KR101363978B1 - a method execution for rock face landscaping - Google Patents

a method execution for rock face landscaping Download PDF

Info

Publication number
KR101363978B1
KR101363978B1 KR1020120054167A KR20120054167A KR101363978B1 KR 101363978 B1 KR101363978 B1 KR 101363978B1 KR 1020120054167 A KR1020120054167 A KR 1020120054167A KR 20120054167 A KR20120054167 A KR 20120054167A KR 101363978 B1 KR101363978 B1 KR 101363978B1
Authority
KR
South Korea
Prior art keywords
mold
natural
rock
formwork
silicon
Prior art date
Application number
KR1020120054167A
Other languages
Korean (ko)
Other versions
KR20130130390A (en
Inventor
박정혁
Original Assignee
정광배
박정혁
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정광배, 박정혁 filed Critical 정광배
Priority to KR1020120054167A priority Critical patent/KR101363978B1/en
Publication of KR20130130390A publication Critical patent/KR20130130390A/en
Application granted granted Critical
Publication of KR101363978B1 publication Critical patent/KR101363978B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Abstract

본 발명은 사면 보강용 암벽조경물의 시공방법에 관한 것으로서, 더욱 상세하게는 자연석을 복제한 인조암벽으로 사면(斜面)을 보강하고 이끼, 수목을 조경하여 천연암벽이 갖는 자연미를 구현할 수 있도록 한 발명에 관한 것이다.
전술한 본 발명의 특징은, 깨끗하게 청소된 자연석(1)의 표면에 겔(gel) 상태의 실리콘(11a)을 도포하는 단계; 실리콘(11a)의 표면에 섬유질 기재(11b)를 부착하고 실리콘(11a)을 다시 도포하는 단계; 실리콘(11a)의 표면에 섬유질 기재(11b)를 부착하고 액상의 합성수지(11c)를 도포한 후 경화시키는 단계; 실리콘과 합성수지가 경화된 몰드(11)를 자연석에서 분리하고 패널(12)에 고정하여 자연석 무늬를 갖는 거푸집(10)을 완성하는 단계; 경사지반(2)을 천공(穿孔)하여 안정된 지층까지 구멍(3)을 뚫는 단계; 지반에 뚫려진 구멍(3)에 인장케이블(4)을 삽입하고 그라우팅재(5)를 주입하여 경화시키는 단계; 상기 인장케이블(4)에 앵커브래킷(6)을 결합하여 지압판(7)을 고정시키는 단계; 지압판(7)과 앵커브래킷(6)의 설치가 완료된 경사지반(2)의 전방에 거푸집 패널(12)들을 연속 설치하고, 패널들을 고정시켜 거푸집(10)을 설치하는 단계; 상기 거푸집(10)의 내부에 몰탈 반죽물(8)을 주입하여 양생시키는 단계; 몰탈 반죽물(10)이 경화되면 거푸집(10)을 분리하여 인조석 벽체(20)를 완성하고, 자연바위의 무늬결이 형성된 인조석 벽체(20)의 표면에 도색(塗色)을 하여 자연석 질감이 나타나도록 하는 단계; 상기 인조석 벽체(20)와 주위에 선태식물(9a)과 수목(9b)을 심는 단계로 이루어진 것으로 특징으로 하는 사면 보강용 암벽조경물의 시공방법에 의하여 달성될 수 있는 것이다.
The present invention relates to a construction method of rock reinforcement for slope reinforcement, and more particularly, to reinforce slopes with artificial rock replicas of natural stone and to moss and trees to implement natural beauty of natural rock walls. It is about.
Features of the present invention described above, the step of applying a silicone (11a) in a gel (gel) state on the surface of the clean natural stone (1); Attaching the fibrous substrate 11b to the surface of the silicon 11a and reapplying the silicon 11a; Attaching the fibrous substrate 11b to the surface of the silicon 11a, applying a liquid synthetic resin 11c, and then curing it; Separating the mold 11 having the silicone and the synthetic resin cured from the natural stone and fixing the mold 11 to the panel 12 to complete the formwork 10 having a natural stone pattern; Drilling a sloped ground (2) to drill holes (3) to a stable ground layer; Inserting the tensile cable 4 into the hole 3 bored in the ground and injecting the grouting material 5 to harden; Fixing the pressure plate (7) by coupling an anchor bracket (6) to the tension cable (4); Installing the formwork panels (12) in front of the inclined ground (2) where the installation of the pressure plate (7) and the anchor bracket (6) is completed, and fixing the panels to install the formwork (10); Injecting and curing the mortar dough 8 into the mold 10; When the mortar dough 10 is cured, the mold 10 is separated to complete the artificial stone wall 20, and the natural stone texture appears by painting the surface of the artificial stone wall 20 on which the natural rock pattern is formed. To make it; The artificial stone wall 20 and the periphery plant (9a) and the tree (9b) in the step of planting the slope reinforcement rock wall landscape, characterized in that it is achieved by the construction method.

Description

사면 보강용 암벽조경물의 시공방법{a method execution for rock face landscaping}Construction method of rock reinforcement for slope reinforcement {a method execution for rock face landscaping}

본 발명은 사면 보강용 암벽조경물의 시공방법에 관한 것으로서, 더욱 상세하게는 자연석을 복제한 인조암벽으로 사면(斜面)을 보강하고 이끼, 수목을 조경하여 천연암벽이 갖는 자연미를 구현할 수 있도록 한 발명에 관한 것이다.
The present invention relates to a construction method of rock reinforcement for slope reinforcement, and more particularly, to reinforce slopes with artificial rock replicas of natural stone and to moss and trees to implement natural beauty of natural rock walls. It is about.

일반적으로 도로나 단지를 조성할 때는 산지와 언덕을 형성하는 경사진 지반이 개발되고, 경사진 사면의 붕괴나 슬라이딩을 방지하기 위하여 어스앵커공법을 이용하여 사면을 보강하는 사면보강공법이 수행된다.Generally, when constructing roads or complexes, sloped grounds are formed to form hills and hills, and slope reinforcement is performed to reinforce slopes using earth anchor method to prevent the collapse or sliding of sloped slopes.

상기 어스앵커공법으로 사면을 보강하는 작업은 사면을 천공(穿孔)한 구멍에 인장케이블과 그라우팅재를 주입하고 앵커브래킷, 지지체, 콘크리트블록을 고정하여 사면의 붕괴를 방지할 수 있도록 되어 있다.The reinforcement of the slope by the earth anchor method is to inject a tension cable and grouting material into the hole perforated slope and to fix the anchor bracket, support, concrete block to prevent the collapse of the slope.

그러나, 종래의 어스앵커공법으로 제작된 사면(斜面)에는 인공블록들이 연속 결합된 인공 구조물로 형성되어 자연적인 느낌을 줄 수 없었으므로 절개 사면에 설치된 인공블록들은 자연의 경관을 해치는 주요 원인이 되었다.However, since the artificial block was formed as a continuous structure of artificial structures in a slope manufactured by the conventional earth anchor method, artificial blocks installed on the incised slope became a major cause of harming the natural landscape. .

따라서, 절개된 사면에 자연석을 복제한 암벽을 설치하여 천연암벽이 갖는 자연미를 구현할 수 있고, 도로나 단지 주변의 외관을 미려하게 유지할 수 있는 자연친화적인 암벽조경물을 제안하게되었다.
Therefore, by installing a rock wall replicating natural stone on the inclined slope to implement the natural beauty of natural rock walls, it was proposed a natural-friendly rock wall landscape that can maintain the beautiful appearance of the road or the surrounding area.

본 발명은 상기한 문제점을 감안하여 창안한 것으로서, 그 목적은 자연석을 복제한 인조석으로 자연적인 암벽을 형성하고, 선태식물이나 수목을 조성하여 자연암벽과 같은 느낌을 줄 수 있는 사면 보강용 암벽조경물의 시공방법을 제공함에 있는 것이다.
The present invention has been made in view of the above problems, the object of which is to form a natural rock wall made of artificial stone replicating natural stone, and to form a natural plant or trees to give a feeling of natural rock wall for slope reinforcement It is to provide a construction method of.

상기한 목적을 달성하기 위한 본 발명의 특징은, 깨끗하게 청소된 자연석(1)의 표면에 겔(gel) 상태의 실리콘(11a)을 도포하는 단계; 실리콘(11a)의 표면에 섬유질 기재(11b)를 부착하고 실리콘(11a)을 다시 도포하는 단계; 실리콘(11a)의 표면에 섬유질 기재(11b)를 부착하고 액상의 합성수지(11c)를 도포한 후 경화시키는 단계; 실리콘과 합성수지가 경화된 몰드(11)를 자연석에서 분리하고 패널(12)에 고정하여 자연석 무늬를 갖는 거푸집(10)을 완성하는 단계; 경사지반(2)의 전방에 거푸집 패널(12)들을 연속 설치하고, 패널(12)의 내부에 흡수체(30)를 부착하고, 패널들을 고정시켜 거푸집(10)을 설치하는 단계; 상기 거푸집(10)의 내부에 몰탈 반죽물(8)을 주입하여 양생시키는 단계; 몰탈 반죽물(10)이 경화되면 거푸집(10)을 분리하여 인조석 벽체(20)를 완성하고, 자연바위의 무늬결이 형성된 인조석 벽체(20)의 표면에 도색(塗色)을 하여 자연석 질감이 나타나도록 하는 단계; 상기 인조석 벽체(20)와 주위에 선태식물(9a)과 수목(9b)을 심는 단계로 이루어진 사면 보강용 암벽조경물의 시공방법에 있어서, 상기 경사지반(2)을 천공(穿孔)하여 안정된 지층까지 구멍(3)을 뚫는 단계; 지반에 뚫려진 구멍(3)에 인장케이블(4)을 삽입하고 그라우팅재(5)를 주입하여 경화시키는 단계; 상기 인장케이블(4)에 앵커브래킷(6)을 결합하여 지압판(7)을 고정시키는 단계를 더 포함하고, 상기 패널(12)들의 설치 단계에서, 경사지반(2)의 내부에 유공관(31)을 매설하여 상기 흡수체(30)에 유공관(31)이 접속되도록 하는 단계를 더 포함하며, 상기 몰드(11)는 패널(12)에 박혀지는 고정구(13)에 의하여 패널(12)에 고정되고, 필요시 분리할 수 있도록 구성된 것을 특징으로 하는 사면 보강용 암벽조경물의 시공방법에 의하여 달성될 수 있는 것이다.
Features of the present invention for achieving the above object, the step of applying a silicone (11a) in a gel (gel) state on the surface of the natural stone (1) cleanly cleaned; Attaching the fibrous substrate 11b to the surface of the silicon 11a and reapplying the silicon 11a; Attaching the fibrous substrate 11b to the surface of the silicon 11a, applying a liquid synthetic resin 11c, and then curing it; Separating the mold 11 having the silicone and the synthetic resin cured from the natural stone and fixing the mold 11 to the panel 12 to complete the formwork 10 having a natural stone pattern; Continuously installing the formwork panels 12 in front of the inclined ground 2, attaching the absorber 30 to the inside of the panel 12, and fixing the panels to install the formwork 10; Injecting and curing the mortar dough 8 into the mold 10; When the mortar dough 10 is cured, the mold 10 is separated to complete the artificial stone wall 20, and the natural stone texture appears by painting the surface of the artificial stone wall 20 on which the natural rock pattern is formed. To make it; In the construction method of the slope reinforcement rock wall landscape consisting of planting the artificial plants (9a) and trees (9b) in the artificial stone wall 20 and the surroundings, to the stable ground layer by drilling Drilling a hole (3); Inserting the tensile cable 4 into the hole 3 bored in the ground and injecting the grouting material 5 to harden; The anchor cable (6) is coupled to the tension cable (4) further comprises the step of fixing the pressure plate (7), in the installation step of the panels 12, the perforated pipe (31) in the interior of the inclined ground (2) The method further includes the step of allowing the hole 31 to be connected to the absorber 30 by embedding the mold 11, and the mold 11 is fixed to the panel 12 by a fixture 13 embedded in the panel 12. It can be achieved by the construction method of the slope reinforcement rock wall characterized in that configured to be separated if necessary.

이상에서 상술한 바와 같은 본 발명은, 절개된 경사지반(2)에 거푸집(10)을 설치하고 몰탈 반죽물(8)을 타설하면 신속 간편하게 암벽 조경물의 시공이 완료되는 것이므로 조경작업의 편의성 및 작업의 효율을 최대한 높여줄 수 있는 동시에 자연석 질감이 잘 나타나는 인조석 벽체를 구현하여 고산지대(高山地帶)의 경관이나 기둥모양의 주상절리(柱狀節理)가 기암절벽(奇巖絶壁)을 이루는 다양한 자연의 경관을 표현할 수 있는 것으로서 절개되어 파손된 자연경관을 복구할 수 있을 뿐 아니라 자연석과 가장 가까운 바위 형태를 구현하여 자연환경의 파괴 없이 아름다운 생태환경 연출할 수 있는 등의 이점이 있는 것으로서 조경업의 대외 경쟁력을 최대한 높여줄 수 있는 것이다.
The present invention as described above, the installation of the formwork 10 in the inclined ground cut 2 and the mortar kneading (8) when the construction of the rock wall landscaping is completed quickly, so the convenience and work of landscaping work In order to maximize the efficiency of the system, it is possible to realize the artificial stone wall that shows the texture of natural stone well, and that the landscape of the alpine area or columnar columnar joint forms a rocky cliff. It is not only able to recover the natural scenery that has been cut and damaged as it can express the scenery, but also has the advantage of realizing the beautiful ecological environment without destroying the natural environment by implementing the form of rock closest to the natural stone. It can be as high as possible.

도 1a∼1f는 본 발명에 의한 거푸집의 제조과정을 순차적으로 나열한 단면도,
도 2a∼2g는 본 발명에 의한 암벽조경물의 시공방법을 공정별로 나열한 단면도,
도 3은 본 발명에 의한 거푸집 패널을 예시한 단면도,
도 4a∼4c는 본 발명에 의한 거푸집 패널의 내부에 흡수체와 유공파이프가 설치된 상태를 예시한 단면도,
도 5a∼5b는 본 발명에 의한 거푸집 패널의 내부에 철근골조가 설치된 상태를 예시한 단면도.
1a to 1f are cross-sectional views sequentially listing the manufacturing process of the formwork according to the present invention;
Figure 2a to 2g is a cross-sectional view of the construction method of the rock wall landscape according to the invention arranged by process,
3 is a cross-sectional view illustrating a formwork panel according to the present invention;
4A to 4C are cross-sectional views illustrating a state in which an absorber and a hole pipe are installed in the formwork panel according to the present invention;
5a to 5b are cross-sectional views illustrating a state in which the reinforcing frame is installed in the formwork panel according to the present invention.

이하, 상기한 목적을 달성하기 위한 바람직한 실시예를 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

실시예Example

도 1a와 도 1b에서 도시한 바와 같이, 자연석(1)을 깨끗하게 손질하여 청소하고, 겔(gel) 상태의 실리콘(11a)을 자연석의 표면에 도포한 후 실리콘(11a)의 표면에 섬유질 기재(11b)를 부착하고 실리콘(11a)을 다시 도포하는 단계를 실시하였다.As shown in FIGS. 1A and 1B, the natural stone 1 is cleaned and cleaned, and after the gel 11a is applied to the surface of the natural stone, a fibrous substrate ( 11b) was attached and the silicone 11a was applied again.

이어서, 도 1c에서 도시한 바와 같이, 실리콘(11a)의 표면에 글라스파이버(glass fiber)로 구성된 섬유질 기재(11b)를 부착하고, 액상의 합성수지(11c)를 도포한 후 경화시키는 단계를 실시하였다.Subsequently, as shown in FIG. 1C, the fibrous substrate 11b made of glass fiber was attached to the surface of the silicon 11a, and then the liquid synthetic resin 11c was applied and cured. .

상기 과정에서 실리콘(11a)을 자연석(1)의 표면에 도포할 때 실리콘(11a)들 사이에 섬유질 기재(11b)를 혼입(混入)하여 적층하는 단계를 실시하면 실리콘 몰드의 내구성을 높여줄 수 있는 한편, 실리콘(11a)의 외부에 합성수지(11c)를 도포하고 경화시키면 경질의 FRP로 구성된 합성수지 외피에 의하여 견고한 구조의 실리콘 몰드(11)를 형성 할 수 있다.When the silicon 11a is applied to the surface of the natural stone 1 in the above process, the step of incorporating and stacking the fibrous substrate 11b between the silicon 11a may increase the durability of the silicon mold. On the other hand, when the synthetic resin (11c) is applied to the outside of the silicone (11a) and hardened by the synthetic resin shell made of a hard FRP it can form a rigid silicone mold (11).

이어서, 도 1e에서 도시한 바와 같이, 실리콘과 합성수지가 경화된 몰드(11)를 자연석에서 분리하여 자연석 무늬를 갖는 몰드(11)를 완성하였고, 도 1f에서 도시한 바와 같이, 몰드(11)를 금속 패널(12)에 고정하여 전체적인 거푸집(10)을 완성하여 준비하였다.Subsequently, as shown in FIG. 1E, the mold 11 having the silicone and the synthetic resin cured is separated from the natural stone to complete the mold 11 having the natural stone pattern. As shown in FIG. 1F, the mold 11 is removed. Fixing to the metal panel 12, the overall formwork (10) was completed and prepared.

상기 몰드(11)는 볼트나 스크류로 구성된 고정구(13)를 사용하여 알루미늄 패널(12)에 고정하여 필요시 분리할 수 있도록 구성하였다.The mold 11 is fixed to the aluminum panel 12 by using a fastener 13 composed of a bolt or a screw so as to be separated when necessary.

이어서, 도 2a에서 도시한 바와 같이, 도로나 단지의 조성에 의하여 형성된 경사지반(2)을 천공(穿孔)하여 안정된 지층까지 구멍(3)을 뚫는 천공작업을 실시하였다.Subsequently, as shown in Fig. 2A, the inclined ground 2 formed by the composition of the road or the complex was drilled to drill the hole 3 to the stable strata.

이어서, 도 2b에서 도시한 바와 같이, 경사지반(2)에 구멍(3)에 인장케이블(4)을 삽입하고, 그라우팅재(5)를 주입하여 경화시켰다. 상기 그라우팅재(5)는 시멘트를 물과 반죽하고 섬유보강재를 혼합함 반죽물을 사용하였다.Subsequently, as shown in FIG. 2B, the tension cable 4 was inserted into the hole 3 in the inclined ground 2, and the grouting material 5 was injected and hardened. The grouting material (5) was kneading cement and water and mixing the fiber reinforcement was used.

이어서, 도 2c에서 도시한 바와 같이, 상기 인장케이블(4)에 앵커브래킷(6)을 결합하여 지반에 밀착된 지지체인 지압판(7)을 견고하게 고정하였다.Subsequently, as shown in FIG. 2C, the anchor bracket 6 is coupled to the tension cable 4 to firmly fix the pressure plate 7, which is a support in close contact with the ground.

이어서, 도 2d에서 도시한 바와 같이, 지압판(7)과 앵커브래킷(6)의 설치가 완료된 경사지반(2)의 전방에 에 일정간격을 이격하여 거푸집 패널(12)을 연속 설치하고, 패널(12)들을 서로 고정시켜 거푸집(10)의 설치를 완료하였다.Subsequently, as shown in FIG. 2D, the formwork panel 12 is continuously installed at predetermined intervals in front of the inclined ground 2 where the pressure plate 7 and the anchor bracket 6 are completed, and the panel ( 12) fixed to each other to complete the installation of the formwork (10).

상기 단계에서 패널(12)들의 고정은 다양한 방법을 사용할 수 있으나, 도 3에서 도시한 바와 같이, 본 발명에서는 패널(12)의 측면판(12a)들을 밀착하여 연속 설치하고, 측면판(12a)에 뚫려진 구멍으로 쐐기핀(12b)을 관통 삽입하여 고정용 핀(12c)으로 고정시키는 방법을 사용하였다.In this step, the fixing of the panels 12 may be used in various ways, as shown in FIG. The wedge pin 12b was inserted through the hole drilled in the hole and fixed with the fixing pin 12c.

경우에 따라서는 도 4a∼4c에서 도시한 바와 같이, 상기 패널(12)들을 연속 설치할 때 패널(12)의 내부에 흡수체(30)를 부착하고, 경사지반(2)의 내부에 유공관(31)을 매설하여 흡수체(30)에 유공관(31)을 접속하면 지반을 통해 침출되는 물이 유공관(31)을 통해 흡수체(30)에 전달되어 흡수체(30)에 심어진 선태식물(9a)과 수목(9b)이 잘 자랄 수 있도록 할 수 있는 것이다.In some cases, as shown in FIGS. 4A to 4C, when the panels 12 are continuously installed, the absorber 30 is attached to the inside of the panel 12, and the perforated pipe 31 is disposed inside the inclined ground 2. When buried to connect the hole tube 31 to the absorber 30, the water leaching through the ground is transferred to the absorber 30 through the hole tube 31, planted in the absorbent body (9a) and the tree (9b) ) Can make it grow well.

바람직하기로는 도 5a와 도 5b에서 도시한 바와 같이, 상기 인장케이블(4)의 선단에 철근골조(32)를 고정시켜 몰탈 반죽물(8)을 타설하면 인조석 벽체(20)의 내구성 및 구조의 견고성을 높여줄 수 있다.Preferably, as shown in Figures 5a and 5b, when the reinforcing steel frame 32 is fixed to the tip of the tension cable (4) to pour mortar kneading (8) of the durability and structure of the artificial stone wall (20) It can increase the robustness.

이어서, 도 2e에서 도시한 바와 같이, 상기 거푸집(10)의 내부에 몰탈 반죽물(8)을 주입하여 타설하고 자연상태에서 양생시키는 단계를 실시하였다.Subsequently, as shown in FIG. 2E, the mortar paste material 8 was poured into the mold 10 and poured into the mold 10 to cure in a natural state.

상기 몰탈 반죽물(8)은 칼슘설포알루미네이트(CSA : Calcium SulfoAluminate) 68.9∼73.9 중량%, 펄라이트 6.6∼7.8 중량%, 물 13.3∼15.3 중량%, 유리섬유 3.1∼3.9 중량%, 에틸렌초산비닐수지(EVA : Ethylene Vinyl Acetate) 1.8∼2.4 중량%, 안료 1.3∼1.7 중량%를 혼합한 반죽물을 사용하였다.The mortar kneading material (8) is calcium sulfo aluminate (CSA: Calcium SulfoAluminate) 68.9-73.9 wt%, pearlite 6.6-7.8 wt%, water 13.3-15.3 wt%, glass fiber 3.1-3.9 wt%, ethylene vinyl acetate resin (EVA: Ethylene Vinyl Acetate) A kneaded mixture of 1.8 to 2.4 wt% and 1.3 to 1.7 wt% pigment was used.

이어서, 도 2f에서 도시한 바와 같이, 몰탈 반죽물의 경화가 완료되었을 때 거푸집(10)을 분리하여 자연바위의 무늬결이 형성된 인조석 벽체(20)를 완성하였고, 자연바위의 무늬결이 형성된 인조석 벽체(20)의 표면에 도색(塗色)을 하여 자연석 질감이 나타나도록 하였다.Subsequently, as shown in FIG. 2F, when the hardening of the mortar dough is completed, the mold 10 is separated to complete the artificial stone wall 20 having the natural rock pattern, and the artificial stone wall 20 having the natural rock pattern is formed. The surface of) was painted to give natural stone texture.

이어서, 도 2g에서 도시한 바와 같이, 상기 인조석 벽체(20)와 주위에 선태식물(9a)과 수목(9b)을 심어 암벽 조경물의 시공을 완료하였다.Subsequently, as shown in Fig. 2g, the planted plant (9a) and the tree (9b) was planted around the artificial stone wall 20 to complete the construction of the rock wall landscape.

상기 패널(12)의 내부에 흡수체(30)를 부착한 후 몰탈 반죽물(8)을 타설한 경우에는 거푸집(10)을 분리하면 도 4c에서 도시한 바와 같이, 흡수체(30)가 인조석 벽체(20)에서 노출되므로 흡수체(30)에 선태식물(9a)과 수목(9b)을 심어서 자랄 수 있도록 할 수 있는 것이다.After attaching the absorbent body 30 to the inside of the panel 12, when the mortar dough 8 is poured, the mold 10 is separated, and as shown in FIG. 4C, the absorber 30 is formed of an artificial stone wall ( 20) because it is exposed to the absorber 30 will be able to grow by planting the selective plant (9a) and the tree (9b).

전술한 구성으로 이루어진 본 발명은, 절개된 경사지반(2)에 거푸집(10)을 설치한 후 몰탈 반죽물(8)을 타설하여 양생시키면 암벽 조경물의 시공이 완료되는 것이므로 조경작업이 간편하면서도 신속하게 이루어져 작업의 효율을 높여줄 수 있는 동시에 자연석 질감이 잘 나타나는 인조석 벽체를 구현하여 고산지대(高山地帶)의 경관이나 기둥모양의 주상절리(柱狀節理)가 기암절벽(奇巖絶壁)을 이루는 다양한 자연의 경관을 표현할 수 있는 것으로서 절개되어 파손된 자연경관을 복구할 수 있고, 시공자가 원하는 어떠한 형태의 자연이라도 시공할 수 있는 등의 이점이 있는 것이다.The present invention made of the above-described configuration, after installing the formwork (10) in the inclined ground (2) is poured mortar kneading (8) to cure the construction of the rock wall landscaping, so the landscaping work is easy and quick It is possible to improve the efficiency of the work and at the same time to realize the artificial stone wall that shows the texture of natural stone well, the landscape of the alpine area or columnar columnar joint forms a variety of rock formations. As it can express the landscape of nature, it is possible to recover the natural scenery that has been cut and broken, and can construct any type of nature desired by the contractor.

또한, 본 발명에 의한 인조석 벽체(20)는 무늬결의 질감이나 재질에 있어서 자연석과 가장 가까운 바위 형태를 구현하여 자연환경의 파괴 없이 아름다운 생태환경 연출할 수 있는 동시에 자연바위에 비하여 운반이 간편하면서도 비용이 절감되고, 장소에 구애됨이 없이 간편하게 설치하여 인공조경을 할 수 있는 것으로서 조경업의 대외 경쟁력을 최대한 높여줄 수 있는 것이다.In addition, the artificial stone wall 20 according to the present invention implements a rock form closest to the natural stone in the texture or material of the pattern texture to produce a beautiful ecological environment without destroying the natural environment and at the same time easy to transport compared to natural rocks It is possible to increase the external competitiveness of the landscaping industry by reducing and being able to easily install the landscaping without regard to the place.

이상에서는 본 발명의 바람직한 실시예에 대하여 도시하고 또한 설명하였으나, 본 발명은 상기한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 본 발명이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이고, 그와 같은 변경은 기재된 청구범위 내에 있게 된다.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments, but many variations and modifications may be made without departing from the scope of the invention. It will be understood by those skilled in the art that various changes may be made and equivalents may be resorted to without departing from the scope of the appended claims.

1 : 자연석 2 : 경사지반
3 : 구멍 4 : 인장케이블
5 : 그라우팅재 6 : 앵커브래킷
7 : 지압판 8 : 몰탈 반죽물
9a : 선태식물 9b : 수목
10 : 거푸집 11 : 몰드
11a : 실리콘 11b : 섬유질 기재
11c : 합성수지 12 : 패널
12a : 측면판 12b : 쐐기핀
12c : 핀 13 : 고정구
20 : 인조석 벽체 30 : 흡수체
31 : 유공관 32 : 철근골조
1: Natural stone 2: Sloped ground
3: hole 4: tension cable
5: grouting material 6: anchor bracket
7: pressure plate 8: mortar dough
9a: Selected Plant 9b: Tree
10 formwork 11: mold
11a: silicon 11b: fibrous substrate
11c synthetic resin 12 panel
12a: side plate 12b: wedge pin
12c: Pin 13: Fixture
20: artificial stone wall 30: absorber
31: Merit pipe 32: Reinforcing steel frame

Claims (3)

깨끗하게 청소된 자연석(1)의 표면에 겔(gel) 상태의 실리콘(11a)을 도포하는 단계; 실리콘(11a)의 표면에 섬유질 기재(11b)를 부착하고 실리콘(11a)을 다시 도포하는 단계; 실리콘(11a)의 표면에 섬유질 기재(11b)를 부착하고 액상의 합성수지(11c)를 도포한 후 경화시키는 단계; 실리콘과 합성수지가 경화된 몰드(11)를 자연석에서 분리하고 패널(12)에 고정하여 자연석 무늬를 갖는 거푸집(10)을 완성하는 단계; 경사지반(2)의 전방에 거푸집 패널(12)들을 연속 설치하고, 패널(12)의 내부에 흡수체(30)를 부착하고, 패널들을 고정시켜 거푸집(10)을 설치하는 단계; 상기 거푸집(10)의 내부에 몰탈 반죽물(8)을 주입하여 양생시키는 단계; 몰탈 반죽물(10)이 경화되면 거푸집(10)을 분리하여 인조석 벽체(20)를 완성하고, 자연바위의 무늬결이 형성된 인조석 벽체(20)의 표면에 도색(塗色)을 하여 자연석 질감이 나타나도록 하는 단계; 상기 인조석 벽체(20)와 주위에 선태식물(9a)과 수목(9b)을 심는 단계로 이루어진 사면 보강용 암벽조경물의 시공방법에 있어서,
상기 경사지반(2)을 천공(穿孔)하여 안정된 지층까지 구멍(3)을 뚫는 단계;
지반에 뚫려진 구멍(3)에 인장케이블(4)을 삽입하고 그라우팅재(5)를 주입하여 경화시키는 단계;
상기 인장케이블(4)에 앵커브래킷(6)을 결합하여 지압판(7)을 고정시키는 단계를 더 포함하고,
상기 거푸집(10)을 설치하는 단계에서, 경사지반(2)의 내부에 유공관(31)을 매설하여 상기 흡수체(30)에 유공관(31)이 접속되도록 하는 단계를 더 포함하며,
상기 몰드(11)는 패널(12)에 박혀지는 고정구(13)에 의하여 패널(12)에 고정되고, 필요시 분리할 수 있도록 구성된 것을 특징으로 하는 사면 보강용 암벽조경물의 시공방법.
Applying silicon (11a) in a gel state to the surface of the natural stone 1 cleanly cleaned; Attaching the fibrous substrate 11b to the surface of the silicon 11a and reapplying the silicon 11a; Attaching the fibrous substrate 11b to the surface of the silicon 11a, applying a liquid synthetic resin 11c, and then curing it; Separating the mold 11 having the silicone and the synthetic resin cured from the natural stone and fixing the mold 11 to the panel 12 to complete the formwork 10 having a natural stone pattern; Continuously installing the formwork panels 12 in front of the inclined ground 2, attaching the absorber 30 to the inside of the panel 12, and fixing the panels to install the formwork 10; Injecting and curing the mortar dough 8 into the mold 10; When the mortar dough 10 is cured, the mold 10 is separated to complete the artificial stone wall 20, and the natural stone texture appears by painting the surface of the artificial stone wall 20 on which the natural rock pattern is formed. To make it; In the construction method of the slope reinforcement rock wall landscape consisting of planting the selective plant (9a) and the tree (9b) in the artificial stone wall 20 and the surroundings,
Drilling the slanted ground (2) to drill holes (3) to a stable strata;
Inserting the tensile cable 4 into the hole 3 bored in the ground and injecting the grouting material 5 to harden;
Further comprising the step of fixing the pressure plate (7) by coupling the anchor bracket (6) to the tension cable (4),
In the step of installing the formwork 10, further comprising the step of embedding the perforated pipe 31 in the interior of the inclined ground (2) so that the perforated pipe 31 is connected to the absorber (30),
The mold (11) is fixed to the panel 12 by a fixture (13) embedded in the panel 12, the construction method of the slope reinforcement rock wall landscape, characterized in that configured to be separated.
삭제delete 삭제delete
KR1020120054167A 2012-05-22 2012-05-22 a method execution for rock face landscaping KR101363978B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120054167A KR101363978B1 (en) 2012-05-22 2012-05-22 a method execution for rock face landscaping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120054167A KR101363978B1 (en) 2012-05-22 2012-05-22 a method execution for rock face landscaping

Publications (2)

Publication Number Publication Date
KR20130130390A KR20130130390A (en) 2013-12-02
KR101363978B1 true KR101363978B1 (en) 2014-03-18

Family

ID=49980075

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120054167A KR101363978B1 (en) 2012-05-22 2012-05-22 a method execution for rock face landscaping

Country Status (1)

Country Link
KR (1) KR101363978B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06304935A (en) * 1993-04-26 1994-11-01 Shinwa Kensou Kk Artificial stone panel and molding thereof
JP2002070043A (en) * 2000-09-05 2002-03-08 S I Sangyo Kk Concrete form for imitation stone and construction method for imitation stone structure
KR100943144B1 (en) * 2009-07-07 2010-02-18 장용옥 Construction method of artificial stone using spray type-concrete and artificial lightweight soil
JP2010216162A (en) * 2009-03-17 2010-09-30 Techno Kogyo Kk Pressure receiving device for anchoring method, and the anchoring method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06304935A (en) * 1993-04-26 1994-11-01 Shinwa Kensou Kk Artificial stone panel and molding thereof
JP2002070043A (en) * 2000-09-05 2002-03-08 S I Sangyo Kk Concrete form for imitation stone and construction method for imitation stone structure
JP2010216162A (en) * 2009-03-17 2010-09-30 Techno Kogyo Kk Pressure receiving device for anchoring method, and the anchoring method
KR100943144B1 (en) * 2009-07-07 2010-02-18 장용옥 Construction method of artificial stone using spray type-concrete and artificial lightweight soil

Also Published As

Publication number Publication date
KR20130130390A (en) 2013-12-02

Similar Documents

Publication Publication Date Title
CN105421470B (en) Assembled anchor pole arched framework combined type ecological revetment construction method
CN104878767A (en) Construction method for carrying out plant-growing concrete and plastic stone combined ecological landscape protection on rocky side slope
CN205314115U (en) High steep side slope combined supporting greening structure of highway
KR100947627B1 (en) The grouting structure of tunnel and tunnel construction method using the same
KR20100094071A (en) Construction method for retaining wall by soil-nailing method and retaining block thereof
KR101215838B1 (en) Vegetation block and retaining wall using the same
KR101363978B1 (en) a method execution for rock face landscaping
KR100943144B1 (en) Construction method of artificial stone using spray type-concrete and artificial lightweight soil
KR100935176B1 (en) A road slope keeping for ecological planting and method
KR101266082B1 (en) Pannel making method and coller pannel for frontage
KR102240949B1 (en) Mounting structure for decorating of wall
KR102340292B1 (en) Vegetation block and retaining wall using the same
KR102317257B1 (en) artificial mountain with cave
KR101279945B1 (en) Construction method of a retaining wall landscaping
KR100898348B1 (en) Method for manufacturing modeling
KR100796241B1 (en) A method for an artificial rock
KR20060116311A (en) Soil construction structure for slope of rockincision
CN207891910U (en) A kind of basement building structure
CN208009448U (en) A kind of mixed bank protection barricade brick of ecology plant
CN107268642B (en) Slope reinforcement synthesis structure and construction method
KR200262414Y1 (en) plastic panel with stone layer
KR20090096077A (en) Cut-Slope Vegetation-Stabilization Structure and Cut-Slope Vegetation-Stabilization Method
KR101107279B1 (en) retaining wall using reinforcement soil blocks and constuction method of retaining wall using that at cutting ground
CN205604223U (en) Foundation stabilization is with filling modular structure
CN205314114U (en) Highway soil property side slope combined supporting greening structure

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
A302 Request for accelerated examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170329

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee