KR101413885B1 - Paving apparatus of shotcrete for paved road and bridge deck - Google Patents

Paving apparatus of shotcrete for paved road and bridge deck Download PDF

Info

Publication number
KR101413885B1
KR101413885B1 KR1020130022540A KR20130022540A KR101413885B1 KR 101413885 B1 KR101413885 B1 KR 101413885B1 KR 1020130022540 A KR1020130022540 A KR 1020130022540A KR 20130022540 A KR20130022540 A KR 20130022540A KR 101413885 B1 KR101413885 B1 KR 101413885B1
Authority
KR
South Korea
Prior art keywords
chain
concrete
chute
tunnel
semicircular chute
Prior art date
Application number
KR1020130022540A
Other languages
Korean (ko)
Inventor
권은태
한상국
Original Assignee
한상국
권은태
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한상국, 권은태 filed Critical 한상국
Priority to KR1020130022540A priority Critical patent/KR101413885B1/en
Application granted granted Critical
Publication of KR101413885B1 publication Critical patent/KR101413885B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/003Arrangement of tracks on bridges or in tunnels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0409Devices for both conveying and distributing with conveyor belts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0481Concrete chutes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a bridge of a high-speed railroad and a concrete placing device for a tunnel. The concrete placing device includes an automatic transfer device rapidly transferring concrete to a placing position when the concrete with a low slump value mixed in a ready-mixed concrete vehicle is poured into a chute. Therefore, the present invention improves workability of the concrete with the low slump value and prevents material segregation of the concrete. The present invention also improves persisting periods of the concrete with the low slump value by maintaining rigidity after the concrete is cured.

Description

고속철도 교량 및 터널용 콘크리트 타설장치{PAVING APPARATUS OF SHOTCRETE FOR PAVED ROAD AND BRIDGE DECK}BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a concrete pouring apparatus for a high-speed railway bridge and a tunnel,

본 발명은 고속철도 교량 및 터널용 콘크리트 타설기술에 관한 것으로서, 보다 상세하게는 레미콘 차량에서 배합(반죽)된 슬럼프치가 낮은 콘크리트를 슈트에 부어 넣을 때 슈트에 적용되는 자동이송장치를 통해 슬럼프치가 낮은 콘크리트를 자동 이송시켜 원하는 위치에 급속하게 타설하여 콘크리트의 시공성을 향상시키고, 콘크리트의 재료 분리를 방지하면서 콘크리트 양생 후 강도를 유지시켜 슬럼프치가 낮은 콘크리트의 내구연한을 증대시킬 수 있도록 하는 고속철도 교량 및 터널용 콘크리트 타설장치에 관한 것이다.The present invention relates to a high-speed railway bridge and a tunnel concrete pouring technique, and more particularly, to a concrete pouring method for a high-speed railway bridge and a tunnel using an automatic transfer device applied to a chute when pouring concrete having a low slump value into a chute, Speed railway bridges and tunnels that can increase the durability of concrete with low slump value by maintaining the strength after concrete curing while preventing the concrete material separation and improving the workability of the concrete The present invention relates to a concrete pouring apparatus.

일반적으로, 철도 및 도로의 콘크리트 타설은 특허등록 제10-1213573호(공고일 2012.12.20.)와 같이 레미콘에서 압송장치가 설치된 펌푸카를 이용하는 방법과, 레미콘에서 직접 슈트를 이용하여 콘크리트를 타설하는 방법이 있다.Generally, concrete casting of railway and road is performed by using a pump car equipped with a press-feeding device in a concrete mixer as in Patent Registration No. 10-1213573 (published on December 20, 2012) and a method of casting concrete using a concrete mixer directly in a concrete mixer .

그러나, 상기와 같은 방법은 슬럼프치(콘크리트에 있어서 물+시멘트+잔골재(모래)+굵은골재+물을 배합함에 있어 배합된 재료를 원통형의 용기에 부어 넣은 후 원통형 용기를 위로 올렸을 때 무너지는 높이)가 양호한 콘크리트를 타설하는 경우에는 시공성 및 품질관리가 양호하게 이루어지지만, 슬럼프치가 낮은 콘크리트를 타설시에는 콘크리트 배합 반죽으로 인하여 시공 속도가 낮고, 재료 분리로 인하여 콘크리트의 강도 저하가 발생하여 콘크리트 타설 후에 보강 작업이 필요로 함은 물론, 콘크리트 구조물 철거 후에 콘크리트를 재타설하여야 하므로 공사비 증액과 시공 효율성, 그리고 강도 저하 요인의 문제점을 내포하고 있었다.However, the above-mentioned method has a problem in that when the slump teeth (water, cement, fine aggregate (sand) + coarse aggregate + water) are poured into a cylindrical container and the cylindrical container is lifted up When the concrete is laid with a good concrete, the workability and quality control are satisfactory. However, when the concrete having a low slump value is poured, the construction speed is low due to the concrete dough and the strength of the concrete is lowered due to the material separation. In addition to the need for reinforcement work, concrete must be rebuilt after demolishing the concrete structure, which results in problems such as construction cost increase, construction efficiency, and strength reduction factor.

따라서, 본 발명은 상기와 같은 종래의 문제점을 개선하기 위한 것으로, 레미콘 차량에서 배합(반죽)된 슬럼프치가 낮은 콘크리트를 슈트에 부어 넣을 때 이를 타설위치로 급속하게 이송시키는 자동이송장치를 포함하는 콘크리트 타설장치를 구성함으로써, 슬럼프치가 낮은 콘크리트의 시공성을 향상시키고, 콘크리트의 재료 분리를 방지하면서 콘크리트 양생 후 강도를 유지시켜 슬럼프치가 낮은 콘크리트의 내구연한을 증대시킬 수 있도록 하는 고속철도 교량 및 터널용 콘크리트 타설장치를 제공함에 그 목적이 있는 것이다.SUMMARY OF THE INVENTION Accordingly, the present invention has been made to solve the above-mentioned problems occurring in the prior art, and it is an object of the present invention to provide an automatic transfer device for rapidly transferring a concrete having a low slump value into a chute, By constructing the piling system, it is possible to improve the workability of concrete with low slump value and to prevent the separation of concrete material, while maintaining the strength after concrete curing, so as to increase the durability of concrete with low slump value. The purpose of the device is to provide.

상기 목적 달성을 위한 본 발명 고속철도 교량 및 터널용 콘크리트 타설장치는, 고속철도 교량 또는 터널의 진행방향을 따라 양측에 일정높이로 형성되는 공동구 구조물; 상기 공동구 구조물과 고속철도 교량 또는 터널의 지면에 올려지도록, "ㄱ"자 형태로 제작되는 프레임 수평방향 자유단과 수직방향 하단 각각에 서로 높이를 달리하며 설치되는 제 1 전동모터를 구비하며, 제 1 전동모터와 체인으로 연결된 대차바퀴를 포함하고, 상기 제 1 전동모터의 구동시 상기 대차바퀴를 통해 고속철도 교량 또는 터널의 진행방향을 따라 전후 이동하는 이동대차; 및, 상기 이동대차에 조절부재를 통해 결합되고, 상기 이동대차의 전후 이동시 상기 고속철도 교량 또는 터널의 진행방향을 따라 지면에 레미콘 차량에서 투하하는 콘크리트를 순차적으로 타설하는 콘크리트 타설 슈트; 를 포함하여 구성된다.According to an aspect of the present invention, there is provided a concrete pouring apparatus for a high-speed railway bridge and a tunnel, comprising: a hollow structure formed at both sides of a high-speed railway bridge or tunnel along a traveling direction thereof; And a first electric motor installed at a height in a horizontal direction free end and a vertical direction lower end of the frame so as to be raised on the ground of the bridge structure or the high speed railway bridge or the tunnel, A moving truck moving forward and backward along the traveling direction of the high-speed railway bridge or tunnel through the truck wheels when the first electric motor is driven; And a concrete putting suit coupled to the moving truck through an adjusting member and sequentially placing concrete to be dropped from the ready-mixed vehicle on the ground along the traveling direction of the high-speed railway bridge or tunnel when the moving truck is moved back and forth; .

또한, 상기 콘크리트 타설 슈트는, 상기 조절부재를 통해 상기 이동대차에 상하 및 좌우 회전이 가능하도록 결합되어 콘크리트를 받아내는 일정길이를 가지는 반원형 슈트; 상기 반원형 슈트의 길이방향으로 일단에 설치되며, 좌우 양단에 제 1 체인기어와 제 2 체인기어를 각각 형성하고 있는 제 1 회전봉; 상기 반원형 슈트의 길이방향으로 타단에 설치되며, 양단에 좌우 한쌍의 제 3 및 제 4 체인기어를 형성하고 있는 제 2 회전봉; 상기 제 1,3 체인기어 또는 제 2,4 체인기어를 연결하는 좌우 한쌍의 제 1 체인; 상기 반원형 슈트의 하단에 설치되며, 상기 제 1 체인기어에 대응하게 제 5 체인기어를 형성하고 있는 구동축을 가지는 제 2 전동모터; 상기 제 1,5 체인기어를 연결하는 제 2 체인; 및, 좌우 한쌍을 이루는 상기 제 1 체인에 고정체를 통해 일정간격을 두고 양단이 고정되며, 상기 제 1 체인의 이동에 따라 연동되어 상기 반원형 슈트로 투입되는 콘크리트를 타설 위치로 이동시키는 이동날개; 를 포함하여 구성된다.The concrete pouring chute may include a semicircular chute having a predetermined length for receiving concrete by being coupled with the movable brakes through the adjusting member so as to be vertically and horizontally rotatable; A first rotating bar provided at one end in the longitudinal direction of the semicircular chute and having a first chain gear and a second chain gear at both right and left ends; A second rotary bar installed at the other end in the longitudinal direction of the semicircular chute and forming a pair of left and right third and fourth chain gears at both ends; A pair of left and right first chains connecting the first and third chain gears or second and fourth chain gears; A second electric motor provided at a lower end of the semicircular chute and having a drive shaft forming a fifth chain gear corresponding to the first chain gear; A second chain connecting the first and second chain gears; And a pair of left and right chains fixed to opposite ends of the first chain at regular intervals through a fixing body and adapted to move in accordance with the movement of the first chain to move the concrete inserted into the semicircular chute to a placement position; .

다른 일면에 따라, 상기 고속철도 교량 및 터널용 콘크리트 타설장치는, "ㄱ"자 형태로 제작되는 프레임 수평방향 자유단과 수직방향 하단 각각에 서로 높이를 달리하며 설치되는 제 1 전동모터를 구비하며, 제 1 전동모터와 체인으로 연결된 대차바퀴를 포함하고, 상기 제 1 전동모터의 구동시 상기 대차바퀴를 통해 전후 이동하는 이동대차와; 상기 이동대차에 조절부재를 통해 결합되는 콘크리트 타설 슈트; 를 포함하여 구성되고, 상기 콘크리트 타설 슈트는, 상기 조절부재를 통해 상기 이동대차에 상하 및 좌우 회전이 가능하도록 결합되어 콘크리트를 받아내는 일정길이를 가지는 반원형 슈트; 상기 반원형 슈트의 길이방향으로 일단에 설치되며, 좌우 양단에 제 1 체인기어와 제 2 체인기어를 각각 형성하고 있는 제 1 회전봉; 상기 반원형 슈트의 길이방향으로 타단에 설치되며, 양단에 좌우 한쌍의 제 3 및 제 4 체인기어를 형성하고 있는 제 2 회전봉; 상기 제 1,3 체인기어 또는 제 2,4 체인기어를 연결하는 좌우 한쌍의 제 1 체인; 상기 반원형 슈트의 하단에 설치되며, 상기 제 1 체인기어에 대응하게 제 5 체인기어를 형성하고 있는 구동축을 가지는 제 2 전동모터; 상기 제 1,5 체인기어를 연결하는 제 2 체인; 및, 좌우 한쌍을 이루는 상기 제 1 체인에 고정체를 통해 일정간격을 두고 양단이 고정되며, 상기 제 1 체인의 이동에 따라 연동되어 상기 반원형 슈트로 투입되는 콘크리트를 타설 위치로 이동시키는 이동날개; 를 포함하여 구성되는 것이다.According to another aspect of the present invention, there is provided a concrete pouring apparatus for a high-speed railway bridge and a tunnel, comprising: a first electric motor installed at a height in a horizontal direction free end and a vertical direction lower end, 1. An electric motor, comprising: an electric motor and a bogie wheel connected by a chain, the bogie moving back and forth through the bogie wheel when the first electric motor is driven; A concrete casting shoe coupled to the moving truck through an adjusting member; A semicircular chute having a predetermined length for receiving concrete by being coupled with the movable carriage so as to be vertically and horizontally rotatable through the regulating member; A first rotating bar provided at one end in the longitudinal direction of the semicircular chute and having a first chain gear and a second chain gear at both right and left ends; A second rotary bar installed at the other end in the longitudinal direction of the semicircular chute and forming a pair of left and right third and fourth chain gears at both ends; A pair of left and right first chains connecting the first and third chain gears or second and fourth chain gears; A second electric motor provided at a lower end of the semicircular chute and having a drive shaft forming a fifth chain gear corresponding to the first chain gear; A second chain connecting the first and second chain gears; And a pair of left and right chains fixed to opposite ends of the first chain at regular intervals through a fixing body and adapted to move in accordance with the movement of the first chain to move the concrete inserted into the semicircular chute to a placement position; .

또한, 상기 조절부재는, 이동대차의 일측 하단부에 돌출 형성되는 고정프레임; 상기 반원형 슈트를 좌우 방향으로 회전시키도록 하측이 상기 고정프레임에 수직하게 결합되고, 상측은 상기 반원형 슈트의 상하 방향으로 회전시키도록 상기 반원형 슈트에 힌지축으로 결합되는 수직봉; 및, 상기 반원형 슈트가 상하 방향으로 회전시 지지력을 제공하도록 상기 고정프레임의 일측에서 상기 반원형 슈트의 저면으로 연장되어 힌지축으로 결합되는 지지봉; 을 포함하여 구성된다.The control member may include a fixed frame protruding from a lower end of the moving carriage; A vertical rod coupled to the semicircular chute so as to rotate the semicircular chute in a vertical direction of the semicircular chute, the lower side of the semicircular chute being vertically coupled to the fixed frame to rotate the semicircular chute in the left-right direction; And a support rod extending from one side of the stationary frame to the bottom of the semicircular chute to be coupled with the hinge shaft so as to provide a supporting force when the semicircular chute is rotated in the vertical direction; .

또한, 상기 제 1 체인은, 감김상태에서는 유연성을 유지하고 풀림상태에서는 일방향으로 절첩되어 역방향으로의 꺽임이 방지되도록 양단에 한 쌍의 제 1 중공홀을 천공하면서 상기 이동날개가 결합 고정되는 제 1 체인연결편과, 양단에 한 쌍의 제 2 중공홀을 천공하는 제 2 체인연결편 및, 상기 제 1,2 체인연결편의 제 1 및 제 2 중공홀을 교차하며 결합되고 상기 제 1,2 체인연결편의 비틀림이 억제되도록 안정된 지지력을 제공하는 체인결합편의 조합으로 구성되는 것이다.In addition, the first chain maintains flexibility in the depressed state, and the first chain is folded in one direction in the unfolded state to puncture the first hollow holes at both ends so as to prevent the bending in the reverse direction, A second chain connecting piece for perforating a pair of second hollow holes at both ends of the first and second chain connecting pieces, and a first and a second hollow holes of the first and second chain connecting pieces, And a combination of chain coupling members for providing a stable bearing force so that twisting is suppressed.

그리고, 상기 체인결합편은 상기 제 1 체인연결편의 제 1 중공홀에 끼워져 결합되는 제 1 핀부와, 상기 제 1 핀부 및 체인결합편의 중심부와 단턱으로 분리된 체 상기 제 2 체인연결편의 제 2 중공홀에 끼워져 결합되는 제 2 핀부를 포함하여 구성된다.The chain connecting piece includes a first fin portion that is engaged with and engaged with the first hollow hole of the first chain connecting piece, and a second hollow portion that is separated from the center portion of the first pin portion and the chain combining piece, And a second fin portion that is fitted and coupled to the hole.

또한, 상기 제 1 체인연결편에는 날개결합편을 연장 구성하고, 상기 날개결합편에는 상기 이동날개가 고정체를 통해 수직하게 직립되도록 체결나사를 통해 결합 구성되도록 하였다.In addition, the first chain connecting piece has a wing coupling part extended, and the wing coupling part is coupled to the wing coupling part through a fastening screw so that the moving wing is vertically erected through a fixing body.

이와 같이 본 발명은 레미콘 차량에서 배합(반죽)된 슬럼프치가 낮은 콘크리트를 슈트에 부어 넣을 때 이를 타설위치로 급속하게 이송시키는 자동이송장치를 포함하는 콘크리트 타설장치를 구성한 것으로, 이를 통해 종래의 공법인 펌푸카가 필요없어 경제성이 우수하고, 종래의 공법에 비해 압송장치가 필요없으며, 슬럼프치가 낮은 콘크리트를 신속하게 타설하므로 콘크리트의 품질 확보 및 시공성이 양호하고, 콘크리트 타설시 재료분리가 발생하지 않도록 하여 콘크리트 강도를 일정하게 유지시킴은 물론, 콘크리트의 내구연한을 증대시켜 향후 유지관리비의 절감을 이루면서 품질확보 및 경제성을 확보하는 효과를 기대할 수 있는 것이다.As described above, the present invention provides a concrete pouring apparatus including an automatic transfer device for rapidly transferring a concrete having a low slump value mixed in a ready-mixed vehicle to a placement position when pouring concrete into a chute. Since the puka is not needed, the punching device is not needed compared with the conventional method, and the concrete with a low slump value is quickly poured. Therefore, the quality of the concrete is secured and the workability is good. It is possible to expect the effect of securing the quality and economical efficiency while maintaining the strength constant and increasing the durability of the concrete, thereby reducing the maintenance cost in the future.

도 1은 본 발명의 실시예로 고속철도 교량 및 터널용 콘크리트 타설상태를 보인 정면도.
도 2는 본 발명의 실시예로 고속철도 교량 및 터널용 콘크리트 타설장치의 구조를 보인 사시도.
도 3은 본 발명의 실시예로 고속철도 교량 및 터널용 콘크리트 타설장치의 구조를 보인 정면도.
도 4는 본 발명의 실시예로 콘크리트 타설 슈트의 구조를 보인 사시도.
도 5는 본 발명의 실시예로 체인과 이동날개의 결합상태를 보인 사시도.
도 6은 본 발명의 실시예로 콘크리트 타설 슈트를 이동대차에 연결하기 위한 조절부재의 확대 사시도.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a front view showing a concrete installation state for a high-speed railway bridge and a tunnel according to an embodiment of the present invention. FIG.
2 is a perspective view showing a structure of a concrete pouring apparatus for a high-speed railway bridge and a tunnel according to an embodiment of the present invention.
3 is a front view showing a structure of a concrete pouring apparatus for a high-speed railway bridge and a tunnel according to an embodiment of the present invention.
4 is a perspective view showing the structure of a concrete casting chute as an embodiment of the present invention.
5 is a perspective view showing a combined state of a chain and a moving blade according to an embodiment of the present invention.
6 is an enlarged perspective view of a control member for connecting a concrete casting chute to a moving car in accordance with an embodiment of the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 실시예들을 설명하기로 한다.Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명의 실시예로 고속철도 교량 및 터널용 콘크리트 타설상태를 보인 정면도이고, 도 2는 본 발명의 실시예로 고속철도 교량 및 터널용 콘크리트 타설장치의 구조를 보인 사시도이며, 도 3은 본 발명의 실시예로 고속철도 교량 및 터널용 콘크리트 타설장치의 구조를 보인 정면도를 도시한 것이다.2 is a perspective view showing the structure of a high-speed railway bridge and a concrete pouring apparatus for a tunnel according to an embodiment of the present invention, and Fig. 3 is a cross-sectional view of a concrete pouring apparatus for a high- 1 is a front view showing a structure of a concrete pouring apparatus for a high-speed railway bridge and a tunnel according to an embodiment of the present invention.

도 4는 본 발명의 실시예로 콘크리트 타설 슈트의 구조를 보인 사시도이고, 도 5는 본 발명의 실시예로 체인과 이동날개의 결합상태를 보인 사시도이며, 도 6은 본 발명의 실시예로 콘크리트 타설 슈트를 이동대차에 연결하기 위한 조절부재의 확대 사시도를 도시한 것이다.FIG. 4 is a perspective view showing the structure of a concrete putting chute according to an embodiment of the present invention, FIG. 5 is a perspective view showing a combined state of a chain and a moving blade according to an embodiment of the present invention, And an enlarged perspective view of the adjusting member for connecting the casting chute to the moving carriage.

첨부된 도 1 내지 도 6을 참조하면, 본 발명의 실시예에 따른 고속철도 교량 및 터널용 콘크리트 타설장치는 고속철도 교량 또는 터널의 진행방향을 따라 양측에 일정높이로 형성되는 공동구 구조물(300)과, 고속철도 교량 또는 터널의 지면에서 대차바퀴를 통해 콘크리트 타설장치 및 레미콘 차량(200)이 이동하면서, 고속철도 교량 또는 터널의 바닥면에 콘크리트를 순차적으로 타설하여 철로(600) 또는 도로를 시공할 수 있도록 한 것으로, 이동대차(10), 조절부재(20), 콘크리트 타설 슈트(30)를 포함하는 것이다.1 to 6, a concrete pouring apparatus for a high-speed railway bridge and a tunnel according to an embodiment of the present invention includes a hollow structure 300 formed at a predetermined height on both sides along a traveling direction of a high-speed railway bridge or tunnel, The concrete pouring apparatus and the remicon vehicle 200 are moved through the railway wheels from the ground of the high-speed railway bridge or the tunnel, and the concrete is sequentially placed on the bottom surface of the high-speed railway bridge or the tunnel so that the railway 600 or the road can be constructed A movable carriage 10, a control member 20, and a concrete casting chute 30.

상기 이동대차(10)는 좌우측이 서로 다른 높이를 가지는 프레임으로 이루어지는 것으로, 좌우측 프레임의 하단에는 각각 제 1 전동모터(11)와 대차바퀴(13)가 구성되고, 상기 제 1 전동모터(11)와 대차바퀴(13)는 체인(12)으로 연결되도록 구성하였다.The first and second electric motors 11 and 13 are formed at the lower ends of the left and right frames. The first and second electric motors 11 and 12 are connected to each other, And the chain wheel 13 are connected to the chain 12.

이에 따라, 상기 제 1 전동모터(11)의 구동력은 체인(12)을 통해 대차바퀴(13)로 전달되면서, 상기 대차바퀴(13)의 구름동작이 이루어져 이동대차(10)의 전후 이동이 이루어질 수 있으며, 따라서 상기 이동대차(10)는 고속철도 교량 또는 터널에서 조종석 의자(400)에 앉은 작업자가 조정패널(500)을 조작할 때 슬럼프치가 낮은 콘크리트의 타설위치로 이동할 수 있는 것이다.The driving force of the first electric motor 11 is transmitted to the wheel 13 through the chain 12 and the rolling motion of the wheel 13 is performed to move the moving truck 10 back and forth Therefore, when the operator sitting on the cockpit chair 400 operates the adjustment panel 500 in the high-speed railway bridge or tunnel, the moving truck 10 can move to the placement position of the concrete having a low slump value.

즉, 상기 이동대차(10)의 좌우측 대차바퀴(13)는, "ㄱ"자 형태로 제작되는 프레임 수평방향 자유단과 수직방향 프레임 하단 각각에 서로 높이를 달리하며 설치되는 것으로서, 프레임 수평방향 자유단에 위치하는 대차바퀴(13)는 고속철도 교량 또는 터널의 양측 중 어느 하나의 공동구 구조물(300)에 올려지고, 수직방향 프레임 하단에 위치하는 대차바퀴(13)는 고속철도 교량 또는 터널의 중간라인 지면에 올려지면서, 상기 고속철도 교량 또는 터널의 진행방향으로 전후 이동하며, 상기 이동대차(10)의 전후 이동시 레미콘 차량(200)도 함께 이동하여, 고속철도 교량 또는 터널의 좌측(또는 우측)의 바닥에 콘크리트를 타설하여 철로(601)가 설치될 바닥면(602) 또는 도로면을 시공하고, 좌측(또는 우측)에 대한 바닥 콘크리트 타설 후 철로(601)가 설치될 바닥면(602) 또는 도로면 시공이 완료된 경우에는, 다시 우측(또는 좌측)에 대한 바닥 콘크리트 타설이 이루어지면서 우측(또는 좌측)에 대한 철로(601)가 설치될 바닥면(602) 또는 도로면 시공이 완료될 수 있도록 한 것이다.That is, the left and right bogie wheels 13 of the moving bogie 10 are installed at different heights of the frame horizontal direction free end and the vertical direction frame lower end, respectively, The railway car 13 located at the lower end of the vertical frame is raised to the intermediate line floor of the high speed railway bridge or the tunnel The remicon vehicle 200 moves together with the moving carriage 10 in the forward and backward movements to move the concrete to the left side (or right side) of the high-speed railway bridge or tunnel The bottom surface 602 or the road surface on which the railway 601 is to be installed and the bottom surface 602 on which the railway 601 is installed after the bottom concrete is poured to the left side (or right side) The floor surface 602 to be installed on the right side (or left side) or the road surface construction to be installed on the right side (or left side) can be completed when the construction of the road surface is completed .

이때, 상기 이동대차(10)의 이동으로부터 레미콘 차량(200)에서 투하하는 콘크리트는 상기 콘크리트 타설슈트(30)에 의해 타설되며, 상기 콘크리트 타설슈트(30)는 상기 조절부재(20)를 통해 상기 이동대차(10)와 결합되어 좌우 및 상하 방향으로 회전하는 것으로, 반원형 슈트(31), 제 1,2 회전봉(32)(33), 제 1 체인(34), 제 2 전동모터(35), 제 2 체인(36), 이동날개(37)를 포함하는 것이다.At this time, the concrete dropped by the ready-mixed vehicle 200 from the movement of the moving truck 10 is laid by the concrete casting chute 30, and the concrete casting chute 30 is moved The first and second rotating rods 32 and 33, the first chain 34, the second electric motor 35, and the first and second electric shafts 32 and 33, A second chain 36, and a moving blade 37.

상기 반원형 슈트(31)는 슬럼프치가 낮은 콘크리트를 받아내어 타설위치로 이동시키도록 일정길이를 가지는 것이며, 상기 조절부재(20)를 통해 상기 이동대차(10)에 상하 및 좌우 회전이 가능하도록 결합 구성된다.The semicircular chute 31 has a predetermined length so as to receive concrete having a low slump value and to move the concrete to a pushed position. The semicircular chute 31 is coupled with the movable bogie 10 so as to be vertically and horizontally rotatable do.

상기 제 1 회전봉(32)은 상기 반원형 슈트(31)의 길이방향으로 일단에 설치되는 것으로, 상기 제 1 회전봉(32)에 양측 단부에는 제 1 체인기어(32a)와 제 2 체인기어(32b)가 각각 형성되는 것이다.The first rotating bar 32 is installed at one end in the lengthwise direction of the semicircular chute 31. A first chain gear 32a and a second chain gear 32b are provided at both ends of the first rotating bar 32, Respectively.

상기 제 2 회전봉(33)은 상기 반원형 슈트(31)의 길이방향으로 타단에 설치되는 것으로, 상기 제 2 회전봉(33)에는 상기 제 2 체인기어(32b)에 대응하는 제 3 체인기어(33a)가 한쌍을 이루며 형성되는 것이다.The second rotating rod 33 is installed at the other end in the longitudinal direction of the semicircular chute 31. The second rotating rod 33 is provided with a third chain gear 33a corresponding to the second chain gear 32b, Are formed as a pair.

상기 제 1 체인(34)은 좌우 한쌍을 이루는 상기 제 1,3 체인기어(32a)(33a) 또는 제 2,4 체인기어(32b)(33b)을 각각 연결하며, 상기 제 2 전동모터(35)의 구동력에 의해 이송되도록 구성되는 것이다.The first chain 34 connects the first and third chain gears 32a and 33a or the second and fourth chain gears 32b and 33b which form a pair of left and right chains, As shown in Fig.

상기 제 2 전동모터(35)는 상기 반원형 슈트(31)의 하단에 설치되는 것으로, 상기 제 1 체인기어(32a)에 대응하는 제 5 체인기어(35a)가 형성되는 구동축이 마련되는 것이다.The second electric motor 35 is installed at the lower end of the semicircular chute 31 and is provided with a drive shaft in which a fifth chain gear 35a corresponding to the first chain gear 32a is formed.

상기 제 2 체인(36)은 상기 제 1,5 체인기어(32a)(35a)를 연결하는 것으로, 상기 제 2 전동모터(35)의 구동력을 상기 제 1 회전봉(32)으로 전달하도록 구성되며, 이에 따라 상기 제 1,2 회전봉(32)(33)은 상기 제 1 체인(34)에 의해 회전이 이루어질 수 있는 것이다.The second chain 36 connects the first and second chain gears 32a and 35a to transmit the driving force of the second electric motor 35 to the first rotation bar 32, Accordingly, the first and second rotation bars 32 and 33 can be rotated by the first chain 34.

이때, 상기 제 1 체인(34)은 각각 감김상태에서는 유연성을 유지하고 풀림상태에서는 일방향으로 절첩되어 역방향으로의 꺽임이 방지되도록 양단에 한 쌍의 제 1 중공홀(71a)을 천공하는 제 1 체인연결편(71)과, 양단에 한 쌍의 제 2 중공홀(72a)을 천공하는 제 2 체인연결편(72), 그리고 상기 제 1,2 체인연결편(71)(72)의 제 1 및 제 2 중공홀(71a)(72a)을 교차하며 결합되고 상기 제 1,2 체인연결편(71)(72)의 비틀림이 억제되도록 안정된 지지력을 제공하는 체인결합편(73)의 조합으로 구성되는 것이다.At this time, the first chain (34) maintains flexibility in the decoupled state and is folded in one direction in the unfolded state, so that the first chain (34) punches a pair of first hollow holes (71a) A second chain connecting piece 72 that punctures a pair of second hollow holes 72a at both ends and a first and a second hollow connecting pieces 72 and 72 of the first and second chain connecting pieces 71 and 72, And a chain coupling piece 73 which is coupled to the holes 71a and 72a to provide a stable supporting force so that the first and second chain coupling pieces 71 and 72 are prevented from being twisted.

그리고, 상기 체인결합편(73)은 상기 제 1 체인연결편(71)의 제 1 중공홀(71a)에 끼워져 결합되는 제 1 핀부(73a)와, 상기 제 1 핀부(73a) 및 체인결합편(73) 중심부(73c)와 단턱으로 분리된 체 상기 제 2 체인연결편(72)의 제 2 중공홀(72a)에 끼워져 결합되는 제 2 핀부(73b)를 포함하며, 상기 제 1 체인연결편(71)에는 날개결합편(74)을 연장 구성하고, 상기 날개결합편(74)에는 상기 이동날개(37)가 고정체(37a)를 통해 수직하게 직립되도록 체결나사(100)를 통해 결합 구성되도록 하였다.The chain engaging piece 73 includes a first pin portion 73a and a first pin portion 73a that are engaged with the first hollow hole 71a of the first chain connecting piece 71, And a second pin portion 73b which is inserted into and engaged with the second hollow hole 72a of the second chain connecting piece 72 separated from the center portion 73c of the first chain connecting piece 71 by a predetermined distance, And the wing engaging piece 74 is coupled to the wing engaging piece 74 through the fastening screw 100 so that the moving wing 37 is vertically erected through the fixing body 37a.

이때, 상기 제 1 핀부(73a)는 상기 제 1 중공홀(71a)에 끼워진 상태로 자유롭게 회전될 수 있도록 제 1 중공홀(71a)보다 미세하게 작은 굵기로 이루어지는 것인데, 그 단부는 외부로 노출되어 최종 리벳마감부(미도시)를 마련하게 된다.At this time, the first fin 73a is finer than the first hollow hole 71a so as to be freely rotated in a state of being fitted in the first hollow hole 71a. The end of the first fin 73a is exposed to the outside A final rivet finishing portion (not shown) is provided.

그리고, 상기 제 2 핀부(73b)는 상기 제 1 핀부(73a) 보다는 굵고 체인결합편(73)의 중심부(73c)보다는 가늘게 구성되는 것으로, 상기 제 1 중공홀(71a)의 직경보다 큰 제 2 중공홀(72a)에 끼워지도록 제 2 중공홀(72a)보다 미세하게 작은 굵기로 이루어진다.The second fin portion 73b is narrower than the central portion 73c of the chain engaging piece 73 and is thicker than the first fin portion 73a. And is finer than the second hollow hole 72a so as to be fitted into the hollow hole 72a.

상기 이동날개(37)는 좌우 한쌍을 이루는 상기 제 1 체인(34)에서 연장 구성되는 날개결합편(74)에 고정체(37a)와 체결부재(100)를 통해 일정간격을 두고 양단이 고정되는 것으로, 상기 제 1 체인(34)의 이동에 따라 연동되어 상기 반원형 슈트(31)로 투입되는 콘크리트를 타설 위치로 이동시키도록 구성되는 것이다.The moving blade 37 is fixed to the blade coupling piece 74 extending from the pair of left and right chains 34 at fixed intervals through the fixing member 37a and the coupling member 100 And is configured to move the concrete inserted into the semicircular chute (31) to the inserted position in accordance with the movement of the first chain (34).

상기 조절부재(20)는 고정프레임(21)과 수직봉(22) 및 지지봉(23)을 포함하는 것으로, 상기 고정프레임(21)은 이동대차(10)의 일측 하단부에 돌출 형성되는 것이다.The control member 20 includes a fixed frame 21, a vertical bar 22 and a support bar 23. The fixed frame 21 protrudes from one side of the lower end of the moving car 10. [

상기 수직봉(22)은 상기 반원형 슈트(31)를 좌우 방향으로 회전시키도록 하측이 상기 고정프레임(21)에 수직하게 결합되고, 상측은 상기 반원형 슈트(31)의 상하 방향으로 회전시키도록 상기 반원형 슈트(31)에 힌지축(22a)으로 결합 구성되는 것이다.The vertical bar 22 is vertically coupled to the stationary frame 21 at its lower side so as to rotate the semicircular chute 31 in the left and right direction, And is connected to the semicircular chute 31 by a hinge shaft 22a.

상기 지지봉(23)은 상기 반원형 슈트(31)가 상하 방향으로 회전시 지지력을 제공하도록 상기 고정프레임(21)의 일측에서 상기 반원형 슈트(31)의 저면으로 연장되어 힌지축(23a)으로 결합 구성되는 것이다.
The supporting rod 23 extends from one side of the fixing frame 21 to the bottom surface of the semicircular chute 31 so as to provide a supporting force when the semicircular chute 31 rotates in the vertical direction, .

이와 같이, 본 발명의 실시예에 따른 고속철도 교량 및 터널용 콘크리트 타설장치는 첨부된 도 1 내지 도 6에서와 같이, 우선 고속철도 교량 및 터널 시공의 현장에서 조절부재(20)를 통해 이동대차(10)와 콘크리트 타설 슈트(30)를 결합시킨다.1 to 6, a high-speed railway bridge and a concrete pouring apparatus for a tunnel according to an embodiment of the present invention are constructed such that, at the site of a high-speed railway bridge and a tunnel construction, ) And the concrete casting chute (30).

다음으로, 상기 이동대차(10)의 좌우측 대차바퀴(13)는 서로 다른 높이로서, 상단측에 위치하는 대차바퀴(13)는 고속철도 교량 또는 터널의 양측 중 어느 하나의 공동구 구조물(300)에 올리고, 하단측에 위치하는 대차바퀴(13)는 고속철도 교량 또는 터널의 중간라인 지면에 올려놓는다.Next, the left and right bogie wheels 13 of the moving bogie 10 are at different heights, and the bogie wheels 13 located at the upper side are placed on the joint structure 300 of either the high speed railway bridge or the both sides of the tunnel And the balancer wheels 13 located on the lower end side are placed on the middle line of the high-speed railway bridge or the tunnel.

다음으로, 작업자가 이동대차(10)의 상면에 마련되는 조정석 의자(400)에 앉은 상태에서 조정패널(500)을 조작하여 상기 이동대차(10)에 마련되는 제 1 전동모터(11)와, 상기 콘크리트 타설 슈트(30)에 마련되는 제 2 전동모터(35)에 전원을 연결시킨 상태에서, 상기 제 1 전동모터(11)를 구동시킨다.Next, the first electric motor 11 provided in the moving bogie 10 by operating the adjusting panel 500 while the operator is sitting on the bogie chair 400 provided on the upper surface of the moving bogie 10, The first electric motor 11 is driven in a state where electric power is connected to a second electric motor 35 provided in the concrete placement chute 30.

그러면, 상기 제 1 전동모터(11)의 구동력은 체인(12)을 통해 대차바퀴(13)로 전달되므로, 상기 대차바퀴(13)의 구름동작으로부터 이동대차(10)는 고속철도 교량 또는 터널내에서 콘크리트 타설위치로 이동할 수 있는 것이다.Since the driving force of the first electric motor 11 is transmitted to the wheel 13 through the chain 12 from the rolling motion of the wheel 13, It is possible to move to the concrete pouring position.

다음으로, 상기 이동대차(10)에 조절부재(20)를 통해 결합되는 콘크리트 타설 슈트(30)의 좌우 및/또는 상하 각도를 조절시킨 상태에서, 첨부된 도 1에서와 같이 레미콘 차량(200)의 슈트(201)를 상기 각도 조절이 이루어진 상기 콘크리트 타설 슈트(30)로 위치시킨다.1, the left and right and / or up-and-down angles of the concrete placement chute 30 coupled to the moving bogie 10 via the adjustment member 20 are adjusted, The chute 201 of the tilting mechanism is positioned in the concrete casting chute 30 with the angle adjustment.

다음으로, 상기 콘크리트 타설 슈트(30)의 반원형 슈트(31)에 레미콘 차량(200)에서 배합된 콘크리트 즉, 슬럼프치가 낮은 콘크리트를 쏟아 넣는다.Next, the concrete mixed in the remicon vehicle 200, that is, concrete having a low slump value, is poured into the semicircular chute 31 of the concrete casting chute 30.

그리고, 상기 반원형 슈트(31)의 하단에 마련되는 제 2 전동모터(35)를 구동시키면, 상기 제 2 전동모터(35)의 구동력은 제 2 체인(36)을 통해 제 1 회전봉(32)으로 전달되어 상기 제 1 회전봉(33)의 회전이 이루어지고, 이와 동시에 상기 제 1 회전봉(32)은 제 1 체인(34)을 통해 제 2 회전봉(33)에 연결되어 있으므로, 상기 제 2 회전봉(33)도 연동 회전을 하게 된다.When the second electric motor 35 provided at the lower end of the semicircular chute 31 is driven, the driving force of the second electric motor 35 is transmitted to the first rotating rod 32 through the second chain 36 And the first rotation bar 32 is connected to the second rotation bar 33 through the first chain 34 so that the rotation of the second rotation bar 33 ) Are also rotated in an interlocked manner.

이때, 상기 제 1 체인(34)을 이루는 제 1 체인연결편(71)에는 날개결합편(74)을 연장 구성되고, 상기 날개결합편(74)에는 이동날개(37)가 수직하게 직립되도록 체결나사(100)를 통해 결합된 상태에서 다수개가 일정간격을 두고 배치되어 있는 바,At this time, the first chain connecting piece 71 constituting the first chain 34 is formed with a wing engaging piece 74, and the wing engaging piece 74 is fastened with a fastening screw (100), and a plurality of the plurality of antenna elements

상기 제 1,2 회전봉(32)(33)이 제 1 체인(34)을 통해 연동회전시, 상기 제 1 체인(34)에 수직하게 직립 고정되는 이동날개(37)는 상기 제 1 체인(34)의 이동방향을 따라 이동 회전하면서, 상기 반원형 슈트(31)에 투입되는 슬럼프치가 낮은 콘크리트를 타설위치로 이동시켜 그 타설이 신속하게 이루어질 수 있는 것이다.A moving wing 37 fixed upright perpendicularly to the first chain 34 when the first and second rotating rods 32 and 33 are rotated together through the first chain 34 is rotatably supported by the first chain 34 The concrete having a low slump value to be injected into the semicircular chute 31 is moved to the installation position and the installation thereof can be performed quickly.

다음으로, 한 위치에서 슬럼프치가 낮은 콘크리트의 타설이 종료된 후 다음 위치에서 슬럼프치가 낮은 콘크리트의 타설을 진행하고자 하는 경우, 우선 대차바퀴(13)와 제 1 전동모터(11) 및 체인(12)을 이용하여 이동대차(10)를 이동시키고, 상기 이동대차(10)의 이동에 따라 조절부재(20)를 통해 결합되는 콘크리트 타설 슈트(30)의 이동이 함께 이루어질 수 있는 것이다.The first electric motor 11 and the chain 12 are moved in the opposite direction to each other when the pouring of the concrete having a low slump value at one position is completed and then the pouring of the concrete having a low slump value at the next position is completed. And the concrete pouring chute 30 which is coupled through the adjusting member 20 can be moved together with the movement of the moving car 10.

그러면, 상기 설명한 바와같이 제 2 전동모터(35)를 통해 제 1,2 회전봉(32)(33)과 제 1 체인(34), 그리고 이동날개(37)를 상기 설명과 같이 회전 이송시킴으로써, 다른 레미콘 차량(200)에서 제공하는 슬럼프치가 낮은 콘크리트의 타설 시공이 종료되는 것이며, 상기와 같인 타설 위치 변경을 반복하면서 슬럼프치가 낮은 콘크리트를 반복 타설함으로써 고속철도 교량 및 터널에 대한 철로(601)가 설치될 바닥면(602) 또는 도로면 시공이 완료되는 것이다.Then, as described above, the first and second rotating rods 32 and 33, the first chain 34, and the moving blade 37 are rotated and transferred through the second electric motor 35 as described above, The concrete installation of the concrete with low slump value provided by the ready-mixed vehicle 200 is completed, and the rail 601 for the high-speed railway bridge and the tunnel is installed by repetitively installing the concrete with low slump value while repeating the above- The bottom surface 602 or the road surface construction is completed.

즉, 본 발명은 고속철도 교량 또는 터널의 좌측(또는 우측)에서 진행방향을 따라 이동대차(10)와, 상기 이동대차(10)에 결합되는 콘크리트 타설 슈트(30)를 전진 이동하며, 상기 이동대차(10)의 전진 이동시 레미콘 차량(200)도 함께 이동하여, 고속철도 교량 또는 터널의 좌측(또는 우측)의 바닥에 콘크리트를 타설하여 철로(601)가 설치될 바닥면(602) 또는 도로면을 시공할 수 있고, 반대의 방향으로 우측(또는 좌측)에 대한 바닥 콘크리트 타설이 순차적으로 이루어지면서 반대 방향에서의 철로(601)가 설치될 바닥면(602) 또는 도로면 시공이 순차적으로 이루어질 수 있는 것이다.That is, according to the present invention, a moving bogie 10 and a concrete placement chute 30 coupled to the moving bogie 10 are moved forward along the traveling direction from the left side (or right side) of a high speed railway bridge or tunnel, The ready-mixed vehicle 200 also moves together with the concrete floor 10 to move the concrete floor to the left side (or right side) of the high-speed railway bridge or the tunnel to construct a floor surface 602 or a road surface on which the railway 601 is to be installed And the bottom surface 602 or the road surface construction on which the railway 601 is to be installed in the opposite direction may be sequentially performed while the bottom concrete is successively placed on the right side (or left side) in the opposite direction .

이상에서 본 발명의 고속철도 교량 및 터널용 콘크리트 타설장치에 대한 기술사상을 첨부도면과 첨부도면과 함께 서술하였지만, 이는 본 발명의 가장 양호한 실시예를 예시적으로 설명한 것이지 본 발명을 한정하는 것은 아니다.While the present invention has been described with reference to the accompanying drawings, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the invention.

따라서, 본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이고, 그와같은 변경은 청구범위 기재의 범위내에 있게 된다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit and scope of the invention as defined by the appended claims. It is to be understood that such changes and modifications are within the scope of the claims.

10; 이동대차 11; 제 1 전동모터
12; 체인 13; 대차바퀴
20; 조절부재 21; 고정프레임
22; 수직봉 22a; 힌지축
23; 지지봉 23a; 힌지축
30; 콘크리트 타설 슈트 31; 반원형 슈트
32; 제 1 회전봉 32a, 32b; 제 1 및 제 2 체인기어
33; 제 2 회전봉 33a, 33b; 제 3 및 제 4 체인기어
34; 제 1 체인 35; 제 2 전동모터
35a; 제 5 체인기어 36; 제 2 체인
37; 이동날개 37a; 고정체
71; 제 1 체인연결편 72; 제 2 체인연결편
73; 체인결합편 74; 날개결합편
100; 체결나사 200; 레미콘 차량
300; 공동구 구조물 400; 조정석 의자
500; 조정패널 601; 철로
602; 바닥면
10; Mobile truck 11; The first electric motor
12; Chain 13; Wheel
20; Adjusting member 21; Fixed frame
22; Vertical bar 22a; Hinge axis
23; A support rod 23a; Hinge axis
30; Concrete casting chute 31; Semicircular suit
32; First rotating rods 32a, 32b; The first and second chain gears
33; Second rotating rods 33a and 33b; The third and fourth chain gears
34; A first chain 35; The second electric motor
35a; A fifth chain gear 36; The second chain
37; A moving blade 37a; Fixed body
71; A first chain connecting piece 72; The second chain connecting piece
73; Chain coupling piece 74; Wing engagement piece
100; Fastening screws 200; Remicon vehicles
300; Cavity structure 400; Chair
500; Adjustment panel 601; Railway
602; Bottom surface

Claims (7)

고속철도 교량 또는 터널의 진행방향을 따라 양측에 일정높이로 형성되는 공동구 구조물;
상기 공동구 구조물과 고속철도 교량 또는 터널의 지면에 올려지도록, "ㄱ"자 형태로 제작되는 프레임 수평방향 자유단과 수직방향 하단 각각에 서로 높이를 달리하며 설치되는 제 1 전동모터를 구비하며, 제 1 전동모터와 체인으로 연결된 대차바퀴를 포함하고, 상기 제 1 전동모터의 구동시 상기 대차바퀴를 통해 고속철도 교량 또는 터널의 진행방향을 따라 전후 이동하는 이동대차; 및,
상기 이동대차에 조절부재를 통해 결합되고, 상기 이동대차의 전후 이동시 상기 고속철도 교량 또는 터널의 진행방향을 따라 지면에 레미콘 차량에서 투하하는 콘크리트를 순차적으로 타설하는 콘크리트 타설 슈트; 를 포함하여 구성하는 것을 특징으로 하는 고속철도 교량 및 터널용 콘크리트 타설장치.
A high-speed rail bridge structure or a hollow structure formed at a predetermined height on both sides along a traveling direction of a tunnel;
And a first electric motor installed at a height in a horizontal direction free end and a vertical direction lower end of the frame so as to be raised on the ground of the bridge structure or the high speed railway bridge or the tunnel, A moving truck moving forward and backward along the traveling direction of the high-speed railway bridge or tunnel through the truck wheels when the first electric motor is driven; And
A concrete putting suit coupled to the moving truck through an adjusting member and sequentially placing concrete to be dropped from the ready-mixed vehicle on the ground along the traveling direction of the high-speed railway bridge or tunnel when the moving truck is moved back and forth; And a concrete installation device for a high-speed railway bridge and a tunnel.
제 1 항에 있어서, 상기 콘크리트 타설 슈트는,
상기 조절부재를 통해 상기 이동대차에 상하 및 좌우 회전이 가능하도록 결합되어 콘크리트를 받아내는 일정길이를 가지는 반원형 슈트; 상기 반원형 슈트의 길이방향으로 일단에 설치되며, 좌우 양단에 제 1 체인기어와 제 2 체인기어를 각각 형성하고 있는 제 1 회전봉; 상기 반원형 슈트의 길이방향으로 타단에 설치되며, 양단에 좌우 한쌍의 제 3 및 제 4 체인기어를 형성하고 있는 제 2 회전봉; 상기 제 1,3 체인기어 또는 제 2,4 체인기어를 연결하는 좌우 한쌍의 제 1 체인; 상기 반원형 슈트의 하단에 설치되며, 상기 제 1 체인기어에 대응하게 제 5 체인기어를 형성하고 있는 구동축을 가지는 제 2 전동모터; 상기 제 1,5 체인기어를 연결하는 제 2 체인; 및, 좌우 한쌍을 이루는 상기 제 1 체인에 고정체를 통해 일정간격을 두고 양단이 고정되며, 상기 제 1 체인의 이동에 따라 연동되어 상기 반원형 슈트로 투입되는 콘크리트를 타설 위치로 이동시키는 이동날개; 를 포함하여 구성하는 것을 특징으로 하는 고속철도 교량 및 터널용 콘크리트 타설장치.
2. The apparatus according to claim 1, wherein the concrete casting chute comprises:
A semicircular chute having a predetermined length for receiving concrete by being coupled with the movable carriage so as to be vertically and horizontally rotatable through the adjustment member; A first rotating bar provided at one end in the longitudinal direction of the semicircular chute and having a first chain gear and a second chain gear at both right and left ends; A second rotary bar installed at the other end in the longitudinal direction of the semicircular chute and forming a pair of left and right third and fourth chain gears at both ends; A pair of left and right first chains connecting the first and third chain gears or second and fourth chain gears; A second electric motor provided at a lower end of the semicircular chute and having a drive shaft forming a fifth chain gear corresponding to the first chain gear; A second chain connecting the first and second chain gears; And a pair of left and right chains fixed to opposite ends of the first chain at regular intervals through a fixing body and adapted to move in accordance with the movement of the first chain to move the concrete inserted into the semicircular chute to a placement position; And a concrete installation device for a high-speed railway bridge and a tunnel.
"ㄱ"자 형태로 제작되는 프레임 수평방향 자유단과 수직방향 하단 각각에 서로 높이를 달리하며 설치되는 제 1 전동모터를 구비하며, 제 1 전동모터와 체인으로 연결된 대차바퀴를 포함하고, 상기 제 1 전동모터의 구동시 상기 대차바퀴를 통해 전후 이동하는 이동대차와; 상기 이동대차에 조절부재를 통해 결합되는 콘크리트 타설 슈트; 를 포함하여 구성되고,
상기 콘크리트 타설 슈트는,
상기 조절부재를 통해 상기 이동대차에 상하 및 좌우 회전이 가능하도록 결합되어 콘크리트를 받아내는 일정길이를 가지는 반원형 슈트;
상기 반원형 슈트의 길이방향으로 일단에 설치되며, 좌우 양단에 제 1 체인기어와 제 2 체인기어를 각각 형성하고 있는 제 1 회전봉;
상기 반원형 슈트의 길이방향으로 타단에 설치되며, 양단에 좌우 한쌍의 제 3 및 제 4 체인기어를 형성하고 있는 제 2 회전봉;
상기 제 1,3 체인기어 또는 제 2,4 체인기어를 연결하는 좌우 한쌍의 제 1 체인;
상기 반원형 슈트의 하단에 설치되며, 상기 제 1 체인기어에 대응하게 제 5 체인기어를 형성하고 있는 구동축을 가지는 제 2 전동모터;
상기 제 1,5 체인기어를 연결하는 제 2 체인; 및,
좌우 한쌍을 이루는 상기 제 1 체인에 고정체를 통해 일정간격을 두고 양단이 고정되며, 상기 제 1 체인의 이동에 따라 연동되어 상기 반원형 슈트로 투입되는 콘크리트를 타설 위치로 이동시키는 이동날개; 를 포함하여 구성됨을 특징으로 하는 고속철도 교량 및 터널용 콘크리트 타설장치.
And a first electric motor installed at a different height from each other in the horizontal direction free end and the vertical direction lower end of the frame, which are manufactured in the shape of "a ", and includes a chain wheel connected with the first electric motor, A moving truck moving back and forth through the truck when the electric motor is driven; A concrete casting shoe coupled to the moving truck through an adjusting member; And,
The concrete pouring chute,
A semicircular chute having a predetermined length for receiving concrete by being coupled with the movable carriage so as to be vertically and horizontally rotatable through the adjustment member;
A first rotating bar provided at one end in the longitudinal direction of the semicircular chute and having a first chain gear and a second chain gear at both right and left ends;
A second rotary bar installed at the other end in the longitudinal direction of the semicircular chute and forming a pair of left and right third and fourth chain gears at both ends;
A pair of left and right first chains connecting the first and third chain gears or second and fourth chain gears;
A second electric motor provided at a lower end of the semicircular chute and having a drive shaft forming a fifth chain gear corresponding to the first chain gear;
A second chain connecting the first and second chain gears; And
A pair of left and right chains fixed to opposite ends of the first chain at regular intervals through a fixing body and connected to the first chain to move the concrete inserted into the semicircular chute to a placement position; And a concrete pouring device for a high-speed railway bridge and a tunnel.
제 1 항 또는 제 3 항에 있어서, 상기 조절부재는,
이동대차의 일측 하단부에 돌출 형성되는 고정프레임;
상기 반원형 슈트를 좌우 방향으로 회전시키도록 하측이 상기 고정프레임에 수직하게 결합되고, 상측은 상기 반원형 슈트의 상하 방향으로 회전시키도록 상기 반원형 슈트에 힌지축으로 결합되는 수직봉; 및,
상기 반원형 슈트가 상하 방향으로 회전시 지지력을 제공하도록 상기 고정프레임의 일측에서 상기 반원형 슈트의 저면으로 연장되어 힌지축으로 결합되는 지지봉; 을 포함하여 구성하는 것을 특징으로 하는 고속철도 교량 및 터널용 콘크리트 타설장치.
4. The apparatus according to claim 1 or 3,
A fixed frame protruding from a lower end of one side of the moving truck;
A vertical rod coupled to the semicircular chute so as to rotate the semicircular chute in a vertical direction of the semicircular chute, the lower side of the semicircular chute being vertically coupled to the fixed frame to rotate the semicircular chute in the left-right direction; And
A support rod extending from one side of the stationary frame to the bottom of the semicircular chute and coupled to the hinge axis so as to provide a bearing force when the semicircular chute is rotated in an up and down direction; And a concrete pouring device for a high-speed railway bridge and a tunnel.
제 2 항 또는 제 3 항에 있어서, 상기 제 1 체인은,
감김상태에서는 유연성을 유지하고 풀림상태에서는 일방향으로 절첩되어 역방향으로의 꺽임이 방지되도록 양단에 한 쌍의 제 1 중공홀을 천공하면서 상기 이동날개가 결합 고정되는 제 1 체인연결편과, 양단에 한 쌍의 제 2 중공홀을 천공하는 제 2 체인연결편 및, 상기 제 1,2 체인연결편의 제 1 및 제 2 중공홀을 교차하며 결합되고 상기 제 1,2 체인연결편의 비틀림이 억제되도록 안정된 지지력을 제공하는 체인결합편의 조합으로 구성하는 것을 특징으로 하는 고속철도 교량 및 터널용 콘크리트 타설장치.
4. The chain according to claim 2 or 3,
A first chain connecting piece to which the moving wing is engaged and fixed while piercing a pair of first hollow holes at both ends so as to be folded in one direction so as to prevent bending in a reverse direction, A second chain connecting piece for piercing the second hollow hole of the first and second chain connecting pieces, and a second holding portion for holding the first and second hollow holes of the first and second chain connecting pieces, And a chain coupling member for connecting the high-speed railway bridge and the tunnel.
제 5 항에 있어서, 상기 체인결합편은,
상기 제 1 체인연결편의 제 1 중공홀에 끼워져 결합되는 제 1 핀부와, 상기 제 1 핀부 및 체인결합편의 중심부와 단턱으로 분리된 체 상기 제 2 체인연결편의 제 2 중공홀에 끼워져 결합되는 제 2 핀부를 포함하여 구성하는 것을 특징으로 하는 고속철도 교량 및 터널용 콘크리트 타설장치.
6. The apparatus according to claim 5,
A second pin hole formed in the second hollow hole of the first chain connecting piece and a second pin hole formed in the second hollow hole of the second chain connecting hole to be engaged with the first hollow hole of the first chain connecting piece; And a fin portion. The concrete pouring apparatus for high speed railway bridges and tunnels.
제 5 항에 있어서,
상기 제 1 체인연결편에는 날개결합편을 연장 구성하고, 상기 날개결합편에는 상기 이동날개가 고정체를 통해 수직하게 직립되도록 체결나사를 통해 결합 구성하는 것을 특징으로 하는 고속철도 교량 및 터널용 콘크리트 타설장치.
6. The method of claim 5,
Wherein the first chain connecting piece is formed with a wing engaging piece and the wing engaging piece is coupled to the wing engaging piece through a fastening screw so that the moving wing is vertically erected vertically through a fixing body. .
KR1020130022540A 2013-03-01 2013-03-01 Paving apparatus of shotcrete for paved road and bridge deck KR101413885B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130022540A KR101413885B1 (en) 2013-03-01 2013-03-01 Paving apparatus of shotcrete for paved road and bridge deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130022540A KR101413885B1 (en) 2013-03-01 2013-03-01 Paving apparatus of shotcrete for paved road and bridge deck

Publications (1)

Publication Number Publication Date
KR101413885B1 true KR101413885B1 (en) 2014-06-30

Family

ID=51134718

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130022540A KR101413885B1 (en) 2013-03-01 2013-03-01 Paving apparatus of shotcrete for paved road and bridge deck

Country Status (1)

Country Link
KR (1) KR101413885B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101771507B1 (en) * 2015-11-27 2017-08-28 화성궤도 주식회사 Conveyor vehicle for placing concrete of railroad way
CN107893537A (en) * 2017-10-13 2018-04-10 中国十七冶集团有限公司 High-precision concrete leveling unit and construction method
CN110454196A (en) * 2019-08-15 2019-11-15 湖南五新隧道智能装备股份有限公司 A kind of concreting chute
CN111119487A (en) * 2020-03-19 2020-05-08 中建一局集团建设发展有限公司 Double-layer chute concrete pouring system and construction method thereof
CN111139834A (en) * 2019-12-20 2020-05-12 中冶天工集团有限公司 One-time pouring forming device for two side walls of high-side wave ditch and construction method thereof
WO2022111131A1 (en) * 2020-11-27 2022-06-02 山东精砼工程机械股份有限公司 Slip-form concrete continuous pouring truck set and pouring method
FR3136794A1 (en) * 2022-06-21 2023-12-22 Eiffage Genie Civil Tunnel concreting walkway

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040008615A (en) * 2002-07-19 2004-01-31 궤도공영 주식회사 method for shoting ready mixed concrete to a mold for construct concrete roadbed in a railway tunnel
KR101006462B1 (en) 2008-07-23 2011-01-06 한상국 Railroad way concrete other opinion system and the method which are space-time on the tunnel inside
KR101119390B1 (en) 2011-09-28 2012-03-06 화성궤도 주식회사 Concrete pour installation method and apparatus thereof
KR101213573B1 (en) 2012-07-31 2012-12-20 한상국 Apparatus and method for placing concrete to construct concrete bed of railroad way

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040008615A (en) * 2002-07-19 2004-01-31 궤도공영 주식회사 method for shoting ready mixed concrete to a mold for construct concrete roadbed in a railway tunnel
KR101006462B1 (en) 2008-07-23 2011-01-06 한상국 Railroad way concrete other opinion system and the method which are space-time on the tunnel inside
KR101119390B1 (en) 2011-09-28 2012-03-06 화성궤도 주식회사 Concrete pour installation method and apparatus thereof
KR101213573B1 (en) 2012-07-31 2012-12-20 한상국 Apparatus and method for placing concrete to construct concrete bed of railroad way

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101771507B1 (en) * 2015-11-27 2017-08-28 화성궤도 주식회사 Conveyor vehicle for placing concrete of railroad way
CN107893537A (en) * 2017-10-13 2018-04-10 中国十七冶集团有限公司 High-precision concrete leveling unit and construction method
CN110454196A (en) * 2019-08-15 2019-11-15 湖南五新隧道智能装备股份有限公司 A kind of concreting chute
CN111139834A (en) * 2019-12-20 2020-05-12 中冶天工集团有限公司 One-time pouring forming device for two side walls of high-side wave ditch and construction method thereof
CN111139834B (en) * 2019-12-20 2024-05-14 中冶天工集团有限公司 Disposable pouring forming device for two side walls of high side wave ditch and construction method thereof
CN111119487A (en) * 2020-03-19 2020-05-08 中建一局集团建设发展有限公司 Double-layer chute concrete pouring system and construction method thereof
CN111119487B (en) * 2020-03-19 2023-10-24 中建一局集团建设发展有限公司 Double-layer chute concrete pouring system and construction method thereof
WO2022111131A1 (en) * 2020-11-27 2022-06-02 山东精砼工程机械股份有限公司 Slip-form concrete continuous pouring truck set and pouring method
FR3136794A1 (en) * 2022-06-21 2023-12-22 Eiffage Genie Civil Tunnel concreting walkway

Similar Documents

Publication Publication Date Title
KR101413885B1 (en) Paving apparatus of shotcrete for paved road and bridge deck
CN108035747B (en) A kind of tunnel steel form lining trolley
KR101771507B1 (en) Conveyor vehicle for placing concrete of railroad way
CN201751271U (en) Self-propelled mortar vehicle chassis and mortar vehicle
CN104153325A (en) Large-thickness concrete automatic pouring machine for channel slope mesh with steel bars
CN208106447U (en) A kind of combined machine trolley device of tunnel side ditch and the construction of Bridge guardrail coagulation
CN114182958A (en) Concrete leveling equipment
KR20060127329A (en) Apparatus for constructing upper structure of bridge, and method for constructing upper structure of bridge with using the same
CN102720102B (en) Construction trolley
CN217148321U (en) Main supporting leg structure of walking type self-balancing overpass bridge girder erection machine
KR101329043B1 (en) Steel carrier for supplying steel reinforcement for concrete road pavement
CN209408881U (en) A kind of automatic longitudinal-moving device of box girder inner formwork
KR101523530B1 (en) Mixer truck moving vehicle for placing concrete of railroad way
CN109083659B (en) A portal system and lining cutting platform truck for lining cutting platform truck
CN107513908B (en) Paving device for trackless intelligent paver
CN107268451B (en) Self-propelled anti-collision wall template device
CN206579646U (en) A kind of change rail wheel assembly for track construction car
CN216914306U (en) A concrete transmission device for precast box girder bottom plate is pour
KR100687136B1 (en) Main carrier for constructing upper structure of bridge
CN110924987A (en) Tunnel secondary lining construction trolley
JP2008308878A (en) Mortar excavating device for repairing slab track
CN206327365U (en) A kind of change rail gantry of track construction car
CN111593667B (en) Integral installation equipment and method for cast-in-situ box girder steel reinforcement framework
JP2573795Y2 (en) Concrete casting equipment
CN219886465U (en) Railway side slope maintenance device

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170411

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180419

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190826

Year of fee payment: 6