KR101316905B1 - Coupling apparatus of pile - Google Patents

Coupling apparatus of pile Download PDF

Info

Publication number
KR101316905B1
KR101316905B1 KR1020120111155A KR20120111155A KR101316905B1 KR 101316905 B1 KR101316905 B1 KR 101316905B1 KR 1020120111155 A KR1020120111155 A KR 1020120111155A KR 20120111155 A KR20120111155 A KR 20120111155A KR 101316905 B1 KR101316905 B1 KR 101316905B1
Authority
KR
South Korea
Prior art keywords
pile
connector
guide
steel wire
wire fixing
Prior art date
Application number
KR1020120111155A
Other languages
Korean (ko)
Inventor
최성희
Original Assignee
최성희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최성희 filed Critical 최성희
Priority to KR1020120111155A priority Critical patent/KR101316905B1/en
Application granted granted Critical
Publication of KR101316905B1 publication Critical patent/KR101316905B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: A pile coupling device is provided to make an upper pile to be normally positioned on the top of a lower pile and to insert a guide bar of a second coupler into a guide pipe by using a guide piece, thereby reducing the time for coupling bolts. CONSTITUTION: A pile coupling device comprises a guide ring (100), a first coupler (200), and a second coupler (300). The guide ring is installed to surround the outside of the head of a lower pile, and has at least two guide pipes which are formed on the outside. Each of the first and the second coupler has one end which is connected through bolts to steel wire fixing nuts formed on the fore-end of the head of the upper pile, and the other end which is connected through bolts to steel wire fixing nuts formed on the head of the lower pile. The second coupler has a guide bar which is formed by being protruded downwardly to be inserted into the guide pipe.

Description

말뚝연결구{Coupling apparatus of pile}Coupling apparatus of pile

본 발명은 말뚝연결구에 관한 것으로, 말뚝에 형성되어 있는 강선고정용 너트에 각각 개별적으로 체결되는 다수의 연결구를 이용하여 상,하부말뚝을 연결해줌으로써 말뚝의 연결이 용이하게 이루어지는 말뚝연결구에 관한 것이다.
The present invention relates to a pile connector, and relates to a pile connector that is easy to connect the pile by connecting the upper and lower piles by using a plurality of connectors respectively fastened to the steel wire fixing nut formed on the pile.

일반적으로 연약지반에 건축구조물을 시공하고자 할 경우, 건축구조물의 하중을 지지층으로 전달하여 건축구조물의 안정성을 확보할 수 있도록 지표면으로부터 지지층으로 연결되는 말뚝이 사용되고 있다.In general, when constructing a building structure on a soft ground, a pile connected to the support layer from the ground surface is used to secure the stability of the building structure by transferring the load of the building structure to the support layer.

한편 말뚝의 시공을 위한 지지층은 주로 지표면으로부터 수십 미터의 깊이에 존재하며, 말뚝의 경우 생산 및 운반의 편의성을 위하여 10m 내외의 길이로 제작되는 바, 다수 개의 말뚝을 상호 연결하여 지표면으로부터 지지층으로 말뚝을 연장시키게 된다.On the other hand, the support layer for the construction of the pile is mainly located in the depth of several tens of meters from the ground surface, in the case of the pile is produced in a length of about 10m for the convenience of production and transport, the pile is interconnected from the ground surface to the support layer Will be extended.

한편 PHC 말뚝(Pretensioned spun High strength Concrete Pile)은 원심력을 이용하여 제작된 속이 빈 고강도 콘크리트 파일에 프리텐션방식으로 프리스트레스를 도입한 것으로 제작되며, 이러한 PHC 말뚝은 휨저항성이 크고 수직력과 수평력에 대한 저항성이 뛰어난 특징을 갖고 있으며, 항타공법을 이용하여 시공이 가능하므로 연약지반에 건축구조물을 시공하고자 할 경우 많이 사용되고 있다.On the other hand, PHC pile (Pretensioned spun High strength Concrete Pile) is made by introducing prestress by pretension to hollow high-strength concrete pile manufactured by centrifugal force. It has this outstanding feature, and can be constructed using anti-taking method, so it is used a lot when you want to construct a building structure on soft ground.

한편 PHC 말뚝간의 결합을 위하여 서로 맞대어지는 말뚝의 선단 및 두부에는 말뚝의 보호를 위한 금속재질의 보호캡이 설치되며, 하부 말뚝의 두부에 설치된 캡과 상부 말뚝의 선단에 설치된 캡이 맞대어지도록 상부 말뚝을 배치한 상태에서 두 캡의 원주 둘레를 용접하는 방식으로 말뚝간의 이음이 이루어지게 된다.On the other hand, a protective cap made of metal for protecting the pile is provided at the tip and the head of the pile opposed to each other for the connection between the PHC piles, and a cap installed on the head of the lower pile and an upper pile The joints between the piles are formed by welding around the circumference of the two caps.

그러나 상기와 같은 용접에 의한 말뚝간의 이음은 작업이 이루어지는 현장여건이나 날씨 그리고 작업자의 숙련도에 따라 품질에 차이가 발생되고, 용접잔류응력에 의하여 캡의 내구 수명이 저하되는 등의 문제점을 갖고 있다.However, the joint between the piles by welding as described above has a problem such as a difference in quality depending on the site conditions or weather conditions and the skill of the operator, the durability of the cap is reduced by the welding residual stress.

이러한 문제점을 감안하여 비용접식으로 말뚝간의 이음작업을 실시하는 다양한 방법이 제안되고 있으나, 이러한 종래의 비용접식 이음방법에 사용되는 이음장치는 구조가 복잡하여 제작 및 시공이 용이하지 못하고 말뚝 연결을 위해 말뚝의 두부와 선단에 별도의 가공을 함으로써 말뚝의 두부와 선단의 강도가 저하되어 항타시에 이음 부분이 파손되는 문제점이 있다.In view of the above problems, various methods for performing a joint operation between piles have been proposed, but the joint apparatus used in the conventional non-folding joint method has a complicated structure, which is not easy to manufacture and install, By processing the head and the tip of the pile separately, there is a problem that the strength of the head and the tip of the pile is lowered and the joint portion is damaged during driving.

또한 공개특허 10-2005-0053499호의 본체는 말뚝의 직경과 동일한 직경을 갖도록 구성되어 상부말뚝과 하부말뚝을 연결해주도록 구성되어 있으나, 본체의 크기가 크고 무게 또한 고중량이라 본체를 들고 말뚝에 조립하거나 운반하는데 어려운 문제점이 있다.In addition, the main body of the Patent Publication No. 10-2005-0053499 is configured to have the same diameter as the diameter of the pile is configured to connect the upper pile and the lower pile, but the size of the main body and the weight is also heavy, so assembling or carrying on the pile holding the main body There is a difficult problem.

또한 본체의 조립시 상부말뚝과 하부말뚝에 형성된 PC너트와의 구멍을 맞추기가 까다로워 작업성이 떨어지는 문제점이 있다.In addition, when assembling the main body there is a problem in that the workability is difficult to match the hole of the PC nut formed in the upper pile and the lower pile.

공개특허 10-2005-0053499Patent Publication 10-2005-0053499 공개특허 10-2010-0086147Patent Publication 10-2010-0086147

상기와 같은 문제점을 해결하기 위한 본 발명의 목적은, 각각의 강선고정용 너트에 개별적으로 체결되는 다수의 연결구를 이용하여 상부말뚝과 하부말뚝을 연결해줌으로써 말뚝의 연결이 용이하고, 연결구의 크기가 작고 무게가 가벼워 작업자가 연결구를 핸들링 하기 쉬어 작업이 빠르고 용이하게 이루어지며, 하부말뚝에 설치되는 가이드링을 통해 강선고정용 너트에 연결구가 정위치함으로써 빠르고 간편한 시공이 이루어지도록 하는 말뚝연결구를 제공함에 있다.
An object of the present invention for solving the above problems, by connecting the upper pile and the lower pile by using a plurality of connectors individually fastened to each steel wire fixing nut, the connection of the pile is easy, the size of the connector The small and light weight makes it easy for the worker to handle the connector, which makes the work quick and easy.The guide ring installed on the lower pile provides a pile connector that enables quick and easy construction by positioning the connector on the steel fixing nut. have.

상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명은, 하부말뚝의 두부 외측을 감싸도록 설치되고 외면에 2개 이상의 가이드관이 형성되어 있는 가이드링; 상부말뚝의 선단에 형성된 강선고정용 너트에 일측단이 볼트결합되고, 하부말뚝의 두부에 형성된 강선고정용 너트에 타측단이 볼트결합되는 다수의 제1연결구; 상부말뚝의 선단에 형성된 강선고정용 너트에 일측단이 볼트결합되고, 하부말뚝의 두부에 형성된 강선고정용 너트에 타측단이 볼트결합되며 상기 가이드관에 끼워질 수 있도록 하부방향으로 가이드바가 돌출 형성되어 있는 제2연결구;를 포함하여 구성된 것을 특징으로 한다.The present invention to achieve the object as described above and to perform the problem for removing the conventional defects, the guide ring is installed to surround the outside of the head of the lower pile and two or more guide tubes are formed on the outer surface; A plurality of first connectors having one end bolted to the steel wire fixing nut formed at the tip of the upper pile and the other end bolted to the steel wire fixing nut formed at the head of the lower pile; One end is bolted to the steel wire fixing nut formed on the tip of the upper pile, the other end is bolted to the steel wire fixing nut formed on the head of the lower pile, and the guide bar protrudes downward to be fitted to the guide tube. It is characterized in that it comprises a; second connector.

또한 상기 가이드링은, 하부말뚝을 감싸도록 띠 형상으로 이루어지고 양 끝단에 서로 마주보는 형태의 볼트체결부가 형성되어 있는 본체; 상기 본체의 외주면에 적어도 2개 이상 설치되고 가이드바가 용이하게 삽입될 수 있도록 입구 부분의 직경이 확장되도록 형성되어 있는 가이드관; 상기 본체의 상부에서 말뚝의 외측 방향을 향해 돌출 형성되어 상부말뚝이 하부말뚝의 상부에 놓여지도록 가이드해주는 다수의 가이드편; 상기 본체의 볼트체결부를 통해 설치되어 본체가 하부말뚝의 외주면에 고정될 수 있도록 하는 볼트;를 포함하여 구성된 것을 특징으로 한다.In addition, the guide ring, the main body is made of a belt shape so as to surround the lower pile and the bolt connection portion is formed facing each other at both ends; At least two guide tubes installed on an outer circumferential surface of the main body and formed to expand a diameter of an inlet portion so that the guide bars can be easily inserted; A plurality of guide pieces formed to protrude from the upper portion of the main body toward the outer side of the pile so that the upper pile is placed on the upper portion of the lower pile; And a bolt installed through the bolt coupling part of the main body to fix the main body to the outer circumferential surface of the lower pile.

또한 상기 제1연결구는, 전,후가 개방된 박스형 몸체; 상기 박스형 몸체의 상부면과 하부면에 상기 강선고정용 너트에 볼트 체결이 가능하도록 형성되어 있는 볼트홀;을 포함하여 구성된 것을 특징으로 한다.In addition, the first connector, the box-shaped body is opened before, after; And a bolt hole formed on the upper and lower surfaces of the box-shaped body to fasten the bolt to the steel wire fixing nut.

또한 상기 제2연결구는, 전, 후가 개방된 박스형 몸체; 상기 박스형 몸체의 상부면과 하부면에 상기 강선고정용 너트에 볼트 체결이 가능하도록 형성되어 있는 볼트홀; 상기 박스형 몸체에서 하부방향으로 돌출 형성되어 상기 가이드관에 삽입됨으로써 제1연결구와 제2연결구의 하부면에 형성된 볼트홀과 하부말뚝에 형성되는 강선고정용 너트가 동일선상에 위치하도록 하는 가이드바;를 포함하여 구성된 것을 특징으로 한다.In addition, the second connector, the box-shaped body is opened before, after; A bolt hole formed on the upper surface and the lower surface of the box-shaped body to be bolted to the steel wire fixing nut; A guide bar protruding downward from the box-shaped body and inserted into the guide tube so that the bolt hole formed on the lower surface of the first connector and the second connector and the steel wire fixing nut formed on the lower pile are positioned on the same line; Characterized in that configured to include.

상기 볼트홀은 장공 형태로 형성되는 것을 특징으로 한다.The bolt hole is characterized in that it is formed in the shape of a long hole.

이상에서 설명한 바와 같이 본 발명에 의하면, 제1연결구와 제2연결구가 개별적으로 구성되어 강선고정용 너트에 설치됨으로써 전체적인 중량이 가벼워 작업자가 운반하거나 말뚝에 설치하기가 용이하여 작업성이 우수하고, 빠르고 간편한 시공이 가능한 효과가 있다.As described above, according to the present invention, the first connector and the second connector are individually configured to be installed on the steel wire fixing nut, so that the overall weight is light, so that it is easy for the worker to carry or install on the pile, and thus the workability is excellent. Quick and easy construction is effective.

또한 가이드링의 가이드편에 의해 상부말뚝이 하부말뚝의 상부에 정위치 되고 가이드관에 제2연결구의 가이드바가 삽입됨으로써 하부말뚝의 하부말뚝의 강선고정용 너트와 제2연결구의 볼트홀이 동일선상에 위치하게 되어 볼트체결을 위한 시간을 저감되어 빠른 말뚝 연결이 가능한 효과가 있는 매우 유용한 발명이다.
In addition, the upper pile is positioned at the upper portion of the lower pile by the guide piece of the guide ring, and the guide bar of the second connector is inserted into the guide tube so that the steel wire fixing nut of the lower pile of the lower pile and the bolt hole of the second connector are on the same line. It is a very useful invention that has the effect of reducing the time for fastening the bolts can be connected to the fast pile.

도 1 은 본 발명에 의한 말뚝연결구를 이용한 말뚝의 이음 상태를 나타낸 사시도,
도 2 는 본 발명에 의한 말뚝연결구를 이용한 말뚝의 이음 상태를 나타낸 정면도,
도 3 은 본 발명에 의한 말뚝연결구를 이용한 상부말뚝과 하부말뚝의 연결과정을 나타낸 분리사시도,
도 4 는 본 발명에 의한 제1연결구와 제2연결구를 상부말뚝에 설치한 상태를 나타낸 예시도,
도 5 는 본 발명에 의한 제1연결구를 나타낸 예시도,
도 6 은 본 발명에 의한 제2연결구를 나타낸 예시도,
1 is a perspective view showing a joint state of a pile using a pile connector according to the present invention,
Figure 2 is a front view showing the joint state of the pile using the pile connector according to the present invention,
Figure 3 is an exploded perspective view showing a process of connecting the upper pile and the lower pile using the pile connector according to the present invention,
4 is an exemplary view showing a state in which the first connector and the second connector according to the present invention installed on the upper pile,
5 is an exemplary view showing a first connector according to the present invention;
6 is an exemplary view showing a second connector according to the present invention;

이하 본 발명의 실시 예인 구성과 그 작용을 첨부도면에 연계시켜 상세히 설명하면 다음과 같다. 또한 본 발명을 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

도 1 은 본 발명에 의한 말뚝연결구를 이용한 말뚝의 이음 상태를 나타낸 사시도, 도 2 는 본 발명에 의한 말뚝연결구를 이용한 말뚝의 이음 상태를 나타낸 정면도, 도 3 은 본 발명에 의한 말뚝연결구를 이용한 상부말뚝과 하부말뚝의 연결과정을 나타낸 분리사시도, 도 4 는 본 발명에 의한 제1연결구와 제2연결구를 상부말뚝에 설치한 상태를 나타낸 예시도, 도 5 는 본 발명에 의한 제1연결구를 나타낸 예시도, 도 6 은 본 발명에 의한 제2연결구를 나타낸 예시도로서,1 is a perspective view showing a joint state of the pile using the pile connector according to the present invention, Figure 2 is a front view showing a joint state of the pile using the pile connector according to the present invention, Figure 3 using a pile connector according to the present invention Figure 4 is an exploded perspective view showing a process of connecting the upper pile and the lower pile, Figure 4 is an exemplary view showing a state in which the first connector and the second connector is installed in the upper pile, Figure 5 is a first connector according to the present invention 6 is an exemplary view showing a second connector according to the present invention,

도면에서와 같이 본 발명은, 상부말뚝(10)과 하부말뚝(20)을 연결해주는 것으로, 상부말뚝(10)과 하부말뚝(20)을 연결하는 제1연결구(200) 및 제2연결구(300)와, 상기 하부말뚝(20)에 설치되어 제1연결구(200) 및 제2연결구(300)가 하부말뚝(20)에 형성된 강선고정용 너트(12)와 동일선상에 위치될 수 있도록 가이드 해주는 가이드링(100)을 포함하여 구성된다.As shown in the drawing, the present invention is to connect the upper pile 10 and the lower pile 20, the first connector 200 and the second connector 300 for connecting the upper pile 10 and the lower pile 20. And, installed on the lower pile 20 to guide the first connector 200 and the second connector 300 to be located on the same line as the steel wire fixing nut 12 formed on the lower pile (20). It is configured to include a guide ring (100).

상기 상부말뚝(10)과 하부말뚝(20)은, 통상의 PHC말뚝로서, 콘크리트몸체와, 상기 콘크리트몸체의 양단에 다수개가 설치되고 내주면에 나사산이 형성되어 있는 강선 고정용 너트와, 양단이 상기 강선고정용 너트에 고정되는 다수의 강선을 포함하여 구성된다.The upper pile 10 and the lower pile 20, as a normal PHC pile, a concrete body, a steel wire fixing nut is provided on both ends of the concrete body and the thread is formed on the inner peripheral surface, both ends are It comprises a plurality of steel wires fixed to the steel fixing nut.

상기 가이드링(100)은, 하부말뚝(20)의 두부 외측을 감싸도록 설치되는 것으로, 하부말뚝(20)을 감싸는 띠 형상으로 이루어지고 양 끝단에 서로 마주보는 형태의 볼트체결부(111)가 형성되어 있는 본체(110)와, 상기 본체(110)의 외주면에 적어도 2개 이상 설치되어 후술되는 제2연결구(300)의 가이드바(330) 삽입되는 가이드관(120)과, 상기 본체(110)의 상부에서 하부말뚝(20)의 외측을 향해 상향 경사지게 돌출되어 상부말뚝(10)이 하부말뚝(20)의 상부에 놓여지는 과정에서 상부말뚝(10)의 중심이 하부말뚝(20)의 중심에 정위치 되도록 가이드해주는 다수의 가이드편(130)과, 상기 본체(110)의 볼트체결부(111)를 통해 설치되어 본체(110)가 하부말뚝(20)의 외주면에 감겨져 고정될 수 있도록 하는 볼트(400)를 포함하여 구성된다.The guide ring 100 is installed so as to surround the outside of the head of the lower pile 20, the bolt connection portion 111 of the form of a band surrounding the lower pile 20 and facing each other at both ends is The guide tube 120 and the main body 110 are formed, the guide pipe 330 is inserted into the guide bar 330 of the second connector 300 which will be installed at least two or more on the outer peripheral surface of the main body 110 is to be described later At the top of the bottom protruding obliquely upward toward the outside of the lower pile 20, the center of the upper pile 10 in the process of the upper pile 10 is placed on top of the lower pile 20 is the center of the lower pile 20 It is installed through a plurality of guide pieces 130 and guides so as to be positioned in the body, the bolt fastening portion 111 of the main body 110 so that the main body 110 is wound on the outer peripheral surface of the lower pile 20 can be fixed It is configured to include a bolt (400).

상기 가이드관(120)은 가이드바(330)가 삽입되는 입구부분, 즉 상부의 직경이 확장되도록 형성되어 가이드바(330)가 용이하게 삽입될 수 있도록 한다.The guide tube 120 is formed so that the diameter of the inlet portion, that is, the upper portion of the guide bar 330 is inserted so that the guide bar 330 can be easily inserted.

즉 고중량으로 이루어진 상부말뚝(10)을 컨트롤 할 경우 입구부분이 확장되어 있는 가이드관(120)에 가이드바(330)가 용이하게 삽입될 수 있어 작업성이 향상되고 빠른 시공이 이루어지게 된다.That is, when controlling the upper pile (10) made of a heavy weight guide bar 330 can be easily inserted into the guide tube 120, the inlet portion is extended is improved workability and quick construction is made.

한편 상기 본체(110)의 볼트체결부(111)는 본체(110)의 양 끝단을 수직하게 절곡하고 절곡된 부분에 볼트홀(220)을 형성함으로서 형성된다.Meanwhile, the bolt fastening portion 111 of the main body 110 is formed by vertically bending both ends of the main body 110 and forming a bolt hole 220 in the bent portion.

상기 가이드편(130)은 일정간격으로 다수개가 형성되어 연결하고자 하는 상부말뚝(10)이 하부말뚝(20)의 상부에 놓여질 경우 하부말뚝(20)의 상부에서 벗어나지 않고 중심축이 일치된 상태로 정 위치될 수 있도록 가이드해 주는 것이다.The guide piece 130 is formed in a plurality at a predetermined interval when the upper pile 10 to be connected to the upper pile is placed on the upper pile 20 in the state that the central axis is consistent without leaving the upper portion of the lower pile 20 It will guide you in place.

한편 상기 제1연결구(200)는, 상부말뚝(10)에 상단부가 체결되며 하단부는 하부말뚝(20)에 체결되며 전, 후가 개방되어 있는 박스형 몸체(210)와, 상기 박스형 몸체(210)의 상부면과 하부면에 형성되어 박스형 몸체(210)를 이용한 말뚝 이음시 상부말뚝(10)과 하부말뚝(20)에 형성되어 있는 강선고정용 너트(12)에 볼트 체결이 가능하도록 하는 볼트홀(220)을 포함하여 구성된다.On the other hand, the first connector 200, the upper end is fastened to the upper pile 10, the lower end is fastened to the lower pile 20, the box-shaped body 210, the front, the rear is open, and the box-shaped body 210 Bolt holes that are formed on the upper surface and the lower surface of the bolt fixing to the steel wire fixing nut 12 formed in the upper pile 10 and the lower pile 20 when the pile is connected using the box-shaped body 210 And 220.

또한 상기 제2연결구(300)는, 상부말뚝(10)에 상단부가 체결되며 하단부는 하부말뚝(20)에 체결되며 전, 후가 개방되어 있는 박스형 몸체(310)와, 상기 박스형 몸체(310)의 상부면과 하부면에 형성되어 박스형 몸체(310)를 이용한 말뚝 이음시 상부말뚝(10)과 하부말뚝(20)에 형성되어 있는 강선고정용 너트(12)에 볼트 체결(400)이 가능하도록 하는 볼트홀(320)과, 상기 박스형 몸체(310)의 하부방향으로 돌출되어 상기 가이드관(120)에 삽입됨으로써 제1연결구(200)와 제2연결구(300)의 하부면에 형성된 볼트홀(320)과 하부말뚝(20)에 형성되는 강선고정용 너트(12)가 동일선상에 위치하도록 하는 가이드바(330)를 포함하여 구성된다.In addition, the second connector 300, the upper end is fastened to the upper pile 10, the lower end is fastened to the lower pile 20, the box-shaped body 310, the front, the rear is open, and the box-shaped body 310 It is formed on the upper surface and the lower surface of the box when the joint using the box-shaped body 310, the bolt fastening 400 to the steel wire fixing nut 12 formed in the upper pile 10 and the lower pile 20 to enable The bolt hole 320 and the bolt hole formed in the lower surface of the first connector 200 and the second connector 300 by being protruded in the lower direction of the box-shaped body 310 is inserted into the guide tube 120 ( 320 and the steel wire fixing nut 12 formed on the lower pile 20 is configured to include a guide bar 330 to be located on the same line.

상기 제2연결구(300)는 가이드링(100)에 형성된 가이드관의 개수에 맞게 2개 이상 설치하는 것이 바람직하다.The second connector 300 is preferably installed at least two to suit the number of guide tubes formed in the guide ring (100).

한편 상기 제1연결구(200)와 제2연결구(300)에 형성되는 볼트홀(220)(320)을 장공 형태로 형성하여 상부말뚝(10)과 하부말뚝(20)에 형성되어 있는 강선고정용 너트(12)와의 볼트 체결시 위치가 조금 어긋난다 하더라도 볼트(400)의 체결이 가능하게 된다.On the other hand, by forming the bolt holes 220, 320 formed in the first connector 200 and the second connector 300 in the form of a long hole for fixing the steel wire formed in the upper pile 10 and the lower pile 20 Even if the position is slightly shifted when the bolt is fastened with the nut 12, the bolt 400 may be fastened.

본 발명은 상기와 같이 제1연결구(200)와 제2연결구(300) 개별적으로 구성됨으로써 무게가 가벼워 상부말뚝(10)과 하부말뚝(20)에 연결시 작업자가 쉽게 잡고 설치가 가능하여 빠르고 쉽게 말뚝의 이음 시공이 가능하다.
According to the present invention, since the first connector 200 and the second connector 300 are individually configured as described above, the weight is light, so that the operator can easily install and install the upper pile 10 and the lower pile 20 so as to quickly and easily. Construction of pile joints is possible.

이와 같이 구성되는 본 발명의 말뚝연결구를 이용하여 상부말뚝(10)과 하부말뚝(20)의 이음 시공 과정을 설명한다.Using the pile connector of the present invention configured as described above will be described the joint construction process of the upper pile 10 and the lower pile (20).

먼저 지중에 설치된 하부말뚝(20)의 두부에 가이드링(100)을 설치한다. 이때 가이드링(100)은 본체를 하부말뚝(20)의 두부 외측으로 감고 볼트체결부(111)의 볼트홀(112)을 통해 볼트(140)를 설치하여 고정한다.First, the guide ring 100 is installed on the head of the lower pile 20 installed in the ground. In this case, the guide ring 100 winds the main body to the outside of the head of the lower pile 20 and installs and fixes the bolt 140 through the bolt hole 112 of the bolt fastening part 111.

이때 상기 가이드링(100)은 가이드관(120)이 강선고정용 너트(12)와 동일 선상에 위치하도록 설치한다.At this time, the guide ring 100 is installed so that the guide pipe 120 is located on the same line as the steel wire fixing nut 12.

또한 상기 하부말뚝(20)에 연결하고자 하는 상부말뚝(10)의 선단에 제1연결구(200)와 제2연결구(300)를 설치한다.In addition, a first connector 200 and a second connector 300 are installed at the tip of the upper pile 10 to be connected to the lower pile 20.

상기 제1연결구(200)와 제2연결구(300)는 박스형 몸체(210)(310)의 개방된 부분으로 볼트(400)를 삽입하여 볼트홀(220)(320)을 통해 상부말뚝(10)의 강선고정용 너트(12)에 체결하여 고정한다.The first connector 200 and the second connector 300 are inserted into the open portion of the box-shaped body (210) (310) by inserting the bolt 400 through the upper hole (10) through the bolt holes 220, 320 Fasten to the steel wire fixing nut (12).

이와 같은 과정을 거쳐 강선고정용 너트(12)마다 제1연결구(200)와 제2연결구(300)를 설치한다.Through such a process, the first connector 200 and the second connector 300 are installed for each steel wire fixing nut 12.

또한 상기 제2연결구(300)는 가이드링(100)에 형성되어 있는 가이드관(120)의 개수에 맞게 설치한다.In addition, the second connector 300 is installed according to the number of guide tubes 120 formed in the guide ring 100.

이렇게 하부말뚝(20)에는 가이드링(100)이 설치되고 상부말뚝(10)에는 제1연결구(200)와 제2연결구(300)가 설치되면, 크레인을 이용하여 상부말뚝(10)을 인양하여 하부말뚝(20)의 상부에 안착시킨다.When the guide ring 100 is installed on the lower pile 20 and the first connector 200 and the second connector 300 are installed on the upper pile 10, the upper pile 10 is lifted by using a crane. Seated on the top of the lower pile (20).

이때 상부말뚝(10)은 하부말뚝(20)에 설치된 가이드링(100)의 가이드편(130)에 의해 가이드 되면서 하부말뚝(20) 상에서 벗어나지 않고 하부말뚝(20)과 중심이 일치되도록 안착된다.At this time, the upper pile 10 is guided by the guide piece 130 of the guide ring 100 installed in the lower pile 20 and is seated so that the center of the lower pile 20 coincides with the lower pile 20.

또한 상부말뚝(10)에 설치된 제2연결구(300)의 가이드바(330)가 가이드링(100)의 가이드관(120)에 삽입되면서 제1연결구(200)와 제2연결구(300)의 하부에 형성되어 있는 볼트홀(220)(320)과 하부말뚝(20)의 강선고정용 너트(12)가 동일선상에 위치하게 된다.In addition, the guide bar 330 of the second connector 300 installed in the upper pile 10 is inserted into the guide tube 120 of the guide ring 100, the lower portion of the first connector 200 and the second connector 300 The bolt holes 220 and 320 formed in the steel wire fixing nut 12 of the lower pile 20 are positioned on the same line.

여기서 상기 가이드관(120)은 상부의 직경이 확장되도록 형성되어 있기 때문에 가이드바(330)가 용이하게 삽입될 수 있다.Here, the guide tube 120 is formed so that the diameter of the upper portion of the guide bar 330 can be easily inserted.

이렇게 상부말뚝(10)이 하부말뚝(20)의 상부에 안착되면 상기 제1연결구(200)와 제2연결구(300)의 하부면에 형성된 볼트홀(220)(320)과 하부말뚝(20)의 강선고정용 너트(12)가 동일선상에 위치하게 되고, 볼트(400)를 이용하여 하부말뚝(20)의 강선고정용 너트에 고정하여 상부말뚝(10)과 하부말뚝(20)을 연결해주고 하부말뚝(20)에 설치되어 있는 가이드링(100)을 분리함으로써 말뚝의 이음 시공이 완료된다.When the upper pile 10 is seated on the upper portion of the lower pile 20, the bolt holes 220, 320 and the lower pile 20 formed on the lower surface of the first connector 200 and the second connector 300 The steel wire fixing nut 12 is positioned on the same line, and fixed to the steel wire fixing nut of the lower pile 20 by using the bolt 400 to connect the upper pile 10 and the lower pile 20, By removing the guide ring 100 installed on the lower pile 20, the construction of the pile is completed.

이와 같이 구성되는 본 발명의 말뚝연결구는 강선고정용 너트에 대응되는 제1연결구(200)와 제2연결구(300)가 개별적으로 구성됨으로써 중량이 가벼워 작업자가 핸들링 하기 용이하여 빠르고 간편한 시공이 가능하며, 상부말뚝(10)과 하부말뚝(20)의 연결 부분에 부분적으로 다수개가 설치됨으로써 자재를 절감할 수 있게 된다.
The pile connector of the present invention configured as described above is configured by the first connector 200 and the second connector 300 corresponding to the steel wire fixing nut individually, so that the weight is light and easy for the worker to handle, thereby allowing for quick and simple construction. , By partially installing a plurality of the upper pile 10 and the connection portion of the lower pile 20 it is possible to reduce the material.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.

(10) : 상부말뚝 (11) : 콘크리트몸체
(12) : 강선고정용 너트 (13) : 강선
(20) : 하부말뚝 (100) : 가이드링
(110) : 본체 (111) : 볼트체결부
(112) : 볼트홀 (120) : 가이드관
(130) : 가이드편 (200) : 제1연결구
(210) : 박스형 몸체 (220) : 볼트홀
(300) : 제2연결구 (310) : 박스형 몸체
(320) : 볼트홀 (330) : 가이드바
(10): upper pile (11): concrete body
(12): steel wire fixing nut (13): steel wire
(20): Lower pile (100): Guide ring
110: main body 111: bolt connection
(112): bolt hole 120: guide tube
(130): Guide piece (200): First connector
(210): box-shaped body 220: bolt hole
(300): second connector 310: box-shaped body
(320): bolt hole 330: guide bar

Claims (5)

말뚝과 말뚝을 연결하는 말뚝연결구에 있어서,
하부말뚝의 두부 외측을 감싸도록 설치되고 외면에 2개 이상의 가이드관이 형성되어 있는 가이드링;
상부말뚝의 선단에 형성된 강선고정용 너트에 일측단이 볼트결합되고, 하부말뚝의 두부에 형성된 강선고정용 너트에 타측단이 볼트결합되는 다수의 제1연결구;
상부말뚝의 선단에 형성된 강선고정용 너트에 일측단이 볼트결합되고, 하부말뚝의 두부에 형성된 강선고정용 너트에 타측단이 볼트결합되며 상기 가이드관에 끼워질 수 있도록 하부방향으로 가이드바가 돌출 형성되어 있는 제2연결구;를 포함하여 구성되되,
상기 가이드링은, 하부말뚝을 감싸도록 띠 형상으로 이루어지고 양 끝단에 서로 마주보는 형태의 볼트체결부가 형성되어 있는 본체와, 상기 본체의 외주면에 적어도 2개 이상 설치되고 가이드바가 용이하게 삽입될 수 있도록 입구 부분의 직경이 확장되도록 형성되어 있는 가이드관과, 상기 본체의 상부에서 말뚝의 외측 방향을 향해 돌출 형성되어 상부말뚝이 하부말뚝의 상부에 놓여지도록 가이드해주는 다수의 가이드편과, 상기 본체의 볼트체결부를 통해 설치되어 본체가 하부말뚝의 외주면에 고정될 수 있도록 하는 볼트를 포함하여 구성된 것을 특징으로 하는 말뚝연결구.
In the pile connector connecting the pile and the pile,
A guide ring installed to surround the outside of the head of the lower pile and having two or more guide tubes formed on an outer surface thereof;
A plurality of first connectors having one end bolted to the steel wire fixing nut formed at the tip of the upper pile and the other end bolted to the steel wire fixing nut formed at the head of the lower pile;
One end is bolted to the steel wire fixing nut formed on the tip of the upper pile, the other end is bolted to the steel wire fixing nut formed on the head of the lower pile, and the guide bar protrudes downward to be fitted to the guide tube. Is configured to include a second connector;
The guide ring may be formed in a band shape to surround the lower pile and at least two or more guide bars are installed on the outer circumferential surface of the main body and the main body is formed with bolt coupling parts facing each other at both ends. A guide tube formed so as to expand the diameter of the inlet portion, a plurality of guide pieces protruding from the upper portion of the main body toward the outer side of the pile, and guiding the upper pile to be placed on the upper portion of the lower pile; Installed through the fastening portion pile connector characterized in that it comprises a bolt to be fixed to the outer peripheral surface of the lower pile.
삭제delete 제 1 항에 있어서,
상기 제1연결구는,
전,후가 개방된 박스형 몸체;
상기 박스형 몸체의 상부면과 하부면에 상기 강선고정용 너트에 볼트 체결이 가능하도록 형성되어 있는 볼트홀;을 포함하여 구성된 것을 특징으로 하는 말뚝연결구.
The method of claim 1,
The first connector,
Box body open before and after;
And a bolt hole formed on the upper surface and the lower surface of the box-shaped body to be bolted to the steel wire fixing nut.
제 1 항에 있어서,
상기 제2연결구는,
전, 후가 개방된 박스형 몸체;
상기 박스형 몸체의 상부면과 하부면에 상기 강선고정용 너트에 볼트 체결이 가능하도록 형성되어 있는 볼트홀;
상기 박스형 몸체에서 하부방향으로 돌출 형성되어 상기 가이드관에 삽입됨으로써 제1연결구와 제2연결구의 하부면에 형성된 볼트홀과 하부말뚝에 형성되는 강선고정용 너트가 동일선상에 위치하도록 하는 가이드바;를 포함하여 구성된 것을 특징으로 하는 말뚝연결구.
The method of claim 1,
The second connector,
A box-shaped body with open front and back;
A bolt hole formed on the upper surface and the lower surface of the box-shaped body to be bolted to the steel wire fixing nut;
A guide bar which protrudes downward from the box-shaped body and is inserted into the guide tube so that the bolt hole formed on the lower surface of the first connector and the second connector and the steel wire fixing nut formed on the lower pile are positioned on the same line; Pile connector, characterized in that configured to include.
제 3 항 또는 제 4 항에 있어서,
상기 볼트홀은 장공 형태로 형성되는 것을 특징으로 하는 말뚝연결구.











The method according to claim 3 or 4,
The bolt hole is a pile connector, characterized in that formed in the long hole shape.











KR1020120111155A 2012-10-08 2012-10-08 Coupling apparatus of pile KR101316905B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120111155A KR101316905B1 (en) 2012-10-08 2012-10-08 Coupling apparatus of pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120111155A KR101316905B1 (en) 2012-10-08 2012-10-08 Coupling apparatus of pile

Publications (1)

Publication Number Publication Date
KR101316905B1 true KR101316905B1 (en) 2013-10-11

Family

ID=49638149

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120111155A KR101316905B1 (en) 2012-10-08 2012-10-08 Coupling apparatus of pile

Country Status (1)

Country Link
KR (1) KR101316905B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869122A (en) * 2017-03-23 2017-06-20 湖北省电力勘测设计院 Prestressed concrete pipe pile Quick mechanical joint design

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09100531A (en) * 1995-10-06 1997-04-15 Kubota Corp Vertical jointing method for steel pipe pile having coupling member
KR100870859B1 (en) * 2008-03-26 2008-11-27 이호경 The coupling structure of pretentioned spun high strength concrete piles
KR20100092290A (en) * 2009-02-12 2010-08-20 (주)삼오기초건설 Guider for concrete file
JP2011247056A (en) 2010-05-31 2011-12-08 Tama Engineering Kk Connection member of rotary press-in pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09100531A (en) * 1995-10-06 1997-04-15 Kubota Corp Vertical jointing method for steel pipe pile having coupling member
KR100870859B1 (en) * 2008-03-26 2008-11-27 이호경 The coupling structure of pretentioned spun high strength concrete piles
KR20100092290A (en) * 2009-02-12 2010-08-20 (주)삼오기초건설 Guider for concrete file
JP2011247056A (en) 2010-05-31 2011-12-08 Tama Engineering Kk Connection member of rotary press-in pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869122A (en) * 2017-03-23 2017-06-20 湖北省电力勘测设计院 Prestressed concrete pipe pile Quick mechanical joint design
CN106869122B (en) * 2017-03-23 2019-06-18 湖北省电力勘测设计院有限公司 Prestressed concrete pipe pile Quick mechanical joint structure

Similar Documents

Publication Publication Date Title
KR101457114B1 (en) Pre-fabrication method for steel reinforcement
JP6871781B2 (en) Reinforcing bar cage pile head fixing and holding structure
KR101318937B1 (en) Coupling apparatus of pile
KR101316905B1 (en) Coupling apparatus of pile
KR101621503B1 (en) Supporter for join rebar
JP5559092B2 (en) Reconstruction method for power pole installation line and retooling tool used in such construction method
KR101252027B1 (en) Coupling apparatus of pile
JP6228838B2 (en) Sheath tube holding device, slip foam device, sheath tube holding method, and PC frame construction method by slip foam method
KR101173218B1 (en) X-Shackle for square type crossarm
JP2007308280A (en) Cable drum, cable winding method, and cable laying method
KR101644449B1 (en) Phc pile using joint plate and connecting fin
CN211523305U (en) Pile foundation sounding pipe installation auxiliary device
JP5974571B2 (en) Stabilizing jig for slant pile
JP2011157769A (en) Hollow columnar reinforcing structure and hollow columnar reinforcing method using the reinforcing structure
JP6432975B2 (en) PC steel direction change method and PC steel direction change jig
CN111697491A (en) Single insulator staple bolt of acting as go-between
JP2009089562A (en) Parallel clevis
CN105110069A (en) Support for unbundling and fixed-length cutting of steel strands of whole bundle
JP6251120B2 (en) Pipe connection method
JP5118329B2 (en) Tightening method and vernier fitting used therefor
JP6529874B2 (en) Method of dismantling a concrete column, and articulated rod device
CN210318809U (en) Tail support frame for horizontal pipe pulling of winch
CN219954483U (en) Bending-resistant reinforcing device for buried pipeline of underlying goaf
JP5420726B2 (en) Clinker ash removal apparatus and clinker ash removal method
CN217840921U (en) Safety protection tool for steel strand of prestressed anchor cable

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160928

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170921

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180927

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190926

Year of fee payment: 7