KR101213573B1 - Apparatus and method for placing concrete to construct concrete bed of railroad way - Google Patents

Apparatus and method for placing concrete to construct concrete bed of railroad way Download PDF

Info

Publication number
KR101213573B1
KR101213573B1 KR1020120083681A KR20120083681A KR101213573B1 KR 101213573 B1 KR101213573 B1 KR 101213573B1 KR 1020120083681 A KR1020120083681 A KR 1020120083681A KR 20120083681 A KR20120083681 A KR 20120083681A KR 101213573 B1 KR101213573 B1 KR 101213573B1
Authority
KR
South Korea
Prior art keywords
concrete
mixer
boom
pump
hopper
Prior art date
Application number
KR1020120083681A
Other languages
Korean (ko)
Inventor
한상국
Original Assignee
한상국
석정건설(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한상국, 석정건설(주) filed Critical 한상국
Priority to KR1020120083681A priority Critical patent/KR101213573B1/en
Application granted granted Critical
Publication of KR101213573B1 publication Critical patent/KR101213573B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B37/00Making, maintaining, renewing, or taking-up the ballastway or the track, not provided for in a single one of groups E01B27/00 - E01B35/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P3/00Vehicles adapted to transport, to carry or to comprise special loads or objects
    • B60P3/16Vehicles adapted to transport, to carry or to comprise special loads or objects for carrying mixed concrete, e.g. having rotatable drums

Abstract

PURPOSE: A concrete placing device and method for a concrete bed of a railroad are provided to remarkably reduce construction time by placing a large amount of concrete for a concrete bed on a railroad. CONSTITUTION: A concrete placing device for a concrete bed of a railroad comprises first and second mixer vehicles(10,20), a bogie(30), a crane unit(40), a placing pipe(50), a convey unit(60), a hydraulic pressure supply unit, and a power supply unit(70). The first and second mixer vehicles travel along a railroad(1) and have mixer drums(12,22), chutes(13,23), and driver seats(14,24). The bogie is installed between the first and second mixer vehicles and travels along the railroad. The crane unit is installed on the bogie and has a boom(41). The placing pipe is installed along the boom of the crane unit. The convey unit comprises a hopper(61) and a concrete pump unit. The hopper is located under the chutes of the first and second mixer vehicles. The concrete pump unit is installed on the bottom of the hopper and fixed to the bogie. The hydraulic pressure supply unit is installed on the bogie and supplies hydraulic pressure to the boom and the concrete pump unit. The power supply unit is installed on the bogie and supplies power to a hydraulic pump of the hydraulic pressure supply unit.

Description

철도의 콘크리트도상 시공용 타설장치 및 방법{APPARATUS AND METHOD FOR PLACING CONCRETE TO CONSTRUCT CONCRETE BED OF RAILROAD WAY}Placing device and method for concrete construction of railways {APPARATUS AND METHOD FOR PLACING CONCRETE TO CONSTRUCT CONCRETE BED OF RAILROAD WAY}

본 발명은 철도의 장대터널, 장대교량, 지하철 등 콘크리트로 시공되는 도상용 직접 타설장치 및 방법 관한 것으로, 특히 한번에 대량의 콘크리트를 적재하여 타설함으로써 공기를 크게 단축시킬 수 있고, 적소에 콘크리트를 타설함으로써 시공효율과 시공능률이 우수한 철도의 콘크리트도상 시공용 타설장치 및 방법에 관한 것이다.
The present invention relates to a direct pouring device and method for the construction of concrete installed in concrete, such as long tunnels, long bridges, subways, etc. In particular, by placing a large amount of concrete at a time, the air can be greatly shortened, and concrete is placed in place. The present invention relates to a construction apparatus and method for concrete phase construction of railroads having excellent construction efficiency and construction efficiency.

한국 등록실용신안공보 제20-0237378호에는 철도 도상을 시공하는 믹서 철도차량이 개시되었다. 상기 선행기술은 철도 차량의 본체에 유압력으로 작동되면서 콘크리트를 형성하는 믹서를 설치하고, 믹서의 입구와 적재대 사이에 모래, 자갈, 시멘트를 공급할 수 있는 원재료 공급수단을 설치함으로써 역 구내와 선로의 부대 공사시 적정량의 콘크리트를 간편하게 이송시켜 콘크리트를 신속하게 타설하고 있다.Korean Registered Utility Model Publication No. 20-0237378 discloses a mixer railway vehicle for construction of a railroad. The prior art is to install a mixer to form concrete while operating by the hydraulic force to the body of the railway vehicle, by installing the raw material supply means for supplying sand, gravel, cement between the inlet and the loading table of the mixer station and track In the event of construction of the company, the proper amount of concrete is easily transported, and the concrete is poured quickly.

그러나 이와 같은 선행기술은 모래, 자갈, 시멘트를 믹싱하여 콘크리트를 형성하는데 많은 시간이 소모되기 때문에 공기를 단축시키는데 한계가 있고, 특히 터널 안의 철도 도상을 시공하는데 시간적, 공간적 제약이 있다.However, this prior art has a limitation in shortening the air because it takes a lot of time to mix the sand, gravel, cement to form concrete, and in particular, there is a time and space constraints on the construction of the railway in the tunnel.

또한, 선행기술은 콘크리트 타설이 고정된 위치에서 이루어지기 때문에, 작업자가 일일히 타설되는 콘크리트를 삽으로 퍼서 원하는 위치로 옮겨야 했다. 이 때문에 작업시간이 길고, 작업능률이 떨어지며, 콘크리트의 진공다짐 시간이 많이 소모되어, 전체적으로 경제적이지 못한 문제가 있다.
In addition, since the prior art is made in a concrete position is fixed, the worker had to shovel the concrete to be placed every day to the desired position. Because of this, the working time is long, the working efficiency is low, and the vacuum compaction time of the concrete is consumed a lot, there is a problem that is not economically as a whole.

한국 등록실용신안공보 제20-0237378호 "믹서 철도차량"Korea Utility Model Publication No. 20-0237378 "Mixer railroad vehicle"

본 발명의 목적은 한번에 대량의 콘크리트를 적재하여 타설함으로써 공기를 크게 단축시킬 수 있고, 적소에 콘크리트를 타설함으로써 시공효율과 시공능률이 우수한 철도의 콘크리트도상 시공용 타설장치 및 방법을 제공하는 데 있다.
SUMMARY OF THE INVENTION An object of the present invention is to provide a placing device and method for laying concrete on a railway, which can greatly reduce air by placing and placing a large amount of concrete at once, and placing concrete in place to provide excellent construction efficiency and construction efficiency. .

본 발명이 이루고자 하는 기술적 과제들은 이상에서 언급한 기술적 과제들로 제한되지 않으며, 언급되지 않은 다른 기술적 과제들은 아래의 기재로부터 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 명확하게 이해될 수 있을 것이다.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory and are not intended to limit the invention to the particular embodiments that are described. It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory and are not restrictive of the invention, There will be.

상기 목적을 달성하기 위한 본 발명의 타설장치는 철도 레일 상으로 주행가능한 제1 철도바퀴를 장착하고, 믹서드럼과, 믹서드럼로부터 토출되는 콘크리트의 타설을 가이드하는 슈트 및 운전석을 구비하며, 상기 믹서드럼이 마주보고 상기 운전석은 반대방향을 향하도록 서로 간격을 두고 배치되는 제1 및 제2 믹서차량수단; 상기 철도 레일 상으로 주행가능한 제2 철도바퀴를 갖고 상기 제1 및 제2 믹서차량수단의 사이에 설치되어 상기 제1 및 제2 믹서차량수단과 연결되는 대차; 상기 대차에 설치되며, 상기 대차로부터 제자리에서 360도 회전하며 유압에 의해 각도가 조절되는 붐을 갖는 크레인수단; 상기 크레인수단의 봄을 따라 설치되는 타설관; 상기 제1 및 제2 믹서차량수단의 슈트들 아래에 위치하는 호퍼와, 상기 호퍼의 하부에 설치되어 상기 대차에 고정되며 상기 타설관과 연결되는 콘크리트펌프수단을 구비한 압송수단; 상기 대차에 설치되며, 상기 크레인수단의 붐 및 상기 콘크리트펌프수단을 작동시키기 위한 유압을 공급하는 유압펌프를 갖는 유압공급수단; 및 상기 대차에 설치되며, 상기 유압펌프를 작동시키기 위한 동력을 공급하는 동력수단을 포함한다.The pouring device of the present invention for achieving the above object is equipped with a first railway wheel that can run on a railway rail, and includes a mixer drum, a chute and a driver's seat for guiding the pouring of concrete discharged from the mixer drum, First and second mixer vehicle means, the drum facing each other, the driver's seat being spaced apart from each other so as to face in opposite directions; A trolley having a second railway wheel that is capable of traveling on the railway rail and installed between the first and second mixer vehicle means and connected to the first and second mixer vehicle means; A crane means installed on the trolley, the crane means having a boom which is rotated 360 degrees in place from the trolley and whose angle is adjusted by hydraulic pressure; A pouring pipe installed along the spring of the crane means; A pressure feeding means including a hopper positioned below the chutes of the first and second mixer vehicle means, and concrete pump means installed at a lower portion of the hopper and fixed to the bogie and connected to the pouring pipe; A hydraulic supply means installed on the trolley and having a hydraulic pump for supplying hydraulic pressure for operating the boom of the crane means and the concrete pump means; And a power unit installed in the trolley and supplying power for operating the hydraulic pump.

구체적으로, 상기 대차에는 내부가 빈 구조의 하우징이 더 설치되고, 상기 크레인수단의 붐은 상기 하우징 위에 설치되며, 상기 하우징에는 상기 붐을 360도 회전시키기 위한 회전수단이 더 설치될 수 있다.In detail, the trolley may further include a housing having an empty structure, a boom of the crane means may be installed on the housing, and the housing may further include a rotation means for rotating the boom 360 degrees.

상기 회전수단은 상기 붐의 하부로부터 상기 하우징을 관통하여 설치되는 회전축과, 상기 회전축 상에 고정 설치되는 피니언부재와, 상기 피니언부재와 치합하는 랙을 형성한 로드를 갖고 상기 하우징에 설치되며 상기 유압펌프로부터 유압을 공급받아 작동하는 실린더부재로 이루어질 수 있다.The rotating means is installed in the housing having a rotating shaft installed through the housing from the lower portion of the boom, a pinion member fixedly installed on the rotating shaft, and a rod forming a rack engaged with the pinion member. It may be made of a cylinder member that is operated by receiving hydraulic pressure from the pump.

상기 동력수단은 전기를 인가받아 구동하는 모터 또는 화석연료를 연소시켜 구동하는 엔진 중 어느 하나일 수 있다.
The power means may be any one of a motor driven by receiving electricity or an engine driven by burning fossil fuel.

본 발명의 타설방법은 크레인수단의 붐을 작동시켜 타설관을 제1 믹서차량수단의 믹서드럼에 위치시키는 제1 단계; 압송수단의 호퍼에 외부로부터의 콘크리트를 투입하고, 콘크리트펌프수단을 작동시켜 상기 호퍼의 콘크리트를 펌핑해 상기 타설관을 통해 상기 제1 믹서차량수단의 믹서드럼에 주입하는 제2 단계; 상기 제1 믹서차량수단의 믹서드럼에 콘크리트 주입이 완료되면 상기 콘크리트펌프수단의 작동을 정지시키고, 상기 크레인수단의 붐을 작동시켜 상기 타설관을 상기 제2 믹서차량수단의 믹서드럼에 위치시키는 제3 단계; 정지된 상기 콘크리트펌프수단을 작동시켜 상기 호퍼의 콘크리트를 펌핑해 상기 타설관을 통해 상기 제2 믹서차량수단의 믹서드럼에 주입하는 제4 단계; 상기 제1 및 제2 믹서차량수단 중 어느 하나의 제1 철도바퀴를 구동시켜 시공장소로 이동하는 제5 단계; 상기 크레인수단의 붐을 작동시켜 상기 타설관을 상기 시공장소에 위치시키는 제6 단계; 상기 제1 및 제2 믹서차량수단 중 어느 하나 또는 모두를 작동시켜 상기 믹서드럼의 콘크리트를 상기 호퍼에 투입하는 제7 단계; 상기 콘크리트펌프수단을 작동시켜 상기 호퍼의 콘크리트를 펌핑해 상기 타설관을 통해 상기 믹서드럼의 콘크리트를 상기 시공장소에 타설하는 제8 단계; 및 상기 제1 및 제2 믹서차량수단의 제1 철도바퀴를 교호로 작동시켜 주행하며 상기 믹서드럼의 콘크리트를 상기 시공장소에 타설하는 제9 단계를 포함한다.The pouring method of the present invention comprises a first step of operating a boom of a crane means to place a pouring pipe in a mixer drum of a first mixer vehicle means; A second step of injecting concrete from the outside into a hopper of a pressure feeding means, operating a concrete pump means to pump concrete of the hopper and injecting the concrete into the mixer drum of the first mixer vehicle means through the pouring pipe; When the concrete injection to the mixer drum of the first mixer vehicle means is completed, the operation of the concrete pump means is stopped, and the boom of the crane means to operate the pour pipe placed in the mixer drum of the second mixer vehicle means Three steps; A fourth step of operating the stationary concrete pump means to pump concrete of the hopper and to inject the concrete into the mixer drum of the second mixer vehicle means through the pour pipe; A fifth step of driving a first railway wheel of any one of the first and second mixer vehicle means to move to a city factory; A sixth step of operating the crane means for placing the pouring pipe at the city factory; A seventh step of operating one or both of the first and second mixer vehicle means to inject the concrete of the mixer drum into the hopper; An eighth step of operating the concrete pumping means to pump concrete of the hopper to pour concrete of the mixer drum through the pour pipe into the factory factory; And a ninth step of traveling by alternately operating the first railway wheels of the first and second mixer vehicle means and placing concrete of the mixer drum at the city factory.

구체적으로, 상기 제9 단계에서 상기 시공장소의 타설 위치에 따라 상기 크레인수단의 붐의 각도를 조절함으로써 상기 타설관의 위치를 변경하며 상기 믹서드럼의 콘크리트를 타설할 수 있다.
Specifically, in the ninth step by changing the position of the pour pipe by adjusting the angle of the boom of the crane means in accordance with the position of the casting place can be poured concrete of the mixer drum.

본 발명에 의하면, 2대의 믹서차량으로 인해 한번에 대량의 콘크리트를 적재하여 타설할 수 있기 때문에, 콘크리트를 공급받기 위해 장대터널, 장대교량, 지하철 등의 시공장소를 왕복 이동하는 믹서차량의 이동량이 줄어 공기가 크게 단축될 수 있다.According to the present invention, since two concrete mixer vehicles can be placed and placed in large quantities at a time, the amount of movement of the mixer vehicle reciprocating through the municipal plants such as a pole tunnel, a pole bridge, and a subway is reduced to receive concrete. The air can be greatly shortened.

또한, 타설 위치를 변경하며 적소에 콘크리트를 타설할 수 있기 때문에 시공효율과 시공능률이 크게 향상될 수 있다. 예를 들면, 타설 위치를 변경하며 적소에 콘크리트를 타설하면, 작업자가 일일히 삽으로 퍼서 옮겨야 하는 작업이 최소화 될 수 있고, 콘크리트의 진공다짐 시간도 크게 단축되어, 결과적으로 철도의 콘크리트도상 시공이 매우 경제적으로 수행될 수 있다.
In addition, since the concrete can be poured in place by changing the placing position, the construction efficiency and construction efficiency can be greatly improved. For example, if you place concrete in place by changing the placement location, you can minimize the work of shoveling and moving workers, and the vacuum compaction time of concrete is greatly shortened. It can be done very economically.

도 1은 본 발명의 콘크리트 타설장치를 나타낸 도면이다.
도 2는 도 1에서 표시 A부분을 확대하여 나타낸 도면이다.
도 3은 본 발명에서 콘크리트펌프수단을 나타낸 도면이다.
도 4는 본 발명에서 믹서드럼에 콘크리트를 주입하는 모습을 나타낸 도면이다.
도 5는 본 발명의 콘크리트 타설장치가 콘크리트를 타설하는 모습을 나타낸 도면이다.
1 is a view showing a concrete pouring device of the present invention.
FIG. 2 is an enlarged view of a portion A of FIG. 1.
3 is a view showing a concrete pump means in the present invention.
4 is a view showing a state of injecting concrete into the mixer drum in the present invention.
5 is a view showing a state in which the concrete pouring device of the present invention to pour concrete.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세하게 설명한다. 도면들 중 동일한 구성요소들은 가능한 어느 곳에서든지 동일한 부호로 표시한다. 또한 본 발명의 요지를 불필요하게 흐릴 수 있는 공지 기능 및 구성에 대한 상세한 설명은 생략한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. Like elements in the figures are denoted by the same reference numerals wherever possible. In the following description, well-known functions or constructions are not described in detail since they would obscure the invention in unnecessary detail.

도 1 내지 도 3에 도시된 바와 같이, 본 발명의 콘크리트 타설장치는 제1 및 제2 믹서차량수단(10)(20), 대차(30), 크레인수단(40), 타설관(50), 압송수단(60), 유암펌프를 갖는 유압공급수단(도면부호 미표시) 및 동력수단(70)을 포함한다.As shown in Figures 1 to 3, the concrete pouring device of the present invention, the first and second mixer vehicle means 10, 20, bogie 30, crane means 40, pour pipe 50, A pressure feeding means 60, a hydraulic pressure supply means (not shown) having a rock pump and a power means 70.

제1 및 제2 믹서차량수단(10)(20)은 철도 레일(1) 상을 주행할 수 타이어바퀴 대신 제1 철도바퀴(11)(21)를 장착한 잘 알려진 기술의 믹서차량 즉, 일명 레미콘차량일 수 있다.The first and second mixer vehicle means 10 and 20 are well-known mixer vehicles that are equipped with first railway wheels 11 and 21 instead of tire wheels that can travel on the railway rail 1. It may be a ready-mixed vehicle.

제1 및 제2 믹서차량수단(10)(20)은 주입된 콘크리트를 뒤섞으면서 작업현장으로 배달하는 믹서드럼(12)(22)을 포함하며, 믹서드럼(12)(22)로부터 토출되는 콘크리트의 타설을 가이드하는 슈트(13)(23)를 갖는다.The first and second mixer vehicle means (10) (20) comprises mixer drums (12) and (22) for mixing the injected concrete and delivering it to the workplace, and the concrete discharged from the mixer drums (12) (22). It has a chute 13 (23) for guiding the pouring.

제1 및 제2 믹서차량수단(10)(20)은 운전석(14)(24)에서 자체 엔진을 통해 전후진 주행이 이루어지고 제동이 이루어지며, 믹서드럼(12)(22)의 회전배출을 작동시켜 슈트(13)(23)를 통해 콘크리트를 외부로 토출한다.The first and second mixer vehicle means 10 and 20 are driven forward and backward through the engine in the driver's seat 14 and 24, and braking is performed, and rotational discharge of the mixer drums 12 and 22 is performed. Operate to discharge the concrete to the outside through the chute (13) (23).

이와 같은 제1 및 제2 믹서차량수단(10)(20)은 믹서드럼(12)(22)이 마주보고 운전석(14)(24)은 반대방향을 향하도록 서로 간격을 두고 철도 레일(1) 상에 배치된다.The first and second mixer vehicle means 10 and 20 are spaced apart from each other such that the mixer drums 12 and 22 face each other and the driver's seat 14 and 24 face in opposite directions. Is disposed on.

대차(30)는 제1 및 제2 믹서차량수단(10)(20)의 사이에 설치된다. 대차(30)는 철도 레일(1) 상으로 주행가능한 제2 철도바퀴(31)를 갖고 제1 및 제2 믹서차량수단(10)(20)의 사이에 설치되며, 곡선 주행이 가능하도록 제1 및 제2 믹서차량수단(10)(20)과 회전되게 연결될 수 있다. 이러한 대차(30)는 자체 엔진이 없기 때문에 제1 및 제2 믹서차량수단(10)(20)의 주행에 따라 끌려다니며 철도 레일(1) 상을 주행한다.The trolley 30 is provided between the first and second mixer vehicle means 10 and 20. The trolley 30 has a second railway wheel 31 which is capable of traveling on the railroad rail 1 and is installed between the first and second mixer vehicle means 10 and 20, and the first to enable the curved running. And it may be connected to the second mixer vehicle means 10 and 20 to be rotated. Since the trolley 30 does not have its own engine, the trolley 30 is driven along the rail rail 1 while being driven by the first and second mixer vehicle means 10 and 20.

크레인수단(40)은 대차(30) 위에 고정 설치되며 붐(41)을 갖는다. 크레인수단(40)은 붐(41)이 대차(30)로부터 제자리에서 360도 회전하도록 설치되며, 붐(41)은 유압에 의해 각도가 조절된다.The crane means 40 is fixedly installed on the trolley 30 and has a boom 41. The crane means 40 is installed so that the boom 41 rotates 360 degrees in place from the trolley 30, and the boom 41 is adjusted in angle by hydraulic pressure.

즉, 붐(41)은 회전되게 연결된 2개 이상의 암부(41a)에 유압실린더(41b)를 각각 장착해서 유압실린더(41b)의 신축에 의해 암부(41a)를 펼치거나 절첩함으로써 벌어짐 각도를 조절할 수 있다. 유압실린더(41b)는 유압공급수단의 유압펌프로부터 유압을 공급받아 작동할 수 있다.That is, the boom 41 may be equipped with two hydraulic cylinders (41b) to rotate the two or more arm (41a) connected to each other by expanding or folding the arm portion (41a) by expansion and contraction of the hydraulic cylinder (41b) can be adjusted have. The hydraulic cylinder 41b may operate by receiving hydraulic pressure from the hydraulic pump of the hydraulic supply means.

대차(30)에는 내부가 빈 구조의 하우징(33)이 설치될 수 있으며, 붐(41)은 하우징(33) 위에 설치될 수 있고, 하우징(33)에는 붐(41)을 제자리에서 360도 회전시키기 위한 회전수단(45)이 설치될 수 있다.The trolley 30 may be provided with a housing 33 having a hollow structure, the boom 41 may be installed on the housing 33, and the housing 33 may be rotated 360 degrees in place. Rotating means 45 may be installed.

회전수단(45)은 붐(41)의 하부로부터 하우징(33)을 관통하여 설치되는 회전축과, 회전축 상에 고정 설치되는 피니언부재와, 피니언부재와 치합하는 랙을 형성한 로드를 갖고 하우징에 설치되며 유압공급수단의 유압펌프로부터 유압을 공급받아 작동하는 실린더부재(45a)로 이루어질 수 있다. 실린더부재(45a)는 하우징(33)의 외벽에 설치될 수 있고, 로드가 하우징(33)을 관통하여 내부에 위치함으로써 랙이 피니언부재와 치합할 수 있다.The rotating means 45 is installed in the housing with a rod having a rotating shaft installed through the housing 33 from the lower portion of the boom 41, a pinion member fixedly installed on the rotating shaft, and a rack engaged with the pinion member. And it may be made of a cylinder member (45a) that is operated by receiving the hydraulic pressure from the hydraulic pump of the hydraulic supply means. The cylinder member 45a may be installed on the outer wall of the housing 33, and the rack may engage with the pinion member because the rod is positioned inside the housing 33.

예를 들면, 실린더부재(45a)의 로드의 길이가 신장되면 회전축이 시계방향으로 회전함으로서 붐(41)이 시계방향으로 회전할 수 있고, 반대로 실린더부재(45a)의 로드의 길이가 축소되면 붐(41)이 반시계방향으로 회전할 수 있다.For example, when the length of the rod of the cylinder member 45a is extended, the rotary shaft rotates clockwise, so that the boom 41 can be rotated clockwise. On the contrary, when the length of the rod of the cylinder member 45a is reduced, the boom is reduced. 41 can rotate counterclockwise.

크레인수단(40)의 작동은 운전석(47)에서 이루어진다. 운전선(47)은 붐(41)의 하부에 일체로 설치됨으로써 붐(41)을 따라 회전한다. 운전석(47)은 붐(41)의 유압실린더(41b) 및 회전수단(45)의 실린더부재(45a)의 작동을 제어하여 붐(45)의 360도 제자리 회전을 제어하고, 붐(45)의 벌어짐 각도를 제어한다.The operation of the crane means 40 takes place in the driver's seat 47. The driving line 47 rotates along the boom 41 by being integrally installed in the lower part of the boom 41. The driver's seat 47 controls the operation of the hydraulic cylinder 41b of the boom 41 and the cylinder member 45a of the rotating means 45 to control the 360-degree in-situ rotation of the boom 45, Control the angle of flare.

타설관(50)은 크레인수단(40)의 봄(41)을 따라 설치된다. 타설관(50)은 붐(41)의 회전점에 해당하는 부위(51)를 신축가능한 주름관 형태로 형성하여 붐(41)이 각도를 조절할 수 있도록 한다. 타설관(50)은 끝단이 붐(41)의 끝단으로부터 길게 뻗어나오게 설치됨이 바람직하다.The pouring pipe 50 is installed along the spring 41 of the crane means 40. The pour pipe 50 forms a portion 51 corresponding to the rotation point of the boom 41 in a flexible corrugated pipe shape to allow the boom 41 to adjust the angle. The pouring pipe 50 is preferably installed so that the end extends from the end of the boom 41 long.

압송수단(60)은 호퍼(61)와 콘크리트펌프수단(65)으로 이루어질 수 있다. 호퍼(61)는 제1 및 제2 믹서차량수단(10)(20)의 슈트들(13)(23) 아래에 위치하며, 콘크리트펌프수단(65)은 호퍼(61)의 하부에 설치되어 대차(30)에 고정된다. 슈트들(13)(23)은 제1 및 제2 믹서차량수단(10)(20)으로부터 다소 길게 설치되어 호퍼(61) 위에 적정하게 위치한다.The pressure feeding means 60 may be composed of a hopper 61 and a concrete pump means (65). The hopper 61 is located under the chutes 13 and 23 of the first and second mixer vehicle means 10 and 20, and the concrete pump means 65 is installed under the hopper 61 to the bogie. It is fixed to 30. The chutes 13 and 23 are installed somewhat longer from the first and second mixer vehicle means 10 and 20 and are properly positioned on the hopper 61.

도 3에 도시된 바와 같이, 콘크리트펌프수단(65)은 유압실린더(65a)의 피스톤의 펌핑에 의해 호퍼(61)에 투입된 콘크리트를 토출구(65b)를 통해 외부로 압송한다. 토출구(65b)에는 타설관(50)이 연결되며 콘크리트가 타설관(50)을 따라 이동할 수 있도록 강하게 펌핑한다. 유압실린더(65a)는 2개 이상 설치되어 콘크리트를 연속적으로 펌핑함이 바람직하다.As shown in FIG. 3, the concrete pump means 65 pumps concrete introduced into the hopper 61 by pumping the piston of the hydraulic cylinder 65a to the outside through the discharge port 65b. The pouring hole 50b is connected to the pouring pipe 50 and strongly pumps the concrete to move along the pouring pipe 50. Two or more hydraulic cylinders 65a are preferably installed to pump concrete continuously.

콘크리트펌프수단(65)과 호퍼(61)와의 사이에는 콘크리트 량을 조절할 수 있는 콘크리트 조절밸브가 설치됨이 바람직하고, 토출구(65b)를 형성하는 관체에는 콘크리트의 흐름을 개폐하는 스톱밸브가 설치됨이 바람직하다. 유압실린더(65a)는 유압공급수단의 유압펌프로부터 유압을 공급받아 작동할 수 있다.A concrete control valve for controlling the amount of concrete is preferably installed between the concrete pump means 65 and the hopper 61, and a stop valve for opening and closing the flow of concrete is preferably installed in the pipe forming the discharge port 65b. Do. The hydraulic cylinder 65a may be operated by receiving hydraulic pressure from the hydraulic pump of the hydraulic supply means.

도시하지는 않았지만, 유압펌프를 갖는 유압공급수단은 대차(30)에 설치되며, 크레인수단(40)의 붐(41) 및 콘크리트펌프수단(65)을 작동시키기 위한 유압을 공급한다.Although not shown, the hydraulic supply means having a hydraulic pump is installed in the trolley 30, and supplies hydraulic pressure for operating the boom 41 and the concrete pump means 65 of the crane means 40.

즉, 유압공급수단은 붐(41)의 유압실린더(41b) 및 회전수단(45)의 실린더부재(45a)와, 콘크리트펌프수단(65)의 유압실린더(65a)와 연결되어 유압펌프가 작동함으로써 생성되는 유압을 공급할 수 있다. 유압펌프의 작동은 크레인수단(40)의 운전석(47)에서 제어됨이 바람직하며, 붐(41)의 유압실린더(41b), 회전수단(45)의 실린더부재(45a) 및 콘크리트펌프수단(65)의 유압실린더(65a)와 각각 대응하게 다수개로 설치되어 필요에 따라 각각에 유압을 공급할 수 있다.That is, the hydraulic pressure supply means is connected to the hydraulic cylinder 41b of the boom 41 and the cylinder member 45a of the rotation means 45, and the hydraulic cylinder 65a of the concrete pump means 65 to operate the hydraulic pump. The hydraulic pressure generated can be supplied. The operation of the hydraulic pump is preferably controlled from the driver's seat 47 of the crane means 40, the hydraulic cylinder 41b of the boom 41, the cylinder member 45a of the rotating means 45 and the concrete pump means 65 A plurality of hydraulic cylinders (65a) of the corresponding to each is provided in plurality can be supplied to each of the hydraulic pressure as necessary.

동력수단(70)은 대차(30) 위에 설치되며, 유압공급수단의 유압펌프를 작동시키기 위한 동력을 공급하다. 동력수단(7)은 전기를 인가받아 구동하는 모터 또는 화석연료를 연소시켜 구동하는 엔진 중 어느 하나일 수 있다. 동력수단(70)은 구동함으로써 발생되는 회전동력을 유압펌프에 전달함으로써 유압펌프를 작동시킨다.
The power means 70 is installed on the trolley 30 and supplies power for operating the hydraulic pump of the hydraulic supply means. The power means 7 may be any one of a motor driven by receiving electricity and an engine driven by burning fossil fuel. The power means 70 operates the hydraulic pump by transmitting the rotational power generated by the driving to the hydraulic pump.

이와 같은 구조를 갖는 본 발명의 콘크리트 타설장치는 다음과 같은 과정을 통해 콘크리트를 타설한다.Concrete placing device of the present invention having such a structure is to pour concrete through the following process.

본 발명의 콘크리트 타설방법은 크레인수단(40)의 붐(41)을 작동시켜 타설관(50)을 제1 믹서차량수단(10)의 믹서드럼(12)에 위치시키는 단계로부터 시작된다. 이와 달리 본 발명의 콘크리트 타설방법은 타설관(50)을 제2 믹서차량수단(20)의 믹서드럼(22)에 위치시키는 단계로부터 시작될 수 있으며, 설명의 편의상 타설관(50)을 제1 믹서차량수단(10)의 믹서드럼(12)에 위치시키는 단계로부터 시작한다. 타설관(50)이 어느 믹서드럼(12)(22)에 위치하든 본 발명의 콘크리트 타설방법은 변경되지 않음을 명백히 밝혀둔다.The concrete pouring method of the present invention starts by operating the boom 41 of the crane means 40 to position the pouring pipe 50 in the mixer drum 12 of the first mixer vehicle means 10. Alternatively, the concrete pouring method of the present invention may be started from the step of placing the pouring pipe 50 in the mixer drum 22 of the second mixer vehicle means 20, for convenience of description the pouring pipe 50 to the first mixer It begins with positioning in the mixer drum 12 of the vehicle means 10. Regardless of which mixer drum 12, 22 the pouring tube 50 is located, it is clear that the concrete placing method of the present invention is not changed.

도 4에 도시된 바와 같이, 유압공급수단의 유압펌프를 작동시켜 붐(41)의 유압실린더(41b) 및 회전수단(45)의 실린더부재(45a)를 작동시킴으로써 타설관(50)을 제1 믹서차량수단(10)의 믹서드럼(12)에 위치시킨다. 타설관(50)이 믹서드럼(12)의 콘크리트 주입구(미도시)에 위치하도록 봄(41)을 회전시키고 각도를 조절한다.As shown in Figure 4, by operating the hydraulic pump of the hydraulic supply means to operate the hydraulic cylinder 41b of the boom 41 and the cylinder member 45a of the rotating means 45 to the first pour pipe 50 It is located in the mixer drum 12 of the mixer vehicle means 10. The spring 41 is rotated and the angle is adjusted so that the pouring pipe 50 is located at the concrete inlet (not shown) of the mixer drum 12.

이후, 압송수단(60)의 호퍼(61)에 외부로부터의 콘크리트를 투입한다. 믹서차량 즉, 레미콘차량을 통해서 배달된 콘크리트를 호퍼(61)에 투입한다. 이어서 콘크리트펌프수단(65)의 유압실린더(65a)를 작동시켜 호퍼(61)의 콘크리트를 펌핑해 타설관(50)을 통해 제1 믹서차량수단(10)의 믹서드럼(12)에 주입한다.Thereafter, concrete from the outside is introduced into the hopper 61 of the pressure feeding means 60. The concrete delivered through the mixer vehicle, that is, ready-mixed vehicle is injected into the hopper 61. Subsequently, the hydraulic cylinder 65a of the concrete pump means 65 is operated to pump concrete of the hopper 61 and to inject the mixer drum 12 of the first mixer vehicle means 10 through the pour pipe 50.

이후, 제1 믹서차량수단(10)의 믹서드럼(12)에 콘크리트 주입이 완료되면, 콘크리트펌프수단(65)의 작동을 정지시킨다. 콘크리트펌프수단(65)의 작동 정지는 해당 유압펌프의 작동을 정지시킴으로써 이루어질 수 있다. 이어서 크레인수단(40)의 붐(41)을 작동시켜 타설관(50)을 제2 믹서차량수단(20)의 믹서드럼(22)에 위치시킨다. 회전수단(45)의 실린더부재(45a)의 작동을 제어하여 타설관(50)을 제2 믹서차량수단(20)의 믹서드럼(22)으로 이동시키고, 붐(41)의 유압실린더(41b)의 작동을 제어하여 타설관(50)을 믹서드럼(22)의 콘크리트 주입구(미도시)에 위치시킨다.Thereafter, when concrete injection is completed in the mixer drum 12 of the first mixer vehicle means 10, the operation of the concrete pump means 65 is stopped. Operation stop of the concrete pump means 65 can be made by stopping the operation of the hydraulic pump. Subsequently, the boom 41 of the crane means 40 is operated to place the pouring pipe 50 in the mixer drum 22 of the second mixer vehicle means 20. By controlling the operation of the cylinder member 45a of the rotating means 45, the pouring pipe 50 is moved to the mixer drum 22 of the second mixer vehicle means 20, and the hydraulic cylinder 41b of the boom 41 is moved. Control the operation of the placing pipe 50 is placed in the concrete inlet (not shown) of the mixer drum 22.

이후, 정지된 콘크리트펌프수단(65)의 유압실린더(65a)를 작동시켜, 외부의 레미콘차량에 의해 배달되어 투입된 호퍼(61)의 콘크리트를 펌핑해 타설관(50)을 통해 제2 믹서차량수단(20)의 믹서드럼(22)에 주입한다.Then, by operating the hydraulic cylinder (65a) of the stationary concrete pump means 65, pumped the concrete of the hopper 61 delivered and introduced by the external ready-mixed concrete vehicle to the second mixer vehicle means through the pouring pipe (50) Injected into the mixer drum (22) of (20).

이후, 제2 믹서차량수단(20)의 믹서드럼(22)에 콘크리트 주입이 완료되면, 콘크리트펌프수단(65)의 작동을 정지시킨다. 이어서, 제1 및 제2 믹서차량수단(10)(20) 중 어느 하나의 제1 철도바퀴(11)(21)를 구동시켜 철도의 장대터널, 장대교량, 지하철 등 콘크리트로 시공되는 도상의 시공장소(5)로 이동한다. 제1 믹서차량수단(10)의 전진 주행에 의해 시공장소(5)로 이동할 수 있고, 제2 믹서차량수단(20)의 후진 주행에 의해 시공장소(5)로 이동할 수 있다.Thereafter, when concrete injection is completed in the mixer drum 22 of the second mixer vehicle means 20, the operation of the concrete pump means 65 is stopped. Subsequently, the first railroad wheels 11 and 21 of any one of the first and second mixer vehicle means 10 and 20 are driven to perform construction on a concrete construction such as a long tunnel of a railway, a long bridge, and a subway. Move to place (5). The forward movement of the first mixer vehicle means 10 can be moved to the city factory 5, and the reverse movement of the second mixer vehicle means 20 can be moved to the factory factory 5.

이후 도 5에 도시된 바와 같이, 크레인수단(40)의 붐(41)을 작동시켜 타설관(50)을 시공장소(5)에 위치시킨다. 회전수단(45)의 실린더부재(45a)의 작동을 제어하여 타설관(50)을 시공장소(5)로 이동시키고, 붐(41)의 유압실린더(41b)의 작동을 제어하여 타설관(50)을 시공장소(5)에서 콘크리트를 타설할 적소에 위치시킨다.Then, as shown in Figure 5, by operating the boom 41 of the crane means 40 to place the pouring pipe 50 in the city factory (5). By controlling the operation of the cylinder member 45a of the rotating means 45, the pouring pipe 50 is moved to the city factory 5, and by controlling the operation of the hydraulic cylinder 41b of the boom 41, the pouring pipe 50 ) Is placed in the place where concrete is to be placed in the city plant (5).

이후, 제1 및 제2 믹서차량수단(10)(20) 중 어느 하나 또는 모두를 작동시켜 믹서드럼(12)(22)의 콘크리트를 슈트(13)(23)를 통해 호퍼(61)에 투입한다. 운전석(14)(24)에서 믹서드럼(12)(22)의 회전배출을 작동시켜 슈트(13)(23)를 통해 콘크리트를 호퍼(61)에 투입한다.Then, one or both of the first and second mixer vehicle means 10 and 20 are operated to inject the concrete of the mixer drums 12 and 22 into the hopper 61 through the chutes 13 and 23. do. Rotational discharge of the mixer drums 12 and 22 is operated in the driver's seat 14 and 24 to inject concrete into the hopper 61 through the chutes 13 and 23.

이후, 콘크리트펌프수단(65)의 유압실린더(65a)를 작동시켜 호퍼(61)의 콘크리트를 펌핑해 타설관(50)을 통해 믹서드럼(10)(20)의 콘크리트를 시공장소(5)에 타설하며, 제1 및 제2 믹서차량수단(10)(20)의 제1 철도바퀴(11)(21)를 교호로 작동시켜 전후진 주행하며 믹서드럼(12)(22)의 콘크리트를 시공장소(5)에 타설한다. 시공장소(5)의 타설위치가 변경될 때마다 붐(41)의 벌어짐 각도와 제자리 회전각도를 조절하여 정확한 위치에 콘크리트를 타설할 수 있도록 타설관(50)의 위치를 수시로 변경한다.Thereafter, the hydraulic cylinder 65a of the concrete pump means 65 is operated to pump the concrete of the hopper 61, and the concrete of the mixer drums 10 and 20 through the pouring pipe 50 to the municipal factory 5. Placing, driving the first rail wheels 11, 21 of the first and second mixer vehicle means 10, 20 alternately back and forth to travel forward and forward the concrete of the mixer drum (12) (22) Pour in (5). Whenever the casting position of the city plant 5 is changed, the position of the placing pipe 50 is changed from time to time so that concrete can be placed at the correct position by adjusting the spreading angle and the rotation angle of the boom 41.

이후, 믹서드럼(12)(22)에 주입된 콘크리트가 모두 소진되면, 상기의 과정을 반복 수행하며 시공장소(5)의 적소에 콘크리트를 타설한다.
Then, when all of the concrete injected into the mixer drum (12) (22) is exhausted, the above process is repeated and the concrete is poured in place in the city factory (5).

상술한 바와 같이 본 발명에 의하면, 2대의 믹서차량으로 인해 한번에 대량의 콘크리트를 적재하여 타설할 수 있기 때문에, 콘크리트를 공급받기 위해 장대터널, 장대교량, 지하철 등의 시공장소를 왕복 이동하는 믹서차량의 이동량이 줄어 공기가 크게 단축될 수 있다.As described above, according to the present invention, since two concrete mixer vehicles can be loaded by placing a large amount of concrete at one time, the mixer vehicle reciprocating through city plants such as a pole tunnel, a pole bridge, and a subway in order to receive concrete The amount of movement of the air is reduced, and the air can be shortened significantly.

또한, 타설 위치를 변경하며 적소에 콘크리트를 타설할 수 있기 때문에 시공효율과 시공능률이 크게 향상될 수 있다. 예를 들면, 타설 위치를 변경하며 적소에 콘크리트를 타설하면, 작업자가 일일히 삽으로 퍼서 옮겨야 하는 작업이 최소화 될 수 있고, 콘크리트의 진공다짐 시간도 크게 단축되어, 결과적으로 철도의 콘크리트도상 시공이 매우 경제적으로 수행될 수 있다.
In addition, since the concrete can be poured in place by changing the placing position, the construction efficiency and construction efficiency can be greatly improved. For example, if you place concrete in place by changing the placement location, you can minimize the work of shoveling and moving workers, and the vacuum compaction time of concrete is greatly shortened. It can be done very economically.

상기의 본 발명은 바람직한 실시예를 중심으로 살펴보았으며, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자는 본 발명의 본질적 기술 범위 내에서 상기 본 발명의 상세한 설명과 다른 형태의 실시예들을 구현할 수 있을 것이다. 여기서 본 발명의 본질적 기술범위는 특허청구범위에 나타나 있으며, 그와 동등한 범위 내에 있는 모든 차이점은 본 발명에 포함된 것으로 해석되어야 할 것이다.
The present invention has been described with reference to the preferred embodiments, and those skilled in the art to which the present invention pertains to the detailed description of the present invention and other forms of embodiments within the essential technical scope of the present invention. Could be. Here, the essential technical scope of the present invention is shown in the claims, and all differences within the equivalent range will be construed as being included in the present invention.

1: 철도 레일 5: 시공장소
10: 제1 믹서차량수단 11,21: 제1 철도바퀴
12,22: 믹서드럼 13,23:슈트
14,24: 운전석 20: 제2 믹서차량수단
30: 대차 31: 제2 철도바퀴
33: 하우징 40: 크레인수단
41: 붐 41a: 암부
41b: 유압실린더 45: 회전수단
45a: 실린더부재 47: 운전석
50: 타설관 51: 주름관 형태의 부위
60: 압송수단 61: 호퍼
65: 콘크리트펌프수단 65a: 유압실린더
65b: 토출구 70: 동력수단
1: railway rail 5: city plant
10: first mixer vehicle means 11, 21: first railway wheel
12,22: Mixer drum 13,23: Suit
14, 24: driver's seat 20: second mixer vehicle means
30: cart 31: 2nd railway wheel
33: housing 40: crane means
41: boom 41a: dark
41b: hydraulic cylinder 45: rotating means
45a: cylinder member 47: driver's seat
50: pouring place 51: area in the form of a corrugated pipe
60: conveying means 61: hopper
65: concrete pump means 65a: hydraulic cylinder
65b: discharge port 70: power means

Claims (6)

철도 레일 상으로 주행가능한 제1 철도바퀴를 장착하고, 믹서드럼과, 믹서드럼로부터 토출되는 콘크리트의 타설을 가이드하는 슈트 및 운전석을 구비하며, 상기 믹서드럼이 마주보고 상기 운전석은 반대방향을 향하도록 서로 간격을 두고 배치되는 제1 및 제2 믹서차량수단;
상기 철도 레일 상으로 주행가능한 제2 철도바퀴를 갖고 상기 제1 및 제2 믹서차량수단의 사이에 설치되어 상기 제1 및 제2 믹서차량수단과 연결되는 대차;
상기 대차에 설치되며, 상기 대차로부터 제자리에서 360도 회전하며 유압에 의해 각도가 조절되는 붐을 갖는 크레인수단;
상기 크레인수단의 봄을 따라 설치되는 타설관;
상기 제1 및 제2 믹서차량수단의 슈트들 아래에 위치하는 호퍼와, 상기 호퍼의 하부에 설치되어 상기 대차에 고정되며 상기 타설관과 연결되는 콘크리트펌프수단을 구비한 압송수단;
상기 대차에 설치되며, 상기 크레인수단의 붐 및 상기 콘크리트펌프수단을 작동시키기 위한 유압을 공급하는 유압펌프를 갖는 유압공급수단; 및
상기 대차에 설치되며, 상기 유압펌프를 작동시키기 위한 동력을 공급하는 동력수단을 포함하는 철도의 콘크리트도상 시공용 타설장치.
A first railway wheel capable of traveling on a railway rail, the mixer drum having a chute and a driver's seat for guiding the pouring of concrete discharged from the mixer drum, the mixer drum facing and the driver's seat facing in the opposite direction; First and second mixer vehicle means disposed at intervals from each other;
A trolley having a second railway wheel that is capable of traveling on the railway rail and installed between the first and second mixer vehicle means and connected to the first and second mixer vehicle means;
A crane means installed on the trolley, the crane means having a boom which is rotated 360 degrees in place from the trolley and whose angle is adjusted by hydraulic pressure;
A pouring pipe installed along the spring of the crane means;
A pressure feeding means including a hopper positioned below the chutes of the first and second mixer vehicle means, and concrete pump means installed at a lower portion of the hopper and fixed to the bogie and connected to the pouring pipe;
A hydraulic supply means installed on the trolley and having a hydraulic pump for supplying hydraulic pressure for operating the boom of the crane means and the concrete pump means; And
Is installed on the bogie, concrete placing construction device for railway including power means for supplying power for operating the hydraulic pump.
제1 항에 있어서,
상기 대차에는 내부가 빈 구조의 하우징이 더 설치되고, 상기 크레인수단의 붐은 상기 하우징 위에 설치되며, 상기 하우징에는 상기 붐을 360도 회전시키기 위한 회전수단이 더 설치되는 철도의 콘크리트도상 시공용 타설장치.
The method according to claim 1,
The trolley is further provided with a housing having a hollow structure, the boom of the crane means is installed on the housing, and the housing is installed on a concrete road construction for installation of a rotating means for rotating the boom 360 degrees. Device.
제2 항에 있어서,
상기 회전수단은 상기 붐의 하부로부터 상기 하우징을 관통하여 설치되는 회전축과, 상기 회전축 상에 고정 설치되는 피니언부재와, 상기 피니언부재와 치합하는 랙을 형성한 로드를 갖고 상기 하우징에 설치되며 상기 유압펌프로부터 유압을 공급받아 작동하는 실린더부재로 이루어진 철도의 콘크리트도상 시공용 타설장치.
The method of claim 2,
The rotating means is installed in the housing having a rotating shaft installed through the housing from the lower portion of the boom, a pinion member fixedly installed on the rotating shaft, and a rod forming a rack engaged with the pinion member. Plastering device for concrete construction of railroad consisting of cylinder member operated by receiving hydraulic pressure from pump.
제1 항에 있어서,
상기 동력수단은 전기를 인가받아 구동하는 모터 또는 화석연료를 연소시켜 구동하는 엔진 중 어느 하나인 철도의 콘크리트도상 시공용 타설장치.
The method according to claim 1,
The power means is a pouring device for the concrete phase construction of the railroad is any one of a motor driven by the application of electricity or an engine for driving by burning fossil fuel.
크레인수단의 붐을 작동시켜 타설관을 제1 믹서차량수단의 믹서드럼에 위치시키는 제1 단계;
압송수단의 호퍼에 외부로부터의 콘크리트를 투입하고, 콘크리트펌프수단을 작동시켜 상기 호퍼의 콘크리트를 펌핑해 상기 타설관을 통해 상기 제1 믹서차량수단의 믹서드럼에 주입하는 제2 단계;
상기 제1 믹서차량수단의 믹서드럼에 콘크리트 주입이 완료되면 상기 콘크리트펌프수단의 작동을 정지시키고, 상기 크레인수단의 붐을 작동시켜 상기 타설관을 상기 제2 믹서차량수단의 믹서드럼에 위치시키는 제3 단계;
정지된 상기 콘크리트펌프수단을 작동시켜 상기 호퍼의 콘크리트를 펌핑해 상기 타설관을 통해 상기 제2 믹서차량수단의 믹서드럼에 주입하는 제4 단계;
상기 제1 및 제2 믹서차량수단 중 어느 하나의 제1 철도바퀴를 구동시켜 시공장소로 이동하는 제5 단계;
상기 크레인수단의 붐을 작동시켜 상기 타설관을 상기 시공장소에 위치시키는 제6 단계;
상기 제1 및 제2 믹서차량수단 중 어느 하나 또는 모두를 작동시켜 상기 믹서드럼의 콘크리트를 상기 호퍼에 투입하는 제7 단계;
상기 콘크리트펌프수단을 작동시켜 상기 호퍼의 콘크리트를 펌핑해 상기 타설관을 통해 상기 믹서드럼의 콘크리트를 상기 시공장소에 타설하는 제8 단계; 및
상기 제1 및 제2 믹서차량수단의 제1 철도바퀴를 교호로 작동시켜 주행하며 상기 믹서드럼의 콘크리트를 상기 시공장소에 타설하는 제9 단계를 포함하는 철도의 콘크리트도상 시공용 타설방법.
A first step of operating the boom of the crane means to position the pouring pipe on the mixer drum of the first mixer vehicle means;
A second step of injecting concrete from the outside into a hopper of a pressure feeding means, operating a concrete pump means to pump concrete of the hopper and injecting the concrete into the mixer drum of the first mixer vehicle means through the pouring pipe;
When the concrete injection to the mixer drum of the first mixer vehicle means is completed, the operation of the concrete pump means is stopped, and the boom of the crane means to operate the pour pipe placed in the mixer drum of the second mixer vehicle means Three steps;
A fourth step of operating the stationary concrete pump means to pump concrete of the hopper and to inject the concrete into the mixer drum of the second mixer vehicle means through the pour pipe;
A fifth step of driving a first railway wheel of any one of the first and second mixer vehicle means to move to a city factory;
A sixth step of operating the crane means for placing the pouring pipe at the city factory;
A seventh step of operating one or both of the first and second mixer vehicle means to inject the concrete of the mixer drum into the hopper;
An eighth step of operating the concrete pumping means to pump concrete of the hopper to pour concrete of the mixer drum through the pour pipe into the factory factory; And
And a ninth step of running by alternately operating the first railway wheels of the first and second mixer vehicle means and placing the concrete of the mixer drum in the city factory.
제5 항에 있어서,
상기 제9 단계에서 상기 시공장소의 타설 위치에 따라 상기 크레인수단의 붐의 각도를 조절함으로써 상기 타설관의 위치를 변경하며 상기 믹서드럼의 콘크리트를 타설하는 철도의 콘크리트도상 시공용 타설방법.
6. The method of claim 5,
In the ninth step by changing the position of the pour pipe by adjusting the angle of the boom of the crane means in accordance with the placing position of the factory, concrete placing construction for the railway of the concrete laying the concrete of the mixer drum.
KR1020120083681A 2012-07-31 2012-07-31 Apparatus and method for placing concrete to construct concrete bed of railroad way KR101213573B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120083681A KR101213573B1 (en) 2012-07-31 2012-07-31 Apparatus and method for placing concrete to construct concrete bed of railroad way

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120083681A KR101213573B1 (en) 2012-07-31 2012-07-31 Apparatus and method for placing concrete to construct concrete bed of railroad way

Publications (1)

Publication Number Publication Date
KR101213573B1 true KR101213573B1 (en) 2012-12-20

Family

ID=47907881

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120083681A KR101213573B1 (en) 2012-07-31 2012-07-31 Apparatus and method for placing concrete to construct concrete bed of railroad way

Country Status (1)

Country Link
KR (1) KR101213573B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101413885B1 (en) 2013-03-01 2014-06-30 한상국 Paving apparatus of shotcrete for paved road and bridge deck
KR101848030B1 (en) 2016-05-25 2018-05-25 최송원 Vehicle for collecting waste concrete
CN110396877A (en) * 2019-08-14 2019-11-01 中铁十一局集团第三工程有限公司 A kind of floating section of track casting system of movable type magnetic
KR102100692B1 (en) 2019-10-22 2020-04-14 황윤태 Construction method of concrete ballast in tunnel
KR200493325Y1 (en) 2019-11-07 2021-03-11 티에이치산업개발 주식회사 Rail supporter for construct concrete road bed

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101006462B1 (en) 2008-07-23 2011-01-06 한상국 Railroad way concrete other opinion system and the method which are space-time on the tunnel inside

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101006462B1 (en) 2008-07-23 2011-01-06 한상국 Railroad way concrete other opinion system and the method which are space-time on the tunnel inside

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101413885B1 (en) 2013-03-01 2014-06-30 한상국 Paving apparatus of shotcrete for paved road and bridge deck
KR101848030B1 (en) 2016-05-25 2018-05-25 최송원 Vehicle for collecting waste concrete
CN110396877A (en) * 2019-08-14 2019-11-01 中铁十一局集团第三工程有限公司 A kind of floating section of track casting system of movable type magnetic
KR102100692B1 (en) 2019-10-22 2020-04-14 황윤태 Construction method of concrete ballast in tunnel
KR200493325Y1 (en) 2019-11-07 2021-03-11 티에이치산업개발 주식회사 Rail supporter for construct concrete road bed

Similar Documents

Publication Publication Date Title
KR101213573B1 (en) Apparatus and method for placing concrete to construct concrete bed of railroad way
CN201763355U (en) Wet integrated concrete sprayer set
CN107938478B (en) A kind of municipal pavement construction concrete injection device of architectural engineering
CN102094611B (en) Coal mine under-well fracturing complete equipment
CN101858215B (en) Road retained method for extrusion molding of waste rock
CN108952733A (en) Separate launching shield technique application construction method in municipal sewerage engineering
CN102889088B (en) Crawler belt walking wet type concrete sprayer
CN104763154A (en) Trailer concrete pump truck
CN203809016U (en) Inverted arch lining trolley and synchronous tunnel operating system
CN102041757B (en) Operating method for self-propelled mortar vehicle
CN108952731B (en) Tunnel construction method
CN204476423U (en) A kind of Open TBM inverted arch concrete injection device
CN211972094U (en) Silt place normal position solidification equipment
CN104594637A (en) Novel concrete distributing cart
CN203570324U (en) Traction self-propelled concrete sprayer with spraying nozzle capable of automatically rotating
CN112092197A (en) Vehicle-mounted stirring grouting unit
CN102720102B (en) Construction trolley
CN202755277U (en) Monolithic track bed construction system
CN202544864U (en) Series-connection relay long-distance grout feeding device for tunnel
CN109339821B (en) Coal mine water disaster prevention and control grouting device
CN105781584A (en) Concrete wet-spraying self-walking shotcrete support robot
CN203531920U (en) Wet-type hydraulic concrete spraying machine for coal mine
CN101705698A (en) Rotary hydraulic excavator for mines
CN103485798B (en) Self-propelled concrete spraying machine with spray head with functions of automatic rotation and traction
CN202807831U (en) Automatic feeding machine of injection pump

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20161125

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170928

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20181203

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20191202

Year of fee payment: 8