레이트(540), 압입수단(550), 반력플레이트(560), 잭승강수단(570)을 포함한다.The reaction force body 500 of the present invention includes upper and lower anchor rods 510 and 520, a support pipe 530, a lower anchor rod fixing plate 540, a pressurizing means 550, a reaction force plate 560, ).

상기 반력체(500)는 도 3a 및 도 3b와 같이 기초(200) 하부 지반(G)에 파일(300)을 압입시키기 위한 장치이다. 즉, 예컨대 기초(200)에 천공홀(210)을 형성시키되 천공홀(210) 하부 지반에 파일(300)을 압입시키기 위하여 사용되는 것이 반력체(500)이다.3A and 3B, the reaction force body 500 is a device for pushing the pile 300 into the ground 200 underneath. That is, for example, the reaction force body 500 is used to form the perforation hole 210 in the foundation 200, and to press the pile 300 into the ground below the perforation hole 210.

상기 기초(200)는 철근콘크리트로 시공된 건축물의 지하바닥판을 예로 들 수 있는데 이에 하부앵커봉(510)의 하단부를 하부정착플레이트(511)를 이용하여 기초(200) 바닥 저면에 지지되도록 설치하고 하부앵커봉(510) 상단부에 상부앵커봉(520)을 연결하고, 상부앵커봉(520)에 압입수단(550), 잭승강수단(570)이 설치된 반력플레이트(560)를 설치하고, 파일(300) 압입이 완료되면 사용된 압입수단(550), 잭승강수단(570)이 설치된 반력플레이트(560)를 상부앵커봉(510)으로부터 분리한 후 상부앵커봉(520)을 하부앵커봉(510)으로부터 분리하게 된다.The foundation 200 may be a basement deck of a building constructed using reinforced concrete. The lower end of the lower anchor rod 510 may be installed on the bottom of the foundation 200 using a lower fixation plate 511 The upper anchor rod 520 is connected to the upper end of the lower anchor rod 510 and the reaction force plate 560 provided with the pressurizing means 550 and the jack raising and lowering means 570 is installed in the upper anchor rod 520, After the reaction force plate 560 having the used pressurizing means 550 and the jack elevating means 570 is separated from the upper anchor rod 510, the upper anchor rod 520 is inserted into the lower anchor rod 510 510).

이에 남겨진 하부앵커봉(510)과 지지용관(530)에 도 4c와 같이 상부정착판(400)을 설치하여 파일(300)을 기초(200)에 정착시키게 된다.The upper fixing plate 400 is installed on the lower anchor rod 510 and the supporting pipe 530 to fix the pile 300 on the base 200. [

먼저 상기 하부앵커봉(510)은 전산볼트라 지칭되는 봉 부재를 이용하게 된다. 외주면에 나사산이 미리 형성된 전산볼트를 이용하여 따로 나사산 형성을 위한 노력이 필요 없도록 하게 되며 상단부는 커플러와 같은 체결구에 의하여 상부앵커봉(520)이 연결되고, 하단부는 하부정착플레이트(511)가 형성되어 있다.First, the lower anchor rod 510 uses a rod member called a computer bolt. An upper anchor rod 520 is connected by a fastener such as a coupler, and a lower end of the lower anchor rod 520 is connected to a lower fixing plate 511 Respectively.

이러한 하부앵커봉(510)은 도 3b와 같이 기초(200)에 형성된 천공홀(210) 내측으로 삽입되어 상단부는 기초 상방으로 돌출되도록 연장되며 하단부에 형성된 하부정착플레이트(511)가 기초(200) 저면에 지지되도록 설치된다.3B, the lower anchor rod 510 is inserted into the perforation hole 210 formed in the base 200. The upper end of the lower anchor rod 510 is extended so as to protrude upward from the base and the lower fixation plate 511 formed at the lower end of the lower anchor rod 510, So as to be supported on the bottom surface.

본 발명에 의한 잭 승강수단을 이용한 반력체(500)는 압입수단(550)과 파일(300)로부터 전달되는 하중이 반력플레이트(560)에 전달되고, 반력플레이트(560)에 전달된 하중은 반력플레이트(560)에 고정된 상부앵커봉(520)에 분산전달 되며, 상기 상부앵커봉(520)에 전달된 하중이 하부정착플레이트(511)에 전달되어, 결국 기초(200) 저면에 지지되도록 설치된 하부정착플레이트(511)에 하중이 저항되도록 함으로서 파일(300)이 기초(200)에 압입되도록 하게 된다.The load transmitted from the pressurizing means 550 and the pile 300 is transmitted to the reaction force plate 560 and the load transmitted to the reaction force plate 560 is transmitted to the reaction force plate 560 by the reaction force plate 560, The load transmitted to the upper anchor rod 520 is transmitted to the lower fixing plate 511 and is finally supported on the bottom of the base 200 The load is resisted to the lower fixation plate 511 so that the pile 300 is pressed into the foundation 200. [

이때, 하중 전달 과정에서 하부정착플레이트(511) 내측 공간에는 아무런 지지체가 없어 기초 저면에 위치되어야 하는 하부정착플레이트(511)가 기초 저면으로부터 이탈되는 경우가 발생하게 되는데, 본 발명은 이러한 이탈을 방지하기 위하여 하부정착플레이트(511) 내측 사이에 지지용관(530)을 배치하게 된다.At this time, there is a case where the lower fixation plate 511, which is to be located at the base bottom, is separated from the base bottom because there is no support in the space inside the lower fixation plate 511 during the load transmission process. The support tube 530 is disposed between the inside of the lower fixation plate 511 and the support tube 530. [

이에 상기 지지용관(530)은 강관 등을 이용하여 하부정착플레이트(511) 내측 사이 공간(천공홀 내부)에 접하도록 하여 하부정착플레이트(511)의 위치 이탈을 방지하는 역할을 하게 되며 이러한 지지용관(530) 내측에 파일(300)이 삽입 배치되고 있음을 알 수 있다.The supporting tube 530 is used to prevent the position of the lower fixing plate 511 from being displaced by making contact with the inner space (the inside of the perforation hole) of the lower fixing plate 511 by using a steel pipe or the like, It can be seen that the file 300 is inserted and arranged in the inside of the housing 530.

본 발명은 지지용관(530)을 하부정착플레이트(511) 내측 사이 공간(천공홀 내부)에 위치하도록 함과 더불어 하부앵커봉정착플레이트(540)를 설치하여 하부앵커봉(510)의 확실한 정착상태를 유지하게 된다.The present invention is characterized in that the supporting pipe 530 is positioned in the space between the inner side of the lower fixation plate 511 (inside the perforation hole) and the lower anchor rod fixing plate 540 is installed to securely fix the lower anchor rod 510 .

즉, 상기 하부앵커봉정착플레이트(540)는 도 3b와 같이 파일(300)이 관통되는 중앙홀(541)과 상기 중앙홀(541) 내면에 하부앵커봉(510)가 끼워지는 삽입홈(542)이 다수 형성된 플레이트로서 강판을 가공한 것을 이용하게 된다.3B, the lower anchor rod fixing plate 540 includes a central hole 541 through which the pile 300 passes, and an insertion groove 542 through which the lower anchor rod 510 is inserted on the inner surface of the center hole 541. [ ) Is used as a plate formed by machining a steel plate.

이때 상기 하부앵커봉정착플레이트(540)는 도 3a와 같이 2개로 구분하여 서로 조립 설치되도록 하여 설치 및 해체가 용이하도록 함이 바람직하다. 예컨대, 2개의 세그먼트정착플레이트를 조립하여 파일이 삽입되는 중앙홀(541)과 삽입홈(542)이 각각 결합 형성되도록 하여 기초(200) 상면에 하부앵커봉(510)이 상기 삽입홈(542)에 끼워져 정착되도록 하게 된다.At this time, it is preferable that the lower anchor rod fixing plate 540 is divided into two as shown in FIG. 3A and assembled to each other to facilitate installation and disassembly. For example, a two-segment fixation plate is assembled so that the center hole 541 and the insertion groove 542, into which the pile is inserted, respectively, are formed so that the lower anchor rod 510 is inserted into the insertion groove 542 on the base 200, As shown in FIG.

이에 도 3b 및 도 3c와 같이 하부앵커봉정착플레이트(540)는 기초(200) 상면에 저면이 접하도록 설치되어 중앙홀(541)에 파일(300)이 관통되고, 하부앵커봉(510)도 미리 삽입홀(542)에 끼워지도록 하여 고정너트(580)에 의하여 하부앵커봉(510)이 하부앵커봉정착플레이트(540)에 정착 지지된다.3B and 3C, the lower anchor rod fixing plate 540 is installed so that the bottom surface thereof is in contact with the upper surface of the base 200 so that the pile 300 passes through the center hole 541 and the lower anchor rod 510 The lower anchor rod 510 is fixedly supported on the lower anchor rod fixing plate 540 by the fixing nut 580 so as to be fitted into the insertion hole 542 in advance.

이에 하부앵커봉(510)은 지지용관(530)과 하부앵커봉정착플레이트(540)에 의하여 상,하단이 정착되는 구조이므로 상부앵커봉(520), 압입수단(550), 반력플레이트(560), 잭승강수단(570)에 의한 작업하중을 안정적으로 지지하면서 하부앵커봉(510)을 안정적으로 설치하기 위한 몰탈과 같은 충진재를 사용하지 않아 현장 작업의 단순하여 신속한 작업이 가능하게 된다.The upper anchor rod 520, the press-in means 550, the reaction plate 560, and the upper anchor rod 510 are fixed by the support tube 530 and the lower anchor rod fixing plate 540. Therefore, The filling operation such as the mortar for stably installing the lower anchor rod 510 is not used while the working load by the jack elevating means 570 is stably supported.

상기 상부앵커봉(520)은 하부앵커봉(510)과 같이 역시 전산볼트라 지칭되는 봉 부재를 이용하게 된다. 이에 하단부는 커플러와 같은 체결구에 의하여 하부앵커봉(510)이 연결되고, 상단부는 반력플레이트(560)가 설치된다.The upper anchor rod 520 uses a rod member, which is also referred to as a computer bolt, like the lower anchor rod 510. The lower anchor rod 510 is connected to the lower end by a fastener such as a coupler, and a reaction force plate 560 is installed at the upper end.

즉, 도 3a 및 도 3b와 같이 하부앵커봉정착플레이트(540)를 경유하여 상방으로 기초 상방으로 연장 형성된 하부앵커봉(510)의 상단부에 체결구를 이용하여 상부앵커봉(520)의 하단부가 연결되며, 이러한 상부앵커봉(520)은 하부앵커봉정착플레이트(540)에 의하여 위치가 가이드되면서 상방으로 연장되어 상단부가 관통되도록 하여 고정너트(580)에 의하여 반력플레이트(560)가 정착됨을 알 수 있다. 이러한 고정너트(580)은 반력플레이트(560)의 상면과 저면에 각각 설치되도록 하여 상부앵커봉(520)의 안정적인 정착이 가능하도록 함이 바람직하다.3A and 3B, a lower end of the upper anchor rod 520 is connected to the upper end of the lower anchor rod 510, which is extended upward from the upper side via the lower anchor rod fixing plate 540, The upper anchor rod 520 is guided by the lower anchor rod fixing plate 540 and extends upward so that the upper end of the upper anchor rod 520 is penetrated so that the reaction plate 560 is fixed by the fixing nut 580. . It is preferable that the fixing nut 580 is installed on the upper surface and the lower surface of the reaction force plate 560 so that the upper anchor rod 520 can be stably fixed.

이에 상기 반력플레이트(560)는 예컨대 원형 강판을 이용하되 상부앵커봉(520)이 관통되는 앵커홀(561)이 다수 외측을 따라 형성되어 있음을 알 수 있으며, 후술되는 잭승강수단(570)에 권취된 와이어로프(571)가 관통하는 와이어로프홀(562)이 다수 형성되어 있음을 알 수 있다.The reaction force plate 560 is formed of a circular steel plate, for example, and has an anchor hole 561 through which the upper anchor rod 520 passes. The reaction force plate 560 includes a jack lift means 570 It can be seen that a large number of wire rope holes 562 through which the wound wire rope 571 passes are formed.

이때 상기 반력플레이트(560)의 중앙 상면에는 잭승강수단(570)이 고정 설치됨을 알 수 있다.At this time, the jack lift means 570 is fixed to the upper surface of the reaction force plate 560.

이러한 상기 잭승강수단(570)은 윈치(Winch)를 이용하여 와이어로프(571)를 권치할 수 있는 장치로서 미도시된 구동장치에 의하여 와이어로프(571)를 상하로 이동시켜 가면서 권취될 수 있도록 와이어로프가 권치되는 드럼부, 드럼부를 회전시키는 구동장치(유압모터 등)를 포함하게 될 것이다.The jack lifting means 570 is a device that can winch the wire rope 571 by using a winch so that the wire rope 571 can be wound up and down by moving the wire rope 571 by a driving device A drum portion to which the wire rope is to be pulled, and a driving device (a hydraulic motor or the like) for rotating the drum portion.

이때 상기 와이어로프(571)는 드럼부로부터 반력플레이트(560)의 와이어로프홀(562)을 관통하여 간격재(590, 필러강관)에 의하여 상부앵커봉(520) 사이에 세팅된 압입수단(550, 유압잭)에 고리 등으로 연결되어 있다.At this time, the wire rope 571 passes through the wire rope hole 562 of the reaction plate 560 from the drum portion and is inserted into the upper anchor rod 520 by the spacing material 590 (filler steel pipe) , And hydraulic jacks).

이때 상기 간격재는 도 3a 및 도 3b와 같이 원통형 부재로서 서로 끼움단턱에 의하여 상하로 끼워져 결합될 수 있도록 함으로서 중량이 작아 작업에 유리하도록 하게 됨을 알 수 있다.As shown in FIGS. 3A and 3B, the spacers can be vertically inserted and coupled with each other as a cylindrical member due to the fitting step.

이에 중량의 압입수단(550, 유압잭)은 와이어로프(571)에 의하여 상하로 승강이 가능하게 됨을 알 수 있으며 이에 현장에서는 중량의 압입수단(550, 유압잭)을 운반 및 장착을 반복하지 않아도 되므로 신속하고 안전한 반력체 운용이 가능하게 된다.As a result, it can be seen that the heavy press-in means 550 (hydraulic jack) can be vertically moved up and down by the wire rope 571. Therefore, it is not necessary to repeatedly carry and mount the heavy press- It becomes possible to operate the reaction force body safely.

이에 간격재(590)의 상면은 반력플레이트(560)의 저면에 접하도록 되어 있고, 간격재의 하면은 압입수단(550, 유압잭)의 실린더가 접하는 보강판이 세팅되어 있게 된다.The upper surface of the spacer material 590 is brought into contact with the bottom surface of the reaction force plate 560 and the lower surface of the gap material is set with the reinforcing plate contacting the cylinder of the press-in means 550 (hydraulic jack).

이에 압입수단(550, 유압잭)을 작동시켜 실린더가 상방으로 연장되면 간격재(590),반력플레이트(560), 상부앵커봉(520), 하부앵커봉(510), 하부정착플레이트(511)에 의한 반력이 보강판에 의하여 파일(300) 상면이 접하도록 설치된 압입수단(550, 유압잭)을 경유하여 최종 파일(300)에 전달됨으로서 파일(300)을 기초(200) 저면의 지반에 압입되도록 하게 된다.When the cylinder is upwardly extended by operating the press-in means 550 (hydraulic jack), the spacer 590, the reaction plate 560, the upper anchor rod 520, the lower anchor rod 510 and the lower fixing plate 511 Is transmitted to the final file 300 via the press fitting means 550 (hydraulic jack) provided so that the upper surface of the pile 300 is in contact with the reinforcing plate by the reinforcing plate so that the pile 300 is pressed into the ground on the bottom surface of the foundation 200 do.

[ 잭 승강수단을 이용한 반력체(500)를 이용한 기초 보강방법 ][Basic Reinforcement Method Using Reaction Force Body 500 Using Jack Lifting Means]

도 4a, 도 4b 및 도 4c는 본 발명의 잭 승강수단을 이용한 반력체를 이용한 기초 보강방법의 순서도이다.4A, 4B and 4C are flowcharts of a basic reinforcement method using a reaction force body using the jack lifting means of the present invention.

먼저 도 4a와 같이 기존의 기초(200)는 철근콘크리트로 시공되어 있어 기초성능을 확장시키기 위하여(건축물 증축등) 기초(200)를 관통하는 파일(300)을 설치하고, 파일을 기초에 정착(일체화)시켜 기초를 보강하게 된다.As shown in FIG. 4A, the existing foundation 200 is constructed of reinforced concrete. In order to expand the basic performance, a file 300 passing through the foundation 200 is installed (building expansion), and the file is fixed on the foundation Thereby reinforcing the foundation.

이에 파일(300)이 관통될 수 있도록 기초(200)에 천공홀(210)을 미도시된 천공기등을 이용하여 형성시키게 된다. 이러한 천공홀(210)은 파일(300), 지지용관(530), 하부앵커봉(510)이 삽입될 수 있을 정도로 형성시키며 된다.The perforation hole 210 is formed in the base 200 using a perforator or the like not shown so that the pile 300 can be penetrated. The perforation hole 210 is formed so that the pile 300, the support pipe 530, and the lower anchor rod 510 can be inserted.

이에 상기 하부정착플레이트(511)가 하단부에 형성되며 상기 하부정착플레이트(511) 내측 사이에 지지용관(530)이 일체로 형성된 하부앵커봉(510)를 천공홀(210) 내부에 삽입하면서 상기 하부정착플레이트(511)가 기초(200) 저면 주위에 지지되도록 세팅하게 된다.The lower fixing plate 511 is formed at the lower end portion and the lower anchor rod 510 having the supporting pipe 530 integrally formed between the inside of the lower fixing plate 511 is inserted into the perforation hole 210, The fixing plate 511 is set so as to be supported around the bottom surface of the base 200.

이때 상기 하부앵커봉(510)에는 기초(200) 상면에 형성시킨 하부앵커정착플레이트(540)를 관통하도록 하여 안정적으로 초기 정착되도록 한 상태에서 상부앵커봉(520)을 간단하게 체결구에 의하여 하부앵커봉(510)에 연결시키게 된다.At this time, the lower anchor rod 510 passes through the lower anchor fixing plate 540 formed on the upper surface of the base 200, and is stably fixed at the initial stage. In this state, the upper anchor rod 520 is simply fastened And is connected to the anchor rod 510.

이에 고정너트(580)를 이용하여 반력플레이트(560)를 상부앵커봉(520) 상단부에 고정 시키게 된다.The reaction force plate 560 is fixed to the upper end of the upper anchor rod 520 by using the fixing nut 580. [

이에 상기 반력플레이트(560) 상면에는 잭승강수단(570)이 고정 설치되어 있고 잭승강수단으로부터 와이어로프(571)가 반력플레이트(560)를 경유하여 하방으로 배치되도록 하게 된다.The jack lift means 570 is fixed to the upper surface of the reaction force plate 560 so that the wire rope 571 is arranged downwardly from the jack lift means via the reaction plate 560.

이에 와이어로프(571)의 하단은 압입수단(550)에 연결되도록 하고, 상기 압입수단(550)을 상부앵커봉(520) 사이에 위치하도록 하면서, 도 3b와 같이 간격재(590)를 반력플레이트(560)와 압입수단(550) 사이에 배치되도록 하게 된다.3B, the lower end of the wire rope 571 is connected to the press-fitting means 550, while the press-in means 550 is positioned between the upper anchor rods 520, (560) and the press-fitting means (550).

이에 압입할 파일(300)을 압입수단(550)의 저면에 접하도록 하여 파일(300)이 지지용관(530)에 의하여 가이드 되도록 하게 된다.The file 300 to be press-fitted is brought into contact with the bottom surface of the press-in means 550 so that the file 300 is guided by the support tube 530.

이에 도 4a와 같이 압입수단(550)의 작동에 의하여 결국 파일(300)이 반력에 의하여 지반(G)에 압입되게 된다.As shown in FIG. 4A, by the operation of the press-in means 550, the file 300 is eventually pressed into the ground G by the reaction force.

이에 파일(300)이 하방으로 압입되어 최종 1개의 파일(300)이 압입 완료되면 간격재를 제거하게 된다.When the file 300 is pressed downwardly and the final one file 300 is press-fitted, the gap material is removed.

이에 도 4a와 같이 잭승강수단(570)을 작동시켜 간단하게 압입수단(550)이 상방으로 인양될 수 있도록 하게 됨을 알 수 있다.As shown in FIG. 4A, the jack lifting means 570 can be actuated to easily lift the press-in means 550 upward.

이에 도 4b와 같이 새로운 파일(300b)을 압입된 파일(300) 상면에 용접 등의 방법으로 연결시키고, 잭승강수단(570)을 작동시켜 압입수단(550)이 새로운 파일(300b) 상면에 접하도록 세팅하게 된다.4b, the new file 300b is connected to the upper surface of the press-fitted file 300 by welding or the like, and the jack elevating means 570 is operated so that the press-in means 550 contacts the upper surface of the new file 300b .

이에 도 4c와 같이 간격재(590)를 압입수단(550)과 반력플레이트(560) 저면 사이에 세팅하여 압입수단(550)을 다시 작동시켜 새로운 파일(300b)과 연결된 파일(300)을 원하는 깊이까지 압입시키게 된다.4C, the interval material 590 is set between the pressurizing means 550 and the bottom surface of the reaction force plate 560 so that the press-in means 550 is operated again to move the file 300 connected to the new file 300b to a desired depth .

이에 최종 파일(300)이 원하는 깊이까지 압입되면 고정너트(580)를 풀어 잭승강수단(570)이 고정 설치된 반력플레이트(560), 간격재(590), 압입수단(550)을 상부앵커봉(520)으로부터 분리하고, 역시 체결구를 풀어 상부앵커봉(520)도 함게 하부앵커봉(510)으로부터 분리시키게 된다.When the final file 300 is pushed to a desired depth, the fixing nut 580 is loosened and the reaction force plate 560, the spacer 590, and the press-in means 550, to which the jack elevating means 570 is fixed, 520, and the upper anchor rod 520 is also detached from the lower anchor rod 510 by loosening the fastener.

이에 기초(200)에는 하부정착플레이트가 형성된 하부앵커봉(510), 파일(300)이 내부에 위치한 지지용관(530)이 남게 되는데, 별도의 상부정착판(400)을 준비하여 높이 정리된 하부앵커봉(510)이 상부정착판(400)을 관통하도록 하고 고정너트(580)로 기초 상면에 상부정착판(400)을 정착시켜 최종 파일(300)을 기초에 정착시키게 된다.The lower anchor rod 510 with the lower fixing plate formed thereon and the supporting tube 530 with the pile 300 therein are left on the foundation 200. A separate upper fixing plate 400 is prepared, The anchor rod 510 is passed through the upper fixing plate 400 and the upper fixing plate 400 is fixed to the upper surface of the base with the fixing nut 580 to fix the final file 300 on the base.

이때, 상기 지지용관(530)의 상면, 파일(300) 상면과 하부앵커봉(510)에 내측면에 고정플레이트(410)를 용접시켜 보다 안정적인 파일압입 시공이 가능하도록 하게 됨을 알 수 있다.At this time, it can be seen that the fixing plate 410 is welded to the upper surface of the support pipe 530, the upper surface of the pile 300 and the lower surface of the lower anchor rod 510, thereby enabling more stable file press-fit construction.

이때 상기 상부정착판(400)의 중앙부에 형성시킨 관통홀을 통해 충진재(C)인 콘크리트등을 충진시켜 콘크리트 충전 파일(300)로서 시공되도록 하게 됨을 알 수 있다.At this time, it can be seen that concrete such as a filler (C) is filled through the through hole formed at the central part of the upper fusing plate (400) to be constructed as a concrete filler pile (300).

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.It will be understood by those skilled in the art that the foregoing description of the present invention is for illustrative purposes only and that those of ordinary skill in the art can readily understand that various changes and modifications may be made without departing from the spirit or essential characteristics of the present invention. will be. It is therefore to be understood that the above-described embodiments are illustrative in all aspects and not restrictive. For example, each component described as a single entity may be distributed and implemented, and components described as being distributed may also be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is defined by the appended claims rather than the detailed description and all changes or modifications derived from the meaning and scope of the claims and their equivalents are to be construed as being included within the scope of the present invention do.

200: 기초 210: 천공홀
300: 파일
400: 상부정착판 410: 고정플레이트
500: 잭 승강수단을 이용한 반력체
510: 하부앵커봉 520: 상부앵커봉
530: 지지용관 540: 하부앵커봉정착플레이트
550: 압입수단 560: 반력플레이트
561: 앵커홀 562: 와이어로프홀
570: 잭승강수단 580: 고정너트
590: 간격재 C: 충진재
200: Base 210: Perforated hole
300: File
400: upper fixing plate 410: fixing plate
500: reaction force body using jack lift means
510: Lower anchor rod 520: Upper anchor rod
530: support tube 540: lower anchor rod fixing plate
550: press-in means 560: reaction force plate
561: Anchor hole 562: Wire rope hole
570: Jack lifting means 580: Fixing nut
590: Interval C: Filler

Claims (8)

기초(200)의 천공홀(210)에 삽입되어 설치되어 파일을 기초 하부 지반에 압입시키는 잭 승강수단을 이용한 반력체에 있어서, 상기 잭 승강수단을 이용한 반력체(500)는,
천공홀(210)에 삽입되어 기초(200)에 정착시킨 전산볼트인 하부앵커봉(510);
천공홀(210)에 세팅된 파일(300)이 관통되는 중앙홀(541)과 상기 중앙홀(541) 내면에 상기 하부앵커봉(510)이 끼워져 상방으로 연장되는 삽입홈(542)이 다수 형성된 플레이트로서 기초 상면에 설치된 하부앵커봉정착플레이트(540);
상기 하부앵커봉(510)에 연결되어 상방으로 연장되어 상단부에 반력플레이트(560)가 설치된 전산볼트인 상부앵커봉(520); 및
권취된 와이어로프(571)가 반력플레이트(560)에 형성시킨 와이어로프홀(562)을 따라 하방으로 배치되어 압입수단(550)이 상부앵커봉(520) 사이에 와이어로프(562)에 매달려지도록 반력플레이트(560)에 상면에 설치된 잭승강수단(570);을 포함하며,
상기 하부앵커봉(510)은 하단부에 하부정착플레이트(511)가 형성되어 하부정착플레이트(511)가 기초 저면에 지지되도록 하며, 상기 하부정착플레이트 내측에 지지용관(530)이 설치되어, 하부앵커봉(510)이 상기 지지용관(530)과 하부앵커봉정착플레이트(540)에 의하여 상,하단이 정착되는 구조로 형성되도록 하되,
세그먼트정착플레이트는 2개의 반원형 세그먼트정착플레이트를 조립하여 파일이 삽입되는 중앙홀(541)과 중앙홀 내면에 삽입홈(542)이 결합 형성되도록 함으로서 기초(200) 상면에 하부앵커봉(510)이 상기 삽입홈(542)에 끼워져 정착되도록 하는 잭 승강수단을 이용한 반력체.
The reaction force body using the jack raising and lowering means is provided with a jack raising and lowering means which is inserted into a perforation hole (210) of a foundation (200) and presses a file into a foundation lower ground,
A lower anchor rod 510 inserted into the perforation hole 210 and fixed to the base 200 as a bolt;
A center hole 541 through which the pile 300 set in the perforation hole 210 passes and a plurality of insertion grooves 542 extending upward by fitting the lower anchor rod 510 on the inner surface of the center hole 541 are formed A lower anchor rod fixing plate 540 installed on the upper surface of the base as a plate;
An upper anchor rod 520 connected to the lower anchor rod 510 and extending upward, and being a bolt provided with a reaction plate 560 at an upper end thereof; And
The wound wire rope 571 is disposed downward along the wire rope hole 562 formed in the reaction force plate 560 so that the press fitting means 550 is suspended from the wire rope 562 between the upper anchor rods 520 And a jack lifting means (570) provided on the upper surface of the reaction force plate (560)
The lower anchor rod 510 has a lower fixing plate 511 formed at its lower end so that the lower fixing plate 511 is supported on the bottom surface of the lower fixing plate 511. A support tube 530 is installed inside the lower fixing plate, And the upper and lower ends of the rod 510 are fixed by the support pipe 530 and the lower anchor rod fixing plate 540,
The segment fixation plate is constructed by assembling two semicircular segment fixing plates so that a center hole 541 in which a pile is inserted and an insertion groove 542 in an inner surface of a center hole are formed so that a lower anchor rod 510 is formed on an upper surface of a base 200 And is inserted and fixed in the insertion groove (542).
삭제delete 제 1항에 있어서,
상기 상부앵커봉(520)는 하단부가 체결구에 의하여 하부앵커봉(510)의 상단부에 연결되며, 고정너트(580)에 의하여 반력플레이트(560)가 상단부에 고정 정착되며, 상부앵커봉(520) 사이에 압입수단(550)이 와이어로프(572)에 의하여 매달려 위치하도록 하는 전산볼트인 잭 승강수단을 이용한 반력체.
The method according to claim 1,
The lower end of the upper anchor rod 520 is connected to the upper end of the lower anchor rod 510 by fastening means and the reaction plate 560 is fixed and fixed to the upper end by the fixing nut 580. The upper anchor rod 520 Which is a bolt for causing the press-in means 550 to be suspended by the wire rope 572 between the upper and lower jacks.
삭제delete (a) 하부정착플레이트(511)가 하단부에 형성되며 상기 하부정착플레이트(511) 내측 사이에 지지용관(530)이 일체로 형성된 전산볼트인 하부앵커봉(510)을 천공홀(210) 내부에 삽입하면서 상기 하부정착플레이트(511)가 기초(200) 저면 주위에 지지되도록 세팅하는 단계;
(b) 천공홀(210)에 세팅된 파일(300)이 관통되는 중앙홀(541)과 상기 중앙홀(541) 내면에 상기 하부앵커봉(510)이 끼워져 상방으로 연장되는 삽입홈(542)이 다수 형성된 플레이트인 하부앵커봉정착플레이트(540)를 기초 상면에 설치하여 하부앵커봉(510)이 기초(200) 상방으로 연장되도록 하는 단계;
(c) 상기 하부앵커봉(510)에 연결되어 상방으로 연장되도록 전산볼트인 상부앵커봉(520)를 설치하고, 상기 상부앵커봉(520) 상단부에 반력플레이트(560)를 설치하는 단계;
(d) 권취된 와이어로프(571)가 상기 반력플레이트(560)에 형성시킨 와이어로프홀(562)을 따라 하방으로 배치되어 압입수단(550)이 상부앵커봉(520) 사이에 와이어로프(562)에 매달려지도록 반력플레이트(560)에 상면에 설치된 잭승강수단(570)을 이용하여 압입수단(550)을 상부앵커봉(520) 사이에 승강시키면서 파일(300)이 상기 압입수단(550)에 의하여 기초 하부 지반에 압입되도록 하는 단계;를 포함하며,
상기 (a)단계의 하부앵커봉(510)은 하단부에 하부정착플레이트(511)가 형성되어 하부정착플레이트(511)가 기초 저면에 지지되도록 하며, 상기 하부정착플레이트 내측에 지지용관(530)이 설치되어, 하부앵커봉(510)이 상기 지지용관(530)과 하부앵커봉정착플레이트(540)에 의하여 상,하단이 정착되는 구조로 형성되며,
상기 (b)단계의 하부앵커봉정착플레이트(540)는 세그먼트정착플레이트를 조립하여 파일이 압입되는 중앙홀(541)과 삽입홈(542)이 각각 결합 형성되도록 하여 기초(200) 상면에 하부앵커봉(510)이 상기 삽입홈(542)에 끼워져 정착되도록 하되, 상기 세그먼트정착플레이트는 2개의 반원형 세그먼트정착플레이트를 조립하여 파일이 삽입되는 중앙홀(541)과 중앙홀 내면에 삽입홈(542)이 결합 형성되도록 함으로서 기초(200) 상면에 하부앵커봉(510)이 상기 삽입홈(542)에 끼워져 정착되도록 하는 잭 승강수단을 이용한 반력체를 이용한 기초 보강방법.
(a) A lower anchor rod 510, which is a bolt formed integrally with a lower portion of the lower fixation plate 511 and which is formed between the inside of the lower fixation plate 511 and the support pipe 530, Setting the lower fixation plate (511) to be supported around the bottom surface of the foundation (200) while being inserted;
(b) a center hole 541 through which the pile 300 set in the perforation hole 210 passes, and an insertion groove 542 in which the lower anchor rod 510 is inserted and extended upwardly on the inner surface of the center hole 541, A lower anchor rod fixing plate 540, which is a plate formed with a plurality of the anchor rods 510, to extend above the base 200;
(c) providing an upper anchor rod 520 connected to the lower anchor rod 510 to extend upward and providing a reaction plate 560 at an upper end of the upper anchor rod 520;
(d) The wound wire rope 571 is disposed downward along the wire rope hole 562 formed in the reaction force plate 560 so that the press-in means 550 is inserted between the upper anchor rods 520 and the wire rope 562 The file 300 is lifted up and down by the pressurizing means 550 while the pressurizing means 550 is lifted and raised between the upper anchor rods 520 by using the jack lifting means 570 provided on the upper surface of the reaction force plate 560 So as to be press-fitted into the foundation underground,
The lower anchor rod 510 of the step (a) has a lower fixing plate 511 formed at the lower end thereof to support the lower fixing plate 511 on the base bottom surface, and a supporting tube 530 And the upper and lower ends of the lower anchor rod 510 are fixed by the support tube 530 and the lower anchor rod fixing plate 540,
The lower anchor rod fixing plate 540 of the step (b) is assembled by assembling the segment fixing plate so that the center hole 541 and the insertion groove 542, into which the pile is inserted, The segment fixation plate is assembled with two semicircular segment fixation plates to form a center hole 541 into which the pile is inserted and an insertion groove 542 in the center hole with the pillar 510 inserted into the insertion groove 542, And the lower anchor rod (510) is inserted into the insertion groove (542) to be fixed on the upper surface of the base (200) by using the jack elevating means.
제 5항에 있어서,
상기 (c)단계의 상부앵커봉(520)은 하단부가 체결구에 의하여 하부앵커봉(510)의 상단부에 연결되며, 고정너트(580)에 의하여 반력플레이트(560)가 상단부에 고정 정착되며, 상부앵커봉(520) 사이에 압입수단(550)이 와이어로프(572)에 의하여 매달려 위치하도록 하는 잭 승강수단을 이용한 반력체를 이용한 기초 보강방법.
6. The method of claim 5,
The upper end of the upper anchor rod 520 is connected to the upper end of the lower anchor rod 510 by fastening means and the reaction plate 560 is fixed and fixed to the upper end by the fixing nut 580, And a jack raising and lowering means for causing the press-in means (550) to be suspended by the wire rope (572) between the upper anchor rods (520).
제 6항에 있어서,
상기 하부앵커봉(510)과 상부앵커봉(520)은 전산볼트를 이용하여 하부앵커봉에 하부정착플레이트(511)가 체결되어 형성되도록 하고, 하부앵커봉(510)과 상부앵커봉(520)이 서로 체결구에 의하여 연결되도록 하는 잭 승강수단을 이용한 반력체를 이용한 기초 보강방법.
The method according to claim 6,
The lower anchor rod 510 and the upper anchor rod 520 may be formed by fastening a lower fixation plate 511 to a lower anchor rod using a computer bolt and a lower anchor rod 510 and an upper anchor rod 520, Wherein the jack elevating means is connected to each other by a fastening tool.
삭제delete
KR1020140096804A 2014-07-29 2014-07-29 Reactive forcing device using jack lifting apparatus and foundation reinforcing method therewith KR101528846B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140096804A KR101528846B1 (en) 2014-07-29 2014-07-29 Reactive forcing device using jack lifting apparatus and foundation reinforcing method therewith

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140096804A KR101528846B1 (en) 2014-07-29 2014-07-29 Reactive forcing device using jack lifting apparatus and foundation reinforcing method therewith

Publications (1)

Publication Number Publication Date
KR101528846B1 true KR101528846B1 (en) 2015-06-22

Family

ID=53519041

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140096804A KR101528846B1 (en) 2014-07-29 2014-07-29 Reactive forcing device using jack lifting apparatus and foundation reinforcing method therewith

Country Status (1)

Country Link
KR (1) KR101528846B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110499760A (en) * 2019-09-03 2019-11-26 中冶京诚工程技术有限公司 Anchor pole Pile feeder
KR20210002105U (en) * 2020-03-13 2021-09-27 주식회사 주안기술단 Fixing structure under a foundation in pile pressing system for foundation reinforcement

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006112106A (en) * 2004-10-14 2006-04-27 Kanematsu Nnk Corp Drop hammer type pile driver
KR100879621B1 (en) * 2008-09-19 2009-01-21 이동훈 Basement reinforcing and structure restoration method using piling appratus
KR101196327B1 (en) * 2010-11-25 2012-11-05 우복기초 주식회사 Percussion device of steel pipe for ground reinforcement
KR101377019B1 (en) * 2013-09-26 2014-03-25 황규원 Reactive forcing device using guide rail and foundation reinforcing method therewith

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006112106A (en) * 2004-10-14 2006-04-27 Kanematsu Nnk Corp Drop hammer type pile driver
KR100879621B1 (en) * 2008-09-19 2009-01-21 이동훈 Basement reinforcing and structure restoration method using piling appratus
KR101196327B1 (en) * 2010-11-25 2012-11-05 우복기초 주식회사 Percussion device of steel pipe for ground reinforcement
KR101377019B1 (en) * 2013-09-26 2014-03-25 황규원 Reactive forcing device using guide rail and foundation reinforcing method therewith

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110499760A (en) * 2019-09-03 2019-11-26 中冶京诚工程技术有限公司 Anchor pole Pile feeder
CN110499760B (en) * 2019-09-03 2024-02-06 中冶京诚工程技术有限公司 Pile driver for anchor rod
KR20210002105U (en) * 2020-03-13 2021-09-27 주식회사 주안기술단 Fixing structure under a foundation in pile pressing system for foundation reinforcement
KR200494977Y1 (en) * 2020-03-13 2022-02-09 주식회사 주안기술단 Fixing structure under a foundation in pile pressing system for foundation reinforcement

Similar Documents

Publication Publication Date Title
KR100879621B1 (en) Basement reinforcing and structure restoration method using piling appratus
CN111456023B (en) Construction method of underground prestressed supporting structure
KR100654228B1 (en) Structure lifting method possible to be re-lifting using pile member
KR101196459B1 (en) Anchor with enlarged connection member for nut and reinforcing construction method therewith
KR101377019B1 (en) Reactive forcing device using guide rail and foundation reinforcing method therewith
KR101103530B1 (en) Apparatus for restoration of disparity sinking construction or introducing pre-stress of pipe pile
KR101427340B1 (en) Apparatus and method for pressing steel pipe
KR20210033815A (en) Method for strengthening the foundation of a structure with improved construction precision and reinforced structural strength
KR101519111B1 (en) jacking method for pile
KR101528846B1 (en) Reactive forcing device using jack lifting apparatus and foundation reinforcing method therewith
KR101133771B1 (en) Structure consecutive lifting apparatus and lifting method using that
US20100080658A1 (en) System for supporting slab with concrete pier
KR20140065321A (en) Apparatus for pressing of pile and operation method of the same
KR102017731B1 (en) Reaction bed for pressing in reinforcing pile and pressing in method of reinforcing pile using the same
US6641333B2 (en) Method of forming enlarged pile heads
KR101362173B1 (en) Fold type anchor reactive device and pile construction method therewith
KR101415250B1 (en) Free fall type reactive device and pile construction method therewith
KR20130047235A (en) Automatic pile pressing system and pile pressing method using that
KR20100138522A (en) Method for constructing retaining wall and the apparatus thereby
JP2010255374A (en) Demolition method for skyscraper building
JP6508958B2 (en) Demolition system and demolition method
CN110670582B (en) Device for construction of cast-in-place pile and cast-in-place pile construction method
KR101517169B1 (en) The the underground structure to equip the pressing dievice
KR101114860B1 (en) Structure lifting and supporting method and apparatus by using a micro pile and shear plate
KR101367227B1 (en) Apparatus for installing liner plate for deep foundation construction of power transmission steel tower and method constructing deep foundation using the same

Legal Events

Date Code Title Description
AMND Amendment
AMND Amendment
E902 Notification of reason for refusal
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180402

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190411

Year of fee payment: 5