KR101222151B1 - Packer adjustable of injection direction and repairing method of subsidence road using it - Google Patents

Packer adjustable of injection direction and repairing method of subsidence road using it Download PDF

Info

Publication number
KR101222151B1
KR101222151B1 KR1020120098084A KR20120098084A KR101222151B1 KR 101222151 B1 KR101222151 B1 KR 101222151B1 KR 1020120098084 A KR1020120098084 A KR 1020120098084A KR 20120098084 A KR20120098084 A KR 20120098084A KR 101222151 B1 KR101222151 B1 KR 101222151B1
Authority
KR
South Korea
Prior art keywords
injection
grout material
road
packer
injection direction
Prior art date
Application number
KR1020120098084A
Other languages
Korean (ko)
Inventor
송석민
이현태
최병천
양재열
양경화
Original Assignee
(주)바우테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)바우테크 filed Critical (주)바우테크
Priority to KR1020120098084A priority Critical patent/KR101222151B1/en
Application granted granted Critical
Publication of KR101222151B1 publication Critical patent/KR101222151B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/10Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for raising or levelling sunken paving; for filling voids under paving; for introducing material into substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

PURPOSE: A packer for adjusting injection direction and a repair method of a subsided road using the same are provided to reduce grouting time by preventing a grout material from being injected into an unnecessary portion of a road. CONSTITUTION: A packer for adjusting injection direction comprises a pipe-shaped body(1), a lifting body(2), a rubber pad(3), and an injection guide(4). The pipe-shaped body has a hollow(11), in which a grout material passes through, and a valve(12) for opening and closing the hollow. The lifting body is installed outside the body to be lifted and has multiple knobs(21). The rubber pad is attached to the bottom of the body and is expanded when the lifting body presses the rubber pad. The injection guide is extended from the bottom end of the body and guides the injection direction of the grout material injected through the body.

Description

주입방향 조절이 가능한 패커 및 이를 이용한 침하도로 보수공법{Packer adjustable of injection direction and repairing method of subsidence road using it}Packer adjustable of injection direction and repairing method of subsidence road using it}

본 발명은 주입방향 조절이 가능한 패커 및 이를 이용한 침하도로 보수공법에 관한 것으로, 보다 상세하게는 침하도로의 각 구조층(지반, 동상방지층, 보조기층, 기층, 콘크리트표층)에 충진되는 그라우트재의 주입 방향을 조정할 수 있어 주입이 필요한 부분으로만 주입함에 따라 불필요한 부분의 융기가 되지 않게 하는 주입방향 조절이 가능한 패커 및 이를 이용한 침하도로 보수공법에 관한 것이다.The present invention relates to a packer capable of adjusting the injection direction and a repair method using the same, and more specifically, injection of grout filled in each structural layer (ground, frost-preventing layer, auxiliary base, base, concrete surface layer) of the settlement road. The present invention relates to a packer capable of adjusting the injection direction to prevent the elevation of unnecessary parts by adjusting the direction and injecting only the portion requiring injection, and to a settlement method using the settlement.

일반적으로 콘크리트포장구조는 지반과, 상기 지반 상부에 석재를 깔아서 다짐을 하는 동상방지층과, 상기 동상방지층의 상부에 상기 동상방지층의 석재보다 상대적으로 작은 입도의 석재를 적층하여 형성된 보조기층과, 상기 보조기층의 상부에 1차적으로 콘크리트를 타설하여 형성된 기층과, 상기 기층 상부에 콘크리트로 타설하는 콘크리트표층으로 이루어진다. In general, the concrete paving structure is the ground, the frost-free layer for compacting by laying a stone on the ground, and the auxiliary base layer formed by laminating a stone of a particle size relatively smaller than the stone of the frost-free layer on top of the frost-free layer, It is composed of a base layer formed by pouring concrete primarily on top of the auxiliary base layer, and a concrete surface layer cast by concrete on the base layer.

이러한 콘크리트포장구조는 지반 또는 동상방지층 및 보조기층의 다짐불량이나 동상방지층 유실 또는 침하 등에 의해서 도로침하가 발생된다. Such concrete pavement structure is caused by road settlement due to compaction of the ground or frost-free layer and auxiliary base layer, loss of frost-free layer, or settlement.

종래에는 상기 도로침하를 보수하는 방법으로 침하된 부분의 콘크리트표층 상부에 콘크리트를 덧씌우거나, 침하된 도로를 부분적으로 철거하고 재 타설하는 방법으로 도로보수가 수행되었지만, 침하되는 원인에 대한 조치가 되지 않은 상태에서 보수가 이루어지기 때문에 다짐불량으로 인한 도로침하가 다시 발생될 수 있다. Conventionally, road repair has been performed by overlaying concrete on the concrete surface of the submerged portion as a method of repairing the subsidence, or by partially removing and repositioning the submerged road, but it is not a measure for the cause of subsidence. Repairs can be made in the unattended state, so road settling due to poor compaction can occur again.

이와 같은 단점을 해소하기 위해서 제시된 방법으로는 침하된 도로층 내에 그라우트재를 충진시켜 그라우트재의 충진압력에 의해 도로가 융기되도록 하는 방법이 있다. In order to solve the above disadvantages, there is a method of filling the grout material in the settled road layer so that the road is raised by the filling pressure of the grout material.

일예로 특허공개 1995-0027099호(1995.10.16 공개)의 도로보수공법에서는 동상방지층과 지반사이 또는 동상방지층과 접하는 지반에 그라우트재를 충진시켜 콘크리트표층을 융기시키는 방법을 제시하고 있다. 또한, 특허공개 2007-0074835호(2007.07.18 공개)에는 1차로 동상방지층에 그라우트재를 주입해 주입된 그라우트재의 경화로 동상방지층을 강화시키고, 2차로 강화된 동상방지층을 관통하여 동상방지층하부의 지반 또는 강화된 동상방지층과 지반사이에 그라우트재를 고압으로 충진하여 강화된 동상방지층과 콘크리트표층을 함께 융기시키도록 한 방법을 제시하고 있다. For example, the road repair method of Korean Patent Publication No. 1995-0027099 (published on Oct. 16, 1995) proposes a method of raising concrete surface by filling grout material between the frost-free layer and the ground or in contact with the frost-free layer. In addition, Japanese Patent Application Publication No. 2007-0074835 (published on July 18, 2007) reinforces the frostbite prevention layer by hardening the injected grout material by injecting a grout material into the frostbite prevention layer first, and penetrating the frostbite prevention layer through the second strengthening frostbite prevention layer. The method of filling the grout material with high pressure between the ground or reinforced frostbite prevention layer and the ground to raise the reinforced frostbite prevention layer and concrete surface layer together.

상기 종래의 기술들은 콘크리트포장 구조층 내에 그라우트재를 충진하여 침하된 도로를 융기시켜 공지 이전의 덧씌우는 방법에서의 재파손이 발생되는 단점을 보완한 것이나, 최종적으로 침하된 도로를 융기시키기 위한 그라우트재의 충진 위치가 동상방지층 하부에 위치하게 된다. 이러한 충진 위치는 그라우트재 주입 시 상부 도로층의 중량이 그대로 전달됨으로 주입되는 그라우트재도 큰 압력으로 주입되는 것을 요구하고 있다. 이와 같이 그라우트재의 주입압력이 증가하게 되면 도로 구조층 사이의 틈새로 그라우트재가 다량 누출되는 단점이 발생될 수 있다. The conventional techniques are to compensate for the disadvantage that re-damage occurs in the overlaying method by filling the grout material in the concrete pavement layer to raise the submerged road, but the grout for the final elevation of the submerged road The filling position of the ash is located under the in-phase prevention layer. This filling position requires that the grout material to be injected is also injected at a great pressure because the weight of the upper road layer is transferred as it is when the grout material is injected. As such, when the injection pressure of the grout material is increased, a large amount of grout material may leak into the gap between the road structure layers.

즉, 침하된 콘크리트표층을 융기시키기 위해서는 실제로 상부 도로층을 융기시키기 위한 압력과 누출압력 이상의 추가압력을 더 가하여야만 침하된 도로의 융기가 이루어지게 됨으로 공사 효율성이 저하된다. In other words, in order to elevate the submerged concrete surface, additional pressures higher than the pressure and the leakage pressure for actually elevating the upper road layer are added to the elevation of the submerged road, thereby lowering the construction efficiency.

또한, 침하도로의 동상방지층에 충진되는 그라우트재의 주입이 한쪽 방향으로 계속해서 주입되므로 주입이 불필요한 부분에 융기가 이루어져 불균일한 충진이 발생하는 한편, 재료비가 낭비되는 문제점이 있었다.In addition, since the injection of the grout material filled in the anti-frost-phase layer on the settlement road is continuously injected in one direction, there is a problem in that non-filling is caused by uneven filling and waste of material costs.

본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로, 침하도로의 각 구조층(지반, 동상방지층, 보조기층, 기층, 콘크리트표층)에 충진되는 그라우트재의 주입 방향을 조정할 수 있어 주입이 필요한 부분으로만 주입함에 따라 불필요한 부분의 융기가 되지 않게 할 뿐만 아니라, 그라우팅 시간을 단축하는 한편, 재료비를 절감할 수 있는 주입방향 조절이 가능한 패커 및 이를 이용한 침하도로 보수공법을 제공하는데 그 목적이 있다.The present invention has been made in order to solve the above problems, it is possible to adjust the injection direction of the grout material filled in each structural layer (ground, frost-preventing layer, auxiliary base layer, base layer, concrete surface layer) of the settlement road, which requires injection It is the purpose of providing a repair method to the packer and the settling using the same to adjust the injection direction to reduce the grouting time, while reducing the cost of the material, as well as not to rise of unnecessary parts by the injection only.

본 발명에 따른 주입방향 조절이 가능한 패커는, 도로의 침하부분에 형성된 천공에 설치되어 그라우트재를 주입시키는 패커에 있어서, 상기 그라우트재가 통과되도록 내부에 중공이 형성되고, 상부 일측에 상기 중공을 개폐시키는 밸브가 형성되는 관 형태의 몸체와; 상기 몸체의 외부에 승강 가능하게 설치되며 외면에 복수개의 손잡이가 형성되는 승강체와; 상기 몸체의 하부에 부착되어 상기 승강체의 가압에 의해 부피가 팽창되는 고무패드와; 상기 몸체의 하단에 연장 형성되어 상기 몸체를 통해 주입되는 그라우트재의 주입 방향을 안내하는 주입가이드를 포함하여 구성되는 것을 특징으로 한다.Packer that can adjust the injection direction according to the present invention, in the packer is installed in the perforation formed in the subsidence of the road to inject the grout material, a hollow is formed in the interior so that the grout material passes, the opening and closing the hollow on one side A tubular body in which a valve is formed; A lifting body which is installed to be liftable on the outside of the body and has a plurality of handles formed on an outer surface thereof; A rubber pad attached to a lower portion of the body to expand in volume by pressurization of the lifting body; It is formed on the bottom of the body characterized in that it comprises an injection guide for guiding the injection direction of the grout material injected through the body.

본 발명에 따른 주입방향 조절이 가능한 패커를 이용한 침하도로 보수공법은, 지반과, 상기 지반 상부에 석재를 깔아서 다짐을 하는 동상방지층과, 상기 동상방지층의 상부에 상기 동상방지층의 석재보다 상대적으로 작은 입도의 석재를 적층하여 형성된 보조기층과, 상기 보조기층의 상부에 1차적으로 콘크리트를 타설하여 형성된 기층과, 상기 기층 상부에 콘크리트로 타설하는 콘크리트표층으로 이루어진 도로의 침하부분을 보수하기 위한 침하도로 보수공법에 있어서, 상기 동상방지층까지 그라우트재를 주입하기 위해 주입공을 천공하는 단계와; 상기 주입공을 천공하는 단계에서 천공된 주입공에 그라우트재의 주입량과 주입방향 조절이 가능한 패커를 설치하는 단계와; 상기 주입방향 조절이 가능한 패커를 통해 그라우트재를 주입하여 도로의 침하부분의 포장을 인상시키는 단계를 포함하는 것을 특징으로 한다.Settlement road repair method using a packer capable of adjusting the injection direction according to the present invention, the ground, the frost-free layer to compact by laying a stone on the ground, and the upper of the frost-free layer is relatively smaller than the stone of the frost-free layer Subsidence layer formed by stacking stone of granularity, base layer formed by placing concrete primarily on top of the subbase layer, and a settlement road for repairing the settlement part of the road consisting of concrete surface layer which is poured into concrete on the base layer. In the repair method, the step of drilling the injection hole for injecting the grout material to the in-phase prevention layer; Installing a packer capable of adjusting the injection amount and injection direction of the grout material in the injection hole drilled in the step of drilling the injection hole; Injecting the grout material through the packer capable of adjusting the injection direction characterized in that it comprises the step of raising the pavement of the settled portion of the road.

본 발명에 따른 주입방향 조절이 가능한 패커 및 이를 이용한 침하도로 보수공법은, 침하도로의 각 구조층(지반, 동상방지층, 보조기층, 기층, 콘크리트표층)에 충진되는 그라우트재의 주입 방향을 조정할 수 있어 주입이 필요한 부분으로만 주입함에 따라 불필요한 부분의 융기가 되지 않게 할 뿐만 아니라, 그라우팅 시간을 단축하는 한편, 재료비를 절감하는 효과가 있다.Packer according to the present invention can be adjusted to the packer and settling road repair method using the same, it is possible to adjust the injection direction of the grout material filled in each structural layer (ground, frost-preventing layer, auxiliary base, base layer, concrete surface layer) of the settlement road By injecting only the portion that needs to be injected, it is possible not only to prevent unnecessary portions from rising, but also to shorten the grouting time and reduce the material cost.

도 1은 본 발명에 따른 주입방향 조절이 가능한 패커를 도시한 사시도.
도 2는 본 발명에 따른 주입방향 조절이 가능한 패커를 도시한 단면도.
도 3은 본 발명에 따른 주입가이드의 다른 일예를 도시한 단면도.
도 4는 본 발명에 따른 주입방향 조절이 가능한 패커를 이용한 침하도로 보수공법을 도시한 공정도.
도 5는 본 발명에 따른 침하도로 보수공법 중 천공하는 단계를 도시한 도면.
도 6은 도 5에 따른 주입공과 관측공을 도시한 도면.
도 7은 본 발명에 따른 침하도로 보수공법 중 패커를 설치하는 단계를 도시한 도면.
도 8은 본 발명에 따른 침하도로 보수공법 중 도로의 침하부분의 포장을 인상시키는 단계를 도시한 도면으로서,
도 8a는 그라우트재 1차 주입상태이고,
도 8b는 그라우트재 2차 주입상태이다.
1 is a perspective view showing a packer capable of adjusting the injection direction according to the present invention.
Figure 2 is a cross-sectional view showing a packer adjustable injection direction according to the present invention.
Figure 3 is a cross-sectional view showing another example of the injection guide according to the present invention.
Figure 4 is a process diagram showing the repair method of settling road using a packer capable of adjusting the injection direction according to the present invention.
Figure 5 is a view showing the step of drilling in the settlement process settlements in accordance with the present invention.
6 is a view showing the injection hole and the observation hole according to FIG.
Figure 7 is a view showing the step of installing the packer during the settlement process settlement road in accordance with the present invention.
8 is a view showing a step of raising the pavement of the settled portion of the road during the settlement road repair process according to the present invention,
8A is a grout material primary injection state,
8B is a second injection state of grout material.

본 발명에 따른 주입방향 조절이 가능한 패커는, 도로의 침하부분에 형성된 천공에 설치되어 그라우트재를 주입시키는 패커에 있어서, 상기 그라우트재가 통과되도록 내부에 중공이 형성되고, 상부 일측에 상기 중공을 개폐시키는 밸브가 형성되는 관 형태의 몸체와; 상기 몸체의 외부에 승강 가능하게 설치되며 외면에 복수개의 손잡이가 형성되는 승강체와; 상기 몸체의 하부에 부착되어 상기 승강체의 가압에 의해 부피가 팽창되는 고무패드와; 상기 몸체의 하단에 연장 형성되어 상기 몸체를 통해 주입되는 그라우트재의 주입 방향을 안내하는 주입가이드를 포함하여 구성되는 것을 특징으로 한다.Packer that can adjust the injection direction according to the present invention, in the packer is installed in the perforation formed in the subsidence of the road to inject the grout material, a hollow is formed in the interior so that the grout material passes, the opening and closing the hollow on one side A tubular body in which a valve is formed; A lifting body which is installed to be liftable on the outside of the body and has a plurality of handles formed on an outer surface thereof; A rubber pad attached to a lower portion of the body to expand in volume by pressurization of the lifting body; It is formed on the bottom of the body characterized in that it comprises an injection guide for guiding the injection direction of the grout material injected through the body.

또한, 상기 몸체의 외부 일측에 수나사가 형성되고, 상기 승강체의 내주면에 상기 수나사와 대응되는 암나사가 형성되는 것을 특징으로 한다.In addition, a male screw is formed on an outer side of the body, and a female screw corresponding to the male screw is formed on an inner circumferential surface of the lifting body.

또한, 상기 주입가이드는 외형이 반원호형으로 만곡지게 형성되는 것을 특징으로 한다.In addition, the injection guide is characterized in that the outer shape is formed to be curved in a semi-circular arc shape.

또한, 상기 주입가이드의 하단에는 상기 몸체의 직경과 동일한 직경을 갖는 차단판이 형성되는 것을 특징으로 한다.In addition, the lower end of the injection guide is characterized in that the blocking plate having the same diameter as the diameter of the body is formed.

본 발명에 따른 주입방향 조절이 가능한 패커를 이용한 침하도로 보수공법은, 지반과, 상기 지반 상부에 석재를 깔아서 다짐을 하는 동상방지층과, 상기 동상방지층의 상부에 상기 동상방지층의 석재보다 상대적으로 작은 입도의 석재를 적층하여 형성된 보조기층과, 상기 보조기층의 상부에 1차적으로 콘크리트를 타설하여 형성된 기층과, 상기 기층 상부에 콘크리트로 타설하는 콘크리트표층으로 이루어진 도로의 침하부분을 보수하기 위한 침하도로 보수공법에 있어서, 상기 동상방지층까지 그라우트재를 주입하기 위해 주입공을 천공하는 단계와; 상기 주입공을 천공하는 단계에서 천공된 주입공에 그라우트재의 주입량과 주입방향 조절이 가능한 패커를 설치하는 단계와; 상기 주입방향 조절이 가능한 패커를 통해 그라우트재를 주입하여 도로의 침하부분의 포장을 인상시키는 단계를 포함하는 것을 특징으로 한다.Settlement road repair method using a packer capable of adjusting the injection direction according to the present invention, the ground, the frost-free layer to compact by laying a stone on the ground, and the upper of the frost-free layer is relatively smaller than the stone of the frost-free layer Subsidence layer formed by stacking stone of granularity, base layer formed by placing concrete primarily on top of the subbase layer, and a settlement road for repairing the settlement part of the road consisting of concrete surface layer which is poured into concrete on the base layer. In the repair method, the step of drilling the injection hole for injecting the grout material to the in-phase prevention layer; Installing a packer capable of adjusting the injection amount and injection direction of the grout material in the injection hole drilled in the step of drilling the injection hole; Injecting the grout material through the packer capable of adjusting the injection direction characterized in that it comprises the step of raising the pavement of the settled portion of the road.

또한, 상기 주입방향 조절이 가능한 패커는 상기 그라우트재가 통과되도록 내부에 중공이 형성되고 상부 일측에 상기 중공을 개폐시키는 밸브가 형성되는 관 형태의 몸체와, 상기 몸체의 외부에 승강 가능하게 설치되며 외면에 복수개의 손잡이가 형성되는 승강체와, 상기 몸체의 하부에 부착되어 상기 승강체의 가압에 의해 부피가 팽창되는 고무패드와, 상기 몸체의 하단에 연장 형성되어 상기 몸체를 통해 주입되는 그라우트재의 주입 방향을 안내하는 주입가이드를 포함하여 구성되는 것을 특징으로 한다.In addition, the packer capable of adjusting the injection direction is a tubular body in which a hollow is formed therein so that the grout material passes and a valve for opening and closing the hollow is formed at an upper side thereof, and is installed to be elevated on the outside of the body and is provided with an outer surface. A lifting body having a plurality of handles formed thereon, a rubber pad attached to a lower portion of the body to expand the volume by pressurization of the lifting body, and an injection of grout material extending from the lower end of the body and injected through the body; Characterized in that it comprises a injection guide for guiding the direction.

또한, 상기 천공하는 단계에서 상기 주입공은 침하도로의 처짐량에 따라 45~90ㅀ의 각도로 경사지게 형성되는 것을 특징으로 한다.In addition, in the drilling step, the injection hole is characterized in that it is formed to be inclined at an angle of 45 ~ 90 ° according to the amount of deflection of the settlement.

또한, 상기 천공하는 단계에서 도로의 침하부분에 그라우트재 주입 확인을 위한 관측공이 다수개 형성되는 것을 특징으로 한다.In addition, a plurality of observation holes for confirming the injection of the grout material is formed in the settlement part of the road in the drilling step.

이하, 본 발명의 바람직한 실시예를 첨부된 도면을 참조하여 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명에 따른 주입방향 조절이 가능한 패커를 도시한 사시도이고, 도 2는 본 발명에 따른 주입방향 조절이 가능한 패커를 도시한 단면도이며, 도 3은 본 발명에 따른 주입가이드의 다른 일예를 도시한 단면도이고, 도 4는 본 발명에 따른 주입방향 조절이 가능한 패커를 이용한 침하도로 보수공법을 도시한 공정도이며, 도 5는 본 발명에 따른 침하도로 보수공법 중 천공하는 단계를 도시한 도면이고, 도 6은 도 5에 따른 주입공과 관측공을 도시한 도면이며, 도 7은 본 발명에 따른 침하도로 보수공법 중 패커를 설치하는 단계를 도시한 도면이고, 도 8은 본 발명에 따른 침하도로 보수공법 중 도로의 침하부분의 포장을 인상시키는 단계를 도시한 도면으로서, 도 8a는 그라우트재 1차 주입상태이고, 도 8b는 그라우트재 2차 주입상태이다.1 is a perspective view illustrating a packer capable of adjusting the injection direction according to the present invention, Figure 2 is a cross-sectional view showing a packer capable of adjusting the injection direction according to the present invention, Figure 3 is another example of the injection guide according to the present invention Figure 4 is a cross-sectional view, Figure 4 is a process diagram showing the repair method of the settlement road using a packer capable of adjusting the injection direction according to the present invention, Figure 5 is a view showing a step of drilling in the settlement process according to the present invention 6 is a view showing the injection hole and the observation hole according to Figure 5, Figure 7 is a view showing the step of installing the packer of the repair method of the settlement road according to the present invention, Figure 8 is a sinking road according to the present invention FIG. 8A is a grout material primary injection state, and FIG. 8B is a grout material secondary injection state.

도 1 및 도 2에 도시된 바와 같이, 본 발명에 따른 주입방향 조절이 가능한 패커는 도로의 침하부분에 형성된 천공에 설치되어 그라우트재(5)를 주입시키는 패커에 있어서, 상기 그라우트재(5)가 통과되도록 내부에 중공(11)이 형성되고, 상부 일측에 상기 중공(11)을 개폐시키는 밸브(12)가 형성되는 관 형태의 몸체(1)와, 상기 몸체(1)의 외부에 승강 가능하게 설치되며 외면에 복수개의 손잡이(21)가 형성되는 승강체(2)와, 상기 몸체(1)의 하부에 부착되어 상기 승강체(2)의 가압에 의해 부피가 팽창되는 고무패드(3)와, 상기 몸체(1)의 하단에 연장 형성되어 상기 몸체(1)를 통해 주입되는 그라우트재(5)의 주입 방향을 안내하는 주입가이드(4)를 포함하여 구성된다.1 and 2, the packer capable of adjusting the injection direction according to the present invention is installed in the perforations formed in the subsidence of the road in the packer for injecting the grout material (5), the grout material (5) Hollow 11 is formed therein so that the passage, the tubular body (1) formed with a valve 12 for opening and closing the hollow (11) on the upper side and the elevating to the outside of the body (1) Lifting body (2) having a plurality of handles 21 are formed on the outer surface and the rubber pad (3) is attached to the lower portion of the body (1) to expand the volume by the pressure of the lifting body (2) And an injection guide 4 extending from the lower end of the body 1 to guide the injection direction of the grout material 5 injected through the body 1.

상기 몸체(1)는 금속 재질의 관 형태로 이루어지며 상단에는 그라우트재 공급장치의 호스와 연결되도록 연결접속구(미도시)가 형성될 수도 있다.The body 1 may be made of a metal tube, and a connection connector (not shown) may be formed at an upper end thereof so as to be connected to a hose of a grout material supply device.

상기 몸체(1)의 외부 일측에 수나사(13)가 형성되고, 상기 승강체(2)의 내주면에 상기 수나사(13)와 대응되는 암나사(22)가 형성된다. 따라서, 도로의 침하부분에 형성된 천공에 패커를 설치하는 경우에 상기 몸체(1)를 천공에 삽입시키고, 상기 승강체(2)의 손잡이(21)를 잡고 회전시켜 하강시키면 상기 승강체(2)의 가압에 의해 몸체(1)의 하부에 부착되어 있는 고무패드(3)의 부피가 팽창하면서 패커의 위치를 고정시킨다.A male screw 13 is formed on an outer side of the body 1, and a female screw 22 corresponding to the male screw 13 is formed on an inner circumferential surface of the lifting body 2. Therefore, when the packer is installed in the perforation formed in the subsided part of the road, the body 1 is inserted into the perforation, and the handle 21 of the lifting body 2 is rotated to lower and lower the lifting body 2. The pressure of the rubber pad (3) attached to the lower part of the body (1) is expanded while fixing the position of the packer.

상기 밸브(12)는 상기 중공(11)을 개폐시켜 몸체(1)의 내부로 공급되는 그라우트재(5)의 주입량을 조절하는 역할을 하게 된다.The valve 12 serves to control the injection amount of the grout material 5 supplied to the inside of the body 1 by opening and closing the hollow 11.

상기 주입가이드(4)는 상기 몸체(1)의 하단에 연장 형성되며 외형이 반원호형으로 만곡지게 형성되어, 도로의 침하부분에 주입되는 그라우트재(5)의 주입 방향을 조정할 수 있어 주입이 필요한 부분으로만 주입함에 따라 불필요한 부분의 융기가 되지 않도록 한다.The injection guide 4 is formed to extend at the bottom of the body (1) and the outer shape is formed to be curved in a semi-circular arc, it is possible to adjust the injection direction of the grout material (5) injected in the settlement part of the road required injection Inject only in portions to avoid bulging of unnecessary parts.

도 3에 도시된 바와 같이, 상기 주입가이드(4)의 하단에는 상기 몸체(1)의 직경과 동일한 직경을 갖는 차단판(41)이 형성될 수 있다.As shown in FIG. 3, a blocking plate 41 having the same diameter as the diameter of the body 1 may be formed at the lower end of the injection guide 4.

따라서, 상기 주입가이드(4)의 안내에 따라 주입되는 그라우트재(5)는 상기 차단판(41)에 의해 하부 방향으로 주입되는 것이 차단되고 상기 주입가이드(4)의 안내 방향으로만 주입되게 된다.Therefore, the grout material 5 injected along the guide of the injection guide 4 is blocked from being injected downward by the blocking plate 41 and is only injected in the guide direction of the injection guide 4. .

이하, 본 발명에 따른 주입방향 조절이 가능한 패커를 이용한 침하도로 보수공법을 설명하면 다음과 같다.Hereinafter, the settlement method using the packer capable of adjusting the injection direction according to the present invention will be described as follows.

도 4에 도시된 바와 같이, 본 발명에 따른 주입방향 조절이 가능한 패커를 이용한 침하도로 보수공법은 지반(6)과, 상기 지반(6) 상부에 석재를 깔아서 다짐을 하는 동상방지층(7)과, 상기 동상방지층(7)의 상부에 상기 동상방지층(7)의 석재보다 상대적으로 작은 입도의 석재를 적층하여 형성된 보조기층(8)과, 상기 보조기층(8)의 상부에 1차적으로 콘크리트를 타설하여 형성된 기층(9)과, 상기 기층(9) 상부에 콘크리트로 타설하는 콘크리트표층(10)으로 이루어진 도로의 침하부분을 보수하기 위한 침하도로 보수공법에 있어서, 상기 동상방지층(7)까지 그라우트재(5)를 주입하기 위해 주입공을 천공하는 단계(100)와, 상기 주입공을 천공하는 단계(100)에서 천공된 주입공(20)에 그라우트재(5)의 주입량과 주입방향 조절이 가능한 패커를 설치하는 단계(200)와, 상기 주입방향 조절이 가능한 패커를 통해 그라우트재(5)를 주입하여 도로의 침하부분의 포장을 인상시키는 단계(300)를 포함한다.As shown in Figure 4, the settlement method using the packer controllable injection direction according to the present invention is ground (6), and the in-phase prevention layer (7) to lay the stone on the ground (6) The auxiliary base layer 8 formed by stacking a stone having a particle size relatively smaller than the stone of the in-phase preventing layer 7, and the concrete on the upper portion of the auxiliary base layer 8 is primarily formed on top of the in-phase preventing layer 7. In the settlement process for repairing the settlement part of the road which consists of the base layer 9 formed by pouring and the concrete surface layer 10 which is poured into concrete on the base layer 9, the grout to the in-phase prevention layer 7 is grouted. Injecting the injection hole (100) to inject the ash (5), and the injection amount and injection direction control of the grout material (5) in the injection hole (20) perforated in the injection hole (100) Installing a possible packer (200), and Injecting the grout material (5) through the packer capable of adjusting the injection direction to raise the pavement of the settlement of the road (300).

도 5 및 도 6에 도시된 바와 같이, 상기 천공하는 단계(100)는 습식용 코어 드릴을 이용하여 동상방지층(7)까지 그라우트재(5)를 주입하기 위해 주입공(20)을 형성하게 된다.As shown in FIGS. 5 and 6, the drilling step 100 forms an injection hole 20 for injecting the grout material 5 to the in-phase preventing layer 7 by using a wet core drill. .

상기 주입공(20)은 그라우트재(5)를 동상방지층(7) 내에 침투시켜 동상방지층(7)을 하나의 큰 덩어리로 응고시킴으로써 추후 가해지는 압력에 대해 지지력을 발휘할 수 있도록 동상방지층(7)을 강화시키기 위한 것이다. The injection hole 20 penetrates the grout material 5 into the in-phase preventing layer 7 to solidify the in-phase preventing layer 7 into one large mass so that the in-phase preventing layer 7 can exert a bearing force against the pressure applied later. It is to strengthen the.

상기 천공하는 단계(100)에서 상기 주입공(20)은 침하도로의 처짐량에 따라 45~90도의 각도로 경사지게 형성되는 것이 바람직하다. 왜냐하면, 상기 주입공(20)이 도로면에 대해 수직으로 천공될 경우 그라우트재 공급장치로부터 토출되는 고압의 그라우트재(5)가 동상방지층(7)에 수직으로 부딪친 다음 주입이 이루어지므로 토출압력이 저하되는 단점이 있다. 따라서, 주입공(20)을 상기 경사각도로 경사지게 천공하여 그라우트재(5) 토출 시 일정각으로 동상방지층(7)과 접하게 함으로써 토출시의 압력저하를 최소화해 적은 압력으로도 주입이 용이하게 이루어지도록 할 수 있는 것이다.In the drilling step 100, the injection hole 20 is preferably formed to be inclined at an angle of 45 ~ 90 degrees according to the amount of deflection of the settlement. Because, when the injection hole 20 is drilled perpendicularly to the road surface, the high pressure grout material 5 discharged from the grout material supply device hits the in-phase preventing layer 7 vertically and then is injected, so that the discharge pressure is increased. There is a disadvantage of deterioration. Therefore, the injection hole 20 is inclined to be inclined at the inclination angle to contact the in-phase preventing layer 7 at a predetermined angle when the grout material 5 is discharged, thereby minimizing the pressure drop at the time of discharging so that the injection is easily performed at a low pressure. You can do it.

상기 천공하는 단계(100)에서 도로의 침하부분에 그라우트재(5) 주입 확인을 위한 관측공(30)이 다수개 형성될 수 있다. 따라서, 상기 관측공(30)을 통해 상기 주입공(20)으로 주입되는 그라우트재(5)의 주입이 제대로 이루어지고 있는지를 확인할 수 있는 것이다. In the drilling step 100, a plurality of observation holes 30 for confirming the injection of the grout material 5 may be formed in the settlement part of the road. Therefore, it is possible to check whether the injection of the grout material 5 injected into the injection hole 20 through the observation hole 30 is properly performed.

이처럼, 상기 주입공(20)은 도로의 침하부분에 일정간격으로 다수개 형성되고 상기 관측공(30)은 가장 외측에 위치한 주입공(20)의 전후로 2개씩 형성되는 것이 바람직하다.As such, it is preferable that the injection holes 20 are formed in plural numbers at predetermined intervals in the settlement part of the road, and the observation holes 30 are formed in front of and behind the injection holes 20 located at the outermost sides.

도 7에 도시된 바와 같이, 주입방향 조절이 가능한 패커를 설치하는 단계(200)에서는 상기 그라우트재(5)가 통과되도록 내부에 중공(11)이 형성되고 상부 일측에 상기 중공(11)을 개폐시키는 밸브(12)가 형성되는 관 형태의 몸체(1)와, 상기 몸체(1)의 외부에 승강 가능하게 설치되며 외면에 복수개의 손잡이(21)가 형성되는 승강체(2)와, 상기 몸체(1)의 하부에 부착되어 상기 승강체(2)의 가압에 의해 부피가 팽창되는 고무패드(3)와, 상기 몸체(1)의 하단에 연장 형성되어 상기 몸체(1)를 통해 주입되는 그라우트재(5)의 주입 방향을 안내하는 주입가이드(4)를 포함하여 구성되는 주입방향 조절이 가능한 패커를 상기 주입공(20)에 설치하는 것이다.As shown in FIG. 7, in the step 200 of installing the packer capable of adjusting the injection direction, a hollow 11 is formed therein so that the grout material 5 passes, and the hollow 11 is opened and closed on an upper side thereof. The tubular body (1) having a valve 12 to be formed, and the lifting body (2) is installed so as to be elevated on the outside of the body (1) and a plurality of handles 21 are formed on the outer surface, and the body A rubber pad 3 attached to the lower part of the body 1 and expanded in volume by pressurization of the lifting body 2, and a grout formed at the lower end of the body 1 and injected through the body 1. It is to install in the injection hole 20 a packer capable of adjusting the injection direction including an injection guide (4) for guiding the injection direction of the ash (5).

상기 주입가이드(4)는 상기 몸체(1)의 하단에 연장 형성되며 외형이 반원호형으로 만곡지게 형성되어, 도로의 침하부분에 주입되는 그라우트재(5)의 주입 방향을 조정할 수 있어 주입이 필요한 부분으로만 주입함에 따라 불필요한 부분의 융기가 되지 않도록 한다. The injection guide 4 is formed to extend at the bottom of the body (1) and the outer shape is formed to be curved in a semi-circular arc, it is possible to adjust the injection direction of the grout material (5) injected in the settlement part of the road required injection Inject only in portions to avoid bulging of unnecessary parts.

따라서, 상기 주입방향 조절이 가능한 패커를 이용하여 그라우트재(5)를 주입함으로써, 침하가 되지 않은 불필요한 부분으로 그라우트재(5)가 주입되는 것을 예방하여 그라우팅 시간을 단축하는 한편, 재료비를 절감하는 효과가 있다.Accordingly, by injecting the grout material 5 using the packer capable of adjusting the injection direction, the grout material 5 is prevented from being injected into an unnecessary part that does not settle, thereby reducing the grouting time and reducing the material cost. It works.

도로의 침하부분의 포장을 인상시키는 단계(300)에서는, 도 8a에서와 같이 상기 그라우트재(5)를 1차로 주입하여 상기 그라우트재(5)가 상기 패커를 통해 동상방지층(7)의 내부로 침투되게 하여 상기 동상방지층(7)의 강도를 보강시켜 지반(6)을 안정시킨다. 또한, 도 8b에서와 같이 상기 그라우트재(5)를 동상방지층(7)과 기층(9) 사이의 경계면에 2차로 주입하여 별도의 보강층이 형성되도록 할 수 있다. 이 때 상기 그라우트재(5)는 동상방지층(7)과 기층(9) 사이의 경계면으로 주입되고 중력에 의해 동상방지층(7)으로 침투되게 하는 방법이 적용될 수도 있다. In the step 300 of raising the pavement of the settled portion of the road, the grout material 5 is first injected as shown in FIG. 8A so that the grout material 5 passes through the packer into the in-phase preventing layer 7. It penetrates and reinforces the strength of the in-phase preventing layer 7 to stabilize the ground 6. In addition, as shown in FIG. 8B, the grout material 5 may be secondarily injected into the interface between the in-phase preventing layer 7 and the base layer 9 so that a separate reinforcing layer may be formed. In this case, the grout material 5 may be injected into the interface between the in-phase prevention layer 7 and the base layer 9 and may be applied to the in-phase prevention layer 7 by gravity.

이밖에도 도로 침하부분의 포장의 인상상태에 따라 그라우트재(5)의 주입량을 조절해야 할 경우에는 각 구조층(지반, 동상방지층, 보조기층, 기층, 콘크리트표층)에 그라우트재(5)를 주입할 수도 있다.In addition, when it is necessary to adjust the injection amount of the grout material (5) according to the lifting state of the pavement of the road settlement part, the grout material (5) is to be injected into each structural layer (ground, frost-preventing layer, auxiliary base layer, base layer, concrete surface layer). It may be.

상기 그라우트재(5)의 재질로는 마이크로시멘트와 보통시멘트가 사용되며, 상기 그라우트재(5)를 지반(6)내의 공극에 침투시키기 위해서는 그라우트재(5)에 혼합되는 물의 양을 증감시켜 유동성을 증가시킨 다음 공급하는 것이 바람직하다.As the material of the grout material 5, microcement and ordinary cement are used. In order to penetrate the grout material 5 into the pores in the ground 6, the amount of water mixed in the grout material 5 is increased and decreased. It is preferable to increase and then feed.

1차 그라우트재(5)의 주입압력은 3~5kgW/cm2 의 범위내로 공급한다. 상기 범위 이하의 압력으로 공급할 경우 지반으로의 그라우트재(5) 공급이 잘 이루어지지 않는 단점이 있으며, 상기 범위 이상의 압력을 공급할 경우 고압으로 인해 확산이 이루어짐으로 단위면적당 공급량 저하로 지반 강화력이 저하되는 단점이 있으므로 상기 범위로 공급하는 것이 바람직하다. 상기 1차 그라우트재(5)의 주입은 관측공(30)에서 그라우트재(5)가 확인될 때까지 진행된다.The injection pressure of the primary grout material 5 is supplied in the range of 3 to 5 kgW / cm 2. Supplying grout material 5 to the ground does not work well when supplied at a pressure below the above range. When supplying pressure above the above range, the ground reinforcement is lowered due to a decrease in supply per unit area due to diffusion due to high pressure. It is preferable to supply the above range because there is a disadvantage. Injection of the primary grout material 5 proceeds until the grout material 5 is identified in the observation hole 30.

콘크리트표층(10)을 인상시키기 위한 2차 그라우트재(5)의 주입압력은 5~10kgW/cm2 의 범위내로 공급한다. 이때, 외형적으로 도로의 침하부분의 변형여부를 확인하면서 주입하는 것이 바람직하며, 그 방법으로는 레이저 레벨기 및 수동으로 실이나 막대를 이용하게 된다.The injection pressure of the secondary grout material 5 for raising the concrete surface layer 10 is supplied in the range of 5-10 kgW / cm <2>. At this time, it is preferable to inject while checking whether the settlement of the settlement of the road is deformed, and the method is to use a laser leveler and a thread or a rod manually.

주입된 그라우트재(5)는 6시간 이상 바람직하게는 하루정도로 충분히 경화되도록 하여 이후 단계에서의 하중에 대한 지지력이 이루어지도록 한다. 상기 경화시간은 그라우트재(5)의 혼합비에 따라 다양하게 조절될 수 있다.The injected grout material (5) is allowed to harden sufficiently for 6 hours or more, preferably about one day, so that the bearing capacity for the load in the subsequent step is achieved. The curing time may be variously adjusted according to the mixing ratio of the grout material (5).

도로의 침하부분에 그라우트재(5)의 주입이 완료되면, 주입된 그라우트재(5)가 주입공(20)을 통해 배출되는 것을 방지하기 위해 별도의 마감처리가 이루어질 수 있으며, 일정시간 경화시간을 갖도록 한 다음 도로통행이 이루어지도록 한다. When the injection of the grout material 5 to the settlement part of the road is completed, a separate finishing treatment may be made to prevent the injected grout material 5 from being discharged through the injection hole 20, and a predetermined time curing time To allow for road traffic.

본 발명은 첨부된 도면을 참조하여 바람직한 실시예를 중심으로 기술되었지만 당업자라면 이러한 기재로부터 본 발명의 범주를 벗어남이 없이 많은 다양한 자명한 변형이 가능하다는 것은 명백하다. 따라서 본 발명의 범주는 이러한 많은 변형의 예들을 포함하도록 기술된 청구범위에 의해서 해석되어져야 한다.Although the present invention has been described with reference to the accompanying drawings, it will be apparent to those skilled in the art that many various obvious modifications are possible without departing from the scope of the invention from this description. Therefore, the scope of the invention should be construed by the claims described to include examples of many such variations.

1 : 몸체
11 : 중공
12 : 밸브
13 : 수나사
2 : 승강체
21 : 손잡이
22 : 암나사
3 : 고무패드
4 : 주입가이드
41 : 차단판
5 : 그라우트재
6 : 지반
7 : 동상방지층
8 : 보조기층
9 : 기층
10 : 콘크리트표층
20 : 주입공
30 : 관측공
1: body
11: hollow
12: valve
13: male thread
2: lifting body
21: handle
22: female thread
3: rubber pad
4: Injection guide
41: blocking plate
5: grout material
6: ground
7: Frostbite prevention layer
8: subbase
9: substrate
10: concrete surface layer
20: injection hole
30: observer

Claims (8)

도로의 침하부분에 형성된 천공에 설치되어 그라우트재(5)를 주입시키는 패커에 있어서,
상기 그라우트재(5)가 통과되도록 내부에 중공(11)이 형성되고, 상부 일측에 상기 중공(11)을 개폐시키는 밸브(12)가 형성되는 관 형태의 몸체(1)와;
상기 몸체(1)의 외부에 승강 가능하게 설치되며 외면에 복수개의 손잡이(21)가 형성되는 승강체(2)와;
상기 몸체(1)의 하부에 부착되어 상기 승강체(2)의 가압에 의해 부피가 팽창되는 고무패드(3)와;
상기 몸체(1)의 하단에 연장 형성되어 상기 몸체(1)를 통해 주입되는 그라우트재(5)의 주입 방향을 안내하는 주입가이드(4)를 포함하여 구성되는 것을 특징으로 하는 주입방향 조절이 가능한 패커.
In the packer installed in the perforation formed in the settlement of the road to inject the grout material (5),
A hollow body (11) formed therein so that the grout material (5) passes, and a tubular body (1) having a valve (12) for opening and closing the hollow (11) on an upper side thereof;
A lifting body (2) installed on the outside of the body (1) to be liftable and having a plurality of handles (21) formed on an outer surface thereof;
A rubber pad (3) attached to a lower portion of the body (1) and expanded in volume by pressurization of the lifting body (2);
The injection direction is adjustable, characterized in that it comprises an injection guide (4) is formed extending to the lower end of the body (1) to guide the injection direction of the grout material (5) injected through the body (1) Packer.
제1항에 있어서, 상기 몸체(1)의 외부 일측에 수나사(13)가 형성되고, 상기 승강체(2)의 내주면에 상기 수나사(13)와 대응되는 암나사(22)가 형성되는 것을 특징으로 하는 주입방향 조절이 가능한 패커.According to claim 1, characterized in that the male screw 13 is formed on the outer side of the body 1, the female screw 22 corresponding to the male screw 13 is formed on the inner peripheral surface of the lifting body (2). Packer with adjustable injection direction. 제1항에 있어서, 상기 주입가이드(4)는 외형이 반원호형으로 만곡지게 형성되는 것을 특징으로 하는 주입방향 조절이 가능한 패커.The packer according to claim 1, wherein the injection guide (4) is formed to be curved in a semicircular shape. 제1항 또는 제3항에 있어서, 상기 주입가이드(4)의 하단에는 상기 몸체(1)의 직경과 동일한 직경을 갖는 차단판(41)이 형성되는 것을 특징으로 하는 주입방향 조절이 가능한 패커.The packer according to claim 1 or 3, wherein a blocking plate (41) having a diameter equal to the diameter of the body (1) is formed at a lower end of the injection guide (4). 지반과, 상기 지반 상부에 석재를 깔아서 다짐을 하는 동상방지층과, 상기 동상방지층의 상부에 상기 동상방지층의 석재보다 상대적으로 작은 입도의 석재를 적층하여 형성된 보조기층과, 상기 보조기층의 상부에 1차적으로 콘크리트를 타설하여 형성된 기층과, 상기 기층 상부에 콘크리트로 타설하는 콘크리트표층으로 이루어진 도로의 침하부분을 보수하기 위한 침하도로 보수공법에 있어서,
상기 동상방지층까지 그라우트재를 주입하기 위해 주입공을 천공하는 단계와;
상기 주입공을 천공하는 단계에서 천공된 주입공에 그라우트재의 주입량과 주입방향 조절이 가능한 패커를 설치하는 단계와;
상기 주입방향 조절이 가능한 패커를 통해 그라우트재를 주입하여 도로의 침하부분의 포장을 인상시키는 단계를 포함하는 것을 특징으로 하는 주입방향 조절이 가능한 패커를 이용한 침하도로 보수공법.
Ground, and a frost-free layer for compacting by laying a stone on top of the ground, an auxiliary base layer formed by laminating a stone of a particle size relatively smaller than the stone of the frost-free layer on the top of the frostbite prevention layer, and 1 on top of the auxiliary base layer In the settlement road repair method for repairing the settlement part of the road consisting of a base layer formed by pouring concrete and a concrete surface layer placed in the upper portion of the base,
Drilling an injection hole to inject a grout material to the in-phase preventing layer;
Installing a packer capable of adjusting the injection amount and injection direction of the grout material in the injection hole drilled in the step of drilling the injection hole;
Injecting grout material through the packer capable of adjusting the injection direction to raise the pavement of the settled portion of the road comprising the step of repairing the settlement road using the packer capable of adjusting the injection direction.
제5항에 있어서, 상기 주입방향 조절이 가능한 패커는 상기 그라우트재가 통과되도록 내부에 중공이 형성되고 상부 일측에 상기 중공을 개폐시키는 밸브가 형성되는 관 형태의 몸체와, 상기 몸체의 외부에 승강 가능하게 설치되며 외면에 복수개의 손잡이가 형성되는 승강체와, 상기 몸체의 하부에 부착되어 상기 승강체의 가압에 의해 부피가 팽창되는 고무패드와, 상기 몸체의 하단에 연장 형성되어 상기 몸체를 통해 주입되는 그라우트재의 주입 방향을 안내하는 주입가이드를 포함하여 구성되는 것을 특징으로 하는 주입방향 조절이 가능한 패커를 이용한 침하도로 보수공법.According to claim 5, The injection direction adjustable packer is a hollow body is formed inside the passage to pass the grout material and the tubular body is formed with a valve for opening and closing the hollow on one side, the elevable outside of the body And a lifting body having a plurality of handles formed on an outer surface thereof, a rubber pad attached to a lower portion of the body to expand the volume by pressurization of the lifting body, and formed at a lower end of the body to be injected through the body. Settlement road repair method using a packer capable of adjusting the injection direction, characterized in that it comprises an injection guide for guiding the injection direction of the grout material. 제5항에 있어서, 상기 천공하는 단계에서 상기 주입공은 침하도로의 처짐량에 따라 45~90도의 각도로 경사지게 형성되는 것을 특징으로 하는 주입방향 조절이 가능한 패커를 이용한 침하도로 보수공법.The method of claim 5, wherein in the drilling step, the injection hole repairing the settlement road using a packer capable of adjusting the injection direction, characterized in that formed inclined at an angle of 45 ~ 90 degrees according to the amount of deflection of the settlement road. 제5항 또는 제7항에 있어서, 상기 천공하는 단계에서 도로의 침하부분에 그라우트재 주입 확인을 위한 관측공이 다수개 형성되는 것을 특징으로 하는 주입방향 조절이 가능한 패커를 이용한 침하도로 보수공법.8. The method of claim 5 or 7, wherein the plurality of observation holes for checking the grout material injection is formed in the settlement part of the road in the drilling step, the settlement road repair method using a packer capable of adjusting the injection direction.
KR1020120098084A 2012-09-05 2012-09-05 Packer adjustable of injection direction and repairing method of subsidence road using it KR101222151B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120098084A KR101222151B1 (en) 2012-09-05 2012-09-05 Packer adjustable of injection direction and repairing method of subsidence road using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120098084A KR101222151B1 (en) 2012-09-05 2012-09-05 Packer adjustable of injection direction and repairing method of subsidence road using it

Publications (1)

Publication Number Publication Date
KR101222151B1 true KR101222151B1 (en) 2013-01-14

Family

ID=47841835

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120098084A KR101222151B1 (en) 2012-09-05 2012-09-05 Packer adjustable of injection direction and repairing method of subsidence road using it

Country Status (1)

Country Link
KR (1) KR101222151B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102306338B1 (en) * 2021-02-05 2021-10-01 김경수 A method to excavation and expand underground tunnel for a catchment of a bedrock aquifer and an apparatus to expand underground tunnel for a catchment of a bedrock aquifer

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200183063Y1 (en) 1996-11-08 2000-06-01 주형식 Grouting packer
KR200237601Y1 (en) 2001-04-06 2001-10-11 주식회사 영화종합기술단건축사사무소 Packer for crack repaying of concrete construction

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200183063Y1 (en) 1996-11-08 2000-06-01 주형식 Grouting packer
KR200237601Y1 (en) 2001-04-06 2001-10-11 주식회사 영화종합기술단건축사사무소 Packer for crack repaying of concrete construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102306338B1 (en) * 2021-02-05 2021-10-01 김경수 A method to excavation and expand underground tunnel for a catchment of a bedrock aquifer and an apparatus to expand underground tunnel for a catchment of a bedrock aquifer

Similar Documents

Publication Publication Date Title
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
US20060088388A1 (en) Method and apparatus for providing a rammed aggregate pier
US10844567B2 (en) Soil densification system and method
CN106759223A (en) Controllable rigid pile+displacement hull+reinforcement cushion combined composite foundation
DK2611968T3 (en) PROCEDURE AND APPARATUS FOR PREPARING AN ENLARGED BASE
WO2020248429A1 (en) Method for strengthening and lifting high-rise building having raft foundation
US20170016200A1 (en) Method for Improving an Inwards Stability of a Levee
CN107100160B (en) A kind of construction technology for lower storage reservoir check dam vibro-replacement stone column
CN102605770A (en) Post grouting device for filling pile and construction method
KR101222151B1 (en) Packer adjustable of injection direction and repairing method of subsidence road using it
CN112176947A (en) Bank protection construction method for concave bank line of sludge layer foundation
KR101192270B1 (en) Repairing method of pavement sunken
CN213390195U (en) Foundation structure
CA2922374C (en) Apparatuses for constructing displacement aggregate piers
CN111519603A (en) Device for comprehensively treating uneven settlement of underground buried pipe of soft soil foundation by combination of replacement and filling and grouting and construction method
CN111749198A (en) Channel slab underwater grouting stabilizing and lifting method
CN104153356A (en) Concrete pile construction equipment and method
CN115450262B (en) Working method for setting construction channel on upper part of post-pouring strip of building structure
CN211735376U (en) Steel casing fixing device
CN115492144B (en) Construction method of pipe-jacking open caisson in sand area
CN211227880U (en) Expansive soil limited deformation anti-upwarp foundation structure
CN216865282U (en) A compact slip casting terrace promotes leveling structure for on filling up ground
CN108005078B (en) Column hammer and column hammer rammed pile-expanding composite foundation construction method
CN113202097A (en) Method for reinforcing soft soil foundation in pipe jacking construction
KR20180104270A (en) Jacking Grouting Method by using multi ports

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160120

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170105

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180209

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190117

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20200120

Year of fee payment: 8