Info

Publication number
JPH10292361A
JPH10292361A JP9745797A JP9745797A JPH10292361A JP H10292361 A JPH10292361 A JP H10292361A JP 9745797 A JP9745797 A JP 9745797A JP 9745797 A JP9745797 A JP 9745797A JP H10292361 A JPH10292361 A JP H10292361A
Authority
JP
Japan
Prior art keywords
casing
drain material
ground
anchor plate
drain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9745797A
Other languages
Japanese (ja)
Inventor
Hideo Kitagawa
英雄 北川
Hitoshi Miura
仁 三浦
Makoto Kawai
誠 川井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toa Corp
Original Assignee
Toa Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toa Corp filed Critical Toa Corp
Priority to JP9745797A priority Critical patent/JPH10292361A/en
Publication of JPH10292361A publication Critical patent/JPH10292361A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

PROBLEM TO BE SOLVED: To force a casing to penetrate a ground such as the periphery of an existing oil tank, which a large heavy construction machine can not enter, by use of a small boring machine or the like and drive a drain member to prevent the liquefaction of the ground. SOLUTION: After a drain member 1 equipped with an anchor plate 2 at one end thereof has been inserted in a casing 5, the drain member 1 is inserted into the ground G together with the casing 5 by a driving machine 6. And the casings 5 and the drain members 1 are additionally connected to insert them to a specified depth of the ground. And then, water is poured into the casings 5 and only casings 5 are drawn out of the ground G and then, the periphery of the drain members is filled back.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、主として重機を搬
入することができないオイルタンクなどの既設構造物の
周辺地盤にドレーン材を打設して、その液状化防止をは
かるために施工されるドレーン材の地盤への打設方法に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention mainly relates to a drain constructed to prevent liquefaction by placing a drain material on the ground around an existing structure such as an oil tank into which heavy equipment cannot be carried. The present invention relates to a method of placing materials on the ground.

【0002】[0002]

【従来の技術】従来、砂質地盤の液状化現象を防止する
ために、その地盤中にドレーン材を打設する方法は広く
知られている。一方、液状化現象が発生する恐れのある
砂質地盤に構築されたオイルタンク等の既設構造物に対
しては、地震等の災害による液状化現象防止対策とし
て、その既設構造物の周辺の地盤中にドレーン材を打設
することが近年関係当局等から要請されている。
2. Description of the Related Art Conventionally, a method of casting a drain material into a sandy ground in order to prevent the liquefaction phenomenon of the sandy ground has been widely known. On the other hand, for existing structures such as oil tanks constructed on sandy ground where liquefaction may occur, as a measure to prevent liquefaction due to disasters such as earthquakes, the ground around the existing structures In recent years, there has been a request from related authorities and the like to put drain material inside.

【0003】一方、従来行われているドレーン材の地盤
への打設方法では、所定長さのケーシングの中にドレー
ン材を予め仕込んだ状態でケーシング先端にアンカプレ
ートを取り付け、クローラ付の杭打機等の大型重機を使
って所定の深さまで打設できる長さのケーシングを地盤
に貫入し、所定の深さまで打設が終わったらドレーン材
を地盤中に残してケーシングを抜き取る作業を行ってい
た。
On the other hand, in a conventional method of driving a drain material into the ground, an anchor plate is attached to the end of a casing in a state where the drain material is previously charged in a casing of a predetermined length, and a pile driving with a crawler is performed. Using a heavy machinery such as a drilling machine, penetrated the ground into a ground with a length that could be cast to a predetermined depth, and when the casting had been completed to the predetermined depth, the drain material was left in the ground and the casing was removed. .

【0004】しかしながら、前記のごときオイルタンク
等の既設構造物の周辺には多数の配管が配設されている
ため大型の重機が入ってドレーン材の打設作業を行うこ
とが困難である。そこで、本発明者等は、上記のごとき
オイルタンク等の既設構造物の周辺に容易に入って、そ
の地盤にケーシングの貫入作業を行ないうる簡易な打設
機、例えば地盤の強度を測ったり、地質調査を行なう小
型のボーリングマシーン等に着目し、種々検討を及び実
験を重ねた結果、簡易な打設機によりドレーン材を地盤
へ打設できる本発明の打設方法を案出するに至った。
[0004] However, since a large number of pipes are arranged around the existing structure such as the oil tank as described above, it is difficult for a large heavy machine to enter and to perform a drain material setting operation. Therefore, the present inventors are able to easily enter the vicinity of an existing structure such as an oil tank as described above and perform a simple driving machine capable of performing a penetration operation of a casing on the ground, for example, measuring the strength of the ground, Focusing on a small boring machine for conducting geological surveys, etc., and after conducting various studies and repeating experiments, the inventors have devised a casting method of the present invention capable of driving a drain material to the ground with a simple driving machine. .

【0005】[0005]

【発明が解決しようとする課題】本発明は、小型のボー
リングマシーン等の簡易な打設機を使用して、ケーシン
グを既設オイルタンク周辺のように大型重機が入れない
地盤に貫入させ、ドレーン材を打設して液状化防止対策
をはかることを可能とするドレーン材の地盤への打設方
法を提供する。
SUMMARY OF THE INVENTION The present invention uses a simple driving machine such as a small boring machine to make a casing penetrate into the ground where large heavy equipment cannot enter, such as around an existing oil tank, and a drain material is provided. The present invention provides a method of placing a drain material on the ground, which makes it possible to take measures against liquefaction.

【0006】[0006]

【課題を解決するための手段】本発明は、一端にアンカ
プレートを取り付けたドレーン材をケーシング内に挿入
した後、ドレーン材をケーシングと共に、打設機により
地盤へ貫入し、ケーシング及びドレーン材を継ぎ足して
地盤の所定深度まで貫入の後、ケーシング内に注水して
ケーシングのみを地盤から抜き取り、そしてドレーン材
の周囲を埋め戻すドレーン材の地盤への打設方法からな
り、また下端にアンカプレートを取り付けたケーシング
を打設機により地盤へ貫入し、ケーシングを継ぎ足して
地盤の所定深度までケーシングを貫入の後、下端に上記
アンカプレートとの接続用キャップを取り付けたドレー
ン材を上記ケーシング内に挿入し、上記アンカプレート
とその接続用キャップとを接続させた後、ケーシング内
に注水してケーシングのみを地盤から抜き取り、そして
ドレーン材の周囲を埋め戻すドレーン材の地盤への打設
方法からなる。
According to the present invention, a drain material having an anchor plate attached to one end is inserted into a casing, and then the drain material is penetrated into the ground together with the casing by a driving machine, and the casing and the drain material are removed. After adding and penetrating the ground to a predetermined depth, water is poured into the casing, only the casing is extracted from the ground, and the drain material is buried around the drain material.The anchor plate is attached to the lower end. After the attached casing penetrates into the ground by a driving machine, the casing is added and the casing is penetrated to a predetermined depth of the ground, and then a drain material having a cap for connection with the anchor plate attached to the lower end is inserted into the casing. After connecting the anchor plate and the connection cap, water is poured into the casing and the case is Withdrawn Gunomi from ground, and consisting of punching 設方 Method to ground drain material backfilled around the drain member.

【0007】またさらに、一端にアンカプレートを取り
付け、かつ他端に吊りワイヤーを取り付けた鉛直方向に
自重で縮む性質を有するドレーン材をケーシング内に挿
入した後、ドレーン材が自重で鉛直方向下方に縮むのを
防止しながらケーシングと共に、打設機により地盤へ貫
入し、ケーシング及びドレーン材を継ぎ足して地盤の所
定深度まで貫入の後、吊りワイヤーでドレーン材が自重
で鉛直方向下方に縮むのを防止しながら、ケーシング内
に注水してケーシングのみを地盤から抜き取り、そして
ドレーン材の周囲を埋め戻すドレーン材の地盤への打設
方法をもその特徴とし、また下端にアンカプレートを取
り付けたケーシングを打設機により地盤へ貫入し、ケー
シングを継ぎ足して地盤の所定深度までケーシングを貫
入の後、下端に上記アンカプレートとの接続用キャップ
を、そして他端に吊りワイヤーをそれぞれ取り付けた鉛
直方向に自重で縮む性質を有するドレーン材を上記ケー
シング内に挿入し、上記アンカプレートとその接続用キ
ャップとを接続させた後、吊りワイヤーでドレーン材が
自重で鉛直方向下方に縮むのを防止しながら、ケーシン
グ内に注水してケーシングのみを地盤から抜き取り、そ
してドレーン材の周囲を埋め戻すドレーン材の地盤への
打設方法からなる。
Further, after inserting a drain material having a property of shrinking by its own weight in the vertical direction having an anchor plate attached to one end and a suspending wire attached to the other end into the casing, the drain material is vertically moved downward by its own weight. While preventing shrinkage, it penetrates into the ground with a casting machine together with the casing, adds the casing and drain material, penetrates to a predetermined depth in the ground, and prevents the drain material from shrinking vertically downward by its own weight with the suspension wire It also features a method of pouring water into the casing, extracting only the casing from the ground, and placing the drain material back to fill the periphery of the drain material into the ground, and driving the casing with an anchor plate attached to the lower end. After penetrating the ground by the construction machine, adding the casing and penetrating the casing to the specified depth of the ground, A cap for connection with an anchor plate, and a drain material having a property of contracting by its own weight in the vertical direction with a hanging wire attached to the other end are inserted into the casing, and the anchor plate and the cap for connection are connected. After that, the suspension material is used to prevent the drain material from shrinking vertically downward by its own weight while being poured into the casing, pulling out only the casing from the ground, and burying the drain material back into the ground, filling the periphery of the drain material. Configuration method.

【0008】[0008]

【発明の実施の形態】以下図面を参照して本発明のドレ
ーン材の地盤への打設方法を適用してドレーン材を地盤
中に打設する作業手順の各実施形態を説明する。まず、
本発明の打設方法は、基本的に地盤改良を行なう必要の
あるオイルタンク等の既設構造物等の周辺で、ケーシン
グ貫入用の大型重機が入れない地盤において、例えば地
質調査用等に使用される小型のボーリングマシーン等の
簡易な打設機を用いてケーシングを貫入することによ
り、そのケーシング内に挿入したドレーン材を地盤中に
残してケーシングを引き抜くものであり、以下にその作
業手順を説明するが、あらかじめケーシング内にドレー
ン材を挿入しておいて、そのケーシングを地盤に貫入す
るドレーン材先入れ方式と、そしてケーシングを地盤に
貫入した後にドレーン材を挿入するドレーン材後入れ方
式の2通りの実施形態における作業手順を説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, with reference to the drawings, embodiments of a work procedure for driving a drain material into the ground by applying the method of driving a drain material to the ground according to the present invention will be described. First,
The casting method of the present invention is basically used, for example, for geological surveys and the like in the ground where existing heavy structures for oil penetration such as oil tanks needing to perform ground improvement and where heavy machinery for casing penetration is not allowed. By using a simple boring machine such as a small boring machine to penetrate the casing, the drain material inserted into the casing is left in the ground, and the casing is pulled out. However, a drain material is inserted into a casing in advance and a drain material is inserted into the ground first, and a drain material is inserted after the casing is inserted into the ground and a drain material is inserted later. The work procedure in the embodiments will be described.

【0009】なお、本実施形態で使用するドレーン材は
スパイラル状の芯材にフィルター材を取り付けたもので
あり、ドレーン材の自重により鉛直方向に縮む性質を有
している。
The drain material used in the present embodiment is a spiral core material with a filter material attached thereto, and has a property of contracting in the vertical direction due to the weight of the drain material.

【0010】最初に上記ドレーン材先入れ方式による本
発明の一実施形態の作業手順を説明すると、図1のごと
く現場に搬入されたドレーン材1を必要長さに適宜に切
断し、その一端にアンカプレート2を取り付け、かつ他
端に吊りワイヤー及び固定ワイヤーからなる2本の吊り
ワイヤー3を取り付けたキャップ5を接続してドレーン
材1の組立てを行なう。
First, a description will be given of an operation procedure of an embodiment of the present invention based on the above-mentioned drain material pre-loading method. As shown in FIG. 1, a drain material 1 carried into a site is appropriately cut to a required length, and one end thereof is provided. The drain plate 1 is assembled by attaching the anchor plate 2 and connecting the cap 5 to which two suspension wires 3 composed of suspension wires and fixed wires are attached to the other end.

【0011】次に、図2のごとく、先端に削孔ビット3
0の付いたケーシング5を準備し、上記のごとく組立て
られたドレーン材1をキャップ4の側から挿入してドレ
ーン材1をケーシングにセットするが、このドレーン材
1をケーシングにセットする際には、ケーシング5内に
ガイドロープ等を事前にセットしておき、引き込み易く
している。
Next, as shown in FIG.
The drain material 1 assembled as described above is prepared from the cap 4 side, and the drain material 1 is set in the casing. When the drain material 1 is set in the casing, A guide rope or the like is set in the casing 5 in advance to make it easier to pull in.

【0012】続いて、上記のケーシング5を前記のごと
き打設機6に図3のごとくセットするが、その際パワー
ランプ7でケーシング5をロックし、ケーシング5内の
ドレーン材1の図示されていない吊りワイヤー3を打設
機6のドリルヘッド10のジョイント部8に図示しない
スイベルジョイントによって接続し、ケーシング5とジ
ョイント部8との芯を合わせてケーシング5のセットを
行なう。
Subsequently, the casing 5 is set on the driving machine 6 as described above as shown in FIG. 3. At this time, the casing 5 is locked by the power lamp 7, and the drain material 1 in the casing 5 is shown. The hanging wire 3 is connected to the joint 8 of the drill head 10 of the setting machine 6 by a swivel joint (not shown), and the casing 5 is set by aligning the core of the casing 5 with the joint 8.

【0013】なお、ケーシングを打ち込む地盤が緩い場
合には、先端の削孔ビット30は不要なときもある。以
下削孔ビット30を図から省略する。次に、ドリルヘッ
ド10のジョイント部8とケーシング5とを図4のごと
く接続し、パワークランプ7を解除するが、その際、先
端のアンカプレート2に注意し、変形や、抜け等が発生
しないように取り扱う。
If the ground into which the casing is driven is loose, the drill bit 30 at the end may not be necessary. Hereinafter, the drill bit 30 is omitted from the figure. Next, the joint portion 8 of the drill head 10 and the casing 5 are connected as shown in FIG. 4, and the power clamp 7 is released. At this time, attention is paid to the anchor plate 2 at the tip, and no deformation or detachment occurs. Handle as follows.

【0014】さらに、図5のケーシング5セットの状態
で、ガイドセル9の倒れを矢印X方向に水準器やトラン
シットにより垂直に調整し、ケーシング5を最終打設位
置に矢印Yのごとく合わせる位置調整を行なうが、一
方、ドレーン材1は吊りワイヤー3で吊った状態であ
る。次に、上記打設位置の確認後に、図6のごとく、ア
ンカプレート2の先端を地盤Gに合わせ、ドリルヘッド
10を回転させるが、初動時は回転を上げず中速以下と
する。
Further, in the state of the set of casings 5 shown in FIG. 5, the position of the guide cell 9 is vertically adjusted by a level or transit in the direction of arrow X to adjust the casing 5 to the final casting position as shown by arrow Y. On the other hand, the drain material 1 is in a state of being suspended by the suspension wire 3. Next, as shown in FIG. 6, after confirming the driving position, the tip of the anchor plate 2 is aligned with the ground G, and the drill head 10 is rotated.

【0015】これによりケーシング5の打ち込みを行な
うが、適正回転速度Rと打込み速度Dを守り、ケーシン
グ5を打設機6により地盤Gへ貫入し、打下げるが、そ
の際、障害物に注意し、異常がある場合は速やかに停止
させるものとし、設計深度又はケーシング5の継ぎ足し
深度迄ケーシング5の打込を行なう。
With this, the casing 5 is driven, but the proper rotation speed R and the driving speed D are maintained, and the casing 5 penetrates into the ground G by the driving machine 6 and is driven down. If there is any abnormality, the casing 5 is stopped immediately, and the casing 5 is driven to the design depth or the replenishment depth of the casing 5.

【0016】ここで、ケーシング5は一般に1本当り3
mの長さであるので、設計深度迄ケーシング5を継ぎ足
す作業が必要であり、そこで図7のごとく、パワークラ
ンプ7でケーシング5をロックし、ドリルヘッド10の
ジョイント部8のねじを外し、ドリルヘッド10を矢印
Lに上昇し、ケーシング5と分離する。
Here, the casing 5 is generally 3
m, it is necessary to add the casing 5 to the design depth, so as shown in FIG. 7, the casing 5 is locked by the power clamp 7 and the screw of the joint 8 of the drill head 10 is removed. The drill head 10 rises to the arrow L and separates from the casing 5.

【0017】次に、打込んだケーシング5内のドレーン
材1のキャップ4部分を吊りワイヤーで吊り上げてドレ
ーン材が自重で下方へ縮むのを防止し、図8に示すごと
く次に接続するケーシング5を現場に用意し、上記のド
レーン材1に継ぐ必要な長さのドレーン材1を準備し、
ケーシング5内に挿入する。ここで、ドレーン材1を継
ぐ必要がない場合は、前記吊りワイヤー3のみを接続す
るケーシング内を通過してドリルヘッド10のジョイン
ト部8に図示しないスイベルジョイントによって接続す
る。
Next, the cap 4 portion of the drain material 1 in the driven casing 5 is lifted by a suspension wire to prevent the drain material from shrinking downward by its own weight, and as shown in FIG. Is prepared on site, and a drain material 1 having a necessary length to be connected to the drain material 1 is prepared.
Insert into the casing 5. Here, when it is not necessary to join the drain material 1, it passes through the casing connecting only the hanging wire 3 and is connected to the joint portion 8 of the drill head 10 by a swivel joint (not shown).

【0018】即ち、打込んだケーシング5内のドレーン
材1とそれに継ぐドレーン材1とを接続し、ドレーン材
1を継ぐ必要が無い場合は吊りワイヤー3を接続するケ
ーシング5内を通過してセットし、中間ケーシング準備
を行なう。
That is, the drain material 1 in the driven casing 5 is connected to the drain material 1 connected thereto, and if it is not necessary to connect the drain material 1, the drain material 1 is passed through the casing 5 connected to the suspension wire 3 and set. Then, prepare the intermediate casing.

【0019】次に、図9のごとくケーシング5内にある
ドレーン材1の吊りワイヤー3をドリルヘッド10のジ
ョイント部8に図示しないスイベルジョイントによって
取り付け、準備されたケーシング5を立ち上げ、打込ん
だケーシング5と次の中間のケーシング5とを矢印Jで
示すごとく接続し、さらにケーシング5をドリルヘッド
10の芯に合わせ、ドリルヘッド10を降下させる。
Next, as shown in FIG. 9, the suspension wire 3 of the drain material 1 in the casing 5 is attached to the joint portion 8 of the drill head 10 by a swivel joint (not shown), and the prepared casing 5 is started up and driven. The casing 5 is connected to the next intermediate casing 5 as shown by the arrow J, the casing 5 is aligned with the core of the drill head 10, and the drill head 10 is lowered.

【0020】さらに、図10に示すごとく、ドリルヘッ
ド10を回転させてケーシング5とジョイント部8との
ねじを締め、打込ケーシング5と継ぎ足すケーシング5
とのジョイントの接続Jの結合を確認し、パワークラン
プ7を緩め、ロック解除を行なう。次に、図11のごと
くドリルヘッド10を回転させ、中間のケーシング5の
打込みを行なうが、その際、図6のケーシング打込みと
同様な注意をはらうものとする。
Furthermore, as shown in FIG. 10, the drill head 10 is rotated to tighten the screw between the casing 5 and the joint portion 8 and to add the driving casing 5 to the casing 5.
After confirming the connection of the joint J with the joint, the power clamp 7 is loosened and the lock is released. Next, as shown in FIG. 11, the drill head 10 is rotated to drive the intermediate casing 5, and the same attention should be paid to the driving of the casing shown in FIG.

【0021】図12は、上記中間のケーシング5の打込
み完了を示しているが、そのあと設計深度まで、図7の
ケーシング解除の工程以降の手順を繰り返してケーシン
グ5の打設を行ない、設計打設深度までケーシング5の
打設が行なわれると打込み完了となる。
FIG. 12 shows the completion of the driving of the intermediate casing 5 described above. Thereafter, the procedure after the step of releasing the casing of FIG. When the casing 5 is driven to the installation depth, the driving is completed.

【0022】以上の打込み完了状態からケーシング5を
引抜く際には、ケーシング5内はドライな状態になって
いるので、ケーシング5先端に泥水圧が大きくかかり、
泥水の流入を防ぐためにはケーシング5内に注水を行な
って水圧差を減らす必要がある。
When the casing 5 is pulled out from the above-described driving completed state, since the inside of the casing 5 is in a dry state, a large muddy water pressure is applied to the tip of the casing 5,
In order to prevent inflow of muddy water, it is necessary to inject water into the casing 5 to reduce the water pressure difference.

【0023】そこで、図12のごとく打設機6を停止の
上、打込み高さを確認した後、図13のごとく、準備し
た注水ポンプからの注水ホース11を打設機6の注水カ
プラー12に接続する。次に図14のごとく、注水ポン
プを運転し、矢印Wで示す注水を行ない、ケーシング5
からの注水Wのオーバフローの確認の後注水ポンプを停
止させる。
Then, after stopping the driving machine 6 as shown in FIG. 12, and confirming the driving height, the pouring hose 11 from the prepared pouring pump is connected to the pouring coupler 12 of the pouring machine 6 as shown in FIG. Connecting. Next, as shown in FIG. 14, the water injection pump is operated to perform water injection indicated by an arrow W, and the casing 5
After confirming the overflow of the water injection W from, the water injection pump is stopped.

【0024】その後、図15のごとく、ドリルヘッド1
0を逆転させてケーシング5を引抜き状態にして、再度
注水Wを行ない、ケーシング5からのオーバフローを確
認し、ケーシング5を矢印P方向に引抜くが、その間引
続き注水Wと、ケーシング5からのオーバフローの確認
と、ケーシング5の引抜き作業を順次繰り返すが、状況
に応じて中間のケーシング5の引抜き完了まで注水W及
び矢印Pの引抜きを行なうものとする。
Then, as shown in FIG.
0, the casing 5 is pulled out, the casing 5 is pulled out, water injection W is performed again, overflow from the casing 5 is confirmed, and the casing 5 is pulled out in the direction of the arrow P. During that time, water injection W and overflow from the casing 5 continue. And the operation of pulling out the casing 5 are sequentially repeated, and depending on the situation, it is assumed that the water injection W and the arrow P are drawn out until the middle casing 5 is pulled out.

【0025】次に、図16のように、ケーシング5を矢
印Pのごとく引抜くが、中間のケーシング5の接続部位
置まで引抜いた状態で、下部のケーシング5をパワーク
ランプ7でロックし、ケーシング5とジョイント部8と
のねじを緩める方向でドリルヘッド10を逆回転させ、
ジョイント部8のねじ込みを解除し、各ケーシング5同
志のジョイントも解除し、ケーシング5の接続を解除す
る。
Next, as shown in FIG. 16, the casing 5 is pulled out as indicated by an arrow P. In a state where the casing 5 is pulled out to the connecting portion position of the intermediate casing 5, the lower casing 5 is locked by the power clamp 7, and the casing 5 is pulled out. 5. Reverse the drill head 10 in the direction to loosen the screw between the joint 5 and 5 and
The screwing of the joint portion 8 is released, the joint between the casings 5 is released, and the connection of the casing 5 is released.

【0026】続いて、図17のごとく、ケーシング5を
引き上げて、ケーシング5内のドレーン材1を引上げ、
吊りワイヤー3の固定ワイヤーを打設機6に仮固定して
ドレーン材が自重で鉛直方向に縮むのを防止し、ドリル
ヘッド10のジョイント部8側にスイベルジョイントに
よって取付けられているドレーン材1の吊りワイヤー3
をドレーン材1のキャップ4から解除して、もう一本の
吊りワイヤー3を使用して専用治具14により中間のケ
ーシング5を吊る状態にする。なお、吊りワイヤー3の
固定ワイヤーを使用せずに、人力でドレーン材を保持し
てもよい。
Subsequently, as shown in FIG. 17, the casing 5 is pulled up, and the drain material 1 in the casing 5 is pulled up.
The fixing wire of the suspension wire 3 is temporarily fixed to the driving machine 6 to prevent the drain material from shrinking in the vertical direction by its own weight, and the drain material 1 attached to the joint portion 8 side of the drill head 10 by a swivel joint. Hanging wire 3
Is released from the cap 4 of the drain material 1 and the intermediate casing 5 is suspended by the dedicated jig 14 using the other suspension wire 3. Note that the drain material may be held manually without using the fixing wire of the suspension wire 3.

【0027】次に、図18に示すごとく、中間のケーシ
ング5とドリルヘッド10のジョイント部8を解除し、
中間のケーシング5を横に引き出すが、その際ドリルヘ
ッド10を降下させ、降下に合わせて中間のケーシング
5を横引きして、ケーシング5を取り出す。なお、専用
治具14と吊りワイヤー3を使用せず人力によって中間
ケーシング5を横に引出すことも可能である。
Next, as shown in FIG. 18, the joint 8 between the intermediate casing 5 and the drill head 10 is released,
The intermediate casing 5 is pulled out sideways, at which time the drill head 10 is lowered, and the middle casing 5 is pulled sideways in accordance with the descent, and the casing 5 is taken out. In addition, it is also possible to pull out the intermediate casing 5 by human power without using the special jig 14 and the hanging wire 3.

【0028】図18のケーシング解除の後、図19のご
とくドリルヘッド10を下げ、ジョイント部8側にスイ
ベルジョイントによって取付けられる吊りワイヤー3を
打込まれているケーシング5内のドレーン材1のキャッ
プ4に取り付け、打設機6に仮止めしている固定ワイヤ
ーをケーシング5内に挿入し、ケーシング5とドリルヘ
ッド10のジョイント部8をパワークランプ7とドリル
ヘッド10を使って接続し、ケーシング5を図20のご
とく矢印P方向に引き抜く。
After releasing the casing of FIG. 18, the drill head 10 is lowered as shown in FIG. 19, and the cap 4 of the drain material 1 in the casing 5 into which the suspension wire 3 attached by the swivel joint is driven into the joint portion 8 side. And the fixing wire temporarily fixed to the setting machine 6 is inserted into the casing 5, and the joint 5 of the casing 5 and the drill head 10 is connected using the power clamp 7 and the drill head 10. Pull out in the direction of arrow P as shown in FIG.

【0029】次に、図21のごとく、ケーシング5を矢
印P方向に引き抜くが、前記図16のケーシング接続解
除から図21までの各作業手順を繰り返して先端のケー
シング5までの引き抜きを行ない、図22のごとく、先
端のケーシング5を引き抜いた後、ドレーン材1の端部
を確認できる位置まで吊りワイヤー3で引き上げ、ドレ
ーン材1を削孔穴より引き出して、削孔穴のドレーン材
1の周囲に矢印Bのごとく埋戻しを行なってドレーン材
1が自重で鉛直方向に縮むのを防止し、吊りワイヤーを
取り外す。これによってドレーン材1の打設が完了す
る。
Next, as shown in FIG. 21, the casing 5 is pulled out in the direction of the arrow P, and the operation steps from disconnection of the casing in FIG. 16 to FIG. 21 are repeated to pull out the casing 5 at the tip. 22, after pulling out the casing 5 at the tip, pull up the hanging wire 3 to a position where the end of the drain material 1 can be confirmed, pull out the drain material 1 from the drilled hole, and place an arrow around the drain material 1 in the drilled hole. The backing is performed as shown in B to prevent the drain material 1 from contracting in the vertical direction by its own weight, and the hanging wire is removed. Thereby, the placement of the drain material 1 is completed.

【0030】以上図1から図22までの手順により1本
のドレーン材1の地盤Gへの打設が完了するが、その
後、次のドレーン材1を打設する際には、図23のごと
く、ケーシング5に次のドレーン材1をセットするため
に、適当な位置まで矢印P方向に引上げ、パワークラン
プ7でケーシング5をロックした状態でドリルヘッド1
0を取付けねじの逆回転を行ない、ねじロックを緩ま
せ、ケーシング5の落下を防止のため、ケーシング5内
のドレーン吊りワイヤー3の先端を専用治具14で固定
する。
The installation of one drain material 1 on the ground G is completed by the procedures shown in FIGS. 1 to 22. Thereafter, when the next drain material 1 is installed, as shown in FIG. Then, in order to set the next drain material 1 on the casing 5, the drill head 1 is pulled up in an arrow P direction to an appropriate position, and the drill head 1 is locked with the casing 5 locked by the power clamp 7.
In order to prevent the casing 5 from dropping, the tip of the drain hanging wire 3 in the casing 5 is fixed with a special jig 14 in order to prevent the casing 5 from dropping.

【0031】次に図24のごとく、パワークランプ7の
ロックを解除して、ケーシング5を倒し、ドリルヘッド
10を降下し、同時にケーシング5をさらに倒してい
く。即ち、図25のごとく、ケーシング5解除の高さま
でドリルヘッド10を下げ、ケーシング5を矢印H方向
に横引きして安定させ、ケーシング5とドリルヘッド1
0のジョイント部8との接合ねじを外し、ケーシング5
を取外し、次のドレーン材1のセットを行ない、前記図
1以降に説明した手順で次のドレーン材1の打設を行な
うものである。図23から図25において、吊りワイヤ
ーと専用治具を使用してケーシング5を保持している
が、これらを使用せずに人力で保持することも可能であ
る。
Next, as shown in FIG. 24, the lock of the power clamp 7 is released, the casing 5 is lowered, the drill head 10 is lowered, and at the same time, the casing 5 is further lowered. That is, as shown in FIG. 25, the drill head 10 is lowered to the height at which the casing 5 is released, and the casing 5 is pulled laterally in the direction of arrow H to stabilize.
0, remove the joint screw with the joint 8
Then, the next drain material 1 is set, and the next drain material 1 is driven according to the procedure described above with reference to FIG. 23 to 25, the casing 5 is held by using a hanging wire and a dedicated jig, but it is also possible to hold the casing 5 manually without using these.

【0032】次に、前記のドレーン材後入れ方式による
本発明の他の実施形態の作業手順を説明すると、まず、
図26に示すごとく、ケーシング5を前記と同様な簡易
なボーリングマシン等の打設機6にセットし、パワーク
ランプ7でケーシング5をロックし、ケーシング5とド
リルヘッド10のジョイント部8の芯を合わせる。この
際、この先端のケーシング5の端部には、図42及び図
43に示すアンカプレート2を取り付けておく。
Next, the working procedure of another embodiment of the present invention based on the above-mentioned drain material insertion method will be described.
As shown in FIG. 26, the casing 5 is set on a driving machine 6 such as a simple boring machine similar to the above, the casing 5 is locked by the power clamp 7, and the core of the joint 5 of the casing 5 and the drill head 10 is aligned. Match. At this time, the anchor plate 2 shown in FIGS. 42 and 43 is attached to the end of the casing 5 at the front end.

【0033】次に、図27のごとくドリルヘッド10の
ジョイント部8と、ケーシング5とを接続し、パワーク
ランプ7を解除するが、その際、先端のアンカープレー
ト2に注意し、変形や抜け等が発生しないように取り扱
うものとする。そして、図28のごとくケーシング5を
セットし、ガイドセル9の倒れを、水準器やトランシッ
トにより垂直にするように矢印Xの倒れ調整を行ない、
ケーシング5を最終打設位置に合わせる矢印Yの位置調
整を行なう。
Next, as shown in FIG. 27, the joint portion 8 of the drill head 10 and the casing 5 are connected, and the power clamp 7 is released. Shall be handled so as not to occur. Then, the casing 5 is set as shown in FIG. 28, and the fall of the arrow X is adjusted so that the fall of the guide cell 9 is made vertical by a level or a transit.
The position of the arrow Y for adjusting the casing 5 to the final casting position is adjusted.

【0034】次に、図29のごとく、打設位置を確認
後、アンカプレート2の先端を地盤Gに合わせ、ドリル
ヘッド10を回転させるが、この場合も初動時は回転を
上げずに中速以下で回転を行なう。
Next, as shown in FIG. 29, after confirming the driving position, the tip of the anchor plate 2 is adjusted to the ground G, and the drill head 10 is rotated. The rotation is performed below.

【0035】そこで、ケーシング5の打ち込みを行う
が、適正回転速度と打込み速度を守り、打ち下げし、障
害物に注意して異常のある場合には速やかに停止させる
ものとする。このようにして設計深度又はケーシング5
の継ぎ足し深度までケーシング5の打込みを行なう。
Therefore, the casing 5 is driven, but the proper rotation speed and the driving speed must be maintained, and the casing 5 should be driven down. Thus, the design depth or casing 5
The casing 5 is driven to the replenishment depth.

【0036】一般にケーシング5は1本当り3mの長さ
なので、設計深度で打込むには、ケーシング5を継ぎ足
す作業が必要であり、図30のごとくパワークランプ7
でケーシング5をロックし、ドリルヘッド10のジョイ
ント部8の接続ねじ部を外した後、ドリルヘッド10を
上昇してケーシング5と分離するケーシング解除を行な
う。
In general, since the length of each casing 5 is 3 m, it is necessary to add the casing 5 in order to drive the casing 5 at the designed depth. As shown in FIG.
After the casing 5 is locked and the connection screw portion of the joint portion 8 of the drill head 10 is removed, the drill head 10 is lifted to release the casing 5 from the casing 5.

【0037】そして,図31のごとくケーシング5を引
上げ、ケーシング5を接続して、ドリルヘッド10とケ
ーシング5との芯を合わせ、ドリルヘッド10を降下さ
せる中間ケーシング準備を行なう。次に、図32のごと
くドリルヘッド10を回転させて、ケーシング5をジョ
イントするねじを締めた上でケーシング5同志のジョイ
ント結合部の接続Jを確認し、パワークランプ7を緩め
てロックを解除するケーシング接続を行なう。
Then, as shown in FIG. 31, the casing 5 is pulled up, the casing 5 is connected, the cores of the drill head 10 and the casing 5 are aligned, and an intermediate casing for lowering the drill head 10 is prepared. Next, as shown in FIG. 32, the drill head 10 is rotated, the screw for joining the casing 5 is tightened, the connection J of the joint connection portion of the casing 5 is confirmed, and the power clamp 7 is loosened to release the lock. Make a casing connection.

【0038】その後、図33のごとくドリルヘッド10
を回転させるが、その際には、図29で説明した時と同
様な考慮を払うものとし、これによりケーシング5の打
込みが行なわれ、このようにして継ぎ足された中間のケ
ーシング5が図34のごとく打込れ、打込み完了した
ら、再び図30のケーシング解除以降の手順を繰り返
し、中間のケーシング5の打設を行ない、設計打設深度
まで打設が行なわれると、打込み完了となる。
Thereafter, as shown in FIG.
In this case, the same considerations as in the case described with reference to FIG. 29 are taken into account, whereby the driving of the casing 5 is performed, and the intermediate casing 5 thus added is replaced with the intermediate casing 5 shown in FIG. When the driving is completed and the driving is completed, the procedure after the release of the casing in FIG. 30 is repeated again, the intermediate casing 5 is driven, and the driving is completed when the driving is performed to the designed driving depth.

【0039】次に、図35のごとくパワークランプ7で
ケーシング5をロックし、ジョイント部8の接続部のね
じを緩めてケーシング5とドリルヘッド10を分離し、
ドリルヘッド10を図36のドレーン材1を挿入しやす
い適当な位置まで引上げる。そして、図36に示すよう
に、ドレーン材1の一端に、図42及び図43のアンカ
プレート2に設けられた接続雄爪16に接続可能な図4
0及び図41に示すような接続雌爪17を下面に設けた
接続用キャップ18を取り付け、そしてその他端に2本
の吊りワイヤー3を取り付けるドレーン材1のセットを
行ない、打設したケーシング5の中に上記のドレーン材
1を挿入する。
Next, as shown in FIG. 35, the casing 5 is locked by the power clamp 7, and the screw at the joint of the joint 8 is loosened to separate the casing 5 from the drill head 10.
The drill head 10 is pulled up to an appropriate position where the drain material 1 shown in FIG. 36 can be easily inserted. Then, as shown in FIG. 36, one end of the drain material 1 can be connected to the connecting male claws 16 provided on the anchor plate 2 of FIGS.
41 and a connecting cap 18 provided on the lower surface with connecting female claws 17 as shown in FIG. 41, and a drain material 1 for attaching two hanging wires 3 to the other end. The above drain material 1 is inserted therein.

【0040】次に図37のごとく固定の吊りワイヤー3
でドレーン材1の頭を仮止めし、ドレーン材1の中に押
し込みロッド19を組み立てながら挿入し、押し込みロ
ッド19でドレーン材1の先端を押し込み、ドレーン材
1先端の接続用キャップ18の接続雌爪17とアンカプ
レート2の接続雄爪16とを接続し、アンカプレート2
とドレーン材1とを接続する。なお、固定の吊りワイヤ
ー3で仮止めせず、人力で保持してもよい。
Next, as shown in FIG.
Temporarily fix the head of the drain material 1, insert the push rod 19 into the drain material 1 while assembling, push the tip of the drain material 1 with the push rod 19, and connect the connecting female of the connection cap 18 at the tip of the drain material 1. The nail 17 is connected to the male nail 16 of the anchor plate 2 and the anchor plate 2 is connected.
And drain material 1 are connected. In addition, you may hold | maintain by human power, without temporarily fixing with the fixed hanging wire 3. FIG.

【0041】その後、図38に示すごとくドリルヘッド
10を吊りワイヤー3のセットを行なうのに適当な位置
まで降下し、吊りワイヤー3をドリルヘッド10のジョ
イント部8に図示しないスイベルジョイントによって接
続して、打設機6に仮止めした固定用の吊りワイヤー3
を外す。
Thereafter, as shown in FIG. 38, the drill head 10 is lowered to a position suitable for setting the suspension wire 3, and the suspension wire 3 is connected to the joint 8 of the drill head 10 by a swivel joint (not shown). , Suspension wire 3 for fixing temporarily fixed to the driving machine 6
Remove.

【0042】次に、図39のごとくパワークランプ7で
ケーシング5をロックして、ジョイント部8のねじ部を
締め付けて接続し、パワークランプ7を解除してドリル
ヘッドの接続を行なう。
Next, as shown in FIG. 39, the casing 5 is locked by the power clamp 7, the screw portion of the joint portion 8 is tightened and connected, and the power clamp 7 is released to connect the drill head.

【0043】上記に続き、打込まれたケーシング5を引
き抜き時において注水Wを行なって、そしてケーシング
5を引抜きする作業手順については、前記図1から図2
2までに説明した材料先入れ方式による実施形態におけ
る図13から図15までの注水、引抜きの手順と、図1
6から図22までのケーシング5の引抜き及び中間のケ
ーシング5の取外しの手順と同様な手順で行なわれるの
で、ここではその説明を省略する。
Following the above, the working procedure for performing water injection W when pulling out the driven casing 5 and pulling out the casing 5 will be described with reference to FIGS.
2 to FIG. 15 in the embodiment based on the material first-in system described up to FIG.
Since the procedure of pulling out the casing 5 and removing the intermediate casing 5 from 6 to FIG. 22 is performed, the description thereof is omitted here.

【0044】上記図26から図39までに説明した他の
実施形態においては、アンカプレート2の接続雄爪16
に対して、ドレーン材1の先端に取り付けられた接続用
キャップ18の接続雌爪17を接続するのに押し込みロ
ッド19を使用しているが、この押し込みロッド19を
使用する代わりに、図44及び図45に示すようなウエ
イト20を使用することも有効である。
In the other embodiments described with reference to FIGS. 26 to 39, the connecting male claws 16 of the anchor plate 2 are used.
In contrast, the pushing rod 19 is used to connect the connecting female claws 17 of the connecting cap 18 attached to the tip of the drain material 1, but instead of using the pushing rod 19, FIG. It is also effective to use a weight 20 as shown in FIG.

【0045】この場合の作業手順は、図26から図34
までと同様な作業手順によりケーシング5の設計深度ま
での打込みが完了した後に、ドレーン材1をケーシング
5内に挿入することになるが、前記の押し込みロッド1
9を使用する場合と同様に、ケーシング5の引き抜き時
に、ドレーン材1が共上がりする可能性があるので、ド
レーン材1の先端の接続用キャップ18をケーシング5
の先端のアンカプレート2に接続する必要がある。
The work procedure in this case is shown in FIGS.
After the driving to the design depth of the casing 5 is completed by the same operation procedure as described above, the drain material 1 is inserted into the casing 5.
9, the drain material 1 may rise together when the casing 5 is pulled out.
It is necessary to connect to the anchor plate 2 at the tip of.

【0046】そこで、前記図34の作業手順の後に、図
35において、パワークランプ7でケーシング5をロッ
クし、ドリルヘッド10のジョイント部8の接続部のね
じを緩めて外すことでケーシング5とドリルヘッド10
を分離し、ドリルヘッド10をドレーン材1を挿入しや
すい適当な位置まで引上げ、さらに図44においてドレ
ーン材1を組立時に上記のウエイト20をセットする。
Therefore, after the operation procedure of FIG. 34, the casing 5 is locked by the power clamp 7 and the connection portion of the joint 8 of the drill head 10 is unscrewed and removed from the casing 5 in FIG. Head 10
Is separated, the drill head 10 is pulled up to an appropriate position where the drain material 1 can be easily inserted, and the above-mentioned weight 20 is set when the drain material 1 is assembled in FIG.

【0047】次に、ドレーン材1に吊りワイヤーと固定
ワイヤーとの2本からなる吊りワイヤー3をセットし、
ドレーン材1をケーシング5内に挿入するドレーン材挿
入作業を行なう。
Next, a suspension wire 3 composed of two suspension wires and a fixed wire is set on the drain material 1,
A drain material insertion operation for inserting the drain material 1 into the casing 5 is performed.

【0048】そこで、図45のごとく、固定の吊りワイ
ヤー3でドレーン材1の頭部を仮固定し、ドレーン材1
の中のウエイト20を上下動させてドレーン材1の先端
の接続用キャップ18とアンカプレート2とを接続の
後、ウエイト20は引き上げてドレーン材1から撤去す
る。なお、固定の吊りワイヤー3で仮固定せず人力で保
持してもよい。
Therefore, as shown in FIG. 45, the head of the drain material 1 is temporarily fixed by the fixed hanging wire 3 and the drain material 1 is fixed.
After the weight 20 in the inside is moved up and down to connect the connection cap 18 at the tip of the drain material 1 and the anchor plate 2, the weight 20 is pulled up and removed from the drain material 1. In addition, you may hold | maintain by temporary power without temporarily fixing with the fixed hanging wire 3. FIG.

【0049】次に、ドリルヘッド10を降下してドレー
ン材1の吊りワイヤー3をドリルヘッド10のジョイン
ト部8に図示しないスイベルジョイントによって接続
し、打設機6に仮固定した固定用の吊りワイヤー3を外
してケーシング5内に挿入する。
Next, the drill head 10 is lowered to connect the suspension wire 3 of the drain material 1 to the joint portion 8 of the drill head 10 by a swivel joint (not shown), and the suspension wire for fixing temporarily fixed to the setting machine 6. 3 is removed and inserted into the casing 5.

【0050】アンカプレート2及びドレーン材1の接続
後は、図39に示すパワークランプ7でケーシング5を
ロックし、ドリルヘッド10のジョイント部8のねじ部
を締め付け接続して、パワークランプ7を解除するドリ
ルヘッド接続の作業の後、前記図13から図22までと
同様の作業手順を経て、ケーシング5を引抜くことで、
ドレーン材1の打設を完了することになる。
After the connection of the anchor plate 2 and the drain material 1, the casing 5 is locked by the power clamp 7 shown in FIG. 39, and the screw portion of the joint 8 of the drill head 10 is tightened and connected to release the power clamp 7. After the operation of connecting the drill head, the casing 5 is pulled out through the same operation procedure as in FIGS.
The placement of the drain material 1 is completed.

【0051】なお、図40および図41に示す接続用キ
ャップ18の下端に設けられた接続雌爪17の外周径
と、図42及び図43に示すアンカプレート2の上側に
設けられた接続雄爪16の外周径とは例えば10mm程度
の差を付けておき、接続雌爪17と接続雄爪16とが容
易に係合し、かつ離脱しにくい接続機構を形成するよう
にしている。
The outer diameter of the connecting female nail 17 provided at the lower end of the connecting cap 18 shown in FIGS. 40 and 41 and the connecting male nail provided on the upper side of the anchor plate 2 shown in FIGS. 42 and 43. For example, a difference of about 10 mm is provided between the outer diameter of the connecting member 16 and the connecting female claw 17 so that the connecting female claw 17 and the connecting male claw 16 are easily engaged with each other, and a connection mechanism that is difficult to be separated is formed.

【0052】以上の実施形態では、ドレーン材がその自
重により鉛直方向へ縮む性質を有するものを使用してい
るが、自重で鉛直方向へ縮むことがないドレーン材を使
用するときには吊りワイヤーでこれを防止する手順は不
要となる。
In the above embodiment, the drain material having the property of shrinking in the vertical direction by its own weight is used. However, when using the drain material which does not shrink in the vertical direction by its own weight, it is necessary to use a hanging wire to No steps are required to prevent it.

【0053】[0053]

【発明の効果】以上に説明した本発明のドレーン材の地
盤への打設方法によれば、小型のボーリングマシーン等
のような簡易な打設機を使用してドレーン材を打設でき
るので、既設オイルタンクの周辺のような大型重機が入
れない地盤に対しても、容易に、かつ経済的にドレーン
材を打設して液状化防止対策用のドレーン材の打設を行
なうことが可能となる。
According to the method for driving the drain material into the ground of the present invention described above, the drain material can be driven by using a simple driving machine such as a small boring machine. It is possible to easily and economically install drain materials even on the ground where large heavy equipment cannot enter, such as around the existing oil tank, and to install drain materials to prevent liquefaction. Become.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のドレーン材の地盤への打設方法を適用
してドレーン打設を行なう材料先入れ方式による一実施
形態の作業手順を説明するドレーン材組立の説明図であ
る。
FIG. 1 is an explanatory view of a drain material assembling explaining an operation procedure of an embodiment according to a material first-in system in which a drain material is driven by applying a method of driving a drain material to the ground according to the present invention.

【図2】図1に続くドレーン材ケーシングセットの説明
図である。
FIG. 2 is an explanatory view of a drain material casing set continued from FIG. 1;

【図3】図2に続くケーシングセットの説明図である。FIG. 3 is an explanatory view of the casing set following FIG. 2;

【図4】図3に続くケーシング接続の説明図である。FIG. 4 is an explanatory view of the casing connection following FIG. 3;

【図5】図4に続くケーシング位置調整の説明図であ
る。
FIG. 5 is an explanatory diagram of the casing position adjustment continued from FIG. 4;

【図6】図5に続くケーシング打込みの説明図である。FIG. 6 is an explanatory view of the driving of the casing following FIG. 5;

【図7】図6に続くケーシング分離の説明図である。FIG. 7 is an explanatory view of the casing separation following FIG. 6;

【図8】図7に続く中間のケーシング準備の説明図であ
る。
FIG. 8 is an explanatory diagram of preparation of an intermediate casing subsequent to FIG. 7;

【図9】図8に続く中間のケーシング接続の説明図であ
る。
FIG. 9 is an explanatory view of the intermediate casing connection following FIG. 8;

【図10】図9に続くドリルヘッド接続の説明図であ
る。
FIG. 10 is an explanatory view of the drill head connection continued from FIG. 9;

【図11】図10に続く中間のケーシングの打込みの説
明図である。
FIG. 11 is an explanatory view of driving of the intermediate casing following FIG. 10;

【図12】図11に続く打込み完了の説明図である。FIG. 12 is an explanatory diagram of the completion of the driving following FIG. 11;

【図13】図12に続く注水ホースセットの説明図であ
る。
FIG. 13 is an explanatory view of the water injection hose set following FIG. 12;

【図14】図13に続く注水の説明図である。FIG. 14 is an explanatory diagram of water injection following FIG. 13;

【図15】図14に続く注水、引抜きの説明図である。FIG. 15 is an explanatory view of water injection and withdrawal following FIG. 14;

【図16】図15に続くケーシング接続解除の説明図で
ある。
FIG. 16 is an explanatory diagram of the casing disconnection following FIG. 15;

【図17】図16に続くケーシング引上げの説明図であ
る。
FIG. 17 is an explanatory view of the casing pulling up following FIG. 16;

【図18】図17に続くケーシング解除の説明図であ
る。
FIG. 18 is an explanatory view following FIG. 17 of casing release.

【図19】図18に続く吊りワイヤーの段取り替え前半
の説明図である。
FIG. 19 is an explanatory diagram of the first half of the setup change of the suspension wire following FIG. 18;

【図20】図19に続く後半の作業の説明図である。FIG. 20 is an explanatory diagram of the latter half of the operation following FIG. 19;

【図21】図20に続くケーシング引抜きの説明図であ
る。
FIG. 21 is an explanatory diagram of the casing withdrawal following FIG. 20;

【図22】図21に続く引抜き完了の説明図である。FIG. 22 is an explanatory view of the completion of drawing after FIG. 21;

【図23】図22に続くケーシング取外し準備の説明図
である。
FIG. 23 is an explanatory view of the preparation for removing the casing following FIG. 22;

【図24】図23に続くケーシング倒しの説明図であ
る。
FIG. 24 is an explanatory diagram of the casing being lowered following FIG. 23;

【図25】図24に続くケーシング取外しの説明図であ
る。
FIG. 25 is an explanatory view of removing the casing following FIG. 24;

【図26】本発明の打設方法を適用してドレーン打設を
行なう材料後入れ方式による他の実施形態における押込
みロッドを使用した作業手順を説明する先端のケーシン
グセットの説明図である。
FIG. 26 is an explanatory diagram of a casing set at a distal end for explaining an operation procedure using a pushing rod in another embodiment by a material insertion method in which a material is cast by applying the casting method of the present invention.

【図27】図26に続くケーシング接続の説明図であ
る。
FIG. 27 is an explanatory diagram of the casing connection following FIG. 26;

【図28】図27に続く位置調整の説明図である。FIG. 28 is an explanatory diagram of the position adjustment continued from FIG. 27;

【図29】図28に続くケーシング打込みの説明図であ
る。
FIG. 29 is an explanatory diagram of the driving of the casing following FIG. 28;

【図30】図29に続くケーシング解除の説明図であ
る。
FIG. 30 is an explanatory view of the release of the casing following FIG. 29;

【図31】図30に続く中間のケーシング準備の説明図
である。
FIG. 31 is an explanatory view of the preparation of the intermediate casing following FIG. 30;

【図32】図31に続くケーシング接続の説明図であ
る。
FIG. 32 is an explanatory view of the casing connection following FIG. 31.

【図33】図32に続くケーシングの打込みの説明図で
ある。
FIG. 33 is an explanatory view of the driving of the casing following FIG. 32;

【図34】図33に続くケーシング打込み完了の説明図
である。
FIG. 34 is an explanatory diagram following FIG. 33 of completion of driving of the casing.

【図35】図34に続くドリルヘッド解除の説明図であ
る。
FIG. 35 is an explanatory view of releasing the drill head following FIG. 34;

【図36】図35に続くドレーン材セットの説明図であ
る。
FIG. 36 is an explanatory diagram of the drain material set following FIG. 35;

【図37】図36に続く押込みロッドによりアンカプレ
ートとドレーン材との接続の説明図である。
FIG. 37 is an explanatory view of the connection between the anchor plate and the drain material by the pushing rod continued from FIG. 36;

【図38】図37に続く吊りワイヤーセットの説明図で
ある。
FIG. 38 is an explanatory diagram of the hanging wire set continued from FIG. 37.

【図39】図38に続くドリルヘッド接続の説明図であ
る。
FIG. 39 is an explanatory view of the drill head connection continued from FIG. 38.

【図40】図37のアンカプレートとドレーン材接続用
の接続用キャップの一部断面で示す側面図である。
40 is a side view showing a partial cross section of a connection cap for connecting the anchor plate and the drain material in FIG. 37.

【図41】図40の下面から見た平面図である。FIG. 41 is a plan view seen from the lower surface of FIG. 40.

【図42】図40の接続用キャップに接続するアンカプ
レートの図43のA−A方向の側断面図である。
42 is a side sectional view of the anchor plate connected to the connection cap of FIG. 40 taken along the line AA in FIG. 43.

【図43】図42の上面から見た平面図である。FIG. 43 is a plan view as seen from above in FIG. 42;

【図44】図26から図39までに示した他の実施形態
におけるウエイトを使用してドレーン材をケーシング内
に挿入する例の説明図である。
FIG. 44 is an explanatory diagram of an example in which a drain material is inserted into a casing using the weights according to the other embodiments shown in FIGS. 26 to 39.

【図45】図44に続くアンプレートとドレーン材との
接続の説明図である。
FIG. 45 is an explanatory view of the connection between the unplate and the drain material, following FIG. 44;

【符号の説明】[Explanation of symbols]

1 ドレーン材 2 アンカプレート 3 吊りワイヤー 5 ケーシング 6 打設機 18 接続用キャップ 19 押し込みロッド 20 ウエイト G 地盤 W 注水 DESCRIPTION OF SYMBOLS 1 Drain material 2 Anchor plate 3 Suspension wire 5 Casing 6 Casting machine 18 Connection cap 19 Push rod 20 Weight G Ground W Water injection

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 一端にアンカプレートを取り付けたドレ
ーン材をケーシング内に挿入した後、ドレーン材をケー
シングと共に、打設機により地盤へ貫入し、ケーシング
及びドレーン材を継ぎ足して地盤の所定深度まで貫入の
後、ケーシング内に注水してケーシングのみを地盤から
抜き取り、そしてドレーン材の周囲を埋め戻すドレーン
材の地盤への打設方法。
After inserting a drain material having an anchor plate attached to one end into a casing, the drain material is penetrated into the ground together with the casing by a driving machine, and the casing and the drain material are added to penetrate to a predetermined depth of the ground. After that, water is poured into the casing, only the casing is extracted from the ground, and the drain material is buried around the drain material.
【請求項2】 下端にアンカプレートを取り付けたケー
シングを打設機により地盤へ貫入し、ケーシングを継ぎ
足して地盤の所定深度までケーシングを貫入の後、下端
に上記アンカプレートとの接続用キャップを取り付けた
ドレーン材を上記ケーシング内に挿入し、上記アンカプ
レートとその接続用キャップとを接続させた後、ケーシ
ング内に注水してケーシングのみを地盤から抜き取り、
そしてドレーン材の周囲を埋め戻すドレーン材の地盤へ
の打設方法。
2. A casing having an anchor plate attached to a lower end thereof is penetrated into the ground by a driving machine, a casing is added to penetrate the casing to a predetermined depth of the ground, and a cap for connection with the anchor plate is attached to a lower end. After inserting the drain material into the casing, connecting the anchor plate and its connection cap, water is poured into the casing, and only the casing is extracted from the ground,
And the method of placing the drain material back on the ground to fill the drain material around.
【請求項3】 一端にアンカプレートを取り付け、かつ
他端に吊りワイヤーを取り付けた鉛直方向に自重で縮む
性質を有するドレーン材をケーシング内に挿入した後、
ドレーン材が自重で鉛直方向下方に縮むのを吊りワイヤ
ーで防止しながらケーシングと共に、打設機により地盤
へ貫入し、ケーシング及びドレーン材を継ぎ足して地盤
の所定深度まで貫入の後、吊りワイヤーでドレーン材が
自重で鉛直方向下方に縮むのを防止しながら、ケーシン
グ内に注水してケーシングのみを地盤から抜き取り、そ
してドレーン材の周囲を埋め戻すドレーン材の地盤への
打設方法。
3. After inserting a drain material having a property of shrinking by its own weight in the vertical direction having an anchor plate attached to one end and a suspending wire attached to the other end into the casing,
Using a suspension wire to prevent the drain material from shrinking vertically downward by its own weight, penetrate the ground with a casting machine together with the casing. A method of pouring drain material into the ground while preventing the material from shrinking vertically downward by its own weight, pouring water into the casing, extracting only the casing from the ground, and filling back around the drain material.
【請求項4】 下端にアンカプレートを取り付けたケー
シングを打設機により地盤へ貫入し、ケーシングを継ぎ
足して地盤の所定深度までケーシングを貫入の後、下端
に上記アンカプレートとの接続用キャップを、そして他
端に吊りワイヤーをそれぞれ取り付けた鉛直方向に自重
で縮む性質を有するドレーン材を上記ケーシング内に挿
入し、上記アンカプレートとその接続用キャップとを接
続させた後、吊りワイヤーでドレーン材が自重で鉛直方
向下方に縮むのを防止しながら、ケーシング内に注水し
てケーシングのみを地盤から抜き取り、そしてドレーン
材の周囲を埋め戻すドレーン材の地盤への打設方法。
4. A casing having an anchor plate attached to a lower end is penetrated into the ground by a driving machine, and the casing is added to penetrate the casing to a predetermined depth of the ground. Then, a drain material having a property of contracting by its own weight in the vertical direction with a hanging wire attached to the other end is inserted into the casing, and the anchor plate and the connection cap are connected to each other. A method of pouring drain material into the ground, injecting water into the casing, extracting only the casing from the ground, and filling back around the drain material while preventing shrinking vertically downward by its own weight.
JP9745797A 1997-04-15 1997-04-15 Driving method of drain member into ground Pending JPH10292361A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9745797A JPH10292361A (en) 1997-04-15 1997-04-15 Driving method of drain member into ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9745797A JPH10292361A (en) 1997-04-15 1997-04-15 Driving method of drain member into ground

Publications (1)

Publication Number Publication Date
JPH10292361A true JPH10292361A (en) 1998-11-04

Family

ID=14192844

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9745797A Pending JPH10292361A (en) 1997-04-15 1997-04-15 Driving method of drain member into ground

Country Status (1)

Country Link
JP (1) JPH10292361A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012007364A (en) * 2010-06-24 2012-01-12 Toa Harbor Works Co Ltd Device and method for preventing pipe body from being pulled out
JP2012241385A (en) * 2011-05-18 2012-12-10 Penta Ocean Construction Co Ltd Method of installing drain member for liquefaction countermeasures
JP2013087445A (en) * 2011-10-14 2013-05-13 Kyadotekku Kk Burying device and burying method for drain material
JP2013253427A (en) * 2012-06-07 2013-12-19 Nishimatsu Constr Co Ltd Erection method and device of drainage material
JP5525637B1 (en) * 2012-05-29 2014-06-18 由伍 小宮 Drain material embedding method and drain material embedding device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012007364A (en) * 2010-06-24 2012-01-12 Toa Harbor Works Co Ltd Device and method for preventing pipe body from being pulled out
JP2012241385A (en) * 2011-05-18 2012-12-10 Penta Ocean Construction Co Ltd Method of installing drain member for liquefaction countermeasures
JP2013087445A (en) * 2011-10-14 2013-05-13 Kyadotekku Kk Burying device and burying method for drain material
JP5525637B1 (en) * 2012-05-29 2014-06-18 由伍 小宮 Drain material embedding method and drain material embedding device
JP2013253427A (en) * 2012-06-07 2013-12-19 Nishimatsu Constr Co Ltd Erection method and device of drainage material

Similar Documents

Publication Publication Date Title
US5028171A (en) Reusable offshore platform with skirt piles
CN106592591A (en) Drilling pile head overall removal construction method
JP5210221B2 (en) Separation structure of core material and method for constructing start shaft of shield excavator using the same
CN110042835A (en) It is bored certainly for native, layer of sand from anchor recoverable anchor rod and its anchoring process
US3991581A (en) Method and apparatus for handling piling and anchoring an offshore tower
US4718791A (en) High capacity tieback installation method
CN1963044A (en) Construction method for withdrawal of waste pile
JP6523064B2 (en) Pipe type surface collapse prevention facility and construction method of pipe type surface collapse prevention facility
JPH0774498B2 (en) Method of forming cast-in-place concrete pile
JPH10292361A (en) Driving method of drain member into ground
JPH0581687B2 (en)
CN115874613B (en) Advanced inclined thread enlarged composite pile, construction equipment and construction process thereof
CN116479899A (en) Recoverable rotary-spraying enlarged-head anchor cable and construction method
JPH0637064Y2 (en) Casing fall prevention device for steel pipe pile driving
KR101847906B1 (en) Simultaneous penetration type composite casing for pile and cast in place pile construction method using the same
JP3219993B2 (en) Piling method in pit structure
JP2002294700A (en) Self-aligning anchor fixing device
JP2017002608A (en) Anchor installation method, boring rod used for the same and casing floatation prevention hardware
JP6616180B2 (en) Construction method of foundation pile with reinforced pile head
JP2549062B2 (en) Pipe rod construction method
CN103103985A (en) Ground source heat pump tube embedment method based on piling process
JPH09143996A (en) Casing pipe and method for constructing pile foundation using the same
JPS61250229A (en) Method and apparatus for penetration of steel sheet pile
JP6847655B2 (en) Anchor facility and method of forming anchor facility
JPS59233019A (en) Method and part for forming earth anchor and automatic penetrator therefor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040407

A977 Report on retrieval

Effective date: 20060511

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060523

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060720

A131 Notification of reasons for refusal

Effective date: 20061003

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Effective date: 20070320

Free format text: JAPANESE INTERMEDIATE CODE: A02