JP3031659B2 - Longitudinal joint method of steel pipe pile and positioning device used for the method - Google Patents

Longitudinal joint method of steel pipe pile and positioning device used for the method

Info

Publication number
JP3031659B2
JP3031659B2 JP7210980A JP21098095A JP3031659B2 JP 3031659 B2 JP3031659 B2 JP 3031659B2 JP 7210980 A JP7210980 A JP 7210980A JP 21098095 A JP21098095 A JP 21098095A JP 3031659 B2 JP3031659 B2 JP 3031659B2
Authority
JP
Japan
Prior art keywords
pile
steel pipe
positioning
receiving portion
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7210980A
Other languages
Japanese (ja)
Other versions
JPH0941368A (en
Inventor
智治 廣瀬
陽一 横山
宏幸 江口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP7210980A priority Critical patent/JP3031659B2/en
Publication of JPH0941368A publication Critical patent/JPH0941368A/en
Application granted granted Critical
Publication of JP3031659B2 publication Critical patent/JP3031659B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、継手部材を有する鋼管
杭の縦継ぎ方法及びそれに使用する位置合せ装置に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for vertically joining steel pipe piles having joint members and a positioning device used for the method.

【0002】[0002]

【従来の技術】鋼管杭どうしの溶接による胴継ぎは、現
場が広い場合は横倒し状態で行われるが、現場が狭い場
合は、埋設孔に挿入した鋼管杭に他の鋼管杭を突き合わ
せて溶接する縦継ぎ方法により行われている。
2. Description of the Related Art Splicing of steel pipe piles by welding is performed sideways when the site is wide, but when the site is narrow, another steel pipe pile is butt-welded to the steel pipe pile inserted into the burial hole. It is performed by the longitudinal joint method.

【0003】外周の縦方向に継手部材を有する鋼管杭を
縦継ぎで行う場合は、継ぎ合わせる上杭と下杭の軸線上
の位置合せばかりでなく、上杭と下杭の継手部材の位置
を合せるための管周方向の位置合わせが必要であり、従
来は、上杭の下端部にチェートングやナイロンスリング
等の荷役運搬具を掛けて、上杭を回転させて行ってい
る。
When a steel pipe pile having a joint member in the longitudinal direction of the outer periphery is longitudinally joined, not only the axial alignment of the upper pile and the lower pile to be joined, but also the position of the joint member between the upper pile and the lower pile. Conventionally, it is necessary to adjust the position in the circumferential direction of the pipe, and conventionally, a cargo handling device such as a chain or a nylon sling is hung on the lower end of the upper pile, and the upper pile is rotated.

【0004】[0004]

【発明が解決しようとする課題】しかし、この従来の方
法では、上杭の設置時に発生する下杭の裏当てリングと
の摩擦により、上杭を容易にcm,mm単位で回転させるこ
とが困難であるとともに、吊り下げた上杭の揺れも影響
するため、位置合せに多くの労力と時間を要しており、
縦継ぎ作業の改善が要望されていた。
However, in this conventional method, it is difficult to easily rotate the upper pile in cm and mm units due to friction between the lower pile and the backing ring generated when the upper pile is installed. In addition, the swinging of the suspended upper pile also affects, so much labor and time is required for positioning,
There was a demand for an improvement in cascading work.

【0005】本発明は、上記従来の問題点を解決するた
めになされたもので、ガイド治具を利用した方法によ
り、継手を有する鋼管杭の縦継ぎを、容易に能率よく行
えるようにしようとするものである。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional problems, and is intended to make it possible to easily and efficiently join a steel pipe pile having a joint by a method using a guide jig. Is what you do.

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
めの本発明の構成について、実施例に対応する図面を参
照して説明すると、請求項1の方法は、上杭1aと下杭
1bの各接続部外周に、その周方向複数個所に上下に対
向してそれぞれ位置合せ用の突起体5,6を固着し、他
方、上杭1aに固着された突起体5の導入係合溝10を設
けた位置合せ用のガイド治具7を形成し、これを、下杭
1bに固着された突起体6に嵌着、立設した後、建込ま
れた下杭1b上に、吊上げた上杭1aを降下して、その
突起体5を導入係合溝10に挿入し、上杭1aを下杭1b
上に接合させることを特徴とするものである。
The structure of the present invention for achieving the above object will be described with reference to the drawings corresponding to the embodiments. The method according to the first embodiment comprises an upper pile 1a and a lower pile 1b. The positioning projections 5 and 6 are fixed to the outer periphery of each connecting portion at a plurality of positions in the circumferential direction so as to be vertically opposed to each other, and the introduction engaging grooves 10 of the projections 5 fixed to the upper pile 1a are fixed. Is formed on the projection 6 fixed to the lower stake 1b, and the jig 7 is erected on the lower stake 1b. The stake 1a is lowered, the protrusion 5 is inserted into the introduction engagement groove 10, and the upper stake 1a is connected to the lower stake 1b.
It is characterized in that it is bonded on top.

【0007】また、請求項2の装置は、接続端部の外周
に位置合せ用の突起体5,6を設けた上杭1a及び下杭
1bと、本体8の下部に、上記下杭1bの突起体6と嵌
脱自在な嵌合孔9を設けるとともに、該嵌合孔9の上方
位置に、本体8の上端より漏斗状に形成した受口部11と
これに続いて上杭1aの突起体5より相当巾広に形成し
た受入部12とによる、突起体5の導入係合溝10を設ける
とともに、先端部を受入部12内に突入可能とした調整ネ
ジ杆13,13を、本体8の横断方向に進退自在に設けた、
位置合せ用のガイド治具7とを具備してなることを特徴
とするものである。
Further, in the apparatus according to the second aspect, the upper pile 1a and the lower pile 1b provided with positioning projections 5, 6 on the outer periphery of the connection end, and the lower pile 1b A fitting hole 9 is provided to be removably fitted to the projection 6 and a receiving portion 11 formed in a funnel shape from the upper end of the main body 8 at a position above the fitting hole 9 and a projection of the upper pile 1a. The receiving screw 12 is formed to be considerably wider than the body 5, and the introduction engaging groove 10 for the protrusion 5 is provided. It is provided to be able to move forward and backward in the cross direction of
The positioning jig 7 is provided.

【0008】[0008]

【作用】地盤に挿入された下杭1bの突起体6に嵌着、
立設したガイド治具8の受口部11に対し、上杭1aの突
起体5が降下、挿入される。その際、突起体5,6の横
方向の位置が多少ずれていても、突起体5は受口部11の
漏斗斜面に当って横方向に移動しながら降下することに
なり、位置の修正が自動的に図られる。
[Function] Fit to the projection 6 of the lower pile 1b inserted into the ground,
The protrusion 5 of the upper pile 1a is lowered and inserted into the receiving portion 11 of the standing guide jig 8. At this time, even if the horizontal positions of the protrusions 5 and 6 are slightly shifted, the protrusions 5 move down in the horizontal direction while hitting the funnel slope of the receiving portion 11, and the position is corrected. This is done automatically.

【0009】また、突起体5が受入部12内に着座したと
きに、なお周方向に位置ずれを生じているときは、調整
ネジ杆13,13をそれぞれ進退させることにより、突起体
5は受入部12内で横方向に移動され、それにともなって
上杭1aは僅かに回転することになり、微小な周方向の
位置決め調節が行える。
When the projection 5 is seated in the receiving portion 12 and still has a positional deviation in the circumferential direction, the projections 5 are moved forward and backward by moving the adjusting screw rods 13 and 13 respectively. The upper pile 1a is moved slightly in the lateral direction within the portion 12, and accordingly, the upper pile 1a is slightly rotated, so that a minute circumferential positioning adjustment can be performed.

【0010】[0010]

【実施例】以下、本発明の実施例について図面を参照し
て説明する。図1〜図3は上杭と下杭の連設状態を、図
4はその連接の過程を示し、図5は本発明において使用
されるガイド治具を示したものである。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 3 show a state in which an upper pile and a lower pile are connected, FIG. 4 shows a connection process, and FIG. 5 shows a guide jig used in the present invention.

【0011】本発明においては、鋼管2の外周縦方向に
一対の継手部材3,4を設けた鋼管杭が用いられる。図
示の例では、一方が雄形の継手部材3、他方が雌形の継
手部材4となっているが、図示の形状に限られるもので
はなく、また、両継手部材3,4を同様にして互いに組
み合える形状とすることもできる。
In the present invention, a steel pipe pile provided with a pair of joint members 3 and 4 in the longitudinal direction of the outer circumference of the steel pipe 2 is used. In the illustrated example, one is a male joint member 3 and the other is a female joint member 4. However, the present invention is not limited to the illustrated shape. The shapes can be combined with each other.

【0012】上記のような継手部材3,4を有する鋼管
杭では、縦継ぎにおける溶接の都合上、図1、図4に示
すように、継手部材3,4は鋼管2の端面より少し内方
位置までの長さで設けられている。また、鋼管2の下端
には溶接用の開先部5が設けられ、他方、下杭1bの鋼
管2の上端部内には、裏当てリング14が上方に突出して
設けられている。
In the steel pipe pile having the joint members 3 and 4 as described above, the joint members 3 and 4 are slightly inward from the end face of the steel pipe 2 as shown in FIGS. It is provided with the length to the position. A welding groove 5 is provided at the lower end of the steel pipe 2, and a backing ring 14 is provided in the upper end of the steel pipe 2 of the lower pile 1b so as to protrude upward.

【0013】本発明では、まず、接続さる鋼管杭である
上杭1aと下杭1bの各端部外周に、両継手部材3,4
の中間部に位置して、それぞれ四角な立方形状をなす複
数個の位置合せ用の突起体5,5,6,6を溶接等によ
り固着しておく。この場合、上杭1aと下杭1bとの突
起体5,5が上下方向(軸線方向)に対向されるように
する。
In the present invention, first, both joint members 3, 4 are attached to the outer periphery of each end of the upper pile 1a and the lower pile 1b, which are steel pipe piles to be connected.
And a plurality of positioning projections 5, 5, 6, and 6, each having a square cubic shape, are fixed by welding or the like. In this case, the protrusions 5, 5 of the upper pile 1a and the lower pile 1b are made to face each other in the vertical direction (axial direction).

【0014】他方、上記突起体5,6と関連して、両杭
1a,1bの位置合せ用のガイド治具7,7を用意す
る。このガイド治具7は、図5にも示すように、上下に
長い板体で形成された本体8の下部に、下杭1bの突起
体6と嵌脱自在とした嵌合孔9が設けられ、また、本体
8の上端より下方に向けて、漏斗状の受口11とこれに続
く受入部12とよりなる突起体5の導入係合溝10が設けら
れている。そして、漏斗状の受口の下部は、上杭の突起
体5が遊通できる巾に形成されているとともに、受入部
12は、突起体5が横方向に相当程度移動可能な巾広に形
成されている。
On the other hand, guide jigs 7, 7 for positioning the two piles 1a, 1b are prepared in relation to the projections 5, 6. As shown in FIG. 5, the guide jig 7 is provided with a fitting hole 9 at the lower part of a main body 8 formed of a vertically long plate so as to be detachable from the projection 6 of the lower pile 1b. Further, an introduction engagement groove 10 of the projection 5 including a funnel-shaped receiving port 11 and a receiving portion 12 following the receiving port 12 is provided below the upper end of the main body 8. The lower part of the funnel-shaped receiving port is formed in a width that allows the protrusion 5 of the upper pile to pass through, and the receiving section is formed.
Numeral 12 is formed wide so that the protrusion 5 can be moved to a considerable extent in the lateral direction.

【0015】また、本体8の上記受入部12の上下中央部
位置には、本体8を横断する方向に進退する押ボルト等
による調整ネジ杆の一対13,13がそれぞれ先端部を受入
部12内に突出自在に設けられている。
A pair of adjusting screw rods 13 and 13 with push bolts or the like which advance and retreat in a direction crossing the main body 8 are provided at the upper and lower central positions of the receiving portion 12 of the main body 8, respectively. It is provided so that it may protrude freely.

【0016】次に、上杭1aと下杭1bとを縦継ぎする
実施態様について説明する。まず、杭建込み用の掘削孔
内に突起体6,6を固着した下杭1bが挿入され、その
上部を所要の長さ地上に突出した状態で固定される。そ
して、突起体6,6には、上記のガイド治具8,8が嵌
合孔9を嵌合して立設される。
Next, an embodiment in which the upper pile 1a and the lower pile 1b are vertically connected will be described. First, the lower pile 1b to which the projections 6, 6 are fixed is inserted into the excavation hole for pile construction, and the upper part thereof is fixed with the upper part protruding above the ground for a required length. The guide jigs 8, 8 are fitted to the protrusions 6, 6 in the fitting holes 9, and are erected.

【0017】突起体5,5を固着した上杭1aは、クレ
ーンで吊上げられて下杭1bの直上に運ばれ、下杭1b
に対して、ほぼ軸線方向の位置合せをするとともに、上
杭1aの突起体5,5が下杭1bに立設されたガイド治
具8,8の受口11に向かうようにして、周方向への位置
合せを行いながら、降下させて行く。そして、突起体
5,5が受口11, 11の広く開かれた上端に達した後は、
受口11の漏斗傾斜面11a,11aに誘導されて受入部12内
へと進んで行くことになる。
The upper pile 1a to which the projections 5 and 5 are fixed is lifted by a crane and transported directly above the lower pile 1b.
And the projections 5, 5 of the upper stake 1a are directed toward the receiving openings 11 of the guide jigs 8, 8 erected on the lower stake 1b in the circumferential direction. While lowering the position, go down. Then, after the protrusions 5 reach the widely opened upper ends of the receiving ports 11, 11,
It is guided by the funnel slopes 11a, 11a of the receiving port 11 and proceeds into the receiving section 12.

【0018】この場合、受口11の狭くなった下端部に導
入される突起体5に対応して、上杭1aの周方向の位置
がほぼ決められることになる。そして、突起体5,5は
受入部12,12の中に着座すると同時に、上杭1aの鋼管
2の下端面が下杭1bの鋼管2の上端面に接合される。
In this case, the position of the upper stake 1a in the circumferential direction is substantially determined in accordance with the projection 5 introduced to the narrowed lower end of the receiving port 11. The projections 5, 5 are seated in the receiving portions 12, 12, and at the same time, the lower end surface of the steel pipe 2 of the upper pile 1a is joined to the upper end surface of the steel pipe 2 of the lower pile 1b.

【0019】上記の方法により、下杭1bに対する上杭
1aの周方向の位置決めがほぼ行われることになるが、
各部材の製作精度や施工性の関係から、突起体5がガイ
ド治具8の受入部12に導入された状態では、両杭1a,
1bの継手部材3,3,4,4どうしの上下位置がな
お、若干ずれることがある。その場合には、ガイド治具
8に設けた一対の調整ネジ杆13,13の先端を突起体5の
側面に当てて進退させ、突起体5の受入部12内で横方向
に移動調節を行うようにする。それにより、上杭1aは
突起体5の移動とともに周方向に回転し、正確な周方向
の位置合せができることになる。
By the above-mentioned method, the circumferential positioning of the upper pile 1a with respect to the lower pile 1b is substantially performed.
In the state where the protrusion 5 is introduced into the receiving portion 12 of the guide jig 8, both piles 1 a,
The upper and lower positions of the joint members 1, 3, 4, and 4 of 1 b may still be slightly shifted. In this case, the tips of the pair of adjusting screw rods 13 provided on the guide jig 8 are moved forward and backward by touching the side surfaces of the projection 5 to adjust the movement in the lateral direction in the receiving portion 12 of the projection 5. To do. Thereby, the upper pile 1a rotates in the circumferential direction along with the movement of the protrusion 5, and accurate circumferential positioning can be performed.

【0020】上下両杭1a,1bの位置合わせ終了後
は、両杭1a,1bの鋼管2,2の接合端外周に沿って
溶接15(図1参照)を行うとともにガイド治具8,8を
除去する。そして上下両杭1a,1bの継手部材3,
3,4,4間に継ぎ合せ材16,17(図1参照)を溶接に
より取り付ければ、上杭1aと下杭1bとの縦継ぎ施工
が完了することになる。
After the positioning of the upper and lower piles 1a, 1b is completed, welding 15 (see FIG. 1) is performed along the outer periphery of the joint end of the steel pipes 2, 2 of both the piles 1a, 1b, and the guide jigs 8, 8 are mounted. Remove. And the joint members 3 of the upper and lower piles 1a, 1b
If the splicing members 16 and 17 (see FIG. 1) are attached between 3, 4, and 4 by welding, the vertical joining of the upper pile 1a and the lower pile 1b will be completed.

【0021】図6は、ガイド治具7の他の実施例を示し
たものである。この実施例では、本体8の受口11を設け
てある上端部に、その横断方向に貫通するボルト挿通孔
を設け、これに締付けボルト18が締付け自在に設けられ
ている。この締付ボルト18は、突起体5が受入部12内に
入った後に取付け、ガイド治具7に強い横方向の力が作
用したときに生じるガイド治具7上端部の開きを防ぐの
に役立つことになる。
FIG. 6 shows another embodiment of the guide jig 7. In this embodiment, a bolt insertion hole penetrating in the transverse direction is provided at the upper end of the main body 8 where the receiving port 11 is provided, and a tightening bolt 18 is provided to be freely tightened. The tightening bolt 18 is attached after the protrusion 5 has entered the receiving portion 12 and serves to prevent the upper end of the guide jig 7 from opening when a strong lateral force acts on the guide jig 7. Will be.

【0022】[0022]

【発明の効果】以上説明したように、本発明によれば、
下杭に固着の突起体に立設したガイド治具に、降下する
上杭の突起体を挿入して、杭接合時における周方向の位
置合わせができるようにしたので、上杭の吊り降ろしに
よる接合作業が簡易に能率よく行え、杭設置時間の大巾
な短縮が図れるとともに、周方向の位置修正がmm単位で
正確にできる。
As described above, according to the present invention,
Inserting the projecting body of the upper pile descending into the guide jig standing on the projecting body fixed to the lower pile so that it can be aligned in the circumferential direction at the time of joining the pile, The joining work can be performed easily and efficiently, and the pile installation time can be greatly reduced, and the circumferential position can be corrected accurately in mm units.

【0023】また、これに使用される装置は構造が簡単
で安価に製作でき、取扱いも容易であるとともに、ガイ
ド治具は施工後、取り外して反覆使用することができ、
一層のコスト低減が図れる。
Further, the device used for this device has a simple structure, can be manufactured at low cost, and can be easily handled. In addition, the guide jig can be removed and used repeatedly after construction.
Further cost reduction can be achieved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の一例を示す、一部切欠正面図で
ある。
FIG. 1 is a partially cutaway front view showing an embodiment of the present invention.

【図2】同平面図である。FIG. 2 is a plan view of the same.

【図3】同要部の側断面図である。FIG. 3 is a side sectional view of the main part.

【図4】上杭の降下過程を示す説明図で有る。FIG. 4 is an explanatory view showing a descending process of an upper pile.

【図5】ガイド治具を示す正面図である。FIG. 5 is a front view showing a guide jig.

【図6】同他の実施例を示す正面図である。FIG. 6 is a front view showing another embodiment.

【符号の説明】[Explanation of symbols]

1 鋼管杭 1a 上杭 1b 下杭 2 鋼管 3,4 継手部材 5,6 突起体 7 ガイド治具 8 本体 9 嵌合孔 10 導入係合溝 11 受口部 12 受入部 13 調整ネジ杆 18 締付ボルト REFERENCE SIGNS LIST 1 steel pipe pile 1 a upper pile 1 b lower pile 2 steel pipe 3, 4 joint member 5, 6 protrusion 7 guide jig 8 main body 9 fitting hole 10 introduction engagement groove 11 receiving part 12 receiving part 13 adjusting screw rod 18 tightening bolt

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 実公 昭40−6046(JP,Y1) (58)調査した分野(Int.Cl.7,DB名) E02D 5/24 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References Jikken 40-6046 (JP, Y1) (58) Field surveyed (Int. Cl. 7 , DB name) E02D 5/24

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 上杭と下杭の各接続部外周に、その周方
向複数個所に、上下に対向してそれぞれ位置合せ用の突
起体を固着し、他方、上杭に固着された突起体の導入係
合溝を設けた位置合せ用のガイド治具を形成し、これ
を、下杭に固着された突起体に嵌着、立設した後、建込
まれた下杭上に、吊上げた上杭を降下して、その突起体
を導入係合溝に挿入し、上杭を下杭上に接合させること
を特徴とする、鋼管杭の縦継ぎ方法。
1. A plurality of positioning projections are fixed to the outer periphery of each connecting portion of an upper pile and a lower pile at a plurality of positions in the circumferential direction so as to be vertically opposed to each other. A guide jig for positioning provided with an introductory engagement groove was formed, and this was fitted to a protrusion fixed to the lower pile, and was erected, and then lifted on the lower pile built in. A method of longitudinally joining steel pipe piles, comprising lowering an upper pile, inserting a protrusion into an introduction engagement groove, and joining the upper pile to a lower pile.
【請求項2】 接続端部の外周に位置合せ用の突起体を
設けた上杭及び下杭と、本体の下部に、上記下杭の突起
体と嵌脱自在な嵌合孔を設けるとともに、該嵌合孔の上
方位置に、本体の上端より漏斗状に形成した受口部とこ
れに続いて上杭の突起体より相当巾広に形成した受入部
とによる、突起体の導入係合溝を設けるとともに、先端
部を受入部内に突入可能とした調整ネジ杆を、本体の横
断方向に進退自在に設けた、位置合せ用のガイド治具と
を具備してなることを特徴とする、鋼管杭の縦継ぎ位置
合せ装置。
2. An upper stake and a lower stake provided with positioning projections on an outer periphery of a connection end, and a fitting hole removably engageable with the projection of the lower stake provided at a lower portion of the main body. At the upper position of the fitting hole, a receiving portion formed in a funnel shape from the upper end of the main body and a receiving portion formed substantially wider than the projecting portion of the upper pile following the receiving portion. And a guide jig for positioning, which is provided with an adjusting screw rod whose tip can be inserted into the receiving portion so as to be able to advance and retreat in the transverse direction of the main body. Pile vertical joint positioning device.
JP7210980A 1995-07-27 1995-07-27 Longitudinal joint method of steel pipe pile and positioning device used for the method Expired - Lifetime JP3031659B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7210980A JP3031659B2 (en) 1995-07-27 1995-07-27 Longitudinal joint method of steel pipe pile and positioning device used for the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7210980A JP3031659B2 (en) 1995-07-27 1995-07-27 Longitudinal joint method of steel pipe pile and positioning device used for the method

Publications (2)

Publication Number Publication Date
JPH0941368A JPH0941368A (en) 1997-02-10
JP3031659B2 true JP3031659B2 (en) 2000-04-10

Family

ID=16598320

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7210980A Expired - Lifetime JP3031659B2 (en) 1995-07-27 1995-07-27 Longitudinal joint method of steel pipe pile and positioning device used for the method

Country Status (1)

Country Link
JP (1) JP3031659B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4927364B2 (en) * 2005-08-10 2012-05-09 調和工業株式会社 Pile jet nozzle mounting device
JP6336378B2 (en) * 2014-10-29 2018-06-06 鹿島建設株式会社 Steel pipe connection method
JP6470584B2 (en) * 2015-02-17 2019-02-13 株式会社クボタ Steel pipe joint mechanism
CN106442120A (en) * 2016-12-02 2017-02-22 西南交通大学 Fatigue test clamp device for T-shaped corner joint
JP6923143B2 (en) * 2019-03-28 2021-08-18 雅浩 菅野 Fittings for steel pipes
CN110374340B (en) * 2019-07-22 2021-05-18 中铁大桥局集团有限公司 Large eccentric steel structure hoisting butt joint auxiliary device and auxiliary tool

Also Published As

Publication number Publication date
JPH0941368A (en) 1997-02-10

Similar Documents

Publication Publication Date Title
US11479940B2 (en) Apparatus and method for lifting building foundations
JPH10311028A (en) Joint for joining steel pipe pile
JP3031659B2 (en) Longitudinal joint method of steel pipe pile and positioning device used for the method
JP3258592B2 (en) Jig for rotary press fitting of steel pipe pile
JPH069063Y2 (en) Prestressed concrete pile
JP4175737B2 (en) How to connect piles
US10246846B2 (en) Interconnectable hollow steel pipe for constructing force driven piles and the method of forming the pile
JP4402543B2 (en) A guide jig for alignment and a method of longitudinal joining of piles using them.
JPH09100530A (en) Vertical jointing method for steel pipe pile having coupling member
JP3078412B2 (en) Groove excavation method and stand for temporary assembly of retaining panels
JP2789509B2 (en) Steel guide wall
JP3138111B2 (en) Connection structure between segment and tie rod
JPS61250222A (en) Method and apparatus for connection of pile
CA2963802C (en) Interconnectable hollow steel pipe for constructing force driven piles and the method of forming the pile
JPH07247602A (en) Connection method and tool for concrete products
JP2981691B2 (en) Joint method and joint structure of box-shaped column in steel frame construction
JPH0311302Y2 (en)
JP2002129552A (en) Spacer for cage
JPH0913367A (en) Method for aligning screw joint pile and aligning jig for use in the same
JPS5947774B2 (en) Method for driving piles such as steel pipe sheet piles
JPH09100531A (en) Vertical jointing method for steel pipe pile having coupling member
JP2004244813A (en) Joining method and joining structure of concrete secondary product
JPS6141786Y2 (en)
JPH0634416Y2 (en) Top pile
JP2000064288A (en) Simple earth retaining method using sheet pile and its device