KR101285156B1 - Centering apparatus of column pile installed in cast-in-place pile construction mold - Google Patents

Centering apparatus of column pile installed in cast-in-place pile construction mold Download PDF

Info

Publication number
KR101285156B1
KR101285156B1 KR1020130022617A KR20130022617A KR101285156B1 KR 101285156 B1 KR101285156 B1 KR 101285156B1 KR 1020130022617 A KR1020130022617 A KR 1020130022617A KR 20130022617 A KR20130022617 A KR 20130022617A KR 101285156 B1 KR101285156 B1 KR 101285156B1
Authority
KR
South Korea
Prior art keywords
pair
support plate
formwork
anchor bolt
horizontal
Prior art date
Application number
KR1020130022617A
Other languages
Korean (ko)
Inventor
김재형
황길수
Original Assignee
(주)대맥건설산업
주식회사 동양이엠씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)대맥건설산업, 주식회사 동양이엠씨 filed Critical (주)대맥건설산업
Priority to KR1020130022617A priority Critical patent/KR101285156B1/en
Application granted granted Critical
Publication of KR101285156B1 publication Critical patent/KR101285156B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/005Individual couplings or spacer elements for joining the prefabricated units
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

PURPOSE: A centering device for an anchor bolt spacer installed in an onsite pouring pile form and a pillar pile installation method using the same are provided to facilitate to grasp the central position of an anchor bolt spacer inside a form when installing a pillar pile in the field. CONSTITUTION: A centering device for an anchor bolt spacer installed in an onsite pouring pile form comprises a pair of fixing type supporting plate bodies (10), a movable supporting plate body (20), a pair of lateral gap adjustment bolt, and a nut. A fixing type supporting plate bodies are formed in the top of a form (3) and comprise vertical fixing type plate parts (11,12) and lateral gap adjustment slots (13,14). The movable supporting plate body is formed in between a pair of fixing type supporting plate bodies and comprises a pair of vertical plate parts (21, 22), a horizontal plate part (25), and a pair of longitudinal gap adjustment slots (27,28). A pair of lateral gap adjustment bolts is connected to both through-holes (23,24) of the movable supporting plate body and lateral gap adjustment slots in a pair of fixing type supporting plate bodies to be protruded to the outside of both sides fixing type supporting plates. The nut is separately joined to both ends of a pair of lateral gap adjustment bolt from the outside of the both sides fixing type supporting plates.

Description

현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치 및 그것을 이용한 지주파일 설치공법{Centering apparatus of column pile installed in cast-in-place pile construction mold}Centering apparatus for anchor bolt spacers installed on cast-in-place pile formwork and holding pile installation method using the same

본 발명은 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치 및 그것을 이용한 지주파일 설치공법에 관한 것으로서, 특히 공사현장에서 지주파일의 설치시에 지주파일을 하부측에서 고정지지하는 앵커볼트스페이서의 중심위치를 거푸집 내에서 용이하게 잡을 수 있도록 하는 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치 및 그것을 이용한 지주파일 설치공법에 관한 것이다.
The present invention relates to a centering device of the anchor bolt spacer to be installed in the cast-in-place pile formwork and the support pile installation method using the same, in particular, anchor bolt spacer for holding the support pile fixed at the lower side when the support pile is installed at the construction site The centering device of the anchor bolt spacer to be installed in the cast-in-place pile form to easily hold the center position of the formwork and the holding pile installation method using the same.

일반적으로 방음벽, 도로표지판, 태양광독립기초 및 도로부대시설물을 설치하기 위하여는 도로나 철로 주변의 설치할 위치의 지면상에 오거 등의 천공장비를 이용하여 일정 깊이의 홈을 천공하고, 그 홈에 강관파일(현장타설말뚝)을 수직 설치한 다음 강관파일(현장타설말뚝) 내에 H-빔 형태의 지주파일을 설치하거나, 그 홈에 앵커볼트스페이서를 설치하게 된다.In general, in order to install soundproof walls, road signs, solar independence foundations, and road subsidiary facilities, a hole of a certain depth is drilled by using auger, such as auger, on the ground at a location where a road or railroad is installed. After installing the steel pipe pile vertically, install the H-beam type holding pile in the steel pipe pile or the anchor bolt spacer in the groove.

이때 현장타설말뚝 내에 앵커볼트스페이서를 설치 시 종래에는 현장타설말뚝의 타설을 위해 지면에 고정설치되는 거푸집의 내측하부에 삽입된 기둥철근에 앵커볼트를 용접하는 방식으로 거푸집 내에 앵커볼트를 고정하였다.In this case, when anchor bolt spacers are installed in the cast-in-place pile, anchor bolts are fixed in the form by welding anchor bolts to the column reinforcement inserted into the inner lower portion of the formwork fixed to the ground for placing the cast-in-place pile.

하지만 이러한 방식은 거푸집 내에 타설되는 현장타설말뚝 내에서 앵커볼트스페이서의 중심을 잡기 위해 작업자가 눈대중으로 작업하기 때문에 정확한 중심을 잡기가 힘들고 또한 기둥철근에 앵커볼트를 용접하기 위해 용접시 열이 가해지므로서, 구조적 부재인 철근 및 앵커볼트의 인장력 저하 및 내구력 저하의 주요인이 되어 왔다. 이로 인해 앵커볼트에 고정 설치되는 지주파일을 정확한 위치에 설치하기 힘들게 되며, 후공정에도 지장을 초래하는 문제점이 있었다.
However, this method is difficult to pinpoint the center of the anchor bolt spacer in the cast-in-place pile that is cast in the formwork, so it is difficult to precisely center and also heat is applied during welding to weld the anchor bolt to the column reinforcement Therefore, it has been a major factor in lowering tensile strength and durability of structural members of rebar and anchor bolts. This makes it difficult to install the holding file fixed to the anchor bolt in the correct position, there was a problem that causes trouble in the post-process.

등록특허 제10-1130167호Patent Registration No. 10-1130167

본 발명은 상기와 같은 종래기술의 문제점을 해결하기 위하여 안출된 것으로서, 공사현장에서 지주파일의 설치시에 지주파일을 하부측에서 고정지지하는 앵커볼트스페이서의 중심위치를 거푸집 내에서 용이하게 잡을 수 있도록 하는 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치 및 그것을 이용한 지주파일 설치공법을 제공하는데 그 목적이 있다.
The present invention has been made to solve the problems of the prior art as described above, when the installation of the holding pile at the construction site can easily hold the center position of the anchor bolt spacer for holding the holding pile fixed from the lower side in the formwork The purpose of the present invention is to provide a centering device for anchor bolt spacers installed in a formwork pile formwork and a support pile installation method using the same.

상기와 같은 목적을 달성하기 위하여 본 발명은, 도로시설물의 설치를 위한 현장타설말뚝을 타설하기 위해 작업현장의 지면상에 고정되어 지면에서부터 상부측으로 수직 설치되는 거푸집의 내부측에 삽입 설치되는 4개의 앵커볼트가 연결고정된 앵커볼트스페이서의 중심을 잡아주기 위한 장치에 있어서, 상기 거푸집의 상부 양측에 상호간에 마주하도록 수직고정형 판부가 형성되며, 각각의 수직고정형 판부 상에 수평방향으로 가로간격조절용장공이 형성되는 한쌍의 고정형지지판체; 상기 한쌍의 고정형지지판체 사이에 상기 수직고정형 판부 방향으로 각각 마주하게 한쌍의 수직판부가 형성되고, 양측 수직판부 상에 상기 가로간격조절용장공에 대응되는 한쌍의 통공이 이격 형성되고, 양측 수직판부의 하단부측을 잇도록 수평판부가 형성되며, 수평판부 상에 상기 가로간격조절용장공 방향과 직각교차되는 방향으로 한쌍의 세로간격조절용장공이 이격 형성되어 상기 4개의 앵커볼트가 삽입되는 이동형지지판체; 상기 한쌍의 고정형지지판체에 형성된 가로간격조절용장공 및 상기 이동형지지판체의 양측에 형성된 양측 통공에 연통되게 결합되어 양측 고정형지지판체의 각 외측으로 돌출되는 한쌍의 가로간격조절볼트; 상기 양측 고정형지지판체의 각 외측에서 상기 한쌍의 가로간격조절볼트의 양단부측에 각각 결합되는 너트;를 포함하여 이루어짐을 특징으로 하는 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치를 제공한다.
In order to achieve the above object, the present invention is fixed on the ground of the work site for the installation of on-site casting piles for the installation of road facilities is inserted into the inner side of the formwork installed vertically from the ground to the upper side four In the device for holding the anchor bolt spacer fixed to the center of the anchor bolt, the vertical fixed plate portion is formed to face each other on the upper sides of the formwork, horizontally spaced adjustment hole for each vertical fixed plate portion A pair of fixed support plates formed therein; A pair of vertical plate portions are formed between the pair of fixed support plate bodies in the direction of the vertical fixed plate portion, and a pair of through holes corresponding to the horizontal gap adjusting holes are formed on both vertical plate portions, and both vertical plate portions are spaced apart from each other. A movable support plate body having a horizontal plate portion formed to connect a lower end side thereof, and having a pair of longitudinal interval adjusting holes spaced apart from each other in a direction perpendicular to the horizontal gap adjusting hole direction on the horizontal plate portion to insert the four anchor bolts; A pair of horizontal spacing adjustment bolts coupled to communicate with both horizontal holes formed on both sides of the pair of fixed support plate bodies and through-holes formed on both sides of the movable support plate body to protrude outwards of each of the fixed support plate bodies; Provides the centering device of the anchor bolt spacer to be installed on the site-casting pile formwork, characterized in that it comprises; nuts each coupled to each end side of the pair of horizontal space adjustment bolts on each outside of the fixed support plate body on both sides. .

이와 같이 이루어지는 본 발명에 의한 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치 및 그것을 이용한 지주파일 설치공법은 지주파일의 현장 설치시 지주파일의 하부측에 설치되는 앵커볼트스페이서를 현장타설말뚝 타설을 위한 거푸집 내에서 가로 및 세로조절할 수 있도록 함으로써 앵커볼트스페이서의 타설시 중심잡기가 용이한 이점이 있다.The centering device of the anchor bolt spacer to be installed in the formwork pile pile form according to the present invention and the strut pile installation method using the same is the anchor bolt spacer is installed on the lower side of the strut pile when the field pile is installed on-site By allowing horizontal and vertical adjustments within the formwork for placing, there is an advantage of easy centering when placing anchor bolt spacers.

또한 이로 인해 앵커볼트스페이서의 상부측에 고정 설치되는 지주파일을 정확한 위치에 단시간에 설치될 수 있게 함으로써 후공정을 원활하게 할 수 있는 이점이 있다.
In addition, this has the advantage that the post pile can be installed in a short time in the correct position of the holding pile fixed to the upper side of the anchor bolt spacer smoothly.

도 1은 본 발명에 의한 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치의 분해 사시도,
도 2 및 도 3은 도 1의 결합과정 및 상태를 알 수 있는 사시도,
도 4 및 도 5는 본 발명에 의한 설치상태를 알 수 있는 평면도,
도 6은은 본 발명에 의한 사용실시예의 정면도이다.
1 is an exploded perspective view of the centering device of the anchor bolt spacer installed in the site-casting pile formwork according to the present invention,
2 and 3 are perspective views showing the coupling process and the state of FIG.
4 and 5 are a plan view showing the installation state according to the present invention,
6 is a front view of a use embodiment according to the present invention.

이하 본 발명의 실시를 위한 구체적인 내용을 첨부한 도면을 참조하여 더욱 상세하게 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 6을 참조하여 보면 본 발명에 의한 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치는 도로시설물의 설치를 위한 현장타설말뚝(2)을 타설하기 위해 작업현장의 지면상에 고정되어 지면에서부터 상부측으로 수직 설치되는 거푸집(3)의 내부측에 삽입 설치되는 4개의 앵커볼트(5a)가 연결고정된 앵커볼트스페이서(5)의 중심을 잡아주기 위한 장치로서, 상기 거푸집(3)의 상부에 구비되는 한쌍의 고정형지지판체(10)와, 상기 한쌍의 고정형지지판체(10)의 사이에 구비되는 이동형지지판체(20)와, 상기 한쌍의 고정형지지판체(10) 및 이동형지지판체(20)에 결합되는 가로간격조절볼트(31,32) 및 너트(40)로 이루어진다.With reference to Figures 1 to 6 the centering device of the anchor bolt spacer is installed on the site pile pile formwork according to the present invention on the ground of the work site to pour the site casting pile (2) for the installation of road facilities A device for holding the center of the anchor bolt spacer (5) fixed to the four anchor bolts (5a) is fixedly inserted into the inner side of the formwork (3) vertically installed from the ground to the upper side, the formwork (3) ) A pair of fixed support plate body 10 provided on the upper portion, a movable support plate body 20 provided between the pair of fixed support plate body 10, the pair of fixed support plate body 10 and the movable support plate The horizontal spacing adjusting bolts 31 and 32 coupled to the sieve 20 and the nut 40 are formed.

상기 한쌍의 고정형지지판체(10)는 도 1에서와 같이 상기 거푸집(3)의 상부 양측에 상호간에 마주하도록 수직고정형 판부(11,12)가 형성되며, 각각의 수직고정형 판부(11,12) 상에 수평방향으로 가로간격조절용장공(13,14)이 형성되어 구성된다.The pair of fixed support plate 10 is formed in the vertical fixed plate portion 11, 12 to face each other on the upper side of the formwork 3 as shown in Figure 1, each vertical fixed plate portion (11, 12) Horizontal spacing adjusting holes 13 and 14 are formed on the horizontal.

상기 한쌍의 고정형지지판체(10)의 사이에 구비되는 이동형지지판체(20)는 도 1 및 도 2에서와 같이 상기 한쌍의 고정형지지판체(10) 사이에 상기 수직고정형 판부(11,12) 방향으로 각각 마주하게 한쌍의 수직판부(21,22)가 형성되고, 양측 수직판부(21,22) 상에 상기 가로간격조절용장공(13,14)에 대응되는 한쌍의 통공(23,24)이 이격 형성되고, 양측 수직판부(21,22)의 하단부측을 잇도록 수평판부(25)가 형성되며, 수평판부(25) 상에 상기 가로간격조절용장공(13,14) 방향과 직각교차되는 방향으로 한쌍의 세로간격조절용장공(27,28)이 이격 형성되어 상기 4개의 앵커볼트(5a)가 삽입되도록 구성한다.The movable support plate body 20 provided between the pair of fixed support plate bodies 10 is in the direction of the vertical fixed plate portions 11 and 12 between the pair of fixed support plate bodies 10 as shown in FIGS. 1 and 2. A pair of vertical plate portions 21 and 22 are formed to face each other, and a pair of through holes 23 and 24 corresponding to the horizontal gap adjusting holes 13 and 14 are spaced apart on both vertical plate portions 21 and 22. It is formed, and the horizontal plate portion 25 is formed so as to connect the lower end side of both vertical plate portion (21, 22), and in the direction perpendicular to the direction of the horizontal spacing hole (13, 14) on the horizontal plate portion 25 A pair of longitudinal spacing holes (27, 28) are formed to be spaced apart so that the four anchor bolts (5a) is inserted.

이때 상기 이동형지지판체(20)의 수평판부(25) 상에 형성된 한쌍의 세로간격조절용장공(27,28) 내에 4개의 앵커볼트(5a)가 삽입되어 너트(45)에 의해 고정되며, 이러한 구조로서 거푸집(3) 내에 위치된 앵커볼트스페이서(5)의 세로간격을 조절하게 된다.At this time, four anchor bolts 5a are inserted into a pair of longitudinal spacing holes 27 and 28 formed on the horizontal plate portion 25 of the movable support plate body 20 to be fixed by a nut 45. As to adjust the longitudinal spacing of the anchor bolt spacer (5) located in the formwork (3).

상기 이동형지지판체(20)의 수평판부(25) 상에는 콘크리트 타설을 위한 콘크리트 투입공(29)이 형성된다. 상기 투입공(29)은 도 3 및 도 5에서와 같이 거푸집(3) 내로 콘크리트 타설시 한쌍의 세로간격조절용장공(27,28)에 지장을 주지 않으면서 콘크리트의 원활한 공급을 위해 수평판부(25)에 형성된 한쌍의 세로간격조절용장공(27,28) 사이에 형성되도록 함이 바람직하다.On the horizontal plate portion 25 of the movable support plate body 20 is a concrete injection hole 29 for placing concrete. The injection hole 29 is a horizontal plate portion 25 for smooth supply of concrete without disturbing the pair of longitudinal spacing holes (27, 28) when placing concrete into the formwork 3, as shown in Figs. It is preferable to be formed between a pair of longitudinal spacing holes (27, 28) formed in the).

한편, 도 3 및 도 4의 (b)에서와 같이 상기 한쌍의 고정형지지판체(10)에 형성된 가로간격조절용장공(13,14) 및 상기 이동형지지판체(20)의 양측에 형성된 양측 통공(23,24)에 연통되게 결합되어 양측 고정형지지판체(10)의 각 외측으로 돌출되는 한쌍의 가로간격조절볼트(31,32)를 구비한다.Meanwhile, as shown in FIGS. 3 and 4 (b), the horizontal gap adjusting holes 13 and 14 formed in the pair of fixed support plate bodies 10 and both side holes 23 formed on both sides of the movable support plate body 20 are provided. Is coupled to communicate with, 24 is provided with a pair of horizontally spaced adjustment bolts (31, 32) protruding outwards of each of the two fixed support plate body (10).

그리고, 상기 양측 고정형지지판체(10)의 각 외측에서 상기 한쌍의 가로간격조절볼트(31,32)의 양단부측에 각각 결합되는 너트(40)를 구비한다.A nut 40 is coupled to both end portions of the pair of horizontal gap adjusting bolts 31 and 32 at each outer side of the both side fixed support plate bodies 10.

상기 한쌍의 가로간격조절볼트(31,32) 및 너트(40)를 사용하여 거푸집(3) 내에 위치되어 이동형지지판체(20)의 수평판부(25)에 고정된 앵커볼트스페이서(5)의 가로간격을 조절하게 된다.
The horizontal of the anchor bolt spacer 5 is positioned in the formwork 3 using the pair of horizontal space adjusting bolts 31 and 32 and the nut 40 and fixed to the horizontal plate portion 25 of the movable support plate body 20. Adjust the interval.

상기와 같이 구성되는 본 발명에 의한 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치 및 그것을 이용한 지주파일 설치공법은 하기와 같다.
Centering device and anchor pile installation method using the anchor bolt spacer to be installed in the site-casting pile formwork according to the present invention configured as described above is as follows.

제1단계(S1) - 먼저, 도로시설물의 설치를 위한 현장타설말뚝(2)을 타설하기 위해 지반을 천공한다.
First step (S1)-First, the ground is drilled in order to cast the site-placed pile (2) for the installation of road facilities.

제2단계(S2) - 상기 천공된 지반에 기초철근(6)을 삽입 고정하고, 지면 상에 현장타설말뚝(2)의 거푸집(3)을 고정 설치한다.
Second step (S2)-Insert and fix the base reinforcement (6) to the perforated ground, and install the formwork (3) of the cast-in-place pile (2) on the ground.

제3단계(S3) - 상기 거푸집(3)의 상부측에 청구항 제1항에 기재된 한쌍의 고정형지지판체(10)를 고정 설치한다.
Third Step (S3)-The pair of fixed support plate bodies 10 according to claim 1 are fixedly installed on the upper side of the formwork 3.

제4단계(S4) - 상기 한쌍의 고정형지지판체(10) 사이로 거푸집(3)의 내측에 4개의 앵커볼트(5a)가 연결 고정된 앵커볼트스페이서(5)를 삽입한다.
Fourth step (S4)-Insert the anchor bolt spacer 5, the four anchor bolts (5a) is connected and fixed inside the formwork (3) between the pair of fixed support plate body (10).

제5단계(S5) - 상기 한쌍의 고정형지지판체(10)의 내측 사이에 청구항 제1항에 기재된 이동형지지판체(20)를 위치시키면서 이동형지지판체(20)의 수평판부(25) 상에 형성된 세로간격조절용장공(27,28)에 상기 4개의 앵커볼트(5a)의 상단부측을 돌출시키고 너트(45)로 고정하는 구조로 앵커볼트스페이서(5)의 세로간격을 조절한다.
Step 5 (S5)-formed on the horizontal plate portion 25 of the movable support plate body 20 while positioning the movable support plate body 20 according to claim 1 between the inner side of the pair of fixed support plate body 10 Prolong the upper end side of the four anchor bolts (5a) to the longitudinal spacing adjustment holes (27, 28) to adjust the longitudinal spacing of the anchor bolt spacer (5) in a structure to be fixed with a nut (45).

제6단계(S6) - 상기 한쌍의 고정형지지판체(10)에 형성된 가로간격조절용장공(13,14) 및 가로간격조절용장공(13,14)에 대응되도록 이동형지지판체(20)에 형성된 통공(23,24)에 연통되게 한쌍의 가로간격조절볼트(31,32)를 삽입 관통시키고, 한쌍의 가로간격조절볼트(31,32)의 양단부측에 너트(40)로 고정하는 구조로 앵커볼트스페이서(5)의 가로간격을 조절한다.
Sixth step (S6)-the through-hole formed in the movable support plate body 20 to correspond to the horizontal gap adjusting hole (13, 14) and the horizontal gap adjusting hole (13, 14) formed in the pair of fixed support plate (10) ( Anchor bolt spacers have a structure in which a pair of horizontal space adjusting bolts 31 and 32 are inserted therethrough so as to communicate with 23 and 24, and fixed to both ends of a pair of horizontal space adjusting bolts 31 and 32 with nuts 40. Adjust the horizontal spacing in (5).

제7단계(S7) - 상기 거푸집(3)의 내측에 위치된 앵커볼트스페이서(5)의 중심을 잡은 후, 거푸집(3)과 앵커볼트스페이서(5) 사이에 콘크리트를 타설한다.
Step 7 (S7)-After holding the center of the anchor bolt spacer (5) located inside the formwork (3), the concrete is poured between the formwork (3) and the anchor bolt spacer (5).

상기한 제7단계(S7)의 콘크리트 타설이 완료되면 양생 후 거푸집(3)을 분리시키고, 앵커볼트스페이서(5)의 각 앵커볼트(5a)의 상단측에 지주파일(7)의 하단측을 연결 고정하면 되고, 도 6에서와 같이 타설이 완료된 H-빔 형태의 지주파일(7)의 사이에 맨먼저 하단부에 프리캐스트(8)를 설치하고, 그 상부로 방음벽체(9)를 설치하면 시공이 완료된다.When the concrete pouring of the seventh step (S7) is completed, after removing the formwork (3) after curing, the lower side of the holding pile (7) on the upper side of each anchor bolt (5a) of the anchor bolt spacer (5) If the connection is fixed, as shown in Figure 6, the precast (8) is first installed in the lower end between the H-beam-shaped holding pile (7), the soundproof wall (9) is installed above Construction is completed.

상기한 구조의 설치시 방음벽체 뿐만 아니라, 도로표지판, 태양광독립기초 및 도로부대시설물의 설치시에도 동일하게 적용된다.
The same applies to the installation of road signs, solar independence foundations and road subsidiary facilities, as well as soundproof walls in the above-described structure.

2 : 현장타설말뚝 3 : 거푸집
5 : 앵커볼트스페이서 5a : 앵커볼트
6 : 기초철근 7 : 지주파일
8 : 프리캐스트 9 : 방음벽체
10 : 고정형지지판체 11,12 : 수직고정형 판부
13,14 : 가로간격조절용장공 20 : 이동형지지판체
21,22 : 수직판부 23,24 : 통공
25 : 수평판부 27,28 : 세로간격조절용장공
29 : 투입공 31,32 : 가로간격조절볼트
40,45 : 너트
2: cast-in-place pile 3: formwork
5: Anchor Bolt Spacer 5a: Anchor Bolt
6: basic rebar 7: holding pile
8: precast 9: soundproof wall
10: fixed support plate 11,12: vertical fixed plate part
13,14: horizontal spacing adjustment length 20: movable support plate
21,22: vertical plate portion 23,24: through hole
25: horizontal plate portion 27, 28: vertical gap adjusting slot
29: injection hole 31,32: horizontal gap adjustment bolt
40,45: Nut

Claims (5)

도로시설물의 설치를 위한 현장타설말뚝(2)을 타설하기 위해 작업현장의 지면상에 고정되어 지면에서부터 상부측으로 수직 설치되는 거푸집(3)의 내부측에 삽입 설치되는 4개의 앵커볼트(5a)가 연결고정된 앵커볼트스페이서(5)의 중심을 잡아주기 위한 장치에 있어서,
상기 거푸집(3)의 상부 양측에 상호간에 마주하도록 수직고정형 판부(11,12)가 형성되며, 각각의 수직고정형 판부(11,12) 상에 수평방향으로 가로간격조절용장공(13,14)이 형성되는 한쌍의 고정형지지판체(10);
상기 한쌍의 고정형지지판체(10) 사이에 상기 수직고정형 판부(11,12) 방향으로 각각 마주하게 한쌍의 수직판부(21,22)가 형성되고, 양측 수직판부(21,22) 상에 상기 가로간격조절용장공(13,14)에 대응되는 한쌍의 통공(23,24)이 이격 형성되고, 양측 수직판부(21,22)의 하단부측을 잇도록 수평판부(25)가 형성되며, 수평판부(25) 상에 상기 가로간격조절용장공(13,14) 방향과 직각교차되는 방향으로 한쌍의 세로간격조절용장공(27,28)이 이격 형성되어 상기 4개의 앵커볼트(5a)가 삽입되는 이동형지지판체(20);
상기 한쌍의 고정형지지판체(10)에 형성된 가로간격조절용장공(13,14) 및 상기 이동형지지판체(20)의 양측에 형성된 양측 통공(23,24)에 연통되게 결합되어 양측 고정형지지판체(10)의 각 외측으로 돌출되는 한쌍의 가로간격조절볼트(31,32);
상기 양측 고정형지지판체(10)의 각 외측에서 상기 한쌍의 가로간격조절볼트(31,32)의 양단부측에 각각 결합되는 너트(40);를 포함하여 이루어짐을 특징으로 하는 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치.
Four anchor bolts (5a) are fixed to the ground of the work site for the installation of road facilities, the four anchor bolts (5a) inserted into the formwork (3) installed vertically from the ground to the upper side is installed In the device for holding the center of the fixed anchor bolt spacer (5),
Vertically fixed plate portions 11 and 12 are formed on both sides of the upper portion of the formwork 3 so as to face each other, and horizontally spaced adjustment holes 13 and 14 are horizontally formed on the respective vertical fixed plate portions 11 and 12. A pair of fixed support plate bodies 10 formed;
A pair of vertical plate portions 21 and 22 are formed between the pair of fixed support plate bodies 10 in the direction of the vertical fixed plate portions 11 and 12, respectively, and the horizontal plates are formed on both vertical plate portions 21 and 22. A pair of through-holes 23 and 24 corresponding to the spacing holes 13 and 14 are spaced apart, and the horizontal plate portion 25 is formed to connect the lower end sides of both vertical plate portions 21 and 22, and the horizontal plate portion ( 25) A movable support plate body in which a pair of longitudinal spacing adjustment holes 27 and 28 are spaced apart in a direction perpendicular to the transverse spacing adjustment holes 13 and 14 directions so that the four anchor bolts 5a are inserted. 20;
Both sides of the fixed support plate body (10) formed in the pair of fixed support plate body (10) and the both sides through holes (23, 24) formed on both sides of the movable support plate body (20) A pair of horizontal interval adjusting bolts (31, 32) protruding to the outside of each;
Installed on the site-casting pile formwork comprising a; nut (40) respectively coupled to both ends of the pair of horizontal space adjusting bolts (31, 32) on each outside of the fixed support plate body (10) on both sides; Centering device of the anchor bolt spacer.
제1항에 있어서,
상기 이동형지지판체(20)의 수평판부(25) 상에는 콘크리트 타설을 위한 콘크리트 투입공(29)이 형성됨을 특징으로 하는 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치.
The method of claim 1,
Centering device of the anchor bolt spacer is installed on the site-casting pile formwork, characterized in that the concrete input hole 29 for the concrete placing is formed on the horizontal plate portion 25 of the movable support plate body (20).
제2항에 있어서,
상기 투입공(29)은 상기 수평판부(25)에 형성된 한쌍의 세로간격조절용장공(27,28) 사이에 형성됨을 특징으로 하는 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치.
The method of claim 2,
The input hole (29) is a centering device of the anchor bolt spacer installed in the site-casting pile formwork, characterized in that formed between a pair of longitudinal spacing holes (27, 28) formed in the horizontal plate portion (25).
도로시설물의 설치를 위한 현장타설말뚝을 타설하기 위해 지반을 천공하는 제1단계(S1);
상기 천공된 지반에 기초철근을 삽입 고정하고, 지면 상에 현장타설말뚝의 거푸집을 고정 설치하는 제2단계(S2);
상기 거푸집의 상부측에 청구항 제1항에 기재된 한쌍의 고정형지지판체를 고정 설치하는 제3단계(S3);
상기 한쌍의 고정형지지판체 사이로 거푸집의 내측에 4개의 앵커볼트가 연결 고정된 앵커볼트스페이서를 삽입하는 제4단계(S4);
상기 한쌍의 고정형지지판체의 내측 사이에 청구항 제1항에 기재된 이동형지지판체를 위치시키면서 이동형지지판체의 수평판부 상에 형성된 세로간격조절용장공에 상기 4개의 앵커볼트의 상단부측을 돌출시키고 너트로 고정하는 구조로 앵커볼트스페이서의 세로간격을 조절하는 제5단계(S5);
상기 한쌍의 고정형지지판체에 형성된 가로간격조절용장공 및 가로간격조절용장공(13,14)에 대응되도록 이동형지지판체에 형성된 통공에 연통되게 한쌍의 가로간격조절볼트를 삽입 관통시키고, 한쌍의 가로간격조절볼트의 양단부측에 너트로 고정하는 구조로 앵커볼트스페이서의 가로간격을 조절하는 제6단계(S6);
상기 거푸집의 내측에 위치된 앵커볼트스페이서의 중심을 잡은 후, 거푸집과 앵커볼트스페이서 사이에 콘크리트를 타설하는 제7단계(S7); 로 이루어짐을 특징으로 하는 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치를 이용한 지주파일 설치공법.
A first step (S1) of drilling ground to install a site-placement pile for installation of road facilities;
A second step (S2) of inserting and fixing the basic reinforcing bars in the perforated ground, and fixing the formwork of the cast-in-place pile on the ground;
A third step (S3) of fixing the pair of fixed support plate bodies according to claim 1 on the upper side of the formwork;
A fourth step (S4) of inserting anchor bolt spacers having four anchor bolts connected and fixed inside the formwork between the pair of fixed support plate bodies;
Protruding the upper end side of the four anchor bolts in the longitudinal spacing adjustment hole formed on the horizontal plate portion of the movable support plate body while positioning the movable support plate body according to claim 1 between the inner side of the pair of fixed support plate bodies and fixed with nuts. A fifth step (S5) of controlling the longitudinal spacing of the anchor bolt spacer to the structure;
Insert a pair of horizontal spacing adjusting bolts so as to communicate with the through-holes formed in the movable support plate body to correspond to the horizontal spacing adjustment hole and the horizontal spacing control holes (13,14) formed in the pair of fixed support plate body, and adjust the pair of horizontal spacing A sixth step (S6) of controlling the horizontal spacing of the anchor bolt spacers with a structure of fixing with nuts at both ends of the bolt;
A seventh step (S7) of holding the center of the anchor bolt spacer located inside the formwork and placing concrete between the formwork and the anchor bolt spacer; Shoring pile installation method using the center catching device of the anchor bolt spacer is installed on the site-casting pile formwork, characterized in that consisting of.
제4항에 있어서,
상기 제5단계(S5)에서 이동형지지판체의 하단면은 거푸집의 상단면에 안착 고정되도록 구성함을 특징으로 하는 현장타설말뚝 거푸집에 설치되는 앵커볼트스페이서의 중심잡기장치를 이용한 지주파일 설치공법.
5. The method of claim 4,
In the fifth step (S5), the bottom surface of the movable support plate body is a holding pile installation method using the center catching device of the anchor bolt spacer installed on the site-placed pile formwork, characterized in that configured to be fixed to the top surface of the formwork.
KR1020130022617A 2013-03-04 2013-03-04 Centering apparatus of column pile installed in cast-in-place pile construction mold KR101285156B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130022617A KR101285156B1 (en) 2013-03-04 2013-03-04 Centering apparatus of column pile installed in cast-in-place pile construction mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130022617A KR101285156B1 (en) 2013-03-04 2013-03-04 Centering apparatus of column pile installed in cast-in-place pile construction mold

Publications (1)

Publication Number Publication Date
KR101285156B1 true KR101285156B1 (en) 2013-07-11

Family

ID=48997158

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130022617A KR101285156B1 (en) 2013-03-04 2013-03-04 Centering apparatus of column pile installed in cast-in-place pile construction mold

Country Status (1)

Country Link
KR (1) KR101285156B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101358985B1 (en) * 2013-09-06 2014-02-07 주식회사 에스티오이엔지 Pillar settling structure and construction method of the same with improved stability and workability
KR101509201B1 (en) 2014-06-05 2015-04-07 오형석 Foundation construction device using concrete box for post of photovoltaic module
KR101616728B1 (en) * 2015-08-18 2016-04-29 운지파워텍(주) Apparatus for supporting anchor bolts
CN111118967A (en) * 2019-12-30 2020-05-08 中铁第六勘察设计院集团有限公司 Construction method for filling foam light soil foundation pit of railway roadbed in soft soil area
KR20200134761A (en) 2019-05-23 2020-12-02 양필규 The workstation mounted on top of file form
KR102459492B1 (en) * 2022-05-17 2022-10-26 (주)경안테크 Bus platform
KR102570994B1 (en) * 2023-03-07 2023-08-24 홍용택 Bridge column with earthquake resistance

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100581092B1 (en) 2005-10-05 2006-05-22 (주)다산컨설턴트 It is a basic anchor for sound isolation walls as before
KR101133453B1 (en) 2011-09-10 2012-04-09 경일피씨 주식회사 Concrete substructure molds

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100581092B1 (en) 2005-10-05 2006-05-22 (주)다산컨설턴트 It is a basic anchor for sound isolation walls as before
KR101133453B1 (en) 2011-09-10 2012-04-09 경일피씨 주식회사 Concrete substructure molds

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101358985B1 (en) * 2013-09-06 2014-02-07 주식회사 에스티오이엔지 Pillar settling structure and construction method of the same with improved stability and workability
KR101509201B1 (en) 2014-06-05 2015-04-07 오형석 Foundation construction device using concrete box for post of photovoltaic module
KR101616728B1 (en) * 2015-08-18 2016-04-29 운지파워텍(주) Apparatus for supporting anchor bolts
KR20200134761A (en) 2019-05-23 2020-12-02 양필규 The workstation mounted on top of file form
CN111118967A (en) * 2019-12-30 2020-05-08 中铁第六勘察设计院集团有限公司 Construction method for filling foam light soil foundation pit of railway roadbed in soft soil area
KR102459492B1 (en) * 2022-05-17 2022-10-26 (주)경안테크 Bus platform
KR102570994B1 (en) * 2023-03-07 2023-08-24 홍용택 Bridge column with earthquake resistance

Similar Documents

Publication Publication Date Title
KR101285156B1 (en) Centering apparatus of column pile installed in cast-in-place pile construction mold
US8646232B2 (en) Foundation construction for superstructures
KR101600845B1 (en) The horizontal structural frame and the underground construction methods using it
KR101107567B1 (en) For top down methode of rc structure, the connecting devices between beam structure and vertical steel material, the supporting structures of exclusive use, and the construction method using these devices
KR101848727B1 (en) Joint structure for PC column and joining method using the same
KR20200012263A (en) Under ground structure using column wall and construction method thereof
CN113431082B (en) Fast-assembly retaining wall structure and construction method thereof
JP6032625B2 (en) Precast concrete member pile head joining method and pile head support structure
JP6543077B2 (en) Construction method of structure
JP3763575B2 (en) Underground beam construction frame and underground beam construction method using the same
JP6083655B2 (en) Hanging frame and method of constructing structure using the same
KR101296856B1 (en) Reinforcement structure for wall of underground structure and construction method of underground structure using the same
KR101906322B1 (en) Rahmen bridge allowing longitudinal displacement and construction method therefor
KR101845078B1 (en) Aseismatic Reinforcement Steel Frame with Adjusting Connector and Aseismatic Reinforcement Method using thereof
CN110629791A (en) Built-in lateral telescopic supporting box type external mold
JP6368630B2 (en) Foundation construction method
KR100562686B1 (en) The underground structure and it's construction method is using sheet pile and cast in a place concrete
JP5345238B1 (en) Construction method of base-isolated base structure and base-isolated base structure
CN202323896U (en) Accurate positioning device for embedded anchor cone
JP2813605B2 (en) Construction foundation and construction method
KR101258330B1 (en) Temporary supporting system of steel beam and construstion method thereof
CN219862943U (en) Steel structure force transmission device between basement outer wall and support pile
JP7396763B1 (en) 3-point anchor integrated liner, long anchor integrated liner, equipment installation method
CN114150598B (en) Traffic sign post and construction method thereof
KR20100078557A (en) A machine tool supporting apparatus and foundation working method thereof

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160629

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170612

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180717

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190710

Year of fee payment: 7