JP6336378B2 - Steel pipe connection method - Google Patents

Steel pipe connection method Download PDF

Info

Publication number
JP6336378B2
JP6336378B2 JP2014220391A JP2014220391A JP6336378B2 JP 6336378 B2 JP6336378 B2 JP 6336378B2 JP 2014220391 A JP2014220391 A JP 2014220391A JP 2014220391 A JP2014220391 A JP 2014220391A JP 6336378 B2 JP6336378 B2 JP 6336378B2
Authority
JP
Japan
Prior art keywords
steel pipe
ring
shaped member
pile
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014220391A
Other languages
Japanese (ja)
Other versions
JP2016089329A (en
Inventor
高橋 幸治
幸治 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2014220391A priority Critical patent/JP6336378B2/en
Publication of JP2016089329A publication Critical patent/JP2016089329A/en
Application granted granted Critical
Publication of JP6336378B2 publication Critical patent/JP6336378B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Standing Axle, Rod, Or Tube Structures Coupled By Welding, Adhesion, Or Deposition (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Description

本発明は、鋼管同士を接続する方法に関する。 The present invention relates to a method for connecting steel pipes.

特許文献1は、溶接を用いる鋼管杭の縦継ぎ方法を開示している。この鋼管杭の縦継ぎ方法では、上杭と下杭の各接続部外周に、その周方向複数箇所に、上下に対向してそれぞれ位置合わせ用の突起体を固着する。また、上杭の突起体を挿入可能な導入係合溝を設けた位置合わせ用のガイド治具を形成し、このガイド治具を、下杭の突起体に嵌着、立設する。この後、建込まれた下杭上に、吊上げた上杭を降下して、上杭の突起体を導入係合溝に挿入することにより、上杭を下杭上に接合させる。   Patent document 1 is disclosing the longitudinal joining method of the steel pipe pile which uses welding. In this method of longitudinally connecting steel pipe piles, alignment protrusions are fixed to the outer periphery of each connection portion of the upper pile and the lower pile, facing each other in a plurality of locations in the circumferential direction. Further, a guide jig for alignment provided with an introduction engaging groove into which the protrusion of the upper pile can be inserted is formed, and this guide jig is fitted and erected on the protrusion of the lower pile. After that, the upper pile that has been lifted is lowered onto the built-in lower pile, and the protrusion of the upper pile is inserted into the introduction engagement groove, thereby joining the upper pile onto the lower pile.

特許文献2は、2つの鋼管の端縁同士を仮付け溶接する際に、2つの鋼管の端縁をルート間隔を空けて相向い合わせて固定する仮付け溶接用固定治具を開示している。仮付け溶接用固定治具は、これら鋼管の端部を収容可能な略半円筒形状の固定部を備えており、この固定部の内側には、前述のルート間隔を保持する突起が形成されている。   Patent Document 2 discloses a fixing jig for tack welding that fixes the edges of two steel pipes facing each other with a root interval when tacking the edges of two steel pipes together. . The fixing jig for tack welding includes a substantially semi-cylindrical fixing portion that can accommodate the ends of these steel pipes, and a protrusion for holding the above-described route interval is formed inside the fixing portion. Yes.

特許第3031659号公報Japanese Patent No. 3031659 特許第4750414号公報Japanese Patent No. 4750414

しかしながら、特許文献1に開示の鋼管杭の縦継ぎ方法において、上杭の突起体は、導入係合溝の受入部内に着座すると同時に、上杭の下端面が下杭の上端面に接合される(特許文献1の段落番号0018参照)。それゆえ、特許文献1において、上杭の突起体が導入係合溝の受入部内に着座している状態では、上杭の下端面と下杭の上端面との間にルート間隔が確保されていなかった。   However, in the steel pipe pile longitudinal joining method disclosed in Patent Document 1, the protrusion of the upper pile is seated in the receiving portion of the introduction engagement groove, and at the same time, the lower end surface of the upper pile is joined to the upper end surface of the lower pile. (See paragraph number 0018 of Patent Document 1). Therefore, in Patent Document 1, in the state where the protrusion of the upper pile is seated in the receiving portion of the introduction engagement groove, a route interval is secured between the lower end surface of the upper pile and the upper end surface of the lower pile. There wasn't.

この点、特許文献2に開示の仮付け溶接用固定治具を用いることで、溶接される鋼管の相互間のルート間隔を確保することが可能である。
しかしながら、特許文献2に開示の仮付け溶接用固定治具では、溶接される鋼管の相互間に突起を介在させることにより、ルート間隔を確保している。それゆえ、特許文献2において、突起の寸法によって決定されるルート間隔を更に調整することが難しかった。
In this regard, by using the tack welding fixing jig disclosed in Patent Document 2, it is possible to secure a route distance between the steel pipes to be welded.
However, in the fixing jig for tack welding disclosed in Patent Document 2, a root interval is secured by interposing a protrusion between the steel pipes to be welded. Therefore, in Patent Document 2, it is difficult to further adjust the route interval determined by the size of the protrusion.

本発明は、このような実状に鑑み、接続される鋼管同士の間の間隔(例えばルート間隔)を簡易に調整可能な鋼管接続用治具、及び、これを用いる鋼管の接続方法を提供することを目的とする。 In view of such a situation, the present invention provides a steel pipe connecting jig capable of easily adjusting a distance between connected steel pipes (for example, a route distance) , and a steel pipe connecting method using the same. With the goal.

そのため本発明に係る鋼管の接続方法は、上下方向に延在する第1の鋼管と、第1の鋼管の上端に下端が相対するように第1の鋼管の上方に配置されて上下方向に延在する第2の鋼管と、を互いに接続する方法である。ここで、第1の鋼管及び第2の鋼管は鋼管杭を構成するものである。前記接続に用いられる鋼管接続用治具は、第1の鋼管の上部の外周面に固定されて第1の鋼管の外周を囲む第1のリング状部材と、第2の鋼管の下部の外周面に固定されて第2の鋼管の外周を囲む第2のリング状部材と、第1のリング状部材と第2のリング状部材との間の距離を変更可能な距離変更手段と、を含んで構成される。距離変更手段は、第1のリング状部材及び第2のリング状部材の周方向における複数の位置での前記距離を変更することにより、第1の鋼管及び第2の鋼管の周方向における複数の位置での第1の鋼管と第2の鋼管との間のルート間隔を調整可能である。本発明に係る鋼管の接続方法は、第1の鋼管を地盤に打ち込む第1工程と、第1工程の後に地上で露出している第1の鋼管の上部の外周面に第1のリング状部材を固定する第2工程と、第2工程の後に第2の鋼管の下端を第1の鋼管の上端に接触させる第3工程と、第3工程の後に第2のリング状部材を第2の鋼管の下部の外周面に固定する第4工程と、第4工程の後に距離変更手段により前記距離を大きくして前記ルート間隔を調整する第5工程と、第5工程の後に第2の鋼管の下端を第1の鋼管の上端に溶接固定する第6工程と、を含む。 Therefore, the steel pipe connection method according to the present invention includes a first steel pipe extending in the vertical direction and a first steel pipe arranged above the first steel pipe so that the lower end faces the upper end of the first steel pipe and extending in the vertical direction. It is the method of connecting the existing 2nd steel pipe with each other. Here, the first steel pipe and the second steel pipe constitute a steel pipe pile. The steel pipe connecting jig that is used in connection with the first ring-shaped member that surrounds the outer periphery of the first steel tube is fixed to the outer peripheral surface of the upper portion of the first steel tube, the lower portion of the second steel pipe A second ring-shaped member fixed to the outer peripheral surface and surrounding the outer periphery of the second steel pipe; and a distance changing means capable of changing a distance between the first ring-shaped member and the second ring-shaped member. Consists of including. The distance changing means changes the distances at a plurality of positions in the circumferential direction of the first ring-shaped member and the second ring-shaped member, thereby a plurality of distances in the circumferential direction of the first steel pipe and the second steel pipe . The route spacing between the first steel pipe and the second steel pipe in position can be adjusted. The steel pipe connection method according to the present invention includes a first step of driving the first steel pipe into the ground, and a first ring-shaped member on the outer peripheral surface of the upper portion of the first steel pipe exposed on the ground after the first step. A second step of fixing the second steel pipe, a third step of bringing the lower end of the second steel pipe into contact with the upper end of the first steel pipe after the second step, and a second ring-shaped member of the second steel pipe after the third step A fourth step of fixing to the outer peripheral surface of the lower part of the steel plate, a fifth step of adjusting the route interval by increasing the distance by a distance changing means after the fourth step, and a lower end of the second steel pipe after the fifth step A sixth step of welding and fixing to the upper end of the first steel pipe.

本発明によれば、第1及び第2のリング状部材の周方向における複数の位置での、第1及び第2のリング状部材の相互間の距離を、距離変更手段によって変更可能である。ゆえに、第1のリング状部材が第1の鋼管の上部の外周面に固定され、かつ、第2のリング状部材が第2の鋼管の下部の外周面に固定されている状態において、第1及び第2のリング状部材の相互間の距離を、距離変更手段によって変更することで、この距離の変更に伴って、第1及び第2の鋼管の周方向における複数の位置での第1及び第2の鋼管の相互間の間隔を簡易に調整することができる。 According to the present invention, the distance between the first and second ring-shaped members at a plurality of positions in the circumferential direction of the first and second ring-shaped members can be changed by the distance changing means. Therefore, in a state where the first ring-shaped member is fixed to the outer peripheral surface of the upper portion of the first steel pipe and the second ring-shaped member is fixed to the outer peripheral surface of the lower portion of the second steel pipe, the first By changing the distance between the second ring-shaped members by the distance changing means, the first and second steel pipes at a plurality of positions in the circumferential direction of the first and second steel pipes with the change of the distance. The interval between the second steel pipes can be easily adjusted.

本発明の一実施形態における鋼管接続用治具の上面図The top view of the jig for steel pipe connection in one embodiment of the present invention 図1のI−I断面図II sectional view of FIG. 図2のII−II断面図II-II sectional view of FIG. 前記一実施形態における弧状部材の上面図Top view of arcuate member in one embodiment 前記一実施形態におけるロッド状部材、第1及び第2の取り付け部材の側面図Side view of rod-shaped member, first and second mounting members in the embodiment. 前記一実施形態における上杭と下杭との接続方法を示す図The figure which shows the connection method of the upper pile and the lower pile in the said one Embodiment. 前記一実施形態における上杭と下杭との接続方法を示す図The figure which shows the connection method of the upper pile and the lower pile in the said one Embodiment. 前記一実施形態における上杭と下杭との接続方法を示す図The figure which shows the connection method of the upper pile and the lower pile in the said one Embodiment. 図8の部分Pの部分拡大図Partial enlarged view of part P in FIG. 前記実施形態における上杭と下杭との間の間隔を示す図The figure which shows the space | interval between the upper pile and the lower pile in the said embodiment.

以下、本発明の実施の形態について、図面を参照して説明する。尚、全図中、同一又は相当部分には同一符号を付すこととする。
図1は、本発明の一実施形態における鋼管接続用治具1の上面図である。図2は図1のI−I断面図である。図3は図2のII−II断面図である。図4(A)は、上側のリング状部材2を構成する弧状部材20の上面図である。図4(B)は、下側のリング状部材3を構成する弧状部材30の上面図である。
Embodiments of the present invention will be described below with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference numerals.
FIG. 1 is a top view of a steel pipe connecting jig 1 according to an embodiment of the present invention. 2 is a cross-sectional view taken along the line II of FIG. 3 is a cross-sectional view taken along the line II-II in FIG. FIG. 4A is a top view of the arcuate member 20 constituting the upper ring-shaped member 2. FIG. 4B is a top view of the arc-shaped member 30 constituting the lower ring-shaped member 3.

鋼管接続用治具1は、上下一対のリング状部材2,3と、リング状部材2,3間の距離を変更可能な距離変更手段4とを含んで構成される。尚、リング状部材2,3の径方向について、以下では、特に指定する場合を除き、単に「径方向」と称する。   The steel pipe connecting jig 1 includes a pair of upper and lower ring-shaped members 2 and 3 and distance changing means 4 that can change the distance between the ring-shaped members 2 and 3. In the following description, the radial direction of the ring-shaped members 2 and 3 is simply referred to as “radial direction” unless otherwise specified.

上側のリング状部材2は、鋼管接続用治具1の上部を構成する部材であり、下側のリング状部材3の直上に配置され得る。
リング状部材2は、複数(図1では2個)の弧状部材20を備える。換言すれば、リング状部材2は、複数の弧状部材20に分割されている。
弧状部材20は鋼製である。図4(A)に示すように、弧状部材20は、半円筒状の本体部21と、本体部21の下端部から径方向外側に張り出す半円状の下フランジ部22と、一対の端板23とを含んで構成される。ここで、半円筒状の本体部21の内径は、後述する上杭110の外径と略一致する。
The upper ring-shaped member 2 is a member constituting the upper part of the steel pipe connecting jig 1 and can be disposed immediately above the lower ring-shaped member 3.
The ring-shaped member 2 includes a plurality (two in FIG. 1) of arc-shaped members 20. In other words, the ring-shaped member 2 is divided into a plurality of arc-shaped members 20.
The arcuate member 20 is made of steel. As shown in FIG. 4A, the arc member 20 includes a semi-cylindrical main body portion 21, a semicircular lower flange portion 22 projecting radially outward from the lower end portion of the main body portion 21, and a pair of ends. And a plate 23. Here, the inner diameter of the semi-cylindrical main body 21 substantially matches the outer diameter of the upper pile 110 described later.

下フランジ部22のうち、距離変更手段4(特に、後述する調整用ボルト41)が設置される複数(例えば図4(A)では2箇所)の領域22aには、各々に、径方向外側に更に張り出す延長部22bが形成されている。
下フランジ部22の領域22a(すなわち下フランジ部22のうち延長部22bが形成されている部分)には、上面視でU字形の断面形状をなす孔部(溝部)24が貫通形成されている。孔部24のうち径方向外側の部分(U字形断面のうちの開放端)は外部に開放されている。それゆえ、調整用ボルト41を外部から水平移動させて孔部24内に挿入することができる。また、調整用ボルト41を孔部24内から外部に水平移動させて調整用ボルト41を孔部24から取り外すことができる。
Of the lower flange portion 22, a plurality of regions 22a (for example, two locations in FIG. 4A) where the distance changing means 4 (especially, adjusting bolts 41 described later) are installed are respectively radially outward. Further, an extended portion 22b that protrudes is formed.
In the region 22a of the lower flange portion 22 (that is, the portion where the extension portion 22b is formed in the lower flange portion 22), a hole portion (groove portion) 24 having a U-shaped cross-sectional shape in a top view is formed so as to penetrate therethrough. . A radially outer portion (open end of the U-shaped cross section) of the hole 24 is open to the outside. Therefore, the adjustment bolt 41 can be horizontally moved from the outside and inserted into the hole 24. Further, the adjustment bolt 41 can be removed from the hole 24 by horizontally moving the adjustment bolt 41 from the inside of the hole 24 to the outside.

ここで、下フランジ部22に形成される複数の延長部22b及び孔部24については、図1に示すように、複数(図1では2個)の弧状部材20が組み立てられてリング状部材2として一体化されたときに、放射状に、かつ、周方向で等間隔に配置されることが好ましい。この点、本実施形態では、リング状部材2が、計4個の延長部22b及び孔部24を備えているので、上面視で、隣り合う孔部24同士の間の中心角が90°(=360°÷4)となっている。尚、本実施形態では、リング状部材2が、計4個の延長部22b及び孔部24を備えているが、延長部22b及び孔部24の個数はこれに限らない。   Here, with respect to the plurality of extension portions 22b and hole portions 24 formed in the lower flange portion 22, a plurality (two in FIG. 1) of arc-shaped members 20 are assembled to form the ring-shaped member 2 as shown in FIG. Are integrated radially and at equal intervals in the circumferential direction. In this respect, in the present embodiment, the ring-shaped member 2 includes a total of four extension portions 22b and hole portions 24, so that the central angle between the adjacent hole portions 24 is 90 ° (when viewed from above) ( = 360 ° ÷ 4). In the present embodiment, the ring-shaped member 2 includes a total of four extensions 22b and holes 24, but the number of extensions 22b and holes 24 is not limited thereto.

下フランジ部22の領域22aの各々には、一対の板状部材25が立設されている。一対の板状部材25の相互間には、前述の孔部24が位置すると共に、距離変更手段4が配置され得る。
板状部材25は、その下端部が下フランジ部22の領域22aの上面に固定されている。また、板状部材25については、図1に示すように、複数(図1では2個)の弧状部材20が組み立てられてリング状部材2として一体化されたときに、放射状に配置されるように、本体部21から径方向外側に向かって延びている。
A pair of plate-like members 25 are erected in each region 22 a of the lower flange portion 22. Between the pair of plate-like members 25, the above-described hole 24 is located, and the distance changing means 4 can be arranged.
The lower end portion of the plate-like member 25 is fixed to the upper surface of the region 22 a of the lower flange portion 22. Further, as shown in FIG. 1, the plate-like members 25 are arranged radially when a plurality of (two in FIG. 1) arc-shaped members 20 are assembled and integrated as the ring-like member 2. In addition, it extends radially outward from the main body 21.

板状部材25の下端部には、径方向外側に向かって更に延びる延長部25aが形成されている。この延長部25aには、外れ止めピン81を挿入可能な孔部25bが貫通形成されている。
板状部材25には、図示しないシャックルを装着するための貫通孔26が形成されている。この貫通孔26に装着されるシャックルには、チェーン(図示せず)の一端が固定される。このチェーンの他端は外れ止めピン81に固定される。従って、外れ止めピン81はチェーン及びシャックルを介して、板状部材25に固定されている。
An extension 25 a that further extends radially outward is formed at the lower end of the plate-like member 25. A hole 25b through which the detachment prevention pin 81 can be inserted is formed through the extension 25a.
The plate-like member 25 is formed with a through hole 26 for mounting a shackle (not shown). One end of a chain (not shown) is fixed to the shackle attached to the through hole 26. The other end of the chain is fixed to a locking pin 81. Therefore, the locking pin 81 is fixed to the plate-like member 25 via the chain and the shackle.

板状部材25の上端部には、上方に向かって更に延びる先細な延長部25cが形成されている。この延長部25cを含む板状部材25は、本発明の「ガイド部材」に対応するものであり、後述する上杭110をリング状部材2内に案内する機能を有する。また、延長部25cを含む板状部材25は、リング状部材2に設けられて上方に突出している。また、延長部25cは、本体部21よりも上側に位置している。
延長部25cのうち上杭110が接触可能なガイド部分25dは、下方に向かうほど、径方向内側に向かうように傾斜している。すなわち、ガイド部分25dは、下方に向かうほど、径方向内側に向かう傾斜面をなしている。また、延長部25cの頂部は丸み付けられている。
At the upper end of the plate-like member 25, a tapered extension 25c that extends further upward is formed. The plate-like member 25 including the extension 25c corresponds to the “guide member” of the present invention, and has a function of guiding the upper pile 110 described later into the ring-like member 2. Further, the plate-like member 25 including the extension portion 25c is provided on the ring-like member 2 and protrudes upward. Further, the extension portion 25 c is located above the main body portion 21.
The guide portion 25d with which the upper pile 110 can come into contact with the extension portion 25c is inclined so as to go radially inward as it goes downward. That is, the guide portion 25d forms an inclined surface that goes radially inward as it goes downward. Moreover, the top part of the extension part 25c is rounded.

延長部25cを含む板状部材25のうち、距離変更手段4に隣接し得る側と反対の側の外面には吊り金具27が設けられている。吊り金具27は板状であり、その中央部に貫通孔27aが貫通形成されている。
尚、本実施形態では、下フランジ部22の領域22aの各々に立設された一対の板状部材25のうちの一方の板状部材25に吊り金具27が設けられているが、弧状部材20に設置される吊り金具27の個数及び設置箇所はこれに限らない。例えば、一対の板状部材25の双方に吊り金具27が設けられてもよい。又は、下フランジ部22の上面に吊り金具27が設けられてもよい。
A suspension fitting 27 is provided on the outer surface of the plate-like member 25 including the extension portion 25 c on the side opposite to the side that can be adjacent to the distance changing means 4. The hanging metal fitting 27 is plate-shaped, and a through hole 27a is formed through the center thereof.
In the present embodiment, the hanging bracket 27 is provided on one plate-like member 25 of the pair of plate-like members 25 erected on each of the regions 22 a of the lower flange portion 22. The number and the installation location of the hanging metal fittings 27 installed in are not limited to this. For example, the hanging metal fittings 27 may be provided on both the pair of plate-like members 25. Alternatively, the hanging metal fitting 27 may be provided on the upper surface of the lower flange portion 22.

半円筒状の本体部21の周方向両端部には、それぞれ、端板23が設けられている。端板23の下端部は、下フランジ部22の周方向端部に固定されている。端板23の中央部には、ボルト85の雄ねじ部を挿入するための貫通孔23aが形成されている。
複数(図1では2個)の弧状部材20が組み立てられてリング状部材2として一体化されるときに、一方の弧状部材20の端板23は、他方の弧状部材20の端板23と相対する。このときに、一方の弧状部材20の端板23の貫通孔23aは、他方の弧状部材20の端板23の貫通孔23aと相対する。弧状部材20同士は、端板23の貫通孔23aに雄ねじ部が挿入されるボルト85と、ボルト85の雄ねじ部に螺合する雌ねじ部を備えるナット86と、によって締結固定される。このようにして組み立てられたリング状部材2は上面視で円形状をなす。
End plates 23 are provided at both ends in the circumferential direction of the semi-cylindrical main body 21. The lower end portion of the end plate 23 is fixed to the circumferential end portion of the lower flange portion 22. A through hole 23 a for inserting a male screw portion of the bolt 85 is formed in the center portion of the end plate 23.
When a plurality (two in FIG. 1) of arc-shaped members 20 are assembled and integrated as the ring-shaped member 2, the end plate 23 of one arc-shaped member 20 is relative to the end plate 23 of the other arc-shaped member 20. To do. At this time, the through hole 23 a of the end plate 23 of one arcuate member 20 faces the through hole 23 a of the end plate 23 of the other arcuate member 20. The arcuate members 20 are fastened and fixed by a bolt 85 in which a male screw portion is inserted into the through hole 23 a of the end plate 23 and a nut 86 having a female screw portion that is screwed into the male screw portion of the bolt 85. The ring-shaped member 2 assembled in this way has a circular shape when viewed from above.

下側のリング状部材3は、鋼管接続用治具1の下部を構成する部材であり、上側のリング状部材2の直下に配置され得る。
リング状部材3は、複数(図3では2個)の弧状部材30を備える。換言すれば、リング状部材3は、複数の弧状部材30に分割されている。
弧状部材30は鋼製である。図4(B)に示すように、弧状部材30は、半円筒状の本体部31と、本体部31の上端部から径方向外側に張り出す半円状の上フランジ部32と、一対の端板33とを含んで構成される。ここで、半円筒状の本体部31の内径は、後述する下杭100の外径と略一致する。
The lower ring-shaped member 3 is a member constituting the lower part of the steel pipe connecting jig 1 and can be disposed immediately below the upper ring-shaped member 2.
The ring-shaped member 3 includes a plurality (two in FIG. 3) of arc-shaped members 30. In other words, the ring-shaped member 3 is divided into a plurality of arc-shaped members 30.
The arcuate member 30 is made of steel. As shown in FIG. 4B, the arc-shaped member 30 includes a semi-cylindrical main body 31, a semicircular upper flange 32 projecting radially outward from the upper end of the main body 31, and a pair of ends. And a plate 33. Here, the inner diameter of the semi-cylindrical main body 31 substantially matches the outer diameter of the lower pile 100 described later.

上フランジ部32のうち、距離変更手段4(特に、後述する調整用ボルト41)が設置される複数(例えば図4(B)では2箇所)の領域32aには、各々に、径方向外側に更に張り出す延長部32bが形成されている。
上フランジ部32の領域32a(すなわち上フランジ部32のうち延長部32bが形成されている部分)には、上面視でU字形の断面形状をなす孔部(溝部)34が貫通形成されている。孔部34のうち径方向外側の部分(U字形断面のうちの開放端)は外部に開放されている。それゆえ、調整用ボルト41を外部から水平移動させて孔部34内に挿入することができる。また、調整用ボルト41を孔部34内から外部に水平移動させて調整用ボルト41を孔部24から取り外すことができる。
Of the upper flange portion 32, a plurality of regions 32a (for example, two locations in FIG. 4B) where the distance changing means 4 (especially, adjusting bolts 41 described later) are installed are respectively radially outward. Further, an extended portion 32b that protrudes is formed.
A hole (groove portion) 34 having a U-shaped cross-sectional shape in a top view is formed through the region 32a of the upper flange portion 32 (that is, the portion of the upper flange portion 32 where the extension portion 32b is formed). . The radially outer portion (open end of the U-shaped cross section) of the hole 34 is open to the outside. Therefore, the adjustment bolt 41 can be horizontally moved from the outside and inserted into the hole 34. Further, the adjustment bolt 41 can be removed from the hole 24 by horizontally moving the adjustment bolt 41 from the inside of the hole 34 to the outside.

ここで、上フランジ部32に形成される複数の延長部32b及び孔部34については、図3に示すように、複数(図3では2個)の弧状部材30が組み立てられてリング状部材3として一体化されたときに、放射状に、かつ、周方向で等間隔に配置されることが好ましい。この点、本実施形態では、リング状部材3が、計4個の延長部32b及び孔部34を備えているので、上面視で、隣り合う孔部34同士の間の中心角が90°(=360°÷4)となっている。尚、本実施形態では、リング状部材3が、計4個の延長部32b及び孔部34を備えているが、延長部32b及び孔部34の個数はこれに限らない。   Here, with respect to the plurality of extensions 32b and holes 34 formed in the upper flange portion 32, as shown in FIG. 3, a plurality (two in FIG. 3) of arc-shaped members 30 are assembled to form the ring-shaped member 3. Are integrated radially and at equal intervals in the circumferential direction. In this respect, in the present embodiment, the ring-shaped member 3 includes a total of four extending portions 32b and holes 34, and therefore, when viewed from above, the central angle between the adjacent holes 34 is 90 ° ( = 360 ° ÷ 4). In the present embodiment, the ring-shaped member 3 includes a total of four extending portions 32b and holes 34, but the number of the extending portions 32b and the holes 34 is not limited thereto.

上フランジ部32の領域32aの各々には、一対の板状部材35が設けられている。一対の板状部材35の相互間には、前述の孔部34が位置すると共に、距離変更手段4が配置され得る。
板状部材35は、その上端部が上フランジ部32の領域32aの下面に固定されている。また、板状部材35については、複数(図3では2個)の弧状部材30が組み立てられてリング状部材3として一体化されたときに、放射状に配置されるように、本体部31から径方向外側に向かって延びている。
A pair of plate-like members 35 is provided in each of the regions 32 a of the upper flange portion 32. Between the pair of plate-like members 35, the aforementioned hole 34 is located, and the distance changing means 4 can be arranged.
The upper end portion of the plate member 35 is fixed to the lower surface of the region 32 a of the upper flange portion 32. Further, the plate-like member 35 has a diameter from the main body 31 so that a plurality of (two in FIG. 3) arc-like members 30 are assembled and integrated as the ring-like member 3 so as to be radially arranged. It extends toward the outside in the direction.

板状部材35の上端部には、径方向外側に向かって更に延びる延長部35aが形成されている。この延長部35aには、外れ止めピン83を挿入可能な孔部35bが貫通形成されている。
板状部材35には、図示しないシャックルを装着するための貫通孔36が形成されている。この貫通孔36に装着されるシャックルには、チェーン(図示せず)の一端が固定される。このチェーンの他端は外れ止めピン83に固定される。従って、外れ止めピン83はチェーン及びシャックルを介して、板状部材35に固定されている。
An extension 35 a that further extends radially outward is formed at the upper end of the plate member 35. A hole 35b through which the detachment prevention pin 83 can be inserted is formed through the extension 35a.
The plate-like member 35 is formed with a through hole 36 for mounting a shackle (not shown). One end of a chain (not shown) is fixed to the shackle attached to the through hole 36. The other end of the chain is fixed to a locking pin 83. Therefore, the locking pin 83 is fixed to the plate-like member 35 via the chain and the shackle.

上フランジ部32の上面には複数(例えば図4(B)では2個)の吊り金具37が立設されている。吊り金具37は板状であり、その中央部に貫通孔37aが貫通形成されている。
尚、上フランジ部32の上面に立設される吊り金具37の個数及び設置箇所はこれに限らない。
また、吊り金具37がリング状部材2,3間に配置され得ることにより、吊り金具37がリング状部材2,3同士の当接を抑制するストッパーとして機能し得るので、吊り金具37は、リング状部材2,3間で作業用具や作業員の身体の一部などが挟まれることを防止する挟まれ防止金具として機能し得る。
A plurality of (for example, two in FIG. 4B) suspension brackets 37 are erected on the upper surface of the upper flange portion 32. The hanging metal fitting 37 is plate-shaped, and a through hole 37a is formed through the central portion thereof.
In addition, the number and installation location of the hanging metal fittings 37 erected on the upper surface of the upper flange portion 32 are not limited thereto.
In addition, since the hanging bracket 37 can be disposed between the ring-shaped members 2 and 3, the hanging bracket 37 can function as a stopper that suppresses contact between the ring-shaped members 2 and 3. It can function as a pinching prevention metal fitting that prevents a work tool, a part of the worker's body, or the like from being pinched between the shaped members 2 and 3.

半円筒状の本体部31の周方向両端部には、それぞれ、端板33が設けられている。端板33の上端部は、上フランジ部32の周方向端部に固定されている。端板33の中央部には、ボルト88の雄ねじ部を挿入するための貫通孔33aが形成されている。
複数(図3では2個)の弧状部材30が組み立てられてリング状部材3として一体化されるときに、一方の弧状部材30の端板33は、他方の弧状部材30の端板33と相対する。このときに、一方の弧状部材30の端板33の貫通孔33aは、他方の弧状部材30の端板33の貫通孔33aと相対する。弧状部材30同士は、端板33の貫通孔33aに雄ねじ部が挿入されるボルト88と、ボルト88の雄ねじ部に螺合する雌ねじ部を備えるナット89と、によって締結固定される。このようにして組み立てられたリング状部材3は上面視で円形状をなす。
End plates 33 are provided at both ends in the circumferential direction of the semi-cylindrical main body 31. An upper end portion of the end plate 33 is fixed to a circumferential end portion of the upper flange portion 32. A through hole 33 a for inserting a male screw portion of the bolt 88 is formed in the center portion of the end plate 33.
When a plurality (two in FIG. 3) of arc-shaped members 30 are assembled and integrated as the ring-shaped member 3, the end plate 33 of one arc-shaped member 30 is relative to the end plate 33 of the other arc-shaped member 30. To do. At this time, the through hole 33 a of the end plate 33 of one arcuate member 30 faces the through hole 33 a of the end plate 33 of the other arcuate member 30. The arc-shaped members 30 are fastened and fixed by a bolt 88 in which a male screw portion is inserted into the through hole 33 a of the end plate 33 and a nut 89 having a female screw portion that is screwed into the male screw portion of the bolt 88. The ring-shaped member 3 assembled in this way has a circular shape when viewed from above.

次に、距離変更手段4について、前述の図1〜図4に加えて、図5を用いて説明する。
図5(A)は、調整用ボルト41の側面図である。図5(B)及び(C)は、それぞれ、調整用ボルト41に第1の取り付け部材42及び第2の取り付け部材43が設けられた状態の各々の側面図である。ここで、図5(B)は、第1の取り付け部材42と第2の取り付け部材43とが互いに離れた状態を示す。一方、図5(C)は、第1の取り付け部材42と第2の取り付け部材43とが互いに近づいた状態を示す。
Next, the distance changing means 4 will be described with reference to FIG. 5 in addition to the above-described FIGS.
FIG. 5A is a side view of the adjustment bolt 41. FIGS. 5B and 5C are side views of the adjustment bolt 41 provided with the first attachment member 42 and the second attachment member 43, respectively. Here, FIG. 5B shows a state in which the first attachment member 42 and the second attachment member 43 are separated from each other. On the other hand, FIG. 5C shows a state in which the first attachment member 42 and the second attachment member 43 are close to each other.

距離変更手段4は、複数(例えば4本)の調整用ボルト41と、各調整用ボルト41にそれぞれ設けられる第1の取り付け部材42及び第2の取り付け部材43とにより構成される。ここで、距離変更手段4を構成する調整用ボルト41の本数は、前述の孔部24,34の各々の個数に一致している。   The distance changing unit 4 includes a plurality of (for example, four) adjustment bolts 41 and a first attachment member 42 and a second attachment member 43 provided on each adjustment bolt 41. Here, the number of adjusting bolts 41 constituting the distance changing means 4 is equal to the number of each of the holes 24 and 34 described above.

図5(A)に示すように、調整用ボルト41は、その下側部分を構成する第1の雄ねじ部45と、上側部分を構成する第2の雄ねじ部46と、上下方向中央部分を構成するナット47とを備える。ナット47は例えば六角ナットである。ナット47は、その下側部分に、第1の雄ねじ部45の上端部に螺合する第1の雌ねじ部(図示せず)を備える。また、ナット47は、その上側部分に、第2の雄ねじ部46の下端部に螺合する第2の雌ねじ部(図示せず)を備える。尚、本実施形態では、第1の雄ねじ部45が左ねじであり、第2の雄ねじ部46が右ねじであるが、これに代えて、第1の雄ねじ部45が右ねじであり、第2の雄ねじ部46が左ねじであってもよい。   As shown in FIG. 5 (A), the adjustment bolt 41 includes a first male screw portion 45 constituting the lower portion thereof, a second male screw portion 46 constituting the upper portion thereof, and a central portion in the vertical direction. And a nut 47 to be provided. The nut 47 is, for example, a hex nut. The nut 47 includes a first female screw portion (not shown) that is screwed into an upper end portion of the first male screw portion 45 at a lower portion thereof. Further, the nut 47 includes a second female screw portion (not shown) that is screwed into a lower end portion of the second male screw portion 46 at an upper portion thereof. In the present embodiment, the first male screw portion 45 is a left-hand screw and the second male screw portion 46 is a right-hand screw, but instead, the first male screw portion 45 is a right-hand screw, The two male screw portions 46 may be left-handed screws.

調整用ボルト41については、ナット47の下側部分に第1の雄ねじ部45の上端部が螺合した状態でナット47と第1の雄ねじ部45とが溶接固定されている。また、ナット47の上側部分に第2の雄ねじ部46の下端部が螺合した状態でナット47と第2の雄ねじ部46とが溶接固定されている。ゆえに、調整用ボルト41では、第1の雄ねじ部45と第2の雄ねじ部46とナット47とが互いに強固に一体化されている。
ここで、調整用ボルト41が本発明の「ロッド状部材」に対応するものである。そして、複数の調整用ボルト41は、リング状部材2,3の周方向に沿って互いに間隔を空けて配置されており、かつ、各々が上下方向に延在している。
Regarding the adjustment bolt 41, the nut 47 and the first male screw portion 45 are fixed by welding in a state where the upper end portion of the first male screw portion 45 is screwed to the lower portion of the nut 47. Further, the nut 47 and the second male screw portion 46 are fixed by welding in a state where the lower end portion of the second male screw portion 46 is screwed to the upper portion of the nut 47. Therefore, in the adjusting bolt 41, the first male screw portion 45, the second male screw portion 46, and the nut 47 are firmly integrated with each other.
Here, the adjustment bolt 41 corresponds to the “rod-shaped member” of the present invention. The plurality of adjustment bolts 41 are arranged at intervals from each other along the circumferential direction of the ring-shaped members 2 and 3, and each extend in the vertical direction.

第1の取り付け部材42は、調整用ボルト41の下側部分(すなわち、第1の雄ねじ部45)に設けられて調整用ボルト41の下側部分をリング状部材3に着脱可能に取り付けるものである。
第1の取り付け部材42は、上下一対の矩形板状の座金42a,42bと、円筒状部材42cと、管状部材42dとにより構成される。上側の座金42aの中央の開口部と下側の座金42bの中央の開口部とを貫通するように、円筒状部材42cは上下方向に延在している。
The first attachment member 42 is provided on the lower portion of the adjustment bolt 41 (that is, the first male screw portion 45) and detachably attaches the lower portion of the adjustment bolt 41 to the ring-shaped member 3. is there.
The first attachment member 42 includes a pair of upper and lower rectangular plate washers 42a and 42b, a cylindrical member 42c, and a tubular member 42d. The cylindrical member 42c extends in the vertical direction so as to pass through the central opening of the upper washer 42a and the central opening of the lower washer 42b.

円筒状部材42cの内面には、第1の雄ねじ部45が回転自在に螺合可能なように雌ねじ部(図示せず)が形成されている。円筒状部材42cの上部には座金42aが溶接固定されている。円筒状部材42cの下部には座金42bが溶接固定されている。円筒状部材42cの上端部には管状部材42dの下端部が溶接固定されている。
円筒状部材42cと管状部材42dとは略同軸上に延在しており、これら部材の中に調整用ボルト41の下側部分(すなわち、第1の雄ねじ部45)が挿入され得る。
ここで、座金42a,42b間の距離は、リング状部材3の上フランジ部32の厚さよりも大きい。また、円筒状部材42cについては、弧状部材30の上フランジ部32の孔部34に挿入可能なように外径が設定されている。
A female screw portion (not shown) is formed on the inner surface of the cylindrical member 42c so that the first male screw portion 45 can be rotatably screwed. A washer 42a is fixed to the upper portion of the cylindrical member 42c by welding. A washer 42b is fixed to the lower portion of the cylindrical member 42c by welding. The lower end of the tubular member 42d is fixed by welding to the upper end of the cylindrical member 42c.
The cylindrical member 42c and the tubular member 42d extend substantially coaxially, and the lower portion of the adjustment bolt 41 (that is, the first male screw portion 45) can be inserted into these members.
Here, the distance between the washers 42 a and 42 b is larger than the thickness of the upper flange portion 32 of the ring-shaped member 3. The cylindrical member 42c has an outer diameter so that it can be inserted into the hole 34 of the upper flange portion 32 of the arc-shaped member 30.

調整用ボルト41の下側部分(すなわち、第1の雄ねじ部45)を管状部材42dに挿入して円筒状部材42cに螺合させた状態で、円筒状部材42cのうち座金42a,42b間の部分を、弧状部材30の上フランジ部32の孔部34に挿入することによって、第1の取り付け部材42を孔部34に嵌めることができる。それゆえ、第1の取り付け部材42によって、調整用ボルト41の下側部分がリング状部材3に着脱可能に取り付けられる。ここにおいて、外れ止めピン83は、第1の取り付け部材42が孔部34から外れて脱落するのを防止する役割がある。
このときに、第1の取り付け部材42に対して調整用ボルト41を中心軸まわりに回転させることにより、第1の取り付け部材42は、調整用ボルト41に対して上下方向に移動することが可能である。
With the lower part of the adjustment bolt 41 (that is, the first male threaded portion 45) inserted into the tubular member 42d and screwed into the cylindrical member 42c, the space between the washers 42a and 42b of the cylindrical member 42c. The first attachment member 42 can be fitted into the hole 34 by inserting the portion into the hole 34 of the upper flange portion 32 of the arcuate member 30. Therefore, the lower portion of the adjustment bolt 41 is detachably attached to the ring-shaped member 3 by the first attachment member 42. Here, the locking pin 83 has a role of preventing the first mounting member 42 from coming off the hole 34 and falling off.
At this time, by rotating the adjustment bolt 41 around the central axis with respect to the first attachment member 42, the first attachment member 42 can move in the vertical direction with respect to the adjustment bolt 41. It is.

第2の取り付け部材43は、調整用ボルト41の上側部分(すなわち、第2の雄ねじ部46)に設けられて調整用ボルト41の上側部分をリング状部材2に着脱可能に取り付けるものである。
第2の取り付け部材43は、上下一対の矩形板状の座金43a,43bと、円筒状部材43cと、管状部材43dとにより構成される。上側の座金43aの中央の開口部と下側の座金43bの中央の開口部とを貫通するように、円筒状部材43cは上下方向に延在している。
The second attachment member 43 is provided on the upper portion of the adjustment bolt 41 (that is, the second male screw portion 46) and detachably attaches the upper portion of the adjustment bolt 41 to the ring-shaped member 2.
The second attachment member 43 includes a pair of upper and lower rectangular plate washers 43a and 43b, a cylindrical member 43c, and a tubular member 43d. The cylindrical member 43c extends in the vertical direction so as to penetrate the central opening of the upper washer 43a and the central opening of the lower washer 43b.

円筒状部材43cの内面には、第2の雄ねじ部46が回転自在に螺合可能なように雌ねじ部(図示せず)が形成されている。円筒状部材43cの上部には座金43aが溶接固定されている。円筒状部材43cの下部には座金43bが溶接固定されている。円筒状部材43cの下端部には管状部材43dの上端部が溶接固定されている。
円筒状部材43cと管状部材43dとは略同軸上に延在しており、これら部材の中に調整用ボルト41の上側部分(すなわち、第2の雄ねじ部46)が挿入され得る。
ここで、座金43a,43b間の距離は、リング状部材2の下フランジ部22の厚さよりも大きい。また、円筒状部材43cについては、弧状部材20の下フランジ部22の孔部24に挿入可能なように外径が設定されている。
An internal thread portion (not shown) is formed on the inner surface of the cylindrical member 43c so that the second external thread portion 46 can be rotatably engaged. A washer 43a is fixed to the upper portion of the cylindrical member 43c by welding. A washer 43b is fixed to the lower portion of the cylindrical member 43c by welding. The upper end portion of the tubular member 43d is fixed by welding to the lower end portion of the cylindrical member 43c.
The cylindrical member 43c and the tubular member 43d extend substantially coaxially, and the upper portion of the adjustment bolt 41 (that is, the second male screw portion 46) can be inserted into these members.
Here, the distance between the washers 43 a and 43 b is larger than the thickness of the lower flange portion 22 of the ring-shaped member 2. The cylindrical member 43c has an outer diameter that can be inserted into the hole 24 of the lower flange portion 22 of the arc-shaped member 20.

調整用ボルト41の上側部分(すなわち、第2の雄ねじ部46)を管状部材43dに挿入して円筒状部材43cに螺合させた状態で、円筒状部材43cのうち座金43a,43b間の部分を、弧状部材20の下フランジ部22の孔部24に挿入することによって、第2の取り付け部材43を孔部24に嵌めることができる。それゆえ、第2の取り付け部材43によって、調整用ボルト41の上側部分がリング状部材2に着脱可能に取り付けられる。ここにおいて、外れ止めピン81は、第2の取り付け部材43が孔部24から外れて脱落するのを防止する役割がある。
このときに、第2の取り付け部材43に対して調整用ボルト41を中心軸まわりに回転させることにより、第2の取り付け部材43は、調整用ボルト41に対して上下方向に移動することが可能である。
A portion between the washers 43a and 43b of the cylindrical member 43c in a state where the upper portion (that is, the second male screw portion 46) of the adjustment bolt 41 is inserted into the tubular member 43d and screwed into the cylindrical member 43c. Is inserted into the hole 24 of the lower flange portion 22 of the arcuate member 20, so that the second attachment member 43 can be fitted into the hole 24. Therefore, the upper portion of the adjustment bolt 41 is detachably attached to the ring-shaped member 2 by the second attachment member 43. Here, the locking pin 81 has a role of preventing the second mounting member 43 from being detached from the hole 24 and falling off.
At this time, by rotating the adjustment bolt 41 around the central axis with respect to the second attachment member 43, the second attachment member 43 can move in the vertical direction with respect to the adjustment bolt 41. It is.

従って、調整用ボルト41の下側部分を管状部材42dに挿入して円筒状部材42cに螺合させ、かつ、調整用ボルト41の上側部分を管状部材43dに挿入して円筒状部材43cに螺合させた状態で、第1の取り付け部材42及び第2の取り付け部材43をそれぞれ孔部34,24に嵌めた後に、第1の取り付け部材42及び第2の取り付け部材43に対して調整用ボルト41を中心軸まわりに正転させることにより、第1の取り付け部材42と第2の取り付け部材43とが互いに離れ(図5(B)参照)、第1の取り付け部材42及び第2の取り付け部材43に対して調整用ボルト41を中心軸まわりに逆転させることにより、第1の取り付け部材42と第2の取り付け部材43とが互いに近づく(図5(C)参照)。このようにして、第1の取り付け部材42が取り付けられたリング状部材3と、第2の取り付け部材43が取り付けられたリング状部材2との間の距離が、距離変更手段4によって変更され得る。また、本実施形態では、複数の調整用ボルト41が、リング状部材2,3の周方向に沿って互いに間隔を空けて配置されており、各調整用ボルト41にはそれぞれ第1の取り付け部材42と第2の取り付け部材43とが設けられているので、リング状部材2,3の周方向における複数の位置にて、各別に、距離変更手段4を用いて、リング状部材2,3間の距離を変更することができる。   Therefore, the lower part of the adjustment bolt 41 is inserted into the tubular member 42d and screwed into the cylindrical member 42c, and the upper part of the adjustment bolt 41 is inserted into the tubular member 43d and screwed into the cylindrical member 43c. After fitting the first mounting member 42 and the second mounting member 43 into the holes 34 and 24 in the combined state, the adjustment bolts with respect to the first mounting member 42 and the second mounting member 43 are adjusted. By rotating 41 forward about the central axis, the first mounting member 42 and the second mounting member 43 are separated from each other (see FIG. 5B), and the first mounting member 42 and the second mounting member The first mounting member 42 and the second mounting member 43 approach each other by reversing the adjustment bolt 41 around the central axis with respect to 43 (see FIG. 5C). In this way, the distance between the ring-shaped member 3 to which the first mounting member 42 is attached and the ring-shaped member 2 to which the second mounting member 43 is attached can be changed by the distance changing means 4. . In the present embodiment, the plurality of adjustment bolts 41 are arranged at intervals from each other along the circumferential direction of the ring-shaped members 2 and 3, and each adjustment bolt 41 has a first attachment member. 42 and the second mounting member 43 are provided, so that the distance changing means 4 is used for each of the ring-shaped members 2 and 3 between the ring-shaped members 2 and 3 at a plurality of positions in the circumferential direction. Can change the distance.

また、本実施形態では、複数の調整用ボルト41が、第1の取り付け部材42を介してリング状部材3に支持され、かつ、第2の取り付け部材43を介してリング状部材2を支持している。それゆえ、鋼管接続用治具1において、リング状部材2,3と距離変更手段4(複数の調整用ボルト41)とが組み立てられたときに、その一体性を維持することができる。
また、本実施形態では、リング状部材2,3と距離変更手段4とが一体的に組み立てられた状態で、鋼管接続用治具1が、吊り金具27を介して、クローラークレーン等の揚重装置により吊下げられ得る。
In the present embodiment, the plurality of adjustment bolts 41 are supported by the ring-shaped member 3 through the first mounting member 42 and support the ring-shaped member 2 through the second mounting member 43. ing. Therefore, in the steel pipe connecting jig 1, when the ring-shaped members 2 and 3 and the distance changing means 4 (the plurality of adjusting bolts 41) are assembled, the integrity can be maintained.
Further, in the present embodiment, the steel pipe connecting jig 1 is lifted by a crawler crane or the like via the hanging metal fitting 27 in a state where the ring-shaped members 2 and 3 and the distance changing means 4 are integrally assembled. It can be suspended by the device.

次に、鋼管接続用治具1の使用方法について、前述の図1〜図5に加えて、図6〜図10を用いて説明する。尚、以下では、鋼管杭の設置工事を例にとって、鋼管接続用治具1の使用方法を説明するが、鋼管接続用治具1が使用され得る工事はこれに限らない。
図6〜図8は、鋼管杭を構成する上杭110と下杭100との接続方法を示す図であり、鋼管杭の縦断面を示している。図9は図8の部分Pの部分拡大図である。図10は、上杭110と下杭100との間の間隔C(特にルート間隔Cr)を示す図であり、図9に対応するものである。
Next, how to use the steel pipe connecting jig 1 will be described with reference to FIGS. 6 to 10 in addition to FIGS. In the following, the method of using the steel pipe connecting jig 1 will be described by taking the installation work of the steel pipe pile as an example, but the construction in which the steel pipe connecting jig 1 can be used is not limited to this.
6-8 is a figure which shows the connection method of the upper pile 110 and the lower pile 100 which comprise a steel pipe pile, and has shown the longitudinal cross-section of the steel pipe pile. FIG. 9 is a partially enlarged view of a portion P in FIG. FIG. 10 is a diagram illustrating a distance C (particularly, a route distance Cr) between the upper pile 110 and the lower pile 100, and corresponds to FIG.

本実施形態において、鋼管接続用治具1は、上下方向に延在する下杭100と、下杭100の上端に下端が相対するように下杭100の上方に配置されて上下方向に延在する上杭110と、の接続に用いられる。ここで、下杭100は鋼管からなり、本発明の「第1の鋼管」に対応する。また、上杭110は鋼管からなり、本発明の「第2の鋼管」に対応する。また、下杭100及び上杭110の外径は例えば600mm程度であるが、外径はこれに限らない。   In this embodiment, the steel pipe connecting jig 1 is disposed above the lower pile 100 so that the lower end faces the upper end of the lower pile 100 extending in the vertical direction and the upper end of the lower pile 100 and extends in the vertical direction. It is used for connection with the upper pile 110 to be used. Here, the lower pile 100 is made of a steel pipe and corresponds to the “first steel pipe” of the present invention. Moreover, the upper pile 110 consists of a steel pipe, and respond | corresponds to the "2nd steel pipe" of this invention. Moreover, although the outer diameter of the lower pile 100 and the upper pile 110 is about 600 mm, for example, an outer diameter is not restricted to this.

まず、下杭100を打撃工法により地盤に打ち込む。地盤に打ち込まれた下杭100は、その上部が地上で露出している。尚、この下杭100の上部の内周面には、後述する裏当てリング101を取り付けるための複数のストッパー部材102が予め設けられている(図6(A)参照)。ストッパー部材102は鋼板により形成されており、下杭100の内周面に溶接固定されている。また、複数のストッパー部材102は、下杭100の周方向に互いに間隔を空けて配置されている。   First, the lower pile 100 is driven into the ground by a batting method. The upper part of the lower pile 100 driven into the ground is exposed on the ground. A plurality of stopper members 102 for attaching a backing ring 101 to be described later are provided in advance on the inner peripheral surface of the upper portion of the lower pile 100 (see FIG. 6A). The stopper member 102 is formed of a steel plate and is fixed to the inner peripheral surface of the lower pile 100 by welding. Further, the plurality of stopper members 102 are arranged at intervals in the circumferential direction of the lower pile 100.

次に、図6(B)に示すように、裏当てリング101を下杭100の上面開口側から下杭100内にたたき込むようにして取り付ける。取り付けられた裏当てリング101の下部はストッパー部材102に当接しており、これにより、裏当てリング101の位置が保持される。また、裏当てリング101の上部は、下杭100の上端より上方に張り出して外部に露出しており、その外周面が上杭110の内周面に当接可能である。尚、裏当てリング101の形状寸法については、例えば、JIS A 5525 附属書Bに示されている。
また、図6(B)に示すように、下杭100の上部に複数の仮受けプレート103を溶接固定する。この仮受けプレート103は、本発明の「仮受け部材」に対応するものであり、下杭100に取り付けられて、リング状部材3を支持し得る。
Next, as shown in FIG. 6B, the backing ring 101 is attached so as to be knocked into the lower pile 100 from the upper surface opening side of the lower pile 100. The lower part of the attached backing ring 101 is in contact with the stopper member 102, whereby the position of the backing ring 101 is maintained. Further, the upper portion of the backing ring 101 protrudes upward from the upper end of the lower pile 100 and is exposed to the outside, and the outer peripheral surface thereof can contact the inner peripheral surface of the upper pile 110. The shape and size of the backing ring 101 are shown in, for example, JIS A 5525 Annex B.
Moreover, as shown in FIG. 6B, a plurality of temporary support plates 103 are fixed to the upper portion of the lower pile 100 by welding. The temporary receiving plate 103 corresponds to the “temporary receiving member” of the present invention, and can be attached to the lower pile 100 to support the ring-shaped member 3.

次に、図7に示すように、地組されて一体化された鋼管接続用治具1をクローラークレーン等の揚重装置により吊下げて下降させて、リング状部材3内に下杭100の上部を挿入させる。このときに、リング状部材2,3と距離変更手段4とは、一体的に組み立てられた状態で、かつ、下杭100及び上杭110から脱離された状態で、クローラークレーン等の揚重装置により、吊り金具27を介して吊下げられる。そして、ボルト88を締め付けることにより、下杭100の上部にリング状部材3を締め付け固定する。このようにして、リング状部材3は、下杭100の上部の外周面に締め付け固定されて下杭100の外周を囲む。ここで、リング状部材3が、本発明の「第1のリング状部材」に対応する。   Next, as shown in FIG. 7, the steel pipe connection jig 1 assembled and integrated is suspended and lowered by a lifting device such as a crawler crane, and the lower pile 100 is placed in the ring-shaped member 3. Insert the top. At this time, the ring-shaped members 2 and 3 and the distance changing means 4 are lifted by a crawler crane or the like in an assembled state and detached from the lower pile 100 and the upper pile 110. It is suspended by a device through a suspension fitting 27. Then, the ring-shaped member 3 is fastened and fixed to the upper portion of the lower pile 100 by tightening the bolts 88. Thus, the ring-shaped member 3 is fastened and fixed to the outer peripheral surface of the upper portion of the lower pile 100 and surrounds the outer periphery of the lower pile 100. Here, the ring-shaped member 3 corresponds to the “first ring-shaped member” of the present invention.

次に、クローラークレーン等の揚重装置により上杭110を吊下げて、上方からリンク状部材2内に上杭110を挿入し、更に、裏当てリング101に上杭110の下端部を当接させつつ上杭110を下降させて、上杭110の下端を下杭100の上端に接触させる(図8及び図9参照)。ここで、上杭110の下端部には溶接用の開先部111が予め形成されている。
次に、ボルト85を締め付けることにより、上杭110の下部にリング状部材2を締め付け固定する。このようにして、リング状部材2は、上杭110の下部の外周面に締め付け固定されて上杭110の外周を囲む。ここで、リング状部材2が、本発明の「第2のリング状部材」に対応する。
Next, the upper pile 110 is suspended by a lifting device such as a crawler crane, the upper pile 110 is inserted into the link-like member 2 from above, and the lower end portion of the upper pile 110 is brought into contact with the backing ring 101. The upper pile 110 is moved down while the upper pile 110 is brought into contact with the upper end of the lower pile 100 (see FIGS. 8 and 9). Here, a groove portion 111 for welding is formed in advance at the lower end portion of the upper pile 110.
Next, the ring-shaped member 2 is fastened and fixed to the lower portion of the upper pile 110 by tightening the bolts 85. Thus, the ring-shaped member 2 is fastened and fixed to the outer peripheral surface of the lower portion of the upper pile 110 and surrounds the outer periphery of the upper pile 110. Here, the ring-shaped member 2 corresponds to the “second ring-shaped member” of the present invention.

次に、第1の取り付け部材42及び第2の取り付け部材43に対して調整用ボルト41を中心軸まわりに回転させて、第1の取り付け部材42と第2の取り付け部材43とを互いに離れさせる(換言すれば、座金42aと座金43bとの間の距離を大きくする)。これにより、第1の取り付け部材42が取り付けられたリング状部材3と、第2の取り付け部材43が取り付けられたリング状部材2との間の距離が大きくなり、この結果、上杭110と下杭100との間の間隔Cが広げられる(図10参照)。尚、この間隔Cの調整については、調整用ボルト41を中心軸まわりに適宜回転させて、リング状部材2,3間の距離を変更することで行われる。それゆえ、本実施形態では、リング状部材2,3の周方向における複数の位置にて、調整用ボルト41を含む距離変更手段4を用いて、リング状部材2,3間の距離を変更することにより、上杭110及び下杭100の周方向における複数の位置での間隔Cを、当該位置ごとに調整することができる。 Next, the adjustment bolt 41 is rotated around the central axis with respect to the first mounting member 42 and the second mounting member 43 to separate the first mounting member 42 and the second mounting member 43 from each other. (In other words, the distance between the washer 42a and the washer 43b is increased). Thereby, the distance between the ring-shaped member 3 to which the first attachment member 42 is attached and the ring-like member 2 to which the second attachment member 43 is attached is increased. The distance C between the piles 100 is increased (see FIG. 10). Incidentally, the adjustment of the interval C is appropriately rotated the adjustment bolt 41 about the central axis, it is carried out by changing the distance between the ring-shaped members 2 and 3. Therefore, in this embodiment, the distance between the ring-shaped members 2 and 3 is changed using the distance changing means 4 including the adjusting bolt 41 at a plurality of positions in the circumferential direction of the ring-shaped members 2 and 3. Thereby, the space | interval C in the several position in the circumferential direction of the upper pile 110 and the lower pile 100 can be adjusted for every the said position.

ここで、間隔Cは、上杭110の下端と下杭100の上端とを溶接固定するときに、当該溶接部分における溶け込み不良を抑制するために形成されるルート間隔Crである。このルート間隔Crは、約1mm以上かつ約4mm以下の範囲内であることが好ましい。   Here, the interval C is a route interval Cr formed in order to suppress poor penetration in the welded portion when the lower end of the upper pile 110 and the upper end of the lower pile 100 are fixed by welding. This route interval Cr is preferably in the range of about 1 mm or more and about 4 mm or less.

次に、上杭110の下端と下杭100の上端とを溶接固定して、上杭110と下杭100とを接続する。この溶接時に、管状部材42d,43dは、調整用ボルト41の雄ねじ部45,46の露出部分が溶接のアークで破損しないように当該露出部分を防護する防護管として機能する。
上杭110の下端と下杭100の上端とを溶接固定が完了すると、次に、全ての外れ止めピン81,83を孔部25b,35bから抜いて、全ての調整用ボルト41をリング状部材2,3から取り外す。
Next, the lower end of the upper pile 110 and the upper end of the lower pile 100 are welded and fixed, and the upper pile 110 and the lower pile 100 are connected. During this welding, the tubular members 42d and 43d function as protective tubes that protect the exposed portions of the male screw portions 45 and 46 of the adjusting bolt 41 so that the exposed portions are not damaged by the welding arc.
When the welding and fixing of the lower end of the upper pile 110 and the upper end of the lower pile 100 are completed, all the locking pins 81 and 83 are then removed from the holes 25b and 35b, and all the adjustment bolts 41 are attached to the ring-shaped member. Remove from 2 and 3.

次に、ボルト85を緩めて弧状部材20同士を分離した上で、各弧状部材20を上杭110から取り外す。また、ボルト88を緩めて弧状部材30同士を分離した上で、各弧状部材30を下杭100から取り外す。
このようにして、上杭110と下杭100とが接続される。
Next, after loosening the bolts 85 to separate the arc-shaped members 20 from each other, each arc-shaped member 20 is removed from the upper pile 110. Moreover, after loosening the bolt 88 and separating the arc-shaped members 30 from each other, each arc-shaped member 30 is removed from the lower pile 100.
In this way, the upper pile 110 and the lower pile 100 are connected.

この後、鋼管杭が地盤における所望の深さに達するまで、前述と同様に、打撃工法による杭(鋼管)の地盤への打ち込みと、新たな杭(鋼管)の継ぎ足しとを繰り返す。この鋼管の継ぎ足し時には、同一の鋼管接続用治具1を使い回すことが可能である。
このようにして、鋼管杭の設置工事が行われる。
Thereafter, until the steel pipe pile reaches a desired depth in the ground, the pile (steel pipe) is driven into the ground by the hammering method and the addition of a new pile (steel pipe) is repeated in the same manner as described above. When the steel pipe is added, the same steel pipe connecting jig 1 can be used.
In this manner, the steel pipe pile installation work is performed.

ところで、従来、上杭110と下杭100との間のルート間隔Crを保持する手法の一例として、下杭100に裏当てリング101を装着した後、下杭100の上端にルート間隔保持ビードを形成して、このルート間隔保持ビードを上杭110と下杭100との間に介在させることで、ルート間隔Crを保持することが知られている(杭基礎施工便覧 平成18年度改訂版(平成19年1月、社団法人 日本道路協会)参照)。
しかしながら、このような手法では、上杭110と下杭100とが互いに固定されていない状態でルート間隔Crを保持したまま、鋼管杭の鉛直度(特に上杭110の鉛直度)を修正するので、上杭110が裏当てリング101から外れてしまう虞があった。
By the way, conventionally, after attaching the backing ring 101 to the lower pile 100 as an example of a method for maintaining the route interval Cr between the upper pile 110 and the lower pile 100, a route interval holding bead is attached to the upper end of the lower pile 100. It is known that the route interval Cr is maintained by forming this route interval holding bead between the upper pile 110 and the lower pile 100 (pile foundation construction manual 2006 revised edition (Heisei (See Japan Road Association, January 19)).
However, in such a method, the verticality of the steel pipe pile (particularly the verticality of the upper pile 110) is corrected while maintaining the root interval Cr in a state where the upper pile 110 and the lower pile 100 are not fixed to each other. The upper pile 110 may be detached from the backing ring 101.

この点、本実施形態では、裏当てリング101を下杭100に装着した後に、上杭110及び下杭100に鋼管接続用治具1を設置して、調整用ボルト41の回転で上杭110と下杭100との間の間隔Cを調整及び固定することにより、溶接に必要なルート間隔Crを保持することができる。また、上杭110及び下杭100に鋼管接続用治具1を設置して、上杭110が鋼管接続用治具1を介して下杭100に支持された状態で、鋼管杭の鉛直度(特に上杭110の鉛直度)を修正することができるので、上杭110が裏当てリング101から外れることを抑制することができ、ひいては、作業の安全性を向上させることができる。併せて、本実施形態によれば、ルート間隔Crの微調整が可能であることから、ルート間隔Crを適切に保持することができ、また、前述のルート間隔保持ビートを形成する必要もなくなるので、現場溶接の品質及び均質性を向上させることができる。従って、鋼管接続用治具1は、鋼管杭現場溶接時に、ルート間隔Crを調整でき、また、上杭110と下杭100とを溶接固定するまでの間、ルート間隔Crを保持できる治具として最適である。また、鋼管接続用治具1を用いることで、上杭110と下杭100との溶接作業をスムーズに行うことができる。   In this respect, in this embodiment, after attaching the backing ring 101 to the lower pile 100, the steel pipe connection jig 1 is installed on the upper pile 110 and the lower pile 100, and the upper pile 110 is rotated by rotating the adjustment bolt 41. By adjusting and fixing the distance C between the lower pile 100 and the lower pile 100, the root distance Cr necessary for welding can be maintained. In addition, the steel pipe connection jig 1 is installed on the upper pile 110 and the lower pile 100, and the vertical degree of the steel pipe pile (with the upper pile 110 supported by the lower pile 100 via the steel pipe connection jig 1) ( In particular, since the verticality of the upper pile 110 can be corrected, it is possible to suppress the upper pile 110 from being detached from the backing ring 101, and thus it is possible to improve work safety. In addition, according to the present embodiment, since the route interval Cr can be finely adjusted, the route interval Cr can be appropriately maintained, and it is not necessary to form the above-described route interval maintaining beat. In addition, the quality and homogeneity of field welding can be improved. Therefore, the steel pipe connecting jig 1 can adjust the route interval Cr at the time of on-site welding of the steel pipe pile, and can maintain the route interval Cr until the upper pile 110 and the lower pile 100 are welded and fixed. Is optimal. Moreover, the welding operation | work with the upper pile 110 and the lower pile 100 can be performed smoothly by using the jig 1 for steel pipe connection.

本実施形態によれば、鋼管接続用治具1は、上下方向に延在する下杭100(第1の鋼管)と、下杭100の上端に下端が相対するように下杭100の上方に配置されて上下方向に延在する上杭110(第2の鋼管)と、の接続に用いられる治具である。鋼管接続用治具1は、下杭100の上部の外周面に固定されて下杭100の外周を囲むリング状部材3(第1のリング状部材)と、上杭110の下部の外周面に固定されて上杭110の外周を囲むリング状部材2(第2のリング状部材)と、リング状部材2,3間の距離を変更可能な距離変更手段4と、を含んで構成される。距離変更手段4は、リング状部材2,3の周方向における複数の位置での前記距離を変更することにより、上杭110及び下杭100の周方向における複数の位置での上杭110と下杭100との間の間隔Cを調整可能である。ゆえに、リング状部材3が下杭100の上部の外周面に固定され、かつ、リング状部材2が上杭110の下部の外周面に固定されている状態において、リング状部材2,3の相互間の距離を、距離変更手段4によって変更することで、この距離の変更に伴って、上杭110及び下杭100の周方向における複数の位置での上杭110及び下杭100の相互間の間隔を簡易に調整することができる。   According to this embodiment, the steel pipe connecting jig 1 is located above the lower pile 100 so that the lower end faces the lower pile 100 (first steel pipe) extending in the vertical direction and the upper end of the lower pile 100. It is the jig | tool used for the connection with the upper pile 110 (2nd steel pipe) arrange | positioned and extended to an up-down direction. The steel pipe connecting jig 1 is fixed to the outer peripheral surface of the upper portion of the lower pile 100 and surrounds the outer periphery of the lower pile 100 on the outer peripheral surface of the lower portion of the upper pile 110 and the ring-shaped member 3 (first ring-shaped member). The ring-shaped member 2 (second ring-shaped member) that is fixed and surrounds the outer periphery of the upper pile 110 and the distance changing means 4 that can change the distance between the ring-shaped members 2 and 3 are configured. The distance changing means 4 changes the distance at a plurality of positions in the circumferential direction of the ring-shaped members 2, 3 to change the upper pile 110 and the lower pile at a plurality of positions in the circumferential direction of the upper pile 110 and the lower pile 100. The distance C between the piles 100 can be adjusted. Therefore, in a state where the ring-shaped member 3 is fixed to the upper outer peripheral surface of the lower pile 100 and the ring-shaped member 2 is fixed to the lower outer peripheral surface of the upper pile 110, the ring-shaped members 2 and 3 are mutually connected. By changing the distance between the upper pile 110 and the lower pile 100 at a plurality of positions in the circumferential direction of the upper pile 110 and the lower pile 100 by changing the distance by the distance changing means 4. The interval can be easily adjusted.

また本実施形態によれば、間隔Cはルート間隔Crであり、上杭110(第2の鋼管)の下端は下杭100(第1の鋼管)の上端に溶接固定される。これにより、上杭110の下端と下杭100の上端とを溶接固定するときに、当該溶接部分における溶け込み不良を抑制することができる。   According to the present embodiment, the interval C is the root interval Cr, and the lower end of the upper pile 110 (second steel pipe) is welded and fixed to the upper end of the lower pile 100 (first steel pipe). Thereby, when welding and fixing the lower end of the upper pile 110 and the upper end of the lower pile 100, the penetration defect in the said welding part can be suppressed.

また本実施形態によれば、リング状部材3(第1のリング状部材)は下杭100(第1の鋼管)の上部の外周面に締め付け固定され、リング状部材2(第2のリング状部材)は上杭110(第2の鋼管)の下部の外周面に締め付け固定される。これにより、リング状部材2,3を上杭110及び下杭100に簡易に固定することができる。   Moreover, according to this embodiment, the ring-shaped member 3 (first ring-shaped member) is fastened and fixed to the outer peripheral surface of the upper portion of the lower pile 100 (first steel pipe), and the ring-shaped member 2 (second ring-shaped). The member is fastened and fixed to the lower outer peripheral surface of the upper pile 110 (second steel pipe). Thereby, the ring-shaped members 2 and 3 can be simply fixed to the upper pile 110 and the lower pile 100.

また本実施形態によれば、リング状部材3(第1のリング状部材)は下杭100(第1の鋼管)の上部の外周面に着脱可能に固定され、リング状部材2(第2のリング状部材)は上杭110(第2の鋼管)の下部の外周面に着脱可能に固定される。これにより、鋼管接続用治具1を上杭110と下杭100との接続に用いた後に、これらと同径の別の鋼管同士の接続に容易に転用することができる。   Moreover, according to this embodiment, the ring-shaped member 3 (1st ring-shaped member) is detachably fixed to the outer peripheral surface of the upper part of the lower pile 100 (1st steel pipe), and the ring-shaped member 2 (2nd 2nd). The ring-shaped member is detachably fixed to the outer peripheral surface of the lower portion of the upper pile 110 (second steel pipe). Thereby, after using the jig 1 for steel pipe connection for the connection of the upper pile 110 and the lower pile 100, it can be diverted easily for the connection of another steel pipe with the same diameter as these.

また本実施形態によれば、リング状部材3(第1のリング状部材)は複数の弧状部材30を含んで構成され、リング状部材2(第2のリング状部材)は複数の弧状部材20により構成される。換言すれば、リング状部材3は複数の弧状部材30に分割されており、また、リング状部材2は複数の弧状部材20に分割されている。これにより、重量物であるリング状部材2,3を小分けにすることができるので、人力作業の負担を軽減することができる。尚、本実施形態では、リング状部材2,3の両方が複数の弧状部材に分割されているが、この他、リング状部材2,3の一方が複数の弧状部材に分割されてもよい。   According to the present embodiment, the ring-shaped member 3 (first ring-shaped member) includes a plurality of arc-shaped members 30, and the ring-shaped member 2 (second ring-shaped member) includes the plurality of arc-shaped members 20. Consists of. In other words, the ring-shaped member 3 is divided into a plurality of arc-shaped members 30, and the ring-shaped member 2 is divided into a plurality of arc-shaped members 20. Thereby, since the ring-shaped members 2 and 3 which are heavy objects can be subdivided, the burden of manual work can be reduced. In the present embodiment, both the ring-shaped members 2 and 3 are divided into a plurality of arc-shaped members, but one of the ring-shaped members 2 and 3 may be divided into a plurality of arc-shaped members.

また本実施形態によれば、距離変更手段4は、リング状部材3(第1のリング状部材)及びリング状部材2(第2のリング状部材)の周方向に沿って互いに間隔を空けて配置され、かつ、各々が上下方向に延在する複数の調整用ボルト41(ロッド状部材)と、調整用ボルト41の下側部分に設けられて調整用ボルト41の下側部分をリング状部材3に取り付ける第1の取り付け部材42と、調整用ボルト41の上側部分に設けられて調整用ボルト41の上側部分をリング状部材2に取り付ける第2の取り付け部材43と、を含んで構成される。第1の取り付け部材42と第2の取り付け部材43との少なくとも一方が、調整用ボルト41に対して上下方向に移動可能である。これにより、距離移動手段4を比較的簡素な構成とすることができる。   Moreover, according to this embodiment, the distance changing means 4 is spaced from each other along the circumferential direction of the ring-shaped member 3 (first ring-shaped member) and the ring-shaped member 2 (second ring-shaped member). A plurality of adjustment bolts 41 (rod-like members) that are arranged and each extend in the vertical direction, and a lower portion of the adjustment bolt 41 provided as a ring-like member. 3 and a second mounting member 43 provided on the upper part of the adjustment bolt 41 and mounting the upper part of the adjustment bolt 41 to the ring-shaped member 2. . At least one of the first attachment member 42 and the second attachment member 43 is movable in the vertical direction with respect to the adjustment bolt 41. Thereby, the distance moving means 4 can be made into a comparatively simple structure.

また本実施形態によれば、第1の取り付け部材42は調整用ボルト41(ロッド状部材)の下側部分をリング状部材3(第1のリング状部材)に着脱可能に取り付け、第2の取り付け部材43は調整用ボルト41の上側部分をリング状部材2(第2のリング状部材)に着脱可能に取り付ける。これにより、上杭110と下杭100との溶接が完了した後に、鋼管接続用部材1を分解して鋼管杭から迅速に撤去することができる。   According to the present embodiment, the first mounting member 42 detachably attaches the lower part of the adjustment bolt 41 (rod-shaped member) to the ring-shaped member 3 (first ring-shaped member). The attachment member 43 detachably attaches the upper part of the adjustment bolt 41 to the ring-shaped member 2 (second ring-shaped member). Thereby, after welding with the upper pile 110 and the lower pile 100 is completed, the member 1 for steel pipe connection can be decomposed | disassembled and can be rapidly removed from a steel pipe pile.

また本実施形態によれば、調整用ボルト41(ロッド状部材)は、その下側部分を構成する第1の雄ねじ部45と、上側部分を構成する第2の雄ねじ部46と、を含んで構成される。第1の雄ねじ部45と第2の雄ねじ部46とのうち、一方が左ねじであり、他方が右ねじである。これにより、調整用ボルト41を中心軸まわりに適宜回転させることで、リング状部材2,3間の距離を変更することができる。 Further, according to the present embodiment, the adjustment bolt 41 (rod-like member) includes the first male screw portion 45 constituting the lower portion thereof and the second male screw portion 46 constituting the upper portion thereof. Composed. One of the first male screw portion 45 and the second male screw portion 46 is a left-hand screw, and the other is a right-hand screw. Thus, in Rukoto appropriately rotated around the central axis the adjustment bolt 41, it is possible to change the distance between the ring-shaped members 2 and 3.

また本実施形態によれば、調整用ボルト41(ロッド状部材)は、第1の取り付け部材42を介してリング状部材3(第1のリング状部材)に支持され、かつ、第2の取り付け部材43を介してリング状部材2(第2のリング状部材)を支持する。これにより、上杭110及び下杭100に鋼管接続用治具1を設置することで、上杭110を鋼管接続用治具1を介して下杭100で支持することができる。   Further, according to the present embodiment, the adjustment bolt 41 (rod-shaped member) is supported by the ring-shaped member 3 (first ring-shaped member) via the first mounting member 42, and the second mounting is performed. The ring-shaped member 2 (second ring-shaped member) is supported via the member 43. Thereby, the upper pile 110 can be supported by the lower pile 100 via the steel pipe connecting jig 1 by installing the steel pipe connecting jig 1 in the upper pile 110 and the lower pile 100.

また本実施形態によれば、リング状部材2(第2のリング状部材)が吊り金具27を備える。リング状部材2,3と距離変更手段4とは、一体的に組み立てられた状態で、かつ、下杭100(第1の鋼管)及び上杭110(第2の鋼管)から脱離された状態で、吊り金具27を介して吊下げ可能である。これにより、鋼管接続用治具1の揚重・運搬を容易に行うことができる。   Further, according to the present embodiment, the ring-shaped member 2 (second ring-shaped member) includes the hanging metal fitting 27. The ring-shaped members 2 and 3 and the distance changing means 4 are in an integrally assembled state and detached from the lower pile 100 (first steel pipe) and the upper pile 110 (second steel pipe). Thus, it can be suspended via the suspension fitting 27. Thereby, the steel pipe connection jig 1 can be easily lifted and transported.

また本実施形態によれば、鋼管接続用治具1は、リング状部材2(第2のリング状部材)に設けられて上方に突出し、上杭110(第2の鋼管)をリング状部材2内に案内可能な延長部25cを含む板状部材25(ガイド部材)を更に含んで構成される。これにより、屋外で風などがある条件下であっても、上杭110をスムーズにリング状部材2内に挿入することができる。   According to the present embodiment, the steel pipe connecting jig 1 is provided on the ring-shaped member 2 (second ring-shaped member) and protrudes upward, and the upper pile 110 (second steel pipe) is connected to the ring-shaped member 2. It further includes a plate-like member 25 (guide member) including an extension 25c that can be guided therein. As a result, the upper pile 110 can be smoothly inserted into the ring-shaped member 2 even under outdoor conditions such as wind.

また本実施形態によれば、延長部25cを含む板状部材25(ガイド部材)のうち上杭110(第2の鋼管)が接触可能なガイド部分25dは、下方に向かうほど、リング状部材2の径方向内側に向かうように傾斜している。すなわち、板状部材25の延長部25cのガイド部分25dには、下方に向かうほど、リング状部材2の径方向内側に向かうようにテーパーがつけられている。これにより、上杭110をリング状部材2内に挿入しやすくすることができる。   Moreover, according to this embodiment, the guide part 25d with which the upper pile 110 (2nd steel pipe) can contact among the plate-shaped members 25 (guide member) containing the extension part 25c is so that it goes below, the ring-shaped member 2 It inclines so that it may go to the radial inside. That is, the guide portion 25d of the extension portion 25c of the plate-like member 25 is tapered so as to go inward in the radial direction of the ring-like member 2 as it goes downward. Thereby, the upper pile 110 can be easily inserted into the ring-shaped member 2.

また本実施形態によれば、鋼管接続用治具1は、下杭100(第1の鋼管)に取り付けられてリング状部材3(第1のリング状部材)を支持する仮受けプレート103(仮受け部材)を更に含んで構成される。これにより、下杭100に対するリング状部材3の位置決めを容易に行うことができる。   Further, according to the present embodiment, the steel pipe connecting jig 1 is attached to the lower pile 100 (first steel pipe) and supports the ring-shaped member 3 (first ring-shaped member). A receiving member). Thereby, positioning of the ring-shaped member 3 with respect to the lower pile 100 can be performed easily.

尚、前述の弧状部材20、30については、無駄な部分を切断して軽量化を行うことにより、人力作業の負担の軽減を図ることができる。
また、前述の調整用ボルト41については、上下の区別を付けるため、上下を色分けすることが好ましい。例えば、調整用ボルト41の上部を黒色で塗装し、他の部分を錆止め塗装の赤色としてもよい。
In addition, about the above-mentioned arc-shaped members 20 and 30, the burden of a manpower operation | work can be reduced by cutting a useless part and reducing a weight.
In addition, the above-described adjustment bolt 41 is preferably color-coded in order to distinguish the upper and lower sides. For example, the upper part of the adjustment bolt 41 may be painted in black, and the other part may be red in rust-preventing paint.

また本実施形態では、距離変更手段4が、複数の調整用ボルト41と第1の取り付け部材42と第2の取り付け部材43とにより構成されているが、リング状部材2,3間の距離を変更可能であれば、距離変更手段4の構成はこれに限らない。例えば、調整用ボルト41がターンバックルのように伸縮自在に形成されてもよい。   In the present embodiment, the distance changing means 4 is constituted by a plurality of adjusting bolts 41, the first mounting member 42, and the second mounting member 43, but the distance between the ring-shaped members 2 and 3 is set. The configuration of the distance changing unit 4 is not limited to this as long as it can be changed. For example, the adjustment bolt 41 may be formed to be extendable and retractable like a turnbuckle.

また本実施形態では、鋼管接続用治具1を鋼管杭の接続に用いているが、この他、鋼管接続用治具1を鋼管矢板(例えば特許文献1に記載のような一対の継手部材を備える鋼管)の接続に用いてもよい。
また、図示の実施形態はあくまで本発明を例示するものであり、本発明は、説明した実施形態により直接的に示されるものに加え、特許請求の範囲内で当業者によりなされる各種の改良・変更を包含するものであることは言うまでもない。
尚、出願当初の請求項は以下の通りであった。
請求項1:
上下方向に延在する第1の鋼管と、前記第1の鋼管の上端に下端が相対するように前記第1の鋼管の上方に配置されて上下方向に延在する第2の鋼管と、の接続に用いられる鋼管接続用治具であって、
前記第1の鋼管の上部の外周面に固定されて前記第1の鋼管の外周を囲む第1のリング状部材と、
前記第2の鋼管の下部の外周面に固定されて前記第2の鋼管の外周を囲む第2のリング状部材と、
前記第1のリング状部材と前記第2のリング状部材との間の距離を変更可能な距離変更手段と、
を含んで構成され、
前記距離変更手段は、前記第1のリング状部材及び前記第2のリング状部材の周方向における複数の位置での前記距離を変更することにより、前記第1の管体及び前記第2の管体の周方向における複数の位置での前記第1の管体と前記第2の管体との間の間隔を調整可能である、
鋼管接続用治具。
請求項2:
前記間隔はルート間隔であり、前記第2の鋼管の下端は前記第1の鋼管の上端に溶接固定される、請求項1に記載の鋼管接続用治具。
請求項3:
前記第1のリング状部材は前記第1の鋼管の上部の外周面に締め付け固定され、前記第2のリング状部材は前記第2の鋼管の下部の外周面に締め付け固定される、請求項1又は請求項2に記載の鋼管接続用治具。
請求項4:
前記第1のリング状部材は前記第1の鋼管の上部の外周面に着脱可能に固定され、前記第2のリング状部材は前記第2の鋼管の下部の外周面に着脱可能に固定される、請求項1〜請求項3のいずれか1つに記載の鋼管接続用治具。
請求項5:
前記第1のリング状部材と前記第2のリング状部材との少なくとも一方は、複数の弧状部材を含んで構成される、請求項1〜請求項4のいずれか1つに記載の鋼管接続用治具。
請求項6:
前記距離変更手段は、
前記第1のリング状部材及び前記第2のリング状部材の周方向に沿って互いに間隔を空けて配置され、かつ、各々が上下方向に延在する複数のロッド状部材と、
前記ロッド状部材の下側部分に設けられて前記ロッド状部材の下側部分を前記第1のリング状部材に取り付ける第1の取り付け部材と、
前記ロッド状部材の上側部分に設けられて前記ロッド状部材の上側部分を前記第2のリング状部材に取り付ける第2の取り付け部材と、
を含んで構成され、
前記第1の取り付け部材と前記第2の取り付け部材との少なくとも一方が、前記ロッド状部材に対して上下方向に移動可能である、請求項1〜請求項5のいずれか1つに記載の鋼管接続用治具。
請求項7:
前記第1の取り付け部材は前記ロッド状部材の下側部分を前記第1のリング状部材に着脱可能に取り付け、前記第2の取り付け部材は前記ロッド状部材の上側部分を前記第2のリング状部材に着脱可能に取り付ける、請求項6に記載の鋼管接続用治具。
請求項8:
前記ロッド状部材は、その下側部分を構成する第1の雄ねじ部と、上側部分を構成する第2の雄ねじ部と、を含んで構成され、
前記第1の雄ねじ部と前記第2の雄ねじ部とのうち、一方が左ねじであり、他方が右ねじである、請求項6又は請求項7に記載の鋼管接続用治具。
請求項9:
前記ロッド状部材は、前記第1の取り付け部材を介して前記第1のリング状部材に支持され、かつ、前記第2の取り付け部材を介して前記第2のリング状部材を支持する、請求項6〜請求項8のいずれか1つに記載の鋼管接続用治具。
請求項10:
前記第2のリング状部材は吊り金具を備え、
前記第1のリング状部材と前記第2のリング状部材と前記距離変更手段とは、一体的に組み立てられた状態で、かつ、前記第1の鋼管及び前記第2の鋼管から脱離された状態で、前記吊り金具を介して吊下げ可能である、請求項1〜請求項9のいずれか1つに記載の鋼管接続用治具。
請求項11:
前記第2のリング状部材に設けられて上方に突出し、前記第2の鋼管を前記第2のリング状部材内に案内可能なガイド部材を更に含んで構成される、請求項1〜請求項10のいずれか1つに記載の鋼管接続用治具。
請求項12:
前記ガイド部材のうち前記第2の鋼管が接触可能なガイド部分は、下方に向かうほど、前記第2のリング状部材の径方向内側に向かうように傾斜している、請求項11に記載の鋼管接続用治具。
請求項13:
前記第1の鋼管に取り付けられて前記第1のリング状部材を支持する仮受け部材を更に含んで構成される、請求項1〜請求項12のいずれか1つに記載の鋼管接続用治具。
In this embodiment, the steel pipe connecting jig 1 is used for connecting steel pipe piles. In addition, the steel pipe connecting jig 1 is a steel pipe sheet pile (for example, a pair of joint members as described in Patent Document 1). You may use for the connection of the steel pipe provided.
The illustrated embodiments are merely examples of the present invention, and the present invention is not limited to those directly described by the described embodiments, and various improvements and modifications made by those skilled in the art within the scope of the claims. Needless to say, it encompasses changes.
The claims at the beginning of the application were as follows.
Claim 1:
A first steel pipe extending in the vertical direction; and a second steel pipe extending in the vertical direction and disposed above the first steel pipe so that the lower end faces the upper end of the first steel pipe. A steel pipe connecting jig used for connection,
A first ring-shaped member fixed to the outer peripheral surface of the upper portion of the first steel pipe and surrounding the outer periphery of the first steel pipe;
A second ring-shaped member fixed to the outer peripheral surface of the lower portion of the second steel pipe and surrounding the outer periphery of the second steel pipe;
Distance changing means capable of changing a distance between the first ring-shaped member and the second ring-shaped member;
Comprising
The distance changing means changes the distance at a plurality of positions in the circumferential direction of the first ring-shaped member and the second ring-shaped member, whereby the first tube body and the second tube. The distance between the first tube and the second tube at a plurality of positions in the circumferential direction of the body can be adjusted.
Steel pipe connection jig.
Claim 2:
The steel pipe connection jig according to claim 1, wherein the interval is a route interval, and a lower end of the second steel pipe is welded and fixed to an upper end of the first steel pipe.
Claim 3:
The first ring-shaped member is fastened and fixed to the outer peripheral surface of the upper portion of the first steel pipe, and the second ring-shaped member is fastened and fixed to the outer peripheral surface of the lower portion of the second steel pipe. Or the jig for steel pipe connection of Claim 2.
Claim 4:
The first ring-shaped member is detachably fixed to the outer peripheral surface of the upper portion of the first steel pipe, and the second ring-shaped member is detachably fixed to the outer peripheral surface of the lower portion of the second steel pipe. The steel pipe connecting jig according to any one of claims 1 to 3.
Claim 5:
The steel pipe connection according to any one of claims 1 to 4, wherein at least one of the first ring-shaped member and the second ring-shaped member includes a plurality of arc-shaped members. jig.
Claim 6:
The distance changing means is
A plurality of rod-shaped members arranged at intervals from each other along the circumferential direction of the first ring-shaped member and the second ring-shaped member, and each extending vertically.
A first attachment member provided at a lower portion of the rod-shaped member and attaching the lower portion of the rod-shaped member to the first ring-shaped member;
A second attachment member provided on the upper part of the rod-like member and attaching the upper part of the rod-like member to the second ring-shaped member;
Comprising
The steel pipe according to any one of claims 1 to 5, wherein at least one of the first attachment member and the second attachment member is movable in the vertical direction with respect to the rod-shaped member. Connection jig.
Claim 7:
The first attachment member detachably attaches the lower part of the rod-like member to the first ring-like member, and the second attachment member attaches the upper part of the rod-like member to the second ring-like part. The steel pipe connecting jig according to claim 6, which is detachably attached to a member.
Claim 8:
The rod-shaped member is configured to include a first male screw portion that constitutes a lower portion thereof, and a second male screw portion that constitutes an upper portion thereof,
The steel pipe connecting jig according to claim 6 or 7, wherein one of the first male screw part and the second male screw part is a left-hand thread and the other is a right-hand thread.
Claim 9:
The rod-shaped member is supported by the first ring-shaped member via the first mounting member, and supports the second ring-shaped member via the second mounting member. The steel pipe connecting jig according to any one of claims 6 to 8.
Claim 10:
The second ring-shaped member includes a hanging metal fitting,
The first ring-shaped member, the second ring-shaped member, and the distance changing means are integrally assembled and detached from the first steel pipe and the second steel pipe. The steel pipe connecting jig according to any one of claims 1 to 9, wherein the jig can be suspended via the suspension fitting in a state.
Claim 11:
The structure according to claim 1, further comprising a guide member provided on the second ring-shaped member and protruding upward and capable of guiding the second steel pipe into the second ring-shaped member. The steel pipe connecting jig according to any one of the above.
Claim 12:
12. The steel pipe according to claim 11, wherein a guide portion with which the second steel pipe can come in contact with the guide member is inclined so as to be directed radially inward of the second ring-shaped member as it goes downward. Connection jig.
Claim 13:
The steel pipe connecting jig according to any one of claims 1 to 12, further comprising a temporary support member attached to the first steel pipe and supporting the first ring-shaped member. .

1…鋼管接続用治具、2…リング状部材(第2のリング状部材)、3…リング状部材(第1のリング状部材)、4…距離変更手段、20…弧状部材、21…本体部、22…下フランジ部、22a…領域、22b…延長部、23…端板、23a…貫通孔、24…孔部、25…板状部材、25a…延長部、25b…孔部、25c…延長部、25d…ガイド部分、26…貫通孔、27…吊り金具、27a…貫通孔、30…弧状部材、31…本体部、32…上フランジ部、32a…領域、32b…延長部、33…端板、33a…貫通孔、34…孔部、35…板状部材、35a…延長部、35b…孔部、36…貫通孔、37…吊り金具、37a…貫通孔、41…調整用ボルト(ロッド状部材)、42…第1の取り付け部材、42a,42b…座金、42c…円筒状部材、42d…管状部材、43…第2の取り付け部材、43a,43b…座金、43c…円筒状部材、43d…管状部材、45…第1の雄ねじ部、46…第2の雄ねじ部、47…ナット、81,83…外れ止めピン、85…ボルト、86…ナット、88…ボルト、89…ナット、100…下杭(第1の鋼管)、101…裏当てリング、102…ストッパー部材、103…仮受けプレート(仮受け部材)、110…上杭(第2の鋼管)、111…開先部、C…間隔、Cr…ルート間隔   DESCRIPTION OF SYMBOLS 1 ... Steel pipe connection jig | tool, 2 ... Ring-shaped member (2nd ring-shaped member), 3 ... Ring-shaped member (1st ring-shaped member), 4 ... Distance changing means, 20 ... Arc-shaped member, 21 ... Main body Part, 22 ... lower flange part, 22a ... area, 22b ... extension part, 23 ... end plate, 23a ... through hole, 24 ... hole part, 25 ... plate-like member, 25a ... extension part, 25b ... hole part, 25c ... Extension part, 25d ... Guide part, 26 ... Through hole, 27 ... Suspension fitting, 27a ... Through hole, 30 ... Arc member, 31 ... Body part, 32 ... Upper flange part, 32a ... Area, 32b ... Extension part, 33 ... End plate, 33a ... through hole, 34 ... hole, 35 ... plate-like member, 35a ... extension, 35b ... hole, 36 ... through hole, 37 ... hanging bracket, 37a ... through hole, 41 ... adjustment bolt ( Rod-shaped member), 42... First mounting member, 42 a and 42 b. ... Cylindrical member, 42d ... Tubular member, 43 ... Second mounting member, 43a, 43b ... Washer, 43c ... Cylindrical member, 43d ... Tubular member, 45 ... First male screw part, 46 ... Second male screw part , 47 ... nuts, 81, 83 ... locking pins, 85 ... bolts, 86 ... nuts, 88 ... bolts, 89 ... nuts, 100 ... lower pile (first steel pipe), 101 ... backing ring, 102 ... stopper member , 103 ... Temporary receiving plate (temporary receiving member), 110 ... Upper pile (second steel pipe), 111 ... Groove, C ... Interval, Cr ... Route interval

Claims (12)

上下方向に延在する第1の鋼管と、前記第1の鋼管の上端に下端が相対するように前記第1の鋼管の上方に配置されて上下方向に延在する第2の鋼管と、を互いに接続する方法であって、
前記第1の鋼管及び前記第2の鋼管は鋼管杭を構成するものであり、
前記接続に用いられる鋼管接続用治具は、
前記第1の鋼管の上部の外周面に固定されて前記第1の鋼管の外周を囲む第1のリング状部材と、
前記第2の鋼管の下部の外周面に固定されて前記第2の鋼管の外周を囲む第2のリング状部材と、
前記第1のリング状部材と前記第2のリング状部材との間の距離を変更可能な距離変更手段と、
を含んで構成され、
前記距離変更手段は、前記第1のリング状部材及び前記第2のリング状部材の周方向における複数の位置での前記距離を変更することにより、前記第1の鋼管及び前記第2の鋼管の周方向における複数の位置での前記第1の鋼管と前記第2の鋼管との間のルート間隔を調整可能であり、
前記方法は、
前記第1の鋼管を地盤に打ち込む第1工程と、
前記第1工程の後に地上で露出している前記第1の鋼管の上部の外周面に前記第1のリング状部材を固定する第2工程と、
前記第2工程の後に前記第2の鋼管の下端を前記第1の鋼管の上端に接触させる第3工程と、
前記第3工程の後に前記第2のリング状部材を前記第2の鋼管の下部の外周面に固定する第4工程と、
前記第4工程の後に前記距離変更手段により前記距離を大きくして前記ルート間隔を調整する第5工程と、
前記第5工程の後に前記第2の鋼管の下端を前記第1の鋼管の上端に溶接固定する第6工程と、
を含む、
鋼管の接続方法。
A first steel pipe extending in the vertical direction, and the second steel tube extending in the vertical direction lower end to the upper end of the first steel tube is arranged above the first steel pipe so as to face the A way to connect to each other,
The first steel pipe and the second steel pipe constitute a steel pipe pile,
The steel pipe connecting jig used for the connection is
A first ring-shaped member fixed to the outer peripheral surface of the upper portion of the first steel pipe and surrounding the outer periphery of the first steel pipe;
A second ring-shaped member fixed to the outer peripheral surface of the lower portion of the second steel pipe and surrounding the outer periphery of the second steel pipe;
Distance changing means capable of changing a distance between the first ring-shaped member and the second ring-shaped member;
Comprising
The distance changing means changes the distances at a plurality of positions in the circumferential direction of the first ring-shaped member and the second ring-shaped member, whereby the first steel pipe and the second steel pipe are changed. adjustable der route distance between the second steel pipe and the first steel pipe at a plurality of positions in the circumferential direction is,
The method
A first step of driving the first steel pipe into the ground;
A second step of fixing the first ring-shaped member to the outer peripheral surface of the upper portion of the first steel pipe exposed on the ground after the first step;
A third step of bringing the lower end of the second steel pipe into contact with the upper end of the first steel pipe after the second step;
A fourth step of fixing the second ring-shaped member to the lower outer peripheral surface of the second steel pipe after the third step;
A fifth step of adjusting the route interval by increasing the distance by the distance changing means after the fourth step;
A sixth step of welding and fixing the lower end of the second steel pipe to the upper end of the first steel pipe after the fifth step;
including,
Steel pipe connection method.
前記第2工程では、前記第1のリング状部材を前記第1の鋼管の上部の外周面に締め付け固定し、
前記第4工程では、前記第2のリング状部材を前記第2の鋼管の下部の外周面に締め付け固定する、請求項1に記載の鋼管の接続方法
In the second step, the clamping and fixing the first ring-shaped member on the outer peripheral surface of the upper portion of the front Symbol first steel pipe,
Wherein in the fourth step, the second ring-shaped fastening member is fixed to the outer peripheral surface of the lower portion of the front Stories second steel pipe, a method of connecting the steel pipe according to claim 1.
前記第2工程では、前記第1のリング状部材を前記第1の鋼管の上部の外周面に着脱可能に固定し、
前記第4工程では、前記第2のリング状部材を前記第2の鋼管の下部の外周面に着脱可能に固定する、請求項1又は請求項2に記載の鋼管の接続方法
In the second step, detachably fixed to the first ring-shaped member on the outer peripheral surface of the upper portion of the front Symbol first steel pipe,
Wherein in the fourth step, the second ring-shaped member detachably fixed to the outer peripheral surface of the lower portion of the front Stories second steel pipe, a method of connecting the steel pipe according to claim 1 or claim 2.
前記第1のリング状部材と前記第2のリング状部材との少なくとも一方は、複数の弧状部材を含んで構成される、請求項1〜請求項3のいずれか1つに記載の鋼管の接続方法The steel pipe connection according to any one of claims 1 to 3 , wherein at least one of the first ring-shaped member and the second ring-shaped member includes a plurality of arc-shaped members. Way . 前記距離変更手段は、
前記第1のリング状部材及び前記第2のリング状部材の周方向に沿って互いに間隔を空けて配置され、かつ、各々が上下方向に延在する複数のロッド状部材と、
前記ロッド状部材の下側部分に設けられて前記ロッド状部材の下側部分を前記第1のリング状部材に取り付ける第1の取り付け部材と、
前記ロッド状部材の上側部分に設けられて前記ロッド状部材の上側部分を前記第2のリング状部材に取り付ける第2の取り付け部材と、
を含んで構成され、
前記第1の取り付け部材と前記第2の取り付け部材との少なくとも一方が、前記ロッド状部材に対して上下方向に移動可能である、請求項1〜請求項4のいずれか1つに記載の鋼管の接続方法
The distance changing means is
A plurality of rod-shaped members arranged at intervals from each other along the circumferential direction of the first ring-shaped member and the second ring-shaped member, and each extending vertically.
A first attachment member provided at a lower portion of the rod-shaped member and attaching the lower portion of the rod-shaped member to the first ring-shaped member;
A second attachment member provided on the upper part of the rod-like member and attaching the upper part of the rod-like member to the second ring-shaped member;
Comprising
The steel pipe according to any one of claims 1 to 4 , wherein at least one of the first attachment member and the second attachment member is movable in a vertical direction with respect to the rod-shaped member. Connection method .
前記第1の取り付け部材は前記ロッド状部材の下側部分を前記第1のリング状部材に着脱可能に取り付け、前記第2の取り付け部材は前記ロッド状部材の上側部分を前記第2のリング状部材に着脱可能に取り付ける、請求項5に記載の鋼管の接続方法The first attachment member detachably attaches the lower part of the rod-like member to the first ring-like member, and the second attachment member attaches the upper part of the rod-like member to the second ring-like part. The steel pipe connection method according to claim 5 , wherein the steel pipe is detachably attached to the member. 前記ロッド状部材は、その下側部分を構成する第1の雄ねじ部と、上側部分を構成する第2の雄ねじ部と、を含んで構成され、
前記第1の雄ねじ部と前記第2の雄ねじ部とのうち、一方が左ねじであり、他方が右ねじである、請求項5又は請求項6に記載の鋼管の接続方法
The rod-shaped member is configured to include a first male screw portion that constitutes a lower portion thereof, and a second male screw portion that constitutes an upper portion thereof,
The steel pipe connection method according to claim 5 or 6 , wherein one of the first male screw part and the second male screw part is a left-hand thread and the other is a right-hand thread.
前記ロッド状部材は、前記第1の取り付け部材を介して前記第1のリング状部材に支持され、かつ、前記第2の取り付け部材を介して前記第2のリング状部材を支持する、請求項5〜請求項7のいずれか1つに記載の鋼管の接続方法The rod-like member is supported by the first ring-shaped member via said first mounting member, and supports the second ring-shaped member through said second attachment member, claim The method for connecting steel pipes according to any one of claims 5 to 7 . 前記第2のリング状部材は吊り金具を備え、
前記方法は、前記第1工程の後であって、かつ、前記第2工程に先立って、前記第1のリング状部材と前記第2のリング状部材と前記距離変更手段とが一体的に組み立てられた状態の前記鋼管接続用治具を、前記吊り金具を介して吊下げて下降させることにより、前記第1のリング状部材内に前記第1の鋼管の上部を挿入することを含む、請求項1〜請求項8のいずれか1つに記載の鋼管の接続方法
The second ring-shaped member includes a hanging metal fitting,
The method comprising: after the first step, and said prior to the second step, the first and the one body to the ring-shaped member and the second ring-shaped member and the distance changing means Including inserting the upper part of the first steel pipe into the first ring-shaped member by suspending and lowering the steel pipe connection jig in an assembled state via the suspension fitting , The method for connecting steel pipes according to any one of claims 1 to 8 .
前記鋼管接続用治具は、前記第2のリング状部材に設けられて上方に突出するガイド部材を更に含んで構成され、
前記ガイド部材は、前記第3工程にて前記第2の鋼管の下端を前記第1の鋼管の上端に接触させるに先立って、前記第2の鋼管を前記第2のリング状部材の上方から前記第2のリング状部材内に案内可能であり、
前記ガイド部材のうち前記第2の鋼管が接触可能なガイド部分は、下方に向かうほど、前記第2のリング状部材の径方向内側に向かうように傾斜している、請求項1〜請求項9のいずれか1つに記載の鋼管の接続方法
The steel pipe connecting jig further includes a guide member provided on the second ring-shaped member and protruding upward ,
Prior to bringing the lower end of the second steel pipe into contact with the upper end of the first steel pipe in the third step, the guide member moves the second steel pipe from above the second ring-shaped member. Can be guided into the second ring-shaped member ;
The guide part with which the said 2nd steel pipe can contact among the said guide members inclines so that it may go to the radial inside of a said 2nd ring-shaped member, so that it goes below. The connection method of the steel pipe as described in any one of these .
前記第2工程に先立って、裏当てリングを前記第1の鋼管の上部の内周面に取り付けることを含む、請求項1〜請求項10のいずれか1つに記載の鋼管の接続方法。The method for connecting steel pipes according to any one of claims 1 to 10, comprising attaching a backing ring to an inner peripheral surface of an upper part of the first steel pipe prior to the second step. 前記第2工程に先立って、前記第1のリング状部材を支持可能な仮受け部材を前記第1の鋼管の上部の外周面に取り付けることを含む、請求項1〜請求項11のいずれか1つに記載の鋼管の接続方法 Prior to the second step comprises attaching the first ring-shaped member a supportable temporary supporting member on the outer peripheral surface of the upper portion of the first steel tube, any one of claims 1 to 11 1 Steel pipe connection method described in one.
JP2014220391A 2014-10-29 2014-10-29 Steel pipe connection method Active JP6336378B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014220391A JP6336378B2 (en) 2014-10-29 2014-10-29 Steel pipe connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014220391A JP6336378B2 (en) 2014-10-29 2014-10-29 Steel pipe connection method

Publications (2)

Publication Number Publication Date
JP2016089329A JP2016089329A (en) 2016-05-23
JP6336378B2 true JP6336378B2 (en) 2018-06-06

Family

ID=56017795

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014220391A Active JP6336378B2 (en) 2014-10-29 2014-10-29 Steel pipe connection method

Country Status (1)

Country Link
JP (1) JP6336378B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6767179B2 (en) * 2016-06-22 2020-10-14 Jfe建材株式会社 How to repair the trap, the repair structure of the trap, the trap and the dam
JP2018013182A (en) * 2016-07-21 2018-01-25 極東工業株式会社 Pipe insertion device
KR102051471B1 (en) * 2017-08-30 2020-01-08 주식회사 하림엔지니어링 pile jointing method using Safety support apparatus
JP7112881B2 (en) * 2018-05-22 2022-08-04 センクシア株式会社 Jig for pile head joint
CN109594545B (en) * 2018-10-23 2020-12-25 武汉船用机械有限责任公司 Pile leg
JP7392697B2 (en) * 2021-08-05 2023-12-06 積水ハウス株式会社 Subsidence correction method for steel pipe members and buildings
KR102421367B1 (en) * 2022-01-07 2022-07-15 주식회사 제이앤지텍 Piping jig with pipe alignment function

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6126427Y2 (en) * 1981-02-13 1986-08-08
JPS6110344U (en) * 1984-06-23 1986-01-22 石川島建材工業株式会社 Corrosion-resistant structure of steel pipe piles
IT1191735B (en) * 1986-04-15 1988-03-23 Riva Calzoni Spa QUICK COUPLING CONNECTOR GROUP FOR PIPES, POLES OR SIMILAR
JPS6341392U (en) * 1986-08-27 1988-03-18
JP2542040Y2 (en) * 1991-08-29 1997-07-23 高砂熱学工業 株式会社 Vertical piping centering jig
JP2528071B2 (en) * 1993-05-27 1996-08-28 株式会社技研製作所 Pile clamping device for pile press-in / pull-out machine
JP2618614B2 (en) * 1995-05-02 1997-06-11 株式会社国土基礎 Hanging bracket for pile
JP3031659B2 (en) * 1995-07-27 2000-04-10 株式会社クボタ Longitudinal joint method of steel pipe pile and positioning device used for the method
JP2003307032A (en) * 2002-04-17 2003-10-31 Shimizu Corp Connection method for columnar steel pipe and fixture for fixing
JP4750414B2 (en) * 2004-12-28 2011-08-17 積水ハウス株式会社 Fixing jig for tack welding
JP2010120076A (en) * 2008-11-21 2010-06-03 Toshiba Corp Pipe alignment apparatus, pipe welding method and method of manufacturing piping member
JP5321549B2 (en) * 2010-07-30 2013-10-23 新日鐵住金株式会社 Oblique pile joint jig, oblique pile joint method using the jig and structure manufacturing method

Also Published As

Publication number Publication date
JP2016089329A (en) 2016-05-23

Similar Documents

Publication Publication Date Title
JP6336378B2 (en) Steel pipe connection method
CA2945861C (en) Alignment tool, system and method for the connection of wind turbine tower segments
US10247330B2 (en) Adjustable pipe support assembly
JP2010185185A (en) Temporary handrail and its construction method
JP5503256B2 (en) Horizontal pipe support
US10392826B2 (en) Tool for use in modifying poles
US20140307452A1 (en) Light clamp
JP5160965B2 (en) Fitting
JP2008253091A (en) Ascending/descending step-bolt mounting device for steel-tower constituting member or the like
CN210029802U (en) Wall body clamping type rescue device
US10464176B2 (en) Fire tube installation and removal tool
CN216029086U (en) Installation equipment for vertical pipeline
CN216141130U (en) Steel shotcrete lifting device
CN214304739U (en) Simple fixer for quickly mounting harness cord suspender expansion bolt
JP4950159B2 (en) Fall prevention bracket attachment for liner plate
JP5974571B2 (en) Stabilizing jig for slant pile
CN214350186U (en) Auxiliary device for perpendicularity of welding nail
CN110076515B (en) Pipeline aligning device
CN210549131U (en) Clamping tool for welding titanium elbow
JP2007124720A (en) Bracket angle adjuster and method of attaching bracket to a variety of utility poles
CN215034980U (en) Roundness control tool for steel vertical tank
JP5745151B1 (en) Construction work scaffolding and construction work scaffolding and dismantling methods
JPS5820669Y2 (en) Jig to prevent falling beams
AU2014262126B2 (en) A tool for use in modifying poles
CN113134705A (en) Roundness control tool for steel vertical tank and application method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170509

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180214

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180220

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180326

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180424

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180502

R150 Certificate of patent or registration of utility model

Ref document number: 6336378

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250