KR100943062B1 - The basis structure of steel pipe and method - Google Patents
The basis structure of steel pipe and method Download PDFInfo
- Publication number
- KR100943062B1 KR100943062B1 KR1020090051680A KR20090051680A KR100943062B1 KR 100943062 B1 KR100943062 B1 KR 100943062B1 KR 1020090051680 A KR1020090051680 A KR 1020090051680A KR 20090051680 A KR20090051680 A KR 20090051680A KR 100943062 B1 KR100943062 B1 KR 100943062B1
- Authority
- KR
- South Korea
- Prior art keywords
- foundation
- pole
- pipe
- concrete
- concrete structure
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2253—Mounting poles or posts to the holder
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Abstract
Description
본 발명은 강관전주의 기초구조 및 그 시공방법에 관한 것으로, 내부에 콘크리트가 양생되어 있는 기초파이프를 미리 제작하여 현장에 출고하기 때문에 기초작업공정이 줄어들어 공사공기를 단축시킬 수 있을 뿐만 아니라, 견고한 제작이 가능하여 품질을 향상시킬 수 있는 장점이 있으며, 연결을 위한 플랜지가 주콘크리트구조물에 묻기기 때문에 안전성확보는 물론 미려한 미관을 갖게 할 수 있는 강관전주의 기초구조 및 그 시공방법에 관한 것이다.The present invention relates to the basic structure of steel pipe poles and its construction method, since the foundation pipes are pre-fabricated with concrete cured inside the factory, the foundation work process can be reduced and shorten construction air, It is possible to manufacture and improve the quality, and because the flange for connection is buried in the main concrete structure, it relates to the basic structure of steel pipe pole and construction method that can ensure safety and beautiful appearance.
일반적으로 전주라 함은 배전선이나 통신용 중계기 등의 통신장비가 설치되어 하부가 지하에 매립되어 고정되는 기둥을 말한다.In general, a pole is a column in which communication equipment such as distribution lines or communication repeaters is installed and the lower part is buried and fixed in the basement.
이러한 전주는 지중에 앵커볼트가 형성된 콘크리트 기초 구조물이 지상으로 돌출되도록 형성한 후, 기둥 하단에 형성된 플랜지를 앵커볼트에 삽입하여 기둥을 고정하는 방식으로 형성된다.These poles are formed in such a way that the anchor bolt is formed in the ground to form a concrete foundation structure protruding to the ground, and then the flange formed at the bottom of the column is inserted into the anchor bolt to fix the column.
그러나, 이러한 전주는 기초 구조물과 기둥 하단의 플랜지가 지상으로 노출 되는 형태이기 때문에 미관을 저해하는 요소로 작용하는 문제점이 있다.However, this pole has a problem that acts as a factor that inhibits aesthetics because the base structure and the flange of the bottom of the pillar is exposed to the ground.
그리하여 상기와 같은 문제점을 해결하기 위한 도 1 또는 도 2에서 도시된 전주 설치방법이 개발되었으며, 이는 외측에 콘크리트를 유입시키기 위한 유입홀(113)을 구비하고, 저면으로는 플랜지(111)를 구비한 전주(110)와, 상기 전주(110)를 기초콘크리트구조물(130)에 설치하기 위한 체결부재(120)로 구성된다.Thus, the electric pole installation method shown in Figure 1 or 2 to solve the above problems has been developed, which has an
그리고, 이러한 전주 설치 방법에 의하면, 먼저, 지면에 기초콘크리트구조물(130)과 주콘크리트구조물(140)이 설치될 수 있는 공간부(101)를 만든다.In addition, according to the installation method of the pole, first, the
그 후에는, 상기 공간부(101)의 저면에 콘크리트구조물(130, 140)을 지지하는 철근물의 배근과 거프집을 설치한 다음, 체결부재(120)를 중앙부에 위치시키고, 이 후 콘크리트를 타설하여 기초콘크리트구조물(130)를 형성하는데, 이때 상기 체결부재(120)는 상부플레이트(121)가 기초콘크리트구조물(130)의 밖으로 돌출되도록 설치한다.Thereafter, the bottom of the
그리고, 기초콘크리트구조물(130)의 양생이 되면 전주(110)를 체결부재(120)에 안착시킨 후, 체결부재(120)에 형성된 앵커볼트(125)를 이용하여 전주(110)의 하단에 형성된 볼트를 체결하여 전주(110)의 설치를 마감하고, 전주(110)에 구성된 유입홀(113)을 통하여 전주(110)의 내부에 콘크리트를 유입시킨 다음, 기초콘크리트구조물(130)의 상면에 주콘크리트구조물(140)을 형성시킨다.When the curing of the
아울러, 주콘크리트구조물(140)의 양생이 완료되면 공간부(101)에 흙을 채워 지면을 다져 작업을 완료한다.In addition, when the curing of the
그러나 상기와 같은 종래의 전주 설치 방법를 이용하면, 전주에 형성된 작은 유입홀(113)을 통하여 전주(110)의 내부로 콘크리트를 미리 유입시켜야 하는 어려움과 불편함이 있었을 뿐만 아니라, 작업의 어려움으로 인해 품질이 저하되는 문제점이 있었고, 이에 따른 공사공기가 늘어나는 문제점이 제기되었다.However, using the conventional method of installing the poles as described above, not only had the difficulty and inconvenience of introducing concrete into the
상기와 같은 목적을 달성하기 위한 본 발명의 강관전주의 기초구조 및 그 시공방법은 기초템플렛과, 내부에 콘크리트가 양생된 기초파이프와, 하부전주와, 상기 기초파이프와 하부전주의 하부에 양생되는 주콘크리트구조물로 구성되며, 지중에 터파기를 하여 공간부를 형성하는 공간부 형성단계; 앙카볼트로 연결된 상,하부플레이트로 구성된 기초템플릿을 위치시킨후, 콘크리트를 타설하여 기초콘크리트구조물을 양생하는 기초템플릿 설치단계; 내부에 콘크리트가 양생된 기초파이프의 하부플랜지를 기초콘크리트구조물에 설치된 기초템플릿의 앙카볼트에 끼운후, 너트결합하여 기초파이프를 설치하는 기초파이프 설치단계; 기초파이프의 상부플랜지에 하부전주의 전주플랜지를 안착시킨 후, 기초파이프와 하부전주를 볼트결합하는 하부전주설치단계; 기초파이프와 하부전주의 하부에 콘크리트를 타설하여 주콘크리트구조물을 양생하는 주콘크리트구조물 형성단계;로 이루어진다.The basic structure and construction method of the steel pipe pole of the present invention for achieving the above object is a base template, a base pipe with concrete cured therein, a bottom pole, and the base pipe and the bottom pole is cured in the lower pole Comprising a main concrete structure, forming a space portion by digging in the ground to form a space portion; Placing a base template consisting of upper and lower plates connected by anchor bolts, and then installing a foundation template for curing the foundation concrete structure by pouring concrete; A foundation pipe installation step of installing a foundation pipe by inserting a nut into the anchor bolt of the foundation template installed on the foundation concrete structure after the lower flange of the foundation pipe cured with concrete therein; A lower pole installation step of mounting the lower pole pole pole on the upper flange of the base pipe and then bolting the base pipe and the lower pole pole; The main concrete structure forming step of curing the main concrete structure by pouring concrete in the lower part of the base pipe and the lower pole.
본 발명의 강관전주의 기초구조 및 그 시공방법을 이용하면, 내부에 콘크리트가 양생되어 있는 기초파이프를 미리 제작하여 현장에 출고하기 때문에 기초작업공정이 줄어들어 공사공기를 단축시킬 수 있을 뿐만 아니라, 견고한 제작이 가능하여 품질을 향상시킬 수 있는 장점이 있으며, 연결을 위한 플랜지가 주콘크리트구조물에 묻기기 때문에 안전성확보는 물론 미려한 미관을 갖게 할 수 있는 유용한 발명이다.By using the basic structure and steel construction method of the steel pipe pole of the present invention, since the foundation pipe with concrete cured in advance to be shipped to the site, the foundation work process can be reduced and shorten the construction air, There is an advantage to improve the quality can be manufactured, and because the flange for the connection is buried in the main concrete structure is a useful invention that can ensure the safety as well as beautiful aesthetics.
상기와 같은 문제점을 해결하기 위한 본 발명의 구성을 살펴보면 다음과 같다.Looking at the configuration of the present invention for solving the above problems are as follows.
본 발명은 기초콘크리트구조물(2)에 설치된 기초템플릿(10)에 결합되는 강관전주의 기초구조에 관한 것으로, 도 7 또는 도 8에 도시된 바와 같이 상기 기초템플릿(10)의 상부에 결합되는 기초파이프(20)와, 하부전주(30)와 주콘크리트구조물(40)로 구성된다.The present invention relates to a basic structure of steel pipe poles coupled to the
여기서, 기초템플릿(10)은 도 3 또는 도 5에 도시된 바와 같이 서로동일한 형태의 상,하부플레이트(12, 13)에 ㄴ자형태를 가진 다수의 앵커볼트(11)가 수직으로 결합되는 것으로, 기초콘크리트구조물(2)에 삽입시 하부플레이트(13)가 기초콘크리트구조물(2) 내부에 위치하고, 상부플레이트(12)의 저면이 기초콘크리트구조물(2)의 상면에 면접 또는 이격되여 형성되며, 이때 상기 기초템플릿(10)은 전주의 수직설치를 위하여 수평을 유지시켜야 한다.Here, the
또한, 기초파이프(20)는 도 3 또는 도 6에 도시된 바와 같이 상기 기초템플릿(10)에 결합되는 것으로, 내부에는 콘크리트(23)가 양생되어 있으며, 상단부와 하단부에는 결합을 위한 상,하부플렌지(21, 22)가 각각 형성되어 있다.In addition, the
그리고, 상기 기초파이프(20)의 상부에는 결합강도를 높이기 위한 보강대(23)가 상부플랜지(21)에 더 결합되도록 하는 것이 바람직하다.In addition, the upper portion of the
또한, 하부전주(30)는 도 3 또는 도 7에 도시된 바와 같이 상기 기초파이프(20)와 결합을 이루는 것으로, 하단부에는 기초파이프(20)의 상부플랜지(21)에 대응하는 전주플랜지(31)가 형성되어 있으며, 상기 하부전주(30)의 하부에는 결합강도를 높이기 위한 보강대(34)가 전주플랜지(31)에 더 결합되도록 하는 것이 바람직하다.In addition, the
여기서, 상기 하부전주(30)와 기초파이프(20)의 결합방법은 통상의 볼트결합으로 이룰 수 있고, 이때 상기 하부전주(30)는 상부전주와 하부전주로 나누어 설치하는 통상의 전주에서의 하부전주를 말하며, 하주전주가 다단으로 나뉜 형태 또는 상부전주와 하부전주가 일체로 형성된 형태로 할 수도 있을 것이다.Here, the coupling method of the
또한, 주콘크리트구조물(40)은 도 3 또는 도 8에 도시된 바와 같이 상기 기초파이프(20)와 기초파이프(20)에 결합된 하부전주(30)의 하부에 양생되는 콘크리트를 말하며, 기초파이프(20)에 결합된 하부전주(30)가 안정되게 설치되게 함은 물론, 하부전주(30)에 형성된 전주플랜지(31)를 가려 미관을 외려하게 하는 작용을 한다.In addition, the
이하에서는 상기와 같은 본 발명의 구성에 따른 시공방법을 설명한다.Hereinafter, a construction method according to the configuration of the present invention as described above.
먼저, 기초템플릿(10)과, 내부에 콘크리트(23)가 타설된 기초파이프(20)와, 하부전주(30) 및 상부전주 등 필요한 구성품을 제작한 후, 전주를 설치할 장소로 각각의 구성품을 운반한다.First, the
그 후에는, 도 4에 도시된 바와 같이 전주를 설치할 장소의 지중에 터파기를 하여 바닥에 공간부(1)를 형성하고(S10), 도 5에 도시된 바와 같이 앙카볼트(11)로 연결된 상,하부플레이트(12, 13)로 구성된 기초템플릿(10)을 위치시킨후, 콘크리트를 타설하여 기초콘크리트구조물(2)을 양생함으로써 기초템플릿(10) 설치를 완료한다. 그리고, 이때에 기초템플릿(10)은 하부전주(30)의 수직설치를 위하여 수평이 유지되게 설치해야 한다.(S20)After that, as shown in FIG. 4, a
아울러, 기초템플릿(10)을 기초콘크리트구조물(2)에 삽입시에는 하부플레이트(13)가 기초콘크리트구조물(2)의 내부에 위치하고, 상부플레이트(12)가 기초콘크리트구조물(2)의 상면에 돌출되도록 형성하여야 하는데, 바람직하게는 상부플레이트(12)의 바닥면이 기초콘크리트구조물(2)의 상면과 면접하도록 하는 것이 좋다. In addition, when the
이와 같이 기초템플릿(10)의 설치를 완료한 후에는, 도 6에 도시된 바와 같이 내부에 콘크리트(23)가 양생된 기초파이프(20)의 하부플랜지(22)를 기초콘크리트구조물(2)에 설치된 기초템플릿(10)의 앙카볼트(11)에 끼운후, 너트결합하여 기초파이프(20)를 설치를 완료할 수 있게 된다.After completing the installation of the
그리고, 이때에 상기 기초템플릿(10)은 기초콘크리트구조물에 묻힌채로 수평하게 설치되어 있고, 기초템플릿(10)에 형성된 앙카볼트(11)와 기초파이프(20)의 하부플랜지(22)에 형성된 결합공(미도시)이 대응하게 형성되어 있기 때문에 너트를 이용한 기초템플릿(10)과 기초파이프(20)의 결합을 용이하게 할 수 있을 것이다.At this time, the
이처럼 기초파이프(20)의 설치가 끝난 후에는, 도 7에 도시된 바와 같이 기초파이프(20)의 상부플랜지(21)에 하부전주(30)의 전주플랜지(31)를 안착시킨 후, 이를 볼트결합함으로써 하부전주를 기초파이프에 설치한다.(S40)After the installation of the
아울러, 도 8에 도시된 바와 같이 기초파이프(20)와 상기 기초파이프(20)에 설치된 하부전주(30)의 하부에 콘크리트를 타설하여 양생함으로써, 주콘크리트구조물(40)을 형성한 다음, 지중에 형성한 공간부(101)에 흙을 채우고 지면을 다짐으로써 작업을 완료한다.(S50)In addition, as shown in FIG. 8 by pouring concrete to the lower portion of the
여기서, 상기 하주전주에 상부전주 및 가로등과 같은 기타 구성품을 연결하는 것은 공지된 방법을 이용하여 용이하게 할 수 있으므로, 자세한 설명은 생략하며, 이러한 본 발명의 시공방법을 이용하면 공사공기를 단축시킴과 더불어 품질이 우수한 전주의 시공을 용이하게 할 수 있게 된다.Here, connecting the other poles and other components such as street poles and street lamps can be easily performed using a known method, detailed description thereof will be omitted, and using the construction method of the present invention shortens the construction air In addition, it is possible to facilitate the construction of poles of excellent quality.
도 1은 종래의 하부전주를 도시한 사시도.1 is a perspective view showing a conventional lower pole.
도 2는 종래의 전주 설치방법에 의해 설치된 전주의 단면도.Figure 2 is a cross-sectional view of the pole installed by the conventional pole installation method.
도 3은 본 발명의 기초템플릿과 기초파이프와 하부전주의 분리사시도.Figure 3 is an exploded perspective view of the base template and the base pipe and the lower pole of the present invention.
도 4는 본 발명의 공간부 형상단계를 도시한 상태도.Figure 4 is a state diagram showing the shape of the space portion of the present invention.
도 5는 본 발명의 기초템플릿 설치단계를 도시한 상태도.Figure 5 is a state diagram showing the step of installing the base template of the present invention.
도 6은 본 발명의 기초파이프 설치단계를 도시한 상태도.Figure 6 is a state diagram showing the foundation pipe installation step of the present invention.
도 7은 본 발명의 하부전주 설치단계를 도시한 상태도.Figure 7 is a state diagram showing the lower pole installation step of the present invention.
도 8은 본 발명의 시공완료상태를 도시한 상태도.8 is a state diagram showing a construction completion state of the present invention.
** 도면의 주요부분에 대한 부호의 설명 **DESCRIPTION OF REFERENCE NUMERALS
1 : 공간부 2 : 기초콘크리트구조물1: space part 2: foundation concrete structure
10 : 기초템플릿 11 : 앙카볼트10: basic template 11: anchor bolt
12 : 상부플레이트 13 : 하부플레이트12: upper plate 13: lower plate
20 : 기초파이프 21 : 상부플랜지20: foundation pipe 21: upper flange
22 : 하부플렌지 23 : 콘크리트22: lower flange 23: concrete
24, 34 : 보강대 30 : 하부전주24, 34: reinforcement 30: lower pole
31 : 전주플랜지 40 : 주콘크리트구조물31: Jeonju Flange 40: Main concrete structure
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090051680A KR100943062B1 (en) | 2009-06-10 | 2009-06-10 | The basis structure of steel pipe and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090051680A KR100943062B1 (en) | 2009-06-10 | 2009-06-10 | The basis structure of steel pipe and method |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100943062B1 true KR100943062B1 (en) | 2010-02-17 |
Family
ID=42083554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090051680A KR100943062B1 (en) | 2009-06-10 | 2009-06-10 | The basis structure of steel pipe and method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100943062B1 (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103184743A (en) * | 2011-12-30 | 2013-07-03 | 华锐风电科技(集团)股份有限公司 | Template flange |
KR101289149B1 (en) * | 2011-08-10 | 2013-07-23 | 재단법인 포항산업과학연구원 | Structure and apparatus for connecting steel pipe struts |
CN103352475A (en) * | 2013-07-08 | 2013-10-16 | 中铁二十一局集团电务电化工程有限公司 | Electrified railway strong wind area contact net steel pipe support foundation bolt positioning mold |
CN103452128A (en) * | 2013-08-06 | 2013-12-18 | 安徽华电工程咨询设计有限公司 | Method for lifting base plane of power transmission line tower by adopting steel pipe connecting leg |
CN103696611A (en) * | 2013-12-03 | 2014-04-02 | 新安县电业公司 | Base structure for steel tube tower |
CN103741708A (en) * | 2014-01-02 | 2014-04-23 | 台山市宁华电力设计有限公司 | Prefabricated concrete pole sleeve base |
KR200474870Y1 (en) * | 2011-01-28 | 2014-10-22 | 한국전력공사 | Steel pole for cable inside |
CN104594377A (en) * | 2015-01-19 | 2015-05-06 | 天津港航工程有限公司 | Steel cylinder type foundation structure of offshore wind turbine |
KR101590614B1 (en) * | 2015-06-01 | 2016-02-01 | (주)비디씨 | The pillar flush type steel pipe base assembly of station and condtruction method |
CN106894669A (en) * | 2017-01-13 | 2017-06-27 | 浙江大学 | The method for designing and purposes of blower foundation ring, blower foundation ring with wing plate |
US10138615B2 (en) | 2014-09-17 | 2018-11-27 | Korea Electric Power Corporation | Base body of electric transmission tower using micropile |
CN111663837A (en) * | 2020-06-11 | 2020-09-15 | 陈如请 | Reinforcing structure for junction of offshore wind power installation framework |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0978608A (en) * | 1995-09-18 | 1997-03-25 | Nippon Chikou Kk | Pole foundation, and construction thereof |
KR200154201Y1 (en) | 1996-03-22 | 1999-08-02 | 강병호 | The foundation structure for setting the posts in the greenhouse |
JP2006207265A (en) | 2005-01-28 | 2006-08-10 | Toda Constr Co Ltd | Joining method of pile and column and its structure |
JP2008184884A (en) | 2007-01-31 | 2008-08-14 | East Japan Railway Co | Foundation steel pipe material for supporting electric traction and its manufacturing method |
-
2009
- 2009-06-10 KR KR1020090051680A patent/KR100943062B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0978608A (en) * | 1995-09-18 | 1997-03-25 | Nippon Chikou Kk | Pole foundation, and construction thereof |
KR200154201Y1 (en) | 1996-03-22 | 1999-08-02 | 강병호 | The foundation structure for setting the posts in the greenhouse |
JP2006207265A (en) | 2005-01-28 | 2006-08-10 | Toda Constr Co Ltd | Joining method of pile and column and its structure |
JP2008184884A (en) | 2007-01-31 | 2008-08-14 | East Japan Railway Co | Foundation steel pipe material for supporting electric traction and its manufacturing method |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200474870Y1 (en) * | 2011-01-28 | 2014-10-22 | 한국전력공사 | Steel pole for cable inside |
KR101289149B1 (en) * | 2011-08-10 | 2013-07-23 | 재단법인 포항산업과학연구원 | Structure and apparatus for connecting steel pipe struts |
CN103184743A (en) * | 2011-12-30 | 2013-07-03 | 华锐风电科技(集团)股份有限公司 | Template flange |
CN103184743B (en) * | 2011-12-30 | 2016-03-02 | 华锐风电科技(集团)股份有限公司 | Template flange |
CN103352475A (en) * | 2013-07-08 | 2013-10-16 | 中铁二十一局集团电务电化工程有限公司 | Electrified railway strong wind area contact net steel pipe support foundation bolt positioning mold |
CN103452128A (en) * | 2013-08-06 | 2013-12-18 | 安徽华电工程咨询设计有限公司 | Method for lifting base plane of power transmission line tower by adopting steel pipe connecting leg |
CN103696611A (en) * | 2013-12-03 | 2014-04-02 | 新安县电业公司 | Base structure for steel tube tower |
CN103741708A (en) * | 2014-01-02 | 2014-04-23 | 台山市宁华电力设计有限公司 | Prefabricated concrete pole sleeve base |
CN103741708B (en) * | 2014-01-02 | 2015-12-09 | 台山市宁华电力设计有限公司 | Prefabricated concrete rod sleeve basis |
US10138615B2 (en) | 2014-09-17 | 2018-11-27 | Korea Electric Power Corporation | Base body of electric transmission tower using micropile |
CN104594377A (en) * | 2015-01-19 | 2015-05-06 | 天津港航工程有限公司 | Steel cylinder type foundation structure of offshore wind turbine |
KR101590614B1 (en) * | 2015-06-01 | 2016-02-01 | (주)비디씨 | The pillar flush type steel pipe base assembly of station and condtruction method |
CN106894669A (en) * | 2017-01-13 | 2017-06-27 | 浙江大学 | The method for designing and purposes of blower foundation ring, blower foundation ring with wing plate |
CN111663837A (en) * | 2020-06-11 | 2020-09-15 | 陈如请 | Reinforcing structure for junction of offshore wind power installation framework |
CN111663837B (en) * | 2020-06-11 | 2022-01-04 | 乐风新能(北京)科技有限公司 | Reinforcing structure for junction of offshore wind power installation framework |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100943062B1 (en) | The basis structure of steel pipe and method | |
KR100588445B1 (en) | Method for installation of environment friendly electric utility pole | |
CN105888108A (en) | Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall | |
KR101904692B1 (en) | Method for the final working to the slab hole and mold | |
CN105715068A (en) | Underpinning and reinforcing structure for seismic isolation bearing of existing brick-concrete structure and construction method for underpinning and reinforcing structure | |
KR20120096605A (en) | Bracket support type downward construction system and method | |
KR20070115112A (en) | Construction method for utility-pipe conduit | |
KR20100125652A (en) | A mold for apartment | |
CN107558483B (en) | A kind of construction method of building foundation that installing wallboard | |
KR101370163B1 (en) | Construction method of concrete structure house | |
US20180195305A1 (en) | Prefabricated concrete pole base and method of installation | |
KR100814442B1 (en) | Concrete mold for flat plate slab/flat slab and construction method using the same | |
KR101036177B1 (en) | Method for constructing building using PRC integrating method | |
KR100875960B1 (en) | Construction method of precast concrete stairs | |
KR101908943B1 (en) | RC WALL STRUCTURE FOR TOP-DOWN AND METHOD FOR CONSTRUCTING THE STRUCTUREa | |
ITVR20100206A1 (en) | FOUNDATION STRUCTURE PARTICULARLY FOR PREFABRICATED BUILDINGS | |
KR101433632B1 (en) | Top down method for Underground structure using the Concrete Bracket integrated Steel beam | |
CN215888951U (en) | Prefabricated double-rib external wall panel | |
CN104948202A (en) | Tunnel mid-partition quick assembly prefabricated component | |
JP4446544B2 (en) | Basic structure of a house | |
CN114263206A (en) | Fabricated concrete foundation and construction method thereof | |
JP6368630B2 (en) | Foundation construction method | |
KR100823348B1 (en) | Installation method of a retaining wall | |
KR20130022656A (en) | Hybrid building construction method combining dry type and wet type | |
KR20170051018A (en) | A twin wall structure using a PC panel and method for manufacturing of it |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130208 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20131216 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20141231 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20181217 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20191231 Year of fee payment: 11 |