JPH09100531A - Vertical jointing method for steel pipe pile having coupling member - Google Patents

Vertical jointing method for steel pipe pile having coupling member

Info

Publication number
JPH09100531A
JPH09100531A JP28643995A JP28643995A JPH09100531A JP H09100531 A JPH09100531 A JP H09100531A JP 28643995 A JP28643995 A JP 28643995A JP 28643995 A JP28643995 A JP 28643995A JP H09100531 A JPH09100531 A JP H09100531A
Authority
JP
Japan
Prior art keywords
pile
steel pipe
piles
joint members
joint member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28643995A
Other languages
Japanese (ja)
Inventor
Masayuki Tsuchiya
正幸 土谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP28643995A priority Critical patent/JPH09100531A/en
Publication of JPH09100531A publication Critical patent/JPH09100531A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To make the positioning easier in the vertical jointing of steel pipe piles having coupling members. SOLUTION: At the upper end of an attaching rod 8 which can insert, a lower portoin into jointing members 3 and 4 of steel pipe piles, guide jigs 7, 7 are formed, which can be separably coupled to a linking rod 10 having a peak portion 11 which is also able to insert the upper portion in the same manner. This is inserted to the coupling members 3 and 4 of the lower pile 1b and is kept, standing vertically. With respect to the lower pile 1b, the upper pile 1b is lowered and its coupling members 3 and 4 are fitted to a linking rod 10 and the upper pile 1a is coupled to a lower pipe 1b. By doing this, the upper and lower piles 1a and 1b can be easily and properly positioned in the axial direction and peripheral direction.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、継手部材を有する鋼管
杭の縦継ぎを行うための方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for cascading steel pipe piles having joint members.

【0002】[0002]

【従来の技術】鋼管杭どうしの溶接による縦継ぎ(胴継
ぎ)は、現場が狭いような場合には、埋設孔に挿入した
下杭に対して上杭をクレーンで吊り下げて突き合せ、溶
接する方法が採られている。
2. Description of the Related Art A vertical joint (body joint) by welding steel pipe piles together is carried out by hanging the upper pile with a crane and abutting the lower pile inserted in the buried hole when the site is narrow. The method of doing is adopted.

【0003】このような縦継ぎを、鋼管柱列土留壁に使
用するような、外周の縦方向に継手部材を有する鋼管杭
で行う場合は、継ぎ合せる上杭と下杭の軸線上の位置合
せばかりでなく、継手部材どうしの位置を合せるための
管周方向の位置合せが必要であり、従来は、上杭の下端
部にチェーントングやナイロンスリング等の荷役運搬具
を掛けて、上杭を回転させて行っている。
When such a vertical joint is carried out on a steel pipe pile having a joint member in the longitudinal direction of the outer periphery, such as used for a steel pipe column soil retaining wall, the axial alignment of the upper pile and the lower pile to be joined is performed. Not only this, it is necessary to align the joint members in the pipe circumferential direction so as to align the positions of the joint members. Conventionally, a cargo handling carrier such as a chain tongue or nylon sling is hung on the lower end of the upper pile to It's rotating.

【0004】[0004]

【発明が解決しようとする課題】しかし、このような従
来の方法では、上杭の設置時に発生する下杭の裏当てリ
ングとの摩擦により、上杭を微小なmm単位で回転させる
ことが困難であるとともに、吊り下げた上杭の揺れも影
響するため、位置合せに多くの労力と時間を要してい
た。そのため、縦継ぎにおける位置合せ作業の改善が大
きな問題となっていた。
However, in such a conventional method, it is difficult to rotate the upper pile by a unit of a minute mm due to the friction with the backing ring of the lower pile generated when the upper pile is installed. In addition, the shaking of the suspended upper pile also affects the alignment, which requires a lot of labor and time for alignment. Therefore, the improvement of the alignment work in the vertical connection has been a big problem.

【0005】本発明は、上記従来の問題点を解決するた
めになされたもので、ガイド治具を用いることにより、
継手部材を有する鋼管杭の縦継ぎを容易に能率よく行え
るようにしようとするものである。
The present invention has been made in order to solve the above-mentioned conventional problems, and by using a guide jig,
An object of the present invention is to make it possible to easily and efficiently vertically connect steel pipe piles having joint members.

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
めの本発明の構成について、実施例に対応する図面を参
照して説明すると、本発明は、鋼管杭の外面縦方向に沿
って設けたパイプ状の継手部材3,4に、下部を所要の
長さ挿入、係止できるようにした取付杆8と、同じく、
上部を所要の長さ挿入できるようにした尖頭部11を有す
る係入杆10とを分離可能に結合したガイド治具7を形成
し、これを下杭1bの継手部材3,4に挿入、立設した
後、該下杭1b上に、上杭1aを吊り降ろして、その継
手部材3,4を上記ガイド治具7の係入杆10に嵌合さ
せ、上杭1aを下杭1b上に接合させることを特徴とす
るものである。
The structure of the present invention for achieving the above object will be described with reference to the drawings corresponding to the embodiments. The present invention is provided along the longitudinal direction of the outer surface of a steel pipe pile. The fitting rod 8 that allows the lower part to be inserted and locked to the pipe-shaped joint members 3 and 4 for a desired length,
A guide jig 7 is formed so as to be separably connected to an engaging rod 10 having a pointed portion 11 whose upper portion can be inserted for a required length, and this is inserted into the joint members 3 and 4 of the lower pile 1b. After standing upright, the upper pile 1a is hung on the lower pile 1b, and the joint members 3 and 4 are fitted into the engaging rods 10 of the guide jig 7 to put the upper pile 1a on the lower pile 1b. It is characterized by being bonded to.

【0007】[0007]

【作用】頭部を地上に突出して埋設孔に挿入、固定され
た下杭1bの継手部材3,4にガイド治具7,7を挿
入、立設させる。これに対し、クレーンで吊り上げた上
杭1aを、その継手部材3,4が下杭1bの継手部材
3,4と大よそ合うようにしながら降下させて、その継
手部材3,4をガイド治具7,7と嵌め合せて行き、上
杭1aを下杭1bに接合させる。
The guide jigs 7, 7 are inserted into the joint members 3, 4 of the lower pile 1b fixed with the head projecting above the ground and inserted into the embedding hole, and then erected. On the other hand, the upper pile 1a lifted by the crane is lowered while the joint members 3 and 4 of the upper pile 1a are substantially aligned with the joint members 3 and 4 of the lower pile 1b, and the joint members 3 and 4 are guided by a guide jig. Then, the upper piles 1a are joined to the lower piles 1b by fitting them together.

【0008】その際、上杭1aの継手部材3,4がガイ
ド治具7,7と少しずれていても、ガイド治具7,7の
尖頭部11,11が継手部材3,4を誘導して、その位置ず
れが自動的に修正されることになり、上下両杭1a、1
bは軸線方向及び周方向の位置決めが正しく行われて接
合されることになる。
At this time, even if the joint members 3 and 4 of the upper pile 1a are slightly displaced from the guide jigs 7 and 7, the pointed portions 11 and 11 of the guide jigs 7 and 7 guide the joint members 3 and 4. Then, the positional deviation will be automatically corrected, and the upper and lower piles 1a, 1
The b is joined by being properly positioned in the axial direction and the circumferential direction.

【0009】[0009]

【実施例】以下、本発明の実施例について図面を参照し
て説明する。図1及び図2は上杭と下杭の接合状態を示
し、図3は同接合の過程を示し、図4は本発明において
使用されるガイド治具を示したものである。
Embodiments of the present invention will be described below with reference to the drawings. 1 and 2 show the joined state of the upper pile and the lower pile, FIG. 3 shows the joining process, and FIG. 4 shows the guide jig used in the present invention.

【0010】本発明においては、鋼管2の外面縦方向に
一対のパイプ状の継手部材3,4を設けた鋼管杭1が用
いられる。一方の継手部材3は断面O形の雄部材、他方
の継手部材4は断面C形の雌部材となっている。なお、
両継手部材3,4は、その両方とも断面C形として互い
に掛け合せする方式のものとすることもできる。
In the present invention, a steel pipe pile 1 is used in which a pair of pipe-shaped joint members 3 and 4 are provided in the longitudinal direction of the outer surface of the steel pipe 2. One joint member 3 is a male member having an O-shaped cross section, and the other joint member 4 is a female member having a C-shaped cross section. In addition,
Both of the joint members 3 and 4 may have a C-shaped cross-section and may be of a type in which they are hung on each other.

【0011】上記のようなパイプ状の継手部材3,4を
有する鋼管杭1では、縦継ぎにおける溶接の都合上、図
1、図3に示すように、継手部材3,4は鋼管2の端面
より少し内方位置までの長さで設けられている。また、
鋼管2の下端には溶接用の開先部5が形成され、他方上
端部内には裏当てリング6が上方に突出して設けられて
いる。
In the steel pipe pile 1 having the pipe-like joint members 3 and 4 as described above, the joint members 3 and 4 are end faces of the steel pipe 2 as shown in FIGS. It is provided with a length to a slightly inward position. Also,
A groove 5 for welding is formed at the lower end of the steel pipe 2, while a backing ring 6 is provided in the upper end so as to project upward.

【0012】本発明方法では、上杭1aと下杭1bとの
位置合せを行うためのガイド治具7が使用される。この
ガイド治具7は、図示のように、下部を継手部材3,4
内に挿脱自在に形成するとともに、その挿入長さを規制
する係止ピン9を設けた取付杆8の上端に、上部を継手
部材3,4内に挿脱自在に形成した、尖頭部11を有する
係入杆10をネジ部12の螺合等により分離可能に結合した
構造となっている。なお、取付杆8のピン9に代えて、
継手部材3,4に挿入されない部分を挿入される部分よ
り径大に形成することもできる。
In the method of the present invention, the guide jig 7 for aligning the upper pile 1a and the lower pile 1b is used. As shown in the figure, the guide jig 7 has a lower portion with joint members 3, 4
A pointed head which is formed so that it can be inserted into and removed from the inside, and an upper part is formed into an inside of the joint members 3 and 4 so that the upper part can be inserted into and removed from the upper end of a mounting rod 8 provided with a locking pin 9 that regulates the insertion length. It has a structure in which an engaging rod 10 having 11 is separably coupled by screwing a screw portion 12 or the like. In addition, instead of the pin 9 of the mounting rod 8,
The diameter of the portion not inserted into the joint members 3 and 4 may be larger than that of the inserted portion.

【0013】下杭1bは、杭建込み用の掘削孔(図示を
略す)内に挿入され、その上部を所要の長さ地上に突出
した状態で仮固定される。そして、取付杆8と係入杆10
を結合したガイド治具7を、下杭1bの継手部の3,4
の上部内に、取付杆8の下部を係止ピン9の位置まで挿
入して立設する。
The lower pile 1b is inserted into an excavation hole (not shown) for building a pile, and is temporarily fixed in a state in which the upper portion of the lower pile 1b projects above the ground for a required length. Then, the mounting rod 8 and the engaging rod 10
The guide jig 7 in which the
The lower part of the mounting rod 8 is inserted up to the position of the locking pin 9 in the upper part of the above to stand upright.

【0014】下杭1bに縦継ぎする上杭1aは、クレー
ンで吊上げられて下杭1bの直上に運ばれ、下杭1bに
対して、ほぼ軸線方向の位置合せをするとともに、上杭
1aの継手部材3,4が下杭1bに立設されたガイド治
具7,7上にほぼ向かうようにして、周方向への位置合
せを行いながら降下させて行き、継手部材3,4がガイ
ド治具7,7の係入杆10に嵌合されるようにする。
The upper pile 1a, which is vertically connected to the lower pile 1b, is lifted up by a crane and carried right above the lower pile 1b to be aligned with the lower pile 1b almost in the axial direction. The joint members 3 and 4 are lowered toward the guide jigs 7 and 7 which are erected on the lower pile 1b while being aligned in the circumferential direction. The fitting rods 7 and 7 are fitted to the engaging rod 10.

【0015】この場合、上杭1aの継手部材3,4の周
部のどこかが、ガイド治具7の尖頭部10に当たるように
されれば、降下が進むにつれて、ガイド治具7に対し
て、これと嵌合する継手部材3,4の方がその位置を修
正することになり、継手部材3,4とガイド治具7,7
の係入杆10とが嵌合されることになる。それによって、
上杭1aと下杭1bの継手部材3,3、4,4どうしの
軸線は合致され、そして、上杭1aと下杭1bの鋼管
2,2の端面は接合される。
In this case, if any part of the periphery of the joint members 3 and 4 of the upper pile 1a hits the pointed portion 10 of the guide jig 7, as the descent proceeds, Then, the positions of the joint members 3 and 4 fitted with this will be corrected, and the joint members 3 and 4 and the guide jigs 7 and 7 will be corrected.
The engaging rod (10) is fitted. Thereby,
The axes of the joint members 3, 3, 4, 4 of the upper pile 1a and the lower pile 1b are aligned with each other, and the end faces of the steel pipes 2, 2 of the upper pile 1a and the lower pile 1b are joined.

【0016】上記のようにして上下両杭1a,1bの接
合後は、ガイド治具7,7の除去を行う。それには、ガ
イド治具7を押し上げてその取付杆8を継手部材3,4
より抜き出た状態にして係入杆10と取付杆8とを相対的
に回してネジ12の螺合をはずして分離し、取付杆8を除
去し、ついで係入杆10を抜き落すようにする。
After the upper and lower piles 1a and 1b are joined as described above, the guide jigs 7 and 7 are removed. To this end, the guide jig 7 is pushed up and its mounting rod 8 is attached to the joint members 3, 4
In such a state that it is further pulled out, the engaging rod 10 and the mounting rod 8 are relatively rotated, and the screw 12 is unscrewed and separated, the mounting rod 8 is removed, and then the engaging rod 10 is pulled out. To do.

【0017】ガイド治具7,7を除去したならば、図5
に示すように、両杭1a,1bの鋼管2,2の接合端外
周に沿って溶接13を行い、ついで、両杭1a,1bの継
手部材3,3、4,4間に、それらと同形の短尺な接続
材14,15を溶接16,16により取り付ければ、上杭1aと
下杭1bとの縦継ぎ施工が完了することになる。
After removing the guide jigs 7, 7, as shown in FIG.
As shown in Fig. 2, welding 13 is performed along the outer circumference of the joint ends of the steel pipes 2 and 2 of both piles 1a and 1b, and then the same shape is formed between the joint members 3, 3, 4 and 4 of both piles 1a and 1b. If the short connecting materials 14 and 15 are attached by welding 16 and 16, the vertical connection construction of the upper pile 1a and the lower pile 1b will be completed.

【0018】[0018]

【発明の効果】以上説明したように、本発明によれば、
下杭の継手部材にガイド治具の下部を挿入、立設してお
き、吊り上げた上杭を降下させて、その継手部材をガイ
ド治具の上部と嵌合させるようにしたので、上杭の継手
部材を下杭の継手部材に大よその位置合せをさせてやれ
ば、ガイド治具と継手部材との嵌め合いによって、上下
両杭の軸線上の位置合せばかりでなく、周方向のずれの
修正が自動的に行われて両杭の接合が正確に行えること
になり、継手部材を有する鋼管杭の縦継ぎ施工が簡易に
能率よくできる。
As described above, according to the present invention,
Since the lower part of the guide jig was inserted into the joint member of the lower pile and stood upright, the suspended upper pile was lowered and the joint member was fitted with the upper part of the guide jig. If the joint member is roughly aligned with the joint member of the lower pile, the fitting between the guide jig and the joint member not only allows the upper and lower piles to be aligned on the axial line, but also can be displaced in the circumferential direction. Since the correction is automatically performed and the two piles can be joined accurately, the vertical jointing of the steel pipe pile having the joint member can be performed easily and efficiently.

【0019】また、これに使用されるガイド治具は、構
造が簡単で安価に製作でき、取扱いも容易であるととも
に、施工後は取り外して反覆使用することができ、コス
トの低減が図れる。
The guide jig used for this purpose has a simple structure, can be manufactured at low cost, is easy to handle, and can be detached and used again after construction, thus reducing the cost.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施態様の一例を示す一部切欠正面図
である。
FIG. 1 is a partially cutaway front view showing an example of an embodiment of the present invention.

【図2】同平断面図である。FIG. 2 is a plan sectional view of the same.

【図3】上杭の降下過程を示す要部の一部切欠正面図で
ある。
FIG. 3 is a partially cutaway front view of a main part showing a lowering process of the upper pile.

【図4】ガイド治具を示す一部切欠正面図である。FIG. 4 is a partially cutaway front view showing a guide jig.

【図5】上下両杭の溶接結合状態を示す正面図である。FIG. 5 is a front view showing a welded state of the upper and lower piles.

【符号の説明】[Explanation of symbols]

1 鋼管杭 1a 上杭 1b 下杭 2 鋼管 3,4 継手部材 7 ガイド治具 8 取付杆 9 係止ピン 10 係入杆 11 尖頭部 12 ネジ部 1 Steel pipe pile 1a Upper pile 1b Lower pile 2 Steel pipe 3,4 Joint member 7 Guide jig 8 Mounting rod 9 Locking pin 10 Engaging rod 11 Pointed portion 12 Threaded portion

Claims (1)

【特許請求の範囲】[Claims] 鋼管杭の外面縦方向に沿って設けたパイプ状の継手部材
に、下部を所要の長さ挿入、係止できるようにした取付
杆と、同じく、上部を所要の長さ挿入できるようにした
尖頭部を有する係入杆とを分離可能に結合したガイド治
具を形成し、これを下杭の継手部材に挿入、立設した
後、該下杭上に、上杭を吊り降ろして、その継手部材を
上記ガイド治具の係入杆に嵌合させ、上杭を下杭上に接
合させることを特徴とする、継手部材を有する鋼管杭の
縦継ぎ方法。
A mounting rod that allows the lower part to be inserted and locked to the pipe joint member that is provided along the longitudinal direction of the outer surface of the steel pipe pile, as well as a sharpened tip that allows the upper part to be inserted to the required length. After forming a guide jig in which the engaging rod having the head portion is separably coupled, it is inserted into the joint member of the lower pile and erected, and then the upper pile is hung on the lower pile, A vertical connection method for steel pipe piles having a joint member, characterized in that the joint member is fitted into the engaging rod of the guide jig, and the upper pile is joined to the lower pile.
JP28643995A 1995-10-06 1995-10-06 Vertical jointing method for steel pipe pile having coupling member Pending JPH09100531A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28643995A JPH09100531A (en) 1995-10-06 1995-10-06 Vertical jointing method for steel pipe pile having coupling member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28643995A JPH09100531A (en) 1995-10-06 1995-10-06 Vertical jointing method for steel pipe pile having coupling member

Publications (1)

Publication Number Publication Date
JPH09100531A true JPH09100531A (en) 1997-04-15

Family

ID=17704410

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28643995A Pending JPH09100531A (en) 1995-10-06 1995-10-06 Vertical jointing method for steel pipe pile having coupling member

Country Status (1)

Country Link
JP (1) JPH09100531A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101316905B1 (en) * 2012-10-08 2013-10-11 최성희 Coupling apparatus of pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101316905B1 (en) * 2012-10-08 2013-10-11 최성희 Coupling apparatus of pile

Similar Documents

Publication Publication Date Title
JPH10311028A (en) Joint for joining steel pipe pile
JP2006226102A (en) Connecting joint of steel pipe
JP3336430B2 (en) Vertical joints for steel pipe sheet piles
JPH09100531A (en) Vertical jointing method for steel pipe pile having coupling member
JP3031659B2 (en) Longitudinal joint method of steel pipe pile and positioning device used for the method
JP2005207081A (en) Joint structure of steel pipe pile
JP4958890B2 (en) A guide jig for alignment and a method of longitudinal joining of piles using them.
CN1274930C (en) Double tile reinforced bar connecting sleeve
JPH0412107Y2 (en)
JP3605688B2 (en) Connection method and connection structure of pipe
JP4402543B2 (en) A guide jig for alignment and a method of longitudinal joining of piles using them.
JP2001279666A (en) Steel pipe erection and steel pipe erection/immersion method
JP3042154U (en) Steel pipe pile fittings
JPH10292361A (en) Driving method of drain member into ground
JPH09143985A (en) Vertical splicing method for steel pipe pile having joint member and device for use in the same
JPH09100530A (en) Vertical jointing method for steel pipe pile having coupling member
JPH09143984A (en) Vertical splicing method for steel pipe pile having joint member and guide jig for therefor
JP2582372B2 (en) Ready-made pile with injection pipe
CN220977977U (en) Continuous pressing structure of anchor rod static pressure pile
CN213980685U (en) Sucker rod connecting and buckling device
JPH0861560A (en) Pipe joining device
US20240117908A1 (en) Coiled tubing weld-on connector
JP2533881B2 (en) Screw type joint pile
JP2004204677A5 (en)
JP2001200534A (en) Longitudinal jointing device for steel pipe pile