KR101103530B1 - Apparatus for restoration of disparity sinking construction or introducing pre-stress of pipe pile - Google Patents

Apparatus for restoration of disparity sinking construction or introducing pre-stress of pipe pile Download PDF

Info

Publication number
KR101103530B1
KR101103530B1 KR1020110037320A KR20110037320A KR101103530B1 KR 101103530 B1 KR101103530 B1 KR 101103530B1 KR 1020110037320 A KR1020110037320 A KR 1020110037320A KR 20110037320 A KR20110037320 A KR 20110037320A KR 101103530 B1 KR101103530 B1 KR 101103530B1
Authority
KR
South Korea
Prior art keywords
pile
press
foundation
load
fixing rod
Prior art date
Application number
KR1020110037320A
Other languages
Korean (ko)
Inventor
김상수
Original Assignee
(주)토탈지오이앤씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)토탈지오이앤씨 filed Critical (주)토탈지오이앤씨
Priority to KR1020110037320A priority Critical patent/KR101103530B1/en
Application granted granted Critical
Publication of KR101103530B1 publication Critical patent/KR101103530B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/54Piles with prefabricated supports or anchoring parts; Anchoring piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/801Ground anchors driven by screwing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1678Shapes triangular
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Abstract

PURPOSE: A device for restoring differential subsidence and introducing pile pre-compression load of a structure is provided to convert the transmission stress direction of the load, which structure receives, by using a coupling structure of a protrusion and a groove. CONSTITUTION: A device for restoring differential subsidence and introducing pile pre-compression load of a structure comprises multiple foundation construction devices. The foundation construction device comprises a fixing pipe(14), a basis fixed bar(15a) and a pile(17). The fixing pipe comprises a protrusion(14a) in the side part. The protrusion is formed on the location corresponding to expansion. The fixing pipe changes the transmission stress direction of the load which the base foundation receives. The basis fixed bar welds in the space between protrusions. The basis fixed bar is inserted into a foundation core and is projected to the outside of the foundation concrete.

Description

구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치{APPARATUS FOR RESTORATION OF DISPARITY SINKING CONSTRUCTION OR INTRODUCING PRE-STRESS OF PIPE PILE} Apparatus for restoring uneven settlement of structures or introducing pile upstream loads {APPARATUS FOR RESTORATION OF DISPARITY SINKING CONSTRUCTION OR INTRODUCING PRE-STRESS OF PIPE PILE}
본 발명은 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치에 관한 것으로, 특히 연약지반에 기초공사가 이루어진 구조물의 부등 침하를 복원하거나 기존 또는 신설말뚝에 선행 하중을 도입하기 위한 장치에 관한 것이다.
The present invention relates to a device for restoring an uneven settlement of a structure or introducing a pile upfront load, and more particularly, to an apparatus for restoring an uneven settlement of a structure in which foundation work is made on a soft ground or introducing a preceding load into an existing or newly constructed pile. .
연약지반에는 일반적으로 기초공사 이전에 말뚝지정 공사를 선행하게 된다.In soft ground, pile designation work is usually performed before foundation work.
하지만, 말뚝지정 공사없이 기초공사만으로 이루어지는 경우도 있으며, 이렇게 기초공사만으로 건축된 구조물은 시간이 흐름에 따라 지반의 문제점으로 구조물이 기울어지거나 하는 등의 경우가 발생한다. 이러한 구조물 기초지반에 문제가 있는 경우에는 기존 구조물의 기초를 보강하여야 한다. 또한 구조물 기울어짐이 큰 경우에는 복원이 요구되기도 한다.However, there is a case where only the foundation works without pile designation work, and the structure built only by the foundation work, such as the structure is inclined due to the problems of the ground over time. If there is a problem with the foundation of such a structure, the foundation of the existing structure should be reinforced. Restoration may also be required when the structure is tilted significantly.
기존 구조물의 기초를 보강하는 경우, 작업 공간이 협소하거나 기초 상부에 구조물이 있어 키 높은 장비의 진입이 불가능할 때는 가느다란 강봉을 토막내서 이어 설치하는 마이크로파일을 많이 활용하고 있다.When reinforcing the foundation of an existing structure, when the working space is narrow or there is a structure at the top of the foundation, it is not possible to enter tall equipment, and a micropile is used to install thin piles of thin rods.
마이크로파일은 지반에 150mm 정도 굵기의 보링을 하고 그 구멍에 두께가 얇은 강관을 삽입한 후 강관 내부에 가느다란 고강도 강봉(직경 50∼75mm)을 이어서 넣고 강관과 강봉 사이 빈 공간에 모르터를 주입하는 공법이다.The micropile is bored with a thickness of about 150mm in the ground, and a thin steel pipe is inserted into the hole, followed by inserting a thin high strength steel bar (diameter 50 ~ 75mm) into the hole and injecting mortar into the empty space between the steel pipe and the steel bar. It is a construction method.
최근에는 유압잭을 이용하여 강관을 압입하는 공법을 사용하기도 한다. Recently, a method of pressing a steel pipe using a hydraulic jack is also used.
이는 말뚝머리를 직접 유압잭으로 눌러 관입하는 무소음 무진동 방법이지만 재래식 일반 유압잭 스트로크(stroke)의 한계 때문에 유압잭 2개를 직렬로 연결하고 유압잭 스트로크에 따라 길이를 보정하는 버팀재를 수시로 갈아 끼운다 해도 말뚝 단위 길이가 2m 정도로 제한되므로 말뚝 관입이 번거롭고 느리며 이음개소가 많은 것이 문제이다.This is a noiseless and vibration-free method where the pile head is pushed directly into the hydraulic jack. However, due to the limitations of conventional general hydraulic jack strokes, it is possible to connect two hydraulic jacks in series and change the length of the pile to adjust the length according to the hydraulic jack stroke. Is limited to about 2m, pile intrusion is cumbersome and slow, and a lot of joints is a problem.
특히 기존 구조물의 기초콘크리트에 다수 천공을 실시하여 반력장치를 형성함으로 인해 기존 기초의 성능을 저하시키는 문제점을 가지고 있다.In particular, there is a problem in deteriorating the performance of the existing foundation by forming a reaction force device by forming a plurality of perforations on the foundation concrete of the existing structure.
또한 기울어진 구조물을 복원하는 방법으로 기초 하부에 그라우팅을 가압 주입하여 구조물을 복원하는 경우도 있으나 이는 기초 하부의 연약한 지반에 대한 근본적인 문제점을 처리함이 없이 이루어져 단기적인 복원에는 유용하게 사용되고 있으나 장기적인 안정성 확보에 문제점을 가지고 있어 기초 하부지반의 유실로 인한 구조물의 기울어진 경우 등에 제한적으로 사용되고 있다.
In addition, there is a case of restoring the structure by pressurizing grouting to the lower part of the foundation as a method of restoring the inclined structure. It has a problem in that it is used in a limited case, such as the inclination of the structure due to the loss of the foundation base.
본 발명이 해결하려는 과제는, 부등 침하된 구조물의 복원공법 또는 기존 또는 신설말뚝에 선행하중을 도입하는 기술을 확보하고자 하는 장치를 제공하고자 한다. The problem to be solved by the present invention is to provide a device for securing a technique for introducing a pre-loading method to the restoration method or the existing or newly piled structure of the differential settlement.
또한, 기초구조물이 받는 하중(인발응력 및 압축응력)의 전달응력방향을 변환시켜 안전한 하중전달을 가능하게 하는 기존 또는 신설말뚝에 선행하중 도입 장치를 제공하고자 한다.In addition, the present invention is to provide a pre-load introduction device to the existing or new piles that enable the safe load transfer by converting the transfer stress direction of the load (drawing stress and compressive stress) received by the foundation structure.
또한, 기존 신축 건물의 기초 지반을 보강하기 위해 협소한 지역에서 부피가 작은 장비에 의해 압입강관말뚝을 기초 기반에 용이하게 압입시킬 수 있는 강관압입말뚝 설치로 구조물의 안전한 기초보강공법을 제공하고자 한다.In addition, in order to reinforce the foundation ground of existing new buildings, it is intended to provide a safe foundation reinforcement method of the structure by installing the steel pipe press-fit pile that can easily press-fit the press-fitted steel pipe pile to the foundation base by small equipment in a small area. .
또한, 이를 이용한 부등 침하된 구조물의 복원공법을 제공하고자 한다.
In addition, it is intended to provide a method for restoring a differentially settled structure using the same.
상술한 과제를 해결하기 위한 본 발명에 따른 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치는, 기초콘크리트의 기초코어를 천공하고 상기 기초코어 내면의 소정 복수 개소에 높이를 달리하여 확장 천공하여 확공부를 형성한 후 상기 기초코어 내부로 삽입되며, 상기 확공부와 대응되는 위치에 하나 이상의 돌출부가 형성되며, 외주연에 상기 돌출부 사이에서 세로방향으로 용접되어 상기 기초코어 내부 삽입시 상기 기초코어의 외부로 돌출되는 기초고정봉을 갖는 고정관; 및 상기 고정관 내부로 삽입되는 말뚝;으로 이루어지는 기초 공사 장치를 포함하여 이루어질 수 있다.In order to solve the above problems, an apparatus for restoring uneven settlement of a structure or introducing a pile preceding load according to the present invention may be formed by drilling a foundation core of a foundation concrete and expanding the drilling by varying a height at a predetermined plurality of locations on an inner surface of the foundation core. After forming the expansion portion is inserted into the base core, one or more protrusions are formed at a position corresponding to the expansion portion, the outer periphery is welded in the longitudinal direction between the protrusions in the base core when the inner core is inserted Fixing tube having a base fixing rod protruding to the outside of the; And a pile inserted into the fixing pipe.
여기서, 상기 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치는, 상기 기초고정봉에 연결재를 통해 보조고정봉을 연결 설치하고, 상기 보조고정봉이 삽입되는 관통홀을 가지며 상기 말뚝 상단에 위치되는 하부반력판; 상기 하부반력판 위에 설치되는 압입잭; 및 상기 압입잭 위에 설치되며 상기 보조고정봉이 삽입되는 관통홀을 갖는 상부반력판;으로 이루어지는 압입장치;를 더 포함하고, 상기 압입장치에 의해 반복적으로 상기 말뚝의 압입(하중) 재하(載荷)와 압입(하중) 제하(除荷)를 실행할 수 있도록 구현된다.Here, the device for restoring the uneven settlement of the structure or the introduction of the pile preload, connecting the auxiliary fixing rod through the connecting member to the base fixing rod, having a through hole into which the auxiliary fixing rod is inserted is located on the pile Lower reaction plate; A press-fit jack installed on the lower reaction plate; And an upper reaction plate installed on the press-fit jack and having a through hole into which the auxiliary fixing rod is inserted. The press-fit device further includes a press-fit (load) load of the pile by the press-fit device. Implemented so as to be able to perform a press-in (load) unloading.
여기서, 상기 상부반력판 위에는 상부고정너트가 상기 보조고정봉에 체결되고, 상기 하부반력판 위에는 하부고정너트가 상기 보조고정봉에 체결되는 것이 바람직하다.Here, an upper fixing nut is fastened to the auxiliary fixing rod on the upper reaction plate, and a lower fixing nut is fastened to the auxiliary fixing rod on the lower reaction plate.
여기서, 상기 확공부와 돌출부는 그 단면이 삼각형태를 갖는 것이 바람직하다.Here, it is preferable that the expanded portion and the protrusion have a triangular shape in cross section thereof.
여기서, 상기 말뚝은 압입말뚝, 마이크로파일, 오거말뚝 또는 강관말뚝 중 어느 하나일 수 있다.
Here, the pile may be any one of the press-fit pile, micro pile, auger pile or steel pipe pile.
상술한 본 발명의 구성에 따르면, 기초구조물이 받는 하중(인발응력 및 압축응력)의 전달응력방향을 변환시켜 안전한 하중전달을 가능하게 하고, 기존 신축 건물의 기초 지반을 보강시 협소한 지역이더라도 부피가 작은 장비를 사용하여 압입강관말뚝을 기초 기반에 용이하게 압입시킬 수 있는 강관말뚝에 의한 부등 침하된 구조물의 복원공법을 제공하는 것이 가능하게 된다.
According to the above-described configuration of the present invention, it is possible to change the transfer stress direction of the load (pulling stress and compressive stress) received by the foundation structure to enable safe load transfer, and even in a narrow area when reinforcing the foundation ground of an existing new building, It is possible to provide a method for restoring unevenly settled structures by means of steel pipe piles that can easily press-fit the press-fitted steel pipe piles to the foundation base using small equipment.
도 1은 본 발명에 따른 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치 중 기초 공사를 위한 기초 공사 장치에 대한 사시도이다.
도 2는 본 발명에 따른 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치 중 말뚝의 압입 공사를 위한 말뚝 압입장치에 대한 사시도이다.
도 3 내지 도 8은 본 발명에 따른 강관말뚝에 의한 부등 침하된 구조물의 복원공법의 (A) 내지 (L)까지의 공정도이다.
1 is a perspective view of a foundation construction apparatus for foundation work among the apparatus for the restoration of uneven settlement of the structure or the introduction of the pile preload load according to the present invention.
Figure 2 is a perspective view of the pile indentation apparatus for the press-fitting construction of the pile of the device for restoring the uneven settlement of the structure or the introduction of the pile preload load in accordance with the present invention.
3 to 8 are process drawings from (A) to (L) of the restoration method of the differentially settled structure by the steel pipe pile according to the present invention.
이하, 첨부된 도면을 참조하여 본 발명에 따른 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치, 그 장치에 의한 구조물의 부등 침하 복원공법 및 작용효과를 설명한다.Hereinafter, with reference to the accompanying drawings will be described the device for the differential settlement restoration or pile preload introduction of the structure according to the present invention, the differential settlement restoration method and the effect of the structure by the apparatus.
도 1은 본 발명에 따른 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치 중 기초 공사를 위한 기초 공사 장치에 대한 사시도이다.1 is a perspective view of a foundation construction apparatus for foundation work among the apparatus for the restoration of uneven settlement of the structure or the introduction of the pile preload load according to the present invention.
도 1에 도시된 바와 같이, 기초 공사 장치(100)는 고정관(14), 기초고정봉(15a) 및 말뚝(17)을 포함하여 이루어진다.As shown in FIG. 1, the foundation construction apparatus 100 includes a fixing pipe 14, a foundation fixing rod 15a, and a pile 17.
고정관(14)은 측면에 돌출부(14a)가 높이에 따라 다수층에 형성되며, 돌출부(14a)는 도 3의 (B)의 확공부(13)에 대응되는 위치에 놓이게 된다. 돌출부(14a)와 확공부(13)는 단면이 삼각형상으로서, 기초구조물이 받는 하중(인발응력 및 압축응력)의 전달응력방향을 변환시켜 안전한 하중전달을 가능하게 하는 구조를 갖는다.Fixing tube 14 is formed in a plurality of layers with a protrusion 14a on the side, the protrusion 14a is placed in a position corresponding to the dilating portion 13 of (B) of FIG. The protruding portion 14a and the expanding portion 13 are triangular in cross section, and have a structure that enables safe load transfer by converting a transfer stress direction of loads (pulling stress and compressive stress) received by the foundation structure.
기초고정봉(15a)은 외측에 볼트 탭이 전체에 형성되며, 일측은 고정관(14)에 용접된 형태를 갖으며, 도시된 바와 같이 돌출부(14a)들 사이의 공간에서 용접된다. 기초고정봉(15a)은 고정관(14)의 길이 보다 크며 기초 코아(12)에 삽입된 후 기초 콘크리트(11) 외부로 돌출된다.Base fixing rod 15a is formed on the outside of the bolt tab, the one side has a form welded to the fixed tube 14, as shown is welded in the space between the projections (14a). The base fixing rod 15a is larger than the length of the fixing tube 14 and is inserted into the foundation core 12 and then protrudes out of the foundation concrete 11.
기초고정봉(15a)은 보조고정봉(15b)과 함께 도 5의 (F)에서와 같이 압입장치를 설치하기 위한 기초 장치로 활용된다.The base fixing rod 15a is used as a base apparatus for installing the indentation apparatus as shown in FIG. 5F together with the auxiliary fixing rod 15b.
고정관(14)과 기초고정봉(15a)은 용접에 의해 일체로 되며, 몰탈 충진에 의해 기초 콘크리트(11)와 일체화되고, 이 후 도 7의 (J)와 같이 기존 구조물의 복원하중재하시 하부 지지대로서의 역할을 수행하게 된다.The fixed tube 14 and the base fixing rod 15a are integrated by welding, and are integrated with the base concrete 11 by mortar filling, and thereafter, as shown in (J) of FIG. It will serve as a support.
말뚝(17)은 압입강관말뚝, 반력강관말뚝, 마이크로파일 또는 오거강관말뚝 중 어느 하나가 사용될 수 있으며, 기존 구조물의 복원 또는 기설 또는 신설된 말뚝에 선행 하중을 도입하기 위한 부재로 사용된다.The pile 17 may be any one of a press-fitted steel pipe pile, a reaction steel pipe pile, a micro pile or an auger steel pipe pile, and used as a member for restoring an existing structure or introducing a preceding load to an existing or newly established pile.
즉, 기존 구조물의 부상에 의한 복원 및 기설 또는 신설된 말뚝에 선행 하중을 도입할 때, 말뚝(17)은 압입장치에 의해 지하 방향으로 힘이 전달되어 도 7의 (J)와 같이 기초 콘크리트(11)와 일체화된 고정관(14) 및 기초고정봉(15a)에 의해 기존 구조물이 부상할 때 지지대 역할을 하게 된다. 마찬가지로, 기존 구조물이 고정된 상태에서는 기설 또는 신설된 말뚝은 기존 구조물을 지지대 삼아 지하 방향으로 선행 하중을 받게되는 구조를 갖는다. That is, when the restoration by the injury of the existing structure and the introduction of the preceding load to the existing or newly installed pile, the pile 17 is transmitted to the underground direction by the indentation device to the base concrete (J) of FIG. 11) by the fixed tube 14 and the base fixing rod 15a integrated with the existing structure to serve as a support when floating. Similarly, in the state in which the existing structure is fixed, the existing or newly constructed pile has a structure in which the existing structure is subjected to a preceding load in the underground direction using the support.
도 2는 본 발명에 따른 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치 중 말뚝의 압입 공사를 위한 말뚝 압입장치에 대한 사시도이다.Figure 2 is a perspective view of the pile indentation apparatus for the press-fitting construction of the pile of the device for restoring the uneven settlement of the structure or the introduction of the pile preload load in accordance with the present invention.
도 2에 도시된 바와 같이, 압입장치(200)는 하부고정판(20), 하부고정너트(20a), 압입잭(18), 상부고정판(21) 및 상부고정너트(21a)를 포함하여 이루어진다.As shown in FIG. 2, the press-fit device 200 includes a lower fixing plate 20, a lower fixing nut 20a, a press-fit jack 18, an upper fixing plate 21, and an upper fixing nut 21a.
하부고정판(20)과 상부고정판(21)은 기초고정봉(15a) 및 보조고정봉(15b)이 삽입되는 관통홀(20b)이 형성되며, 하부고정판(20)은 말뚝(17)의 상단부에 위치되고, 하부고정판(20) 위로는 압입잭(18)이 놓이고, 압입잭(18) 위로는 상부고정판(21)이 위치된다.The lower fixing plate 20 and the upper fixing plate 21 have a through hole 20b into which the basic fixing bar 15a and the auxiliary fixing bar 15b are inserted, and the lower fixing plate 20 is formed at the upper end of the pile 17. The press-fit jack 18 is positioned above the lower fixing plate 20, and the upper fixation plate 21 is positioned above the press-fit jack 18.
하부고정판(20) 상부방향으로의 외곽 원주 방향으로는 하부고정너트(20a)가 보조고정봉(15b)에 체결되고, 상부고정판(21) 상부방향으로의 외곽 원주 방향으로는 상부고정너트(21a)가 보조고정봉(15b)에 체결된다.The lower fixing nut 20a is fastened to the auxiliary fixing rod 15b in the outer circumferential direction of the lower fixing plate 20 in the upper direction, and the upper fixing nut 21a in the outer circumferential direction of the upper fixing plate 21 in the upper direction. ) Is fastened to the auxiliary fixing rod (15b).
하부고정너트(20a)는 압입잭(18)에 의해 말뚝(17)이 압입되어 하강할 때, 하중의 재하(載荷)와 하중 제하(除荷)가 반복적으로 이루어지므로 제하시 말뚝(17)의 자진 부상을 막기 위한 장치가 되며, 상부고정너트(21a)는 압입잭(18)에 의해 말뚝(17) 압입시 압입잭(18) 상부를 상부고정판(21)에 의해 지지되도록 설치되는 장치가 된다.When the pile 17 is press-fitted and lowered by the press-fit jack 18, the lower fixing nut 20a is repeatedly loaded and unloaded. It is a device for preventing a self-injury, the upper fixing nut (21a) is a device which is installed to support the upper part of the press-in jack 18 by the upper fixing plate 21 when the pile 17 is press-fit by the press-in jack (18). .
이렇게 설치되는 압입장치(200)는 도 5 (F)의 압입장치(200) 설치에서부터 도 6 (G) 내지 도 7 (H)까지의 반복으로 소기 깊이까지의 압입 시행 및 도 7 (J)의 기존 구조물의 부상시까지 사용될 수 있다. The press-fit apparatus 200 installed as described above is press-fitted to the desired depth by repeating the installation of the press-fit apparatus 200 of FIG. 5 (F) to FIGS. 6 (G) to 7 (H), and of FIG. 7 (J). Can be used until the injury of existing structures.
이하에서는 바람직한 실시예로서 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치를 이용하여 부등 침하된 구조물의 복원 공법을 설명하기로 하며, 기존 구조물에 기설되어 있거나 신설되는 말뚝에 선행하중을 도입하는 공법도 동일하므로 이 부분에 대한 공법 설명은 생략된다. Hereinafter, as a preferred embodiment, a method for restoring an unevenly settled structure using a device for restoring an uneven settlement of a structure or introducing a pile upfront load will be described, and the preceding load is introduced to an existing or newly established pile in an existing structure. Since the construction method is the same, the description of the construction method for this part is omitted.
도 3 내지 도 8은 본 발명에 따른 강관말뚝에 의한 부등 침하된 구조물의 복원공법의 (A) 내지 (L)까지의 공정도이다.3 to 8 are process drawings from (A) to (L) of the restoration method of the differentially settled structure by the steel pipe pile according to the present invention.
도 3의 (A)를 참조하면, 먼저 연약지반 위에 기초 콘크리트(11)로 기초공사된 구조물을 기초 보강하기 위해서 기초 콘크리트(11)에 구조물 지주 좌우로 기초코어(12)를 천공한다.Referring to FIG. 3 (A), first, the foundation core 12 is drilled on the foundation concrete 11 to the left and right of the structure support to reinforce the foundation structured with the foundation concrete 11 on the soft ground.
도 3의 (B)를 참조하면, 기초코어(12)를 천공한 후 기초코어(12)의 천공부를 확장하게 된다.Referring to FIG. 3B, after drilling the foundation core 12, the perforations of the foundation core 12 are expanded.
기초코어(12)의 확공부(13)는 기초코어(12)의 깊이에 따라 아래에서부터 위로 등간격을 유지하며 소정 개소를 확장하게 된다.The expansion portion 13 of the foundation core 12 extends a predetermined position while maintaining an equal interval from the bottom up according to the depth of the foundation core 12.
확공부(13)의 단면은 도시된 바와 같이 삼각형태를 가지며, 삼각 단면을 갖는 확공부(13)는 기초구조물이 받는 하중(인발응력 및 압축응력)의 전달응력방향을 변환시켜 안전한 하중 전달을 가능하게 한다.The cross section of the dilatation section 13 has a triangular shape as shown, and the dilation section 13 having a triangular cross section converts the transfer stress direction of the load (pulling stress and compression stress) received by the foundation structure to provide safe load transmission. Make it possible.
도 4의 (C)를 참조하면, 확공부(13)의 확장 천공이 완료된 후 기초코어(12) 내부로 고정관(14)과 기초고정봉(15a)을 삽입하게 된다.Referring to FIG. 4C, after the expansion drilling of the dilation part 13 is completed, the fixing tube 14 and the basic fixing rod 15a are inserted into the basic core 12.
고정관(14)은 확공부(13)와 대응되는 위치에 동일 형상 단면을 갖으며 적어도 하나 이상 또는 바람직하게는 확공부(13)의 개수와 동일의 개수의 돌출부(14a)가 형성되며, 그 평면은 다수개의 원호띠 형상이 연이어 형성된 형태를 취한다.The fixing tube 14 has the same shape cross-section at a position corresponding to the expansion portion 13, and at least one or preferably the same number of protrusions 14a as the number of the expansion portions 13 is formed, the plane Has a shape in which a plurality of arc-shaped bands are formed successively.
돌출부(14a)끼리 연결되는 부분에는 기초고정봉(15a)이 위치되며, 바람직하게는 고정관(14)을 기준으로 90도 각도를 유지하며 4개의 기초고정봉(15a)이 위치될 수 있다.The base fixing rod 15a is positioned at the portion where the protrusions 14a are connected to each other, and preferably, four base fixing rods 15a may be positioned while maintaining a 90 degree angle with respect to the fixing tube 14.
고정관(14)은 기초 콘크리트(11)와 일체로 몰탈 충진에 의해 하중을 분산시키기 위해 기초 콘크리트(11) 외부로 돌출되지 않도록 매설되며, 기초고정봉(15a)은 압입잭 설치 및 압입 공정을 수행하기 위해 기초 콘크리트(11) 외부로 돌출되도록 매설된다.The fixed tube 14 is buried so as not to protrude out of the base concrete 11 in order to distribute the load by mortar filling integrally with the base concrete 11, and the base fixing rod 15a performs a press-fit jack installation and a press-fit process. It is embedded so as to protrude out of the base concrete (11).
기초고정봉(15a)은 전체에 나사탭이 형성된 강재이다. The base fixing rod 15a is a steel material with a thread tab formed therein.
도 4의 (D)를 참조하면, 고정관(14) 및 기초고정봉(15a)의 매입이 완료된 후 고정관(14)과 기초코어(12) 사이에는 1차적으로 몰탈 충진이 이루어지고, 몰탈의 경화에 따라 기초 콘크리트(11)와 고정관(14)은 서로 일체가 된다.Referring to FIG. 4D, after completion of the purchase of the fixed tube 14 and the base fixing rod 15a, mortar filling is primarily performed between the fixed tube 14 and the base core 12, thereby curing the mortar. As a result, the foundation concrete 11 and the fixed tube 14 are integrated with each other.
도 5의 (E)를 참조하면, 몰탈 충진이 완료된 후에는 압입 또는 반력말뚝(17)이 고정관(14) 내부로 삽입된다.Referring to FIG. 5E, after the mortar filling is completed, the press-fit or reaction force pile 17 is inserted into the fixed tube 14.
도 5의 (F)를 참조하면, 압입 또는 반력말뚝(17)이 고정관(14) 내부로 삽입된 후 압입 또는 반력말뚝(17)의 지반으로의 압입을 위한 압입(하중)장치가 설치된다.Referring to FIG. 5F, after the press-fit or reaction force pile 17 is inserted into the fixed tube 14, a press-fit (load) device for press-fitting or press-fitting the ground of the reaction force pile 17 is installed.
기초 보강 공사이므로 그 장소가 협소하여 소형의 압입잭(18)이 사용되며, 소형의 압입잭(18)에 의한 효율적인 압입(하중)을 위해 본 발명에서는 다음과 같은 구조의 압입장치를 설치하게 된다.Since the place is narrow because of the foundation reinforcement construction, a small press-fit jack 18 is used, and in the present invention, a press-fit device having the following structure is installed in order to efficiently press-fit (load) the compact press-fit jack 18. .
우선, 기 삽입되어 있는 기초고정봉(15a)에 동일 외경 및 형상을 갖는 보조고정봉(15b)을 강봉연결재(19)를 매개로 서로 연결시킨다. 강봉연결재(19)는 내부가 관통된 탭을 갖을 수 있다.First, the auxiliary fixing rod 15b having the same outer diameter and shape to the base fixing rod 15a which is already inserted is connected to each other via the steel rod connecting member 19. The steel rod connecting member 19 may have a tab penetrated therein.
보조고정봉(15b) 선단을 통해 하부반력판(20)이 삽입되고 하부반력판(20)은 압입 또는 반력말뚝(17)의 선단부에 얹혀지게 된다. The lower reaction plate 20 is inserted through the tip of the auxiliary fixing rod 15b, and the lower reaction plate 20 is mounted on the tip of the press-fitting or reaction force pile 17.
하부반력판(20) 위로는 압입잭(18)이 위치되며, 압입잭(18) 위로는 보조고정봉(15b) 선단을 통해 상부반력판(21)이 삽입되어 위치된다.The presser jack 18 is positioned above the lower reaction plate 20, and the upper reaction plate 21 is inserted and positioned through the tip of the auxiliary fixing rod 15b above the presser jack 18.
하부반력판(20) 및 상부반력판(21) 상부로는 보조고정봉(15b)과 나사 연결된 하부고정너트(20a) 및 상부고정너트(21a)가 체결된다.The lower fixing plate 20 and the upper reaction plate 21 are fastened to the lower fixing nut 20a and the upper fixing nut 21a which are screwed with the auxiliary fixing rod 15b.
하부고정너트(20a)는 하부반력판(20)을 고정하는 역할을 하며, 상부고정너트(21a)는 상부고정판(21)을 고정하는 역할을 한다. The lower fixing nut 20a serves to fix the lower reaction plate 20, and the upper fixing nut 21a serves to fix the upper fixing plate 21.
상부고정판(21)과 상부고정너트(21a)는 압입잭(18)에 의한 압입 또는 반력말뚝(17)의 지반으로의 압입시 압입잭(18)의 상부를 지지하는 역할을 수행하고, 하부고정판(20)과 하부고정너트(20a)는 압입잭(18)에 의해 압입 또는 반력말뚝(17)이 압입된 상태에서 압입 하중된 상태에서 하중이 제거되는 것을 방지한다.The upper fixing plate 21 and the upper fixing nut 21a serve to support the upper part of the press-fit jack 18 when press-fitting or press-fitting the ground of the reaction force pile 17 by the press-fit jack 18, and the lower fixing plate 20 and the lower fixing nut 20a prevents the load from being removed in the press-fitted state while the press-fit or reaction force pile 17 is press-fitted by the press-fit jack 18.
하부반력판(20)과 상부반력판(21)은 보조고정봉(15b)이 삽입될 수 있도록 관통홀(20b)이 형성된다.The lower reaction plate 20 and the upper reaction plate 21 are formed with a through hole 20b so that the auxiliary fixing rod 15b can be inserted therein.
도 6의 (G) 및 (H)를 참조하면, 압입장치 설치가 완료된 후 (G)와 같이 압입잭(18)에 의해 압입(하중) 재하((載荷)를 실시하고, (H)와 같이 압입(하중) 제하(除荷)를 실시한 후 상부고정판(21), 상부고정너트(21a) 및 하부고정너트(20a)를 압입잭(18)의 위치에 대응하는 위치로 이동시킨다.Referring to Figs. 6 (G) and (H), after the installation of the press-fit device is completed, the press-fit (load) load is performed by the push-in jack 18 as shown in (G), and as shown in (H). After the press fitting (loading) removal, the upper fixing plate 21, the upper fixing nut 21a and the lower fixing nut 20a are moved to a position corresponding to the position of the press fitting jack 18.
(G)와 (H)의 압입(하중) 재하와 압입(하중) 제하는 압입 또는 반력말뚝(17)이 원하는 위치가 될 때까지 반복적으로 실시하게 된다. The press-in (load) load and the press-in (load) removal of (G) and (H) are repeatedly performed until the press-in or reaction force pile 17 is at a desired position.
하부고정판(20)과 하부고정너트(20a)는 압입된 압입 또는 반력말뚝(17)의 기도입된 하중이 제거되지 않도록 하며, 상부고정판(21)과 상부고정너트(21a)는 압입잭(18)에 의한 압입시 압입잭(18) 상부를 지지하여 압입력을 압입 또는 반력말뚝(17)에 인가하도록 한다.The lower fixing plate 20 and the lower fixing nut 20a do not remove the air-loaded load of the press-fitted press or reaction force pile 17, and the upper fixing plate 21 and the upper fixing nut 21a are press-fit jacks 18. At the time of press-fitting by), the press-fit jack 18 is supported to apply the press-in input to the press-fit or reaction force pile 17.
도 7의 (I) 및 (J)를 참조하면, 압입 또는 반력말뚝(17)의 압입(하중) 종료 및 부상(하중) 재하 상태를 나타낸다.Referring to (I) and (J) of Fig. 7, the indentation (load) end of the indentation or reaction force pile 17 and the floating (load) loading state is shown.
(I)의 경우는 소기의 지지력이 확보된 상태의 압입 또는 반력말뚝(17) 상태를 나타내고, (J)의 경우는 압입 완료된 압입 또는 반력말뚝(17)을 이용하여 상부구조물을 부상(부등침하가 발생한 구조물을 복원)하도록 부상 하중을 도입하는 과정을 나타낸다. 부상(하중) 재하는 상부구조물의 변위(P)로 나타내어진다.In case of (I), it shows the state of press-fitting or reaction force pile 17 in which the desired supporting force is secured, and in case of (J), the upper structure is injured by using the press-fitting press-fitting or reaction force pile 17. Represents the process of introducing a floating load to restore the generated structure. The floating load is represented by the displacement P of the superstructure.
도 8의 (K)를 참조하면, 보조고정봉(15b), 압입잭(18) 및 상부고정판(21)이 해체되고, 해체 후에 압입 또는 반력말뚝(17)과 고정관(14)의 용접 및 압입 또는 반력말뚝(17)과 기초고정봉(15a)의 절단작업이 수행된다.Referring to FIG. 8 (K), the auxiliary fixing rod 15b, the press-fit jack 18, and the upper fixing plate 21 are dismantled, and after disassembly, the press-fitting or reaction force pile 17 and the fixed pipe 14 are welded and press-fitted. Alternatively, the cutting force of the reaction force pile 17 and the base fixing rod 15a is performed.
압입 또는 반력말뚝(17)과 고정관(14)의 용접은 고정관(14)의 매설높이(22)부근에서 이루어지며, 용접 후 압입 또는 반력말뚝(17)은 고정관(14)이 매설된 높이와 동일한 위치에서 절단되며, 기초고정봉(15a)은 기초콘크리트(11)의 최상단면과 동일한 위치에서 절단된다.The welding of the press-fitting or reaction force pile 17 and the fixed tube 14 is performed near the buried height 22 of the fixed tube 14, and after welding, the press-fit or reaction force pile 17 is the same as the height at which the fixed tube 14 is embedded. Cut at the position, the base fixing rod 15a is cut at the same position as the top end surface of the base concrete 11.
그리고, 용접 및 절단작업과 동시 또는 후에 상부 구조물이 부상된 부상부의 2차 몰탈 충진(23a)이 이루어진다.Then, at the same time as or after the welding and cutting operations, the secondary mortar filling 23a of the floating part in which the upper structure is floated is made.
도 8의 (L)를 참조하면, 압입 또는 반력말뚝(17)과 기초고정봉(15a)을 절단시킨 후 지압판(23)을 압입 또는 반력말뚝(17)과 고정관(14) 상단에 위치시킨 상태에서 기초고정봉(15a)을 통해 너트(24)로 지압판(23)을 단단하게 고정시킨다.Referring to FIG. 8 (L), after cutting the press-fitting or reaction force pile 17 and the base fixing rod 15a, the pressure plate 23 is placed on the top of the press-fitting or reaction force pile 17 and the fixed tube 14. Fasten the pressure plate 23 with the nut 24 through the base fixing rod 15a.
지압판(23)이 완벽하게 고정된 후, 압입 또는 반력말뚝(17) 내부와 몰탈 충진이 이루어지지 않는 나머지 공간에 내부 보강에 따른 3차 몰탈 충진과 경화가 이루어진다.After the acupressure plate 23 is completely fixed, the third mortar filling and hardening according to the internal reinforcement is made in the remaining space where the indentation or reaction force pile 17 and the mortar filling is not made.
상술한 바와 같이, 본 발명은 부등 침하된 구조물의 복원공법 또는 말뚝에 선행하중을 도입하는 기술을 확보하는 데 유효한 공법이며, 본 발명에서는 압입말뚝을 주 대상으로 설명하였으나, 압입말뚝은 마이크로 파일, 오거말뚝, 강관말뚝 등이 포함될 수 있다.As described above, the present invention is an effective method for securing a technique for restoring an unevenly settled structure or a technique for introducing a preceding load into a pile, and in the present invention, the press-fitted pile has been mainly described, but the press-fit pile is a micro pile, Auger pile, steel pipe pile, etc. may be included.
이상 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 설명하였지만, 상술한 본 발명의 기술적 구성은 본 발명이 속하는 기술 분야의 당업자가 본 발명의 그 기술적 사상이나 필수적 특징을 변경하지 않고서 다른 구체적인 형태로 실시될 수 있다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적인 것이 아닌 것으로서 이해되어야 하고, 본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 등가 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.
While the present invention has been described with reference to exemplary embodiments, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, As will be understood by those skilled in the art. Therefore, it should be understood that the above-described embodiments are to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than the foregoing description, It is intended that all changes and modifications derived from the equivalent concept be included within the scope of the present invention.
11 : 기초 콘크리트 12 : 기초코어
13 : 확공부 14 : 고정관
14a : 돌출부 15a : 기초고정봉
15b : 보조고정봉 16, 23a, 23b : 몰탈충진
17 : 압입 또는 반력말뚝 18 : 압입잭
19 : 연결재 20 : 하부고정판
20a : 하부고정너트 20b : 관통홀
21 : 상부고정판 21a : 상부고정너트
22 : 고정관의 매설높이 24 : 지압판
25 : 너트 100 : 기초 공사 장치
200 : 압입장치
11: foundation concrete 12: foundation core
13 expansion part 14: fixed tube
14a: protrusion 15a: base fixing rod
15b: auxiliary fixing rod 16, 23a, 23b: mortar filling
17: press-fit or reaction force pile 18: press-fit jack
19: connecting member 20: lower fixing plate
20a: Lower fixing nut 20b: Through hole
21: upper fixing plate 21a: upper fixing nut
22: buried height of the fixing tube 24: pressure plate
25: nut 100: foundation construction device
200: indentation device

Claims (5)

  1. 기초콘크리트의 기초코어를 천공하고 상기 기초코어 내면의 소정 복수 개소에 상하로 이격되어 확공한 삼각형의 단면을 갖는 확공부를 형성한 후 상기 기초코어 내부로 삽입되며,
    상기 확공부의 위치에 대응되도록 2 이상의 돌출부가 원주방향으로 서로 이격되어 외주연에 원의 형태로 형성되며, 이격된 상기 돌출부 사이에는 세로방향으로 용접되는 하나 이상의 기초고정봉이 형성되는 고정관; 및
    상기 고정관 내부로 삽입되는 말뚝;으로 이루어지는 기초 공사 장치를 포함하고,
    상기 확공부와 돌출부의 결합 구조에 의해 구조물이 받는 하중의 전달응력방향을 변환시키는, 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치.
    Perforated the foundation core of the foundation concrete and formed into an expansion core having a triangular cross section spaced up and down at a predetermined plurality of places on the inner surface of the foundation core and inserted into the foundation core,
    Two or more protrusions spaced apart from each other in the circumferential direction so as to correspond to the location of the expansion portion, and are formed in a circular shape on the outer circumference, and the fixed tube having at least one basic fixing rod welded in the longitudinal direction between the spaced apart protrusions; And
    It includes a foundation construction device consisting of; a pile inserted into the fixed tube,
    Apparatus for restoring uneven settlement of the structure or introduction of the pile preload load for converting the direction of the transfer stress of the load received by the structure by the coupling structure of the expansion portion and the protrusion.
  2. 제1항에 있어서,
    상기 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치는,
    상기 기초고정봉에 연결재를 통해 보조고정봉을 연결 설치하고, 상기 보조고정봉이 삽입되는 관통홀을 가지며 상기 말뚝 상단에 위치되는 하부반력판;
    상기 하부반력판 위에 설치되는 압입잭; 및
    상기 압입잭 위에 설치되며 상기 보조고정봉이 삽입되는 관통홀을 갖는 상부반력판;으로 이루어지는 압입장치;를 더 포함하고,
    상기 압입장치에 의해 반복적으로 상기 말뚝의 압입(하중) 재하(載荷)와 압입(하중) 제하(除荷)를 실행하는, 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치.
    The method of claim 1,
    The device for restoring the uneven settlement of the structure or introducing the pile preload,
    A lower reaction plate having a through hole into which the auxiliary fixing rod is inserted and installed at the top of the pile;
    A press-fit jack installed on the lower reaction plate; And
    A press-fit device formed on the press-fit jack and having an upper reaction plate having a through hole into which the auxiliary fixing rod is inserted;
    An apparatus for restoring an uneven settlement of a structure or introducing a pile preceding load by repeatedly indenting (loading) and indenting (loading) the pile by the press-fitting device.
  3. 제2항에 있어서,
    상기 상부반력판 위에는 상부고정너트가 상기 보조고정봉에 체결되고, 상기 하부반력판 위에는 하부고정너트가 상기 보조고정봉에 체결되는, 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치.
    The method of claim 2,
    An upper fixing nut is fastened to the auxiliary fixing rod on the upper reaction plate, and a lower fixing nut is fastened to the auxiliary fixing rod on the lower reaction plate.
  4. 삭제delete
  5. 제1항에 있어서,
    상기 말뚝은 압입말뚝, 마이크로파일, 오거말뚝 또는 강관말뚝 중 어느 하나인, 구조물의 부등 침하 복원 또는 말뚝 선행하중 도입을 위한 장치.
    The method of claim 1,
    The pile is any one of the indentation pile, micropile, auger pile or steel pipe pile, the device for restoring uneven settlement of the structure or introducing the pile preload.
KR1020110037320A 2011-04-21 2011-04-21 Apparatus for restoration of disparity sinking construction or introducing pre-stress of pipe pile KR101103530B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110037320A KR101103530B1 (en) 2011-04-21 2011-04-21 Apparatus for restoration of disparity sinking construction or introducing pre-stress of pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110037320A KR101103530B1 (en) 2011-04-21 2011-04-21 Apparatus for restoration of disparity sinking construction or introducing pre-stress of pipe pile

Publications (1)

Publication Number Publication Date
KR101103530B1 true KR101103530B1 (en) 2012-01-06

Family

ID=45613909

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110037320A KR101103530B1 (en) 2011-04-21 2011-04-21 Apparatus for restoration of disparity sinking construction or introducing pre-stress of pipe pile

Country Status (1)

Country Link
KR (1) KR101103530B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160090955A (en) * 2015-01-22 2016-08-02 (주)골든엔지니어링 Pre-loading apparatus for pile and pre-loading method using the same
KR101652837B1 (en) 2016-02-23 2016-09-01 주식회사 한국지오콘 Pre-loading apparatus for construction pile and method for constructing the pile using the same
KR101683718B1 (en) 2016-04-25 2016-12-09 주식회사 한국지오콘 Pre-loading apparatus for construction pile and method for constructing the pile using the same
KR101732134B1 (en) * 2016-03-04 2017-05-04 이기환 Pre-loading method for pile using pre-loading apparatus
KR101732132B1 (en) * 2015-02-12 2017-05-04 이기환 Construction method for addition pile
KR101785011B1 (en) * 2016-04-19 2017-11-07 이기환 Pre-loading apparatus for pile and pre-loading method using the same
KR101834962B1 (en) * 2017-05-15 2018-04-19 (주)나다건설 Device and method for loading newly installed pile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6539685B2 (en) 2000-11-28 2003-04-01 Thomas A. Bell Apparatus and method for lifting sunken foundations
KR100654228B1 (en) * 2006-08-24 2006-12-06 정언섭 Structure lifting method possible to be re-lifting using pile member
KR100687496B1 (en) * 2006-07-26 2007-02-27 (주)서영엔지니어링건축사사무소 Construction method of pile for building
KR20080107731A (en) * 2007-06-08 2008-12-11 주식회사고려이엔시 Structure strengthening method using the steel pipe with pull-resistance means

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6539685B2 (en) 2000-11-28 2003-04-01 Thomas A. Bell Apparatus and method for lifting sunken foundations
KR100687496B1 (en) * 2006-07-26 2007-02-27 (주)서영엔지니어링건축사사무소 Construction method of pile for building
KR100654228B1 (en) * 2006-08-24 2006-12-06 정언섭 Structure lifting method possible to be re-lifting using pile member
KR20080107731A (en) * 2007-06-08 2008-12-11 주식회사고려이엔시 Structure strengthening method using the steel pipe with pull-resistance means

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160090955A (en) * 2015-01-22 2016-08-02 (주)골든엔지니어링 Pre-loading apparatus for pile and pre-loading method using the same
KR101672930B1 (en) 2015-01-22 2016-11-07 (주)골든엔지니어링 Pre-loading apparatus for pile and pre-loading method using the same
KR101732132B1 (en) * 2015-02-12 2017-05-04 이기환 Construction method for addition pile
KR101652837B1 (en) 2016-02-23 2016-09-01 주식회사 한국지오콘 Pre-loading apparatus for construction pile and method for constructing the pile using the same
KR101732134B1 (en) * 2016-03-04 2017-05-04 이기환 Pre-loading method for pile using pre-loading apparatus
KR101785011B1 (en) * 2016-04-19 2017-11-07 이기환 Pre-loading apparatus for pile and pre-loading method using the same
KR101683718B1 (en) 2016-04-25 2016-12-09 주식회사 한국지오콘 Pre-loading apparatus for construction pile and method for constructing the pile using the same
KR101834962B1 (en) * 2017-05-15 2018-04-19 (주)나다건설 Device and method for loading newly installed pile

Similar Documents

Publication Publication Date Title
KR101103530B1 (en) Apparatus for restoration of disparity sinking construction or introducing pre-stress of pipe pile
KR100713787B1 (en) The underground structure assembly and the underground structure building method which it uses
KR100654228B1 (en) Structure lifting method possible to be re-lifting using pile member
KR100807810B1 (en) Structure lifting method by foundation strengthening
KR101863792B1 (en) Pre-loading method of reinforcing pile
KR100915099B1 (en) Structure for supporting retaining wall of earth with arch material and method constructing the arch structure
JP3899094B2 (en) Foundation reinforcement method for existing structures by press-fitting steel pipe piles
KR102017731B1 (en) Reaction bed for pressing in reinforcing pile and pressing in method of reinforcing pile using the same
KR20180109112A (en) Reinforcement method of concrete floor thickness during file press-in
KR101377019B1 (en) Reactive forcing device using guide rail and foundation reinforcing method therewith
TW202117138A (en) Corrugated shell bearing piles and installation methods
KR101514763B1 (en) Alternation pressure type foundation strengthening apparatus and method
KR20190123854A (en) Micropile
KR20210033815A (en) Method for strengthening the foundation of a structure with improved construction precision and reinforced structural strength
JP4771244B2 (en) Connection joint between steel pipe pile and concrete pile, connection pile structure between steel pipe pile and concrete pile, construction method of connection pile between steel pipe pile and concrete pile
KR101824876B1 (en) Construction method for underground vertical shaft structures
KR100862387B1 (en) Tensional kit for top-down constructing of acupressure lasting anchor and top-down constructing method of acupressure lasting anchor using this
CN106884429B (en) Precast pile construction method
KR101304659B1 (en) Vertical column construction method of none-excavation underground structure
KR200436405Y1 (en) Structure for constructing bracing for reinforcing support
KR101182802B1 (en) a Complex Micro Pile
JPH11310928A (en) Vibration isolation reinforcing method for existing structure
KR101657880B1 (en) Assembling method of underground structure and underground structure thereby
KR101452185B1 (en) Concrete Composite Steel Pile and Its Manufacturing Apparatus and Method
KR101217488B1 (en) Extension structure of pile foundation

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141231

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee