KR101482584B1 - Post foundation block structure for avoiding undergroung laying object - Google Patents

Post foundation block structure for avoiding undergroung laying object Download PDF

Info

Publication number
KR101482584B1
KR101482584B1 KR20130079448A KR20130079448A KR101482584B1 KR 101482584 B1 KR101482584 B1 KR 101482584B1 KR 20130079448 A KR20130079448 A KR 20130079448A KR 20130079448 A KR20130079448 A KR 20130079448A KR 101482584 B1 KR101482584 B1 KR 101482584B1
Authority
KR
South Korea
Prior art keywords
anchor
support plate
concrete
cap
underground
Prior art date
Application number
KR20130079448A
Other languages
Korean (ko)
Other versions
KR20150006126A (en
Inventor
박준홍
Original Assignee
(주) 성우미래산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 성우미래산업 filed Critical (주) 성우미래산업
Priority to KR20130079448A priority Critical patent/KR101482584B1/en
Publication of KR20150006126A publication Critical patent/KR20150006126A/en
Application granted granted Critical
Publication of KR101482584B1 publication Critical patent/KR101482584B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B35/00Screw-bolts; Stay-bolts; Screw-threaded studs; Screws; Set screws
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/04Clamping or clipping connections
    • F16B7/0406Clamping or clipping connections for rods or tubes being coaxial
    • F16B7/0413Clamping or clipping connections for rods or tubes being coaxial for tubes using the innerside thereof
    • F16B7/042Clamping or clipping connections for rods or tubes being coaxial for tubes using the innerside thereof with a locking element, e.g. pin, ball or pushbutton, engaging in a hole in the wall of at least one tube
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1607Shapes round, e.g. circle
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0032Steel; Iron in sheet form, i.e. bent or deformed plate-material

Abstract

본 발명은 땅속에 매설되어서, 전선, 가스관 또는 수도관 등 지하매설물의 간섭을 받지 않고 가로등, CCTV, 신호등 및 도로표지판 등의 기둥의 기초 역할을 하는 기초구조물의 설치하기 위한 지하매설물 회피용 기둥 기초 블럭 구조물은, 다수 개의 금속 판넬이 고정핀 또는 볼트를 통해 연결되어서 속이 빈 블록구조를 형성하고 있는 앵글; 상기 앵글 내부에 콘크리트를 타설하여 이루어지되 장착공간부가 구비되도록 타설되는 다수 개의 콘크리트 블록; 상기 장착공간부에 수용되어서 상기 콘크리트 블록의 상부에 설치되는 제1 앵커; 일측이 상기 제1 앵커의 상부에 회동가능하게 설치되는 연결플레이트; 상단부에 구비된 플랜지의 상부에 방사상으로 다수 개의 체결볼트를 구비하고, 상기 제1 앵커와 대응되는 상기 연결플레이트의 타측에 설치되는 제2 앵커; 중앙부에 기둥이 삽입설치되게 하는 설치공을 구비하고 상기 체결볼트가 삽입 관통하여 체결되도록 하는 다수 개의 체결공을 구비하여서 상기 제2 앵커의 상부에 설치되는 지지플레이트; 및 상기 지지플레이트의 외부에 결합되는 캡;을 포함하여 구성 The present invention relates to a pillar base block for underground burial avoiding for installing a foundation structure buried in the ground and serving as a base of a column such as a street light, a CCTV, a traffic light and a road sign without being interfered by underground buried materials such as a wire, a gas pipe, The structure may include an angle where a plurality of metal panels are connected through a fixing pin or bolt to form a hollow block structure; A plurality of concrete blocks poured with concrete in the inside of the angle so as to have a mounting space; A first anchor accommodated in the mounting space portion and installed on the concrete block; A connecting plate rotatably installed on one side of the first anchor; A second anchor provided on an upper portion of a flange provided at an upper end and having a plurality of fastening bolts radially and installed on the other side of the connecting plate corresponding to the first anchor; A support plate provided on an upper portion of the second anchor, the support plate having a plurality of fastening holes to allow the fastening bolts to be inserted and fastened; And a cap coupled to the outside of the support plate

Description

지하매설물 회피용 기둥 기초 블럭 구조물{Post foundation block structure for avoiding undergroung laying object}BACKGROUND OF THE INVENTION Field of the Invention The present invention relates to a post-foundation block structure for avoiding underground objects,

본 발명은 지하매설물 회피용 기둥 기초 블럭 구조물에 관한 것으로, 보다 상세하게는 땅속에 매설되어서, 가로등, CCTV, 신호등 및 도로표지판 등의 기둥의 기초 역할을 하는 기초구조물의 설치를 용이하게 하고 안전성을 확보할 수 있게 함과 아울러 전선, 가스관 또는 수도관 등 지하매설물의 간섭을 받지 않고 설치할 수 있게 하는 지하매설물 회피용 기둥 기초 블럭 구조물에 관한 것이다.The present invention relates to a column base block structure for underground burial avoidance, and more particularly, to a column base block structure for facilitating the installation of a foundation structure serving as a base of a column such as a street light, a CCTV, a traffic light and a road sign, The present invention relates to a pillar base block structure for underground burial avoiding, which can be installed without being interfered by underground items such as electric wires, gas pipes or water pipes.

종래에는 가로등, 보안등, 이정표 등의 기둥을 설치하기 위하여는 지하에 기초를 묻고, 기초의 상부는 땅위로 노출되도록 하고, 기초의 상부에 기둥을 설치하였다.Conventionally, in order to install pillars such as street lights, security lights, and milestones, bases are buried in the basement, the top of the foundation is exposed to the ground, and columns are installed on the foundation.

그러나, 최근 정부에서는 기둥의 하부 플레이트나 브라켓등이 지면(보도블럭, 아스콘 등)의 위로 노출되어 도시미관을 해치므로, 기둥의 하부 플레이트나 브라켓등이 지면위로 노출되지 않도록 하고 있다.In recent years, however, the lower plate or bracket of the column is exposed above the ground (sidewall block, ascon, etc.), so that the lower plate or bracket of the column is not exposed above the ground.

이러한 일환으로, 대한민국 등록특허 제10-0790553호(출원번호 10-2007-74177호)에는 가로 기둥 오목 기초(1)가 개시되어 있다.As a result, Korean Patent Registration No. 10-0790553 (Application No. 10-2007-74177) discloses a horizontal pit foundation 1.

그러나, 상기와 같은 종래의 가로 기둥 오목 기초(1)는, 기초의 상부의 매립공간이 밀봉되지 않아 지하에 묻히는 기둥의 하부 베이스플레이트나 브라켓이 지하의 습기에 노출되며, 덮개(2)를 사용하므로 자재비가 많이 소요되며, 덮개(2)와 기초(1) 또는 덮개(2)와 기둥(3) 사이의 접촉면을 이용한 수분의 침투에 대응할 수 없으며, 시공시간이 상대적으로 많이 소요되는 문제점이 있었다.However, in the conventional horizontal pit concave foundation 1 as described above, since the buried space at the upper part of the foundation is not sealed, the lower base plate or the bracket of the pillar buried in the underground is exposed to the moisture in the underground, And it is not possible to cope with penetration of moisture by using the contact surface between the lid 2 and the base 1 or between the lid 2 and the column 3 and the construction time is relatively long .

그리고, 상기의 기초 구조물을 설치하기 위해서는 거푸집을 설치하고 콘크리트 양생 후 거푸집을 해체하는 작업을 하게 되는데, 이는 거푸집을 해체하고 다시 되메우기를 해야하기 때문에 작업이 번거로울 뿐만 아니라 작업기간과 비용이 많이 소요되는 문제점이 있었다.In order to install the above-described foundation structure, a mold is installed and the concrete is cured and then the mold is dismantled. This requires dismantling the formwork and then re-backing it, which is not only troublesome to work, There was a problem.

또한, 양생된 기초 구조물을 직접 시공하는 경우에는 구조물의 크기와 무게 때문에 운반과 시공에 따른 부대비용이 과도하게 발생하게 되고, 아울러 양생 구조물의 운반의 제약 때문에 중대형 기초 구조물에는 사용할 수 없는 단점이 있다.In addition, when the cured base structure is directly applied, the cost associated with transportation and construction is excessively generated due to the size and weight of the structure, and it is disadvantageous in that it can not be used for medium to large-sized foundation structures due to restriction of curing structure transportation .

그리고, 시내 도로변에 시공시 기존에 설치된 전선, 가스관 또는 수도관 등 지하매설물의 간섭 때문에 거푸집 설치 또는 양생 구조물로 시공하기는 어렵고, 이에 장소를 옮기거나 크기를 줄여서 시공해야 하므로 목적하는 바의 결과를 달성하기에는 어려운 점이 있었다.In addition, it is difficult to construct the building as a formwork or curing structure due to the interference of underground buried materials such as electric wires, gas pipes or water pipes installed at the roadside of the city, so it is necessary to move the place or reduce the size thereof. There were difficulties in doing so.

아울러, 상기 기초 구조물 시공 후 지표면에 노출되는 부분의 외관을 미려하게 하기 위해서는 별도의 거푸집을 사용하고 미장과 같은 후처리를 해야하기 때문에 작업시간이 많이 소요되고 작업 숙련도에 따른 완성도의 차이가 발생하게 되며, 또한 기둥을 고정하기 위한 플랜지를 노출하여 시공하는 방법과 플랜지가 보이지 않도록 매립하여 시공하는 방법은 시공방법에 있어서 차이가 많기 때문에 종래의 방법으로는 현장 상황에 맞추어 신속하게 시공하기가 어려운 문제점이 있었다. In addition, in order to improve the appearance of the part exposed to the ground surface after the foundation structure is constructed, it is necessary to use a separate formwork and post-treatment such as plastering, so that it takes a lot of time for work, In addition, since the method of exposing the flange for fixing the column and the method of embedding the flange so as to be invisible are different from each other in the construction method, it is difficult .

아울러, 상기와 같은 기초 구조물은 전선, 가스관 또는 수도관 등 지하매설물이 있을 경우에는 간섭을 받아 그 장소에 설치가 불가능한 문제점이 있었다.In addition, when the underfloor such as a wire, a gas pipe, or a water pipe exists, the basic structure as described above has a problem in that it can not be installed in the place due to interference.

상기한 바와 같은 문제점을 해결하기 위한 본 발명의 목적은 기초구조물을 설치하기 위한 거푸집을 사용하지 않음으로써 설치가 용이하고 작업시간이 줄어들고, 결과적으로 원가가 절감됨과 함께 표준화된 제품으로 대량생산이 가능하며, 전선, 가스관 또는 수도관 등 지하매설물의 간섭을 받지 않고 설치할 수 있어 작업이 수월하게 진행될 수 있게 하면서 구조물의 안전성을 확보할 수 있는 지하매설물 회피용 기둥 기초 블럭 구조물을 제공하는 데에 있다.In order to solve the above-mentioned problems, it is an object of the present invention to provide an apparatus and a method for installing a foundation structure, which are easy to install, reduce work time, and consequently reduce cost, The present invention is to provide a pillar foundation block structure for avoiding underground buried objects that can be installed without interference from underground buried objects such as electric wires, gas pipes, and water pipes, thereby ensuring the safety of the structure while allowing work to proceed smoothly.

상기한 바와 같은 목적을 성취하기 위한 본 발명의 실시예에 따른 땅속에 매설되어서, 전선, 가스관 또는 수도관 등 지하매설물의 간섭을 받지 않고 가로등, CCTV, 신호등 및 도로표지판 등의 기둥의 기초 역할을 하는 기초구조물의 설치하기 위한 지하매설물 회피용 기둥 기초 블럭 구조물은, 다수 개의 금속 판넬이 고정핀 또는 볼트를 통해 연결되어서 속이 빈 블록구조를 형성하고 있는 앵글; 상기 앵글 내부에 콘크리트를 타설하여 이루어지되 장착공간부가 구비되도록 타설되는 다수 개의 콘크리트 블록; 상기 장착공간부에 수용되어서 상기 콘크리트 블록의 상부에 설치되는 제1 앵커; 일측이 상기 제1 앵커의 상부에 회동가능하게 설치되는 연결플레이트; 상단부에 구비된 플랜지의 상부에 방사상으로 다수 개의 체결볼트를 구비하고, 상기 제1 앵커와 대응되는 상기 연결플레이트의 타측에 설치되는 제2 앵커; 중앙부에 기둥이 삽입설치되게 하는 설치공을 구비하고 상기 체결볼트가 삽입 관통하여 체결되도록 하는 다수 개의 체결공을 구비하여서 상기 제2 앵커의 상부에 설치되는 지지플레이트; 및 상기 지지플레이트의 외부에 결합되는 캡;을 포함하여 구성된다.In order to accomplish the above object, the present invention provides a method of constructing a pillar of a street lamp, a CCTV, a traffic light, a road sign, etc. without being interfered with underground objects such as electric wires, gas pipes, A column base block structure for underground burial avoiding for installing a foundation structure includes: an angle where a plurality of metal panels are connected through a fixing pin or a bolt to form a hollow block structure; A plurality of concrete blocks poured with concrete in the inside of the angle so as to have a mounting space; A first anchor accommodated in the mounting space portion and installed on the concrete block; A connecting plate rotatably installed on one side of the first anchor; A second anchor provided on an upper portion of a flange provided at an upper end and having a plurality of fastening bolts radially and installed on the other side of the connecting plate corresponding to the first anchor; A support plate provided on an upper portion of the second anchor, the support plate having a plurality of fastening holes to allow the fastening bolts to be inserted and fastened; And a cap coupled to the outside of the support plate.

본 발명의 실시예에 따르면, 상기 캡은 콘크리트로 이루어지고 상기 지지플레이트는 철재 원형판으로 이루어져서, 상기 지지플레이트를 상기 캡과 결합하여 일체로 양생되는 것을 특징으로 한다.According to an embodiment of the present invention, the cap is made of concrete, and the support plate is made of a steel circular plate, and the support plate is cemented with the cap so as to be integrally cured.

본 발명의 실시예에 따르면, 상기 캡과 상기 지지플레이트의 결합체의 하부에는 앵커의 플랜지를 수용하는 수용홈부가 구비되어서, 상기 결합체를 씌우는 형태에 따라 상기 플랜지가 노출되는 것을 특징으로 한다.According to an embodiment of the present invention, a lower end of the coupling body of the cap and the support plate is provided with a receiving groove for receiving a flange of the anchor, and the flange is exposed according to the shape of the coupling body.

본 발명의 실시예에 따르면, 상기 캡과 상기 지지플레이트의 결합체의 하부에는 앵커의 플랜지를 수용하는 수용홈부가 구비되어서, 상기 결합체를 씌우는 형태에 따라 상기 플랜지가 노출되는 것을 특징으로 한다.According to an embodiment of the present invention, a lower end of the coupling body of the cap and the support plate is provided with a receiving groove for receiving a flange of the anchor, and the flange is exposed according to the shape of the coupling body.

상기한 바와 같은 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물을 이용하게 되면, 거푸집 없이 구조물을 설치 또는 전선, 가스관 또는 수도관 등 지하매설물의 간섭을 받지 않고 설치할 수 있기 때문에 설치작업을 용이하게 하고, 경량화된 조립식 구조물을 설치함으로써 시공 시간을 줄일 수 있고, 다양한 현장 상황에 대처할 수 있어 표준화된 제품의 대량생산을 통한 원가의 절감이 가능하며, 작업자의 숙련도와 관계없이 미려하고 튼튼한 구조물을 시공할 수 있는 효과를 제공한다.If the column base block structure for avoiding underground buried objects according to the embodiment of the present invention as described above is used, it is possible to install the structure without the formwork or install it without being interfered with underground objects such as electric wires, gas pipes or water pipes. It is possible to reduce the construction time by installing the lightweight and prefabricated structure and cope with various situation in the field. It is possible to reduce the cost through mass production of the standardized product, and the beautiful, And the like.

도 1은 종래의 기둥 기초구조물을 보인 사시도.
도 2는 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물을 보인 부분분해사시도.
도 3은 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물을 보인 결합사시도.
도 4는 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물의 캡의 저면을 보인 사시도.
도 5는 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물의 판넬을 보인 사시도.
도 6은 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물의 실시상태도.
1 is a perspective view showing a conventional pillar foundation structure.
FIG. 2 is a partially exploded perspective view showing a columnar foundation block structure for evacuating underground objects according to an embodiment of the present invention; FIG.
FIG. 3 is a perspective view of a columnar foundation block structure for evacuating underground objects according to an embodiment of the present invention; FIG.
4 is a perspective view showing a bottom surface of a cap of a columnar foundation block structure for underground buried objects according to an embodiment of the present invention;
FIG. 5 is a perspective view showing a panel of a columnar foundation block structure for underground burial avoidance according to an embodiment of the present invention; FIG.
FIG. 6 is a state diagram of a column base block structure for underground burial avoidance according to an embodiment of the present invention; FIG.

이하, 본 발명에 따른 지하매설물 회피용 기둥 기초 블럭 구조물에 대한 바람직한 실시예들에 대해 첨부된 도면들을 참조로 하여 상세히 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of a columnar foundation block structure for underground buried objects according to the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물을 보인 부분분해사시도이고, 도 3은 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물을 보인 결합사시도이고, 도 4는 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물의 캡의 저면을 보인 사시도이며, 도 5는 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물의 판넬을 보인 사시도이다.FIG. 2 is a partially exploded perspective view showing a columnar foundation block structure for evacuating underground objects according to an embodiment of the present invention, FIG. 3 is an assembled perspective view showing a columnar foundation block structure for evacuating underground objects according to an embodiment of the present invention, 4 is a perspective view showing a bottom surface of a cap of a columnar foundation block structure for avoiding underground buried objects according to an embodiment of the present invention, and FIG. 5 is a perspective view showing a panel of a columnar foundation block structure for avoiding underground objects according to an embodiment of the present invention .

우선, 도면들 중, 동일한 구성요소 또는 부품들은 가능한 동일한 참조부호로 나타내고 있음에 유의하여야 한다. 또한, 본 발명을 설명함에 있어, 관련된 공지기능 혹은 구성에 대한 구체적인 설명은 본 발명의 요지를 모호하지 않게 하기 위하여 생략하기로 한다.First, in the drawings, it is noted that the same components or parts are denoted by the same reference numerals as possible. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted so as to avoid obscuring the subject matter of the present invention.

땅속에 매설되어서, 전선, 가스관 또는 수도관 등 지하매설물의 간섭을 받지 않고 가로등, CCTV, 신호등 및 도로표지판 등의 기둥의 기초 역할을 하는 기초구조물의 설치하기 위한 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물은, 도면에 도시된 바와 같이, 앵글(100), 콘크리트 블록(200), 제1 앵커(300), 연결플레이트(400), 제2 앵커(500), 지지플레이트(600) 및 캡(700)을 포함하여 구성된다.Underground burial avoidance according to the embodiment of the present invention for installing a foundation structure buried in the ground and serving as a base of columns such as a street lamp, a CCTV, a traffic light, and a road sign without being interfered by underground objects such as electric wires, gas pipes, The concrete block 200, the first anchor 300, the connecting plate 400, the second anchor 500, the support plate 600, And a cap 700.

상기 앵글(100)은 다수 개의 금속 판넬(110)이 고정핀(120) 또는 볼트를 통해 연결되어서 속이 빈 블록구조를 형성하고 있다.In the angle 100, a plurality of metal panels 110 are connected through a fixing pin 120 or a bolt to form a hollow block structure.

상기 금속 판넬(110)은 다수 개가 좌우 및 상하로 적층되어 구성되어 있고 그리고 서로가 고정핀(120)으로 결합되어 있기 때문에 경량화되어 설치 작업이나 해체작업을 용이하게 한다.Since the metal panels 110 are stacked vertically and horizontally, and the metal panels 110 are coupled to each other by the fixing pins 120, the metal panels 110 are lightweight and facilitate installation work and disassembly work.

그리고, 상기 금속 판넬(110)은 콘크리트 블록(200)의 수용공간을 넓힐 수 있도록 도 5에 도시된 바와 같이 내측에 홈을 구비하는게 바람직하다.In addition, the metal panel 110 may have a groove on the inner side as shown in FIG. 5 so as to widen the receiving space of the concrete block 200.

여기서, 상기 금속 판넬(110)의 결합은 고정핀(120) 및 볼트 이외에 필요시 철근을 보강하여 사용할 수 있다.Here, the metal panel 110 may be combined with reinforcing bars, if necessary, in addition to the fixing pins 120 and the bolts.

그리고, 구조물의 소형화 경량화를 위해서, 본 발명의 실시예에서는 가로와 세로의 길이가 500㎜ X 500㎜ 규격으로 형성되어 콘크리트 조립품을 결합하여 시공할 수 있게 하였다.In order to reduce the size and weight of the structure, in the embodiment of the present invention, the longitudinal and longitudinal lengths are formed to be 500 mm x 500 mm, so that the concrete assemblies can be combined with each other.

따라서, 상기 기초 구조물이 소형 경량화 됨으로써 운반과 시공시 별도의 중장비가 필요치 않으며, 원하는 사이즈로 조립한 후 레미콘으로 콘크리트를 타설하며 거푸집 설치 및 해제 없이 설치 및 마무리되므로 시공시간이 절감된다.Therefore, since the foundation structure is made compact and lightweight, it is not necessary to have a separate heavy equipment when transporting and constructing, and the construction time is reduced because the concrete is assembled in a desired size, and concrete is installed and finished without installing or releasing the formwork.

그러나, 상기 규격은 기본 단위로 하고, 다양한 사이즈, 즉 500㎜, 1000㎜, 1500㎜, 2000㎜가 되게 연결하여 기초 구조물을 변경할 수 있다. However, it is possible to change the base structure by connecting the standard as a basic unit and having various sizes, i.e., 500 mm, 1000 mm, 1500 mm, and 2000 mm.

그리고, 상기 금속 판넬(110)은, 도 2 및 도 3에 도시된 바와 같이 필요에 따라서 어느 한 측의 판넬(110)을 제거하여 사용할 수 있다.2 and 3, the metal panel 110 can be used by removing the panel 110 on either side as needed.

즉, 도 6에 도시된 바와 같이 전선과 같은 지하매설물의 간섭을 받지 않고 설치될 수 있도록 하기 위해서 금속 판넬(110) 및 콘크리트 블록(200)이 제거되어 그 부분으로 지하매설물이 지나가게 한다.That is, as shown in FIG. 6, the metal panel 110 and the concrete block 200 are removed so that the underground buried material passes through the metal panel 110 and the concrete block 200 to be installed without being interfered by underground buried objects such as electric wires.

따라서, 기둥을 지지하는 앵커를 제1 앵커(300) 및 제2 앵커(500)로 이루어지게 하였고, 상기 제2 앵커(500)는 지하매설물의 설치위치를 벗어나도록 회전가능하게 설치되며, 이에 대한 구체적인 설명은 후술하기로 한다.Therefore, the anchors for supporting the columns are made of the first anchors 300 and the second anchors 500, and the second anchors 500 are installed to be rotatable so as to be out of the installation position of the underground objects, A detailed description will be given later.

상기 콘크리트 블록(200)은 앵글(100) 내부의 공간부에 콘크리트를 타설하여 다수 개로 구성되되, 도 2 및 도 3에 도시된 바와 같이, 앵글(100)의 상부가 개방될 때 다음에 기술된 앵커(300)가 설치될 수 있도록 하는 장착공간부(210)가 형성되도록 타설된다. As shown in FIGS. 2 and 3, when the upper portion of the angle 100 is opened, the concrete block 200 is formed as follows. So that a mounting space 210 for mounting the anchor 300 is formed.

그리고, 상기 콘크리트 블록(200)은 상술된 바와 같이 전선과 같은 지하매설물이 설치되는 상황에 대응하여 어느 한 부분이 제거되어 설치될 수 있다. As described above, the concrete block 200 may be installed in such a manner that any part of the concrete block 200 may be removed in response to a situation where an underground buried object such as a wire is installed.

상기 제1 앵커(300)는 장착공간부(210)에 수용되어서 콘크리트 블록(200)의 상부에 견고하게 설치된다.The first anchor 300 is received in the installation space 210 and is firmly installed on the concrete block 200.

상기 연결플레이트(400)는 제1 앵커(300)와 제2 앵커(500)를 회전가능하게 연결시켜주는 역할을 하는 것으로, 일측이 제1 앵커(300)의 상부에 회동가능하게 설치되어서 타측에 설치된 제2 앵커(500)의 위치가 지하매설물의 설치 위치를 벗어나도록 유도한다.The connecting plate 400 rotatably connects the first anchor 300 and the second anchor 500. The connecting plate 400 is rotatably installed at one side of the first anchor 300, So that the position of the installed second anchor 500 is displaced from the installation position of the underground buried object.

상기 제2 앵커(500)는 상단부에 구비된 플랜지(520)의 상부에 방사상으로 다수 개의 체결볼트(510)를 구비하고, 상기 제1 앵커(300)와 대응되는 연결플레이트(400)의 타측에 설치된다.The second anchor 500 has a plurality of fastening bolts 510 radially formed on a top of a flange 520 provided at an upper end thereof and is fastened to the other side of the connection plate 400 corresponding to the first anchor 300 Respectively.

상기한 바와 같은 제1 앵커(300), 연결플레이트(400) 및 제2 앵커(500)는 앵글(100) 및 콘크리트 블록(200)이 지하매설물을 회피할 수 있도록 하부 공간을 확보하게 하고, 콘크리트와 결합되는 표면적을 증가시켜 콘크리트 타설 및 양생 후 기초구조물의 구조적 안정성이 확보되게 하였다.The first anchor 300, the connecting plate 400 and the second anchor 500 secure the lower space so that the angle 100 and the concrete block 200 can avoid underground objects, And the structural stability of the foundation structure after curing is ensured.

그리고, 기둥을 고정하기 위한 제1 앵커(300)의 앵커볼트(미도시)는 다양한 사이즈의 기둥에 공용으로 사용될 수 있도록 하기 위해서 여러 가지 사이즈의 홀을 가공하여 기둥에 맞게 앵커볼트 위치를 바꿔서 사용할 수 있도록 하였다. The anchor bolts (not shown) of the first anchor 300 for fixing the columns may be formed by working holes of various sizes so as to be commonly used for the columns of various sizes, .

상기 지지플레이트(600)는 중앙부에 기둥이 삽입설치되게 하는 설치공(610)을 구비하고 상기 체결볼트(510)가 삽입 관통하여 체결되도록 하는 다수 개의 체결공(620)을 구비하여서 제2 앵커(300)의 상부에 설치된다.The support plate 600 includes a plurality of fastening holes 620 through which the fastening bolts 510 are inserted so that the fastening bolts 510 are inserted into the fastening holes 620. The fastening holes 620 fasten the fastening bolts 510, 300).

도 2, 도 3 및 도 6에 도시된 바와 같은 상기 캡(700)은 지지플레이트(600)의 외부에 일체형으로 결합되어서 기초구조물의 설치 후 미관성이 향상되도록 하였다. The cap 700 as shown in FIGS. 2, 3 and 6 is integrally coupled to the outside of the support plate 600 to improve the beauty after installation of the foundation structure.

그리고, 상기 캡(700)은 지지플레이트(600)와 콘크리트에 의해 일체로 양생되어 이루어지는 것도 가능하다.Also, the cap 700 may be integrally cured by the support plate 600 and the concrete.

즉, 상기 캡(70)은 콘크리트로 이루어지게 하고 지지플레이트(600)는 철재 원형판으로 이루어지게 하여서, 상기 지지플레이트(600)를 캡(700)과 결합하여 일체로 양생하는 것이 가능하다.That is, the cap 70 may be made of concrete, and the support plate 600 may be made of an iron circular plate so that the support plate 600 can be combined with the cap 700 to cure in one piece.

여기서, 상기 캡(700)과 상기 지지플레이트(600)의 결합체의 하부에는 제2 앵커(500)의 플랜지(520)를 수용하는 수용홈부(710)가 구비되어서, 상기 결합체를 씌우는 형태에 따라 플랜지(520)가 노출 또는 노출되지 않은 상태가 된다.The flange 520 of the second anchor 500 is provided at a lower portion of the assembly of the cap 700 and the support plate 600. The flange 520 of the flange 520 of the second anchor 500, (520) is not exposed or exposed.

즉, 상기 결합체를 제2 앵커(500)의 플랜지(520)에 삽입하는 방향에 따라 플랜지(520)가 수용홈부(710)에 삽입 또는 비삽입되어 플랜지(520)가 노출되는 타입 또는 비노출 타입으로 변경하여 시공을 가능하게 한다.That is, the flange 520 is inserted or not inserted into the receiving groove 710 according to the direction in which the coupling body is inserted into the flange 520 of the second anchor 500, To make the construction possible.

상기한 바와 같은 구성으로 이루어진 본 발명의 실시예에 따른 지하매설물 회피용 기둥 기초 블럭 구조물의 제조방식을 간단하게 살펴보면 다음과 같다.Hereinafter, a method of manufacturing a pillar foundation block structure for avoiding underground objects according to an embodiment of the present invention will be described.

먼저, 다수 개의 금속 판넬(110)을 고정핀(110)을 이용하여 앵글(100) 형태로 결합시켜서 내부에 수용공간부가 형성되게 한다. First, a plurality of metal panels 110 are coupled to each other in the form of an angle 100 using a fixing pin 110, thereby forming a receiving space in the inside.

상기와 같이 앵글(100)이 완성되면 콘크리트로 타설하여 수용공간부 내에서 큰크리트 블록(200)이 형성되게 하되, 그의 상부에는 장착공간부(210)가 형성되게 한다.When the angle 100 is completed as described above, it is poured into concrete so that a large clear block 200 is formed in the accommodation space, and a mounting space 210 is formed on the upper part.

상기와 같이 타설된 콘크리트 블록(200)은 양생이 되는데, 이때 빠른 양생을 위해서 급결제를 사용하는 것도 가능하다.The concrete block 200 installed as described above is cured. In this case, it is also possible to use a quick-setting method for rapid curing.

상기 콘크리트 블록(200)의 양생이 완료되면, 기초구조물이 설치될 위치의 상황, 즉 지하매설물이 있을 때 그 형태에 맞춰서 앵글(100) 및 콘크리트 블록(200)을 제거한 다음 장착공간부(210)의 바닥부에 제1 앵커(300)를 견고하게 설치한다.When the curing of the concrete block 200 is completed, the angle 100 and the concrete block 200 are removed according to the shape of the foundation structure, that is, The first anchor 300 is firmly installed at the bottom of the first anchor 300.

그 다음, 상기 연결플레이트(400)를 이용하여 기둥이 설치될 제2 앵커(500)를 제1 앵커(300)와 연결되게 한다.Then, the second anchor 500 to which the column is to be installed is connected to the first anchor 300 by using the connection plate 400.

이때, 상기 연결플레이트(400)를 회전시켜서 제2 앵커(500)가 지하매설물을 피해 설치될 수 있게 한다.At this time, the connection plate 400 is rotated so that the second anchor 500 can be installed to avoid the underground objects.

그 후, 일체형으로 이루어진 상기 지지플레이트(600) 및 캡(700)을 제2 앵커(500)의 상부로 덮어씌우되, 상기 제2 앵커(500)의 상부로 돌출된 다수 개의 체결볼트(510)가 지지플레이트(600)에 구비된 체결공(620)으로 삽설됨으로써 결합된다. A plurality of fastening bolts 510 protruding from the upper portion of the second anchor 500 and covering the support plate 600 and the cap 700 integrally formed thereon with the upper portion of the second anchor 500, Is inserted into the fastening hole 620 provided in the support plate 600 to be coupled.

상기와 같은 형태로 하여 기초 블록 구조물이 완성이 되면, 가로등, CCTV, 신호등 및 도로표지판 등의 기둥을 설치하기 위한 적절한 장소로 옮겨서 구조물이 수용될 수 있는 공간만큼 땅을 판 다음 매설하면 된다. When the basic block structure is completed as described above, it may be moved to a suitable place for installing columns such as a street light, a CCTV, a traffic light, a road sign, etc., and then the ground can be installed and buried as much as a space in which the structure can be accommodated.

상기와 같이 구조물이 땅에 매설되어 설치가 완료되면, 기둥을 지지플레이트(600)의 설치공(610)과 제2 앵커(500)의 수용공간부로 삽입되게 한 후, 체결볼트(510)에 너트 등을 체결하여 세우면 된다.After the structure is installed in the ground and the installation is completed as described above, the column is inserted into the accommodation space of the installation hole 610 of the support plate 600 and the accommodation space of the second anchor 500, And so on.

상술 한 바와 같이 본 발명은 비록 한정된 실시 예에 의해 설명되었으나, 본 발명은 이것에 한정되지 않으며, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 본 발명의 기술사상과 아래에 기재될 특허 청구범위의 균등범위 내에서 다양한 수정 및 변형이 가능하다 할 것이다.Although the present invention has been described in connection with the exemplary embodiments, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, It will be understood that various modifications and changes may be made without departing from the scope of the appended claims.

100: 앵글 110: 금속 판넬
120: 고정핀
200: 콘크리트 블록 210: 장착공간부
300: 제1 앵커
400: 연결플레이트
500: 제2 앵커 510: 체결볼트
520: 플랜지
600: 지지플레이트 610: 설치공
620: 체결공 700: 캡
710: 수용홈부
100: angle 110: metal panel
120: Fixing pin
200: concrete block 210: mounting space part
300: First anchor
400: connecting plate
500: second anchor 510: fastening bolt
520: Flange
600: Support plate 610: Installation hole
620: fastening ball 700: cap
710: receiving groove

Claims (4)

땅속에 매설되어서, 전선, 가스관 또는 수도관 등 지하매설물의 간섭을 받지 않고 가로등, CCTV, 신호등 및 도로표지판 등의 기둥의 기초 역할을 하는 기초구조물의 설치하기 위한 지하매설물 회피용 기둥 기초 블럭 구조물에 있어서,
다수 개의 금속 판넬(110)이 고정핀(120) 또는 볼트를 통해 연결되어서 속이 빈 블록구조를 형성하고 있는 앵글(100);
상기 앵글(100) 내부에 콘크리트를 타설하여 이루어지되 장착공간부(210)가 구비되도록 타설되는 다수 개의 콘크리트 블록(200);
상기 장착공간부(210)에 수용되어서 상기 콘크리트 블록(200)의 상부에 설치되는 제1 앵커(300);
일측이 상기 제1 앵커(300)의 상부에 회동가능하게 설치되는 연결플레이트(400);
상단부에 구비된 플랜지(520)의 상부에 방사상으로 다수 개의 체결볼트(510)를 구비하고, 상기 제1 앵커(300)와 대응되는 상기 연결플레이트(400)의 타측에 설치되는 제2 앵커(500);
중앙부에 기둥이 삽입설치되게 하는 설치공(610)을 구비하고 상기 체결볼트(510)가 삽입 관통하여 체결되도록 하는 다수 개의 체결공(620)을 구비하여서 상기 제2 앵커(300)의 상부에 설치되는 지지플레이트(600); 및
상기 지지플레이트(600)의 외부에 결합되는 캡(700);을 포함하여 구성되는 것을 특징으로 하는 지하매설물 회피용 기둥 기초 블럭 구조물.
In a pillar foundation block structure for underground burial avoidance for installing a foundation structure buried in the ground and serving as a base of a column such as a street lamp, a CCTV, a traffic light and a road sign without being interfered by underground objects such as a wire, a gas pipe or a water pipe ,
An angle 100 in which a plurality of metal panels 110 are connected through a fixing pin 120 or a bolt to form a hollow block structure;
A plurality of concrete blocks 200 formed by placing concrete in the angle 100 and having a mounting space 210;
A first anchor 300 housed in the installation space 210 and installed on the concrete block 200;
A connecting plate 400 having one side rotatably installed on the upper portion of the first anchor 300;
A plurality of fastening bolts 510 radially formed on the upper portion of the flange 520 provided at the upper end and a second anchor 500 installed at the other side of the connection plate 400 corresponding to the first anchor 300 );
And a plurality of fastening holes 620 for fastening the fastening bolts 510 so that the fastening bolts 510 are inserted into the fastening holes 610. The fastening bolts 510 are installed on the upper portion of the second anchor 300, (600); And
And a cap (700) coupled to the outside of the support plate (600).
청구항 1에 있어서, 상기 캡(700)은 상기 지지플레이트(600)와 콘크리트에 의해 일체로 양생되는 것을 특징으로 하는 지하매설물 회피용 기둥 기초 블럭 구조물.4. The columnar foundation block structure for underground buried objects according to claim 1, wherein the cap (700) is integrally cured by the support plate (600) and concrete. 청구항 1에 있어서, 상기 캡(700)은 콘크리트로 이루어지고 상기 지지플레이트(600)는 철재 원형판으로 이루어져서, 상기 지지플레이트(600)를 상기 캡(700)과 결합하여 일체로 양생되는 것을 특징으로 하는 기둥 기초 블럭 구조물.[6] The method of claim 1, wherein the cap 700 is made of concrete, and the support plate 600 is made of an iron circular plate, and the support plate 600 is cured integrally with the cap 700 Column base block structure. 청구항 1에 있어서, 상기 캡(700)과 상기 지지플레이트(600)의 결합체의 하부에는 제2 앵커(500)의 플랜지(520)를 수용하는 수용홈부(710)가 구비되어서, 상기 결합체를 씌우는 형태에 따라 상기 플랜지(520)가 노출되는 것을 특징으로 하는 기둥 기초 블럭 구조물.The cap 700 and the support plate 600 are provided with a receiving groove 710 for receiving the flange 520 of the second anchor 500 at a lower portion of the assembly of the cap 700 and the support plate 600, Wherein the flange (520) is exposed in accordance with the shape of the flange (520).
KR20130079448A 2013-07-08 2013-07-08 Post foundation block structure for avoiding undergroung laying object KR101482584B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20130079448A KR101482584B1 (en) 2013-07-08 2013-07-08 Post foundation block structure for avoiding undergroung laying object

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20130079448A KR101482584B1 (en) 2013-07-08 2013-07-08 Post foundation block structure for avoiding undergroung laying object

Publications (2)

Publication Number Publication Date
KR20150006126A KR20150006126A (en) 2015-01-16
KR101482584B1 true KR101482584B1 (en) 2015-01-29

Family

ID=52569607

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20130079448A KR101482584B1 (en) 2013-07-08 2013-07-08 Post foundation block structure for avoiding undergroung laying object

Country Status (1)

Country Link
KR (1) KR101482584B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0583046U (en) * 1991-04-03 1993-11-09 日本地工株式会社 Steel pile foundation
JPH0714434Y2 (en) * 1990-10-17 1995-04-10 東京電力株式会社 Crank-shaped steel pipe pillar
JP2005194850A (en) 2004-01-03 2005-07-21 Katsuto Toriyama Collapse prevention mechanism for buried overhead wire column
KR20120047685A (en) * 2010-11-04 2012-05-14 유한회사 동서산업 Street light foundation equipped with integral cover

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0714434Y2 (en) * 1990-10-17 1995-04-10 東京電力株式会社 Crank-shaped steel pipe pillar
JPH0583046U (en) * 1991-04-03 1993-11-09 日本地工株式会社 Steel pile foundation
JP2005194850A (en) 2004-01-03 2005-07-21 Katsuto Toriyama Collapse prevention mechanism for buried overhead wire column
KR20120047685A (en) * 2010-11-04 2012-05-14 유한회사 동서산업 Street light foundation equipped with integral cover

Also Published As

Publication number Publication date
KR20150006126A (en) 2015-01-16

Similar Documents

Publication Publication Date Title
KR100943062B1 (en) The basis structure of steel pipe and method
KR100873266B1 (en) Prefabricated pillar structure
KR101588593B1 (en) Temporary bridge construction method
KR101408770B1 (en) Street lights or modular integrated antenna mounting device support structures object and construction methods
KR101327388B1 (en) The pc wall for water-storage tank of assembly type and method for constructing thereof
WO2012081653A1 (en) Method of installing a mounting base
KR101482585B1 (en) Post foundation block structure
KR20160000702A (en) Fastening member used in concrete filled steel tube and its using concrete filled steel tube mounting structure and method and its includes build underground structure and method
KR101370163B1 (en) Construction method of concrete structure house
KR101482584B1 (en) Post foundation block structure for avoiding undergroung laying object
JP6301742B2 (en) Steel pipe pole and its installation method
KR101862567B1 (en) Standardization of Mat Foundation assembling House system
KR101772938B1 (en) Precast foundation structure buried support of road facility and method for constructing this same
JP2015081467A (en) Base isolation structure
US20160040424A1 (en) Pre-fabricated structures and methods
KR20160035243A (en) Iron plate concrete base
CN204457074U (en) Combined enclosing wall component
KR20140046322A (en) Building and fabrication method using the module house
KR101984772B1 (en) Post structure assembly for outdoors
KR200315989Y1 (en) Facilities base
JP4496500B2 (en) Holding member
JP7288390B2 (en) Foundation construction method and foundation
KR20180086926A (en) A pillar and installation method
KR20240047607A (en) mold for the construction of bridge streetlight foundation and the construction method of streetlight foundation using it
JP5520130B2 (en) Prop

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20190102

Year of fee payment: 5